Method for constructing underground structure
The method constructs underground structures with a permeable filling structure to cover joint parts, addressing the inflow of earth and sand during earthquakes, ensuring cost-effectiveness and water management.
Patent Information
- Application Number
- JP2023044572
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-20
- Publication Date
- 2024-10-03
AI Technical Summary
Existing methods for constructing underground structures fail to reliably prevent the inflow of earth and sand from joint portions during earthquakes, and conventional countermeasures are prone to damage or increase costs when accommodating large openings.
A method involving excavation, frame construction, and installation of a filling structure with a permeable water-filling material, such as a gabion with crushed stones, to cover joint parts of underground structures, allowing for effective suppression of earth and sand inflow while managing seepage water.
The method effectively suppresses the inflow of earth and sand from joint portions, is cost-effective, and maintains water permeability to manage seepage from rivers, reducing the risk of damage and cost associated with conventional countermeasures.
Smart Images

Figure 2024134330000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a method for constructing an underground structure. [Background technology]
[0002] A method of constructing a concrete product is known in which a concrete foundation block is placed at the boundary between adjacent box culverts, and the box culvert is then placed on this foundation block via an elastic material (for example, Patent Document 1). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2013-108271 A Summary of the Invention [Problem to be solved by the invention]
[0004] In multiple underground structures constructed so as to be connected to each other, gaps may occur at the joints (structural joints) of the multiple underground structures during an earthquake, and soil and sand from the back of the underground structures may flow in through the joints. For this reason, in the construction of underground structures, it is possible to cover the joints using gap prevention members such as flexible joints, sheets, or steel plates. However, conventional gap prevention members may be damaged when large gaps are encountered.
[0005] The present invention aims to provide a method for constructing underground structures that can reliably prevent soil and sand from flowing into the rear of underground structures through the joints between multiple underground structures. [Means for solving the problem]
[0006] One aspect of the present invention is a construction method for underground structures, comprising an excavation process for forming a trench, a framework construction process for constructing a plurality of underground structures in the trench so that they are connected to each other via joints, and an installation process for installing a filler structure, in which a filler material is contained inside an exterior configuration part that constitutes the exterior, in the trench so as to cover the joints of the plurality of constructed underground structures.
[0007] In the underground structure construction method according to one aspect of the present invention, a trench is formed in the excavation step. A plurality of underground structures are constructed in the trench so as to be connected to each other via joints in the framework construction step. A filling structure having a filling material accommodated inside an external configuration part that constitutes the external shape is installed in the trench so as to cover the joints of the constructed underground structures in the installation step. As a result, even if an opening occurs at the joints, for example, the filling structure suppresses the inflow of soil and sand from the rear of the underground structure. Therefore, according to the underground structure construction method according to one aspect of the present invention, it is possible to reliably suppress the inflow of soil and sand from the rear of the underground structure through the joints of the underground structures.
[0008] In one embodiment, the underground structure is installed alongside a levee extending along a river, and in the excavation step, a trench is formed along the levee on the opposite side of the river with respect to the levee, and in the installation step, a permeable filling structure, which is a filling structure having water permeability, may be installed in the trench so as to cover the joint. Here, as a method other than the conventional gap prevention member, it is considered to cover the joint by improving the backfill soil behind the skeleton of multiple underground structures with cement. However, when an underground structure is installed alongside a levee extending along a river, it is necessary to consider that there is a request to pass seepage water from the river into the ground of the levee for the purpose of managing the river. In this regard, by using a permeable filling structure having water permeability as the filling structure, even if, for example, a gap occurs at the joint, the permeable filling structure suppresses the inflow of sediment behind the underground structure. In addition, the seepage water from the river passing through the ground of the levee can pass through the permeable filling structure. Therefore, in multiple underground structures installed alongside a levee extending along a river, it is possible to prevent soil and sand from the back of the underground structures from flowing in through the joints between the multiple underground structures, while allowing the flow of seepage water from the river through the ground of the levee.
[0009] In one embodiment, in the installation step, a gabion having a metal cage that forms the outer shape of the filling structure and crushed stone contained inside the metal cage may be installed as the filling structure. In this case, if a conventional opening countermeasure member is to be made to accommodate a large opening, the cost of the member increases, for example, because it has to be a custom-made product. However, since the filling structure is made of a metal cage and crushed stone, it can be constructed cheaply and easily.
