Generator cooler performance monitoring device
The generator cooler performance monitoring device addresses the issue of dirt accumulation in cooling pipes by providing real-time contamination tracking, ensuring efficient heat exchange and minimizing shutdown risks through predictive maintenance.
Patent Information
- Application Number
- JP2023045626
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-22
- Publication Date
- 2024-10-04
- Estimated Expiration
- 2043-03-22
AI Technical Summary
The accumulation of dirt on the inner walls of cooling pipes in generator coolers reduces thermal resistance, leading to decreased heat exchange performance, which can cause temperature increases and potential shutdowns, necessitating costly and time-consuming manual cleaning.
A generator cooler performance monitoring device that calculates and displays the degree of contamination of cooling pipes based on past and future contamination predictions, allowing for timely maintenance and reducing the need for manual inspections.
Enables continuous monitoring and predictive maintenance of generator coolers, preventing performance degradation and reducing operational costs by scheduling cleaning at optimal times.
Smart Images

Figure 2024135103000001_ABST
Abstract
Description
[Technical field]
[0001] An embodiment of the present invention relates to an apparatus for monitoring generator cooler performance. [Background technology]
[0002] During operation, generators at power plants experience iron losses, consisting of hysteresis losses and eddy current losses, in the stator and rotor cores, and copper losses in the stator and rotor windings. The interior of the generator is filled with a cooling gas, such as hydrogen gas, which circulates through the interior of the generator to cool it. In some cases, cooling water is passed through the stator coils to cool them directly.
[0003] The cooling gas is cooled by heat exchange with the cooling water in the generator cooler. That is, heat generated inside the machine, such as iron loss and copper loss, is removed by the cooling gas and transferred to the cooling water in the generator cooler. The heat transferred to the cooling water is then transferred to the final heat sink. Examples of the final heat sink include seawater or river water in the final cooler, or the atmosphere in a cooling tower. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Japanese Patent Application Publication No. 9-26273 Summary of the Invention [Problem to be solved by the invention]
[0005] In generator gas coolers, dirt accumulates on the inner walls of the cooling pipes depending on the quality of the cooling water used, and dirt adheres to the fins of the cooling pipes, increasing the thermal resistance (called the dirt coefficient) between the cooling gas and the cooling water. This is the main cause of the decline in the heat exchange performance of the cooler. In addition to simple dirt on the heat transfer surface, corrosion of the cooling pipes or the intrusion of hydrogen gas into the cooling water through the cooling pipes can also cause the heat exchange performance of the cooler to decline. This results in an increase in the temperature of the cooling gas and an increase in the amount of cooling water, and ultimately leads to a shutdown of the system due to high temperatures of the cooling gas or cooling water.
[0006] On the other hand, in order to restore the level of contamination, it is necessary to stop the generator, open the generator cooler, and clean the inside and outside of the cooling pipes. Therefore, a certain amount of time is required to restore the level of contamination, and since this leads to an increase in regular inspection costs, it is necessary to select an appropriate time.
[0007] The problem that the present invention aims to solve is to provide a generator cooler performance monitoring device that can recognize the degree of contamination of the cooling pipes of a generator cooler from the past to the present, calculated based on measured information, and predict the future degree of contamination of the cooling pipes in a chronological order. [Means for solving the problem]
[0008] In order to achieve the above-mentioned objective, the generator cooler performance monitoring device of this embodiment is characterized by having an image data generation unit that generates display information on a display unit to display past contamination level related information regarding the contamination level of the cooling pipes of the generator cooler from the past to the present, calculated based on information measured about the generator, and future contamination level related information indicating information regarding the future contamination level of the cooling pipes in the future, calculated based on the past contamination level related information. [Brief description of the drawings]
[0009] [Figure 1] 1 is a conceptual vertical cross-sectional view showing an example of the configuration of a generator that is a target of a generator cooler performance monitoring device according to an embodiment. [Diagram 2] 1 is a block diagram showing a configuration of a generator cooler performance monitoring device according to an embodiment; [Diagram 3] FIG. 4 is a first flowchart showing a detailed flow of calculation steps performed by a loss / internal gas state quantity calculation unit of the generator cooler performance monitoring device according to the embodiment. [Figure 4] 5 is a second flowchart showing a detailed flow of the calculation steps performed by the loss / in-machine gas state quantity calculation unit of the generator cooler performance monitoring device according to the embodiment. FIG. [Diagram 5] 4 is a flowchart showing a detailed flow of calculation steps performed by a cooler characteristic calculation unit of the generator cooler performance monitoring device according to the embodiment. FIG. [Figure 6] 11 is a first diagram showing an example of a calculation target state quantity specification screen 132a for specifying a calculation target state quantity in the method of the generator cooler performance monitoring device according to the embodiment. FIG. [Figure 7] 13 is a second diagram showing an example of a calculation target state quantity specification screen 132a for specifying a calculation target state quantity in the method of the generator cooler performance monitoring device according to the embodiment. FIG. [Figure 8] FIG. 3 is a third diagram showing an example of a calculation target state quantity specification screen 132a for specifying a calculation target state quantity in the method of the generator cooler performance monitoring device according to the embodiment. [Figure 9] 4 is a flow chart showing a process flow of the generator cooler performance monitoring device according to the embodiment. FIG. [Figure 10] 1 is a screen diagram showing an example of an initial operation image displayed on an HMI of a generator cooler performance monitoring device according to an embodiment. FIG. [Figure 11] 1 is a screen diagram showing an example of a latest performance image displayed on an HMI of a generator cooler performance monitoring device according to an embodiment. FIG. [Figure 12] 10 is a screen diagram showing an example of a first verification result image displayed on the HMI of the generator cooler performance monitoring device according to the embodiment. FIG. [Figure 13] FIG. 11 is a screen diagram showing an example of a second verification result image displayed on the HMI of the generator cooler performance monitoring device according to the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] Hereinafter, a generator cooler performance monitoring device according to an embodiment of the present invention will be described with reference to the drawings. Here, the same or similar parts are given the same reference numerals, and overlapping descriptions will be omitted.
[0011] FIG. 1 is a conceptual vertical cross-sectional view showing an example of the configuration of a generator 10 that is a target of a generator cooler performance monitoring device 100 according to an embodiment.
[0012] The generator 10 has a rotor 11 , a fan 12 attached to the rotor 11 , a collector 13 , a stator 14 , bearings 15 , a generator cooler 16 , and a frame 17 .
[0013] The rotor 11 has a rotor shaft 11a extending in the direction of the rotation axis and rotatably supported on both sides of the axial direction by bearings 15, a rotor core 11b attached to the radial outside of the rotor shaft 11a, and a field winding 11c wound around the rotor core 11b. The rotor shaft 11a and the rotor core 11b may be manufactured integrally. A collector 13 is attached to the end of the rotor shaft 11a for each phase so as to face the brush 13b on the stationary side in order to supply direct current to the field winding 11c. Although not shown, a brushless type may be used in which a rotating part and a rotating commutator of an exciter are attached to the rotor shaft 11a, and a stationary part of the exciter is arranged radially outside the rotating part of the exciter so as to face it.
