Quality control method for rotary pile

A quality control method for steel pipe piles ensures safe reuse by verifying forces and dimensions, addressing the limitations of existing methods in determining pile suitability for reuse.

JP2024138728APending Publication Date: 2024-10-09NIPPON STEEL METAL PROD CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
JP2023049370
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-27
Publication Date
2024-10-09

AI Technical Summary

Technical Problem

Existing methods do not provide a practical way to determine whether steel pipe piles can be reused, as they fail to confirm that the cross-sectional shape and plate thickness meet reuse criteria and that forces applied during extraction and service do not exceed yield stress.

Method used

A quality control method involving four steps: determining that driving, service, and extraction forces do not exceed yield strength, and verifying dimensions post-extraction, using sensors to measure axial strain and bending moment, and evaluating mechanical joint fatigue.

Benefits of technology

Ensures the soundness of rotary piles during reuse by confirming forces and dimensions within safe ranges, ensuring reliable quality and performance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024138728000001_ABST
    Figure 2024138728000001_ABST
Patent Text Reader

Abstract

To provide a specific and effective quality control method for reusing rotary piles.SOLUTION: A quality control method for a rotary pile is provided, which determines whether or not the rotary pile can be reused after extraction based on the following steps: a first step of determining that a force generated in a pile body when the rotary pile is driven does not exceed a predetermined range based on a yield strength of the pile body; a second step of determining that a force generated in the pile body while the rotary pile is in service does not exceed the predetermined range; a third step of determining that a force generated in the pile body when the rotary pile is extracted does not exceed the predetermined range; and a fourth step of checking whether or not dimensions of the rotary pile satisfy the standards after the rotary pile is extracted.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for quality control of a rotary pile. [Background technology]

[0002] When steel pipe piles are used, for example, as the foundations of temporary structures, they can be pulled out and reused after the structure is no longer in service. Rotary piles in particular are easy to pull out and are easy to reuse because they often do not have cement or other fasteners. Patent Documents 1 to 4 refer to the pulling out and reuse of such rotary piles. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Patent No. 6322057 [Patent Document 2] JP 2015-74881 A [Patent Document 3] Utility Model Registration No. 3179843 [Patent Document 4] Utility Model Registration No. 3101153 Summary of the Invention [Problem to be solved by the invention]

[0004] Here, in order to actually reuse a rotary pile, it is necessary that the cross-sectional shape, plate thickness, and other specifications of the rotary pile satisfy the conditions of the reuse destination, and it is also necessary to confirm that the rotary pile is in a sound state, for example, that no force exceeding the yield stress of the steel pipe is acting on the rotary pile when driving it, when pulling it out, and during use. However, the above Patent Documents 1 to 4 do not disclose a method for actually determining whether or not a rotary pile can be reused.

[0005] Therefore, an object of the present invention is to provide a specific and effective quality control method for reusing rotary piles. [Means for solving the problem]

[0006] [1] A quality control method for a rotary pile, which determines whether or not the rotary pile can be reused after extraction based on the following steps: a first step of determining that the force generated in the pile body when the rotary pile is driven does not exceed a predetermined range based on the yield strength of the pile body; a second step of determining that the force generated in the pile body during the service of the rotary pile does not exceed the predetermined range; a third step of determining that the force generated in the pile body when the rotary pile is extracted does not exceed the predetermined range; and a fourth step of checking whether the dimensions of the rotary pile satisfy the standards after the rotary pile is extracted. [2] A quality control method for a rotary pile described in [1], in which the first step determines that the driving force, pull-out force and torque applied to the pile body by the heavy machinery driving the rotary pile do not exceed the specified range. [3] A quality control method for a rotary pile described in [1] or [2], in which the second step determines that the axial force calculated based on the axial strain measured at the above-ground part of the pile body does not exceed the specified range. [4] A quality control method for a rotary pile described in any one of [1] to [3], wherein the second step determines that the maximum bending moment calculated based on the axial strain and horizontal displacement measured at the above-ground part of the pile body does not exceed the specified range. [5] A quality control method for a rotary pile described in any one of [1] to [4], in which the third step determines that the extraction force and torque applied to the pile body by the heavy machinery pulling out the rotary pile do not exceed the specified range. [6] A quality control method for a rotary pile described in any one of [1] to [5], in which the fourth step calculates the amount of wear by comparing the dimensions of the rotary pile after extraction with the design values ​​or the dimensions before casting. [7] A quality control method for a rotary pile described in any one of [1] to [6], wherein the rotary pile includes a plurality of pile bodies and a mechanical joint that axially connects the plurality of pile bodies, and in the first step and the third step, it is further determined that the number of forward and reverse rotations of the torque applied to the pile body does not exceed a predetermined range based on the fatigue strength of the mechanical joint. Effect of the Invention

