Method of inserting a profile into the ground and vibrator assembly therefor

The method enhances profile insertion by using a variable weight force and controlled vibration to achieve deeper penetration with reduced noise and environmental impact, addressing the limitations of existing techniques for large offshore profiles.

EP4335974B1Active Publication Date: 2024-11-06TECHN UNIV HAMBURG HARBURG
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
EP2022194596
Authority / Receiving Office
EP · EP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-09-08
Publication Date
2024-11-06
Estimated Expiration
2042-09-08

AI Technical Summary

Technical Problem

Existing methods for inserting large profiles, such as monopiles, into offshore soils face challenges in achieving the final depth due to limitations in static loading and high noise levels associated with ramming techniques, while vibration methods are not effectively utilized for larger profiles in marine environments.

Method used

A method utilizing a vibrator guided on a rope with a ballast container that applies a variable weight force by pumping or draining seawater, allowing controlled insertion and minimizing hydrosound emissions by decoupling vibrations and regulating load based on propulsion speed and hydrosound measurements.

Benefits of technology

Enables deeper and more controlled insertion of large profiles with reduced environmental impact by managing weight force and vibrations, achieving stable anchoring of profiles in offshore conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure IMGF0001
    Figure IMGF0001
Patent Text Reader

Abstract

The invention relates to a method for installing a profile into the ground, particularly for offshore applications, using a vibrator (20) guided by a cable (6) and resting on the profile (1) to be installed, characterized in that a variable weight force is applied to the vibrator (20) by means of a ballast container (5). Furthermore, the invention relates to a vibrator arrangement (2) for carrying out the method according to one of the preceding claims for installing a profile (1) into the ground, particularly for offshore applications, with a vibrator (20) guided by a cable (6) and resting on the profile (1) to be installed, characterized in that a ballast container (5) with a feed or discharge line is provided, which exerts a variable weight force on the profile (1) and / or the vibrator (20) by feeding or discharging a fluid into the ballast container (5).
Need to check novelty before this filing date? Find Prior Art

Description

[0001] The invention relates to a method for inserting a profile into the subsurface for offshore applications, using a vibrator guided by a cable that rides on the profile to be inserted. Furthermore, the invention relates to a vibrator assembly for this purpose.

[0002] Various methods for installing profiles into the subsoil (ground) are known in the art. These methods are suitable for different profiles, profile sizes, and subsoils depending on the final depth to be achieved. The profiles are usually semi-finished steel products, manufactured in a defined shape with a consistent cross-section across their entire length. Steel profiles are rolled, drawn, or pressed and can be used for sheet piling, steel girders, pipes, or similar purposes. Such profiles can be pressed, vibrated, or driven into the subsoil using appropriate installation devices.

[0003] Pressing a profile into the ground by applying sufficient weight to the profile is a very gentle installation process that, for example, does not transmit vibrations into the body of water (hydrosound) even offshore. However, for most applications, the required final depth for the respective profile to be inserted is far from achieved. For example, DE 2 312 727 A1 describes a method and device for pressing a component into the ground in which the weight force exerted on the component to be pressed in can be increased by filling separate tanks with seawater. Nevertheless, the static loading of weights and thus the successful installation of profiles desired for installation is limited to soft or easily penetrable soils and / or smaller profile cross-sections.

[0004] Piling rigs are also known that drive a profile into the subsoil by means of piling blows. These include free-riding piling rigs that are placed on the profile and are not actively guided, as well as piling rigs that are arranged on a so-called leader as a guidance device, usually attached to a construction machine, and that guide the profile to be driven precisely into the subsoil. The piling rig can also use the leader to transfer part of its weight to the profile to be driven, thus achieving improved advancement with each piling blow. However, leaders cannot be used in offshore applications without considerable effort. Another general disadvantage of piling rigs is the considerable noise generated by the piling blows. This is transmitted to the waterbody when used in water and causes considerable environmental impact at sea.

[0005] In offshore applications, i.e. the installation of profiles on the seabed, for example for the foundations of drilling platforms or wind turbines, ever larger profiles are being installed into the seabed. For wind turbines, for example, so-called monopiles, i.e. a simple but correspondingly large steel pipe, are used as a foundation in the seabed. Such monopiles currently have diameters of over 5 meters, in particular 6 meters, up to 10 meters and a pipe wall thickness of 30 to 80 mm. It is expected that even larger monopiles will be used in the future. Accordingly, it is necessary to distribute the impact energy generated by ramming over a large radius and thus almost evenly. For this purpose, anvil weights sitting on the monopile are known for distributing the impact energy.