[0014] The stator 14 has a cylindrical stator core 14a disposed radially outside the rotor core 11b with a gap therebetween, and an armature winding 14b which is a stator winding wound around the stator core 14a.
[0015] The frame 17 houses the stator 14, the collector 13, the rotor core 11b, etc. Heat is generated in the frame 17 due to iron loss in the rotor core 11b and the stator core 14a, etc., and copper loss in the field winding 11c and the armature winding 14b, etc. In order to remove heat from each heat generating part, a cooling gas such as hydrogen gas is sealed in the frame 17. In addition, in order to circulate the cooling gas within the frame, a fan 12 is attached to the rotor shaft 11a and rotates together with the rotor shaft 11a, ensuring a circulation head. Note that in FIG. 1, the detailed configuration for circulating the cooling gas within the machine (within the frame 17) is omitted from the illustration.
[0016] Further, in order to remove heat from the cooling gas, a generator cooler 16 is provided in the circulation flow path of the cooling gas. In FIG. 1, the generator cooler 16 is shown inside the frame 17 as an example, but it may be outside the frame 17. Also, although only one cooler is shown in FIG. 1, multiple generator coolers may be installed. The generator cooler 16 has finned cooling pipes 16a arranged inside a casing 16b, and performs heat exchange between the cooling gas passing outside the cooling pipes 16a inside the casing 16b and the cooling water passing inside the cooling pipes 16a, thereby cooling the cooling gas.
[0017] Each state quantity related to the generator 10 is measured by a respective detector (not shown), and these signals are input to an in-plant control device 5 such as a DCS (Distributed Control System). Note that the measured state quantities may differ for each power generation plant.
[0018] The generator cooler performance monitoring device 100 acquires information required for monitoring the generator cooler performance from the in-plant control device 5, and also receives other necessary information as an external input.
[0019] FIG. 2 is a block diagram showing the configuration of a generator cooler performance monitoring device 100 according to an embodiment.
[0020] The generator cooler performance monitoring device 100 includes an input unit 110, a calculation unit 120, an image data generation unit 130, a storage unit 140, a judgment control unit 150, and a human machine interface (HMI) 160. The generator cooler performance monitoring device 100 is, for example, a computer system, but may also be a collection of each of these devices.
[0021] The input unit 110 receives and acquires each state value of the generator 10 via the in-plant control device 5 such as a DCS, as well as pre-acquired data such as factory test data and design values. Note that each state value is a digital value converted into a digital signal in the in-plant control device 5 even if the signal detected by the detector is an analog signal. The pre-acquired data is also assumed to be a digital value. Furthermore, if these values are analog values, they are assumed to be converted into a digital signal by an AD converter not shown. Furthermore, the pre-acquired data may include estimated values calculated with reference to other plants, etc., for example, when the target generator is manufactured by a different manufacturer and factory test data and design values are unavailable.
[0022] The state values include the power value of the generator 10. Here, the power value is assumed to be both the active power (MW) and reactive power (MVar), or the apparent power (MVA). The sum of the active power (MW) and reactive power (MVar), or the apparent power (MVA), corresponds to the current value of the armature winding 14b, that is, the thermal load. Note that if there is neither active power (MW) nor reactive power (MVar), only the active power (MW) may be used. Hereinafter, these are collectively referred to as the power value P GEN This will be referred to as:
[0023] The calculation unit 120 performs calculations up to the calculation of the degree of contamination ζ of the inner and outer surfaces of the cooling pipe 16a, which is an index of the heat transfer performance of the generator cooler 16 based on the operating record, predictive calculation of the degree of contamination ζ, and verification of the calculation. The calculation unit 120 has a calculation target state quantity specifying unit 121, an average value etc. calculation unit 122, a calculation target state quantity calculation unit 123, a loss / in-machine gas state quantity calculation unit 124, a cooler characteristic calculation unit 125, a prediction calculation unit 126, a cleaning recommendation timing derivation unit 127, and a verification calculation unit 128.
[0024] Here, the degree of contamination ζ is the amount of heat exchanged P COOL The heat removed by the generator cooler 16 (gas cooler heat input P LOSS ) when the two values are equal, the degree of contamination ζ is 1. When the inner surface of the cooling pipe 16a is contaminated, the degree of contamination ζ of the inner surface of the cooling pipe 16a is greater than 1. In the following, the degree of contamination ζ is expressed as the "degree of contamination ζ of the inner surface of the cooling pipe 16a," but the degree of contamination ζ defined here is a comprehensive index that includes not only simple contamination of the heat transfer surface, but also corrosion of the cooling pipe or deterioration of heat exchange performance due to the infiltration of hydrogen gas into the cooling water through the cooling pipe.
[0025] The calculation target state quantity specifying unit 121 confirms and specifies the state quantities that are not included in the state values accepted by the input unit 110 via the in-plant control device 5, among the state values required for the standard calculation leading to the calculation of the contamination level ζ, i.e., the calculation target state quantities.
[0026] The average value etc. calculation unit 122 performs averaging of each state value received by the input unit 110. Specifically, it performs temporal averaging of each state value received by the input unit 110 to calculate a time average value. The temporal average may be calculated as a moving average of a predetermined number of average processing N of state values or an average time width Δt that is a predetermined time width including these, or may calculate an average value divided by the predetermined number of average processing N or the predetermined average time width Δt.
[0027] The predetermined number of average processes N or the predetermined average time span Δt (hereinafter collectively referred to as the "predetermined number of average processes N") is received by the HMI 160 as an external input of an initial condition, as described below. In addition, the average value calculation unit 122 calculates the cooler inlet gas temperature T I from the cooler outlet gas temperature T O The gas temperature range ΔTg minus the cooler outlet cooling water temperature T wout Cooler inlet / outlet cooling water temperature T winThe cooling water temperature range ΔTw is calculated by subtracting
[0028] The calculation target state quantity calculation unit 123 calculates the calculation target state quantity, the details of which will be described later with reference to Figs.
[0029] The loss / in-machine gas state quantity calculation unit 124 calculates each loss and the state quantity of the in-machine gas that are heat sources in the state quantity machine based on the state quantities accepted by the input unit 110 or calculated by the calculation target state quantity calculation unit 123 and the pre-acquired data.
[0030] The cooler characteristic calculation unit 125 calculates the equivalent heat transfer coefficient K of the generator cooler 16 based on the state quantities related to the generator cooler 16 and the previously acquired data. m and the amount of heat exchange P COOL is calculated, and further the degree of contamination ζ of the inner and outer surfaces of the cooling pipe 16a is calculated.
