Concrete supply distributor

The concrete supply distributor addresses interference and stability issues by rotating outriggers and secure storage, enhancing efficiency and durability in transportation and construction.

JP2024137385APending Publication Date: 2024-10-07KYOKUTO KAIHATSU IND
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2023048889
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-24
Publication Date
2024-10-07

AI Technical Summary

Technical Problem

Conventional concrete supply distributors with long outriggers face increased size and complexity, leading to interference issues during transportation and construction site movement, complicating the work process and reducing efficiency.

Method used

A concrete supply distributor with a base device and boom device, featuring outriggers that rotate around a horizontal axis, allowing deployment outward or upward/downward retraction, and a coupling device for secure storage, reducing interference and stabilizing support.

Benefits of technology

The solution enables longer outriggers without interference, stabilizes support, reduces actuator load, and enhances durability by reliable retraction, simplifying transportation and construction site operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024137385000001_ABST
    Figure 2024137385000001_ABST
Patent Text Reader

Abstract

To simplify works of a concrete supply distributor, which comprises a base unit and a boom device mounted on the base unit, by eliminating necessity of stowing the most part of each outrigger in the base body or stowing it along the outer face of the base body, and as a result, by inhibiting interference of the outriggers in the stowed positions with other objects when the distributor is loaded on a vehicle or in transit in a construction site even in the case the outriggers are lengthened.SOLUTION: A base unit 10 comprises a base body 11 as its main frame and multiple outriggers R1-R4 of which base parts Rb are supported with shafts rotatably around the horizontal axes at intervals along the circumferential direction on the base body 11. Each outrigger R1-R4 is movable by the rotation between a deployed position Ro at which it spreads outward from the base body 11 and a stowed position Ri at which it extends either upward or downward from the base body 11.SELECTED DRAWING: Figure 4
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a concrete supply distributor including a base device and a boom device mounted on the base device. [Background technology]

[0002] The above-mentioned concrete supply distributor is conventionally known, for example as described in Patent Document 1, and in this known type, a plurality of outriggers 32 are attached to the base base 1 (base body) of the base device so as to be movable between an extension device that extends outward from the base base 1 and a stored position closer to the base base 1 than its deployed position. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2020-193494 A Summary of the Invention [Problem to be solved by the invention]

[0004] In the distributor of Patent Document 1, the outriggers 32 are stored outside the base table 1 so as to follow the outer surface thereof.

[0005] Incidentally, in order to lengthen the support span of the base device and stabilize the support, it is effective to lengthen the overall length of the outriggers 32, but when the outriggers 32 are formed particularly long, the long outriggers 32 protrude to a considerable extent from the periphery of the base stand 1 even when stored, and this results in the overall size of the base device including the outriggers 32. Therefore, when transporting the base device using a distributor vehicle or moving the base device at the construction site (for example, reloading work), care must be taken to avoid interference between the enlarged base device and other objects, which makes the work more complicated and reduces work efficiency, among other problems.

[0006] SUMMARY OF THE PRESENT INVETION The present invention has been proposed in view of the above, and has an object to provide a distributor for supplying concrete that can solve the problems of the conventional structure with a simple structure. [Means for solving the problem]

[0007] In order to achieve the above-mentioned object, the present invention provides a concrete supply distributor comprising a base device and a boom device mounted on the base device, wherein the base device comprises a base body which serves as the main frame of the base device, and a plurality of outriggers whose bases are supported on the base body at intervals around the circumferential direction and are rotatable about a horizontal axis, and each of the outriggers is capable of moving between an deployed position in which it extends outward from the base body and a stored position in which it extends above or below the base body by the rotation of the outriggers.

[0008] In addition to the first characteristic, the present invention has a second characteristic in that the bases of the pair of upper and lower outriggers are supported on the upper and lower parts of one side and the other side of the base body so as to be rotatable around the horizontal axis, and a support body capable of supporting the base device can be clamped between the pair of upper and lower outriggers when the pair of upper and lower outriggers are in the deployed position.

[0009] In addition to the first or second characteristics, the present invention has a third characteristic in that it comprises a mast body extending in the vertical direction, with its lower end supported in an upright position in the center of the base body and with the boom device mounted on its upper end, and a connecting device is interposed between the mast body and the outriggers so as to be detachable between them and secure the outriggers in the stored position. Effect of the Invention

[0010] According to the present invention, the base device comprises a base body which is a main frame thereof, and a plurality of outriggers whose bases are supported by the base body at intervals in the circumferential direction thereof so as to be rotatable about a horizontal axis, and each outrigger can be moved between a deployed position where it projects outward from the base body and a stored position where it extends above or below the base body by rotating, so that it is not necessary to store most of the outriggers within the base body or along the outer surface of the base body. Therefore, even if the outriggers are made long and large, the outriggers in the stored position are less likely to interfere with other objects when the distributor is loaded onto the vehicle or moved at the construction site, making the work easier, and since the outriggers can be made long and large without interfering with other objects, the support of the base body can be stabilized.