[0010] In one embodiment, in the framework construction step, a U-shaped retaining wall and a box culvert are constructed as a plurality of underground structures so as to be connected to each other, and the bottom of the U-shaped retaining wall is not subjected to ground improvement, and the bottom of the box culvert is subjected to ground improvement, and in the installation step, a filling structure may be installed in the trench so as to cover the joint between the U-shaped retaining wall and the box culvert. In this case, the framework construction step does not perform ground improvement in the bottom of the U-shaped retaining wall, and ground improvement is performed in the bottom of the box culvert. Therefore, the bottom of the U-shaped retaining wall and the bottom of the box culvert tend to shake differently during an earthquake, and gaps tend to occur easily. Here, in the installation step, a filling structure is installed in the trench so as to cover the joint between the U-shaped retaining wall and the box culvert. This makes it possible to effectively suppress the inflow of soil and sand from the back of the underground structure into the joint where gaps tend to occur easily. Effect of the Invention
[0011] According to the underground structure construction method of the present invention, it is possible to reliably prevent soil and sand from flowing into the rear surface of an underground structure through the joints between multiple underground structures. [Brief description of the drawings]
[0012] [Figure 1] 1 is a cross-sectional view illustrating an example of an underground structure that is the subject of a construction method for an underground structure according to an embodiment of the present invention. [Diagram 2] FIG. 2(a) is a side cross-sectional view illustrating a joint of the underground structure of FIG. 1. FIG. 2(b) is a schematic plan view showing an example of the installation of a filler structure that covers the joint of FIG. [Diagram 3] 2 is a flowchart showing the flow of a construction method for an underground structure according to an embodiment. [Figure 4] 1A is a cross-sectional view illustrating a retaining wall casting step, and FIG. 1B is a cross-sectional view illustrating an excavation step. [Diagram 5] 1A is a cross-sectional view illustrating a framework construction process for a U-shaped retaining wall, FIG. 1B is a cross-sectional view illustrating an installation process for a U-shaped retaining wall, and FIG. 1C is a cross-sectional view illustrating an earth retaining wall removal process for a U-shaped retaining wall. [Figure 6] 1A is a cross-sectional view illustrating a process of constructing a box culvert's framework, FIG. 1B is a cross-sectional view illustrating a process of installing a box culvert, and FIG. 1C is a cross-sectional view illustrating a process of removing an earth retaining wall of a box culvert. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0013] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In the description of the drawings, the same or corresponding elements are given the same reference numerals, and duplicated descriptions are omitted as appropriate. In addition, the drawings may be partially simplified or exaggerated for ease of understanding, and the dimensions, ratios, angles, etc. are not limited to those shown in the drawings.
[0014] FIG. 1 is a cross-sectional view illustrating an underground structure that is a target of a construction method for an underground structure according to an embodiment. FIG. 1 shows a skeleton 1 as an example. In this embodiment, the skeleton 1 is a concrete structure that constitutes an expressway, and at least a portion of it is buried in ground 2. FIG. 2(a) is a side cross-sectional view illustrating a joint portion of the underground structure in FIG. 1. As shown in FIG. 1 and FIG. 2(a), the skeleton 1 has a plurality of underground structures 10 constructed so as to be connected to each other via joint portions 3.
[0015] In this embodiment, multiple underground structures 10, which are the subject of the underground structure construction method, are arranged side by side on a levee 4. The levee 4 is provided so as to extend along a river 5. The multiple underground structures 10 are constructed in a trench 6 formed along the levee 4. The trench 6 is formed on the opposite side of the levee 4 to the river 5. As will be described later, the multiple underground structures 10 are constructed inside the formed trench 6, and at least a portion of them is buried in the ground 2 by backfilling the trench 6.
[0016] The multiple underground structures 10 are constructed so that a U-shaped retaining wall 11, part of the lower side of which is buried in the ground 2, and a box culvert 12, the entirety of which is buried in the ground 2, are connected to each other via joints 3.
[0017] The U-shaped retaining wall 11 has a base 11a and side walls 11b extending upward from both ends of the base 11a. The U-shaped retaining wall 11 is open at the top, and pavement 11c is constructed on the base 11a. The box culvert 12 has a base 12a, side walls 12b extending upward from both ends of the base 12a, a top slab 12c forming a ceiling, and a gable wall 12d erected at the end of the top slab 12c. The box culvert 12 is closed at the top, and the top slab 12c, except for the gable wall 12d, is covered with soil 12e. The box culvert 12 has an internal space 12f paved with pavement.
