Precut processing method
By taking leftover materials from the input side of the processing machine and reintroducing them using a robot arm, the method addresses the worker burden and equipment costs associated with handling leftover materials, improving material yield and reducing waste.
Patent Information
- Application Number
- JP2023038279
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-13
- Publication Date
- 2024-09-27
- Estimated Expiration
- 2043-03-13
AI Technical Summary
The burden on workers in pre-cut lines to manually handle and return leftover materials is high, leading to increased equipment costs and reduced material yield, as these materials are often discarded instead of being reused.
A method where leftover materials are taken out from the input side of the processing machine, stored on the input side, and reintroduced into the processing machine using a robot arm, allowing for efficient reuse and reducing the need for additional conveyors.
This approach reduces worker burden, minimizes equipment costs, and enhances material yield by enabling effective reuse of leftover materials without the need for extensive conveyor systems.
Smart Images

Figure 2024129221000001
Abstract
Description
[Technical field]
[0001] The present invention relates to a precutting method for efficiently precutting pattern materials and structural materials without waste. [Background technology]
[0002] The timber used for braces, studs, lintels, etc., and the structural timber used for the structure of foundations, pillars, beams, etc. All of these construction materials are pre-cut into lengths of 3m to 4m and then manufactured into products.
[0003] In a pre-cut line that processes construction materials, raw materials are taken out from a material storage area and fed into a processing machine, where they are cut into pre-cut pieces and then discharged as finished products. One or more products are cut from one piece of material. Any parts that cannot be cut are discarded as waste. Most of the waste is discarded, but discarding materials that can be used for pre-cutting other products is a waste of resources.
[0004] Therefore, among the scraps discharged from the processing machine along with the finished product, experienced workers would determine which lengths were reusable, store them, and then return them all together to the input side. However, because the materials are long and the pre-cut line is several tens of meters long, manually returning the long and heavy scraps to the input side of the processing machine places a heavy burden on the workers. Mechanizing this process would increase the equipment costs. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2016-69088 A Summary of the Invention [Problem to be solved by the invention]
[0006] The main object of the present invention is to reduce the burden on workers at the product discharge side of the processing machine in a pre-cut line that processes long materials such as feather pattern materials and structural materials, and further to reduce equipment costs and improve material yield. [Means for solving the problem]
[0007] The following configurations are each a means for solving the above problems.
[0008] <Configuration 1> 1. An apparatus for precutting feather or structural materials, comprising: The material is then fed into the processing machine after the products to be precut are allocated to it so that the part corresponding to the remnant material is positioned on the input side of the material processing machine. The products processed by the processing machine are discharged to the discharge side, A precut processing method characterized in that residual material generated during precut processing is removed from the input side of the processing machine.
[0009] <Configuration 2> The precut processing method according to configuration 1, characterized in that when the above-mentioned residual material is reused, the residual material is removed from the input side of the processing machine and stored on the input side of the processing machine.
[0010] <Configuration 3> The precutting method according to configuration 1, characterized in that all materials are allocated so that the product with the earlier discharge order for one material is precut in the processing machine first, and when the discharge order of the product allocated to the material to be fed into the processing machine next and to be precut first is earlier than the discharge order of the product allocated to the part of the material fed into the processing machine first, the part to be allocated to the product with the later discharge order of the material fed into the processing machine first is left, removed from the input side of the processing machine before being precut and stored, and the stored part is re-fed into the processing machine in the discharge order for precutting.
[0011] <Configuration 4> The precut processing method according to configuration 1 or 2, characterized in that a plurality of types of materials having different width or height dimensions are sorted and arranged in the material storage area.
