Concrete wall structure with opening and construction method of concrete wall structure with opening

The concrete wall structure with precast members and connecting elements addresses the inefficiency of traditional construction methods by enhancing workability and reinforcing openings to withstand earthquakes.

JP2024134271APending Publication Date: 2024-10-03TAKENAKA CORP
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
JP2023044485
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-20
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

Existing methods for constructing concrete walls with openings are time-consuming due to the embedding of opening reinforcing members in cast-in-place concrete, which affects workability.

Method used

A concrete wall structure with openings is designed using precast members, including a first and second concrete wall portion connected by a connecting member, allowing for reduced formwork installation and removal, and enhancing workability while reinforcing the structure to withstand tensile forces during earthquakes.

Benefits of technology

The method improves workability by allowing precast construction of at least one wall portion, reducing formwork requirements, and effectively transmits stress between connected walls to prevent damage to the opening corners during seismic events.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024134271000001_ABST
    Figure 2024134271000001_ABST
Patent Text Reader

Abstract

To improve workability of a concrete wall with an opening while reinforcing the concrete wall.SOLUTION: A concrete wall structure with an opening comprises a sleeve wall 38, a spandrel wall 72, a base member 80 provided on a side of the sleeve wall 38 at a corner of an opening 22 formed by the sleeve wall 38 and the spandrel wall 72, a base member 80 provided on a side of the spandrel wall 72 at a corner of the opening 22, and a connecting member 90 connecting the base member 80 and the base member 80.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a concrete wall structure with an opening and a construction method for the concrete wall structure with an opening. [Background technology]

[0002] 2. Description of the Related Art Reinforcement structures for concrete walls that reinforce concrete walls having openings formed therein are known (see, for example, Patent Documents 1 and 2).

[0003] Also, a joint structure for joining precast wall members is known (see, for example, Patent Document 3). [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2002-339487 A [Patent Document 2] Japanese Patent Application Publication No. 11-03648 [Patent Document 3] JP 2009-144400 A Summary of the Invention [Problem to be solved by the invention]

[0005] In the technology disclosed in Patent Document 1, an opening reinforcing member for reinforcing an opening is placed in a formwork for a concrete wall, and then cast-in-place concrete is poured to embed the opening reinforcing member in the concrete wall. This makes the construction of the concrete wall time-consuming.

[0006] In consideration of the above, the present invention aims to reinforce a concrete wall having an opening while improving the workability of the concrete wall. [Means for solving the problem]

[0007] The concrete wall structure with an opening as described in claim 1 comprises a first concrete wall portion constituting a sleeve wall, a second concrete wall portion constituting a hanging wall or waist wall adjacent to the first concrete wall portion via a joint, a first base member provided on the first concrete wall portion side at a corner of an opening formed by the first concrete wall portion and the second concrete wall portion, a second base member provided on the second concrete wall portion side at the corner, and a connecting member connecting the first base member and the second base member.

[0008] According to the concrete wall structure with an opening according to claim 1, the first concrete wall portion constitutes a sleeve wall. The second concrete wall portion constitutes a hanging wall or a waist wall adjacent to the first concrete wall portion via a joint. The first concrete wall portion and the second concrete wall portion form an opening.

[0009] A first base member is provided on the corner of the opening facing the first concrete wall portion, and a second base member is provided on the corner of the opening facing the second concrete wall portion, and the first base member and the second base member are connected by a connecting member.

[0010] As a result, during an earthquake, stress (tensile force) is transmitted between the first concrete wall portion and the second concrete wall portion via the connecting member, thereby suppressing damage to the corners of the opening.

[0011] In addition, in the present invention, at least one of the first concrete wall portion and the second concrete wall portion can be precast. This reduces the time and effort required for temporary construction and removal of formwork, thereby improving the workability of the concrete wall with an opening.

[0012] The construction method for the concrete wall structure with an opening described in claim 2 comprises an installation process of installing a first concrete wall section constituting a sleeve wall and a second concrete wall section constituting a hanging wall or waist wall adjacent to each other via a joint to form an opening, and a connecting process of connecting a first base member provided on the first concrete wall section side and a second base member provided on the second concrete wall section side at a corner of the opening via a connecting member.