[0018] Among the multiple underground structures 10, below the box culvert 12, crushed stone replacement 13 and ground improvement 14 are being carried out. Since soil 12e is placed on the top plate 12c of the box culvert 12, the load applied to the bottom plate 12a of the box culvert 12 increases. Below the box culvert 12, consolidation settlement may occur. Here, consolidation settlement refers to a phenomenon in which the soil constituting the ground 2 below the box culvert 12 is crushed by the load of the soil 12e and the box culvert 12, etc., and the soil is consolidated in volume, and gradually settles over a long period of time. Therefore, in order to suppress consolidation settlement, ground improvement 14 is carried out on the ground 2 below the box culvert 12 (here, below the crushed stone replacement 13) by, for example, a mechanical mixing method.
[0019] On the other hand, among the multiple underground structures 10, crushed stone replacement 15 is performed below the U-shaped retaining wall 11. Below the U-shaped retaining wall 11, ground improvement 16 may be performed on the ground 2 below the crushed stone replacement 15, for example, by a high-pressure jet mixing method. This ground improvement 16 is for improving the stability of a temporary retaining wall 17, and is different from the ground improvement 14 for suppressing consolidation settlement. The U-shaped retaining wall 11 is not covered with soil, and the originally existing soil is removed by excavation. Since the soil covering thickness is smaller than before construction, consolidation settlement as in the case of the box culvert 12 is unlikely to occur. Therefore, it is not necessary to perform ground improvement 14 for suppressing consolidation settlement on the ground 2 below the U-shaped retaining wall 11.
[0020] However, because the ground improvement conditions are different between the ground 2 below the box culvert 12 and the ground 2 below the U-shaped retaining wall 11, a relative difference in shaking due to an earthquake or the like is likely to occur at the joint 3 between the box culvert 12 and the U-shaped retaining wall 11. When a relative difference in shaking occurs, the mesh size is likely to increase at the joint 3 between the box culvert 12 and the U-shaped retaining wall 11. The mesh size is the size of the opening at the joint 3.
[0021] In order to prevent the inflow of soil and sand from the rear of the underground structure 10 through the joint 3 with a large mesh size, it is possible to cover the joint 3 with an anti-mesh material such as a flexible joint, sheet, or iron plate. However, with conventional anti-mesh materials, there is a possibility that the anti-mesh material may be damaged when the mesh size is large. If conventional anti-mesh materials are to be used for large mesh sizes, the cost of the materials may increase, for example, by making them custom-made. In addition, as a method other than the conventional anti-mesh material, it is possible to cover the joint 3 by improving the backfill soil on the rear of the skeleton 1 of multiple underground structures 10 with cement. However, since the underground structures 10 are installed side by side on the embankment 4 extending along the river 5, there is a demand for the seepage water 5a (dashed line in FIG. 1) from the river 5 to pass into the ground 2 of the embankment 4 for the management of the river 5. When performing cement improvement, the cement-improved portion becomes less permeable, which impedes the flow of the seepage water 5a from the river 5.
[0022] Therefore, a filling structure in which a filling material is accommodated inside an external configuration part that configures the external shape is installed in the trench 6 so as to cover the joints 3 of the constructed underground structures 10. As a specific example, a permeable water-filling structure 20 can be used as the filling structure. The permeable water-filling structure 20 is a gabion having a metal cage that configures the external shape of the filling structure and crushed stone accommodated inside the metal cage. In addition, a water-permeable sheet such as a nonwoven fabric may be attached to the surface of the metal cage of the gabion. By attaching a water-permeable sheet to the surface of the metal cage, it is possible to suppress the absorption (flow) of fine particles of the ground 2 into the open joints 3, and to suppress the subsidence of the ground 2.
[0023] The filling structure is not limited to a gabion. The filling structure may have an external configuration part that configures the external shape of the filling structure and a filling material contained inside the external configuration part. The filling structure is preferably a structure configured to allow water to pass through. The external configuration part may be a cage body other than a metal cage, a frame body, or a box body having a through hole. In the permeable water filling structure 20, it is preferable that the multiple filling materials are covered by the external configuration part so as to be fastened, and the shape retention rigidity of the permeable water filling structure 20 can be expected. The filling material may be a block other than crushed stone or a concrete scrap material. In the permeable water filling structure 20, for example, it is preferable that the filling material has a certain weight, and the permeable water filling structure 20 can be expected to be self-supporting so that it is difficult to collapse and to be displaced. In the permeable water filling structure 20, it is preferable that the multiple filling materials are not bonded or fixed to each other so as not to reduce the water permeability.
