Controller and control method

The control device and method use a state space model and disturbance observer to quickly assess both fast and slow-reacting indicators in blast furnace operations, addressing the challenge of delayed observations and stabilizing furnace conditions.

JP2024137344APending Publication Date: 2024-10-07NIPPON STEEL CORPORATION
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2023048836
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-24
Publication Date
2024-10-07

AI Technical Summary

Technical Problem

Existing blast furnace control methods struggle to accurately and promptly adjust operations due to the delayed observation of critical indicators like hot metal temperature, leading to unstable furnace conditions and prolonged deviations from desired temperatures.

Method used

A control device and method that utilizes a state space model and disturbance estimation observer to quickly determine the state of the blast furnace by observing indicators with fast and slow time responses, allowing for timely adjustments based on observable quantities with both quick and slow time responses.

Benefits of technology

Enables rapid and accurate control of blast furnace operations by predicting and adjusting to both fast and slow-reacting indicators, reducing the time lag in temperature stabilization and improving operational stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024137344000001_ABST
    Figure 2024137344000001_ABST
Patent Text Reader

Abstract

To appropriately determine an operation quantity of a blast furnace without waiting for an observation quantity result observable in a relatively slow time response to operation and disturbance to the blast furnace.SOLUTION: A disturbance value is estimated from an observation quantity when a first time elapses after operation to a blast furnace by using a first state space model and a disturbance estimation observer for estimating an observation quantity observable with a relatively quick time response and a corresponding state of the blast furnace. A heat change quantity accompanying the disturbance is calculated from the estimated disturbance value. A variation quantity of a molten metal temperature is calculated from the calculated heat change quantity. A second state space model for estimating the observation quantity including the observation quantity observable with a relatively slow time response and the corresponding state of the blast furnace and a third state space model using the variation quantity of the molten metal temperature are generated to estimate the observation quantity and the corresponding state of the blast furnace after a second time longer than the first time elapses after operation to the blast furnace. Based on the estimation result, a next operation quantity to the blast furnace is determined.SELECTED DRAWING: Figure 4
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a control device and a control method, and to a control device and a control method capable of executing control to appropriately determine the operation amount of a blast furnace without waiting for the observation results of observable amounts that can be observed with a relatively slow time response to operations or disturbances on the blast furnace. [Background technology]

[0002] In recent years, the blast furnace process has been moving toward using cheap iron ore and operating under low reducing agent ratio conditions, and there is an increasing need to stabilize the blast furnace conditions.

[0003] However, operation using cheap, low-quality raw materials and low-reducing materials can easily lead to unstable furnace conditions, which can cause fluctuations in production volume and a decrease in furnace heat. For example, it is known that various types of disturbances occur due to charged raw materials such as iron ore and coke, causing fluctuations in blast furnace operation. Therefore, in order to achieve stable blast furnace operation, it is necessary to operate the blast furnace while taking these disturbances into consideration.

[0004] In addition, during blast furnace operation, various operations are performed on the blast furnace, such as adding materials and changing conditions. In order to optimize blast furnace operation, the changes that occur as a result of the operations are observed as observable quantities, and the observed quantities are fed back to adjust the amount of operation to be performed next.

[0005] As a technique related to blast furnace operation, a method has been proposed for predicting the molten iron temperature in a blast furnace using a physical model capable of calculating the state inside the blast furnace (see Non-Patent Document 1).

[0006] For example, Patent Document 1 discloses a technology that, in view of the fact that in blast furnace operation, the effects of disturbances caused by charge materials are often only actually measured after a certain amount of time has passed, improves the accuracy of prediction of molten iron temperature by fitting the error between the output variable of a physical model in a specified past interval and its actual measured value based on the response of the output variable when the output variable is changed in a stepwise manner, thereby making it possible to compensate for the error in the output variable.

[0007] Furthermore, in Patent Document 2, in consideration of the fact that when predicting the molten iron temperature using a physical model, the prediction accuracy of the molten iron temperature may decrease due to the influence of disturbances that are difficult to model, such as the reducibility of iron ore and gas drift, the technology discloses a technique in which the difference between the calculated value and the actual value is calculated as the calculation error of the molten iron temperature based on the time change rate of the error in the past interval of output variables other than the molten iron temperature, and the influence of the prediction error resulting from changes in the manipulated variable from the time of calculation is removed, thereby improving the prediction accuracy of the change in the molten iron temperature and improving the prediction accuracy of the molten iron temperature. [Prior art documents] [Patent documents]

[0008] [Patent Document 1] Patent Publication No. 2018-24935 [Patent Document 2] Patent Publication 2019-19385 [Non-patent literature]

[0009] [Non-Patent Document 1] Hagiwara: Introduction to Digital Control, Corona Publishing, 1999 Summary of the Invention [Problem to be solved by the invention]

[0010] However, observables that reflect the results of an operation or disturbance include observables that are observed at a relatively late timing after the operation (observables that can be observed with a relatively slow time response to the operation or disturbance) and observables that are observed at a relatively early timing (observables that can be observed with a relatively fast time response to the operation or disturbance). For this reason, even if the amount of operation for the next operation is adjusted by simply feeding back the amount of observation observed at a relatively early timing, it is not possible to perform appropriate control that reflects the amount of observation observed at a relatively late timing, and even if the amount of operation for the next operation is adjusted by simply feeding back the amount of observation observed at a relatively late timing, there is a problem that the response is delayed and it becomes too late.

[0011] For example, the molten iron temperature, which is an important indicator in operation, is observed at a relatively late timing relative to the influence of operations and disturbances. For example, even if an operation is performed to bring the molten iron temperature closer to the desired value at the time when it is observed that the molten iron temperature has deviated from the desired value, it will take a long time for the operation to bring the molten iron temperature closer to the desired value. In this case, the state of the blast furnace where the temperature is significantly different from the desired temperature continues for a long period of time, causing problems in operation.

