Tool for the in situ construction of a sandwich wall, and method applying same

The tooling system addresses the challenges of maintaining and adjusting reinforcement in sandwich wall production by using a dagger and lock mechanism, ensuring the insulating panel and reinforcement remain in place during concrete pouring, resulting in enhanced mechanical resistance and retention characteristics.

EP3697981B1Active Publication Date: 2024-11-27GBE
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
EP2018797017
Authority / Receiving Office
EP · EP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2017-10-19
Filing Date
2018-10-16
Publication Date
2024-11-27
Estimated Expiration
2038-10-16

AI Technical Summary

Technical Problem

Existing methods for in situ production of sandwich walls with concrete walls separated by a thermal insulation panel face challenges such as lifting of the insulating panel during concrete pouring and difficulty in maintaining and adjusting structural reinforcement for enhanced mechanical strength.

Method used

A tooling system comprising a positioning system with a dagger and lock mechanism, allowing for the adjustment and securement of reinforcement relative to the insulating panel, ensuring it remains in place during concrete pouring, and adaptable to various reinforcement sizes and positions.

Benefits of technology

The system effectively maintains the insulating panel and reinforcement in position, allowing for the production of walls with improved mechanical resistance and retention characteristics, adaptable to different reinforcement sizes and positions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure IMGF0001
    Figure IMGF0001
  • Figure IMGF0002
    Figure IMGF0002
  • Figure IMGF0003
    Figure IMGF0003
Patent Text Reader

Abstract

The invention relates to a tool for the construction of a wall (1) with two concrete wall sections (2, 3), between which at least one insulating panel (4) is entrapped. This tool comprises at least one system (8) for positioning the insulating panel (4) that is composed, on the one hand, of a dagger (10) having a stem (12) provided with a bearing stop (13) and, on the other hand, of a lock (11) provided with a counter-stop (16). The lock is provided with at least two notches (17) for receiving a first reinforcement (51), said notches being arranged locally on the circumference of the positioning system, extending set back from the first end of the stem, being delimited on either side by retaining stops spaced apart so as to retain the first reinforcement (51) in position, defining a housing with a profile converging in an opposite direction to their opening, and arranged along the length of the positioning system (8) so as to be able to adjust the position of the first reinforcement (51) along the length of the positioning system (8).
Need to check novelty before this filing date? Find Prior Art

Description

[0001] The present invention relates to the field of construction of building walls or structures in the general sense and more specifically aims at the in situ and simultaneous construction of two concrete walls separated by a thermal insulation panel.

[0002] In the state of the art, the various advantages of constructing sandwich walls, comprising two concrete walls separated by an insulating panel, are known, particularly in terms of thermal insulation. The state of the art has proposed various technical solutions for the in situ construction of such sandwich walls incorporating thermal insulation.

[0003] For example, European patent application 0 073 553 describes a device and a method for producing a wall comprising two parallel vertical concrete walls between which an insulating panel is trapped. The two concrete walls are produced simultaneously or substantially simultaneously by pouring concrete between the insulating panel and two parallel formwork. The insulating panel is centered between the formwork before the concrete is poured, using positioning systems passing through the insulating panel and bearing on the internal faces of the two formwork. The formwork is held in position using assembly devices arranged outside the wall to be produced. The assembly devices are thus removed after the concrete has solidified while the positioning systems remain trapped in the wall thus produced.

[0004] The implementation of this technique has a major drawback linked to the phenomenon of lifting of the insulating panel which appears during the in situ concrete pouring operation. Another drawback concerns the difficulty of implementing such a process when integrating structural reinforcement into concrete walls in the case where the erected wall must have good resistance or mechanical strength characteristics. The device described does not allow the reinforcement to be held in position during the concrete pouring stage, nor does it allow its positioning to be adjusted beforehand.

[0005] In the same sense, document US 2005 / 0108985 describes a device and a method for producing a wall comprising two parallel vertical concrete walls between which an insulating panel is inserted. The insulating panel is held between two formworks, before the concrete is poured, using systems for positioning the insulating panel and assembling the formworks. Each positioning and assembly system comprises a rod passing through the insulating panel so that each threaded end of the rod is intended to receive a tapped sleeve ensuring the assembly of the formworks. Each formwork rests by its internal face on a ring inserted on a sleeve and resting on the insulating panel or on the reinforcement inserted between the insulating panel and a formwork.

[0006] Such a process presents a major difficulty for the installation of the various components of the positioning and assembly systems. Furthermore, the device requires a stop assembly between the insulating panel and the reinforcement, and therefore does not allow effective maintenance of the reinforcement. In addition, this device does not allow adjustment of the position of the reinforcement. Finally, it turns out that such a process does not allow for obtaining a wall with good mechanical resistance and retention characteristics from one wall to another.

[0007] In order to overcome the drawbacks of the state of the art, the Applicant has previously described in application WO 2011 / 107696 a tool and a method for the in situ production of a vertical sandwich wall with two concrete walls separated by an insulating panel allowing the integration of reinforcement in the concrete walls. This tool comprises systems for positioning the insulating panel between the formwork, as well as devices for assembling the formwork together. The positioning systems each comprise, on the one hand, a dagger having a rod provided with a support stop and, on the other hand, a lock provided with a counter-stop and an angularly adjustable hook adapted to cooperate with reinforcement. The assembly devices each comprise a tubular spacer crossed internally by a clamping rod provided at each end with a clamping member.