[0012] <Component 5> The precut processing method according to configuration 1 or 2, characterized in that the materials are piled up in the material storage area. Effect of the Invention
[0013] <Effects of Configuration 1> If there is a portion of the material that corresponds to the remnant material on the input side of the material processing machine, when the precut product is discharged on the output side, the remnant material can be grasped and removed on the input side of the processing machine. <Effects of Configuration 2> Precut leftover materials can be removed from the input side of the processing machine and stored, allowing for effective reuse. If a storage area is provided on the input side of the processing machine, the leftover materials can be transported within the reach of the robot arm used for material input. <Effects of Configuration 3> If materials are allocated with a priority on yield, it is difficult to allocate the order of packaging. If the part allocated to the products with the later discharge order is temporarily evacuated and stored, it can be precut and discharged according to the discharge order. <Effects of Configuration 4> If a robot arm is used, even if multiple types of materials are stocked in the material storage area, it can distinguish between them and take them out, eliminating the need for multiple large-scale feeding conveyors. <Effects of Configuration 5> If a robot arm is used, even if materials are piled up in a material storage area, it can pick them out one by one. This eliminates the need to line up the materials one by one on the conveyor. [Brief description of the drawings]
[0014] [Figure 1] Plan view of a precut line with remnant stock [Diagram 2] Block diagram of precut control system [Diagram 3]An example of product allocation to materials [Figure 4] An explanatory diagram of the operation procedure of the first embodiment [Diagram 5] An explanatory diagram of the operation procedure of the second embodiment [Figure 6] An illustration of a material storage area with multiple types of materials. [Figure 7] A diagram of a pile of materials in a material storage area DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS EXAMPLES
[0015] In the precut line shown in Fig. 1, material 20 carried into material storage area 18 is picked up by a robot arm 22 and fed into the input conveyor 14. The material 20 is sent from the input conveyor 14 in the direction of arrow A and enters the processing machine 12. Products 24 precut inside the processing machine 12 are discharged onto the discharge conveyor 16 and then transported to the product storage area 26, where they are then packaged.
[0016] As shown in FIG. 2, in a computer 48 for controlling the precut line, for example, a precut control device 50 operates to control the processing machine 12 and the robot arm 22 in accordance with precut data 52 .
[0017] The storage device 54 of the computer 48 stores allocation data 56, robot control data 58, and discharge order data 60 extracted from the precut data 52. The allocation data 56 is data for allocating products to the material 20 with good yield. The robot control data 58 is control data used to control the robot arm 22 to transport the material 20 and remnant material 28 in a timely manner. The discharge order data 60 is data for managing the order in which products are discharged from the processing machine 12. The discharge order data 60 is used only in the second embodiment.
[0018] 1, as described above, the input material 20 is precut, and the processed product 24 is discharged to the discharge side. When reusing the waste material 28 generated in the precut processing, the robot arm 22 removes the waste material 28 from the input side of the processing machine 12 and stores it in the waste material stock 30.
[0019] At a predetermined timing, the pre-cut control device 50 allocates products to the remnant material 28 transported to the remnant material stock 30 according to the pre-cut data 52. The allocated remnant material 28 is taken out of the remnant material stock 30 by the robot arm 22 and fed into the processing machine 12. The remnant material 28 may be allocated in advance before being fed. This will be described in the second embodiment.
[0020] As described above, in this embodiment, the remaining material 28 of the precut raw material 20 is not discharged to the discharge side of the processing machine 12 but is removed from the input side and stored in the remaining material stock 30 on the input side of the processing machine 12. Furthermore, the remaining material 28 can be re-input into the processing machine 12 under the control of the precut control device 50. This allows the remaining material 28 to be used freely and effectively.
[0021] To make the above process possible, the following allocation is required. In Fig. 3(a), the raw material 20a has an allocated portion 32 and an unallocated portion 34. The unallocated portion 34 corresponds to the remaining material 28. The raw material 20 is fed into the processing machine 12 in the direction of arrow A. The product 24 is allocated so that the portion corresponding to the remaining material 28 is located on the input side of the raw material 20 to the processing machine 12.
[0022] In this way, if there is a portion of the raw material 20 corresponding to the remnant material 28 on the input side of the processing machine 12, when the precut product 24 is discharged to the discharge side, the remnant material 28 exposed on the input side of the processing machine 12 can be grasped and removed by the robot arm 22.