[0012] The technology of Patent Document 1 does not take into consideration the difference between observation quantities in which the effects of operations or disturbances are observed at relatively late timing and those in which the effects are observed at relatively early timing, and therefore cannot solve the operational problems described above.

[0013] Moreover, changes in the actual value of the molten iron temperature are not only due to factors that can be explained by the time change rate of operational indicators such as the gas utilization rate and RAR, but also due to disturbance changes influenced by various factors such as changes in the heat exchange coefficient between the solid and liquid in the lower part of the furnace, changes in the movement of the molten iron flow at the hearth, variations in heat removal at the hearth, heat removal in the runner after tapping, and measurement errors when measuring the temperature.

[0014] For this reason, even if a regression model is constructed in which the calculation error of the molten iron temperature, which is superimposed with various disturbances, is used as the objective variable and the time rate of change of the operational index is used as the explanatory variable, as in the method of Patent Document 2, there is a problem that it is difficult to accurately calculate the regression coefficients.

[0015] One aspect of the present invention aims to realize a technology that enables control to be performed to appropriately determine the operation amount of a blast furnace without waiting for the observation results of observable quantities that can be observed with a relatively slow time response to operations or disturbances on the blast furnace. [Means for solving the problem]

[0016] In order to solve the above problems, a control device according to one embodiment of the present invention is a control device for controlling a process of a blast furnace, and includes a first state space model that estimates an observable quantity that is observable with a relatively fast time response to an operation or disturbance on the blast furnace and a state of the blast furnace corresponding to the observable quantity that is observable with the relatively fast time response, and a disturbance estimation observer, and includes a disturbance estimation unit that estimates a disturbance value from an observation quantity observed when a first time has elapsed after an operation on the blast furnace, a heat change calculation unit that calculates a heat change amount associated with the occurrence of a disturbance from the estimated disturbance value, a temperature change calculation unit that calculates a change amount of molten iron temperature from the calculated heat change amount, and a disturbance estimation unit that calculates a disturbance value based on the observed quantity observed when a first time has elapsed after an operation on the blast furnace. the state observation quantity estimation unit generates a second state space model that estimates an observation quantity including an observation quantity observable with a relatively slow time response to operations and disturbances and a state of the blast furnace corresponding to the observation quantity including the observation quantity observable with a relatively slow time response, and a third state space model using the change in molten iron temperature calculated by the temperature change quantity calculation unit, and estimates the observation quantity observed when a second time longer than the first time has elapsed after the operation on the blast furnace and the state of the blast furnace corresponding to the observation quantity; and an operation quantity determination unit that determines an operation quantity for the next operation on the blast furnace based on the estimation result of the state observation quantity estimation unit.

[0017] In order to solve the above-mentioned problems, a control method according to one aspect of the present invention is a control method for a control device that controls a process of a blast furnace, and includes a disturbance estimation observer and a first state space model that estimates an observable quantity that is observable with a relatively fast time response to an operation or disturbance on the blast furnace and a state of the blast furnace corresponding to the observable quantity that is observable with the relatively fast time response, and the control method includes a disturbance estimation step of estimating a disturbance value from an observation quantity observed when a first time has elapsed after an operation on the blast furnace, a heat change calculation step of calculating a heat change amount associated with the occurrence of a disturbance from the estimated disturbance value, a temperature change calculation step of calculating a change amount of the molten iron temperature from the calculated heat change amount, and a disturbance estimation step of calculating a disturbance value based on the operation or disturbance on the blast furnace and a disturbance estimation step of calculating a disturbance value based on the disturbance value. the state of the blast furnace corresponding to the observation quantity that is observed when a second time longer than the first time has elapsed after the operation on the blast furnace, based on a result of the estimation in the state observation quantity estimation step; and Effect of the Invention

[0018] According to one aspect of the present invention, control can be performed to appropriately determine the operation amount of a blast furnace without waiting for the observation results of observable amounts that can be observed with a relatively slow time response to operations or disturbances on the blast furnace. [Brief description of the drawings]

[0019] [Figure 1] FIG. 1 is a diagram illustrating an overview of a blast furnace process. [Diagram 2] FIG. 2 is a diagram showing the relationship between a blast furnace process and operation and observation quantities. [Diagram 3] FIG. 2 is a diagram illustrating an overview of operation input in blast furnace operation. [Figure 4] FIG. 2 is a block diagram showing a configuration example of a control device for controlling a blast furnace process. [Diagram 5] 11 is a flowchart illustrating an example of a control process. [Figure 6] 11 is a graph relating to verification of the estimation result of an observable according to the present embodiment. [Figure 7] 1 is a graph relating to verification of the estimation result of the amount of change in molten iron temperature according to this embodiment. [Figure 8] FIG. 2 is a block diagram illustrating a physical configuration of a computer used as a control device. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0020] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Exemplary embodiments of the present invention will now be described in detail with reference to the accompanying drawings. First, an overview of a blast furnace process will be described.

[0021] Fig. 1 is a diagram for explaining the outline of the blast furnace process. In the blast furnace process, as shown in Fig. 1, sintered ore and coke are charged from the top of the blast furnace 101 so as to create alternating layers, and hot air and pulverized coal as a reducing agent are blown in from the blast tuyeres at the bottom of the furnace. The hot air gasifies the pulverized coal and coke, and high-temperature reducing gases such as carbon monoxide and hydrogen rise up inside the furnace, melting the sintered ore while removing oxygen, and the molten iron comes into contact with the carbon in the coke and is reduced, becoming molten iron containing just under 5% carbon, which accumulates in the basin at the bottom of the furnace.