[0008] This tool has the advantage of holding the insulating panel in position during the concrete pouring operation. However, in certain implementation conditions, maintaining the reinforcement during the concrete pouring does not seem sufficient. In addition, this tool does not offer the possibility of adjusting the position of the reinforcement in relation to the insulating panel. In addition, this tool only allows for the maintenance of a single reinforcement.

[0009] Also known from document US 5,996,297 is a tool and a method for producing a wall with two concrete walls comprising a reinforcing material between which an insulating panel is trapped. This tool consists of a rod provided at one of its ends with hooks and at the other end with notches, in order to hold a reinforcing material.

[0010] This tooling has the disadvantage of only being able to cooperate with a reinforcing material having a size corresponding to that of the hooks, and of not being able to adapt to materials having varied sizes. In addition, the position of the reinforcing material is determined by the position of the hooks and cannot be adjusted during the construction of the wall. In other words, the reinforcing material must adapt to the tooling as described in this document.

[0011] The present invention therefore aims to overcome the drawbacks of the prior art, by proposing a tool according to claim 1 and a method according to claim 10 for producing a wall with two concrete walls between which an insulating panel is trapped. The tool and the method according to the invention allow the integration of at least one reinforcement in the walls of the concrete, while ensuring that the insulating panel and the reinforcement(s) are held in position during the concrete pouring operation. Advantageously, the tool makes it possible to adjust the position of the reinforcement(s) relative to the insulating panel, while maintaining them in position. In other words, the position of the reinforcement(s) can be adjusted using the tool according to the invention, which guarantees a margin in the positioning of the reinforcement(s).Advantageously, the tooling is suitable for holding reinforcements of different dimensions (for example, more or less thick) in position. The tooling according to the invention is therefore suitable for the installation conditions, and in particular for the different reinforcements that can be used, both due to their positioning and their size.

[0012] Another object of the invention is to propose a method for producing a sandwich wall making it possible to obtain good mechanical resistance characteristics, and in particular the retention of one wall by the other wall. Advantageously, the method according to the invention is simple to implement, and in particular allows the reinforcement(s) to be held in position in an easy manner and adjustable to the position and size of the reinforcements chosen.

[0013] To achieve such an objective, the subject of the invention relates to a tool for producing a wall with two concrete walls between which at least one insulating panel is trapped. This tool comprises at least one system for positioning the insulating panel composed, on the one hand, of a dagger having a rod provided with a support stop and, on the other hand, of a lock provided with a counter-stop. Said rod has a first end intended to be in contact with a first formwork and a second end intended to be in contact with a second formwork, so that the distance between the first and the second end is equal to the thickness of the wall.The lock is provided with at least two notches for receiving a first reinforcement, arranged locally on the circumference of the positioning system, extending back from the first end of the rod, delimited on either side by holding stops spaced apart so as to hold the first reinforcement in position, defining a housing with a converging profile in the opposite direction of their opening, and arranged along the length of the positioning system so as to be able to adjust the position of the first reinforcement according to the length of the positioning system. The housing with a converging profile in the opposite direction of the opening of the notches allows the tool to adapt to the reinforcement, and in particular to different sizes of reinforcement.

[0014] The tooling according to the invention may also have, in combination, one or more of the following additional characteristics: the holding stop(s) comprise a locking notch at the opening of the notch; the positioning system comprises a first hook extending radially back from the first end of the rod, and delimiting a first holding stop; the notches are of identical or different heights; the positioning system comprises a second hook, angularly orientable and extending back from the second end of the rod, in order to hold a second reinforcement in position; the distance between the support stop and the counter-stop, possibly in the presence of one or more compensation washers, is equal to the thickness of the insulation; the tooling comprises devices for assembling the formwork together, each comprising a tubular spacer crossed inside by a clamping rod provided at each end with a clamping member; the dagger comprises assembly means between the lock and the dagger;the assembly means between the lock and the dagger comprise at least one lug arranged on the stem of the dagger and cooperating with a housing arranged on the lock after rotation of the latter; the assembly means between the lock and the dagger are of the irreversible or repositionable type.;

[0015] Another object of the invention concerns the implementation of the tooling according to the invention for the construction of a wall with two concrete walls between which is trapped at least one insulating panel and comprising at least one reinforcement. The tooling according to the invention makes it possible to adjust the positioning of the reinforcement whatever its size.