[0007] According to the above configuration, the soundness of the rotary pile is judged when it is driven, while it is in service, and when it is removed, and the dimensions of the rotary pile after removal are also judged to be within a range that will not affect its performance, so that the quality of the rotary pile when it is reused can be more reliably guaranteed. [Brief description of the drawings]

[0008] [Figure 1] 1 is a flowchart showing an overall configuration of a quality control method for a rotary pile according to an embodiment of the present invention. [Diagram 2] 1. FIG. 4 is a diagram showing an example of a sheet for recording the amount of wear in the quality control method of FIG. [Diagram 3] FIG. 13 is a diagram showing an example of sensor arrangement in a system for measuring the axial force and maximum bending moment acting on a pile body during service of a rotary pile. [Figure 4] FIG. 1 is a diagram showing an example of the configuration of a measuring device in a system for measuring the axial force and maximum bending moment acting on a pile body during service of a rotary pile. [Diagram 5] 4 is a diagram for explaining a force calculated in the example shown in FIG. 3. FIG. [Figure 6] FIG. 2 shows the structure of a rotary pile suitable for reuse using the quality control method for the rotary pile shown in FIG. 1. [Figure 7] FIG. 1 shows a first example of a mechanical joint for a rotary pile. [Figure 8] FIG. 13 shows a second example of a mechanical joint for a rotary pile. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings. In this specification and the drawings, components having substantially the same functional configurations are designated by the same reference numerals, and duplicated explanations will be omitted.

[0010] FIG. 1 is a flow chart showing the overall configuration of a quality control method for a rotary pile according to an embodiment of the present invention. The quality control method according to this embodiment includes steps of soundness determination at the time of driving (step S101), soundness determination during service (step S102), soundness determination at the time of extraction (step S103), and quality confirmation after extraction (step S104). If positive results are obtained in all of the determinations and confirmations in steps S101 to S104, it is determined that the rotary pile can be reused (step S105). On the other hand, if negative results are obtained in any of the determinations and confirmations in steps S101 to S104, it is determined that the rotary pile cannot be reused as a rotary pile, and the rotary pile is scrapped (step S106). Each step will be further described below.

[0011] In the soundness judgment during driving (step S101), it is judged that the force generated in the pile body during driving of the rotary pile does not exceed a predetermined range based on the yield strength of the pile body. In this specification, "force" includes moment. Specifically, it is judged that the pressing force, pulling force, and torque applied to the pile body by a heavy machine such as a pile driver that drives the rotary pile do not exceed a predetermined range. Here, torque is the moment around the rotation axis of the rotary pile. During driving, the rotary pile is penetrated into the ground with a predetermined pressing force while applying torque to rotate the blade attached to the tip. For example, when penetrating into hard ground, the direction of the torque may be reversed or a pulling force may be applied in the opposite direction to the pressing force, and the penetration operation may be repeated. The magnitude of the pressing force, pulling force, and torque applied by the heavy machine is monitored, so that the above judgment is possible. More specifically, the applied pressure-in force and pull-out force may be converted into an axial force acting on the pile body of the rotary pile, and the torque into a shear force acting on the pile body, and then compared with the threshold values ​​of the axial force and shear force calculated based on the yield strength of the steel pipe. Alternatively, the threshold value of the axial force calculated based on the yield strength of the steel pipe may be converted into the pressure-in force and pull-out force, and the threshold value of the shear force may be converted into a torque, and then the pressure-in force, pull-out force, and torque applied during driving may be compared with the converted threshold values.