[0011] According to the second feature, the bases of the pair of upper and lower outriggers are supported on the upper and lower parts of one and the other side of the base body so as to be rotatable about a horizontal axis, and a support capable of supporting the base device can be sandwiched between the pair of upper and lower outriggers when they are in the deployed position, so that by sandwiching a support (for example, a floor slab) between the pair of upper and lower outriggers when they are in the deployed position, it is possible to reliably prevent the outriggers from rising or sinking relative to the support. This makes it possible to more stably support the base body to the support via the outriggers.

[0012] According to the third feature, the mast body extends in the vertical direction, with its lower end supported in an upright position in the center of the base body and a boom device mounted on its upper end, and a connecting device is interposed between the mast body and the outriggers so that they can be detachably connected to each other and fastened to the outriggers in the stored position. Therefore, the outriggers can be more reliably held in the stored position compared to when the actuator alone is used to hold them in the stored position, which not only reduces the load on the actuator but also contributes to improved durability. [Brief description of the drawings]

[0013] [Figure 1]FIG. 1 is an overall vertical cross-sectional view showing an example of an operating state of a distributor according to a first embodiment of the present invention; [Diagram 2] Side view of the distributor as seen from the direction of the 2X arrow in Figure 1 [Diagram 3] FIG. 3 is an enlarged side view, partially cut away, of the main parts of the base device and the mast device when the outriggers are in the deployed position (enlarged view of the part indicated by the arrow 3X in FIG. 1). [Figure 4] FIG. 3 corresponds to FIG. 3 and shows the main parts of the base device and the mast device when the outriggers are in the stowed position. [Diagram 5] FIG. 5 is a plan view showing the base device with the outriggers in the deployed position (as viewed from the arrow 5X in FIG. 3). [Figure 6] FIG. 6 is a plan view showing the base device with the outriggers in the stowed position (viewed from the arrow 6X in FIG. 4). [Figure 7] FIG. 7 is an enlarged side view showing the main part of the mast device (enlarged view of the part shown by the arrow 7X in FIG. 1). [Figure 8] FIG. 2 is an overall perspective view of the base device with the outriggers in the deployed position; [Figure 9] An explanatory diagram showing an example of a distributor replacement process [Figure 10] FIG. 11 is a schematic plan view showing a main part of a base device according to a second embodiment; [Figure 11] FIG. 13 is a schematic plan view showing a main part of a base device according to a third embodiment; DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] First, a first embodiment of the present invention will be specifically described below with reference to FIGS. 1 to 8. FIG.

[0015] The concrete supply distributor DS is used to receive ready mixed concrete for constructing various parts of the structure (such as floor slabs and each wall) from a concrete pump (not shown) placed on the ground at the construction site, for example, of a building, and supply it to various parts of the casting site located at an elevated position. An example of its use is shown in Figures 1 and 2.

[0016] This distributor DS comprises a base device 10 serving as a foundation, a height-adjustable mast device 20 supported in an upright state on the base device 10, and a boom device 30 mounted on the mast device 20. Next, an example of each of the devices 10, 20, 30 will be described in order with reference to Figs. 3 to 7.

[0017] First, the base device 10 will be described. It comprises a base body 11 formed in a vertically flat rectangular parallelepiped shape that serves as the main frame of the base device 10, and a plurality of (four in the embodiment) outriggers R1 for ensuring a long support span for the base body 11 and stabilizing support of the base body 11. The base body 11 is thus composed of a hollow rigid frame formed by framing a plurality of metal frame plates, and the outer edge is formed into a substantially polygonal shape (substantially square in the embodiment) in a plan view.

[0018] A support cylinder 11a is fixed to the center of the base body 11 for releasably fitting with and supporting the lower part of the mast assembly 20 (specifically, the lower end of the lowermost mast body 21 described later), and the lower end of this support cylinder 11a is placed on and fixed to the bottom wall 11b of the base body 11. The support cylinder 11a is formed into a square tube having substantially the same cross-sectional shape as the mast body 21, and its upper end penetrates the upper wall 11t of the base body 11 and protrudes upward.

[0019] Around the support cylinder portion 14a, through holes (not shown) for passing a connection pipe 28 (described later) are provided at appropriate positions on the top wall 11t and the bottom wall 11b of the base body 11. When a curved or flexible pipe is used for part of the connection pipe 28 so that the connection pipe 28 can be routed without passing through the base body 11 (for example, part of the connection pipe 28 can be routed around the outside of the base body 11), the through hole in the base body 11 can be omitted.

