Construction method and construction device for concrete structures
The method and apparatus automate vibrator placement and compaction in concrete construction, addressing labor-intensive issues and improving productivity for high lift height structures.
Patent Information
- Application Number
- JP2023044546
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-20
- Publication Date
- 2024-10-03
AI Technical Summary
Constructing concrete structures with high pouring lift heights requires significant labor and effort, and manual placement of vibrators leads to positioning errors, reducing productivity.
A method and apparatus that automates the placement, compaction, and lifting of vibrators using a hoisting device with a detection system to ensure precise positioning, allowing for automated layering of concrete.
Reduces labor effort and improves productivity by enabling efficient construction of concrete structures with high lift heights through automated vibrator placement and compaction.
Smart Images

Figure 2024134311000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a method and an apparatus for constructing a concrete structure. [Background technology]
[0002] Conventionally, when constructing a concrete structure, concrete is poured into a formwork, and then the concrete is vibrated with a vibrator to compact it. In the following Patent Document 1, concrete is poured in a number of layers. Patent Document 1 proposes a concrete pouring and compacting device and method in which the discharge side of a concrete hose and the vibrator side of a cable-attached rod-type vibrator are suspended using a pulley. The concrete is compacted immediately after being poured by using the pulley to pull up and operate the discharge port of the concrete hose and the vibrator of the cable-attached rod-type vibrator in response to pouring of the concrete. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Japanese Patent Application Publication No. 9-203208 Summary of the Invention [Problem to be solved by the invention]
[0004] However, when constructing a concrete structure with a high pouring lift height, if the vibrator is positioned or moved upward by hand, it is necessary to position, compact, and lift the vibrator at a high place with poor footing, which requires heavy labor and reduces productivity. Furthermore, as in Patent Document 1, controlling the lifting of the concrete hose and vibrator based on data such as the working speed and duration of work corresponding to the properties of the concrete to be poured requires time and effort before construction. In addition, when constructing concrete structures with a high pouring lift height, such as high piers, as the concrete pouring position becomes higher, errors are likely to occur in the vibrator position, which requires time and effort for corrections, etc.
[0005] The present invention has been made in consideration of the above-mentioned circumstances, and has an object to provide a method and apparatus for constructing concrete structures that can reduce the amount of work required and improve productivity, even for concrete structures with a high pouring lift height. [Means for solving the problem]
[0006] The method for constructing a concrete structure of the present invention, which solves the above-mentioned problems, is a method for constructing a concrete structure, which involves pouring concrete into a forming space defined by a formwork, and compacting the concrete by immersing a vibration part of a vibrator in the concrete and vibrating it, and which is characterized by repeating the following steps: a preparation step of supporting the vibrator, which has a detection part provided at a predetermined position relative to the vibration part, on a hoisting device and arranging the hoisting device above the forming space; a pouring step of pouring the concrete with the vibration part arranged in the forming space and stopping pouring of the concrete when the detection part detects that the vibration part has been immersed; a compaction step of forming a concrete layer by vibrating the vibration part for a predetermined period of time after the concrete pouring has been stopped; and a hoisting step of winding up the vibrator with the hoisting device and arranging the vibration part in the forming space above the concrete layer after the concrete has been compacted, thereby stacking the desired concrete layers in the forming space.
[0007] According to this construction method, the vibrator, which has a detection unit provided at a predetermined position relative to the vibration unit, is supported by a hoisting device and disposed above the forming space, so that the detection unit can be disposed at a predetermined position relative to the vibration unit by winding up the vibrator with the hoisting device and disposing the vibration unit within the forming space. Therefore, the vibration unit and detection unit of the vibrator can be easily disposed within the forming space by the hoisting device. Then, by repeating a pouring step of pouring concrete with the vibrating unit disposed in the molding space, a compaction step of stopping pouring when the vibrating unit is immersed in the concrete and compacting the concrete for a predetermined period by the vibrating unit to form a concrete layer, and a hoisting step of hoisting the vibrating unit above the formed concrete layer by winding up the vibrator with a hoisting device, multiple concrete layers are laminated. Therefore, when laminating multiple concrete layers in the molding space, the placement of the vibrator, compaction, lifting, pouring and stopping of the concrete can be automated, and multiple concrete layers can be laminated automatically in the molding space. As a result, even for concrete structures with a high pouring lift height, the work required can be reduced and productivity can be improved.