[0016] The invention relates to a method for producing a wall with two concrete walls, between which at least one insulating panel is trapped, the walls being produced simultaneously or substantially simultaneously by pouring concrete between the insulating panel and a first formwork on the one hand, and between the insulating panel and a second formwork on the other hand, the formworks being arranged on either side of the insulating panel, a first reinforcement being put in place on the side of the internal face of the first formwork, the insulating panel being held between the two formworks, before the concrete is poured, using positioning systems passing through the insulating panel and bearing on the internal faces of the formworks. The positioning system is composed, on the one hand, of a dagger having a rod provided with a support stop and, on the other hand, of a lock provided with a counter-stop. The method according to the invention comprises: the installation on each insulating panel before their positioning, of positioning systems each comprising at least two notches for receiving the first reinforcement, delimited on either side by holding stops spaced apart so as to hold the first reinforcement in position, extending back from a first end of the rod, defining a housing with a convergent profile in the opposite direction of its opening and arranged along the length of the positioning system; the installation of each insulating panel with passage through the first reinforcement, of the positioning systems, with possible rotation of said systems to ensure the engagement of the first reinforcement in the notches, and the adjustment of the positioning of the first reinforcement thanks to the presence of at least two receiving notches.

[0017] In addition, the method according to the invention may further have in combination at least one and / or other of the following additional characteristics: installing a second reinforcement on the side of the internal face of the second formwork, with possible rotation for the passage of at least one hook which can be oriented angularly and extends back from a second end of the rod and their assembly with said second reinforcement, installing, on each insulating panel, the positioning systems by threading the rod of a dagger up to a support stop, a lock provided with at least one notch being assembled on the rod protruding from the insulating panel, when a counter-stop carried by the lock is in abutment against the insulating panel, possibly in the presence of one or more compensation washers, holding the two forms in position using assembly devices by installing, for each assembly device, before positioning the second formwork, a tubular spacer passing through the insulating panel and after positioning the second formwork,bearing tightly on the internal faces of the formwork, each tubular spacer being crossed by a clamping rod extending outside the formwork to receive a clamping member at each end.

[0018] Various other characteristics emerge from the description given below with reference to the appended drawings which show, by way of non-limiting examples, embodiments of the subject of the invention. There Figure 1 is a perspective view showing a wall in accordance with the invention produced by the method in accordance with the invention. The Figure 2 is a side view of a positioning system according to the invention. The Figure 3 is a perspective view of an embodiment of the lock of a positioning system according to the invention. The Figure 4 is a perspective view illustrating a dagger of a positioning system according to the invention. The Figure 5 is a perspective view showing an exemplary embodiment of an assembly device according to the invention. The Figures 6A à 6G illustrate successive steps of a method of manufacturing a wall in accordance with the invention. The Figure 7 is a perspective view showing the assembly of a positioning system through reinforcements.

[0019] As more precisely shown in the Fig. 1 , the subject of the invention concerns a method for creating a wall 1 with two concrete walls 2 , 3 , between which at least one insulating panel is trapped 4 . The wall 1 thus includes a first concrete wall 2 , and a second concrete wall 3 on either side of the insulating panel 4 . In the example illustrated in Fig. 1 , the two concrete walls 2 , 3are vertical and substantially parallel. This embodiment is nevertheless not limiting and the walls 2 , 3 are not necessarily vertical and / or substantially parallel.

[0020] The insulating panel 4 is made of any thermal insulation material, such as polystyrene.

[0021] The walls 2 , 3 are carried out simultaneously or substantially simultaneously, by pouring concrete in situ between the insulating panel 4 and a first bench 6 on the one hand, and between the insulating panel 4 and a second bench 7 on the other hand. The benches 6 , 7 are arranged on either side of the insulating panel 4 and at a distance from it. The benches 6 , 7 are either internal or external benches. The first bench 6 extends facing a first face4 1 of the insulating panel 4 , parallel or not to it, and at a determined distance from the latter corresponding to the thickness of the first wall 2 , while the second bench 7 extends facing the external face 4 2 of the insulating panel 4 , parallel or not to it, and at a determined distance from the latter corresponding to the thickness of the second wall 3 .

[0022] The first wall 2 incorporates reinforcement, called first reinforcement 5 1 , of any type known per se. The first reinforcement 5 1 can be achieved by one or more meshes or reinforcements placed before pouring the concrete, between the insulating panel 4 and the first bench 6.

[0023] According to a preferred embodiment feature, the second wall 3 also incorporates reinforcement, called second reinforcement5 2 , of any known type, placed before pouring the concrete, between the insulating panel 4 and the second bench 7. The two reinforcements 5 1 And 5 2 may be identical or different, and are advantageously of the same nature.

[0024] The method according to the invention is implemented using suitable tools comprising positioning systems 8 allowing the insulating panel to be maintained 4 and reinforcement 5 between the benches 6 , 7 and possibly assembly devices 9 benches 6 , 7 between them, independent of the positioning systems 8.

[0025] Each positioning system 8 includes in the example embodiment illustrated in Fig. 2 à 4 And 6 , a first piece such as a dagger 10on which a second part such as a lock is intended to be assembled 11.

[0026] The dagger 10 has a stem 12 intended to be inserted through the insulating panel 4 from one of the faces 4 1 , 4 2 of the insulating panel 4. The stem 12 has a first end 12 1 extending away from a second end 12 2 . The stem 12 is intended to come into support by its ends 12 1 , 12 2 , against the internal faces of the benches 6 , 7. The stem 12 has a length equal to the thickness of the wall 1 produced. According to a preferred embodiment, the rod 12 may have, from one, and preferably from both of its ends, pre-cut or predefined sectionable parts allowing the length of the rod to be adjusted 12 to the thickness of the wall1 to be made. According to another variant of realization, a family of daggers can be made 10 comprising stems 12 of different lengths, thus allowing walls of different thicknesses to be created.