[0020] Furthermore, a number of connecting blocks Bd are fixed to the outer periphery of the upper end of the support cylinder 11a at intervals in the circumferential direction. The lower end of the lowermost mast body 21 and the support cylinder 11a (and therefore the base body 11) are connected to each other via these connecting blocks Bd, a number of connecting blocks Bu fixed to the outer periphery of the lower end of the lowermost mast body 21, and connecting means (e.g., bolts) that detachably connect the blocks Bd, Bu, as described below.

[0021] In this connected state, the upper and lower connecting blocks Bu, Bd come into contact with each other, and their contact surfaces engage with each other in a concave-convex manner so as to prevent circumferential and radial positional deviations between the lowest mast body 21 and the support cylinder 11a. This concave-convex engagement makes it easy to position the lowest mast body 21 on the support cylinder 11a (and therefore the base body 11), and also reliably prevents the mast body 21 from being displaced in the direction along the contact surfaces.

[0022] In addition, if necessary, a bracket with a locking hole (not shown) for locking the lower end of a suspension wire when the base device 10 is suspended alone by a crane is fixed to the upper wall 11t of the base body 11.

[0023] The base body 11 is placed and fixed on the floor slabs FS1 to FS3 of the framework as a support body via the outriggers R1, and is formed slightly smaller than the through holes (e.g., elevator halls FS1h to FS3h) formed in the floor slabs FS1 to FS3. Therefore, when each outrigger R is in the storage position Ri, the base body 11 can pass through the elevator halls FS1h to FS3h in the vertical direction.

[0024] The four outriggers R1 are formed into a square tube or column shape with a rectangular cross section and closed both ends. The four outriggers R have their bases Rb received in recesses 15 that are U-shaped in plan view and provided in the side walls 11s, which are the four sides of the outer edge of the base body 11 and form straight lines in plan view, and the bases Rb are supported by the base body 11 via a pivot 16 so as to be rotatable in the vertical direction. The pivot 16 has a horizontal axis line that crosses the base Rb as its central axis line, and is coupled (for example, by spline fitting, keying, welding, etc.) to the base Rb so as to rotate integrally with the base Rb around the horizontal axis line.

[0025] More specifically, a pair of bearings 17 that rotatably support both ends of the pivot 16 are fixed to the left and right inner walls of the recess 15 of the base body 11. A motor unit U serving as an actuator that is adjacent to the outside of one of the left and right bearings 17 and can rotate the pivot 16 (and therefore the outrigger R) is housed in the base body 11, and its unit case is fixed to an appropriate position on the inner wall of the base body 11.

[0026] The motor unit U includes an electric motor 18 and a gear transmission mechanism 19 that rotates a motor shaft 18m of the electric motor 18 and the pivot 16 in an interlocking manner, and the rotational driving force of the motor 18 is transmitted to the outrigger R via the gear transmission mechanism 19 and the pivot 16 to rotate the outrigger R. Note that a hydraulic motor or an air motor may be used instead of the electric motor 18.

[0027] Thus, each outrigger R1 is driven by a motor unit U to rotate up and down around the horizontal axis, and this rotation enables it to move between a deployed position Ro in a horizontal position in which it extends far outward from the base body 11, and a stored position Ri in a vertical position in which it extends upward beyond the base body 11.

[0028] Meanwhile, a first coupling device Jo capable of detachably coupling the base body 11 and a middle portion of the outrigger R close to the base portion Rb is interposed between the base body 11 and the middle portion of the outrigger R to fasten the outrigger R1 to the deployed position Ro. The first coupling device Jo has at least one first bolt Bo which penetrates the outrigger R at the deployed position Ro from above and is screwed into the bottom wall 11b of the base body 11. Note that a coupling means other than the first bolt Bo, for example, a retaining pin which penetrates the outrigger R at the deployed position Ro from above and is inserted into the bottom wall 11b of the base body 11, may be used.

[0029] A second coupling device Ji is interposed between the mast main body 21 (described later) and the tip portion Ra of the outrigger R1, which is capable of detachably coupling the two together and fastening the outrigger R1 to the storage position Ri. The second coupling device Ji has at least one second bolt Bi which penetrates the outrigger R at the storage position Ri from the side and is screwed into a receiving member 25 fixed (for example, by welding) to the side wall 21s of the mast main body 21. Note that a coupling means other than the second bolt Bi, for example, a retaining pin which penetrates the outrigger R at the storage position Ri from the side and is inserted into the side wall 11s of the mast main body 21, may be used.

[0030] Next, an example of a mast assembly 20 will be described mainly with reference to FIGS. 1 to 3 and 7. FIG.