[0008] In the method for constructing a concrete structure of the present invention, the concrete may be poured and compacted by the vibrator at a plurality of positions within the molding space. With this construction, even for large concrete structures, the work required can be reduced and productivity can be improved.
[0009] In the method for constructing a concrete structure of the present invention, a new molding space may be formed on top of the concrete layer that has been hardened by stacking multiple times using the formwork or another formwork, and the hoisting device may be moved above the new molding space, and a new concrete layer may be stacked by carrying out the pouring process, the compaction process and the hoisting process. In this way, a new molding space is formed on top of the concrete layer formed by stacking multiple times, the hoisting device is moved above the new molding space, and the pouring, compaction and hoisting processes are carried out again to stack a new concrete layer, making it possible to minimize work effort even for concrete structures with a higher pouring lift height.
[0010] The concrete structure construction device of the present invention, which solves the above-mentioned problems, is a concrete structure construction device comprising a formwork which defines a molding space, a pouring section which pours concrete into the molding space, and a compacting section which compacts the poured concrete, wherein the compacting section has a vibrator which immerses a vibrating section in the concrete and vibrates it, and the compacting section has the vibrator which has a detection section provided at a predetermined position relative to the vibrating section, and a hoisting device which is positioned above the molding space and supports the vibrator so that it can be wound up, and when the detection section detects that the vibrating section has been immersed in the concrete, the pouring of the pouring section is stopped and the vibrating section is vibrated for a predetermined period of time, and after the predetermined period has elapsed, the vibrator is wound up by the hoisting device to move the vibrating section upward, and pouring of the pouring section is resumed.
[0011] According to the construction device of the present invention, the compaction unit has a vibrator with a detection unit provided at a predetermined position relative to the vibration unit, and a hoisting device arranged above the forming space and supporting the vibrator so that it can be wound up.Therefore, by simply winding up the vibrator with the hoisting device and positioning the vibration unit at an upper position within the forming space, the detection unit can be positioned at a predetermined position relative to the vibration unit and it can be detected that the vibration unit has been immersed in the concrete. When the detection unit detects that the vibrating unit has been immersed in concrete, the pouring of the pouring unit is stopped and the vibrating unit is vibrated for a predetermined period of time, and after the predetermined period has elapsed, the vibrator is wound up by the hoisting device to move the vibrating unit upward and pouring of the pouring unit is resumed.Therefore, the pouring process, compaction process and hoisting process described above can be automatically repeated, and multiple concrete layers can be automatically and efficiently stacked within the forming space. Effect of the Invention
[0012] According to the concrete structure construction method and concrete structure construction device of the present invention, it is possible to reduce the amount of work required and improve productivity, even for concrete structures with a high pouring lift height. [Brief description of the drawings]
[0013] [Figure 1] FIG. 1 is a vertical cross-sectional view showing a state in which a concrete structure is constructed using a construction method according to an embodiment of the present invention. [Diagram 2] 1 is a cross-section of a forming space in a construction method according to an embodiment of the present invention, showing the arrangement of a casting section and a compaction section. [Diagram 3] 1 is a flowchart showing an outline of a construction method according to an embodiment of the present invention. [Figure 4] FIG. 2 is a vertical cross-sectional view showing a state during construction of a concrete structure using a construction method according to an embodiment of the present invention, showing the initial construction state of the bottom region. [Diagram 5] FIG. 2 is a vertical cross-sectional view showing a state during construction of a concrete structure using a construction method according to an embodiment of the present invention, showing the state of the bottom region in the middle of construction. [Figure 6] FIG. 2 is a longitudinal cross-sectional view showing a state during construction of a concrete structure using a construction method according to an embodiment of the present invention, showing the construction state of an intermediate region. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0014] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings. In this embodiment, an example of constructing a high pier as a concrete structure will be described. FIG. 1 is a vertical cross-sectional view showing a state in which a concrete structure is constructed by the construction method of this embodiment, and FIG. 2 is a horizontal cross-sectional view of the molding space.
[0015] The construction device 10 used in the method for constructing a concrete structure of this embodiment will be described. The construction device 10 of this embodiment includes a formwork 12 that defines a molding space 11, a casting section 14 that casts concrete 13 into the molding space 11, a compaction section 15 that compacts the poured concrete 13, and a control section 16 that controls the operation of each section.