[0006] Furthermore, various devices and methods for introducing and handling monopiles are known from EP 0 301 114 A1, US 2017 / 0145650 A1, CN 114457802 A, CN 113585261 A, US 6,672,805 B1 and WO 2016 / 071067 A1.

[0007] Furthermore, WO 2020 / 263095 A1 discloses the so-called "BLUE PILING Technology" (trademark of IHC Holland IE BV), in which a large mass of seawater held in a container is lifted and dropped for pile driving. While the slightly longer impact impulse, i.e., the modified impact characteristics, is intended to reduce underwater noise compared to conventional hammer blows, extremely powerful impacts are required to install the large-sized monopiles, which still cause significant environmental impact, particularly in terms of hydroacoustic emissions.

[0008] Furthermore, as already mentioned at the beginning, vibration installation methods are known. On land, similar to piling equipment, corresponding vibrators are known. These, for example, are mounted on the profile to be installed as a free-riding, so-called vibrating ram and are not actively guided. Alternatively, vibrators are known that are precisely guided on the aforementioned leaders. Compared to the piling method, the impact on the environment caused by installing the profiles with vibrators is significantly less. Accordingly, vibration methods can often also be used in built-up areas where conventional piling would cause significant structural damage.

[0009] A common onshore method is known as "Vibroflot" from WO 2021 / 160798 A1. In this method, a crane-held implement with a vibrating head located at its lower end is inserted into soft, usually sandy soil by vibrating movements and applying a load. To support the insertion process, water is poured into a tank located at the upper end of the implement and drained again before the implement is pulled. Once the desired final depth is reached, in the Vibroflot method described here, gravel is poured via the implement's guide tube into the cavity formed by the implement, and in particular the vibrating head, as the implement is slowly raised.By activating the vibrator head, the filled gravel is compacted so that a columnar foundation structure with high stability is created until the working device is completely pulled out, for example for the foundation of buildings in loose soils.

[0010] Accordingly, when used in the sea, i.e. when vibrations / impacts are transmitted into the water body, lower hydronoise emissions are likely to occur during vibration compared to ramming.

[0011] Despite these advantages, vibration technology is rarely or never used in the marine sector, especially for larger profiles, because large profiles, such as monopiles with diameters over 5 meters, cannot be driven to their final depth, even in medium-density sand, such as that found in the North Sea. If the more gentle vibration technology is to be used, it is necessary to switch to ramming when the maximum depth is reached in the vibration method, which is time-consuming and costly.

[0012] The object of the invention is therefore to improve the vibration technology for the insertion of large profiles, particularly in offshore applications, in order to be able to insert the profile to be inserted to the final depth by means of vibration.

[0013] This object is achieved by a method according to claim 1 and / or a vibrator arrangement according to claim 8.

[0014] If a variable weight force is applied to the vibrator by means of a ballast container, the load for the vibrator can be adjusted to the required level during the installation process in order to be able to install the profile to be installed to the final depth.

[0015] Preferably, the variable weight force is achieved by pumping or discharging water into or from the ballast tank. For offshore applications, this involves pumping seawater into the ballast tank and / or discharging seawater from the ballast tank as needed.

[0016] Because the variable weight of the ballast container is vibration-decoupled from the vibrator, the weight of the ballast container acts solely as a quasi-static load, so that the mass inertia of the load is not activated.

[0017] If the vibrator and ballast container (and the profile to be installed underneath) are caused to vibrate by the vibrator, so that the applied load increases the vibrating mass, the cable from the ballast container and vibrator must be vibration-decoupled. This prevents these vibrations from being transmitted to the support cable of the arrangement. Otherwise, the support cable, and thus also the crane holding the vibrator, could be caused to vibrate uncontrollably.

[0018] By measuring the advance speed during the insertion of the profile and increasing the variable weight force when the advance speed is reduced and decreasing it when the advance speed is increased, a controlled insertion process can be carried out which regulates the variable weight force according to the advance speed.

[0019] In addition or alternatively, the load can be regulated by means of appropriate hydrosound measurements in such a way that specified hydrosound limit values ​​are complied with, namely by measuring the hydrosound emission when the profile is inserted and increasing the variable weight force when the hydrosound emission is reduced and decreasing it when the hydrosound emission is increased.

[0020] When the vibrator is switched off after reaching the final depth and the variable weight force is increased to the maximum weight, the profile to be installed is quasi statically braced or brought into force connection with the subsurface by the maximum load, since during vibration the profile springs back slightly after the vibration process has ended in accordance with the dynamic laws, meaning that a direct force connection between the profile end face and the subsurface would not yet be present.