[0013] According to the construction method for a concrete wall structure with an opening according to claim 2, first, in the installation step, a first concrete wall section constituting a sleeve wall and a second concrete wall section constituting a hanging wall or waist wall are installed adjacent to each other via joints to form an opening. Next, in the connection step, a first base member provided on the first concrete wall section side and a second base member provided on the second concrete wall section side are connected via a connection member at the corners of the opening.

[0014] As a result, during an earthquake, stress (tensile force) is transmitted between the first concrete wall portion and the second concrete wall portion via the connecting member, thereby suppressing damage to the corners of the opening.

[0015] In addition, in the present invention, at least one of the first concrete wall portion and the second concrete wall portion can be precast. This reduces the time and effort required for temporary construction and removal of formwork, thereby improving the workability of the concrete wall with an opening.

[0016] The concrete wall structure with an opening as described in claim 3 comprises a first precast member having a column and a sleeve wall, a second precast member having a hanging wall or waist wall adjacent to the sleeve wall, and a connecting member provided at the corner of an opening formed by the sleeve wall and the hanging wall or the waist wall, connecting the first precast member and the second precast member.

[0017] According to the concrete wall structure with an opening according to claim 3, the first precast member has a column and a sleeve wall. The second precast member has a hanging wall or a waist wall adjacent to the sleeve wall of the first precast member. An opening is formed by the sleeve wall of the first precast member and the hanging wall or the waist wall of the second precast member.

[0018] A connecting member is provided at the corner of the opening to connect the first precast member and the second precast member. As a result, during an earthquake, stress (tensile force) is transmitted between the first precast member and the second precast member via the connecting member. This prevents damage to the corner of the opening.

[0019] In addition, in the present invention, the sleeve wall of the first precast member and the hanging wall or waist wall of the second precast member are installed adjacent to each other, so that the opening can be easily formed. Therefore, the workability of the concrete wall with an opening is improved.

[0020] The construction method for a concrete wall structure with an opening as described in claim 4 comprises an installation process of installing a sleeve wall of a first precast member having a column and the sleeve wall adjacent to a hanging wall or waist wall of a second precast member to form an opening, and a connecting process of connecting the first precast member and the second precast member at a corner of the opening.

[0021] According to the construction method for a concrete wall structure with an opening according to claim 4, in the installation step, the sleeve wall of the first precast member and the hanging wall or waist wall of the second precast member are installed adjacent to each other to form an opening. Next, in the connection step, the first precast member and the second precast member are connected at the corners of the opening.

[0022] As a result, during an earthquake, stress (tensile force) is transmitted between the first precast member and the second precast member via the connecting member, thereby suppressing damage to the corners of the opening.

[0023] In addition, in the present invention, the sleeve wall of the first precast member and the hanging wall or waist wall of the second precast member are installed adjacent to each other, so that the opening can be easily formed. Therefore, the workability of the concrete wall with an opening is improved. Effect of the Invention

[0024] As described above, according to the present invention, it is possible to reinforce a concrete wall having an opening while improving the workability of the concrete wall. [Brief description of the drawings]

[0025] [Figure 1] FIG. 1 is an elevation view showing a structure to which an opening-equipped concrete wall structure according to an embodiment is applied. [Diagram 2] 2 is an enlarged cross-sectional view showing a pair of base members and a connecting member shown in FIG. 1. [Diagram 3] 3 is a cross-sectional view taken along line 3-3 of FIG. 2. [Figure 4] FIG. 2 is an elevation view showing a construction process of a concrete wall structure with an opening according to one embodiment. [Diagram 5] FIG. 2 is an elevation view showing a construction process of a concrete wall structure with an opening according to one embodiment. [Figure 6] FIG. 2 is an elevation view showing a construction process of a concrete wall structure with an opening according to one embodiment. [Figure 7] 3 is an enlarged cross-sectional view corresponding to FIG. 2 and showing a modified example of a connecting member according to one embodiment. FIG. [Figure 8] 8 is a cross-sectional view taken along line 8-8 in FIG. 7. [Figure 9] 4 is an enlarged cross-sectional view corresponding to FIG. 2 and showing a modified example of a pair of base members and a connecting member according to one embodiment. FIG. [Figure 10] 10 is a cross-sectional view taken along line 10-10 in FIG. 9. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0026] Hereinafter, one embodiment will be described with reference to the drawings.