[0016] The formwork 12 of this embodiment defines a molding space 11 having a shape corresponding to a part of the height of the concrete structure and has an annular cross-sectional shape. The molding space 11 has an upper end opening 11a that opens upward at its upper end.
[0017] The casting section 14 includes a supply source 17 of concrete 13, a pressure delivery pipe 18 through which the concrete 13 from the supply source 17 is pressure delivery, and a plurality of casting pipes 19 branching off from the pressure delivery pipe 18 and having an open lower end. The supply source 17 is provided with a pressure delivery pump (not shown), and is configured to be able to control the pouring and stopping of the concrete 13. The pressure delivery pipe 18 is disposed above along the molding space 11. The casting pipes 19 are disposed at multiple positions along the molding space 11 at intervals in the horizontal direction, each extending downward from the pressure delivery pipe 18, with its lower end inserted into the molding space 11. It is preferable that the opening at the lower end is disposed at a height position directly above the concrete layer 13a to be formed.
[0018] The compaction section 15 includes a vibrator 21 that is immersed in the concrete 13 to vibrate it, and a hoisting device 22 that is disposed above the forming space 11 and supports the vibrator 21 so that it can be hoisted. A plurality of vibrators 21 and hoisting devices 22 are disposed at a plurality of positions along the forming space 11 at intervals in the horizontal direction.
[0019] The lower end side of the vibrator 21 is provided with a vibration unit 23 that is immersed in the concrete 13 to vibrate it, and a detection unit 24 that is disposed at a predetermined position relative to the vibration unit 23 and detects that the vibration unit 23 is immersed in the concrete 13. The detection unit 24 in this embodiment is disposed, for example, at the uppermost part of the region of the vibration unit 23 that is immersed in the concrete 13.
[0020] The control unit 16 is configured to be able to control the driving of each unit such as the supply source 17, the vibrator 21, the hoisting device 22, and the like.
[0021] When the control unit 16 detects by the detection unit 24 that the vibration unit 23 is immersed in the concrete 13, the control unit 16 stops the pouring of the concrete pouring unit 14 and vibrates the vibration unit 23 for a predetermined period of time. After the predetermined period of vibration, the control unit 16 drives the hoisting device 22 to wind up the vibrator 21, thereby moving the vibration unit 23 and the detection unit 24 of the vibrator 21 upward. When winding up the vibrator 21, the vibration unit 23 is placed at a predetermined position in the molding space 11 that is required when pouring the next concrete 13. The predetermined position in the molding space 11 is the height position of the concrete layer 13a to be formed next, and is the position where the concrete 13 is immersed when it is poured. This position can be set in advance. After the control unit 16 places the vibration unit 23 at the predetermined position in the molding space 11, the control unit 16 drives the supply source 17 of the pouring unit 14 to resume pouring the concrete 13.
[0022] Next, a method for constructing a concrete structure using such a construction device 10 will be described. Fig. 3 is a flow chart showing the construction method of this embodiment. Figs. 4 to 6 are vertical cross-sectional views showing the state during construction of a concrete structure, with Fig. 4 showing the early stage of construction of the lowest region, Fig. 5 showing the middle stage of construction of the lowest region, and Fig. 6 showing the construction state of the intermediate region. Figs. 4 and 6 show the state during pouring of concrete 13, and Fig. 5 shows the state in which the vibration unit 23 of the vibrator 21 is being driven.
[0023] As shown in Fig. 3, first, in the preparation step S1, a scaffolding 26 corresponding to a concrete structure is provided, and a molding space 11 is defined by a formwork 12. In this embodiment, the formwork 12 defines the molding space 11 corresponding to a part of the height direction of the high pier.
[0024] Next, the casting section 14 and the compaction section 15 are placed.
[0025] The casting unit 14 has a pressure pipe 18 disposed above along the forming space 11, and a plurality of casting pipes 19 each connected to the pressure pipe 18 with their lower ends disposed within the forming space 11. The control unit 16 and the supply source 17 are installed at any position on the construction site. The supply source 17 is connected to the pressure pipe 18. The control unit 16 is connected to the compaction unit 15 and the necessary locations of the supply source 17.