[0031] The prediction calculation unit 126 calculates the degree of contamination ζ of the cooling pipe 16a after the present (future) based on the information of the degree of contamination ζ stored in the cooling pipe contamination degree calculation value storage unit 144. Specifically, the prediction calculation unit 126 first calculates the increase rate of the degree of contamination ζ (degree of contamination ζ / month) every day from the valid data for a predetermined period (e.g., 12 months) up to the present. This result is stored in the cooling pipe contamination degree calculation value storage unit 144. Next, the prediction calculation unit 126 derives the maximum increase rate in the predetermined period (e.g., 12 months) stored in the cooling pipe contamination degree calculation value storage unit 144, and calculates the future value of the degree of contamination ζ that will increase at this maximum increase rate. The cooling pipe contamination degree display data generation unit 133 generates image data for displaying this future performance deterioration prediction line on the HMI 160.
[0032] The cleaning recommendation time derivation unit 127 calculates the time when the contamination level threshold value ζth is reached from the performance deterioration prediction line derived by the prediction calculation unit 126. R The recommended cleaning time deriving unit 127 derives the recommended cleaning time based on the value of t. C Here, it is determined whether the predetermined period tC In the case of a predetermined period, the cleaning recommendation timing deriving unit 127 notifies the cooling pipe dirt level display data generating unit 133 that the cleaning recommendation timing is within a predetermined period t C The cooling pipe contamination level display data generating unit 133 generates image data for causing the HMI 160 to display information to that effect.
[0033] The verification calculation unit 128 performs verification of the calculation up to the calculation of the degree of contamination ζ of the inner and outer surfaces of the cooling pipe 16a of the generator cooler 16. For this purpose, the measured values of the main parameters are compared with the calculation results. Based on this result, the calculation model can be adjusted.
[0034] The image data generating unit 130 creates image data for an image to be displayed on the HMI 160. The image data generating unit 130 has an initial operation image data generating unit 131, a screen data generating unit 132 for specifying a state quantity to be calculated, a cooling pipe contamination level display data generating unit 133, and a verification result display data generating unit 134.
[0035] The initial operation image data generating unit 131 generates initial operation image data for a state quantity acquisition case specifying image, a display condition setting image, and the like to be displayed on the HMI 160 .
[0036] The calculation target state quantity specifying screen data generating unit 132 creates screen data for specifying the calculation target state quantity to be displayed on the HMI 160.
[0037] The cooling pipe contamination level display data generating unit 133 creates data for an image that displays the change over time in contamination level ζ of the inner and outer surfaces of the cooling pipes 16 a of the generator cooler 16 on the HMI 160 .
[0038] The verification result display data generation unit 134 creates image data for an image showing the measurement values and calculation results for the main parameters as the verification result of the calculations performed by the verification calculation unit 128 up to the calculation of the degree of contamination ζ of the inner and outer surfaces of the cooling pipe 16a of the generator cooler 16.
[0039] The storage unit 140 includes a measurement value storage unit 141 , a pre-acquired data storage unit 142 , a state quantity calculation value storage unit 143 , a cooling pipe contamination level calculation value storage unit 144 , a display parameter storage unit 145 , and a verification calculation result storage unit 146 .
[0040] The measurement value storage unit 141 stores and memorizes each state value, which is each measurement value received by the input unit 110, together with the time of reception and the power value. Furthermore, the measurement value storage unit 141 stores and memorizes the time average value of each of these state values calculated by the average value etc. calculation unit 122.
[0041] The pre-acquired data storage unit 142 stores and stores the pre-acquired data such as the factory test data and design values received by the input unit 110 .
[0042] The state quantity calculated value storage unit 143 stores the calculation target state quantities calculated by the calculation target state quantity operating unit 123 .
[0043] The cooling pipe dirt level calculation value storage unit 144 stores and memorizes the calculation results including the cooling pipe dirt level ζ calculated by the cooler characteristic calculation unit 125. Here, the cooling pipe dirt level ζ is an index of dirt on the inner and outer surfaces, including the fins, of the cooling pipes 16a of the generator cooler 16.
[0044] The display parameter storage unit 145 stores and stores the display parameters that the HMI 160 accepts as external input.
[0045] The verification calculation result storage unit 146 stores and preserves the calculation results by the verification calculation unit 128 and the measurement values of the corresponding parameters.
[0046] The determination control unit 150 controls the progress of processing by the generator cooler performance monitoring device 100, and also makes necessary determinations in the progress.
[0047] The human machine interface (HMI) 160 has a display unit that displays images necessary for monitoring by the generator cooler performance monitoring device 100 generated by the image data generation unit 130, and also accepts monitoring parameters including image display from outside.
[0048] Here, first, details of the calculation up to the calculation of the dirt level ζ of the inner and outer surfaces of the cooling pipe 16a by the calculation unit 120 will be described with reference to Fig. 3 to Fig. 5. This content corresponds to calculation step S100 by the calculation unit 120 in the procedure of the generator cooler performance monitoring method to be described later with reference to Fig. 9. Calculation step S100 by the calculation unit 120 includes calculation step S110 by a loss / in-machine gas state quantity calculation unit 124, calculation step S120 by a loss / in-machine gas state quantity calculation unit, and calculation step S130 by a cooler characteristic calculation unit 125.
[0049] FIG. 3 is a first flow chart showing a detailed flow of the calculation step S110 by the loss / in-machine gas state quantity calculation unit 124 of the generator cooler performance monitoring device according to the embodiment.
[0050] First, the input unit 110 inputs the armature winding resistance value R at 20° C. as pre-acquired data such as factory test data or design values. A20 , iron loss P as a reference value CL0 , stray load loss P as a reference value SCCL0 , Windage loss W as the reference value 0 , the reference gas density ρ as the reference value 0 is accepted as an external input and acquired (step S111).
[0051] Next, the input unit 110 detects the terminal voltage V A , the armature current I A , the temperature of the armature winding 14b, T A , the field voltage V applied to the field winding 11c F , and the field current I which is the current flowing through the field winding 11c FThe respective measured values are received and acquired from the in-plant control device 5 (step S112).
[0052] Next, the loss / in-machine gas state quantity calculation unit 124 performs the following calculation, and finally calculates the electrical loss P ELEC Calculate.
[0053] (1) Terminal voltage V A Iron loss P as an n-th order function of CL Here, iron loss P CL is calculated in advance as an n-th order function, such as a 4th order function, of the terminal voltage from the factory test value or design value, and the measured terminal voltage V A From the value of iron loss P CL The value of is calculated (step S113).
[0054] (2) Stray load loss P at rated current obtained from factory tests or design values SCCL The value of armature current I A The square ratio is used for the calculation (step S114).
[0055] (3) Armature winding resistance R A Armature winding temperature T A The dependence of the armature winding temperature T A From armature winding resistance R A Next, the armature winding resistance R A and armature current I A Armature copper loss P A is calculated (step S116).
[0056] (4) Field voltage V F and the field current I F From field copper loss P F is calculated (step S117).
[0057] (5) Iron loss P calculated in step S113 to step S117 CL , stray load loss P SCCL , armature copper loss P A , and field copper loss PF The total value of the electrical loss P ELEC is calculated (step S118).
[0058] FIG. 4 is a second flow chart showing a detailed flow of the calculation step S120 by the loss / internal gas state quantity calculation unit of the generator cooler performance monitoring device according to the embodiment.