[0012] In the in-service soundness judgment (step S102), it is judged that the force generated in the pile body during service as a foundation for a temporary structure after the rotary pile is driven does not exceed a predetermined range based on the yield strength of the pile body. Specifically, it is judged that the axial force and maximum bending moment measured and calculated during service of the rotary pile by a method to be described later do not exceed a predetermined range. Note that, in the case of a normal earthquake generally called level 1 earthquake motion, the magnitude of the axial force and maximum bending moment acting on the steel pipe during service does not exceed that at the time of driving. Therefore, it is not necessary to compare all the axial forces and maximum bending moments measured during service with the predetermined ranges. For example, the measured axial force and maximum bending moment may be compared with the predetermined ranges only when a large earthquake called level 2 earthquake motion occurs.

[0013] In the soundness judgment at the time of extraction (step S103), it is judged that the force generated in the pile body at the time of extraction of the rotary pile does not exceed a predetermined range based on the yield strength of the pile body. Specifically, it is judged that the extraction force and torque applied to the pile body by a heavy machine such as a pile extractor that extracts the rotary pile does not exceed a predetermined range. At the time of extraction, the rotary pile is extracted from the ground by applying an extraction force and a torque in the opposite direction to that at the time of driving. Note that, even at the time of extraction, the direction of the torque may be reversed, for example, in a process called friction cut at the beginning of extraction. Since the magnitude of the extraction force and torque applied by the heavy machine is monitored as in the case of driving, the above judgment is possible. More specifically, as in the case of driving, the applied extraction force and torque may be converted into axial force and shear force and compared with a threshold value, or the extraction force and torque themselves may be compared with a threshold value calculated based on the yield strength of the pile body.

[0014] In the quality check after extraction (step S104), it is confirmed whether the dimensions of the rotary pile after extraction, such as the cross-sectional shape and plate thickness, meet the standards. Specifically, for example, the dimensions of the rotary pile after extraction are compared with the design values ​​or the dimensions before driving to calculate the amount of wear, and it is confirmed whether the amount of wear exceeds a predetermined threshold. An example of a sheet for recording the amount of wear is shown in FIG. 2. If it is determined in the above steps S101 to S103 that no force or moment exceeding the yield strength has been applied, and if it is determined in step S104 that the amount of wear does not exceed the threshold, the performance of the rotary pile is maintained at the same level as when it was manufactured or before it was driven, so that the quality of the rotary pile when it is reused can be more reliably guaranteed.

[0015] It should be noted that the reusability of the rotary pile may be judged by the above quality control method only for the pile body, i.e., the steel pipe part. The blade part attached to the tip of the rotary pile is subjected to a large force when penetrating or pulling out, and tends to wear out more than the pile body, so it may be replaced with a new one when reusing, regardless of whether the pile body is reusable or not.

[0016] (Method of monitoring rotary piles during use) 3 and 4 are diagrams showing an example of the configuration of a system for measuring the axial force and maximum bending moment acting on the pile body during the service of the rotary pile in the quality control method of the rotary pile shown in FIG. 1. In the illustrated example, the rotary pile that is driven into the ground with the pile head protruding above ground is the object of measurement. The rotary pile monitoring system 2 (see FIG. 4) includes strain gauge groups 21, 22 (first and second strain gauge groups) that detect the axial strain of the pile body 1 of the rotary pile, a displacement meter 23 that detects the horizontal displacement of the pile body 1, and a measuring device 24. The strain gauge group 21 includes two pairs of strain gauges 21A1, 21A2, 21B1, and 21B2 that are attached to a first height position (shown as height h1) in the aboveground part of the pile body 1 and are arranged opposite to each other at two cross sections (xz cross section and yz cross section) including the axial direction (z direction) of the pile body 1. Similarly, the strain gauge group 22 is attached to a second height position (illustrated as height h2) on the ground and includes two pairs of strain gauges 22A1, 22A2, 22B1, 22B2 arranged opposite each other at two cross sections including the axial direction of the pile body. The displacement meter 23 includes displacement meters 23A, 23B arranged at a height position corresponding to the ground surface of the pile body 1, respectively at two cross sections including the axial direction of the pile body 1.