[0031] The mast assembly 20 is divided into a plurality of mast bodies 21 which are supported in an upright state on the base assembly 10 and connected to each other in a vertical row, and the overall length (and therefore the overall height) of the mast assembly 20 can be increased (higher) by increasing the number of connections of the mast bodies 21. A boom assembly 30 is mounted on the upper portion of the mast assembly 20 (i.e., the upper end portion of the uppermost mast body 21).

[0032] These mast bodies 21 are basically hollow cylinders with the same cross section, and in this embodiment have a sturdy closed cross section structure with a rectangular cross section. A ladder 23 is fixed to the outer periphery of each mast body 21 so that workers can ascend and descend along the mast assembly 20, and a work platform 24 is fixed to the top of the uppermost mast body 21 so that workers can safely perform various tasks (e.g., assembly, inspection and maintenance, etc.). These fixing operations are performed in advance, for example, by fixing means (not shown) before the mast assembly 20 is installed on the base assembly 10.

[0033] Furthermore, a plurality of connecting pipes 28 are fixed to the outer periphery of each mast body 21. The connecting pipes 28 extend in a vertical arrangement along the mast body 21 and can be connected to a concrete pumping pipe extending from a concrete pump not shown. Adjacent connecting pipes 28 can be connected to each other in a liquid-tight manner using joints that are well known in the art.

[0034] Additionally, a number of joining blocks Bd, Bu are fixed to the outer periphery of the upper and lower ends of each mast body 21, aligned at the same circumferential position and spaced apart from one another in the circumferential direction at both ends. Thus, the joining blocks Bd, Bu fixed to the adjacent ends of a pair of adjacent mast bodies 21 abut against each other when the two mast bodies 21 are vertically arranged one above the other, and the abutting surfaces engage with each other in a concave-convex manner so as to prevent circumferential and radial misalignment of the adjacent mast bodies 21 from occurring.

[0035] Therefore, the connection structure between adjacent mast bodies 21 using the connecting blocks Bd, Bu is basically the same as the connection structure between the lowermost mast body 21 and the support cylinder portion 11a (base body 11) using the connecting blocks Bd, Bu as described above.

[0036] Next, an example of a boom device 30 will be described with reference mainly to Figures 1 and 2. The boom device 30 includes a boom train BT consisting of a plurality of booms B1-B4 arranged in series with one another and pivotally connected to one another so that they can be bent and swung, and a boom support base BS that is attached to the upper part of the mast device 20 (specifically, the upper end part of the uppermost mast body 21) and supports the first boom B1, which is the most proximal side in the boom train BT, so that it can be raised and lowered by means of a horizontal pivot J1.

[0037] The boom support base BS comprises a fixed base 31 fixed to the upper part of the mast assembly 20, and a swivel base 32 supported on the fixed base 31 so as to be rotatable about a vertical axis, and a swivel drive unit capable of driving the swivel base 32 is interposed between the fixed base 31 and the swivel base 32. The structure of this swivel drive unit is well known in the technical field of crane equipment with multi-stage booms, so further explanation will be omitted.

[0038] The lower end of the fixed base 31 is formed of a square cylinder having approximately the same cross-sectional shape as the mast body 21, and a plurality of connecting blocks Bu of the same structure as those fixed to the lower end of each mast body 21 are fixed to the outer periphery of the lower part of the square cylinder. The connecting block Bu on the fixed base 31 side and the connecting block Bd on the upper end side of the uppermost mast body 21 abut against each other when the fixed base 31 is mounted on the mast body 21, and their abutting surfaces engage with each other in a concave-convex manner so as to suppress circumferential and radial positional deviation between the fixed base 31 and the mast body 21.

[0039] Thus, the connection structure between the connecting block Bu on the fixed base 31 side and the connecting block Bd of the uppermost mast body 21 is basically the same as the connection structure between adjacent mast bodies 21 by the connecting blocks Bd, Bu as described above.

[0040] In the boom train BT, a hydraulic cylinder C1 is interposed between the first boom B1 and the boom support base BS (particularly the upright wall portion 32s of the swivel base 32 described later) to forcibly raise and lower the first boom B1 relative to the boom support base BS. Hydraulic cylinders C2 to C4 are interposed between adjacent booms in the boom train BT (i.e., between the first boom B1 at the base end and the next second boom B2, between the second boom B2 and the next third boom B3, and between the third boom B3 and the fourth boom B4 at the most distal end), respectively, to forcibly flex and swing between them, either directly or via a link mechanism.

[0041] A hydraulic supply system (including, for example, an oil tank, hydraulic pump, control valve, etc.) installed on the boom support base BS (particularly the fixed base 31 described later) is connected to each of the hydraulic cylinders C1-C4 via hydraulic piping (not shown) routed along the boom row BT. The supply and discharge of hydraulic pressure between this hydraulic supply system and each of the hydraulic cylinders C1-C4 is controlled based on the operation of an operator. The configuration of the hydraulic control system is also well known in the technical field of multi-boom crane equipment.