[0027] (Concrete wall structure with openings) 1 shows a structure 10 to which the concrete wall structure with an opening according to this embodiment is applied. The structure 10 includes a frame 12 and a concrete wall with an opening 20 provided on the frame 12. The frame 12 is a rigid frame structure, and includes a pair of columns 32 and upper and lower beams 52 erected on the pair of columns 32.

[0028] The concrete wall with an opening 20 is, as an example, a reinforced concrete earthquake-resistant wall (load-bearing wall) having an opening 22. This concrete wall with an opening 20 has sleeve walls 38 on both sides, a hanging wall 60, and a waist wall 72. The opening 22 is defined by these sleeve walls 38, hanging walls 60, and waist wall 72.

[0029] The sleeve wall 38 is an example of a first concrete wall portion. The hanging wall 60 and the waist wall 72 are an example of a second concrete wall portion.

[0030] Here, the structure 10 is constructed by a precast concrete construction method. Specifically, the structure 10 includes a pair of left and right precast column wall members 30, a pair of upper and lower precast beam wall members 50, and a precast wall member 70.

[0031] The precast column wall member 30 is an example of a first precast member. The precast beam wall member 50 and the precast wall member 70 are an example of a second precast member.

[0032] (Precast column wall components) The pair of left and right precast column wall members 30 are made of precast concrete and are arranged on both the left and right sides of the frame 12. Each precast column wall member 30 has a column 32 and two sleeve walls 38. The column 32 and the two sleeve walls 38 are integrally formed in a factory or the like.

[0033] The pillar 32 is disposed across the upper and lower beam-column joints 12S. The cross-sectional shape of the pillar 32 is rectangular. A plurality of main column reinforcements 34 are embedded in the outer periphery of the pillar 32. The upper and lower beam-column joints 12S are formed of cast-in-place concrete.

[0034] The multiple column main reinforcements 34 are arranged at intervals in the circumferential direction of the column 32. The upper ends of the multiple column main reinforcements 34 extend upward from the upper surface of the column 32 and penetrate the column-beam joint 12S in the vertical direction. The upper ends of these column main reinforcements 34 are inserted into mechanical joints embedded in the base of another column (not shown) installed on the column-beam joint 12S. The lower ends of the multiple column main reinforcements 34 are each connected to a mechanical joint 36 embedded in the base of the column 32.

[0035] The multiple mechanical joints 36 are embedded in the outer periphery of the base of the column 32. The lower ends of the aforementioned column main reinforcements 34 are connected to the upper ends of the mechanical joints 36. Meanwhile, the upper ends of the column main reinforcements 34 of other columns (not shown) protruding from the lower beam-column joint 12S are inserted into the lower ends of the multiple mechanical joints 36. By filling these mechanical joints 36 with a filler such as grout, the column main reinforcements 34 of the column 32 and the other columns are connected to each other.

[0036] In addition, the joint between the column 32 and the lower column-beam joint portion 12S is filled with a filler G such as grout.

[0037] Sleeve walls 38 are integrated with the left and right side surfaces of the column 32. Each sleeve wall 38 is made of reinforced concrete, and wall reinforcement bars (not shown) are embedded inside. Each sleeve wall 38 extends from the side surface of the column 32 into the framework 12, and is disposed between the upper and lower beams 52. Each sleeve wall 38 is adjacent to the upper and lower beams 52 in the vertical direction via joints M. The joints M are filled with a filler G such as grout. This sleeve wall 38 defines the opening 22.

[0038] Additionally, the column 32 may have at least one sleeve wall 38 integral therewith.