[0017] The strain gauge groups 21, 22 and the displacement meter 23 are connected to the measuring device 24 via lead wires or the like. The measuring device 24 includes, for example, a recording unit 241 that records the measured values ​​of the strain gauge groups 21, 22 and the displacement meter 23, and a calculation unit 242 that performs calculations based on the measured values. The recording unit 241 and the calculation unit 242 may be implemented by the same device, or may be implemented as separate devices. When implemented as separate devices, the measured values ​​are transmitted from the recording unit 241 to the calculation unit 242 via, for example, a removable recording medium or a communication line. The calculation unit 242 calculates the force acting on the pile main body 1, specifically the maximum bending moment and axial force, based on the axial strain of the pile main body 1 detected by the strain gauge groups 21, 22 and the horizontal displacement of the pile main body 1 detected by the displacement meter 23. The calculation by the calculation unit 242 may be performed continuously or periodically during the use of the rotary pile including the pile main body 1, or may be performed collectively after the use of the rotary pile has ended.

[0018] As described above, in this embodiment, for each of the strain gauge groups 21, 22, a pair of strain gauges are arranged opposite to each other on a cross section including the axial direction of the pile main body 1. This makes it possible to separate the detected strain value into an axial force contribution (same for both of the pair of strain gauges) and a bending contribution (different for each of the pair of strain gauges). Specifically, for the strain amounts ε1, ε2 detected by each of the strain gauges 21A1, 21A2 arranged opposite to each other, the axial force contribution (hereinafter referred to as axial strain ε N The average (ε N =(ε1+ε2) / 2), and the bending contribution (hereinafter, bending strain ε M (also called) is the difference between each strain amount and the average (ε M =|ε1-ε N |=|ε2-ε N |).

[0019] Each of the strain gauge groups 21 and 22 includes two pairs of strain gauges arranged opposite each other at two cross sections including the axial direction of the pile main body 1. The bending strain ε MA ,ε MB From the ratio of the maximum bending moment M of the pile body 1 max The direction in which the bending strain ε MA ,ε MB The bending strain in the maximum bending direction ε M In the following explanation, the bending strain ε M In this case, it refers to the bending strain in the maximum bending direction. If the maximum bending direction is known, for example because the supporting load of the pile body 1 is eccentric, a pair of strain gauges can be arranged opposite each other in a cross section including the maximum bending direction, and the above conversion is not necessary. In this case, each of the strain gauge groups 21 and 22 includes only one pair of strain gauges.

[0020] Similarly, the displacement gauges 23A and 23B are arranged at two cross sections including the axial direction of the pile main body 1. As a result, the displacement δ A, δ B can be converted to the horizontal displacement δ of the pile main body 1 in the maximum bending direction. When the maximum bending direction is known, only one displacement meter 23 may be placed in a cross section including the maximum bending direction. As indicated in the Guidelines for Designing Building Foundations (Architectural Institute of Japan) and the like, the relationship of the horizontal displacement of the aboveground part (from the ground surface to the pile head) of a pile whose head protrudes above ground is known, so the displacement meter 23 does not necessarily have to be placed at a height position corresponding to the ground surface of the pile main body 1, and can be placed at any position on the aboveground part of the pile main body 1. When the displacement meter 23 is not placed at a height position corresponding to the ground surface, the measured value is converted to the horizontal displacement δ at the height corresponding to the ground surface of the pile main body 1 based on the height of the displacement meter 23 from the ground surface.

