Concreting device for a prefabricated segment beam

DE202024106245U1Active Publication Date: 2025-02-20CHINA RAILWAY (GUANGZHOU) INVESTMENT & DEV CO LTD +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
DE202024106245
Authority / Receiving Office
DE · DE
Patent Type
Utility models
Current Assignee / Owner
Priority Date
2023-12-29
Filing Date
2024-10-31
Publication Date
2025-02-20
Estimated Expiration
2034-10-31

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

Concreting device for a prefabricated segment beam, comprising a mold (1) and a concreting pipe (4) arranged above the mold (1) for connection to the pump pipe of a concrete pump truck, characterized in that the concreting device also comprises: a frame (2) which is arranged on an upper part of the form (1); a control unit (3) which is arranged on the frame (2) and is used to adjust the mounting position of the concreting pipe (4) above the mold (1); an adjustment unit (5) which is arranged on the control unit (3) and is used to fix the concreting pipe (4).
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present utility model relates to the technical field of construction, specifically to a concreting device for a prefabricated segmental beam. STATE OF THE ART

[0002] When using the segmental beam technique in bridge construction, the steel cages must first be tied off. The tied steel cages are then supported and fixed by formwork. After the formwork has been fixed, the concreting work can begin.

[0003] The disadvantage of existing equipment is that concrete pouring projects generally use concrete mixers and pouring pipes for concreting, but during the pouring process, operators must hold the pouring pipes to control the pouring position. Manual adjustment cannot ensure that the pouring time is consistent for each concreting area, and it is difficult to ensure that the concrete is poured evenly onto the surface of the building's top. In the later stages, a lot of manual labor is required to smooth the concrete poured onto the building's top, which reduces work efficiency.

[0004] Therefore, in this application, a concreting device for a prefabricated segmental beam is proposed to solve the above-mentioned problems. CONTENTS OF THE PRESENT UTILITY MODEL

[0005] The purpose of this utility model is to provide a concreting device for a precast segmental beam to solve the above problems, which are that it cannot be ensured that the concreting time is constant for each concreting area, and it is difficult to ensure that the concrete is poured evenly on the surface of the building top, and a lot of manual labor is required in the later stage to smooth the concrete poured on the building top.

[0006] To achieve the above-mentioned object, the present utility model provides the following technical solutions: Concreting device for a prefabricated segmental beam, comprising a mold and a concreting pipe arranged above the mold for connection to the pump pipe of a concrete pump truck, the concreting device also comprising: a frame arranged on the upper part of the mold; a control unit which is placed on the frame and used to adjust the mounting position of the concreting pipe above the form; an adjustment unit which is arranged on the control unit and is used to fix the concreting pipe.

[0007] The control unit comprises a slide rail provided on the inside of the frame, a drive part provided on the slide rail for driving the internal components of the slide rail, and fixing blocks arranged on the slide rail and connected to the frame and used to fix the slide rail, the fixing blocks being arranged at intervals on one side of the slide rail.

[0008] The adjustment unit comprises a sliding block arranged inside the sliding rail, a connecting ring arranged on one side of a sliding block, a fixing device provided at the lower part of the connecting ring for positioning the components, a concreting opening for conveying concrete arranged at the lower part of the concreting pipe, and an adjusting device provided at the lower part of the fixing device for smoothing the poured concrete, wherein the concreting pipe is provided through the connecting ring and the sliding rail is provided with a sliding groove at a position corresponding to the sliding block to allow the sliding block to move.

[0009] The fastening device comprises a plurality of connecting rods arranged at intervals on the connecting ring, a fastening ring arranged on a side of the connecting rod facing away from the connecting ring, a mounting frame provided on the outside of the fastening ring, a motor provided on the upper part of the mounting frame for driving the movement of the adjusting device, a rotary shaft provided at the power output of the motor and a positioning rod provided on the upper part of the mounting frame for limiting the adjusting device, wherein the rotary shaft is connected to the adjusting device.