[0021] According to the device, the object is achieved by providing a ballast container with a supply or discharge line, which exerts a variable weight force on the profile and / or the vibrator by supplying or discharging a fluid into the ballast container. The fluid is preferably seawater. The seawater is supplied, for example, via a submersible pump.

[0022] In one embodiment, the ballast container is arranged above the vibrator on the profile, with the cable also attached to the ballast container via a second vibration isolator. The ballast container and vibrator form a jointly vibrating mass.

[0023] In order not to activate the inertia of the ballast container, the vibrator sits directly on the profile and the ballast container is loaded onto the vibrator via a first vibration isolator, whereby the vibrator transfers its vibrations directly to the profile to be inserted, but does not transfer the vibrations to the ballast container due to the intermediate first vibration isolator between the vibrator and the ballast container.

[0024] If sensors for determining the propulsion speed are arranged on the vibrator and / or on the ballast container, which interact with a recording and control device, the corresponding control can be carried out during the installation process and the installation process can be logged.

[0025] Furthermore, hydrosound sensors are preferably arranged to measure the hydrosound in the surrounding water body, which are operatively connected to the recording and control device so that compliance with nature conservation regulations can be monitored and recorded.

[0026] To provide a suitable, sufficiently variable ballast, the ballast tank has a water capacity of 5 to 50 cubic meters, particularly 10 to 20 cubic meters. This allows 5 to 50 tons, or preferably 10 to 20 tons, of ballast to be added or removed as needed when filling with water / seawater.

[0027] The vibration arrangement is preferably used for the insertion of a monopile, in particular with a diameter greater than 5 m.

[0028] Two embodiments of the invention and the lowering process are described in detail below using the following drawings.

[0029] It shows: Fig. 1 a vibrator arrangement in a first embodiment in a schematic, partly sectioned side view, Fig. 2 in Fig. 1 similar representation of an embodiment of a vibrator arrangement in a second embodiment and Fig. 3 a graphic representation of an exemplary insertion process.

[0030] In Fig. 1 A first exemplary embodiment of a vibrator arrangement is shown in a schematic, partially sectioned side view. There, a profile 1 to be inserted, for example a monopile, is shown in a substantially vertical orientation, already partially inserted into a seabed B, above which a body of water W extends, for example, the sea in offshore areas. The profile has an elongated shape, with its cross-section being the same over its entire length. The profile 1, here a monopile, has a profile base 12, which is to be inserted into the ground to a final depth T. The upper end of the profile 1, the profile head 11, is then later used to attach the structure to be erected, for example a wind turbine or the like. For inserting the profile 1 into the ground B, a vibrator arrangement 2, consisting of a vibrator 20, a vibration isolator 3, and a ballast container 5, is seated on the profile head 11.The vibrator assembly 2 is lifted, handled and guided by a crane or the like via a rope 6 in order to be able to place and hold the vibrator assembly 2 on the profile head 11 of the profile 1 to be inserted.

[0031] The first vibrator arrangement 2' in a first embodiment according to Fig. 1 is characterized in that the vibrator 20 riding on the profile head 11 of the profile 1 is assembled via a first vibration isolator 31 with the ballast container 5 arranged above it.

[0032] In contrast, the Fig. 2 illustrated second embodiment as a second vibrator arrangement 2" according to Fig. 2 constructed from the vibrator 20, which rides directly on the profile head 11 of the profile 1 to be inserted and has a ballast container 5 directly attached thereto with a second vibration isolator 32 arranged above it.

[0033] At the upper end of the vibrator arrangement 2, according to Fig. 1 thus at the upper end of the ballast container 5 and in Fig. 2 At the upper end of the second vibration isolator 32, the rope 6 for handling the entire device is attached. The crane required for handling, on which the rope 6 is guided and lifted as needed, is shown in the Fig.1 und 2 not shown.

[0034] The vibrator 20 provided in the first or second vibrator arrangement 2' / 2" is a vibrator generally known in the prior art, the unbalance amplitude and frequency of which can be varied in the usual way. The vibrator 20 naturally has a certain dead weight with which this vibrator 20 rests on the profile head 11 of the profile 1 to be inserted. For this purpose, a connecting element 21 is formed on the vibrator 20, which rests on the profile head 11 of the profile 1 to be inserted with as much precision as possible and also guides the vibrator arrangement 2 sitting on the profile 1.