[0042] Further, a flexible blow-out tube 37 capable of blowing out ready mixed concrete from its tip is attached to the tip of the fourth boom B4. The base end of this blow-out tube 37 and the downstream end of the aforementioned connection pipe 28 installed along the mast body 21 are connected via a first relay pipe 38 installed across the inside and outside of the boom support base BS, and a second relay pipe 39 supported by each of the booms B1-B4 of the boom row BT and arranged along each of the booms B1-B4.

[0043] The second relay pipe 39 is bent at a folded portion midway through the hollow pivots J2 to J4 which serve as pivotal connections between the adjacent booms B1, B2; B2, B3; B3, B4, and is routed along the adjacent booms B1 to B4.

[0044] Moreover, the upstream end of the second relay pipe 39 and the downstream end of the first relay pipe 38 are connected via a joint that connects them to be relatively rotatable around the axis of the pivot J1. Also, joints that connect the upstream pipe section and the downstream pipe section to be relatively rotatable are respectively provided midway along the second relay pipe 39, particularly near each of the turning portions. Therefore, these joints enable the second relay pipe 39 to smoothly follow the raising and lowering rotation and bending swing of the first boom B1 and the bending and swinging of adjacent booms B1, B2; B2, B3; B3, B4.

[0045] Meanwhile, the fixed base 31 is provided with a plurality of, i.e., four, first attachment parts T1, which are conventionally known and used when lifting the fixed base 31 with a crane. More specifically, the first attachment parts T1 are used when lifting the boom device 30 with a crane via the first ropes W1 in a state where the boom row BT is folded and in a vertical position (see FIG. 8) or a horizontal position (not shown), and at that time, the lower end of the first ropes W1 is releasably engaged with each of the first attachment parts T1 via a conventionally known engagement / disengagement mechanism. Note that, since large cranes capable of lifting the boom device 30 are conventionally known, the crane body is not shown in the embodiment, and only the crane hook 80 suspended from the boom tip of the claimed body via a wire is shown.

[0046] In particular, in this embodiment, two sets of pairs of first mounting parts T1 arranged at intervals in a predetermined direction (hereinafter simply referred to as the width direction of the boom row BT) along the axis of the pivot J1 of the base of the first boom B1 are disposed on the fixed base 31 at intervals in a horizontal direction perpendicular to the width direction (i.e., four locations in total on the front, back, left and right sides of the fixed base 31). It is noted that three or more sets of pairs of first mounting parts T1 may be provided.

[0047] Incidentally, the above-described multiple first mounting parts T1 are provided on the boom support base BS, particularly the fixed base 31, via the support brackets 41 in order to ensure a long mutual spacing, but they may also be provided directly on the fixed base 31. Also, instead of providing the first mounting parts T1 on the fixed base 31, they may be provided on the swivel base 32 directly or via a support member such as a bracket.

[0048] In addition, a second mounting portion T2 (see Figure 1) is provided, if necessary, midway along the first boom B1. The second mounting portion T2 is used when lifting the boom device 30 with a crane via a second rope (not shown) when the boom row BT is in a horizontal position and can be connected to the second rope.

[0049] Next, the operation of the first embodiment will be described. When the distributor DS of this embodiment is used at a building construction site, for example, a reinforced concrete floor slab FS1 of the lowest floor (for example, the first floor) is constructed in advance. Then, an assembly process of assembling and installing the distributor DS on the floor slab FS1 and a process of constructing the upper floor slabs FS2, FS3 and related walls based on the pouring of ready mixed concrete using the installed distributor DS are sequentially performed.

[0050] When the upper floor slabs FS2, FS3, etc. are constructed in this way, a process (called "re-laying" on-site) is performed in which the entire distributor DS is placed on the upper floor slab (e.g., FS2) in order to construct the upper floor slabs, etc. The above-mentioned distributor DS assembly process and re-laying process will be explained in order. [Assembly process] 1 shows the state immediately after the distributor DS is installed on the floor slab FS1 in this assembly process. In this assembly process, first, only the base unit 10 is suspended by a crane and lowered to approximately the same level as the floor slab FS1, and the outriggers R1 deployed to the deployment position Ro are placed on the floor slab FS1 and fixed to the floor slab FS1 using a conventionally known fixing means (e.g., U-bolts, anchor bolts, etc.). Next, the mast unit 20, which has been assembled in advance at a different location, is suspended by a crane and mounted and fixed on the base unit 10 (on the support cylinder portion 11a of the base body 11), and then the boom unit 30, which has been assembled in advance at a different location, is suspended by a crane and mounted and fixed on the upper part of the mast unit 20. Next, by carrying out the necessary piping work related to the pumping of ready-mixed concrete, the ready-mixed concrete can be pumped and supplied sequentially from the concrete pump installed on the ground to the connecting pipe 28, the first and second relay pipes 38, 39 and the blow-out tube 37 (see Figure 1).

