Finished shape management device and finished shape management method and finished shape management program
The performance management device aligns laser beam reflector coordinates with design data coordinates to address the mismatch issue, enabling accurate excavation state determination and finished shape measurement in tunnel excavation.
Patent Information
- Application Number
- JP2023050301
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-27
- Publication Date
- 2024-10-09
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing methods for measuring the finished shape of excavated areas in tunnel excavation work face challenges due to mismatched position coordinates between design data and point cloud data, leading to inaccurate measurements and difficulty in controlling the excavation process.
A performance management device and method that utilizes a laser beam to determine the coordinates of reflectors installed around the excavation area, converting these coordinates into an absolute coordinate system aligned with design data to ensure accurate alignment and determination of the excavation state.
Enables precise measurement and management of the finished shape by aligning point cloud data with design data, ensuring accurate determination of the excavation state and improving the consistency between on-site and design coordinates.
Smart Images

Figure 2024139390000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a completed work progress management device, a completed work progress management method, and a completed work progress management program. [Background technology]
[0002] In the above technical field, Patent Document 1 discloses a technology for measuring the completed shape of an excavation site in tunnel excavation work, in which a contour map is generated from point cloud data and design data acquired by irradiating a laser beam onto the excavation site, the generated contour map is divided into a grid to set multiple regions, and the coordinates of four intersections of each set region are calculated by interpolation from the coordinate data of each point acquired from the point cloud data, thereby measuring the completed shape of the excavation site (paragraphs
[0014] ,
[0028] to
[0029] , etc. of the same document). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2022-151963 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, since the finished shape was measured directly using the position coordinates obtained from the point cloud data, the position coordinates in the design data did not match the position coordinates in the point cloud data, making it impossible to accurately measure and manage the finished shape. [Means for solving the problem]
[0005] In order to achieve the above object, the present invention relates to a completed product management device, a design data acquisition unit that acquires design data of an area to be excavated during excavation; A reflected light data acquisition unit that acquires reflection time data and reflection direction data of reflected light of laser light irradiated to four reflectors installed around the excavation target area so as to surround the excavation target area; a laser beam coordinate derivation unit that derives a first laser beam coordinate of a first reflector, a second laser beam coordinate of a second reflector, a third laser beam coordinate of a third reflector, and a fourth laser beam coordinate of a fourth reflector in a laser beam coordinate system based on an irradiation source of the laser beam from the acquired reflection time data and reflection direction data; an absolute coordinate derivation unit that derives first absolute coordinates, second absolute coordinates, third absolute coordinates, and fourth absolute coordinates by converting the first laser beam coordinates, the second laser beam coordinates, the third laser beam coordinates, and the fourth laser beam coordinates into an absolute coordinate system that is a coordinate system in the design data; an excavation state determination unit that determines an excavation state of the excavation target area based on at least one of the first absolute coordinate, the second absolute coordinate, the third absolute coordinate, and the fourth absolute coordinate; Equipped with:
[0006] In order to achieve the above object, the present invention provides a method for managing completed work, A design data acquisition step of acquiring design data of an area to be excavated during excavation; A reflected light data acquisition step of acquiring reflection time data and reflection direction data of reflected light of laser light irradiated to four reflectors installed around the excavation target area so as to surround the excavation target area; a laser beam coordinate derivation step of deriving a first laser beam coordinate of a first reflector, a second laser beam coordinate of a second reflector, a third laser beam coordinate of a third reflector, and a fourth laser beam coordinate of a fourth reflector in a laser beam coordinate system based on an irradiation source of the laser beam from the acquired reflection time data and reflection direction data; an absolute coordinate derivation step of deriving first absolute coordinates, second absolute coordinates, third absolute coordinates, and fourth absolute coordinates by converting the first laser beam coordinates, the second laser beam coordinates, the third laser beam coordinates, and the fourth laser beam coordinates into an absolute coordinate system that is a coordinate system in the design data; an excavation state determination step of determining an excavation state of the excavation target area based on at least one of the first absolute coordinate, the second absolute coordinate, the third absolute coordinate, and the fourth absolute coordinate; Includes.