[0010] The adjusting device comprises an adjusting rod connected to the rotary shaft and the positioning rod, an adjusting frame arranged on a side of the adjusting rod facing away from the positioning rod, and a hydraulic cylinder arranged on a side of the adjusting frame facing away from the concreting opening, wherein the lower part of the hydraulic cylinder is provided with a wiping plate for smoothing the poured concrete.

[0011] The concreting opening comprises a connecting hose connected to the concreting pipe and an outlet cover arranged at the lower part of the connecting hose, wherein the outlet cover is arranged on the adjustment frame.

[0012] The frame comprises a fixing clamp plate arranged on the upper part of the mold, a fixing rod arranged on the upper part of the fixing clamp plate and a fixing frame provided on the upper part of the fixing rod for mounting the slide rail, wherein the fixing clamp plate is connected to the mold via fixing screws.

[0013] The mold includes an outer mold, an end mold disposed on both sides of the outer mold, a bottom mold disposed on the bottom of the outer mold and the end mold, and a fixing seat disposed on the bottom of the bottom mold to support the bottom mold, with an inner mold provided inside the outer mold.

[0014] Compared with the prior art, the advantageous effects of the present utility model are: In this utility model, the concrete pump truck moves to one side of the mold that needs to be poured. Then, the pump pipe is connected to the concreting pipe. After the steel rod is laid, concrete is poured into the mold. Then, the operating unit is started, and the adjusting unit will drive the concreting pipe to run on the operating unit and pour concrete evenly into the mold. After the concrete pouring is completed, the components of the adjusting unit can smooth the top of the concrete, thereby reducing the subsequent operations that require workers to perform concrete smoothing alone and reducing the labor intensity of the workers. The entire concreting device can inject concrete evenly, ensuring uniform concreting time in each concreting area and improving the flatness of the top of the precast beam. BRIEF DESCRIPTION OF THE DRAWINGS Fig. 1 is a schematic diagram of a main structure in an embodiment of the present utility model; Fig. 2 is a schematic structural plan view in an embodiment of the present utility model; Fig. 3 is a schematic structural side view in an embodiment of the present utility model; Fig. 4 is a schematic structural internal view of a mold in an embodiment of the present utility model; Fig. 5 is a schematic structural internal view of a slide rail in an embodiment of the present utility model; Fig. 6 is a schematic structural diagram for a connection between the concreting pipe and the connecting hose in an embodiment of the present utility model; Fig. 7 is a schematic structural diagram of the adjustment unit in an embodiment of the present utility model; Fig. 8 is a schematic structural exploded view of the adjustment unit in an embodiment of the present utility model.

[0015] In the drawings: 1. Mold; 11. Outer mold; 12. End mold; 13. Bottom mold; 14. Fixing seat; 15. Inner mold; 2. Frame; 21. Fixing clamp plate; 22. Fixing screw; 23. Fixing rod; 24. Fixing frame; 3. Operating unit; 31. Slide rail; 32. Driving part; 33. Slide groove, 34. Fixing block; 4. Concreting pipe; 5. Adjusting unit; 51. Slide block; 52. Connecting ring; 53. Fixing device; 531. Fixing ring; 532. Connecting rod; 533. Mounting frame; 534. Positioning rod; 535. Motor; 536. Rotating shaft; 54. Concreting opening; 541. Connecting hose; 542. Outlet cover; 55. Adjusting device; 551. Adjusting frame; 552. Adjusting rod; 553. Hydraulic cylinder; 554. Wiper plate. DETAILED DESCRIPTION

[0016] In the following, the technical solutions in the embodiments of the present utility model are described clearly and completely with reference to the drawings. Obviously, the described embodiments are only some of the embodiments of the present utility model, not all of them. All other embodiments that a person skilled in the art can derive from the embodiments in the present utility model without creative effort are within the scope of protection of the present utility model.