[0059] First, the input unit 110 receives the gas temperatures at the inlet and outlet of the casing 16b of the generator cooler 16, respectively, and outputs the gas temperatures T I and cooler outlet gas temperature T O The internal pressure Pg, which is the pressure of the cooling gas such as hydrogen within the frame 17, and the gas purity X, which is the purity of the cooling gas, are received (step S121).
[0060] Next, the loss / in-machine gas state quantity calculation unit 124 calculates the cooler inlet gas temperature T I and cooler outlet gas temperature T O From this, the internal gas temperature Tg is calculated (step S122).
[0061] Next, the loss / in-board gas state quantity calculation unit 124 calculates the in-board gas molar mass Mg, the in-board gas density ρg, and the windage loss W from the in-board gas temperature Tg, the in-board pressure Pg, and the gas purity X (step S123).
[0062] FIG. 5 is a flow chart showing a detailed flow of the calculation step S130 by the cooler characteristic calculation unit 125 of the generator cooler performance monitoring device 100 according to the embodiment.
[0063] First, the input unit 110 inputs the in-machine gas airflow Q as a reference value as pre-acquired data such as factory test data or design values. 0 , and the heat exchanger correction coefficient F as a design value are accepted and acquired as external inputs (step S131).
[0064] Next, the input 110 detects the gas temperatures at the inlet and outlet of the casing 16b of the generator cooler 16, respectively, and outputs the cooler inlet gas temperature Tg Iand cooler outlet gas temperature Tg O , the cooler inlet cooling water temperature T Win and the cooler outlet cooling water temperature T Wout , the fan head H, and the cooling water flow rate Qw, which is the flow rate of the cooling water flowing through the cooling pipe 16a of the generator cooler 16, are received and acquired from the in-plant control device 5 (step S133).
[0065] Next, the cooler characteristic calculation unit 125 performs the following calculation, and finally calculates the degree of contamination ζ of the inner and outer surfaces of the cooling pipe 16 a of the generator cooler 16 .
[0066] (1) Cooler inlet gas temperature Tg I , cooler outlet gas temperature Tg O , cooler inlet cooling water temperature T Win and the cooler outlet cooling water temperature T Wout From this, the logarithmic mean temperature difference ΔTm is calculated (step S134).
[0067] (2) An in-machine gas flow rate Qg, which is the flow rate of cooling gas inside the machine, is calculated from the fan head H (step S134). Next, the speed of the cooling gas flowing outside the cooling pipe 16a of the generator cooler 16 is calculated from the in-machine gas flow rate Qg, and based on this, a gas heat transfer coefficient αg, which is the heat transfer coefficient of the outer surface of the cooling pipe 16a, is calculated (step S135).
[0068] (3) The speed of the cooling water flowing through the cooling pipe 16a of the generator cooler 16 is calculated from the cooling water flow rate Qw, and the cooling water heat transfer coefficient αw, which is the heat transfer coefficient of the inner surface of the cooling pipe 16a, is calculated based on this (step S136).
[0069] (4) Using the results of steps S134 to S136 and the heat exchanger correction coefficient F read as pre-acquired data, the equivalent heat transfer coefficient Km of the generator cooler 16 and the heat exchange amount P COOL (Step S137). Here, the equivalent heat transfer coefficient Km and the amount of heat exchanged P COOLare expressed as the following equations (1) and (2), respectively. km = 1 / [(1 / a g )+(r 1 / K TUBE )+(r 2 / a w ) (1) Here, K TUBE is the tube-fin equivalent heat transfer coefficient design value (W / (m 2 K)), a g is the cooling gas heat transfer coefficient (W / (m 2 K)), a w is the cooling water heat transfer coefficient (W / (m 2 K)), r 1 is the cooling tube heat transfer area correction coefficient, r 2 is the correction coefficient for the heat transfer area of the inner surface of the cooling tube.
[0070] P COOL = Km F ΔTm (2) where F is the correction factor (m 2 ) where F=1 or a value may be empirically set based on the type, dimensions, etc. of the generator cooler.
[0071] Next, the degree of contamination ζ of the inner surface of the cooling pipe 16a is calculated (step S137).
[0072] First, the gas cooler heat input P LOSS (W) is calculated using the following formula (3). P LOSS =P ELEC +W ···(3) Here, P ELEC is the electrical loss P calculated in step S118 ELEC where W is the windage loss W calculated in step S123.
[0073] The degree of contamination ζ of the inner surface of the cooling pipe 16a is given by the following formula (4). ζ=P COOL / P LOSS (4)
[0074] That is, the amount of heat exchanged by the generator cooler 16 calculated by the formula (2) assuming that the inner surface of the cooling pipe 16a is not dirty is COOL The heat removed by the generator cooler 16 (gas cooler heat input P LOSS ) are equal, the degree of contamination ζ is 1. On the other hand, if the inner surface of the cooling pipe 16a is contaminated, the degree of contamination ζ of the inner surface of the cooling pipe 16a calculated by the above formula (4) is a value greater than 1.
[0075] In addition, measurement errors and the amount of heat exchanged P COOL There are also errors other than measurement errors, such as an error in the correction coefficient F in the calculation formula for (a). Therefore, theoretically, the degree of contamination ζ is 1 when there is no contamination, but in reality, the calculated degree of contamination ζ is not 1, but may be less than 1. Figure 11, which will be shown later, shows an example in which the degree of contamination ζ displayed after cleaning of cooler B is less than 1.
[0076] Although the contamination level ζ is calculated by the formula (3) and the formula (4) here, the present invention is not limited to this, and other estimation methods may be used.
[0077] The above is the details of the calculation up to the calculation of the contamination level ζ by the calculation unit 120 in step S100 (steps S110 to S130).
[0078] Next, a description will be given of calculation of an estimated value in place of a measured value when actual measurement data cannot be obtained via the in-plant control device 5. Depending on the plant, there are cases where actual measurement data cannot be obtained via the in-plant control device 5 shown in Fig. 3 to Fig. 5, so it is necessary to specify a state quantity to be calculated and calculate an estimated value in place of a measured value.
[0079] 6 to 8 are first to third diagrams showing an example of a calculation target state quantity specification screen 132a for specifying a calculation target state quantity in the method of the generator cooler performance monitoring device according to the embodiment. Here, since it is not possible to display everything in one diagram, it is shown in three diagrams for convenience. However, the screen display may be shown in one diagram.
[0080] 6 to 8 are flows for the calculation target state quantity specification unit 121 to judge, specify, and determine a calculation method, and the calculation method is determined according to the judgment. Based on this, the calculation target state quantity operation unit 123 calculates the state quantity of the specified calculation target.
[0081] At this time, in order to proceed through this flow, it is necessary to input "YES" or "NO" for each judgment item reached along the flow. The flow shown in Figures 6 to 8 is the calculation target state quantity specification screen 132a for specifying the calculation target state quantity that the calculation target state quantity specification screen data generation unit 132 displays on the HMI 160. Note that the reference symbols in Figures 6 to 8 are for the purpose of explanation and are not displayed on the screen.