[0007] Furthermore, in order to achieve the above object, the present invention provides a completed form management program, A design data acquisition step of acquiring design data of an area to be excavated during excavation; A reflected light data acquisition step of acquiring reflection time data and reflection direction data of reflected light of laser light irradiated to four reflectors installed around the excavation target area so as to surround the excavation target area; a laser beam coordinate derivation step of deriving a first laser beam coordinate of a first reflector, a second laser beam coordinate of a second reflector, a third laser beam coordinate of a third reflector, and a fourth laser beam coordinate of a fourth reflector in a laser beam coordinate system based on an irradiation source of the laser beam from the acquired reflection time data and reflection direction data; an absolute coordinate derivation step of deriving first absolute coordinates, second absolute coordinates, third absolute coordinates, and fourth absolute coordinates by converting the first laser beam coordinates, the second laser beam coordinates, the third laser beam coordinates, and the fourth laser beam coordinates into an absolute coordinate system that is a coordinate system in the design data; an excavation state determination step of determining an excavation state of the excavation target area based on at least one of the first absolute coordinate, the second absolute coordinate, the third absolute coordinate, and the fourth absolute coordinate; to be executed by the computer. Effect of the Invention
[0008] According to the present invention, the completed form can be measured more accurately and the completed form can be managed. [Brief description of the drawings]
[0009] [Figure 1A] FIG. 2 is a diagram showing an overall image of work-product management by a work-product management device according to a preferred embodiment of the present invention. [Figure 1B] 1A is a partially enlarged perspective view and FIG. 1B is a plan view of an excavation area to be subjected to work progress management by a work progress management device according to a preferred embodiment of the present invention. [Figure 2A] 1 is a block diagram for explaining the configuration of a completed form management device according to a preferred embodiment of the present invention. [Figure 2B] FIG. 2 is a diagram for explaining coordinate transformation by a finished product management device according to a preferred embodiment of the present invention. [Diagram 3] 1 is a diagram for explaining an example of a coordinate system table possessed by a finished product management device according to a preferred embodiment of the present invention. FIG. [Figure 4] 1 is a diagram for explaining a hardware configuration of a completed form management device according to a preferred embodiment of the present invention. FIG. [Diagram 5] 2 is a flowchart for explaining a processing procedure of a completed form management device according to a preferred embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] Hereinafter, the embodiments of the present invention will be described in detail with reference to the drawings. However, the configurations, numerical values, process flows, functional elements, etc. described in the following embodiments are merely examples, and are free to be modified or changed, and are not intended to limit the technical scope of the present invention to the following description.
[0011] An as-built management device 100 according to a preferred embodiment of the present invention will be described with reference to Fig. 1A to Fig. 5. First, an overview of as-built management by the as-built management device 100 according to this embodiment will be described with reference to Fig. 1A and Fig. 1B. Installation of an invert in construction of a mountain tunnel 120 is performed, for example, by closing one lane of traffic, excavating an excavation target area 102 with a heavy excavation machine such as a backhoe 101, and installing an invert in the invert section where excavation has been completed.
[0012] Here, in the excavation of the invert section, the construction is carried out while checking the finished shape of the excavated excavation surface 103. To check the finished shape of the excavation surface 103, a worker sets a height standard on the tunnel side wall and uses a ruler to measure the height of the excavation surface 103. The measured value is then compared with the design value to determine whether there is a hit or over-excavation, and if there is, re-excavation is required to get closer to the design value. According to this construction method, the finished shape of the excavation surface 103 of the invert section is checked, but in this construction method, the measurement of the excavation surface 103 is done manually by a worker, which can be inaccurate and time-consuming.
[0013] In the as-built management device 100 of this embodiment, for example, a worker can check whether the excavation target area 102 excavated using a heavy excavation machine such as a backhoe 101 is in the as-built shape as designed by irradiating a laser beam onto the excavation site.