[0022] The molten iron is taken out from a tap hole installed at the side of the hearth and transported to the next steelmaking process. Gases such as coke oven gas (COG) or natural gas (NG) may be blown into the furnace through the blast tuyeres (or other tuyeres).

[0023] In addition, in blast furnace operation, operation control indexes are set, the time transition of the operation control indexes is monitored, and operation operations for the blast furnace process are performed with the corresponding operation amount to control the furnace condition. Therefore, setting appropriate operation control indexes is extremely important for stable operation of the blast furnace. Details of the operation control indexes will be described later, but the operation control indexes include indexes that should be kept at set target values ​​(in this embodiment, control amount) and indexes that are mainly used to grasp changes in the furnace condition (in this embodiment, observation amount).

[0024] Figure 2 is a diagram showing the relationship between the blast furnace process 1 and the manipulated variable u and the observed variable y. As shown in Figure 2, the blast furnace process 1 inputs the manipulated variable u and outputs the observed variable y. The state of the blast furnace process 1 is represented by x.

[0025] The operation amount u is a value related to the air blowing amount, the amount of pulverized coal (the amount of pulverized coal injection PCI or the pulverized coal ratio PCR), or the like.

[0026] The observed quantities y are molten iron temperature, gas composition (e.g., CO concentration, CO2 concentration, N2 concentration, H2 concentration), gas utilization rate (e.g., CO utilization rate, H2 utilization rate), carbon solution loss (CSL), CO utilization rate, H2 utilization rate, iron tapping rate, molten iron Si, molten iron temperature, etc. Among these observed quantities y, molten iron temperature, molten iron Si, and iron tapping rate are often regarded as controlled quantities with target values ​​set.

[0027] In recent years, the blast furnace process has been moving toward using cheap iron ore and operating under low reducing agent ratio conditions, and there is an increasing need to stabilize the blast furnace conditions.

[0028] However, operation using cheap, low-quality raw materials and low-reducing materials can easily cause unstable furnace conditions, leading to fluctuations in production volume and a drop in furnace heat. For example, it is known that various types of disturbances occur due to charged raw materials such as iron ore and coke, causing fluctuations in blast furnace operation. Therefore, in order to achieve stable blast furnace operation, it is necessary to operate the blast furnace while taking these disturbances into consideration.

[0029] In addition, during blast furnace operation, various operations are performed on the blast furnace, such as adding materials and changing conditions. In order to optimize blast furnace operation, the changes that occur as a result of the operations are observed as observable quantities, and the observed quantities are fed back to adjust the amount of operation to be performed next.

[0030] Figure 3 is a diagram for explaining an overview of operation inputs in blast furnace operation. As shown in Figure 3, in process control, disturbance and state estimation is performed, and an estimated disturbance value d^ and an estimated blast furnace state value x^ are calculated. Here, x^ and d^ are represented by a ^ (hat) placed above x and d, respectively. The letters with a hat will be represented in the same way hereafter.

[0031] The manipulated variable u is determined based on the calculated estimated disturbance value d^ and the estimated value x^ of the blast furnace state, and the operation input is performed.

[0032] The operation corresponding to the operation amount u affects the blast furnace process. The blast furnace process includes a fast response P1 and a slow response P2 to the operation or disturbance. The fast response P1 means that it takes a relatively short time to obtain a response to the operation or disturbance, and the slow response P2 means that it takes a relatively long time to obtain a response to the operation or disturbance. The fast response P1 causes, for example, changes in the gas utilization rate, CSL, etc., and the slow response P2 causes, for example, changes in the molten iron temperature, etc. Although details will be described later, the fast reaction P1 corresponds to a chemical reaction process such as the reduction reaction of ore or the consumption reaction of coke, while the slow reaction P2 roughly corresponds to the movement and heat transfer phenomenon of reaction heat generated in the fast reaction.

[0033] The values ​​of the indices such as the gas utilization rate, CSL, and molten iron temperature that change due to the fast reaction P1 and the slow reaction P2 are fed back to the process control as observed quantities. That is, disturbance and state estimation is performed based on the observed quantities, and the estimated disturbance value d^ and the estimated blast furnace state value x^ are recalculated. Then, a new operation value u is determined based on the calculated estimated disturbance value d^ and estimated blast furnace state value x^, and operation input is performed.

[0034] 3, the observables observed as a result of an operation include observables related to indices that change due to a fast response P1 to an operation or disturbance, and observables related to indices that change due to a slow response P2 to an operation or disturbance. That is, among the observables fed back to the process control, an index that has changed due to a slow response P2 is actually an index that has changed in response to an operation or disturbance that was input a considerable amount in time, and an index that has changed due to a fast response P1 is actually an index that has changed in response to an operation or disturbance that was input a little while ago.

[0035] An observable related to an index that changes due to a fast response P1 to an operation or disturbance (e.g., gas utilization rate, CSL) can be observed a relatively short time after the operation or disturbance occurs, and such an observable can be said to be an observable that can be observed with a relatively fast time response to an operation or disturbance. On the other hand, an observable related to an index that changes due to a slow response P2 to an operation or disturbance (e.g., molten iron temperature) can be observed a relatively long time after the operation or disturbance occurs, and such an observable can be said to be an observable that can be observed with a relatively slow time response to an operation or disturbance.

[0036] For this reason, if an observation amount that is observed with a relatively slow time response to an operation or disturbance is fed back and reflected in the next operation amount, it is not possible to realize a rapid control operation.

[0037] For example, the change in the molten iron temperature, which is an important indicator in operation, is observed at a relatively late timing. Even if an operation is performed to bring the molten iron temperature closer to the target temperature at the time when it is observed that the molten iron temperature has deviated from the desired value (target temperature), it will take a long time for the molten iron temperature to approach the target temperature as a result of the operation. In this case, the state of the blast furnace where the temperature deviates greatly from the target temperature will continue for a long time.