[0082] That is, in the judgment steps in the flows shown in Fig. 6 to Fig. 8, YES or NO is determined depending on the contents of the external input. Based on this external input, the calculation target state quantity specification unit 121 specifies a flow, and determines the state quantity to be calculated and the calculation method thereof.
[0083] The image may be an image in which the options "YES" or "NO" are displayed in the display portion of the determination step to be reached in the flow chart showing the flow shown in Figures 6 to 8, allowing one to select either one. Also, as long as substantially similar information can be input, an image may be used that allows the user to select, for example, a list of items with measured values, instead of the flow charts shown in Figures 6 to 8.
[0084] As shown in FIG. 6 to FIG. 8, the flow is as follows.
[0085] First, the calculation target state quantity specifying unit 121 determines whether or not there is a fan head measurement value (step S141). Here, the determination by the calculation target state quantity specifying unit 121 means that the determination is based on an external input received by the HMI 160, as described above. The same applies hereinafter.
[0086] If the calculation target state quantity specifying unit 121 determines that there is a fan head measurement value (step S141: YES), the calculation target state quantity specifying unit 121 decides to calculate the air volume and windage loss from the fan head (step S142). If the calculation target state quantity specifying unit 121 determines that there is no fan head measurement value (step S141: NO), the calculation target state quantity specifying unit 121 decides to calculate the air volume and windage loss using the calorie method (step S143).
[0087] Next, the calculation target state quantity specifying unit 121 determines whether or not there is a coolant flow rate measurement value (step S144). If the calculation target state quantity specifying unit 121 determines that there is a coolant flow rate measurement value (step S145 YES), the calculation target state quantity specifying unit 121 determines whether or not there is a coolant temperature measurement value (step S145). If the calculation target state quantity specifying unit 121 determines that there is a coolant temperature measurement value (step S145 YES), calculation of the degree of contamination ζ of the cooling pipe 16a and the like is performed in step 130 shown in FIG. 5.
[0088] When the calculation target state quantity specifying unit 121 determines that there is no coolant temperature measurement value (NO in step S145), the calculation target state quantity specifying unit 121 determines whether or not there is a coolant inlet temperature measurement value (step S147).
[0089] When the calculation target state quantity specifying unit 121 determines that the coolant inlet temperature measurement value is present (YES in step S147), the calculation target state quantity specifying unit 121 determines to calculate the coolant outlet temperature by the calorie method (step S148).
[0090] When the calculation target state quantity specifying unit 121 determines that there is no cooling water inlet temperature measurement value (step S147 NO), as shown in Fig. 7, first, the calculation target state quantity specifying unit 121 determines whether or not there is a refrigerant outlet temperature measurement value (step S157). When the calculation target state quantity specifying unit 121 determines that there is a refrigerant outlet temperature measurement value (step S157 YES), it decides to calculate the cooling water inlet temperature by the calorie method (step S149).
[0091] In step S157, if the calculation target state quantity specifying unit 121 determines that there is no measured coolant inlet temperature value (step S157 NO), the calculation target state quantity specifying unit 121 determines whether there is coolant temperature estimation information (step S158). If the calculation target state quantity specifying unit 121 determines that there is coolant temperature estimation information (step S158 YES), it decides to calculate the coolant temperature by the calorific method (step S159). If the calculation target state quantity specifying unit 121 determines that there is no coolant temperature estimation information (step S158 NO), only the gas inlet and outlet temperatures are displayed (step S156).
[0092] If the calculation target state quantity specifying unit 121 determines in step S144 that there is no coolant flow rate measurement value (NO in step S144), the calculation target state quantity specifying unit 121 determines whether or not there is a coolant temperature measurement value (step S150).
[0093] When the calculation target state quantity specifying unit 121 determines that the coolant temperature measurement value is present (YES in step S150), the calculation target state quantity specifying unit 121 determines to calculate the coolant flow rate by the calorie method (step S151). After that, the calculation of the degree of contamination, etc. in step S130 is performed.
[0094] Moreover, when the calculation target state quantity specifying unit 121 determines that there is no coolant inlet temperature measurement value (NO in step S150), the calculation target state quantity specifying unit 121 determines whether or not there is a coolant inlet temperature measurement value (step S152).
[0095] When the calculation target state quantity specifying unit 121 determines that the cooling water inlet temperature measurement value is present (step S152: YES), the calculation target state quantity specifying unit 121 determines whether or not there is information for estimating the cooling water flow rate (step S154). Here, the information for estimating the cooling water flow rate is, for example, the opening degree of a cooling water temperature control valve (not shown). When the calculation target state quantity specifying unit 121 determines that the cooling water inlet temperature measurement value is absent (step S152: NO), the calculation target state quantity specifying unit 121 determines whether or not there is a cooling water outlet temperature measurement value (step S153). When the calculation target state quantity specifying unit 121 determines that the cooling water outlet temperature measurement value is present (step S153: YES), similarly, the calculation target state quantity specifying unit 121 determines whether or not there is information value for estimating the cooling water flow rate (step S154).
[0096] When the calculation target state quantity specifying unit 121 determines that the coolant outlet temperature measurement value is present (YES in step S154), it performs a calculation of the coolant flow rate and temperature (step S155), after which it performs the calculation of the degree of contamination, etc. in step S130.
[0097] In step S153, when the calculation target state quantity specifying unit 121 determines that there is no measured value of the coolant outlet temperature (step S153 NO), as shown in Fig. 8, the calculation target state quantity specifying unit 121 determines whether or not there is coolant temperature estimation information (step S160). In step S160, when it is determined that there is coolant temperature estimation information (step S160 YES), the calculation target state quantity operating unit 123 performs an estimation calculation of the gas inlet or gas outlet temperature (step S161), and then proceeds to the determination of the above-mentioned step S154. In addition, in step S160, when it is determined that there is no coolant temperature estimation information (step S160 NO), only the gas inlet and outlet temperatures are displayed (step S156).
[0098] In step S154, if the calculation target state quantity specifying unit 121 determines that there is no cooling water flow rate measurement value (step S154 NO), the process does not proceed to calculation of the degree of contamination ζ, etc. in step S130, and only displays, for example, the gas inlet temperature and the gas outlet temperature on the HMI 160 (step S156). In this case, the HMI 160 may display a warning that information required to calculate the degree of contamination ζ is insufficient.
[0099] As described above, based on the result of the calculation target state quantity specification unit 121 specifying the calculation target state quantity and determining the calculation method, the calculation target state quantity calculation unit 123 calculates the calculation target state quantity. For example, if it is determined in step S141 of FIG. 6 that there is no fan head H in the operational data that can be acquired from the in-plant control device 5 (NO in step S141), the flow rate Qg of the cooling gas is calculated, for example, using the following equation (5). Qg=P LOSS / 〔(C Pg ρg)(T gin -T gout ) (5) Here, P LOSS is the heat input to the gas cooler (W), C Pg is the gas specific heat (J / kg K), and ρg is the gas density (kg / m 3 ), T gin is the gas temperature at the cooler inlet (℃), T gout is the cooler outlet gas temperature (℃).