[0051] Thus, the installation of the distributor DS on the floor slab FS1 of the lowest level is completed, and from this state, the distributor DS can supply ready mixed concrete to a desired casting location from the blow-out tube 37 at the end of the boom train BT by appropriately bending the booms B1 to B4 of the boom train BT relative to each other and rotating the swivel base 32 (and therefore the boom train BT). This makes it possible to sequentially build the floor slab FS2 and wall of the next level, and further the floor slab FS3 and wall of the next level.

[0052] Once the upper floor slabs FS2, FS3 and wall bodies have been built in this manner, the next re-laying process is performed in which the entire distributor DS is re-placed, for example, on the floor slab FS2 in order to build the upper floor slab FS4, etc. [Refilling process] In this step, for example, the connection pipe 28 fixed to the mast body 21 is disconnected from the concrete pump-connected concrete pump pipe, and the outrigger R1 is released from the floor slab FS1. Then, as shown in Fig. 8(A), the folded boom row BT is raised and swung up until it is in a substantially vertical position, and in this state, the connected parts at the lower ends of the four first ropes W1 are respectively connected to the four first mounting parts T1 of the boom support base BS (fixed base 31). Then, the connected parts at the upper ends of the first ropes W1 are hooked onto the crane hook 80, and the entire distributor DS in the vertical position is lifted up by a crane.

[0053] Next, as shown in Fig. 8(B), the outriggers R1 are rotated to the storage position Ri so that the outriggers R1 do not interfere with the periphery of the elevator hole FS2h as a through hole of the floor slab FS2 of the upper floor when the distributor DS is raised. Then, the entire distributor DS is lifted and raised by a crane until the base device 10 is at approximately the same level as the floor slab FS2 of the upper floor.

[0054] After this ascent, the outriggers R are again deployed to the deployed position Ro, as shown in Figure 8(C), and then placed on and fixed to the floor slab FS2 of the upper floor. Next, the lower ends of all of the first ropes W1 are removed from the first mounting parts T1 of the fixing base 31 and stored in a separate storage location. Furthermore, if the concrete pressure pipe extending from the concrete pump is reconnected to the upstream end (lower end) of the connecting pipe 28 fixed to the mast body 21, it becomes possible to pressure-feed and supply ready-mixed concrete to the connecting pipe 28, the first and second relay pipes 38, 39, and the blow-out tube 37 in that order.

[0055] Thus, the distributor DS finishes transferring concrete to the upper floors, and from this state, as shown in Fig. 8(D), the distributor DS lays down the first boom B1 of the boom train BT, bends the booms B1 to B4 relative to each other as appropriate, and rotates the swivel base 32 (and therefore the boom train BT), so that ready-mixed concrete can be supplied from the blow-out tube 37 at the end of the boom train BT to a desired casting location on the upper floors. This makes it possible to construct the floor slab FS4 and walls of the upper floors.

[0056] Thus, by carrying out the above-mentioned replacement process in sequence as the floor slab FS increases in level, it becomes possible to construct medium-rise and high-rise buildings without difficulty using the same distributor DS.

[0057] According to the first embodiment described above, the base device 10 of the distributor DS comprises a base body 11 which serves as its main frame, and a plurality of outriggers R1 whose base parts Rb are supported on the base body 11 at intervals in the circumferential direction thereof so as to be rotatable about a horizontal axis, and each outrigger R1 can be moved by the above-mentioned rotation between a deployed position Ro in which the tip part Ra extends far outward from the base body 11, and a stored position Ri in which it extends upward from the base body 11.

[0058] As a result, it is no longer necessary to store most of each outrigger R1 inside the base body 11 or along the outer surface of the base body 11. Therefore, even if the outriggers R are made long and large, the outriggers R1 in the storage position Ri are less likely to interfere with other objects when the distributor DS is loaded onto a vehicle or moved around the construction site, making work easier. Also, by being able to reasonably lengthen the outriggers R1 while avoiding interference with other objects in this way, a sufficiently long support span for the base body 11 can be secured, and support of the base body 11 can be stabilized.

[0059] In this embodiment, a coupling device Jo is provided between the mast body 11 and the tip Ra of the outrigger R1, which is capable of detachably coupling them to fasten the outrigger R1 to the stowed position Ri. This makes it possible to more reliably hold the outrigger R1 in the stowed position Ri compared to a case in which the actuator alone is used to hold the outrigger R1 in the stowed position Ri, thereby reducing the load on the actuator and contributing to improved durability.