[0038] <Embodiment> (State space model of a blast furnace) In this embodiment, the state of the blast furnace is obtained using a parameter that relates an observable quantity that can be observed with a relatively fast time response to operations or disturbances to an observable quantity that can be observed with a relatively slow time response to operations or disturbances. In other words, the state of the blast furnace can be quickly obtained without waiting for the observation results of the observable quantity that can be observed with a relatively slow time response to operations or disturbances, and the observable quantity corresponding to the state of the blast furnace can also be obtained.

[0039] In this embodiment, a discrete-time linear state space model using equations (1) and (2) expressing blast furnace operation is used to control the blast furnace process 1. The discrete-time linear state space model includes an equation expressing a discrete-time change in which the state (state variable) of the blast furnace process 1 changes from x0(k) to x0(k+1) when the current time is represented by k and an operation amount u(k) is applied at the current time.

[0040] Note that x0(k) indicates the state of the blast furnace, which is the state of factors within the blast furnace that affect the observable quantities, including various reaction heats and pressures. y0(k) indicates the general observable quantities of the blast furnace, including observable quantities that can be observed with a relatively slow time response (after a long time has passed) to operations and disturbances in relation to operations on the blast furnace. u(k) indicates the amount of operation on the blast furnace, and k is an index indicating time and minutes.

[0041] Examples of the manipulated variable u(k) include the amount of air blown and the amount of pulverized coal injected.

[0042] Examples of y0(k) include molten iron Si and molten iron temperature.

[0043] Moreover, the coefficients A0, B0, C0, and D0 are determined in advance.

[0044]

number

[0045]

number

[0046] Moreover, it is assumed that the values ​​of the coefficients A, B, C, and D are specified in advance.

[0047] Since the factors and observations of the state of the blast furnace that are the subject of equations (1) and (2) and equations (3) and (4) are different, the variables and constants of the state space model are subscripted to distinguish between the two. On the other hand, the manipulated variable u(k) is common to equations (1) and (2) and equations (3) and (4), so it is not distinguished by a subscript.

[0048] Incidentally, formula (1) and formula (3) may be the same formula or may be different formulas.

[0049]

number

[0050]

number

[0051] That is, the calculated values ​​of the observed quantities deviate from the actual measured values ​​due to the influence of various disturbances that cause fluctuations in blast furnace operation, such as changes in the properties of the raw materials charged from the furnace top. For example, deviations occur when the main chemical reaction amounts in the furnace change unexpectedly due to the occurrence of disturbances. The main chemical reaction amounts in the furnace include the amount of indirect reduction reactions, the amount of direct reduction reactions, the amount of hydrogen reduction reactions, the amount of coke consumption, the amount of coke combustion reactions, and other chemical reaction amounts.

[0052] Therefore, in order to more accurately calculate the state and observation quantities of the blast furnace, it is necessary to feed back the actual measured values ​​of the blast furnace affected by disturbances to the state space model shown in equations (1) to (4) and reflect them in the calculated values ​​of the state space model.

[0053] In this case, if feedback is attempted after waiting for an observable quantity that can be observed with a relatively slow time response to operations or disturbances to actually be observed, the blast furnace state with a large deviation from the target temperature will continue for a long period of time, as described above. Therefore, it is desirable to use an observable quantity that can be observed with a relatively fast time response to operations or disturbances as the observable quantity to be fed back.

[0054] Here, the case where disturbance is taken into consideration for the formulas (3) and (4) will be considered.

[0055] When disturbance is taken into consideration, a known disturbance estimation observer is applied to calculate the disturbance estimate value d^(k) based on equations (3) and (4), which results in equations (5), (6), and (7).

[0056]

number

[0057]

number

[0058]

number

[0059] The configuration procedure and design method of an observer in a discrete-time system are described in, for example, Non-Patent Document 1.

[0060] The estimated disturbance value d^(k) can be obtained by solving equations (5) to (7) using the values ​​of the observed quantities y(k) that are actually observed. Here, as the values ​​of the observed quantities y(k), for example, the observed quantities that can be observed with a relatively fast time response to operations and disturbances, such as the gas composition, CSL, CO utilization rate, H2 utilization rate, and tapping rate, can be actually observed and used.

[0061] Then, by using a state space model (equations (3) and (4)) that estimates observable quantities with a relatively fast time response to operations and disturbances, and a disturbance estimation observer, the disturbance value is estimated from the observation quantities observed a relatively short time after operations on the blast furnace.

[0062] As described above, since the discrepancy between the calculated value and the actual measured value is considered to be due to disturbance, it is possible to obtain an observation quantity close to the actual measured value by using this disturbance estimated value d^(k), as shown in equation (6). However, this disturbance estimated value d^(k) is obtained from an observation quantity that can be observed with a relatively fast time response to the operation or disturbance. Therefore, even if it is attempted to appropriately reflect the disturbance estimated value d^(k) in the state space model (equations (1) and (2)) that includes an observation quantity that can be observed with a relatively slow time response to the operation after the operation or disturbance, it is difficult because the calculation procedure is not self-evident.

[0063] Therefore, in accordance with the calculation procedure described below, we decided to introduce a parameter that relates observable quantities that can be observed with a relatively fast time response to operations or disturbances to observable quantities that can be observed with a relatively slow time response to operations or disturbances.

[0064] As described above, the disturbance corresponding to the estimated disturbance value d^(k) is considered to correspond to the change in chemical reaction resulting from the change in the properties of the raw materials charged from the top of the blast furnace. In other words, the amount of chemical reaction such as the amount of indirect reduction reaction, the amount of direct reduction reaction, the amount of hydrogen reduction reaction, the amount of coke consumption, the amount of coke combustion reaction, etc. in the furnace occurs due to disturbance factors such as the change in the properties of the raw materials charged from the top of the blast furnace.