[0024] Fig. 2(b) is a schematic plan view showing an example of installation of a filling structure to cover the joint of Fig. 2(a). Fig. 2(b) shows a plan view of the excavated trench 6 after a box culvert 12 and a U-shaped retaining wall 11 have been constructed in the trench 6, but before the trench 6 is backfilled. As shown in Fig. 2(b), a permeable water filling structure 20 is installed in the trench 6 so as to cover the joint 3 between the box culvert 12 and the U-shaped retaining wall 11. The permeable water filling structure 20 is installed in the trench 6, between the joint 3 and the retaining wall 17.
[0025] The permeable water-filling structure 20 is, for example, a rectangular parallelepiped, and is rectangular in plan view. The longitudinal dimension of the permeable water-filling structure 20 along the underground structure 10 in plan view may be calculated based on the expected mesh size and the overlapping allowance (lap amount) to the underground structure 10 when the mesh size is created. For example, when the expected mesh size is 600 mm and the overlapping allowance to one of the underground structures 10 when the mesh size is created is 1000 mm, the longitudinal dimension of the permeable water-filling structure 20 can be calculated as shown in the following formula (1). 600mm+1000mm×2=2600mm...(1)
[0026] In addition, the overlapping margin to one of the underground structures 10 when an opening occurs is not limited to 1000 mm, and may be, for example, 500 mm. It is sufficient that the overlapping of the permeable water-filling structure 20 to the underground structure 10 does not come off when an opening occurs.
[0027] The short side dimension of the permeable water-filling structure 20 in the plan view along the direction intersecting with the underground structure 10 may be calculated taking into consideration the bending rigidity applied by the earth pressure from the ground 2 of the underground structure 10 when an expected mesh size occurs. For example, when the expected mesh size is 600 mm, it may be calculated using the following formula (2). However, the bending inspection necessity judgment value is a numerical value for judging the necessity of bending inspection to verify the validity of the above-mentioned bending rigidity. The bending inspection necessity judgment value may be, for example, about 2.5. When the inequality of the following formula (2) is established, the bending inspection can be omitted. In this case, the short side dimension of the permeable water-filling structure 20 may be, for example, about 1000 mm. 600mm / short side dimension < bending inspection necessity judgment value (2)
[0028] Next, the procedure of the underground structure construction method will be described. FIG. 3 is a flow chart showing the flow of the underground structure construction method according to the embodiment. In the underground structure construction method according to the present embodiment, first, an earth-retaining wall casting step is performed (step S01). FIG. 4(a) is a cross-sectional view illustrating the earth-retaining wall casting step. As shown in FIG. 4(a), in the earth-retaining wall casting step, first, a pair of earth-retaining walls 17 are cast into the ground 2. The earth-retaining walls 17 may be composed of, for example, a plurality of steel sheet piles. The steel sheet pile is a steel plate that has a trapezoidal shape in a cross section cut in a plane perpendicular to the longitudinal direction of the steel sheet pile. The steel sheet pile may be composed of a plurality of steel plates connected together.
[0029] Next, an excavation process is performed (step S02). FIG. 4(b) is a cross-sectional view illustrating the excavation process. The excavation process is a process of forming a trench 6 along the embankment 4 on the side opposite the river 5 with respect to the embankment 4. As shown in FIG. 4(b), after the retaining walls 17 are cast into the ground 2, an excavation process is performed in which the ground 2 located inside the pair of retaining walls 17 in a plan view is excavated. The excavation of the ground 2 forms the trench 6, which is a space for constructing the structure 1 below the ground surface 2a.
[0030] Next, a skeleton construction process is performed (step S03). FIG. 5(a) is a cross-sectional view illustrating the skeleton construction process for a U-shaped retaining wall. FIG. 6(a) is a cross-sectional view illustrating the skeleton construction process for a box culvert. The skeleton construction process is a process of constructing a plurality of underground structures 10 in the excavation section 6 so that they are connected to each other via joints 3. As shown in FIG. 5(a) and FIG. 6(a), in the skeleton construction process, after the excavation section 6 is formed, formwork is installed and concrete is poured, etc., to construct a skeleton 1 including a U-shaped retaining wall 11 and a box culvert 12 in the excavation section 6.