[0021] 5 is a diagram for explaining the force calculated in the example shown in FIG. 3. As described above, in this embodiment, the bending strain ε M (In the following, the strain ε M1 ,ε M2 The force acting on the pile body 1 is calculated based on the horizontal displacement δ measured by the displacement meter 23 and the horizontal displacement δ measured by the displacement meter 23. As indicated in the Guidelines for Designing Foundation Structures (Architectural Institute of Japan) and other documents, in the case of a pile whose head protrudes above ground, the maximum bending moment M max It is known that the maximum bending moment M acting on the pile body 1 is generated at a shallow position underground and can be calculated from the horizontal force H acting on the pile head, the projection amount h of the pile, and the characteristic value β described later. In this embodiment, this is utilized to calculate the maximum bending moment M acting on the pile body 1 as described in (A) below. max The soundness of the rotary pile may be evaluated by calculating the axial force acting on the pile body 1 as described below in (B), and the maximum bending moment M max The soundness of the rotary pile may be evaluated by combining the axial force and the load.

[0022] (A) Calculation of maximum bending moment If the bending moments in the maximum bending direction at the height positions of the strain gauge groups 21 and 22 are M1 and M2, respectively, the bending moments M1 and M2 can be calculated by the following formulas (1) and (2) using the Young's modulus E of the pile body 1 and the section modulus Z of the pile body 1. M1 ,σ M2 is the maximum bending stress at the height positions of the strain gauge groups 21 and 22. Furthermore, the horizontal force H acting on the pile head is calculated by equation (3) using the bending moments M1 and M2, and the difference Δh (Δh=h1-h2) between the height positions at which the strain gauge groups 21 and 22 are attached.

[0023]

number

[0024] Maximum bending moment M max is calculated by the following formula (4) using the horizontal force H, the pile projection amount h, and the characteristic value β. The characteristic value β indicates the relative stiffness between the pile body 1 and the ground, and is calculated by formula (5). In formula (5), k h is the horizontal subgrade reaction coefficient (kN / m 3 ), B is the non-dimensional pile diameter of the pile body 1 (a dimensionless value that expresses the pile diameter in cm), and EI is the bending stiffness of the pile body 1 (kN m 2 At this point, in equations (4) and (5), the horizontal force H, the projection amount h, the dimensionless pile diameter B, and the bending rigidity EI are known from the arrangement and measurement values ​​of the strain gauge groups 21 and 22, as well as the physical properties of the pile body 1, and the characteristic value β and the horizontal subgrade reaction coefficient k h is unknown.

[0025]

number

[0026] On the other hand, the relationship between β in equations (4) and (5) and the horizontal displacement δ at the ground surface position of the pile body 1 is also expressed by the following equation (6). Since the horizontal displacement δ is known from the measurement value of the displacement meter 23, the horizontal subgrade reaction coefficient k can be obtained by solving equations (5) and (6) as simultaneous equations. h The maximum bending moment M max The maximum bending moment M max is the yield bending moment M of the pile body 1. y Compared to M max <M y By confirming that this is the case, the soundness of the rotary pile can be evaluated.

[0027]

number

[0028] (B) Calculation of axial force The axial strain ε in the above-mentioned strain gauge groups 21 and 22 N (In the following, the strain ε N1 ,ε N2 From the Young's modulus E of the pile body 1 and the cross-sectional area A of the pile body 1, the axial forces N1 and N2 acting on the pile body 1 can be calculated using the following equations (7) and (8). Here, the axial force acting on the pile body 1 decreases the deeper it goes underground due to the action of peripheral friction force, and becomes maximum and almost constant above ground. Therefore, at least one of the axial forces N1 and N2 can be calculated as the yield axial force N y Compared to N1 <N y or N2 <N y By confirming that the above is the case, the soundness of the pile main body 1 can be evaluated.