[0035] In the execution according to Fig. 1 The first vibrator assembly 2' has a first vibration isolator 31 above the vibrator 20, which neutralizes the vibrations generated by the vibrator 20 and essentially does not transmit them to the ballast container 5 located above the first vibration isolator 31. Such vibration isolators are known in the art.

[0036] The ballast tank 5 encloses a cavity 50 to which a supply line 51 with a pump 52 is connected, whereby water, in particular seawater, can be pumped into the cavity 50 of the ballast tank 5 by means of the pump 52 via the supply line 51 extending into the water body W. Furthermore, a drain line 53 with a drain valve 54 is connected such that water can be drained into the water body W via the drain line 53 by opening the drain valve 54.

[0037] Furthermore, a detection and control device 7 is provided, which is operatively connected to the vibrator 20, the pump 52 and the discharge valve 54. Furthermore, in the illustrated embodiment according to Fig. 1 a hydrophone 8 arranged in the water body W is operatively connected to the detection and control device 7, which can measure the hydrosound in the water body W.

[0038] Alternatively to the embodiment according to Fig. 1 is in Fig. 2 In the second vibrator arrangement 2", the ballast container 5 is arranged directly on the vibrator 20, whereby the separate load of the ballast container 5 increases the vibrating mass of the vibrator 20. In order to prevent the rope 6, on which the second vibrator arrangement 2" is secured and handled, from undesirably transmitting vibrations to the crane carrying the rope 6, the second vibration isolator 32 is provided above the ballast container 5.

[0039] By forming the ballast container 5 with the cavity 50 provided therein, the weight of the ballast container 5 and thus the load on the profile 1 to be introduced can be varied by supplying water (seawater) into the cavity 50. By pumping water into the cavity 50, the load is increased, and by draining water from the cavity 50, the load is reduced.

[0040] In an exemplary insertion process, which is Fig. 3 in two graphs, one showing the controlled load over time and the other showing the depth reached over time. When placing the profile 1 to be installed on the seabed B, an initial static minimum indentation is achieved due to the dead weight of the profile 1 and the vibrator 20 placed on it. The dynamic installation process then begins by activating the vibrator 20 with a low load. If necessary, the entire vibrator assembly 2 is relieved by the crane via the cable 6 and only a very low load is applied to the profile head 11 of the profile 1 to be installed. As the profile 1 is vibrated into the seabed B, the load is increased according to the upper curve of the Fig. 3 by pumping seawater into the cavity 50 of the ballast tank 5, whereby a suitable propulsion speed, i.e. further penetration of the profile foot 12 of the profile 1 into the seabed B, is achieved.

[0041] If the profile base 12 of the profile 1 to be installed reaches a softer or more easily penetrated layer in the subsoil, the load weight of the ballast container 5 can be reduced or not increased further by appropriate control via the detection and control device 7, in order to ensure a continued, as even as possible, installation process with a constant advance rate. This situation gives the Fig. 3 The "dent" shown in the upper graph appears in the area marked by the arrow. As the tunnel advances further, the applied load is increased again and terminated when the desired final depth T is reached. This deactivates vibrator 20.

[0042] In a preferred embodiment of the installation method, however, the load is not immediately reduced and lifted off, but rather the cavity 50 is first filled to its maximum capacity with seawater via supply line 51 and pump 52 in order to achieve static settlement of the installed profile 1. In this case, the profile 1, which recoils slightly upon completion of the vibration process, is pressed into the seabed B by the increased static load at least far enough that the profile foot 12 of the installed profile 1 enters a frictional connection or a tensioned state with the seabed B. This is particularly useful for large profiles 1, for example monopiles with a diameter of greater than or equal to 5 m and a material thickness of the monopile of, for example, up to 80 mm, in order to be able to use the peak resistance immediately without further settlement movements during further use of the profile 1, for example as a foundation for a wind turbine.After this static settlement process, the load is then reduced by draining the water from the cavity 50 of the ballast container 5 and finally the entire vibrator arrangement 2 is lifted by a crane using the rope 6.

[0043] For comparison with a vibration insertion process without a separate ballast container 5, i.e. without variable weight force, corresponding dashed graphs are shown, from which it can also be seen that with medium-density sands in the seabed B, as is the case, for example, in the North Sea, the desired final depth T cannot be achieved.