[0039] A plurality of mechanical joints 40 are embedded in the upper and lower ends of the sleeve wall 38. The multiple mechanical joints 40 are arranged at intervals in the width direction of the sleeve wall 38, and upper and lower ends of wall reinforcement bars (not shown) embedded in the sleeve wall 38 are connected to the mechanical joints 40.

[0040] Connecting bars 58 (see Figs. 4 and 5) protruding from the lower or upper surfaces of the upper and lower beams 52 are inserted into each mechanical joint 40. By filling these mechanical joints 40 with a filler such as grout, the connecting bars 58 are connected to wall reinforcement bars (not shown) embedded in the sleeve wall 38.

[0041] The joint structure between the sleeve wall 38 and the upper and lower beams 52 can be changed as appropriate. For example, the connecting bars (wall bars) protruding from the upper and lower ends of the sleeve wall 38 may be connected to mechanical joints embedded in the upper and lower beams 52.

[0042] (Precast beams and wall components) The pair of upper and lower precast beam wall members 50 are made of precast concrete and are arranged above and below the framework 12. Each precast beam wall member 50 has a beam 52 and a hanging wall 60. The beam 52 and the hanging wall 60 are integrally formed in a factory or the like. Note that in FIG. 1, the hanging wall 60 of the lower precast beam wall member 50 is omitted.

[0043] The beam 52 is installed between a pair of left and right columns 32. More specifically, both ends of the beam 52 are joined to the pair of left and right columns 32 via beam-pillar joints 12S. The cross-sectional shape of the beam 52 is rectangular.

[0044] 5 and 6, a plurality of beam main reinforcements 54 are embedded in the upper end and lower end of the beam 52. The beam main reinforcements 54 are arranged at intervals in the width direction of the beam 52. The ends of the beam main reinforcements 54 protrude from the end faces of the beam 52 and are embedded in the beam-column joint 12S. As an example, the ends of the beam main reinforcements 54 are connected to the beam main reinforcements 54 of the adjacent beams 52 in the beam-column joint 12S via mechanical joints 56 (see FIG. 6).

[0045] In addition, the beam main reinforcements 54 of adjacent beams 52 may be connected by means of a lap joint or the like, without being limited to the mechanical joint 56.

[0046] A hanging wall 60 is integrated with the lower surface of the beam 52. The hanging wall 60 is made of reinforced concrete and has wall reinforcement (not shown) buried inside. The hanging wall 60 extends from the lower surface of the beam 52 into the frame 12 and is disposed between the left and right sleeve walls 38.

[0047] The hanging wall 60 is adjacent to the left and right sleeve walls 38 in the width direction via joints M. The joints M are filled with a filler G such as grout. The hanging wall 60 defines an opening 22. The hanging wall 60 is also connected to the sleeve walls 38 via connecting members 90 described later.

[0048] In addition, the joints M between the hanging wall 60 and the left and right sleeve walls 38 may be filled with a filler G as necessary, and the filler G may be omitted as appropriate.

[0049] (Precast wall components) The precast wall member 70 is made of precast concrete. The precast wall member 70 has a spandrel wall 72 disposed in the lower part within the frame 12.

[0050] The waist wall 72 is made of reinforced concrete, and wall reinforcement bars (not shown) are buried inside. The waist wall 72 is adjacent to the lower beam 52 in the vertical direction via joint M, and is adjacent to the left and right sleeve walls 38 in the horizontal direction via joint M. The joints M are filled with a filler G such as grout. The waist wall 72 defines the opening 22.

[0051] In addition, the joints M between the waist wall 72 and the left and right sleeve walls 38 may be filled with filler G as necessary, and the filler G may be omitted as appropriate.

[0052] A plurality of mechanical joints 74 are embedded in the lower end of the waist wall 72. The multiple mechanical joints 74 are arranged at intervals in the lateral width direction of the waist wall 72, and are connected to the lower ends of wall reinforcement bars (not shown) embedded in the waist wall 72.