[0031] Next, the installation process is performed (step S04). FIG. 5(b) is a cross-sectional view illustrating the installation process for a U-shaped retaining wall. FIG. 6(b) is a cross-sectional view illustrating the installation process for a box culvert. The installation process is a process of installing the permeable water-filling structure 20 in the excavation section 6 so as to cover the joints 3 of the constructed underground structures 10. In the installation process, after the skeleton 1 is constructed in the excavation section 6, the permeable water-filling structure 20 is installed between the back surface of the skeleton 1 at the joints 3 and the retaining wall 17, as shown in FIG. 5(b). In addition, when the joints 3 are joints between box culverts 12, the permeable water-filling structure 20 may be installed on the top plate 12c of the box culvert 12 at the joints 3, as shown in FIG. 6(b).
[0032] Next, the retaining wall removal process is performed (step S05). FIG. 5(c) is a cross-sectional view illustrating the retaining wall removal process for a U-shaped retaining wall. FIG. 6(c) is a cross-sectional view illustrating the retaining wall removal process for a box culvert. The retaining wall removal process is a process of backfilling the excavation portion 6 and removing the retaining wall 17. As shown in FIG. 5(c) and FIG. 6(c), the space between the back surface of the structure 1 and the retaining wall 17 is backfilled until it reaches the ground surface 2a. At this time, shoring and the like may be removed while backfill soil is being filled from below into the space between the back surface of the structure 1 and the retaining wall 17.
[0033] According to the underground structure construction method described above, the trench 6 is formed in the excavation step. In the framework construction step, a plurality of underground structures 10 are constructed in the trench 6 so as to be connected to each other via the joints 3. In the installation step, a permeable water-filling structure 20 (filling structure) in which crushed stone (filling material) is accommodated inside a metal cage (outer shape component) constituting the outer shape is installed in the trench 6 so as to cover the joints 3 of the constructed plurality of underground structures 10. As a result, even if, for example, the joints 3 open, the permeable water-filling structure 20 suppresses the inflow of soil from the rear of the underground structure 10. Therefore, according to the underground structure construction method, it is possible to reliably suppress the inflow of soil from the rear of the underground structure 10 through the joints 3 of the plurality of underground structures 10.
[0034] The underground structure 10 is installed alongside a levee 4 extending along a river 5. In the excavation process, a trench 6 is formed along the levee 4 on the opposite side of the river 5 with respect to the levee 4. In the installation process, a permeable filling structure 20, which is a filling structure having water permeability, is installed in the trench 6 so as to cover the joint 3. Here, as a method other than the conventional gap prevention member, it is considered to cover the joint by improving the backfill soil behind the skeleton of multiple underground structures with cement. However, when an underground structure is installed alongside a levee extending along a river, it is necessary to consider that there is a request to pass seepage water from the river into the ground of the levee for the purpose of river management. In this regard, by using a permeable filling structure 20 as a filling structure, even if, for example, a gap occurs in the joint 3, the permeable filling structure 20 suppresses the inflow of sediment behind the underground structure 10. In addition, the seepage water from the river 5 passing through the ground 2 of the levee 4 can pass through the permeable filling structure 20. Therefore, in multiple underground structures 10 arranged alongside a levee 4 extending along a river 5, it is possible to prevent soil and sand from the back of the underground structures 10 from flowing in through the joints 3 between the multiple underground structures 10, while allowing the flow of seepage water 5a from the river 5 passing through the ground 2 of the levee 4.
[0035] In the installation process, a gabion having a metal cage that forms the outer shape of the permeable water filling structure 20 and crushed stone contained inside the metal cage is installed as a filling structure. As a result, while trying to make conventional opening countermeasure members compatible with large openings would result in an increase in material costs, for example by requiring custom-made products, the filling structure can be constructed cheaply and easily using a metal cage and crushed stone.
[0036] In the framework construction step, a U-shaped retaining wall 11 and a box culvert 12 are constructed so as to be connected to each other as a plurality of underground structures 10, and ground improvement work is not performed on the lower part of the U-shaped retaining wall 11, while ground improvement work 14 is performed on the lower part of the box culvert 12. In the installation step, a permeable water-filling structure 20 is installed in the excavation part 6 so as to cover the joint part 3 between the U-shaped retaining wall 11 and the box culvert 12. As a result, even if the lower part of the U-shaped retaining wall 11 and the lower part of the box culvert 12 shake differently during an earthquake and tend to be easily opened, the installation step installs the permeable water-filling structure 20 in the excavation part so as to cover the joint part 3 between the U-shaped retaining wall 11 and the box culvert 12, so that it is possible to effectively prevent soil and sand from flowing in from the back of the underground structure 10 into the joint part 3, which tends to be easily opened.