[0065] Such changes in chemical reaction quantities occur relatively quickly, and are therefore thought to affect both observables that can be observed with a relatively fast time response to operations or disturbances, and observables that can be observed with a relatively slow time response to operations or disturbances.

[0066] Therefore, we will continue to study these changes in chemical reactions.

[0067] The change in the chemical reaction factors occurring inside the blast furnace, especially the change in the chemical reaction factors through the gas flow, is denoted as Δs. During the stable period of the furnace condition, the process fluctuation is relatively small, so the disturbance estimate d^(k) can be linearized and expressed as in equation (8).

[0068]

number

[0069] In addition, since changes in chemical reaction factors in the furnace are accompanied by changes in heat, the relationship between each chemical reaction factor and the amount of heat generated, based on whether each chemical reaction is an exothermic or endothermic reaction, can be obtained as shown in equation (9).

[0070]

number

[0071] The value of the reaction heat coefficient vector h in formula (9) can be calculated specifically using, for example, a model (blast furnace mathematical model) capable of calculating the time change of chemical reactions in a blast furnace, as described above. That is, in the operating state (operating point) that is the reference for linear approximation, various boundary condition setting values ​​that can be set in the model, which correspond to disturbances around the operating point, are changed to perturb each chemical reaction factor in the furnace, and the perturbation amount from the operating point is calculated, thereby calculating the value of the reaction heat coefficient vector h in formula (9).

[0072] Furthermore, by substituting equation (8) into equation (9), equations (10) and (11) are obtained.

[0073]

number

[0074]

number

[0075] In this way, the amount of heat change ΔQ associated with the occurrence of a disturbance can be calculated from the disturbance estimated value d^(k).

[0076] From the nominal value of the heat exchange coefficient between the solid and liquid inside the blast furnace (e.g., the cohesive zone) and the amount of pig iron produced, the relationship between the heat change ΔQ and the temperature change ΔT of the molten iron can be expressed as shown in equation (12).

[0077]

number

[0078] In this way, the amount of change in molten iron temperature can be estimated from the amount of heat change.

[0079] However, in reality, when heat is generated by chemical reactions in a blast furnace, the molten iron temperature does not change immediately, and there is a time delay (called dead time) due to the time it takes for the charges to descend into the furnace and the time the molten iron remains in the lower part of the furnace. Furthermore, because the heat capacity of the blast furnace is large, there is a time delay in the heat transfer to the molten iron temperature. As a result, it takes a long time for the molten iron temperature to change.

[0080] For this reason, taking into account the dead time and the time constant of the heat transfer phenomenon, the time change of ΔT is expressed as the dynamics of a first-order lag system including dead time, as shown in equation (13). Equation (13) is expressed as a discrete-time model that is time-discretized at an appropriate calculation period, and the time delay of the influence of the heat of each chemical reaction can be set individually.

[0081]

number

[0082] Moreover, the formula (13) can also be transformed into the formula (14) by using the formulas (8) to (11).

[0083]

number

[0084] In other words, the disturbance estimate used to calculate the change in the molten iron temperature is calculated using the observations observed over the past time k´lag,i. In this case, the observations that can be observed with a relatively fast time response to operations and disturbances are used as the observations observed in the past. This is because disturbances that affect the change in the molten iron temperature ΔT are considered to affect both the observations that can be observed with a relatively fast time response to operations and disturbances and the observations that can be observed with a relatively slow time response to operations and disturbances.

[0085] In this way, it becomes possible to calculate the amount of change in the molten iron temperature ΔT from the amount of heat change accompanying the occurrence of a disturbance. In this case, the amount of change in the molten iron temperature is obtained from an observable amount that can be observed with a relatively fast time response to operations or disturbances, and the obtained amount of change in the molten iron temperature can be applied to the state of the blast furnace including an observable amount that can be observed with a relatively slow time response to operations or disturbances. In other words, the amount of change in the molten iron temperature functions as a parameter that relates an observable amount that can be observed with a relatively fast time response to operations or disturbances to an observable amount that can be observed with a relatively slow time response to operations or disturbances.

[0086] Equations (1) and (2), which show the state of a blast furnace, include observable quantities that have a relatively slow time response to operations and disturbances. By adding the effects of disturbances such as those used in equations (5) to (7) and the change in molten iron temperature ΔT, a state space model of the blast furnace can be expressed as equations (15) to (17).

[0087]

number

[0088]

number

[0089]

number

[0090] Although the above-mentioned formula (16) includes the direct term D0u(k), when the estimation target is the molten iron temperature, the direct term does not need to be considered and can be omitted. Therefore, formula (16) can be rewritten as formula (18).

[0091]

number

[0092]

number

[0093]

number

[0094]

number

[0095]

number

[0096] Therefore, the state of the blast furnace required for determining the operation amount can be quickly obtained without waiting for the observation results of the observable amount that can be observed with a relatively slow time response to the operation or disturbance. In addition, the state space model of equations (19) to (21) makes it possible to accurately calculate the observable amount that can be observed with a relatively slow time response to the operation or disturbance, such as the molten iron temperature and the molten iron Si. Therefore, it becomes possible to appropriately control the blast furnace process by feeding back the observable amount that can be observed with a relatively slow time response to the operation or disturbance.

[0097] (Control device configuration) Fig. 4 is a block diagram showing a configuration example of a control device for controlling a blast furnace process. The control device 200 shown in Fig. 4 is a device that observes an operation index and controls the blast furnace process. As shown in Fig. 4, the control device 200 has an estimation unit 201 and an operation control unit 202.