[0053] A connecting bar 58 (see FIG. 4) protruding from the upper surface of the lower beam 52 is inserted into each mechanical joint 74. By filling these mechanical joints 74 with a filler such as grout, the connecting bars 58 are connected to wall reinforcement bars (not shown) embedded in the spandrel wall 72.

[0054] The joint structure between the waist wall 72 and the lower beam 52 can be modified as appropriate. For example, a connecting bar (wall bar) protruding from the lower end of the waist wall 72 may be connected to a mechanical joint embedded in the lower beam 52.

[0055] (Wall connection structure) Next, a description will be given of the wall connection structure between the sleeve wall 38 and the waist wall 72. Note that the wall connection structure between the sleeve wall 38 and the hanging wall 60 is similar to the wall connection structure between the sleeve wall 38 and the waist wall 72, so a description thereof will be omitted.

[0056] 2 and 3, the wall connecting structure has a pair of base members 80 and a connecting member 90 that connects the pair of base members 80. The base member 80 is formed of a steel plate or the like with a T-shaped cross section. The base member 80 has a base plate portion 80A and a fixing plate portion 80B.

[0057] The base member 80 may be formed by welding two steel plates together, or may be formed from a T-shaped steel.

[0058] Of the pair of base members 80, one base member 80 is provided on the sleeve wall 38 side at the corner of the opening 22, and the other base member 80 is provided on the waist wall 72 side at the corner of the opening 22. A base plate portion 80A of one base member 80 is disposed along a side end face (end face on the opening 22 side) of the sleeve wall 38, and its surface is exposed from the sleeve wall 38. A fixing plate portion 80B is provided on the back surface of this base plate portion 80A.

[0059] The fixing plate portion 80B extends from the base plate portion 80A towards the sleeve wall 38 and is embedded in the sleeve wall 38. The fixing plate portion 80B has a plurality of through holes 82 formed therein to increase the adhesive force with the sleeve wall 38. The base plate portion 80A is fixed to the side end surface of the sleeve wall 38 via the fixing plate portion 80B.

[0060] The base plate portion 80A of the other base member 80 is disposed along the upper end surface (the end surface on the opening 22 side) of the waist wall 72, with its surface exposed from the waist wall 72. A fixed plate portion 80B is provided on the rear surface of this base plate portion 80A. Fixed plate portion 80B extends from base plate portion 80A towards the waist wall 72 and is embedded in said waist wall 72. The fixed plate portion 80B is also formed with the aforementioned multiple through holes 82. The base plate portion 80A is fixed to the upper end surface of the waist wall 72 via this fixed plate portion 80B.

[0061] The number, arrangement, and shape of the through holes 82 formed in the fixing plate portion 80B can be changed as appropriate. Also, the through holes 82 may be provided as necessary, and can be omitted as appropriate.

[0062] The connecting member 90 is formed of a steel plate (angle) or the like bent into an L shape along a corner of the opening 22, and is disposed across the pair of base members 80. The connecting member 90 has a pair of flange portions 90A. The pair of flange portions 90A are joined by welding in a state where they are overlapped on the base plate portions 80A of the pair of base members 80, respectively.

[0063] Specifically, as shown in Fig. 3, the width W2 of the pair of flange portions 90A is narrower than the width W1 of the base plate portion 80A. End portions 90E on both sides in the width direction of the pair of flange portions 90A are joined to the base plate portion 80A by fillet welding or the like. As a result, stress such as tensile force is transmitted between the sleeve wall 38 and the waist wall 72 via the connecting member 90 during an earthquake.

[0064] The joint points between the base member 80 and the connecting member 90 can be changed as appropriate. For example, the longitudinal end of the flange portion 90A of the connecting member 90 may be joined to the base plate portion 80A of the base member 80 by fillet welding or the like.

[0065] (Construction method for concrete wall structure with opening) Next, an example of a construction method for a concrete wall structure with an opening will be described.

[0066] (Installation process) 4 shows a state in which the lower precast beam wall member 50 has been constructed. From this state, in the installation process, a pair of precast column wall members 30, a precast wall member 70, and a precast beam wall member 50 are installed to form the opening 22 in the opening-equipped concrete wall 20.