[0026] The compaction section 15 has a vibration section 23 and a detection section 24 arranged at a predetermined position relative to the vibration section 23 provided on the lower end side of each of a plurality of vibrators 21, and the upper end side of each vibrator 21 is supported by a hoisting device 22.
[0027] Each hoisting device 22 is disposed above the upper end opening 11a of the forming space 11. In this embodiment, a plurality of vibrators 21 and hoisting devices 22 are disposed at multiple positions along the forming space 11 at intervals in the horizontal direction. Each hoisting device 22 is fixed to a scaffolding 26.
[0028] After the hoisting device 22 is installed, a pouring process S2, a compaction process S3, and a hoisting process S4 are repeatedly performed to stack a plurality of concrete layers 13a in the molding space 11.
[0029] In the casting step S2, after the vibration part 23 of the vibrator 21 is placed at a predetermined position in the molding space 11, a pressure pump for the concrete 13 provided in the supply source 17 is driven to cast the concrete 13 into the molding space 11. The concrete 13 is supplied from the supply source 17 through the pressure pipe 18 and the casting pipe 19 into the molding space 11. To place the vibration part 23 at a predetermined position in the molding space 11, the control unit 16 controls the hoisting device 22 to hoist or lower the vibrator 21, so that the vibration part 23 can be automatically placed at a preset height position. At this time, the detection unit 24 is also placed at a predetermined position relative to the vibration part 23.
[0030] When the concrete 13 is accumulated in the molding space 11 and the vibration unit 23 is immersed in the concrete 13, the detection unit 24 detects the immersion state of the concrete 13 and transmits a detection signal to the control unit 16. Based on this detection signal, the control unit 16 stops driving the supply source 17 to stop pouring the concrete 13 and terminates the pouring process S2 (see FIG. 4).
[0031] In the compaction step S3, after the control unit 16 stops pouring of the concrete 13, the vibration unit 23 is vibrated for a predetermined period of time to compact the concrete 13. When pouring of the concrete 13 is stopped, the vibration unit 23 of the vibrator 21 is immersed in the concrete 13, so that the poured concrete 13 can be compacted by vibrating the vibration unit 23 (see FIG. 5). After a predetermined time has passed after the concrete 13 has been compacted, a concrete layer 13a is formed.
[0032] In the winding step S4, after the compaction step S3, the control unit 16 drives the winding device 22 to wind up the vibrator 21. Driving the winding device 22 raises the vibration unit 23 and the detection unit 24 arranged on the lower end side of the vibrator 21. The winding up of the vibrator 21 needs to be performed quickly while the formed concrete layer 13a is not yet hardened. Then, the vibration unit 23 is placed at a predetermined position in the forming space 11, which is set in advance, above the concrete layer 13a formed in the compaction step S3.
[0033] By carrying out the pouring step S2, the compaction step S3 and the winding step S4, one concrete layer 13a is formed.
[0034] In this embodiment, after the winding step S4 is completed, it is determined whether the concrete layer 13a has reached the target number of layers (height determination step S5). If the target number of layers (target height) has not been reached, the pouring step S2, the compaction step S3, and the winding step S4 are repeated again. This allows multiple concrete layers 13a to be formed in the molding space 11 (see FIG. 6).
[0035] At this time, in each winding process S4, a predetermined position within the forming space 11 corresponding to the next concrete layer 13a to be formed is set in advance, so that the vibrator 21 can be wound up to position the vibration unit 23 at a predetermined position, and the detection unit 24 can be positioned at a position corresponding to the vibration unit 23.
[0036] Therefore, in each pouring step S2, the concrete 13 can be reliably poured into the forming space 11, and by automatically repeating the pouring step S2, the compaction step S3 and the winding step S4 multiple times, the desired concrete layer 13a can be stacked.
[0037] In this embodiment, after it is determined in the height determination process S5 that the target number of layers (target height) has been reached, it is then determined whether the target pouring lift height has been reached (lift height determination process S6), and if it has not been reached, the preparation process S1 is performed again.
[0038] In the preparation step S1, after multiple concrete layers 13a are stacked and formed, the stacked concrete layers 13a are hardened, and then a scaffolding 26 is added to the top of the concrete layers 13a, and a new molding space 11 is formed by the formwork 12. At this time, a new formwork 12 may be used, but in this embodiment, the formwork 12 used when forming the hardened multiple concrete layers 13a is moved above the hardened concrete layers 13a to form a new molding space 11.