[0029]

number

[0030] (C) Integrated evaluation of bending moment and axial force The maximum bending moment M calculated as above max and the axial force N1 (or N2) is calculated using the following equation (9) to determine the yield stress σ of the pile body 1. y By comparing it with the bending moment and axial force, the soundness of the pile body 1 can be evaluated by integrating them.

[0031]

number

[0032] In the example described above with reference to Figs. 3 to 5, the maximum bending moment M acting on the pile body 1 is calculated from the measured values ​​of the strain gauge groups 21 and 22 and the displacement meter 23 attached to the aboveground portion of the pile body 1. max The axial force N1 is calculated and the maximum bending moment M max and the axial force N1. The strain gauge groups 21, 22 and the displacement meter 23 are all attached to the above-ground part of the pile body 1, and can be attached after the rotary pile is constructed. This is much simpler than, for example, attaching strain gauges over the entire length of the pile body 1 during the construction of the rotary pile.

[0033] (Structure of a rotating pile suitable for reuse) FIG. 6 is a diagram showing the structure of a rotary pile suitable for reuse using the quality control method of the rotary pile shown in FIG. 1. In the illustrated example, the rotary pile has a structure in which a plurality of pile bodies 1A, 1B, and 1C are axially connected by mechanical joints 3. A wing portion 4 is provided at the lower end of the bottom pile body 1A. Note that the pile body 1A, pile body 1B, and pile body 1C connected to each other by the mechanical joints 3 do not necessarily have to be composed of a single steel pipe, and may include a welded joint such as the welded joint 5 connecting the two steel pipes constituting the pile body 1C as shown in the figure. The mechanical joints 3 are also connected to the pile bodies on both sides by welded joints. These welded joints are constructed, for example, by factory welding.

[0034] The rotary pile having a structure in which multiple pile bodies are connected by mechanical joints as described above has the advantage that on-site welding is not required during driving because the pile bodies 1A, 1B, 1C can be driven while being connected in sequence by the mechanical joint 3B, and also has the advantage that cutting of the pile body by gas cutting or the like is not required during extraction because the piles can be pulled out while releasing the mechanical joint 3 in sequence. Since gas cutting is not required, at least the pile bodies 1B and 1C can be reused in their original length, and the amount of steel material to be scrapped can be reduced.

[0035] For example, in the case of a rotary pile connected using a mechanical joint as exemplified below, it is necessary to evaluate not only the soundness of the pile body but also the soundness of the mechanical joint. In this regard, if the mechanical joint is designed so that the yield strength in the axial and circumferential directions of the pile body is equal to or greater than that of the steel pipe constituting the pile body, the soundness of the mechanical joint can also be judged in steps S101 to S103 shown in FIG. 1. In addition, in the case of a mechanical joint, it is necessary to evaluate the soundness from the viewpoint of fatigue strength. In this regard, in the soundness evaluation steps at the time of driving and at the time of extraction in steps S101 and S103 shown in FIG. 1, the number of forward and reverse rotations of the torque applied to the rotary pile by the heavy equipment is monitored, and the number of times can be compared with a range based on the fatigue strength of the mechanical joint measured in advance, thereby evaluating the soundness of the mechanical joint.

[0036] FIG. 7 is a diagram showing a first example of a mechanical joint of a rotary pile. In the illustrated example, a mechanical joint 3A connecting pile bodies 1D and 1E of a rotary pile includes an inner joint pipe 31, an outer joint pipe 32, and a plurality of connecting pins 33. The inner joint pipe 31 is joined to the lower end surface of the upper pile body 1D by welding or the like, and has a plurality of through holes 34 arranged in the circumferential direction. In the illustrated example, the through holes 34 are formed at eight locations at equal intervals in the circumferential direction of the inner joint pipe 31. The outer joint pipe 32 is joined to the upper end surface of the lower pile body 1E by welding or the like, and has a plurality of through holes 35 arranged in the circumferential direction similarly to the inner joint pipe 31. The outer diameter of the inner joint pipe 31 corresponds to the inner diameter of the outer joint pipe 32, and the inner joint pipe 31 can be inserted inside the outer joint pipe 32. The inner joint pipe 31 is inserted into the inside of the outer joint pipe 32 to overlap the through holes 34, 35, and the connecting pin 33 is inserted into the through holes 34, 35 from the outside, thereby connecting the inner joint pipe 31 and the outer joint pipe 32, and the pile main bodies 1D, 1E joined to the inner joint pipe 31 and the outer joint pipe 32, respectively.