[0067] Specifically, the precast column wall component 30 is lifted by a lifting machine or the like, and the base of the column 32 is placed on the lower column-beam connection portion 12S. At this time, the upper ends of the multiple column main reinforcements 34 protruding from the upper surface of the column-beam connection portion 12S are inserted into the multiple mechanical joints 36 embedded in the column base of the precast column wall component 30. In addition, the multiple connecting reinforcements 58 protruding from the upper surface of the beam 52 are inserted into the multiple mechanical joints 40 embedded in the lower end of the sleeve wall 38. In addition, the mechanical joints 36, 40 are filled with a filler material, and the joints M are filled with a filler material G.

[0068] Next, the precast wall member 70 is lifted by a lifting machine or the like and inserted between the sleeve walls 38 of the pair of left and right precast column wall members 30. Then, the waist wall 72 of the precast wall member 70 is installed on the beam 52, and the waist wall 72 is adjacent to the sleeve wall 38 via joints M. At this time, the multiple connecting bars 58 protruding from the upper surface of the beam 52 are inserted into the multiple mechanical joints 74 embedded in the lower end of the waist wall 72. Furthermore, each mechanical joint 74 is filled with a filler material, and the joints M are filled with a filler material G.

[0069] Next, as shown in Fig. 5, the precast beam wall member 50 is lifted by a lifting machine, and the hanging wall 60 is inserted between the sleeve walls 38 of the pair of left and right precast column wall members 30. Then, the sleeve wall 38 and the hanging wall 60 are adjacent to each other via the joint M, and both ends of the beam 52 are placed on the left and right hanging walls 60. At this time, a plurality of connecting bars 58 protruding from the lower surface of the beam 52 are inserted into a plurality of mechanical joints 40 embedded in the upper end of the sleeve wall 38. Then, each mechanical joint 40 is filled with a filler material, and the joints M are filled with a filler material G.

[0070] Next, as shown in Fig. 6, multiple beam main reinforcements 54 of adjacent beams 52 are connected on the column 32 via mechanical joints 56, and in-situ concrete is poured on the column 32 to construct the upper beam-column joint 12S. This joins the column 32 and the beam 52 via the beam-column joint 12S. At this time, the column main reinforcements 34 of the column 32 are left protruding from the upper surface of the beam-column joint 12S.

[0071] The construction order of the pair of precast column wall members 30, the precast wall member 70, and the precast beam wall member 50 is not limited to the above and can be changed as appropriate. For example, the construction may be performed in the order of the precast wall member 70, the pair of precast column wall members 30, and the precast beam wall member 50, or the construction may be performed in the order of the pair of precast column wall members 30, the precast beam wall member 50, and the precast wall member 70. Also, the construction may be performed in the order of one precast column wall member 30, the precast wall member 70, the other precast column wall member 30, and the precast beam wall member 50.

[0072] (Connection process) Next, as shown in FIG. 1, in the connecting process, the sleeve wall 38 and the waist wall 72 are connected via connecting members 90 at each corner of the opening 22, and the sleeve wall 38 and the hanging wall 60 are connected via connecting members 90.

[0073] 2 and 3, a pair of flange portions 90A of a connecting member 90 are overlapped with base plate portions 80A of a pair of base members 80 provided on the sleeve wall 38 and the waist wall 72. In this state, the pair of flange portions 90A of the connecting member 90 are welded (fillet welded) to the base plate portions 80A of the pair of base members 80, respectively.

[0074] 1, the pair of flange portions 90A of the connecting member 90 are overlapped with the base plate portions 80A of the pair of base members 80 provided on the sleeve wall 38 and the hanging wall 60, respectively. In this state, the pair of flange portions 90A of the connecting member 90 are welded (fillet welded) to the base plate portions 80A of the pair of base members 80, respectively. In this way, the concrete wall 20 with an opening is formed.

[0075] (Action and Effects) Next, the operation and effects of this embodiment will be described.