[0023] 4 is a flow chart showing the operation procedure of the precut control device 50. First, in step S11, the robot arm 22 takes out the material 20 from the material storage area 18 and inserts it into the processing machine 12. In step S12, the processing machine 12 performs a precut process on the material 20. In step S13, the processing machine 12 ejects the processed product 24.
[0024] In step S14, the precut control device 50 judges whether or not there is any reusable remaining material. If the result of this judgment is yes, the process proceeds to step S15, and if the result is no, the process proceeds to step S16. In step S15, the remaining material 28 is stored in the remaining material stock 30. In step S16, the precut control device 50 judges whether or not to precut the remaining material in the remaining material stock. That is, here, it is judged whether or not to precut the remaining material already stored in the remaining material stock next. If the result of this judgment is yes, the process proceeds to step S11, and if the result is no, the process proceeds to step S17. In step S17, the remaining material 28 in the remaining material stock is fed into the processing machine 12. The above-mentioned processes are repeated.
[0025] If the robot arm 22 is used not only to feed the materials 20 from the material storage area 18 to the processing machine 12, but also to transport the remnant materials 28 to the remnant material stock 30 and to feed the materials from the remnant material stock 30 to the processing machine 12, the line structure can be simplified compared to the case where a conveyor is installed. The remnant material stock 30 only needs to be on the input side of the processing machine 12, and may be integrated with the material storage area 18.
[0026] The length of the processing machine 12 and its product discharge side shown in Fig. 1 is shown considerably reduced, and since an apparatus for precutting feather pattern material or structural material is actually 10 meters or more, it is difficult to remove the remnant material from the product discharge side within the reach of the illustrated robot arm 22. Therefore, as in this embodiment, the remnant material 28 is removed from the input side of the processing machine 12 and stored in the remnant material stock 30 on the input side of the processing machine 12, making it possible to utilize the robot arm 22.
[0027] The products that can be allocated to the remnants may be decided before or after the precutting process, or if the dimensions are judged to be sufficiently long, the remnants may be taken out to the remnant stock even if the products to be allocated have not yet been decided. On the other hand, if there are no plans to use the remnants for the time being, they may be sent directly to the discharge side. EXAMPLES
[0028] In the second embodiment, the pre-cut line of FIG. 1 is used, and the materials 20b and 20c shown in FIGS. 3(b) and 3(c) are used to perform pre-cut control in the procedure shown in FIG.
[0029] First, a method of allocating products to blanks 20b and 20c using the well-known first-fit method will be described with reference to Figures 3(b) and 3(c). First, the product 36, which is number 1 in the discharge order, is allocated to blank 20b. Since blank 20b does not have enough length to allocate product 38, which is number 2 in the discharge order, the product 38 is allocated to blank 20c.
[0030] The next product 40, which is number 3 in the discharge order, can be assigned to the material 20b. Then, the next product 42, which is number 4 in the discharge order, and the product 44, which is number 5 in the discharge order, are assigned to the material 20c.
[0031] In this embodiment, similar to the first embodiment, no matter which product is allocated to one piece of material, the product discharged earlier is precut by the processing machine 12 first, and so allocation is performed in this order for all materials.
[0032] If precutting were to continue in this state, the materials would be precut and discharged in the following order: product 36, which is discharge order 1, product 40, which is discharge order 3, product 38, which is discharge order 2, and product 42, which is discharge order 4. For example, Patent Document 1 introduces a technique for rearranging the materials in the order in which they are packed before transporting the columnar construction materials to the site. However, this leads to increased equipment costs.
[0033] Therefore, the discharge order of the product (product 40 with discharge order No. 3) assigned to a part of the material 20b that is first fed into the processing machine 12 and precut is compared with the discharge order of the product (product 38 with discharge order No. 2) that is assigned to the material 20c that is next fed into the processing machine and is to be precut first.