[0098] The estimation unit 201 estimates the observation amount to be observed in the future and the state of the blast furnace corresponding to the observation amount based on various operation indicators, and outputs the estimated value. The estimation unit 201 is supplied with information indicating the operation amount related to the operation of the blast furnace from an operation unit (not shown).

[0099] The operation control unit 202 controls the determination of the operation amount for the blast furnace so as to optimize the operation of the blast furnace based on the estimation result of the estimation unit 201. For example, when it is estimated that the molten iron temperature will rise above the target temperature, the operation amount for the next operation is controlled so that the molten iron temperature will be lowered by the next operation. The operation amount is, for example, the blast amount, the pulverized coal injection amount, etc.

[0100] As shown in FIG. 4, the estimation unit 201 includes a disturbance estimation unit 211 , a heat change amount calculation unit 212 , a temperature change amount calculation unit 213 , and a state / observation amount estimation unit 214 .

[0101] The disturbance estimation unit 211 uses a state space model (equations (3) and (4)) that estimates observable quantities that can be observed with a relatively fast time response to operations and disturbances on the blast furnace and the state of the blast furnace corresponding to the observable quantities that can be observed with a relatively fast time response, and a disturbance estimation observer, to estimate a disturbance value from the observable quantities observed when a first time has elapsed after operations on the blast furnace.

[0102] The state space model expressed by equations (3) and (4) will be referred to as the first state space model as appropriate. Observable quantities that can be observed with a relatively fast time response to operations and disturbances on the blast furnace related to the first state space model include gas composition, carbon solution loss (CSL), CO utilization rate, H2 utilization rate, and iron production rate.

[0103] That is, the disturbance estimation unit 211 uses the operation amount u(k) related to the input operation and the actually measured observation amount y(k) to solve the above-mentioned equations (5) to (7) to obtain the disturbance estimated value d^(k). Then, an equation is generated that linearizes the obtained disturbance estimated value d^(k) as shown in the above-mentioned equation (8).

[0104] The heat change amount calculation unit 212 calculates the amount of heat change associated with the occurrence of a disturbance from the disturbance value estimated by the disturbance estimation unit 211. That is, the heat change amount calculation unit 212 calculates the amount of heat change ΔQ according to equation (10) using equation (8) generated by the disturbance estimation unit 211.

[0105] The temperature change amount calculation unit 213 estimates the amount of change in the molten iron temperature from the amount of heat change calculated by the heat change amount calculation unit 212. That is, the temperature change amount calculation unit 213 calculates a vector v that represents the relationship between the disturbance estimated value d^(k) shown in equation (11) and the amount of heat change associated with the occurrence of a disturbance, and calculates the amount of change ΔT(k) in the molten iron temperature as shown in equation (14).

[0106] The state / observable estimation unit 214 generates a state space model using the state space model (equations (1) and (2)) that estimates the state of the blast furnace corresponding to the observables including the observables observable with a relatively slow time response to operations on the blast furnace and disturbances and the observables including the observables with a relatively slow time response, and the change in the molten iron temperature ΔT(k) calculated by the temperature change calculation unit 213, and estimates the observables observed when a second time longer than the first time has elapsed after operations on the blast furnace and the state of the blast furnace corresponding to the observables.

[0107] The state space model expressed by equations (1) and (2) is referred to as the second state space model. Observable quantities that can be observed with a relatively slow time response to operations and disturbances related to the second state space model include molten iron Si, molten iron temperature, etc.

[0108] That is, the state and observed quantity estimator 214 generates a state space model represented by equations (15) to (17) by adding the influence of disturbances such as those used in equations (5) to (7) and the change amount ΔT of the molten iron temperature to equations (1) and (2) that indicate the state of the blast furnace, including observed quantities that can be observed with a relatively slow time response to operations and disturbances. Furthermore, the state and observed quantity estimator 214 makes it possible to calculate estimated values ​​of observed quantities at future prediction times kp=1, 2, ..., Hp in the state space model represented by equations (15) to (17). That is, a state space model represented by equations (19), (20), and (21) is generated.

[0109] The state space model expressed by equations (19), (20) and (21) will be referred to as a third state space model as appropriate.

[0110] Then, the observation quantity (molten iron temperature) to be observed in the future and the state of the blast furnace corresponding to the observation quantity are estimated by this third state space model. That is, an estimated value of the molten iron temperature at time k+kp is calculated as the observation quantity y0^(k+kp) expressed by the above-mentioned equation (21). Also, an estimated value of the state of the blast furnace x0^(k+kp) expressed by the above-mentioned equation (19) is calculated.

[0111] The estimation unit 201 supplies the estimation result of the state / observable estimation unit 214 to the operation control unit 202 .

[0112] The state / observation quantity estimator 214 may be included in the operation controller 202. In this case, the estimator 201 may supply the molten iron temperature change amount ΔT(k) calculated by the temperature change amount calculator 213 to the operation controller 202.

[0113] (Control process flow) Next, a description will be given of the flow of control processing by the control device 200. Fig. 5 is a flowchart illustrating an example of the control processing.

[0114] In step S101, the disturbance estimation unit 211 uses a first state space model that estimates an observable quantity that can be observed with a relatively fast time response to operations or disturbances on the blast furnace and the state of the blast furnace corresponding to that observable quantity, and a disturbance estimation observer to estimate a disturbance value from the observable quantity observed when a first time has elapsed after operations on the blast furnace.

[0115] In step S102, the temperature change amount calculation unit 213 calculates the amount of heat change caused by the occurrence of the disturbance from the disturbance value estimated in the process of step S101.

[0116] In step S103, the temperature change calculation unit 213 estimates the amount of change in the molten iron temperature from the amount of heat change calculated in the process of step S102.