[0014] In the completed form management device 100, for example, the excavation state of the excavation target area 102, etc. is determined by comparing point cloud data obtained by irradiating laser light from a laser sensor 104 mounted on a backhoe 101 to an excavation target area 102 and an excavation surface 103 with design data. However, if the position information of the point cloud data and the design data do not match, the excavation state cannot be determined accurately.
[0015] That is, since the point cloud data is measured as reflected light of a laser beam emitted from the laser sensor 104 mounted on the backhoe 101, the point cloud data has position data centered on the laser sensor 104. That is, if the backhoe 101 moves, a shift will occur in the center of the measurement.
[0016] In contrast, the design data is data that is created regardless of the position of the laser sensor 104 mounted on the backhoe 101, and is data that is created based on the absolute coordinates of the excavation target area 102 (excavation surface 103). As described above, the center of the coordinate system is different between the point cloud data and the design data, so it has been difficult to adequately manage the accurate grasp of the excavation position and the accurate judgment of the excavation state.
[0017] Therefore, in the as-built management device 100, before starting excavation of the excavation target area 102, an operation (calibration) is performed to match the coordinate system (laser light coordinate system) formed by the laser sensor 104 with the coordinate system (absolute coordinate system) formed by the design data. Specifically, the as-built management device 100 converts coordinates between the laser light coordinate system by the laser sensor 104 and the absolute coordinate system, obtains the position of the laser sensor 104 in the absolute coordinate system, and achieves consistency between the two.
[0018] Therefore, in this embodiment, reflectors 141, 142, and 143 that reflect laser light are installed in an area outside the excavation target area 102, for example, in three of the four corners of the excavation target area 102. Furthermore, one reflector 144 is installed directly above one of the reflectors 141, 142, and 143 installed at the three points. As a result, four reflectors 141, 142, 143, and 144 are arranged around the excavation target area 102.
[0019] Then, laser light is irradiated from the laser sensor 104 to the four reflectors 141, 142, 143, and 144, and the coordinates of the four reflectors 141, 142, 143, and 144 are obtained from the data of the reflected light, and these are converted into an absolute coordinate system. This makes it possible to perform coordinate conversion between the laser light coordinate system and the absolute coordinate system, thereby ensuring consistency between design data and on-site data, and enabling more accurate shape management.
[0020] Next, the configuration of the completed shape management device 100 according to this embodiment will be described with reference to Figures 2A and 2B. The completed shape management device 100 has a design data acquisition unit 201, a reflected light data acquisition unit 202, a laser light coordinate derivation unit 203, an absolute coordinate derivation unit 204, and an excavation state determination unit 205.
[0021] The design data acquisition unit 201 acquires design data of the excavation target area 102 being excavated. The design data is data showing the state of the excavation target area 102 after excavation, and is, for example, data showing the completed form of the excavation target area generated using a three-dimensional CAD (Computer-Aided Design). The design data may be generated in the completed form management device 100 or may be generated by a device different from the completed form management device 100.
[0022] The reflected light data acquiring unit 202 acquires reflection time data and reflection direction data of the reflected light of the laser light irradiated onto four reflectors 141, 142, 143, and 144 that are installed around the excavation target area 102 so as to surround the excavation target area 102.
[0023] Here, the laser sensor 104 is, for example, a LiDAR (Light Detection and Ranging) sensor, which is a measurement technique using light. The laser sensor 104 irradiates a pulsed laser beam and can measure the distance between the reflectors 141, 142, 143, and 144 and the laser sensor 104 based on the time difference between the laser beam hitting the reflectors 141, 142, 143, and 144 and bouncing back.
[0024] In addition, the directions of the reflectors 141, 142, 143, and 144 can be measured from the direction of the reflected light. Therefore, the reflected light data acquisition unit 202 acquires reflection time data and reflection direction data of the laser light. The irradiation conditions of the laser light, such as the intensity, wavelength, and frequency of the laser light irradiated from the laser sensor 104, are set according to the surrounding environment of the excavation target area 102, etc.