[0027] The stem 12 is provided with a support stop 13 placed near the second end 12 2 to come into contact with the second face 4 2 of the insulating panel 4. For example, the support stop 13 is made in the form of a disc extending transversely to the stem 12. This support stop 13 is far from the second end 12 2 of the stem 12 at a distance corresponding to the thickness of the second wall 3. Adjusting the length of the rod 12 from the second end 12 2 allows to adapt to the thickness of the second wall 3.

[0028] The width between the second end 12 2 of the stem 12 and the second side 4 2 of the insulating panel 4 can be adjusted using one or more washers threaded onto the rod 12 from the first end 12 1 , until it comes into contact with the support stop 13. The installation of these washers allows the support for the insulating panel to be moved away 4 relative to the second end 12 2 . Preferably, the stem 12 present from the support stop 13 , longitudinal grooves arranged on the periphery of the rod 12 to the first end 12 1 which has a beveled shape to facilitate passage through the insulating panel 4.

[0029] The lock 11 comes in the form of a tubular sleeve 15 intended to be threaded onto the rod 12from its first end 12 1 . This tubular sleeve 15 is provided with a counter-stop 16 intended to rest on the first face 4 1 of the insulating panel 4. In the example shown, the counter-stop 16 is in the form of a disc extending transversely or radially from the proximal end of the tubular sleeve 15.

[0030] The lock 11 also includes a first hook 14 extending radially back from the first end 12 1 of the stem 12 , and for example from the distal end of the tubular sleeve 15 , as shown in the Fig. 2 . In the illustrated embodiment, the first hook 14comes in the form of a plate of approximately rectangular shape, with a limited angular width of around ten degrees, extending perpendicular to the stem 12 and protruding from the tubular sleeve 15.

[0031] The lock 11 also has at least two notches 17 , or groove or notch, for receiving a first reinforcement 5 1 , adapted to cooperate with the first reinforcement 5 1 . The notches 17 are delimited on either side by stops 18 holding, spaced apart so as to hold and lock the first reinforcement in position 5 1 The notches are made locally on the circumference of the tubular sleeve. 15 of the positioning system 8 and extend back from the first end 12 1 of the stem 12.

[0032] More precisely, the lock 11has at least one notch 17 1 delimited on either side by two retaining stops 18 1 And 18 2 , respectively delimited by the sides of the first hook 14 and a first wing or spine 19 1 . The first wing or spine 19 1 is arranged locally on the circumference of the tubular sleeve 15 of the positioning system 8 , and extends radially back from the first hook 14 depending on the length of the positioning system 8 , one behind the other.

[0033] Advantageously, each notch 17 defines a housing for the first reinforcement 5 1 , with a profile which, depending on the length of the positioning system 8 , is convergent in the opposite direction of its opening. In other words, each notch 17has a triangular-shaped housing. This geometry allows each notch to cooperate with reinforcements of different sizes.

[0034] The first stop 18 1 holding is advantageously substantially perpendicular to the rod 12. The second stop 18 2 holding is advantageously oblique to the rod 12 facing the first hook 14. This geometry advantageously makes it possible to optimize the blocking in position of the first reinforcement 5 1 during the concrete pouring operation.

[0035] The lock 11 may have several notches 17 reception, and in particular two, three or four, arranged one behind the other along the length of the tubular sleeve 15 by the incorporation of wings or spines 19. According to a particular embodiment shown in Fig. 2 And 3, the lock 11 has two notches 17 reception of a first reinforcement 5 1 , thanks to the presence of the first hook 14 and two wings 19 1 And 19 2 .

[0036] The notches 17 reception areas are arranged according to the length of the positioning system 8. It is then possible to adjust the position of the first reinforcement 5 1 , thanks to the choice of notch 17 in which the first reinforcement will be maintained 5 1 . The different notches may be of the same or different dimensions, and in particular of the same or different height. The wings or spines 19 are preferably triangular in shape, as is notably illustrated in the exemplary embodiment of the Fig. 2 .

[0037] The wings or spines 19 as well as the first hook 14have a locking notch 20 at the opening of the notch, in order to avoid any movement of the reinforcement during the concrete pouring operation. More precisely, each notch 17 has a locking notch 20 on one of the stops delimiting it, and preferably on the end of the stop corresponding to the opening of the notch. Each locking notch is preferably located on a stop 18 holding obliquely relative to the rod 12 and oriented towards the first hook 14.

[0038] According to one embodiment, the dagger 10 has a second hook 21 suitable for cooperating with a second reinforcement 5 2 . The second hook 21 thus extends radially back from the second end 12 2 of the stem 12, and for example from the support stop 13 as represented in the Fig. 4 .In the illustrated embodiment, the second hook 21 comes in the form of a plate of approximately rectangular shape, with a limited angular width of around ten degrees, and extends outward from the stem 12. The second hook 21 is angularly adjustable, and thus allows the second reinforcement to be held in position 5 2 during the concrete pouring operation.