[0017] With reference to Fig.1-8, the present utility model provides a technical solution: concreting device for a prefabricated segmental beam, comprising a mold 1 and a concreting pipe 4 arranged above the mold 1 for connection to the pump pipe of a concrete pump truck, the concreting device also comprising: a frame 2 arranged at an upper part of the mold 1;

[0031] an operating unit 3 arranged on the frame 2 and used to adjust the mounting position of the concreting pipe 4 above the mold 1; an adjustment unit 5, which is arranged on the operating unit 3 and is used to fix the concreting pipe 4.

[0018] It should be noted that when working, the concrete pump truck moves to the side of the mold 1 to be poured, then the pump pipe is connected to the concreting pipe 4, and after laying the steel rod, concrete is poured into the mold 1, then the operating unit 3 is started and the adjusting unit 5 will drive the concreting pipe 4 so that it runs on the operating unit 3 and pours concrete evenly into the inside of the mold 1. After the concrete pouring is completed, the components of the adjusting unit 5 can smooth the upper part of the concrete, thereby reducing the subsequent work steps that the personnel need to perform concrete smoothing alone and reducing the labor intensity of the personnel, and the entire concreting device can inject concrete evenly, so as to ensure uniform concreting time in each concreting area and improve the flatness of the top of the precast beam.

[0019] In one embodiment, the operating unit 3 comprises a slide rail 31 provided on the inside of the frame 2, a drive part 32 provided on the slide rail 31 for driving the internal components of the slide rail 31 and fastening blocks 34 which are arranged on the slide rail 31 and are connected to the frame 2 and are used to fasten the slide rail 31, wherein the fastening blocks 34 are arranged at intervals on one side of the slide rail 31.

[0020] In this structure, the drive part 32 is activated to move the internal transmission members of the slide rail 31, so that the transmission members drive the adjusting unit 5 to move the adjusting unit at a constant speed on the slide rail 31, then the concreting pipe 4 drives the pump pipe to pour the pump pipe evenly over the mold 1, so that the concrete stays in each concreting area for the same time, thereby achieving the effect of evenly supplying the inside of the mold 1, wherein the fixing block 34 is arranged on one side of the frame 2 to avoid blocking the travel path of the adjusting unit 5, which makes it easier for the adjusting unit 5 to travel above the mold 1 in different concreting areas and improves the efficiency of concrete pouring.

[0021] In one embodiment, the adjustment unit 5 comprises a sliding block 51 arranged within the sliding rail 31, a connecting ring 52 arranged on one side of a sliding block 51, a fastening device 53 provided on the lower part of the connecting ring 52 for positioning the components, a concreting opening 54 for conveying concrete, which is arranged on the lower part of the concreting pipe 4, and an adjusting device 55 provided on the lower part of the fastening device 53 for smoothing the poured concrete, wherein the concreting pipe 4 is provided so as to penetrate the connecting ring 52 and the sliding rail 31 is provided with a sliding groove 33 at a position corresponding to the sliding block 51 so that the sliding block 51 can move.

[0022] In this structure, the slide block 51 moves on the slide rail 31, so that the connecting ring 52 drives the concreting pipe 4 to run along the track of the slide rail 31, so that the concreting port 54 can pour equal amounts of concrete at a uniform speed in each concreting area. When the concrete pouring in the mold 1 is completed, the fixing device 53 drives the adjusting device 55 to move on the upper part of the concrete. The adjusting device 55 is used to smooth the concrete, eliminating the need for personnel to stand above the mold 1 to smooth the top of the precast beam, reducing the labor intensity of the personnel and improving construction safety.

[0023] In one embodiment, the fastening device 53 comprises a plurality of connecting rods 532 arranged at intervals on the connecting ring 52, a fastening ring 531 arranged on a side of the connecting rod 532 facing away from the connecting ring 52, a mounting frame 533 provided on the outside of the fastening ring 531, a motor 535 provided on the upper part of the mounting frame 533 for driving the movement of the adjusting device 55, a rotary shaft 536 provided at the power output of the motor 535 and a positioning rod 534 provided on the upper part of the mounting frame 533 for limiting the adjusting device 55, wherein the rotary shaft 536 is connected to the adjusting device 55.