[0037] The connecting pin 33 is a columnar member having an outer diameter corresponding to the diameters of the through hole 34 of the inner joint pipe 31 and the through hole 35 of the outer joint pipe 32, and is inserted into the through holes 34, 35 from the outside as described above. A fixing screw 36 is inserted into a through hole formed in the connecting pin 33 along the axial direction, and the fixing screw 36 is screwed into a threaded hole formed in a fixing plate (not shown) welded in advance to the inside of the through hole 34 of the inner joint pipe 31. This allows the connecting pin 33 to be fixed in a state where it is inserted into the through holes 34, 35.

[0038] In the mechanical joint 3A of the rotary pile as described above, the inner surfaces of the through holes 34, 35 of the inner joint pipe 31 and the outer joint pipe 32 come into contact with the outer surface of the connecting pin 33 inserted therein, thereby transmitting the axial force and torque between the pile main bodies 1D, 1E. As shown in the figure, it is preferable that the outer dimensions of the outer joint pipe 32 are the same as the outer diameter dimensions of the pile main bodies 1D, 1E. This reduces the overhang of the mechanical joint 3 from the pile main body, thereby suppressing the resistance when the rotary pile is inserted. In addition, by making the pipe thickness of the inner joint pipe 31 and the outer joint pipe 32 larger than the pipe thickness of the pile main bodies 1D, 1E, it is possible to compensate for the cross-sectional loss caused by the formation of the through holes 34, 35 and ensure sufficient bearing strength.

[0039] FIG. 8 is a diagram showing a second example of a mechanical joint for a rotary pile. In the illustrated example, in the mechanical joint 3B connecting the pile bodies 1D and 1E of the rotary pile, a common engagement member 6 is fitted into an engagement hole 61 (the engagement hole on the end plate 37B side is not visible) formed in the part corresponding to the inside of the pile body of the end plates 37A and 37B joined to the respective ends of the pile bodies 1D and 1E, and the flange parts corresponding to the outside of the pile body of the end plates 37A and 37B are overlapped and fastened using a bolt 39A and a nut 39B inserted into the bolt holes 38A and 38B. The engagement hole 61, the engagement hole on the end plate 37B side, and the engagement member 6 have corresponding polygonal (hexagonal in the illustrated example) cross sections. As a result, the engagement hole and the engagement member 6 engage with each other at the corners of the polygonal cross section, and torque can be transmitted between the pile bodies 1D and 1E by the bearing pressure between the faces. In order to enable the above-mentioned engagement, the flange portions of the end plates 37A, 37B are fastened together using the bolts 39A and nuts 39B in a loose manner that allows for slippage between the end plates 37A, 37B.

[0040] As a specific connection process, as shown in Fig. 8(a), the engaging member 6 is fitted into the engaging hole 61 at the upper end of the pile main body 1D that has already been driven into the ground, and the engaging member 6 is placed on a stopper 62 provided on the inside of the pile main body 1D to stabilize it. In this state, as shown in Fig. 8(b), the lower end of the pile main body 1E is lowered from above, and the engaging member 6 is also fitted into the engaging hole on the end plate 37B side, and further, as shown in Fig. 8(c), the flange portions of the end plates 37A, 37B are overlapped and fastened using bolts 39A and nuts 39B.