[0039] The lock 11 and the dagger 10 include assembly means for securing the lock 11 on the stem 12 in a fixed position along the stem 12, so that the support stop 13 and the counter-thrust 16 are respectively supported on the faces 4 1 , 4 2 of the insulating panel 4. In the example embodiment illustrated in Fig. 3 et 4 , the assembly means comprise at least one lug22 carried by the stem 12 and intended to cooperate with at least one additional accommodation 23 fitted on the tubular sleeve 15. The accommodation 23 opens laterally into a groove 24 fitted in the tubular sleeve 15 to the proximal end of the tubular sleeve 15. In other words, the groove 24 opens into the accommodation 23 which presents an angularly offset shape, complementary to the lug 22 to ensure its translational locking along the axis of the rod 12.

[0040] The spur 22 is positioned on the stem 12 so that in a position of cooperation with the accommodation 23 of the lock 11, the distance between the support stop 13 and the counter-thrust 16 correspond to the thickness of the insulating panel 4.According to a preferred embodiment, the assembly means are adapted to allow the distance between the support stop 13 and counter-butted 16. According to this embodiment, the rod 12 is equipped with a series of lugs 22 distributed along the length of the stem 12 to match various classic thicknesses of insulation panel 4. These spurs 22 are equally distributed angularly on the periphery of the stem 12 so that each one can enter a groove 24 corresponding fitted on the lock 11. The lock 11 thus has as many grooves 24 and housing 23 that many spurs 22, these grooves 24 being angularly offset from each other by a value equal to the angular offset presented by the lugs 22 on the stem 12. This dagger 10 and this lock11 allow them to be used for various thicknesses of the insulation panel 4 by choosing the cooperation of the appropriate lug with its corresponding housing.

[0041] In practice, the lock 11 is engaged on the rod 12 by engaging the tubular sleeve 15 by its proximal end from the first end 12 1 of the stem 12, while making each groove angularly coincide 24 with a spur 22. The lock 11 is slid towards the support stop 13 until it comes to rest against the first face 4 1 of the insulating panel 4. In this position, at least one spur 22 opens into a dwelling 23 so that a relative rotation between the lock 11 and the stem 12 leads to blockage of the spur 22 in the accommodation 23complementary, thus preventing any translational or sliding movement of the lock 11 on the stem 12. In this position, the insulating panel 4 is equipped with one or more positioning systems 8.

[0042] The means of assembly 22, 23, 24 between the lock 11 and the dagger 10 are irreversible or repositionable.

[0043] When the means of assembly 22, 23, 24 between the lock 11 and the dagger 10 are of irreversible type, means of irreversibility 25 prohibit relative rotation in an opposite direction between the lock 11 and the stem 12 after assembly between the lock 11 and the dagger 10 obtained as a result of the relative rotation between the lock 11 and the stem 12. These means of irreversibility 25allow effective locking in position between the lock 11 and the stem 12. For example, these means of irreversibility 25 are made by elastically deformable fingers adapted to be deformed by the lugs 22 during the rotational movement of the lugs 22 bringing them into the accommodations 23. When the deformable fingers are no longer stressed by the spurs 22, these return to their initial position ensuring the locking of the lugs 22 inside the accommodations 23, preventing their rotation in a direction leading to their exit from the housings 23.

[0044] There Fig. 5 illustrates an example of the realization of an assembly device 9 in accordance with the invention, comprising a tubular spacer 26 internally delimiting a bore 27. This tubular spacer 26is intended to penetrate the insulating panel 4, from its second side 4 2 and to come to bear against the internal faces of the formwork 6, 7. The tubular spacer 26 present in relation to its direction of penetration into the insulating panel 4, a downstream end 26 1 and an upstream end 26 2 . The tubular spacer 26 is externally equipped with sharp or cutting elements 28 suitable for cutting the insulating panel 4 when mounting the tubular spacer 26 in the insulating panel 4 by a rotational movement of the tubular spacer 26. For example, sharp elements 28 are distributed in a helix or according to a screw thread facilitating its penetration into the insulating panel 4 engaged at its downstream end 26 1 .

[0045] According to an advantageous embodiment characteristic, the downstream end 26 1 of the tubular spacer 26 has teeth 29 penetration aid to start the cutting operation of the insulating panel 4. Advantageously, the teeth 29 are adapted to crush against the internal face of the first formwork 6 or the second bench 7, contributing to the sealing between the formwork 6 Or 7 and the tubular spacer 26.

[0046] According to another advantageous embodiment characteristic, the tubular spacer 26 has at its upstream end 26 2 , a peripheral collar 30 deformable character intended to be crushed by tightening in order to ensure the seal between the other formwork 6 Or 7 and the tubular spacer 26.

[0047] According to a particular embodiment characteristic, the tubular spacer 26 also has a gripping member at its upstream end 31, such as a disc, extending transversely to the length of the tubular spacer 26. Preferably, this gripping member has a notch on its periphery to facilitate its operation, particularly when inserting it into the insulating panel. 4.