[0100] FIG. 9 is a flow chart showing the flow of processing by the generator cooler performance monitoring device according to the embodiment.
[0101] The processing flow by the generator cooler performance monitoring device can be broadly divided into step S10, which processes data up to the calculation of generator performance by the generator cooler performance monitoring device 100, and step S20, which is related to display for monitoring the generator cooler performance by the generator cooler performance monitoring device 100.
[0102] First, the flow of data processing up to the calculation of generator performance by the generator cooler performance monitoring device 100 will be described.
[0103] The input unit 110 receives and acquires each state value and pre-acquired data of the generator 10 via the in-plant control device 5 (step S11).
[0104] Next, the calculation of the calculation target state quantity is performed (step S12). That is, the calculation target state quantity is calculated according to the flow based on FIG. 6, based on the result of specifying the calculation target state quantity obtained in step S25 of step S20 described later.
[0105] Next, the calculation unit 120 performs calculations up to the calculation of the cooling pipe contamination level ζ (step S100). The details are as described above with reference to Figs.
[0106] 9, the storage unit 140 stores and memorizes the calculation result (step S13). In detail, the cooling pipe contamination level calculation value storage unit 144 stores and memorizes the contamination level ζ calculated in step S100 and each calculation result obtained in each step leading up to this.
[0107] Next, the average value of the degree of contamination ζ, etc. is calculated (step S14). Specifically, the average value etc. calculation unit 122 calculates a moving average value of a predetermined number N of calculation results of the degree of contamination ζ, etc. stored in the cooling pipe contamination degree calculation value storage unit 144. The predetermined number N is received from outside in step S23 of receiving initial conditions, etc., which will be described later.
[0108] Next, the prediction calculation unit 126 performs a prediction calculation of the contamination level ζ (step S15). That is, based on the information of the contamination level ζ stored in the cooling pipe contamination level calculation value storage unit 144, the prediction calculation unit 126 calculates the future contamination level ζ and the future value of the contamination level ζ at the maximum increase rate in a predetermined period of time in the past.
[0109] Next, the cleaning recommendation time deriving unit 127 derives the cleaning recommendation time and C It is determined whether the predetermined period t Cis a period set based on the period required to carry out the matters that need to be done in advance, such as securing the budget for the cleaning in the periodic inspection, adjusting the schedule for the periodic inspection, adjusting the work place, and preparing for securing personnel. It is possible to leave some leeway. The predetermined period t C is accepted by the HMI 160 as part of the initial conditions, etc.
[0110] The cleaning recommendation time deriving unit 127 determines whether the cleaning recommendation time is within a predetermined period t C If it is determined that the cleaning recommendation time is within the predetermined period t C If it is not determined to be within the range (NO in step S17), the process returns to step S11.
[0111] After step S16, in parallel with step S17 or before or after step S18, the determination control unit 150 determines whether or not a request to display the verification result has been input to the HMI 160 (step S18). If the determination control unit 150 determines that a request to display the verification result has not been input (NO in step S18), the process returns to step S11.
[0112] If the determination control unit 150 determines that a request to display the verification result has been input (YES in step S18), the verification calculation unit 128 performs a verification calculation (step S19), and the process returns to step S11.
[0113] The above is the flow of data processing step S10 up to the calculation of generator performance by the generator cooler performance monitoring device 100.
[0114] Next, the details of step S20 related to the display for monitoring the generator cooler performance by the generator cooler performance monitoring device 100 will be described below.
[0115] First, the initial operation image data generating unit 131 of the image data generating unit 130 generates image data for initial operation to be displayed on the HMI 160 (step S21). Specifically, the initial operation image data generating unit 131 generates initial operation image data for setting display conditions and for identifying a state quantity acquisition case to be displayed on the HMI 160. Based on this, the HMI 160 displays an initial operation image (step S22).
[0116] 10 is a screen diagram showing an example of an initial operation image 135 displayed on the HMI 160 of the generator cooler performance monitoring device 100 according to the embodiment. In the following, an example of icon display will be described, but a hardware button or the like may be used as long as the same operation can be performed.
[0117] The initial operation image 135 displays items related to calculation conditions, items related to data center machine conditions, and items related to display conditions.
[0118] An icon 135a for "number of objects to calculate average value" is displayed as a calculation condition on the initial operation image 135. When the "number of objects to calculate average value" icon is clicked, a pull-down menu is displayed with the options of "time range" or "number of times." If "number of times" is selected, the number of average processes N can be directly input. If "time range" is selected, it becomes possible to input, for example, 10 minutes. The average value calculation unit 122 calculates the number of average processes N from the time interval Δt.
[0119] As data selection conditions on the initial operation image 135, an icon 135b for "power value range" and an icon 135c for "gas temperature range" and an icon 135d for "cooling water temperature range" are displayed.
[0120] When the "power value range" icon 135b is selected, an input window for (xx) to (yy) is displayed in MVA and MW units. The minimum and maximum values can be input as (xx) and (yy), respectively, to specify the power range. In other words, when the power is low, the accuracy of deriving the impurity level ζ deteriorates, so the low output range is excluded.
[0121] When the "Gas temperature range" icon 135c is selected, an input window of "(xx)~(yy)" in degrees Celsius is displayed. The gas temperature range can be specified by inputting minimum and maximum values for (xx) and (yy), respectively. When the "Cooling water temperature range" icon 135d is selected, an input window of (xx)~(yy) in degrees Celsius is displayed. The coolant temperature range can be specified by inputting minimum and maximum values for (xx) and (yy), respectively. If the gas temperature and cooling water ranges are too large, the accuracy in deriving the contamination level ζ will decrease, so the purpose is to eliminate data with a large deviation.
[0122] As display conditions on the initial operation image 135, an icon 135f of "generator cooler to be displayed" and an icon 135g of "period to be displayed" are displayed.
[0123] When the icon 135f of "Generator Cooler to be displayed" is selected, the names of the selectable targets and selection fields are displayed in a pull-down menu, for example, Unit A, Unit B, Unit C, and Unit D. Here, one or more display targets can be selected.
[0124] When you select the "Display period" icon 135g, a pull-down menu will appear with options to choose between months and years. When you select either of these, an input window will appear. For example, if you enter 5 years, the past 5 years' performance and the forecast for the next 5 years will be displayed on the time axis with the present at the center, as shown in Figure 11, which will be cited later.
[0125] When the icon 135h for "pollution degree threshold" is selected, an input window is displayed, allowing the input of the pollution degree threshold. Here, the pollution degree threshold is a level of the pollution degree ζ that, when the pollution degree ζ derived by the calculation unit 120 reaches this threshold, it is recommended that the generator cooler 16 be opened and the cooling pipe 16a be cleaned.