[0039] Further, each hoisting device 22 is moved above the new forming space 11 and disposed above the upper end opening 11a of the new forming space 11, and each hoisting device 22 is fixed to and installed on the scaffolding 26, and the vibrator 21 equipped with the vibration unit 23 and the detection unit 24 is supported by the hoisting device 22. Note that, for example, a crane is used to move the hoisting device 22 upward.
[0040] Thereafter, the pouring step S2, the compaction step S3, and the winding step S4 are repeated a number of times in the same manner as described above, thereby stacking a number of new concrete layers 13a. Then, until the target pouring lift height is reached, the concrete layers 13a are stacked and the concrete structure is constructed by repeating the installation of the formwork 12 and the movement of the compaction unit 15 in the preparation step S1, the pouring step S2, the compaction step S3, and the hoisting step S4 multiple times. When pouring of the concrete 13 is completed to a predetermined height in the lift height determination step S6, the process ends. By carrying out such steps, a concrete structure with a significantly high pouring lift height, such as a high pier, can be easily constructed.
[0041] According to the above-described method for constructing a concrete structure of this embodiment, the vibrator 21 having the detection unit 24 provided at a predetermined position relative to the vibration unit 23 is supported by the hoisting device 22 and disposed above the forming space 11, so that the detection unit 24 can be disposed at a predetermined position relative to the vibration unit 23 by winding up the vibrator 21 with the hoisting device 22 and disposing the vibration unit 23 in the forming space 11. Therefore, the vibration unit 23 and the detection unit 24 of the vibrator 21 can be easily disposed in the forming space 11 by the hoisting device 22. The positional relationship of the detection unit 24 to the vibration unit 23 can be set arbitrarily. The detection unit 24 may be directly attached to the vibration unit 23, or may be disposed by another method as long as the positional relationship with the vibration unit 23 can be kept constant.
[0042] A pouring step S2 in which the concrete 13 is poured with the vibration unit 23 disposed in the molding space 11, a compaction step S3 in which pouring is stopped when the vibration unit 23 is immersed in the concrete 13 and the concrete layer 13a is formed by compacting the concrete by the vibration unit 23 for a predetermined period, and a hoisting step S4 in which the vibration unit 23 and the detection unit 24 are disposed above the concrete layer 13a formed by winding up the vibrator 21 by the hoisting device 22 are repeated to form a plurality of concrete layers 13a in the formwork 12. Therefore, when forming a plurality of concrete layers 13a in the molding space 11, the arrangement, compaction, lifting, pouring and stopping of the vibrator 21 can be automated, and a plurality of concrete layers 13a can be automatically formed in the molding space 11. As a result, even in the case of a concrete structure with a high pouring lift height, the labor required for the work can be reduced and productivity can be improved.
[0043] Furthermore, according to the construction method of this embodiment, the concrete 13 is poured at multiple horizontally spaced positions in the molding space 11 and the concrete 13 is compacted with the vibrator 21, so that even for large concrete structures, the work effort can be reduced and productivity can be improved.
[0044] Furthermore, according to the construction method of this embodiment, a new molding space 11 is formed on top of the multiple concrete layers 13a by using the formwork 12 or another formwork 12, the hoisting device 22 is moved above the new molding space 11, and the casting process S2, the compaction process S3, and the hoisting process S4 are carried out to form multiple new concrete layers 13a in layers. Therefore, even for concrete structures with a higher casting lift height, construction can be carried out with minimal work effort.
[0045] In addition, according to the construction method of this embodiment, the compaction section 15 uses a construction device 10 having a vibrator 21 with a detection unit 24 provided at a predetermined position relative to the vibration unit 23, and a hoisting device 22 arranged above the forming space 11 and supporting the vibrator 21 so that it can be wound up.Therefore, by simply winding up the vibrator 21 with the hoisting device 22 and positioning the vibration unit 23 at an upper position within the forming space 11, the detection unit 24 can be positioned at a predetermined position relative to the vibration unit 23, and it can be detected that the vibration unit 23 has been immersed in the concrete 13.