[0048] Advantageously, the bore 27 of the tubular spacer 26 comprises from its upstream end 26 2 , a prismatic shape allowing cooperation with a maneuvering or screwing tool facilitating the operation of penetration into the insulating panel 4.

[0049] According to an advantageous embodiment variant, the tubular spacer 26has a removable ring at each end. Thus, one of the removable rings has the teeth 29 while the other removable ring has the peripheral collar 30 and a prismatic maneuvering shape. These rings are mounted for example by interlocking, at each end of the tubular spacer 26. These rings have a tapered exterior shape allowing their removal, relative to the spacer and the concrete walls. 2, 3, after the formation of the latter.

[0050] The assembly device 9 also features a clamping rod 32 passing inside the bore 27 and crossing the benches 6 And 7. This clamping rod 32 protrudes on either side of the benches 6 And 7 to allow the screwing of clamping devices 33 such as nuts.

[0051] The process of building a wall 1 follows directly from the preceding description.

[0052] The method according to the invention consists of equipping the insulating panel 4 of one or more positioning systems 8 in accordance with the invention.

[0053] As more precisely shown in the Fig. 6A à 6G , the process consists of engaging the rod 12 by its first end 12 1 in the insulating panel 4 until the support stop 13 comes into contact directly (or by means of one or more added compensation washers not shown in the figures), with the external face 4 2 of the insulation panel 4. In this position, the rod 12 is protruding from the internal face 4 1 of the insulating panel 4. The spur(s) 22 are thus located on the side of the internal face4 1 of the insulating panel 4. The method according to the invention then consists of ensuring the assembly of the lock 11 on the stem 12 extending projecting from the face 4 1 of the insulating panel 4. The tubular sleeve 15 of the lock 11 is threaded onto the rod 12 from its first end 12 1 . As more precisely shown in the Fig. 6B , the lock 11 is translated so that the counter-stop 16 comes into contact with the internal face 4 1 of the insulating panel 4. During this translation, the lock 11 is angularly oriented so that a lug 22 slides into a groove 24 complementary. When the counter-thrust 16 is supported on the internal face 4 1 of the insulating panel 4, the lock 11 is rotated angularly relative to the rod12 so as to bring the spur 22 in the additional accommodation 23 to allow the lock to be locked 11 in a fixed position on the rod 12. At the end of the assembly operation, the dagger 10 and the lock 11 are assembled by a complete connection.

[0054] Regardless of the mounting of the positioning system 8 and the assembly device 9, the process of building a wall consists of putting in place the first formwork 6 in situ to build the wall 1. Of course, the first bench 6 is put in place in a conventional manner by any known bracing equipment or tool which will not be described more precisely in the rest of the description. In the same sense, the following description describes the construction of a wall using two formwork 6, 7but it is clear that, in a conventional manner, the walls require the creation of a first and a second formwork using in particular a series of first and second formworks placed side by side in a bed or two bunk beds depending on the height of the wall to be created. This installation technique is not described in more detail because it uses conventional construction techniques well known to those skilled in the art. In a conventional manner, each formwork 6, 7 has through holes respectively 6 1 , 7 1 for the passage of a clamping rod 32.

[0055] The method according to the invention consists, as illustrated in Fig. 6A , to put in place an initial reinforcement 5 1 compared to the first bench 6. The installation of this first reinforcement 5 1 is not described more precisely because it is well known to those skilled in the art. In the same sense, the reservation mannequins for the openings or the shuttering frames are positioned on the first shuttering 6 before the first reinforcement is put in place 5 1 .

[0056] The method according to the invention then consists of positioning the insulating panel 4 compared to the first bench 6 in front of which the first reinforcement is positioned 5 1 . As it emerges from the Fig. 6B , the insulating panel 4 is positioned so as to allow the first end to abut 12 1 of the stem 12 resting on the internal face of the first bench 6 and to allow the first hook 14 to cross the first reinforcement 5 1 with a view to cooperation between the first reinforcement 5 1 and the first hook 14after the first reinforcement blocking operation 5 1 thanks to the positioning system 8.

[0057] The method according to the invention then consists of putting in place a second reinforcement 5 2 on the side of the second face 4 2 of the insulating panel 4, as illustrated in the Fig. 6C , according to techniques well known to those skilled in the art. The second reinforcement 5 2 then crosses the second reinforcement 5 2 and is positioned to cooperate with the second hook 21 after the operation of blocking the second reinforcement thanks to the positioning system 8.

[0058] The stem 12 is then turned using a handle to allow the notch 17 and on the second hook 21 to cooperate respectively with the first reinforcement 5 1 and the second reinforcement 5 2 , as represented in Fig. 6D And 7 , and thus allow the reinforcements to be locked in position 5 1 And 5 2 . The positioning system 8 thus ensures through the notch 17 and the second hook 21, an assembly of the insulating panel 4 compared to the first and second reinforcements 5 1 , 5 2 and a positioning relative to the first bench 6. The lock 11 comprising several notches 17, the choice of the notch with which the reinforcement will be held makes it possible to adjust the position of the first reinforcement in relation to the first face 4 1 of the insulating panel 4.