[0126] When the "pollution degree threshold" icon 135h is selected, an input window is displayed, and the pollutant degree threshold value ζth can be input. Here, the pollutant degree threshold value ζth is a level of the pollutant degree ζ that, when the pollutant degree ζ derived by the calculation unit 120 reaches this pollutant degree threshold value ζth, recommends that the generator cooler 16 should be opened and the cooling pipe 16a should be cleaned. Note that, although the case where the pollutant degree threshold value ζth is input from outside has been shown here, it may be stored as a fixed value in the cleaning recommendation timing derivation unit 127 or the storage unit 140, for example.
[0127] When the generator is disassembled during regular inspection of the plant, it may become necessary to change the contamination threshold value ζth due to changes in the conditions of the equipment other than the generator cooler 16, such as the cooling water system or the final heat dissipation destination. In this case, the time to clean the generator cooler 16 may be set based on the absolute value of the cooler contamination, or the contamination level for a certain period after cleaning may be set as a reference value, and the time may be set based on a relative value from this reference value (for example, 1.8 times).
[0128] The "cleaning recommendation information" icon 135j is related to the display in the latest performance image 133a (FIG. 11) described later. When the "cleaning recommendation information" icon 135j is selected, the "cleaning recommendation information" is displayed for a predetermined period of time t C For example, an input window for the number of driving cycles is displayed as "( driving cycles)." If, for example, 4 driving cycles is input, the latest performance image 133a displays the recommended cleaning time from the point in time 4 driving cycles before the point in time when the contamination level ζ derived by the calculation unit 120 exceeds the contamination level threshold.
[0129] 10 is merely an example, and other types of images may be used as long as substantially similar input is possible. Also, if the items in the initial operation image 135 are provided in another image to increase operability, they may be moved to the other image, or may be provided in both images to allow input in either one.
[0130] Furthermore, the initial operation image 135 may be different for the designer of the generator cooler performance monitoring device 100 and for users such as monitors who use the generator cooler performance monitoring device 100, such as by making the display conditions only for the designer of the generator cooler performance monitoring device 100, or even making some of the display conditions only for the designer. In such a case, the initial operation image 135 shown in Fig. 10 is used as the initial operation image for the designer.
[0131] Next, the HMI 160 accepts operations, input initial conditions, and the like based on the initial operation image 135 (step S23).
[0132] After the initial conditions and the like are accepted, the calculation target state quantity specifying screen data generating unit 132 creates screen data for specifying the calculation target state quantity to be displayed on the HMI 160 .
[0133] Next, the calculation target state quantity specifying screen data generating unit 132 generates calculation target state quantity specifying screen data (step S24), and the HMI 160 displays the calculation target state quantity specifying screen 132a based on this (step S25). Next, the HMI 160 accepts a judgment input (step S26), and the calculation target state quantity specifying unit 121 specifies the calculation target state quantity according to the flow shown in Fig. 6, and determines a method for calculating an estimated value in place of a measured value (step S27). Based on this, the calculation target state quantity operating unit 123 executes the calculation (step S12).
[0134] Next, in the flow shown in FIG. 9, based on the results of the average calculation of the degree of contamination ζ, etc. in step S14 and the predictive calculation of the degree of contamination ζ in step S15, the data generation unit 133 for displaying the degree of contamination of the cooling pipe generates image data for displaying the degree of contamination of the cooling pipe on the HMI 160 (step S28).
[0135] 11 is a screen diagram showing an example of a latest performance image 133a displayed on the HMI 160 of the generator cooler performance monitoring device according to the embodiment. The latest performance image 133a shown here is an example of a display image for supervisors such as technical personnel, maintenance personnel, or operators of the power plant.
[0136] The latest performance image 133a has three elements: a graph of the time change in the degree of contamination of the cooling pipe ζ, a selection option for the generator cooler, and a selection option for the display width of the time axis of the graph.
[0137] The first element is a graph of the change over time in the degree of contamination of the cooling pipe ζ, and is placed in the center of the latest performance image 133a. The horizontal axis of the graph is time, and the vertical axis is the degree of contamination of the cooling pipe ζ.
[0138] The second element is a display of selection candidates for the generator cooler 16 to be displayed, and is arranged below the graph in the example of Fig. 11. The example of Fig. 11 shows a case where there are four units, A to D. By selecting and displaying "Cooler A" to "Cooler D", it is possible to select the target generator cooler 16 to be displayed on the graph, and a method of inputting the symbol of the generator cooler 16 to be selected may also be used.
[0139] The third element is a display of selection options for the display width of the time axis of the graph, which is arranged above the graph in the example of Fig. 11. In the example of Fig. 11, the selection options "1 month", "6 months", "1 year", "5 year" and "10 year" are displayed, allowing the user to select one month, six months, one year, five years or ten years.
[0140] In the graph of the first element, the center of the horizontal axis indicates the present, the left side of the center indicates past performance, and the right side of the center indicates the display period of future predictions. For example, if "10 years" is selected, the left half will display from 10 years ago to the present, and the right half will display from the present to 10 years in the future. Note that the "present" point in time is not limited to being placed in the center of the horizontal axis, and the position of the "present" on the horizontal axis may be set arbitrarily.
[0141] In Fig. 11, of the generator coolers 16, units A and B are selected. The change over time in the degree of contamination ζ of each is displayed for unit A by a hollowed-out circular marker and a solid line connecting them, and for unit B by a hollowed-out triangular marker and a solid line connecting them. The future prediction display period is also displayed by a dashed line. In this way, when there are multiple generator coolers 16 to display, the degree of contamination ζ of each cooling tube may be distinguished by the type of marker as shown in Fig. 11, or by the type of line such as a solid line or dashed line. Alternatively, they may be distinguished by color.
[0142] The graph shows a thick dashed line indicating the contamination level threshold value ζth. The line indicating the contamination level threshold value ζth is not limited to a thick dashed line, and may be displayed in a colored or other manner to draw attention.
[0143] In the example shown in Figure 11, the results of cleaning are shown, and after cleaning, the cooling pipe contamination level ζ returns to a low value, but this value can be calculated when the plant inspection is completed, operation begins, and operation data can be collected, so there is a time delay from cleaning when the data display after cleaning begins. Note that after cleaning, the contamination level ζ becomes the value after cleaning, so the display before cleaning may be erased. Alternatively, the display may be left as a reference for understanding the upward trend of the contamination level ζ. Figure 11 shows an example of leaving the display.
[0144] In step S17 described above, the cleaning recommendation time deriving unit 127 determines whether the cleaning recommendation time is within a predetermined period t C If it is determined that the degree of contamination of the cooling pipe is within the range (YES in step S17), the cooling pipe contamination level display data generating unit 133 receives the information to that effect and generates image data to display information to call attention to the effect on the HMI 160 (step S30). The HMI 160 performs display based on this image data (step S31).
[0145] In the example shown in FIG. 11, the cooling pipe contamination level ζ is expected to reach the contamination level threshold ζth for Unit A before 2029, and for Unit B before 2030. Therefore, the cooling pipes of Unit A need to be cleaned in 2028 at the latest, and for Unit B need to be cleaned in 2029 at the latest. For this reason, it is necessary to prepare in advance the budget for the cleaning during regular inspections, the schedule for the regular inspections, the work location, and the personnel. In this way, information that "preparation for cleaning needs to start" is displayed on the screen at the latest by the time when cleaning should be performed and the preparation period is brought forward to call attention.