[0076] As shown in Figure 1, according to this embodiment, an opening 22 is formed by the sleeve walls 38 of a pair of left and right precast column wall members 30, the hanging wall 60 of the precast beam wall member 50, and the waist wall 72 of the precast wall member 70.

[0077] In this embodiment, the opening-equipped concrete wall 20 is formed using a pair of left and right precast column wall members 30, a precast beam wall member 50, and a precast wall member 70, eliminating the need for cast-in-place concrete, thereby improving the workability of the opening-equipped concrete wall 20.

[0078] Furthermore, a connecting member 90 is provided at each corner of the opening 22. The connecting member 90 connects the adjacent sleeve walls 38 and hanging walls 60, and also connects the adjacent sleeve walls 38 and waist wall 72. As a result, when the opening 22 is subjected to shear deformation during an earthquake, for example, stress (tensile force) is transmitted between the sleeve walls 38 and hanging walls 60 via the connecting member 90, and stress (tensile force) is transmitted between the sleeve walls 38 and waist wall 72. Therefore, damage to the corners of the opening 22 is suppressed.

[0079] Furthermore, by previously integrating (precasting) the base member 80 with the sleeve wall 38, the hanging wall 60, and the waist wall 72, the ease of installation of the connecting member 90 is improved.

[0080] In addition, by filling the joints M between the hanging wall 60 and the left and right sleeve walls 38 with a filler G, it is possible to improve airtightness, sound insulation, etc. Similarly, by filling the joints M between the hanging wall 60 and the left and right waist walls 72 with a filler G, it is possible to improve airtightness, sound insulation, etc.

[0081] (Modification) Next, a modification of the above embodiment will be described.

[0082] In the above embodiment, the connecting member 90 is formed of a steel plate (angle) bent into an L shape along the corner of the opening 22. However, the connecting member 90 may be formed of a flat steel plate.

[0083] 7 and 8, for example, a pair of connecting members 100 are disposed opposite each other in the thickness direction of the concrete wall 20 with an opening. The pair of connecting members 100 are formed in a trapezoidal shape when viewed from the thickness direction of the concrete wall 20 with an opening.

[0084] The pair of connecting members 100 are disposed across the base plate portions 80A of the pair of base members 80, and both ends thereof are welded in abutting relation to the base plate portions 80A. In this way, the pair of base members 80 are connected via the pair of connecting members 90. During an earthquake, stress (tensile force) is transmitted between the sleeve wall 38 and the waist wall 72 via the pair of connecting members 100.

[0085] In the above embodiment, the connecting member 90 is welded to the base plate portions 80A of the pair of base members 80. However, for example, as in a modified example shown in Fig. 9 and Fig. 10, the connecting member 90 may be bolted to the pair of base members 80.

[0086] Specifically, through holes 86, 92 are formed in the base plate portion 80A of the base member 80 and the flange portion 90A of the connecting member 90, respectively. Insert nuts 84 are embedded in the side end surfaces of the sleeve walls 38 of the precast column wall member 30 and in the upper end surface of the waist wall 72 of the precast wall member 70, respectively. These insert nuts 84 are bolted to the base member 80 by screwing bolts 94 through the through holes 86, 92.

[0087] By bolting the connecting member 90 to the base member 80 in this manner, for example, if the connecting member 100 is damaged, the connecting member 90 can be easily replaced.

[0088] Furthermore, the base plate portion 80A of the base member 80 may be provided with headed studs, reinforcing bar studs, or the like, instead of the fixing plate portion 80B.

[0089] In the above embodiment, the pair of base members 80 are connected by the connecting member 90. However, the configuration of the connecting member can be changed as appropriate. The connecting member only needs to connect the sleeve wall 38 and the hanging wall 60 or the waist wall 72 in a manner that allows stress to be transmitted between them, and for example, a back-cast belt may be provided between the sleeve wall 38 and the hanging wall 60 or the waist wall 72, and concrete may be poured into the back-cast belt as a connecting member to connect them.