[0025] Of the four reflectors 141, 142, 143, and 144, three reflectors 141, 142, and 143 are disposed on the same plane, and the remaining reflector 144 is disposed vertically above or vertically below one of the three reflectors 141, 142, and 143. In this embodiment, the reflector 144 is disposed vertically above the reflector 143. In this manner, the reflector 144 is disposed on a plane different from the plane on which the other three reflectors 141, 142, and 143 are disposed.
[0026] Here, the reflectors 143 and 144 are attached to the same rod-shaped jig so that their height positions can be adjusted. By attaching the two reflectors 143 and 144 to the same jig, it becomes possible to arrange the reflector 144 on a different plane from the other three reflectors 141, 142, and 143. In other words, the reflector 144 is arranged on a different plane from the plane spanned by the three reflectors 141, 142, and 143.
[0027] The laser light coordinate derivation unit 203 derives the laser light coordinates of the reflector 141, the laser light coordinates of the reflector 142, the laser light coordinates of the reflector 143, and the laser light coordinates of the reflector 144 in the laser light coordinates based on the irradiation source of the laser light from the acquired reflection time data and reflection direction data. The laser light coordinate derivation unit 203 derives the position coordinates of the reflectors 141, 142, 143, and 144 as the laser light coordinates of each of the reflectors, with the laser sensor 104 as the origin, using the acquired reflection time data and reflection direction data of the reflected light. Note that the reflectors 141, 142, and 143 exist on the same plane, so that the coordinates of the axis in the height direction (Z axis) are the same. Furthermore, the coordinates of the axes in the vertical and horizontal directions (X axis, Y axis) of the reflectors 143 and 144 are the same, and the coordinates in the Z axis direction are different.
[0028] The absolute coordinate derivation unit 204 derives absolute coordinates by converting the laser beam coordinates of the reflectors 141, 142, 143, and 144 into the absolute coordinates of the reflectors 141, 142, 143, and 144, which are the coordinate system in the design data.
[0029] Here, the coordinate conversion from the laser beam coordinate system to the absolute coordinate system will be described with reference to Fig. 2B. Consider the laser beam coordinate system (Xs, Ys, Zs; origin P) and the design coordinate system (X0, Y0, Z0; origin O) as shown in Fig. 2B.
[0030] When the measurement point Q is expressed in the laser beam coordinate system and the design coordinate system, the relationship between the two is expressed by equation (1).
[0031]
number
[0032] Where: JPEG2024139390000003.jpg9151TIFF2024139390000004.tif9169[R]: Rotation matrix JPEG2024139390000005.jpg9166
[0033] In equation (1), if the translation and rotation are expressed by one matrix (simultaneous transformation matrix), equations (2) and (3) are obtained.
[0034]
number
number
[0035] To relate the two coordinate systems, it is sufficient to obtain the simultaneous conversion matrix shown in formula (2). The unknown components of the simultaneous conversion matrix are 12, R11 to R33 and Xop to Zop in formula (3). Therefore, if there are four coordinates of the laser light and the laser sensor 104 (TS measurement) at the same measurement point, the simultaneous conversion matrix can be obtained.
[0036] The coordinate values of the laser light measurement and the design coordinate measurement (TS measurement) of point Q are shown in Equations (4) and (5).
[0037]
number
number
[0038] By substituting equations (4) and (5) into equation (2), we obtain equation (6).
[0039]
number
[0040]
number
[0041] In equation (7), unknowns R11 to R33 and Xop to Zop are found by solving three sets of four-variable linear simultaneous equations with unknowns (R11, R12, R13, Xop), (R21, R22, R23, Yop), and (R31, R32, R33, Zop).
[0042] As an example, let us solve the four-variable linear simultaneous equation (8) with unknowns (R11, R12, R13, Xop).
[0043]
number
[0044]
number
[0045]
number
[0046] In order to find a set of solutions in equation (10), the inverse matrix of the coefficient matrix must exist. The condition for an inverse matrix to exist is that the coefficient matrix in equation (9) must be regular. A regular coefficient matrix means that the determinant of the coefficient matrix is not zero.