[0146] Next, in the flow shown in FIG. 9, if there is an external request to display the verification result, the HMI 160 accepts this as an external input (step S32).
[0147] The determination control unit 150 constantly determines whether or not there is a request to display the verification result (step S18), and if there is no request to display the verification result (NO in step S18), the flow returns to step S11.
[0148] On the other hand, when the HMI 160 accepts a request to display the verification result as an external input in step S32, the judgment control unit 150 determines that there is a request to display the verification result (YES in step S18) and instructs the verification calculation unit 128 to perform a verification calculation, and the verification calculation unit 128 performs the verification calculation (step S19).
[0149] The verification result display data generating unit 134 creates data for a verification result image based on the verification result by the verification calculation unit 128 (step S33), and the HMI 160 displays the verification result image (step S34). Two examples of the verification result image are shown below.
[0150] FIG. 12 is a screen diagram showing an example of a first verification result image 134a displayed on the HMI 160 of the generator cooler performance monitoring device 100 according to the embodiment.
[0151] The horizontal axis of the first verification result image 134a is time, and the vertical axis is the cooling water flow rate [L / min]. The dashed curve indicates the predicted value of the cooling water flow rate. The solid curve indicates the measured value of the cooling water flow rate. In the example shown in FIG. 12, the predicted value of the cooling water flow rate shows good agreement with the measured value of the cooling water flow rate.
[0152] In the case of a plant where the measured value of the cooling water flow rate cannot be obtained, it is important to confirm and verify whether the model is valid when the value of the cooling water flow rate is estimated by the calculation unit 120. In such a case, the validity of the model can be verified by comparing the predicted value and the measured value of the cooling water flow rate as shown in Fig. 12 using the example plant.
[0153] FIG. 13 is a screen diagram showing an example of a second verification result image 134b displayed on the HMI 160 of the generator cooler performance monitoring device 100 according to the embodiment.
[0154] The horizontal axis of the second verification result image 134b is the opening degree [%] of the cooling water temperature control valve, and the vertical axis is the cooling water flow rate [%]. The curve shown by the solid line indicates the calculated value of the cooling water flow rate calculated based on the opening degree vs. Cv characteristic of the cooling water temperature control valve (not shown). The marker with a white circle indicates the predicted value of the cooling water flow rate. Here, the predicted value of the cooling water flow rate is a value calculated by the calorific method, that is, from the thermal balance of the system. In the example shown in FIG. 13, the cooling water flow rate calculated based on the opening degree vs. Cv characteristic of the cooling water temperature control valve (not shown) shows good agreement with the cooling water flow rate calculated by the calorific method. Therefore, when necessary information is lacking in one of the methods, an appropriate value can be obtained by calculation using the other method.
[0155] As shown above in the examples of Figures 12 and 13, the verification calculation unit 128 calculates the verification result for the specified state quantity, the verification result display data generation unit 134 generates display data, and the MHI 160 displays the verification result, thereby enabling the verification result to be confirmed.
[0156] According to the embodiment described above, it is possible to provide a generator cooler performance monitoring device that can recognize the degree of contamination of the cooling pipes of a generator cooler from the past to the present, calculated based on measured information, and predict the future degree of contamination of the cooling pipes in a chronological order.
[0157] [Other embodiments] Although the embodiments of the present invention have been described above, the embodiments are presented as examples and are not intended to limit the scope of the invention. In addition, the features of each embodiment may be combined. Furthermore, the embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the gist of the invention. The embodiments and their modifications are included in the scope of the invention and its equivalents as described in the claims, as well as in the scope and gist of the invention. [Explanation of symbols]
[0158] 5...in-plant control device, 10...generator, 11...rotor, 11a...rotor shaft, 11b...rotor core, 11c...field winding, 12...fan, 13...collector, 13b...brush, 14...stator, 14a...stator core, 14b...armature winding, 15...bearing, 16...generator cooler, 16a...cooling tube, 16b...casing, 17...frame, 100...generator cooler performance monitoring device, 110...input section, 120...calculation section, 121...state quantity characteristic section to be calculated, 122...average value calculation section, 123...state quantity calculation section to be calculated, 124...loss / in-machine gas state quantity calculation section, 125...cooler characteristic calculation section, 127...cleaning recommendation time derivation section, 128...verification calculation section, 130...image data data generation unit, 131...initial operation image data generation unit, 133...cooling pipe dirt level display data generation unit, 133a...latest performance image, 134...verification result display data generation unit, 134a...first verification result image, 134b...second verification result image, 135...initial operation image, 135a, 135b, 135c, 135d, 135f, 135g, 135h, 135j...icon, 140...storage unit, 141...measurement value storage unit, 142...pre-acquired data storage unit, 143...state quantity calculation value storage unit, 144...cooling pipe dirt level calculation value storage unit, 145...display parameter storage unit, 146...verification calculation result storage unit, 150...judgment control unit, 160...human machine interface (HMI)
Claims
1. A generator cooler performance monitoring device characterized by having an image data generating unit that generates display information to be displayed on a display unit, including past contamination level related information regarding the contamination level of the cooling pipes of the generator cooler from the past to the present, calculated based on information measured about the generator, and future contamination level related information indicating information regarding the future contamination level of the cooling pipes in the future, calculated based on the past contamination level related information.
2. The image data generating unit 2. The generator cooler performance monitoring device according to claim 1, wherein the display information is generated so that both the past contamination level related information and the future contamination level related information are displayed in chronological order on the display unit.
3. 2. The generator cooler performance monitoring device according to claim 1, wherein the past contamination level related information is used as a predetermined number of pieces or an average value of the past contamination level related information over a predetermined time span including these pieces.
4. 4. The generator cooler performance monitoring device according to claim 3, wherein the display information is generated based on input data selection conditions, and the data selection conditions include any one of the specified number or the specified time width, an output width of the generator, a width of the gas temperature of the generator cooler, and a width of the cooling water temperature of the generator cooler.
5. 2. The generator cooler performance monitoring device according to claim 1, wherein the future contamination level related information is calculated based on a maximum rate of increase of the past contamination level related information during a predetermined period up to the present.
6. The generator cooler performance monitoring device of claim 1, characterized in that the image data generation unit generates the display information that displays on the display unit the recommended cleaning time for cleaning the generator cooler, calculated based on the future dirtiness level related information.
Citation Information
Patent Citations
Performance monitoring device for gas turbine intake cooling system
JP1997112294A
Method for identifying predicting model of molten iron temperature in blast furnace and its program, and method for predicting molten iron temperature in blast furnace and its program
JP2005320588A
Computer program for control device and control device
JP2017226197A
Scale monitoring device and scale monitoring method
JP2022112186A
Flow path surveillance system
JP2023001969A