[0090] In the above embodiment, the hanging wall 60 and the beam 52 are integrally precast. However, the hanging wall 60 and the beam 52 may be precast separately. That is, the hanging wall 60 may be a precast wall member, and the beam 52 may be a precast beam member.

[0091] In the above embodiment, the beam 52 and the waist wall 72 are precast separately. However, the beam 52 and the waist wall 72 may be precast integrally. That is, the beam 52 can be precast integrally with at least one of the hanging wall 60 and the waist wall 72.

[0092] In the above embodiment, the column-beam joint 12S is made of cast-in-place concrete. However, the column-beam joint 12S may be precast integrally with the column 32 or may be precast integrally with the beam 52.

[0093] Also, in the above embodiment, both the adjacent sleeve wall 38 and the waist wall 72 are precast members. However, one of the adjacent sleeve wall 38 and the waist wall 72 may be formed of cast-in-place concrete. That is, in the above embodiment, at least one of the adjacent sleeve wall 38 and the waist wall 72 can be a precast member. Similarly, at least one of the adjacent sleeve wall 38 and the hanging wall 60 can be a precast member. That is, in the above embodiment, at least one of the first concrete wall portion and the second concrete wall portion can be a precast member.

[0094] In the above embodiment, the concrete wall 20 with an opening has a pair of left and right sleeve walls 38 surrounding the opening 22, the hanging wall 60, and the waist wall 72. However, it is sufficient for the concrete wall 20 with an opening to have at least the sleeve wall 38 as the first concrete wall portion, and the hanging wall 60 or the waist wall 72 as the second concrete wall portion.

[0095] Although one embodiment of the present invention has been described above, the present invention is not limited to such an embodiment, and one embodiment and various modified examples may be used in appropriate combination, and it is of course possible to implement the present invention in various forms without departing from the gist of the present invention. [Explanation of symbols]

[0096] 20 Concrete wall with opening 22 Aperture 30 Precast column wall member (first precast member) 32 Pillars 38 Sleeve wall (first concrete wall section) 50 Precast beam wall member (second precast member) 60 Hanging wall (second concrete wall section) 70 Precast wall member (second precast member) 72 Waist wall (second concrete wall section) 80 base member (first base member, second base member) 90 Connecting member 100 Connecting member M joint

Claims

1. A first concrete wall portion constituting a sleeve wall; A second concrete wall portion constituting a hanging wall or a waist wall adjacent to the first concrete wall portion through a joint; a first base member provided on the first concrete wall side at a corner of an opening formed by the first concrete wall portion and the second concrete wall portion; A second base member provided on the second concrete wall portion side at the corner portion; A connecting member that connects the first base member and the second base member; A concrete wall structure with an opening.

2. an installation process in which a first concrete wall portion constituting a sleeve wall and a second concrete wall portion constituting a hanging wall or a waist wall are installed adjacent to each other via a joint to form an opening; a connecting step of connecting a first base member provided on the first concrete wall side and a second base member provided on the second concrete wall side at a corner of the opening via a connecting member; A construction method for a concrete wall structure with an opening.

3. A first precast member having a column and a sleeve wall; A second precast member having a hanging wall or a waist wall adjacent to the sleeve wall; a connecting member provided at a corner of an opening formed by the sleeve wall and the hanging wall or the waist wall, connecting the first precast member and the second precast member; A concrete wall structure with an opening.

4. an installation step of installing a sleeve wall of a first precast member having a column and a sleeve wall adjacent to a hanging wall or a waist wall of a second precast member to form an opening; a connecting step of connecting the first precast member and the second precast member at a corner of the opening; A construction method for a concrete wall structure with an opening.

Citation Information

Patent Citations

  • Fabricated structure system with high prefabrication rate

    CN214784780U

  • Light weight foamed concrete in - plate plate mounting device for a window

    JP1979043013U

  • ALC fitting frame and method for assembling the same

    JP2018053670A

  • Rigid frame structure using wing wall and joint method thereof

    JP2019078056A

  • Modular architectural construction system comprising universal interconnectable parts

    US20190119909A1