[0117] In step S104, the state / observable estimation unit 214 generates a second state space model that estimates the observables including observables that can be observed with a relatively slow time response to operations on the blast furnace and disturbances, and the state of the blast furnace corresponding to the observables, and a third state space model that uses the change in molten iron temperature calculated in the processing of step S103, and estimates the observables observed when a second time longer than the first time has elapsed after operations on the blast furnace, and the state of the blast furnace corresponding to the observables.

[0118] In step S105, the operation control unit 202 determines the amount of operation for the next operation based on the estimation result by the processing in step S104 so as to optimize the operation of the blast furnace.

[0119] In this manner, the control process is carried out.

[0120] 6 is a graph related to the verification of the estimation result of the observation quantity according to this embodiment. In this verification, assuming that the operation quantities related to a series of operations actually performed at a time ahead of the present time are known, the observation quantities, which are the time responses of the blast furnace process to the operations, are calculated using a state space model. Then, the calculated values ​​using the state space model at a time ahead of several hours are compared with the actual measured values.

[0121] The top graph in Fig. 6, with the vertical axis representing the amount of tapping (Pmax) and the horizontal axis representing time, shows the calculated and measured values ​​for the change in the amount of tapping (observed amount) from the present to 8 hours after the lapse of time. The second graph from the top in Fig. 6, with the vertical axis representing the molten iron temperature and the horizontal axis representing time, shows the calculated and measured values ​​for the change in the molten iron temperature (observed amount) from the present to 8 hours after the lapse of time.

[0122] The third graph from the top in Fig. 6 has the pulverized coal injection rate (PCI) on the vertical axis and time on the horizontal axis, and shows the change in the pulverized coal injection rate from the present to 8 hours later as the change in the operation amount. The bottom graph in Fig. 6 has the total air volume on the vertical axis and time on the horizontal axis, and shows the change in the air volume from the present to 8 hours later as the change in the operation amount.

[0123] As can be seen from the top and second graphs in Figure 6, the observed values ​​after three hours are almost identical to the calculated values.

[0124] Fig. 7 is a graph relating to the verification of the estimation result of the amount of change in molten iron temperature according to this embodiment. The upper graph in Fig. 7 shows the accuracy of the calculation result of the amount of change in molten iron temperature according to the method according to this embodiment. In this verification, it is assumed that the amount of operation related to the series of operations actually performed at a time ahead of the present time is known, and the amount of change in molten iron temperature after 3 hours is calculated using the calculation method shown in Equation (14).

[0125] The upper graph in Figure 7 plots the calculated values ​​corresponding to the measured values ​​of the change in the hot metal temperature. As can be seen from this graph, the estimation results for the change in the hot metal temperature after 3 hours are good. The RMSE of the estimation results is 5.77°C, and R 2 was 0.43.

[0126] 7 shows, as a comparative example, the accuracy of the calculation results of the amount of change in the molten iron temperature using a method different from that of the present embodiment. In this method, the amount of change in the molten iron temperature is calculated without using observables that can be observed with a relatively fast time response to operations or disturbances.

[0127] The lower graph in Fig. 7 plots the calculated values ​​corresponding to the measured values ​​of the change in the hot metal temperature. As can be seen from this graph, the accuracy of the estimation result of the change in the hot metal temperature after 3 hours is lower than that of the upper graph in Fig. 7. The RMSE of the estimation result is 7.25°C, and the R 2 was 0.22.

[0128] (Effects of the embodiment) As described above, according to this embodiment, the amount of change in the molten iron temperature is obtained from an observable quantity that can be observed with a relatively fast time response to operations or disturbances, and the obtained amount of change in the molten iron temperature can be applied to the state of the blast furnace including an observable quantity that can be observed with a relatively slow time response to operations or disturbances. Therefore, when an observable quantity that can be observed with a relatively fast time response to operations or disturbances is observed, it is possible to estimate an observable quantity that can be observed with a relatively slow time response to operations or disturbances.

[0129] As a result, according to this embodiment, by feeding back changes in observation quantities (e.g., gas utilization rate, CSL) observed at relatively early timing, it becomes possible to determine the operation quantities so that the observation quantities observed at relatively late timing (e.g., molten iron temperature) approach the target values. In other words, it becomes possible to execute control that appropriately determines the operation quantities of the blast furnace without waiting for the observation results of the observation quantities that can be observed at relatively late timing.

[0130] <Example of software implementation> The functions of the control device 200 are implemented by a program for causing a computer to function as the device, and can be realized by a program for causing a computer to function as each block of the device.

[0131] Fig. 8 is a block diagram illustrating a physical configuration of a computer used as the control device 200. As shown in Fig. 8, the control device 200 can be configured by a computer including a bus 510, a processor 501, a main memory 502, an auxiliary memory 503, a communication interface 504, and an input / output interface 505. The processor 501, the main memory 502, the auxiliary memory 503, the communication interface 504, and the input / output interface 505 are connected to one another via the bus 510. An input device 506 and an output device 507 are connected to the input / output interface 505.

[0132] The processor 501 may be, for example, a CPU (Central Processing Unit), a microprocessor, a digital signal processor, a microcontroller, or a combination of these.

[0133] The main memory 502 may be, for example, a semiconductor RAM (random access memory).

[0134] For example, a flash memory, a hard disk drive (HDD), a solid state drive (SSD), or a combination of these may be used as the auxiliary memory 503. A program for causing the processor 501 to execute the above-mentioned operation of the control device 200 is stored in the auxiliary memory 503. The processor 501 loads the program stored in the auxiliary memory 503 onto the main memory 502, and executes each instruction included in the loaded program.

[0135] The communication interface 504 is an interface for connecting to a network.