[0060] 9 shows a second embodiment of the present invention. As in the first embodiment, the outrigger R2 of the second embodiment has a base portion Rb received in a recess 15 in a side wall 11s of the base body 11, and the base portion Rb is supported on the base body 11 via a pivot 16 so as to be rotatable about a horizontal axis. However, the outrigger R1 can move between a deployed position Ro where a tip portion Ra projects far outward from the base body 11, and a stored position Ri where the tip portion Ra extends downward from the base body 11, by the above-mentioned rotation.

[0061] Therefore, in the process of transferring the distributor DS, the base device 10 (distributor DS) is temporarily lifted upward by a crane or the like just before rotating it downward from the deployed position Ro to the stored position Ri, and the outrigger R1 in the deployed position Ro is raised a predetermined height above the floor slab FS1, making it possible to rotate the outrigger R1 downward toward the stored position Ri while avoiding interference with the floor slab FS1.

[0062] Other configurations of the second embodiment are basically similar to those of the first embodiment, so further explanation will be omitted.

[0063] According to the second embodiment, the same effects as those of the first embodiment can be achieved, and further, the following effects can be achieved: In the second embodiment, since the outrigger R1 can be held in the storage position Ri by its own weight, the second coupling device Ji can be omitted.

[0064] 10 shows a third embodiment of the present invention. In the third embodiment, bases Rb of a pair of upper and lower outriggers R3, R4 are supported rotatably about a horizontal axis on the upper and lower parts of one and the other sides of the base body 11, and when the pair of upper and lower outriggers R3, R4 are in the deployed position Ro, floor slabs FS1 to FS3 can be sandwiched between the two outriggers R3, R4 as supports capable of supporting the base device 10.

[0065] In this third embodiment, it is desirable to set the axis-to-axis distance between the pivots 16, 16' of the upper and lower outriggers R3, R4 so that the vertical distance between the outriggers R3, R4 when they are in the deployed position Ro is greater than or equal to the thickness of a typical floor slab (150 mm).

[0066] Other configurations of the third embodiment are basically the same as those of the first embodiment, so further description will be omitted. Thus, according to the third embodiment, the same effects as those of the first and second embodiments can be achieved, and further the following effects can be achieved. That is, when the pair of upper and lower outriggers R3, R4 are both in the deployed position Ro, the floor slabs FS1 to FS3 serving as supports are sandwiched between them, so that the outrigger R can be reliably prevented from rising or sinking relative to the supports. This makes it possible to more stably support the base body 11 to the floor slabs FS1 to FS3 (i.e., supports) via the outriggers R3, R4.

[0067] Although the embodiment of the present invention has been described above, the present invention is not limited to the embodiment, and various embodiments can be implemented within the scope of the present invention.

[0068] For example, in the above embodiment, an example has been shown in which a motor unit U is used as an actuator for rotationally driving the outriggers R1 to R4, but the rotational drive device of the outriggers R1 to R4 is not limited to that in the embodiment, and other drive methods (for example, a combination of a chain mechanism and a telescopic cylinder, etc.) may be used. Alternatively, depending on the size and weight of the outriggers R1 to R4, the rotation of the outriggers R1 to R4 between the stored position Ri and the deployed position Ro may be performed manually.

[0069] In the above embodiment, the first coupling device Jo for fastening the outriggers R1 to R4 to the deployed position Ro is interposed between the base body 11 and the outriggers R1 to R4, and one example thereof is shown to use the first bolt Bo or a retaining pin, but it may be interposed between the base body 11 and the outriggers R1 to R4 depending on the shape and structure of the base body 11. Also, instead of the first coupling device Jo, a motor unit U with a self-locking function that can lock the outriggers R1 to R4 in a rotation stop position by an automatic locking mechanism may be used to fasten the outriggers R1 to R4 to the deployed position Ro.

[0070] In addition, in the above embodiment, the second coupling devices Ji for fastening the outriggers R1 to R4 to the storage positions Ri are interposed between the mast body 21 and the outriggers R1 to R4, but depending on the shape and structure of the base body 11, they may be interposed between the base body 11 and the outriggers R1 to R4. Also, instead of the second coupling devices Ji, a motor unit U with a self-locking mechanism capable of exhibiting an automatic locking function at the rotation stop position may be used to fasten the outriggers R1 to R4 to the storage positions Ri.

[0071] In addition, in the above embodiment, an example was given in which the size of the base body 11 of the distributor DS is formed smaller than the size of the elevator holes FS1h to FS3h in each floor slab FS1 to FS3 where the distributor DS is rearranged, making it possible to use the elevator holes FS1h to FS3h for rearrangement, but if the elevator holes FS1h to FS3h are not used for rearrangement, the size of the base body 11 may be formed larger than the elevator holes FS1h to FS3h.