[0044] Due to the variable weight force applied to the vibrator 20 by means of the ballast container 5, the propulsion speed during the insertion of the profile 1 can be achieved not only by changing the vibrator frequency and, if applicable, the imbalance amplitude of the vibrator, as is already known from the prior art, but also by deliberate control, i.e., changing the applied weight force by means of a ballast container 5, into whose cavity 50 water is pumped or drained as needed. It is advantageous if the propulsion speed is measured during the insertion of the profile and, at reduced propulsion speed, the load is increased by pumping water into the cavity 50. As the propulsion speed increases, the load on the ballast container 5 is reduced by draining water from the cavity 50.This control loop makes the insertion process more uniform and overall a significantly greater insertion depth of the profile is achieved.

[0045] Likewise, by additionally measuring the hydrosound emissions using the hydrophone 8, the load can be varied depending on the measured hydrosound. In parallel to the first-mentioned control loop, a maximum permissible hydrosound emission can be specified in the recording and control unit. Upon reaching this hydrosound emission limit, the load is reduced by draining water from the cavity 50 of the ballast container 5, and subsequently the hydrosound emission is also reduced. Depending on the other control parameters, if the hydrosound emissions are correspondingly low, the load weight can then be increased by pumping water into the cavity 50 of the ballast container 5, thus increasing the propulsion speed when inserting the profile 1. List of reference symbols

[0046] 1Profile, Monopile 11Profile head 12Profile base 2, 2', 2"Vibrator arrangement 20Vibrator 21Connection part 3Vibration isolator 31First vibration isolator 32Second vibration isolator 4Rope 5Ballast tank 50Cavity 51Supply line 52Pump 53Drain line 54Drain valve 6Rope 7Detection and control device 8Hydrophone, hydrosound sensor BSoil, seabed WWater body TFinal depth

Claims

1. A method for introducing a profile into the subgrade for offshore applications by means of a vibrator (20) which is guided on a cable (6) and which - in the operating position - is mounted on the profile (1) which is to be introduced, wherein a changeable weight force is applied to the vibrator (20) by means of a ballast tank (5) in which a supply line or discharge line is provided.

2. A method according to claim 1, characterised in that the changeable weight force is obtained by pumping in or discharging water into or out of the ballast tank (5).

3. A method according to claim 1 or 2, characterised in that the ballast tank (5) is vibration-isolated from the vibrator (20).

4. A method according to claim 1 or 2, characterised in that the cable is vibration-isolated from the ballast tank (5) and the vibrator (20).

5. A method according to one of the preceding claims, characterised in that the speed of advance when introducing the profile (1) is measured and the changeable weight force is increased when the speed of advance is reduced, and is reduced when the speed of advance is increased.

6. A method according to one of the preceding claims, characterised in that the hydro sound emission when introducing the profile (1) is measured and the changeable weight force is increased when the hydro sound emission is reduced, and is reduced when the hydro sound emission is increased.

7. A method according to one of the preceding claims, characterised in that once the final depth (T) has been reached the vibrator (20) is switched off and the changeable weight force is increased to maximum weight.

8. A vibrator assembly (2) for carrying out the method according to one of the preceding claims for introducing a profile (1) into the subgrade for offshore applications, having a vibrator (20) which is guided on a cable (6) and which - in the operating position - is mounted on the profile (1) which is to be introduced, wherein a ballast tank (5) is provided with a supply line or discharge line, so that by supplying or discharging a fluid into the ballast tank (5) a changeable weight force can be exerted on the profile (1) and / or the vibrator (20).

9. A vibrator assembly (2) according to claim 8, characterised in that the ballast tank (5) is arranged above the vibrator (20) on the profile (1), the cable (6) being fastened to the ballast tank (5) via a second vibration isolator (32).

10. A vibrator assembly (2) according to claim 8 or 9, characterised in that the vibrator (20) is seated directly on the profile (1) and the ballast tank (5) is loaded on the vibrator (20) via a first vibration isolator (31).

11. A vibrator assembly (2) according to one of claims 8 to 10, characterised in that sensors for ascertaining the speed of advance which cooperate with a detection and control device (7) are arranged on the vibrator (20) and / or on the ballast tank (5).

12. A vibrator assembly (2) according to one of claims 8 to 10 with claim 11, characterised in that hydrosound sensors (8) for measuring the hydrosound which are in an operative connection with the detection and control device (7) are arranged in the surrounding body of water (W).

13. A vibrator assembly (2) according to one of claims 8 to 12, characterised in that the ballast tank (5) has a tank volume for water of 5 to 50 cbm, in particular 10 to 20 cbm.

14. Use of the vibrator assembly (2) according to one of claims 8 to 13, wherein the profile (1) which is to be introduced is a monopile.

Citation Information

Patent Citations

  • Process for driving pile sections under water

    EP0301114A1