[0037] Although the embodiment of the present invention has been described above, the present invention is not limited to the above embodiment and can be embodied in various forms.
[0038] In the above embodiment, as shown in Fig. 2, the case where the joint portion 3 is a joint portion between a U-shaped retaining wall 11 and a box culvert 12 has been mainly described, but as shown in Fig. 6(b), the joint portion 3 may be a joint portion between box culverts 12. Also, the joint portion 3 may be a joint portion between U-shaped retaining walls 11.
[0039] In the above embodiment, the underground structure 10 (the skeleton 1) is a concrete structure that constitutes an expressway, but is not limited thereto. For example, the underground structure may be for an underground waterway or may form a space for electric wires.
[0040] In the above embodiment, the underground structure 10 is installed alongside the embankment 4 extending along the river 5, and in the excavation step, the trench 6 is formed along the embankment 4 on the opposite side of the river 5 with respect to the embankment 4, but this is not limiting. The underground structure does not have to be close to the river or the embankment. In this case, the filling structure does not have to be permeable.
[0041] The constituent elements of various aspects of the present invention will be described below. <Invention 1> A method for constructing an underground structure, comprising the steps of: an excavation step for forming a trench; A framework construction process for constructing a plurality of the underground structures in the trench so that the structures are connected to each other via joints; A construction method for an underground structure, comprising: an installation process for installing a filling structure, in which a filling material is contained inside an exterior configuration part that constitutes the exterior shape, in the excavation section so as to cover the joints of the constructed multiple underground structures. <Invention 2> The underground structure is installed alongside a levee extending along a river, In the excavation step, the trench is formed along the bank on the opposite side of the bank from the river, The construction method for underground structures described in Invention 1, wherein in the installation step, a permeable filling structure, which is a filling structure having water permeability, is installed in the trench so as to cover the joint portion. <Invention 3> A construction method for underground structures as described in Invention 1 or 2, in which, in the installation process, a gabion having a metal cage that forms the outer shape of the filling structure and crushed stone contained inside the metal cage is installed as the filling structure. <Invention 4> In the framework construction process, a U-shaped retaining wall and a box culvert are constructed in series as the plurality of underground structures, and ground improvement is not performed at the bottom of the U-shaped retaining wall, and ground improvement is performed at the bottom of the box culvert. A construction method for an underground structure described in any one of Inventions 1 to 3, wherein in the installation process, the filling structure is installed in the trench so as to cover the joint between the U-shaped retaining wall and the box culvert. [Explanation of symbols]
[0042] 3...joint, 4...levee, 5...river, 6...excavation, 10...underground structure, 11...U-shaped retaining wall, 12...box culvert, 14...ground improvement work, 20...permeable water-filled structure (filled structure).
Claims
1. A method for constructing an underground structure, comprising the steps of: an excavation step for forming a trench; A framework construction process for constructing a plurality of the underground structures in the trench so that the structures are connected to each other via joints; A construction method for an underground structure, comprising: an installation process for installing a filling structure, in which a filling material is contained inside an exterior configuration part that constitutes the exterior shape, in the excavation section so as to cover the joints of the constructed multiple underground structures.
2. The underground structure is installed alongside a levee extending along a river, In the excavation step, the trench is formed along the bank on the opposite side of the bank from the river, 2. The underground structure construction method according to claim 1, wherein in the installation step, a permeable water-filling structure, which is the filling structure having water permeability, is installed in the trench so as to cover the joint portion.
3. The construction method for underground structures according to claim 1 or 2, wherein in the installation process, a gabion having a metal cage that forms the outer shape of the filling structure and crushed stone contained inside the metal cage is installed as the filling structure.
4. In the framework construction step, a U-shaped retaining wall and a box culvert are constructed in a connected manner as the plurality of underground structures, and ground improvement is not performed at the bottom of the U-shaped retaining wall, and ground improvement is performed at the bottom of the box culvert.
3. The underground structure construction method according to claim 1 or 2, wherein in the installation step, the filling structure is installed in the trench so as to cover the joint between the U-shaped retaining wall and the box culvert.
Citation Information
Patent Citations
Penetration type box culvert, penetration type sewer, and construction method for the same
JP2002004394A
Concrete block for waterway and concrete waterway
JP2004244881A
Long-sized concrete box culvert product
JP2006219859A
Block for dyke foot water channel and water channel structure
JP2008184768A
Water sealing structure for emergency
JP2010196258A