[0059] The method according to the invention then consists of putting in place the assembly devices 9 benches 6, 7, by installing one or more tubular spacers 26intended to be established between the two benches 6, 7. The method according to the invention therefore consists of placing each tubular spacer 26 in alignment with a hole 6 1 arranged in the first bench 6. According to an advantageous embodiment variant, it may be envisaged to pass through the hole 6 1 and the insulating panel 4 a needle opening on the external face 4 2 of the insulating panel 4 in order to locate the axis of a hole 6 1 of the first bench 6. The tubular spacer 26 is then threaded onto the end of the needle protruding from the outer face 4 2 of the insulating panel 4 to come into contact with the insulating panel through its downstream end 4. Rotation of the tubular spacer 26 leads to its penetration thanks to the sharp elements 28 inside the insulating panel 4.After passing through the insulating panel 4, the tubular spacer 26 comes to a stop, by its downstream end 26 1 , against the internal face of the first bench 6. In this position, after removing the pre-positioning needle, the clamping rod 32 is threaded through the hole 6 1 of the first bench 6 and bore 27 of the tubular spacer 26 thus driving the carrot out of the insulating panel 4 made by the tubular spacer 26.

[0060] The method according to the invention then consists of putting in place the second formwork 7 to come to bear on the upstream end 26 2 of the tubular spacer 26 ( Fig. 6E ). During this operation, the clamping rod 32 is engaged inside a passage hole 7 1 arranged in the second bench 7.In this position, the clamping rod 32 completely crosses the benches 6, 7 and the insulation panel 4 extending on either side of the benches 6, 7. The clamping rod 32 then serves for mounting clamping devices 33 such as nuts, to ensure the formwork is locked in position 6, 7 between them. It should be noted that during this operation, tightening the nuts ensures localized deformation of the downstream ends 26 1 and upstream 26 2 of the tubular spacer 26 so as to ensure a seal between this tubular spacer 26 and the benches 6, 7.

[0061] As long as the internal formwork and the external formwork are completed, the concreting operation can be considered to ensure the simultaneous or substantially simultaneous injection of the concrete between the insulating panel 4 and the benches6, 7 to simultaneously or substantially simultaneously produce the walls 2 And 3 ( Fig. 6F And 6G ). Concrete can be poured either from the top of the formwork or preferably from the bottom of the formwork. For example, injection nozzles are placed at the bottom of the formwork 6 And 7 placed opposite each other so as to allow the concrete to be poured from the lower part of the formwork. Taking into account the installation of the positioning systems 8, the insulating panel 4 and reinforcements 5 1 And 5 2 remain in place during the pouring of the concrete. In particular, the insulating panel 4 and reinforcements 5 1 And 5 2 do not lift during the simultaneous concrete pouring operation between the formwork 6, 7 and the insulating panel 4.

[0062] After the concrete has solidified, the method according to the invention then consists of removing the clamping rod 32 by loosening the clamping devices 33 and remove the benches 6, 7. It should be noted that in the case where the tubular spacers 26 are fitted with removable rings at their ends, these removable rings are removed so that the tubular spacers which remain in place are no longer flush with the external faces of the walls 2, 3. The wall 1 realized thus incorporates the assembly devices 9 and positioning systems 8 which, mounted independently of each other, thus ensure in combination a mechanical retention of the second wall 3 compared to the first wall 2. The wall thus built has good mechanical resistance characteristics.

[0063] In the example embodiment illustrated in Fig. 6A à 6Fand detailed above, the positioning system is placed so that the first end 12 1 of the rod is in support against the internal face of the first formwork 6, and the second end 12 2 of the rod resting against the internal face of the second formwork 7. This embodiment is not limiting, and the positioning system can also be positioned so that the first end 12 1 of the rod is in support against the internal face of the second formwork 7, and the second end 12 2 of the rod resting against the internal face of the first formwork 7.

[0064] The method according to the invention thus makes it relatively easy to create, in situ, a sandwich wall directly integrating thermal insulation between two concrete walls created simultaneously.

[0065] In the above description, the positioning systems8 are made of plastic material such as polymer. According to this embodiment, the dagger 10 and the lock 11 are made by molding. Similarly, the tubular spacer 26 is made of plastic material such as polymer.

[0066] The invention is not limited to the examples described and shown because various modifications can be made thereto without departing from its scope.

Claims

1. - A tooling for manufacturing a wall (1) with two concrete walls (2, 3) between which at least one insulation panel (4) is trapped, this tooling including at least one system for positioning (8) the insulation panel (4) composed, on the one hand of a dagger (10) having a rod (12) provided with a bearing stop (13) and, on the other hand of a lock (11) being in the form of a tubular sleeve (15), said lock (11) being provided with a counter-stop (16), the rod (12) having a first end (121) intended to be in contact with a first form panel (6) and a second end (122) intended to be in contact with a second form panel (7), so that the distance between the first and the second end is equal to the thickness of the wall (1), characterized in that the lock (11) is provided with at least two notches (17) for receiving a first reinforcement (51), arranged locally on the circumference of the positioning system, extending set back from the first end (121) of the rod (12), delimited on either side by retaining stops (18) spaced apart so as to maintain in position the first reinforcement (51), defining a housing with a profile converging in the opposite direction to their opening, and arranged according to the length of a tubular sleeve (15) of the positioning system (8) so as to be able to adjust the position of the first reinforcement (51) according to the length of the positioning system (8).