[0034] Because the product 38 with the second discharge order is discharged before the product 40 with the third discharge order, the portion of the material 20b that was first fed into the processing machine and to which the product with the later discharge order (product 40 with the third discharge order) is allocated is treated in the same way as the remaining material in Example 1. In other words, the portion to which the product 40 with the third discharge order is allocated is left, removed from the input side of the processing machine 12 before precutting, and stored in the remaining material stock 30.
[0035] Thereafter, the material 20c is pre-cut to discharge the product 38 with the discharge order number 2, and then the portion allocated to the product 42 with the discharge order number 4 is removed from the input side of the processing machine 12 before being pre-cut, and stored in the remnant stock 30.
[0036] Next, the portion allocated to product 40 with discharge order No. 3 is removed from the remnant stock 30 and re-feed into the processing machine 12 for pre-cutting. Finally, the portion allocated to product 42 with discharge order No. 4 is removed from the remnant stock 30 and re-feed into the processing machine 12 for pre-cutting. In this way, product 36 with discharge order No. 1, product 38 with discharge order No. 2, product 40 with discharge order No. 3, and product 42 with discharge order No. 4 are pre-cut and discharged in this order, so they can be packaged as they are.
[0037] 5 is a flowchart showing the operation procedure of the precut control device 50 in the embodiment 2. In steps S21 to S23 of this flowchart, the first product 36 in the discharge order of the raw material 20b is precut and discharged, and in step S24, the portion allocated to the third product in the discharge order is determined to be a remaining material.
[0038] In step S25, this remnant material is stored in the remnant material stock 30. In the next step S26, it is determined whether or not to precut the remnant material already stored in the remnant material stock, and in this case, the process returns to step S21 and proceeds to the precutting process of the new material 20c. After that, in step S22, the product 38 with the second discharge order is precut, and in step S23, the product is discharged. Next, in step S24, the portion allocated to the product 42 with the fourth discharge order and the product 44 with the fifth discharge order is determined to be remnant material. In step S25, this remnant material is stored in the remnant material stock.
[0039] Then, in step S26, it is determined that product 40 with the discharge order No. 3, which was previously stored in the remnant stock, should be precut this time, and in step S27, remnant material 28 is removed from remnant material stock 30 and re-introduced into processing machine 12. Then, the process returns to step S22, where product 40 with the discharge order No. 3 is precut and discharged. Thereafter, in steps S26 and S27, the remnant material assigned to product 42 with the discharge order No. 4 and product 44 with the discharge order No. 5 are removed, and precut in step S22.
[0040] That is, as described above, the pre-cut control device 50 can specify the order in which the products are discharged, and feed the materials in the material storage area 18 or the leftover materials in the leftover material stock into the processing machine so that they are pre-cut in accordance with the above-mentioned discharge order.
[0041] Therefore, if materials are allocated with a priority on yield, it is difficult to allocate the packing order, but if the parts allocated to products with a later discharge order are temporarily stored in the remaining material stock as leftover materials, they can be pre-cut according to the discharge order and discharged in order. This allows pre-cutting to be done efficiently without waste.
[0042] The incoming blanks 20 vary in length to some extent. There may be some scratches on the blanks, which may result in the usable length being shorter than expected. Therefore, the dimensions of the blanks 20 are measured just before they are fed into the processing machine 12, and the blanks 20 are precut to a range of usable lengths.
[0043] In such a case, the first material fed in is assigned to product 36, which is number 1 in the discharge order, and pre-cut. If it is found that product 38, which is number 2 in the discharge order, cannot be assigned to the remaining material, it is stored as the remaining material for the time being. It is also possible to assign product 38, which is number 2 in the discharge order, to the next material 20 fed in, and then, once a product that effectively utilizes the remaining material is found, assign it to it and pre-cut it.
[0044] That is, products may be assigned to all materials in advance and discharge sequence data 60 indicating the discharge sequence for each material as shown in FIG. 3 may be generated, or products may be assigned to each material immediately before it is fed into the processing machine 12, and products may be assigned to the remaining materials at any timing. EXAMPLES
[0045] For example, in window openings, materials with different cross-sectional dimensions are used for each location, such as studs and window sills. In order to precut and discharge these products in the order convenient for packaging, the materials fed into the processing machine must be switched each time.