[0047] In this embodiment, the reflectors 141 to 144 are installed at three points (for example, A=(X1, Y1, Z1), B=(X2, Y2, Z2), C=(X3, Y3, Z3)) at approximately the same height.
[0048] Then, if the fourth point (D = (X4, Y4, Z4) is placed at the same height as the other three points, D will be on plane ABC. This means that TIFF2024139390000015.tif1589 is the other three vectors as shown in equation (10). It can be represented as TIFF2024139390000016.tif1589.
[0049]
number
[0050]
number
[0051]
number
[0052]
number
[0053] The reason is that the fourth point D is set on the plane ABC, and thus the point D can be expressed by another vector. In order to avoid this, if the point D is set outside the plane ABC, the point D cannot be expressed by another vector, and the determinant does not become zero. Therefore, in this embodiment, the height position of the reflector 144 is set to a height position different from the height positions of the other three reflectors 141, 142, and 143.
[0054] The excavation state determination unit 205 determines the excavation state of the excavation target area 102 based on at least one of the absolute coordinates of the reflector 141, the absolute coordinates of the reflector 142, the absolute coordinates of the reflector 143, and the absolute coordinates of the reflector 144 as a reference.
[0055] The excavation condition is determined by irradiating laser light from the laser sensor 104 and obtaining point cloud data of the excavation surface. The point cloud data obtained here is data obtained in a laser light coordinate system centered on the laser sensor 104. Since alignment is performed between the design data and the point cloud data (laser light coordinates), the excavation condition determination unit 205 can perform accurate determination of the excavation condition.
[0056] An example of the coordinate system table 301 held by the completed shape management device 100 will be described with reference to Fig. 3. The reflector ID (Identifier) 311 is an identifier for identifying each of the four reflectors 141, 142, 143, and 144. The laser beam coordinate system 312 is the position coordinates of the reflectors 141, 142, 143, and 144 in a coordinate system centered on the laser sensor 104. The design coordinate system 313 is the position coordinates (absolute coordinates) in the design data. The completed shape management device 100 uses the coordinate system table 301 to perform coordinate conversion between the laser beam coordinate system and the absolute coordinate system.
[0057] The hardware configuration of the completed shape management device 100 will be described with reference to FIG. 4. The CPU (Central Processing Unit) 410 is a processor for arithmetic control, and executes a program to realize each functional configuration of the completed shape management device 100 in FIG. 2. The CPU 410 has multiple processors, and may execute different programs, modules, tasks, threads, etc. in parallel. The ROM (Read Only Memory) 420 stores fixed data such as initial data and programs, and other programs. The network interface 430 communicates with other devices via a network. The CPU 410 is not limited to one, and may be multiple CPUs or may include a GPU (Graphics Processing Unit) for image processing. The network interface 430 preferably has a CPU independent of the CPU 410, and writes or reads transmitted / received data in an area of the RAM (Random Access Memory) 440. It is also preferable to provide a DMAC (Direct Memory Access Controller) that transfers data between the RAM 440 and the storage 450 (not shown). The CPU 410 recognizes that data has been received or transferred to the RAM 440, and processes the data. Furthermore, the CPU 410 prepares the processing results in the RAM 440, and leaves the subsequent transmission or transfer to the network interface 430 or DMAC.
[0058] The RAM 440 is a random access memory used by the CPU 410 as a temporary storage work area. The RAM 440 has a storage area reserved for storing data necessary for implementing this embodiment. The design data 441 is data showing the final shape of the excavation target area 102. The reflected light data 442 is data on the reflection time and reflection direction of the reflected light of the laser light irradiated from the laser sensor 104 and reflected by the reflectors 141, 142, 143, and 144 and returning. The laser light data 443 is data on the intensity, amplitude, wavelength, and the like of the laser light irradiated from the laser sensor 104. The laser coordinate system 444 is the position coordinates of the reflectors 141, 142, 143, and 144 in a coordinate system centered on the laser sensor 104. The design coordinate system 445 is the position coordinates of each point included in the excavation target area 102 in absolute coordinates.