2. - The tooling according to claim 1, characterized in that the retaining stops (18) include a locking detent (20) at the opening of the notches (17).

3. - The tooling according to claim 1 or 2, characterized in that the positioning system (8) comprises a first hook (14) extending radially set back from the first end (121) of the rod (12), and delimiting a first retaining stop (181).

4. - The tooling according to any one of claims 1 to 3, characterized in that the positioning system (8) comprises a second hook (21), angularly orientable and extending set back from the second end (122) of the rod (12), in order to maintain in position a second reinforcement (52).

5. - The tooling according to any one of claims 1 to 4, characterized in that the distance between the bearing stop (13) and the counter-stop (16), possibly in the presence of one or more compensating washers, is equal to thickness of the insulator (4).

6. - The tooling according to any one of claims 1 to 5, characterized in that it includes devices for assembling (9) the form panels (6, 7) together, each including a tubular spacer (26) inside which a tightening rod (32) provided at each end with a tightening member (33) passes.

7. - The tooling according to any one of claims 1 to 6, characterized in that the dagger (10) includes assembly means (22, 23, 24) between the lock (11) and the dagger (10).

8. - The tooling according to claim 7, characterized in that the assembly means include at least one lug (22) arranged on the rod (12) of the dagger and cooperating with a housing (23) arranged on the lock (11) after rotation thereof.

9. - The tooling according to claim 7 or 8, characterized in that the assembly means (22, 23, 24) between the lock (11) and the dagger (10) are of the irreversible or repositionable type.

10. - A method for manufacturing a wall (1) with two concrete walls (2, 3), between which at least one insulation panel (4) is trapped, the two walls (2, 3) being manufactured simultaneously or substantially simultaneously by pouring concrete between the insulation panel (4) and a first form panel (6) on the one hand, and between the insulation panel (4) and a second form panel (7) on the other hand, the form panels (6, 7) being disposed on either side of the insulation panel (4), a first reinforcement (51) being placed on the side of the inner face of the first form panel (6), the insulation panel (4) being held between the two form panels (6, 7), before pouring the concrete, using positioning systems (8) passing through the insulation panel (4) and bearing on the inner faces of the form panels (6, 7), the positioning system (8) being composed, on the one hand, of a dagger (10) having a rod (12) provided with a bearing stop (13) and, on the other, of a lock (11) being in the frame of a tubular sleeve (15), said lock (11) being provided with a counter-stop (16), the method being characterized by: - placing on each insulation panel (4) before their positioning, positioning systems (8) each including at least two notches (17) for receiving the first reinforcement (51), delimited on either side by retaining stops (18) spaced apart so as to maintain in position the first reinforcement (51), extending set back from a first end (121) of the rod (12), defining a housing with a profile converging in the opposite direction to its opening, and arranged according to the length of the tubular sleeve (15) of the positioning system (8), - placing each insulation panel (4) with passage of the positioning systems (8) through the first reinforcement (51), with possible rotation of said systems to ensure the engagement of the first reinforcement (91) in the notches (17), and - the adjustment of the positioning of the first reinforcement (51) thanks to the presence of at least two receiving notches (17).

11. - The method according to claim 10, characterized in that it comprises placing a second reinforcement (52) on the side of the inner face of the second form panel (7), with possible rotation for the passage of at least a second hook (21) angularly orientable and extending set back from a second end (122) of the rod (12) and their assembly with said second reinforcement (52).

12. - The method according to claim 10 or 11, characterized in that it consists in placing on each insulation panel (4), the positioning systems (8) by threading the rod (12) of a dagger (10) up to a bearing stop (13), a lock (11) provided with at least two notches (17) being assembled on the rod (12) protruding from the insulation panel (4), when a counter-stop (16) carried by the lock (11) bears against the insulation panel (4), possibly in the presence of one or more compensating washers.

13. - The method according to any one of claims 10 to 12, characterized in that the two form panels (6, 7) are maintained in position using assembly devices (9) by placing, for each assembly device (9), before positioning the second form panel (7), a tubular spacer (26) passing through the insulation panel (4) and after positioning the second form panel (7), sealingly bearing on the inner faces of the form panels (6, 7), each tubular spacer (26) being traversed by a tightening rod (32) extending outside the form panels to receive at each end a tightening member (33).

Citation Information

Patent Citations

  • Insulated wall construction apparatus

    EP0073553A2

  • Systems and methods of erecting reinforced concrete walls, including concrete walls with textured surfaces

    US20050108985A1

  • Method and equipment for the in situ construction of a sandwich wall comprising two concrete walls separated by an insulation board

    WO2011107696A1

  • ADJUSTABLE SPACER FOR CONCRETE REINFORCEMENTS

    BE826054A

  • Concrete sandwich wall panels and a connector system for use therein

    US20050016095A1