[0046] In the precut line shown in Figure 6, the width of the material storage area 18 is made longer. In this embodiment, two types of materials 20a and 20b with different cross-sectional dimensions are placed in the material storage area 18. For feathered and structural materials, the length of the material is almost uniform regardless of the cross-sectional dimension, but materials with different width and height dimensions are used depending on the application. The materials 20a and 20b are sorted and placed on the left and right sides of the material storage area.
[0047] Conventionally, in order to automatically select multiple types of materials placed in the material storage area 18 and feed them into the processing machine, separate conveyors were provided for each material with a different cross-sectional size. By contrast, by using a robot arm, sorted materials can be freely selected and fed into the processing machine, which saves on the equipment that would be required to provide conveyors. EXAMPLES
[0048] In the above-mentioned embodiment 3, this problem was solved by sorting and arranging a plurality of types of materials in the material storage area 18. In this embodiment 4, furthermore, it is possible to arrange the materials 20 in piles as shown in Fig. 7. For example, when the materials 20 are brought in, they can be left piled up as they are in an unpackaged state.
[0049] That is, it becomes possible to carry the raw materials 20 into the raw material storage area 18 in the same packaging as when they were purchased. In the third embodiment, the width of the raw material storage area 18 is increased to store two types of raw materials, but since there is a limit to how far the raw material storage area 18 can be extended in the width direction, the vertical width is increased. This makes it possible to store raw materials with different cross-sectional dimensions in the area indicated by the dashed line in FIG. 7.
[0050] Under the control of the precut control device 50 (FIG. 3), the robot arm 22 can identify where each material is placed, remove the piled materials 20 in order from the top, and feed them into the processing machine 12. This can further reduce the burden of transporting the materials 20 to the material storage area 18 and sorting them. [Explanation of symbols]
[0051] 12 Processing machine 14 Input conveyor 16 Discharge conveyor 18 Material Storage 20 Materials 22 Robot Arm 24 products 26 Product storage area 28 Leftover material 30 Remnant Stock 32 Allocated Part 34 Unassigned portion 36 First product to be discharged 38 Product No. 2 in the discharge order 40 Product No. 3 in the discharge order 42 Product No. 4 in the discharge order 44 Product No. 5 in the discharge order 46 Product No. 6 in the discharge order 48 Computers 50 Precut control device 52 Precut data 54 Storage device 56 Allocation Data 58 Robot Control Data 60 Ejection Order Data
Claims
1. 1. An apparatus for precutting feather or structural materials, comprising: The material is then fed into the processing machine after the products to be precut are allocated to it so that the part corresponding to the remnant material is positioned on the input side of the material processing machine. The products processed by the processing machine are discharged to the discharge side, A precut processing method characterized in that residual material generated during precut processing is removed from the input side of the processing machine.
2. 2. The precut processing method according to claim 1, wherein when the scrap material is to be reused, the scrap material is removed from the input side of the processing machine and stored on the input side of the processing machine.
3. A precutting method according to claim 1, characterized in that all materials are allocated so that a product with an earlier discharge order for one material is precut in the processing machine first, and when the discharge order of a product allocated to the material to be fed into the processing machine next and to be precut first is earlier than the discharge order of a product allocated to a part of the material which was fed into the processing machine first, the part to be allocated to the product with a later discharge order of the material which was fed into the processing machine first is left, removed from the input side of the processing machine before being precut and stored, and the stored part is re-fed into the processing machine in accordance with the discharge order for precutting.
4. 3. The precut processing method according to claim 1, wherein a plurality of types of materials having different widths or heights are sorted and arranged in the material storage area.
5. 3. The precut processing method according to claim 1, wherein the materials are piled up in the material storage area.
Citation Information
Patent Citations
Cutting machine and cutting method
JP2021107096A
Automated lumber cutting and delivery system
US20200246999A1
Rearranging device of assembled structure, machining line and program for rearrangement
JP2016069088A