[0024] In this construction, the motor 535 drives the rotating shaft 536 to rotate, so that the rotating shaft 536 drives the adjusting device 55 to reciprocate below the fixing ring 531, thereby smoothing the poured concrete.

[0025] In one embodiment, the adjustment device 55 comprises an adjustment rod 552 connected to the rotary shaft 536 and the positioning rod 534, an adjustment frame 551 arranged on a side of the adjustment rod 552 facing away from the positioning rod 534, and a hydraulic cylinder 553 arranged on a side of the adjustment frame 551 facing away from the concreting opening 54, wherein the lower part of the hydraulic cylinder 553 is provided with a wiping plate 554 for smoothing the poured concrete.

[0026] In this structure, the side of the adjusting rod 552 connected to the rotating shaft 536 is fixed to the rotating shaft 536, and the motor 535 drives the adjusting rod 552 to rotate along the rotating shaft 536, and then drives the adjusting frame 551 to swing the adjusting frame back and forth in a circular manner below the fixing ring 531, and the hydraulic cylinder 553 drives the wiping plate 554 to move downward and contact the top surface of the concrete, and driven by the adjusting frame 551, the wiping plate 554 scrapes the top surface of the concrete flat.

[0027] In one embodiment, the concreting opening 54 comprises a connecting hose 541 connected to the concreting pipe 4 and an outlet cover 542 arranged on the lower part of the connecting hose 541, wherein the outlet cover 542 is arranged on the adjustment frame 551.

[0028] With this construction, the connecting hose 541 can facilitate the movement of the outlet cover 542 together with the adjustment frame 551 when the motor 535 drives the adjustment frame 551.

[0029] In one embodiment, the frame 2 comprises a fastening clamp plate 21 arranged on the upper part of the mold 1, a fastening rod 23 arranged on the upper part of the fastening clamp plate 21 and a fastening frame 24 which is provided on the upper part of the fastening rod 23 for mounting the slide rail 31, wherein the fastening clamp plate 21 is connected to the mold 1 via fastening screws 22.

[0030] In this construction, the fixing clamp plate 21 is clamped to the upper part of the mold 1, and then the fixing clamp plate 21 and the mold 1 are fixed by the fixing screws 22, then the slide rail 31 is fixed inside the fixing frame 24, so that the concreting pipe 4 can run inside the fixing frame 24 and concreting work for the mold 1 is performed.

[0031] In one embodiment, the mold 1 comprises an outer mold 11, an end mold 12 arranged on both sides of the outer mold 11, a bottom mold 13 arranged on the underside of the outer mold 11 and the end mold 12, and a mounting seat 14 arranged on the underside of the bottom mold 13 to support the bottom mold 13, wherein an inner mold 15 is provided inside the outer mold 11.

[0032] In this structure, the bottom mold 13 is fixed on the fixing seat 14, and then the outer mold 11 is fixed on the bottom mold 13, and then the inner mold 15 is mounted on the end mold 12, and finally the end mold 12 and the outer mold 11 are fixed to complete the assembly of the whole mold 1, then the steel bars are incorporated into the mold 1 and the concrete pouring is carried out to complete the concreting work of the precast segmental beam.

[0033] In summary, the utility model discloses a concreting device for the prefabricated segmental beam in the field of construction, comprising a mold and a concreting pipe arranged above the mold for connection to the pump pipe of a concrete pump truck, the concreting device also comprising: a frame arranged on the upper part of the mold; an operating unit arranged on the frame and used to adjust the mounting position of the concreting pipe above the mold; and an adjusting unit arranged on the operating unit and used to fix the concreting pipe.The components on the adjustment unit of the present utility model can smooth the upper part of the concrete, thereby reducing the subsequent work steps in which the personnel have to perform the concrete smoothing alone and reducing the labor intensity of the personnel, and the entire concreting device can inject concrete evenly to ensure a uniform concreting time in each concreting area and improve the flatness of the top of the precast beam.