[0041] In the mechanical joint 3B of the rotary pile as described above, torque is transmitted between the pile bodies 1D, 1E by contact between the inner surface of the engagement hole 61 formed in the end plates 37A, 37B and the outer surface of the engagement member 6 fitted therein. The axial force is transmitted by the contact of the end plates 37A, 37B when pressed in, and via the bolts 39A and nuts 39B at the flange portions of the end plates 37A, 37B when pulled out. By appropriately setting the plate thicknesses of the end plates 37A, 37B and the dimensions of the engagement member 6, the strength required for the mechanical joint can be ensured.

[0042] According to one embodiment of the present invention as described above, the soundness of the rotary pile is judged throughout the driving, service and extraction of the rotary pile, and the wear amount of the rotary pile is judged to be within a range that does not affect the performance, so that the quality of the rotary pile when reused can be more reliably guaranteed. At the time of driving and extraction, it is convenient to use the press-in force, extraction force and torque monitored by heavy machinery, but some or all of these may be measured separately. In addition, the above-described method can be used to measure the axial force and bending moment during service, but this is not limiting, and one or both of the axial force and bending moment may be measured by other methods. [Explanation of symbols]

[0043] 1, 1A, 1B, 1C, 1D, 1E...pile body, 2...monitoring system, 21, 22...strain gauge group, 21A1, 21A2, 21B1, 21B2, 22A1, 22A2, 22B1, 22B2...strain gauge, 23, 23A, 23B...displacement meter, 24...measuring device, 241...recording unit, 242...calculating unit, 3, 3A, 3B...mechanical joint, 31...inner joint pipe, 32...outer joint pipe, 33...connecting pin, 34, 35...through hole, 36...fixing screw, 37A, 37B...end plate, 38A, 38B...bolt hole, 39A...bolt, 39B...nut, 4...wing portion, 5...welded joint, 6...engaging member, 61...engaging hole, 62...stopper.

Claims

1. A first step of determining that a force generated in a pile body during driving of a rotary pile does not exceed a predetermined range based on a yield strength of the pile body; A second step of determining that a force generated in the pile body during service of the rotary pile does not exceed the predetermined range; A third step of determining that a force generated in the pile body when the rotary pile is pulled out does not exceed the predetermined range; A fourth step of checking whether the dimensions of the rotary pile meet the standard after the rotary pile is pulled out; This is a quality control method for a rotary pile, which determines whether the rotary pile can be reused after extraction based on the above.

2. The quality control method for a rotary pile according to claim 1, wherein the first step determines whether the driving force, pull-out force and torque applied to the pile body by a heavy machine driving the rotary pile do not exceed the predetermined range.

3. The quality control method of a rotary pile as described in claim 1, wherein in the second step, it is determined that the axial force calculated based on the axial strain measured at the above-ground portion of the pile body does not exceed the predetermined range.

4. The quality control method for a rotary pile as described in claim 1, wherein the second step determines whether a maximum bending moment calculated based on axial strain and horizontal displacement measured at the above-ground portion of the pile body does not exceed the specified range.

5. The quality control method for a rotary pile according to claim 1 , wherein in the third step, it is determined that the pulling force and torque applied to the pile body by a heavy machine for pulling out the rotary pile do not exceed the predetermined range.

6. The quality control method for a rotary pile according to claim 1 , wherein in the fourth step, a wear amount is calculated by comparing a dimension of the rotary pile after extraction with a design value or a dimension before driving.

7. The rotary pile includes a plurality of pile bodies and a mechanical joint that axially connects the plurality of pile bodies, The quality control method for a rotary pile according to any one of claims 1 to 6, further comprising determining that in the first step and the third step, the number of forward and reverse rotations of the torque applied to the pile body does not exceed a predetermined range based on the fatigue strength of the mechanical joint.

Citation Information

Patent Citations

  • Reuse system and management system thereof

    JP2003296403A

  • Wireless device and method for driving pile analysis

    JP2004526085A

  • Work execution management method for rotary intrusion steel pipe pile

    JP2005023775A

  • Steel pipe having flange disk welded thereto

    WO2012131852A1

  • Rotary pile construction method, pile group manufacturing method, pile group, rotary pile construction and management device, rotary pile construction and management system

    WO2020218561A1