[0072] In addition, in the above embodiment, the outriggers R1 to R4 in the deployed position Ro are fixed to the floor slabs FS1 to FS3 using conventionally known fixing means (e.g., U-bolts, anchor bolts, etc.), but in an operating environment in which the distributor DS can be maintained in a stable position without specially fixing the outriggers R1 to R4 to the floor slabs FS1 to FS3, the above-mentioned fixation may be omitted.

[0073] In the above embodiment, the mast assembly 20 is formed of two mast bodies 21 connected to each other in a column shape, and the boom assembly 30 is mounted on the base assembly 10 via the mast assembly 20, but depending on the length of the mast body 21 and the work conditions at the site, the mast assembly 20 may be formed of one mast body 21, or three or more mast bodies 21 may be connected in a vertical row to form the mast assembly 20. Depending on the work conditions at the site and the surrounding environment, the boom assembly 30 may be directly mounted on the base assembly 10 without the mast assembly 20, and in this case, a coupling device (coupling means corresponding to the coupling device Ji in the above embodiment) capable of fastening the outriggers R1 to R4 to the storage position Ri may be interposed between the base body 11 and the outriggers R1 to R4, or may be interposed between the boom assembly 30 (for example, the fixed base 31 of the boom support base BS) and the outriggers R1 to R4.

[0074] In the above embodiment, the connecting blocks Bd, Bu are fixed to the outer peripheries of the adjacent ends of the adjacent mast bodies 21 at intervals in the circumferential direction, are vertically adjacent to each other, face each other and abut against each other in the vertical direction, and the abutting surfaces are connected to each other by a connecting means such as a bolt, but the connecting means may be other than bolts (for example, welding, caulking, pinning, etc.). Also, the connecting blocks Bd, Bu may be adjacent to each other in the circumferential direction of the mast body 21, face each other and abut against each other in the circumferential direction, and the abutting surfaces may be connected to each other by a connecting means such as bolts 25. In this case, the bolts or fixing pins that connect the abutting surfaces to each other are oriented horizontally (i.e., facing in the circumferential direction).

[0075] In addition, in the above embodiment, the boom train BT in the boom device 30 is shown as being composed of first to fourth booms B1 to B4 arranged in series and capable of bending and swinging relative to each other, but the boom train BT only needs to connect at least two booms and is not limited to the number of booms in the embodiment.

[0076] In the above embodiment, when the distributor DS performs the "reloading process," the boom device 30 in the vertical position is hoisted by a crane via the first rope W1 as shown in Fig. 8. However, even if the boom device 30 is hoisted by a crane via the first rope W1 or a second rope (not shown) while in the horizontal position, the reloading work may be performed with the boom device 30 in the horizontal position, provided that the boom device 30 does not interfere with an already constructed structure (e.g., a floor slab on the upper layer, etc.). [Explanation of symbols]

[0077] DS...Distributor Ji...Second coupling device as coupling device R1~R4 Outriggers Ra: Base of the outrigger Ri... Storage position Ro... Deployment position 10. Base device 11... Base body 21 Mast body 30. Boom device

Claims

1. A concrete supply distributor including a base device (10) and a boom device (30) mounted on the base device (10), The base device (10) includes a base body (11) which is a main frame of the base device (10), and a plurality of outriggers (R1 to R4) whose base portions (Rb) are supported rotatably about a horizontal axis on the base body (11) at intervals in the circumferential direction thereof, A distributor for supplying concrete, characterized in that each of the outriggers (R1 to R4) can be moved between a deployed position (Ro) in which it protrudes outward from the base body (11) and a stored position (Ri) in which it extends above or below the base body (11) by rotating it.

2. A concrete supply distributor as described in claim 1, characterized in that the bases (Rb) of the pair of upper and lower outriggers (R3, R4) are supported on the upper and lower parts of one and the other sides of the base body (11) so as to be rotatable around the horizontal axis, and when the pair of upper and lower outriggers (R3, R4) are in the deployed position (Ro), a support body (FS1 to FS3) capable of supporting the base device (10) can be clamped between the two outriggers (R3, R4).

3. The mast body (21) extends in the vertical direction and has a lower end supported in an upright position at the center of the base body (11) and has the boom device (30) mounted at an upper end thereof; A concrete supply distributor as described in claim 1 or 2, characterized in that a connecting device (Ji) is interposed between the mast body (21) and the outriggers (R1 to R4) so ​​as to detachably connect them and secure the outriggers (R1 to R4) to the storage position (Ri).

Citation Information

Patent Citations

  • Climbing cradle for tower crane

    JP1990145287U

  • Support

    JP1996042163A

  • Frame device of climbing tower crane

    JP2005212936A

  • Distributor

    JP2020193494A

  • Concrete supply distributor

    JP2022092126A