Claims

[1] Concreting device for a prefabricated segmental beam, comprising a mold (1) and a concreting pipe (4) arranged above the mold (1) for connection to the pump pipe of a concrete pump truck, characterized by that the concreting device also includes: a frame (2) arranged on an upper part of the mold (1); an operating unit (3) which is arranged on the frame (2) and is used to adjust the mounting position of the concreting pipe (4) above the mold (1); an adjustment unit (5) which is arranged on the operating unit (3) and is used to fix the concreting pipe (4). [2] Concreting device for the prefabricated segmental beam according to claim 1, characterized byin that the operating unit (3) comprises a slide rail (31) provided on the inside of the frame (2), a drive part (32) provided on the slide rail (31) for driving the internal components of the slide rail (31) and fastening blocks (34) which are arranged on the slide rail (31) and are connected to the frame (2) and are used to fasten the slide rail (31), wherein the fastening blocks (34) are arranged at intervals on one side of the slide rail (31). [3] Concreting device for the prefabricated segmental beam according to claim 2, characterized byin that the adjustment unit (5) comprises a sliding block (51) arranged inside the sliding rail (31), a connecting ring (52) arranged on one side of a sliding block (51), a fastening device (53) provided on the lower part of the connecting ring (52) for positioning the components, a concreting opening (54) for conveying concrete, which is arranged on the lower part of the concreting pipe (4), and an adjustment device (55) provided on the lower part of the fastening device (53) for smoothing the poured concrete, wherein the concreting pipe (4) is provided so as to penetrate the connecting ring (52) and the sliding rail (31) is provided with a sliding groove (33) at a position corresponding to the sliding block (51) so that the sliding block (51) can move. [4] Concreting device for the prefabricated segmental beam according to claim 3, characterized byin that the fastening device (53) comprises a plurality of connecting rods (532) arranged at intervals on the connecting ring (52), a fastening ring (531) arranged on a side of the connecting rod (532) facing away from the connecting ring (52), a mounting frame (533) provided on the outside of the fastening ring (531), a motor (535) provided on the upper part of the mounting frame (533) for driving the movement of the adjusting device (55), a rotary shaft (536) provided at the power output of the motor (535), and a positioning rod (534) provided on the upper part of the mounting frame (533) for limiting the adjusting device (55), wherein the rotary shaft (536) is connected to the adjusting device (55). [5] Concreting device for the prefabricated segmental beam according to claim 4, characterized byin that the adjusting device (55) comprises an adjusting rod (552) connected to the rotary shaft (536) and the positioning rod (534), an adjusting frame (551) arranged on a side of the adjusting rod (552) facing away from the positioning rod (534), and a hydraulic cylinder (553) arranged on a side of the adjusting frame (551) facing away from the concreting opening (54), wherein the lower part of the hydraulic cylinder (553) is provided with a wiping plate (554) for smoothing the poured concrete. [6] Concreting device for the prefabricated segmental beam according to claim 5, characterized by in that the concreting opening (54) comprises a connecting hose (541) connected to the concreting pipe (4) and an outlet cover (542) arranged on the lower part of the connecting hose (541), wherein the outlet cover (542) is arranged on the adjustment frame (551). [7] Concreting device for the prefabricated segmental beam according to claim 2, characterized by in that the frame (2) comprises a fastening clamping plate (21) arranged on the upper part of the mold (1), a fastening rod (23) arranged on the upper part of the fastening clamping plate (21) and a fastening frame (24) which is provided on the upper part of the fastening rod (23) for mounting the slide rail (31), wherein the fastening clamping plate (21) is connected to the mold (1) via fastening screws (22). [8] Concreting device for the prefabricated segmental beam according to claim 1, characterized by that the mold (1) comprises an outer mold (11), an end mold (12) arranged on both sides of the outer mold (11), a bottom mold (13) arranged on the underside of the outer mold (11) and the end mold (12), and a fastening seat (14) arranged on the underside of the bottom mold (13) to support the bottom mold (13), wherein an inner mold (15) is provided inside the outer mold (11).