[0136] As the input / output interface 505, for example, a USB interface, a short-range communication interface such as infrared or Bluetooth (registered trademark), or a combination of these is used.

[0137] The input device 506 may be, for example, a keyboard, a mouse, a touch pad, a microphone, or a combination of these. The output device 507 may be, for example, a display, a printer, a speaker, or a combination of these.

[0138] When the functions of the control device 200 are realized by a program for causing a computer to function as the device, the functions described in each of the above embodiments are realized by executing the above program by a processor 501 and a main memory 502.

[0139] The program may be non-transitory and may be recorded in one or more computer-readable recording media. The recording media may or may not be included in the device. In the latter case, the program may be provided to the device via any wired or wireless transmission medium.

[0140] In addition, some or all of the functions of the above-mentioned blocks may be realized by logic circuits. For example, an integrated circuit in which a logic circuit that functions as each of the above-mentioned control blocks is formed is also included in the scope of the present invention.

[0141] Furthermore, some or all of the functions of each of the above blocks may operate on the above device, or may operate on another device (for example, an edge computer or a cloud server, etc.).

[0142] The present invention is not limited to the above-described embodiments, and various modifications are possible within the scope of the claims. Embodiments obtained by appropriately combining the technical means disclosed in different embodiments are also included in the technical scope of the present invention. [Explanation of symbols]

[0143] 1 Blast Furnace Process 200 Control device 201 Estimation Department 202 Operation control section 211 Disturbance Estimation Unit 212 Heat change calculation unit 213 Temperature change calculation unit 214 State and Observation Estimation Unit

Claims

1. A control device for controlling a process of a blast furnace, comprising: a disturbance estimation unit that estimates a disturbance value from an observation amount observed when a first time has elapsed after an operation on the blast furnace, using a first state space model and a disturbance estimation observer that estimates an observation amount that is observable with a relatively fast time response to an operation or disturbance on the blast furnace and a state of the blast furnace corresponding to the observation amount that is observable with the relatively fast time response; a heat change amount calculation unit that calculates a heat change amount associated with the occurrence of a disturbance from the estimated disturbance value; a temperature change calculation unit that calculates a change in the molten iron temperature from the calculated heat change; a state observation quantity estimating unit that generates a second state space model that estimates an observation quantity including an observation quantity observable with a relatively slow time response to operations on the blast furnace or disturbances and a state of the blast furnace corresponding to the observation quantity including the observation quantity observable with a relatively slow time response, and a third state space model using the amount of change in the molten iron temperature calculated by the temperature change quantity calculating unit, and estimates an observation quantity observed when a second time longer than the first time has elapsed after operations on the blast furnace and a state of the blast furnace corresponding to the observation quantity; an operation amount determination unit that determines an operation amount related to the next operation of the blast furnace based on the estimation result of the state observation amount estimation unit; A control device having the above configuration.

2. The observable quantities that can be observed with a relatively fast time response related to the first state space model are the gas composition, the amount of carbon solution loss, the CO utilization rate, H 2 At least one of the utilization rate and the amount of hot metal produced; 2. The control device according to claim 1, wherein the observable quantity that can be observed with a relatively slow time response related to the second state space model is at least one of molten iron Si and molten iron temperature.

3. The control device according to claim 1 or 2, wherein the manipulated variable is an air blowing amount or an amount of pulverized coal injection.

4. A control method for a control device that controls a process of a blast furnace, comprising: a disturbance estimation step of estimating a disturbance value from an observation quantity observed when a first time has elapsed after an operation on the blast furnace, using a first state space model that estimates an observation quantity that is observable with a relatively fast time response to an operation or disturbance on the blast furnace and a state of the blast furnace corresponding to the observation quantity that is observable with the relatively fast time response, and a disturbance estimation observer; a heat change amount calculation step of calculating a heat change amount caused by the occurrence of a disturbance from the estimated disturbance value; a temperature change calculation step of calculating a change in the molten iron temperature from the calculated heat change; a state observation quantity estimation step of generating a second state space model that estimates an observation quantity including an observation quantity observable with a relatively slow time response to operations on the blast furnace or disturbances and a state of the blast furnace corresponding to the observation quantity including the observation quantity observable with a relatively slow time response, and a third state space model that uses the amount of change in the molten iron temperature calculated by the processing of the temperature change quantity calculation step, and estimating an observation quantity observed when a second time longer than the first time has elapsed after operations on the blast furnace and a state of the blast furnace corresponding to the observation quantity; an operation amount determination step of determining an operation amount related to the next operation of the blast furnace based on the estimation result of the state observation amount estimation step; The control method includes:

5. The observable quantities that can be observed with a relatively fast time response to the operation or disturbance of the blast furnace are gas composition, carbon solution loss amount, CO utilization rate, H 2 At least one of the utilization rate and the amount of hot metal produced; 5. The control method according to claim 4, wherein the observable quantity that can be observed with a relatively slow time response to operations or disturbances on the blast furnace is at least one of molten iron Si and molten iron temperature.

6. The control method according to claim 4 or 5, wherein the manipulated variable is at least one of an air blowing amount and an amount of pulverized coal injection.

Citation Information

Patent Citations

  • Molten iron temperature prediction method, molten iron temperature prediction device, operation method of blast furnace, operation guidance device, molten iron temperature control method and molten iron temperature control device

    JP2018024935A

  • Controller, method, and program

    JP2023025646A

  • method for predicting variation of furnace heat for blast furnace

    KR1020130023886A

  • Manufacturing process control with deep learning-based predictive model for hot metal temperature of blast furnace

    US20190093186A1

  • Method and device for predicting molten iron temperature, operation method of blast furnace, operation guidance device, and method and device for controlling molten iron temperature

    JP2019019385A