[0046] Then, when the detection unit 24 detects that the vibration unit 23 has been immersed in the concrete 13, pouring of the concrete 13 is stopped and the vibration unit 23 is vibrated for a predetermined period of time, and after the predetermined period has elapsed, the hoisting device 22 winds up the vibrator 21 to move the vibration unit 23 upward, and pouring of the concrete 13 is resumed. In this manner, in this embodiment, the pouring process S2, the compaction process S3, and the hoisting process S4 can be automatically repeated.
[0047] The above embodiment can be modified as appropriate within the scope of the present invention.
[0048] For example, in the above embodiment, concrete 13 was poured at multiple horizontally spaced positions in molding space 11 and compacted with vibrator 21, but a method in which concrete 13 is poured at one horizontal position in molding space 11 and compacted with vibrator 21 may also be used.
[0049] In addition, in the above embodiment, multiple concrete layers 13a are formed and hardened in the molding space 11 defined by the formwork 12, and then a new molding space 11 is formed by the formwork 12 above the multiple concrete layers 13a, and multiple more concrete layers 13a are formed. However, a method in which all concrete layers 13a are formed in the molding space 11 defined initially and then hardened to complete the construction may also be used.
[0050] Furthermore, in the above embodiment, the height position of the lower end opening of the concrete pouring pipe 19 is adjusted and positioned, but for example, the concrete pouring pipe 19 itself may be raised and lowered, or the height position of the lower end opening may be changed by connecting concrete pouring pipes 19 of different lengths to the pressure transport pipe 18. [Explanation of symbols]
[0051] 10 Construction equipment 11 Molding space 11a Top opening 12 Formwork 13. Concrete 13a Concrete layer 14 Casting section 15 Compaction section 16 Control section 17 Source 18 Pressure Pipe 19 Casting piping 21 Vibrator 22 Hoisting device 23 Vibration section 24 Detection unit 26 Scaffolding S1 Preparation process S2 pouring process S3 Compaction process S4 Hoisting process S5 Height determination process S6 Lift height determination process
Claims
1. A method for constructing a concrete structure, comprising pouring concrete into a molding space defined by a formwork, and compacting the concrete by immersing a vibration portion of a vibrator in the concrete and vibrating the concrete, comprising: a preparation step of supporting the vibrator, the vibrator having a detection unit provided at a predetermined position relative to the vibration unit, on a hoisting device and disposing the hoisting device above the molding space; A pouring process in which the concrete is poured while the vibration unit is disposed in the molding space, and pouring of the concrete is stopped when the detection unit detects that the vibration unit is immersed. a compaction step of forming a concrete layer by vibrating the vibration unit for a predetermined period of time after stopping pouring of the concrete; a hoisting process in which, after the concrete is compacted, the vibrator is hoisted up by the hoisting device, and the vibration unit is disposed in the molding space above the concrete layer; and repeating the steps to stack the desired concrete layers in the molding space.
2. 2. The method for constructing a concrete structure according to claim 1, further comprising the steps of pouring the concrete and compacting it with the vibrator at a plurality of positions within the molding space.
3. A new molding space is formed by the formwork or another formwork on the upper part of the concrete layer that has been layered and hardened multiple times, and the hoisting device is moved above the new molding space; 2. The method for constructing a concrete structure according to claim 1, further comprising the steps of: carrying out the pouring step, the compacting step, and the winding step to build up a new concrete layer.
4. A construction device for a concrete structure comprising: a formwork for defining a molding space; a pouring section for pouring concrete into the molding space; and a compaction section for compacting the poured concrete, the compaction section having a vibrator for immersing a vibration section in the concrete to vibrate the concrete, The compaction unit includes the vibrator having a detection unit provided at a predetermined position relative to the vibration unit, and a hoisting device disposed above the molding space and supporting the vibrator so as to be capable of being hoisted up, When the detection unit detects that the vibration unit is immersed in the concrete, the pouring unit stops pouring and the vibration unit is vibrated for a predetermined period of time. A concrete structure construction device, wherein after the predetermined period has elapsed, the vibrator is wound up by the hoisting device, the vibration section is moved upward, and pouring of the concrete is resumed by the pouring section.
Citation Information
Patent Citations
Vibrator beam, vibrator frame and method for compacting concrete
EP3964673A1
Solidifying casting construction method of concrete
JP1987185962A
Automatic concrete placing method and device
JP1993025938A
Device for hoisting vibrator
JP1995292975A
Automatic concrete placing method
JP1996042149A