[0059] The transmitted / received data 446 is data that is transmitted and received via the network interface 430. The RAM 440 also has an application execution area 447 for executing various application modules.
[0060] The storage 450 stores a database, various parameters, or the following data or programs required to realize this embodiment. The storage 450 stores a coordinate system table 301. The coordinate system table 301 is a table that manages the relationship between the reflector ID 311 and the laser beam coordinate system 312 shown in FIG. 3.
[0061] The storage 450 further stores a design data acquisition module 451, a reflected light data acquisition module 452, a laser light coordinate derivation module 453, an absolute coordinate derivation module 454, and an excavation state determination module 455. The design data acquisition module 451 is a module that acquires the design data 107 of the excavation target area 102 being excavated. The reflected light data acquisition module 452 is a module that acquires reflection time data and reflection direction data of the reflected light of the laser light irradiated to four reflectors installed so as to surround the excavation target area 102. The laser light coordinate derivation module 453 derives the laser light coordinates of the reflectors 141, 142, 143, and 144 based on the laser sensor 104, which is the irradiation source of the laser light, from the acquired reflection time data and reflection direction data. The absolute coordinate derivation module 454 is a module that derives the absolute coordinates of the reflectors 141, 142, 143, and 144 by converting the laser light coordinates of the reflectors 141, 142, 143, and 144 into an absolute coordinate system that is the absolute coordinate system in the design data. The excavation state determination module 455 is a module that determines the excavation state of the excavation target area 102 based on any one of the reflectors 141, 142, 143, and 144. These modules 451 to 455 are read by the CPU 410 into the application execution area 447 of the RAM 440 and executed. The control program 456 is a program for controlling the entire completed form management device 100.
[0062] The input / output interface 460 interfaces input / output data with input / output devices. A display unit 461 and an operation unit 462 are connected to the input / output interface 460. A storage medium 464 may be further connected to the input / output interface 460. A speaker 463 serving as an audio output unit, a microphone (not shown) serving as an audio input unit, or a GPS position determination unit may be further connected. Note that the RAM 440 and the storage 450 shown in FIG. 4 do not show programs and data related to the general-purpose functions of the completed form management device 100 or other feasible functions.
[0063] Next, a processing procedure of the completed form management device 100 will be described with reference to the flowchart shown in Fig. 5. This flowchart is executed by the CPU 410 in Fig. 4 using the RAM 440, and realizes each functional configuration of the completed form management device 100 in Fig. 2.
[0064] In step S501, the design data acquisition unit 201 acquires design data of the excavation target area 102. In step S503, the reflected light data acquisition unit 202 acquires reflection time data and reflection direction data of the reflected light of the laser light irradiated to the four reflectors 141, 142, 143, and 144. In step S505, the laser light coordinate derivation unit 203 derives the coordinates of the reflectors 141, 142, 143, and 144 in the laser light coordinate system based on the laser sensor 104 from the acquired reflection time data and reflection direction data. In step S507, the absolute coordinate derivation unit 204 converts the laser light coordinates of the reflectors 141, 142, 143, and 144 into an absolute coordinate system, which is a coordinate system in the design data, to derive absolute coordinate values. In step S509, the excavation state determination unit 205 determines the excavation state of the excavation target area 102 using any one of the absolute coordinates of the reflectors 141, 142, 143, and 144 as a reference.
[0065] According to this embodiment, even in an environment without a GPS (Global Positioning System), the coordinates of each point included in the excavation area can be converted into the coordinates of the absolute coordinate system. Therefore, accurate and reliable as-built management can be performed.
[0066] Although the present invention has been described above with reference to the embodiments, the present invention is not limited to the above-described embodiments and can be modified as appropriate. Various modifications that can be understood by those skilled in the art can be made to the configuration and details of the present invention within the scope of the present invention. In addition, systems or devices that combine separate features included in each embodiment in any way are also included in the scope of the present invention.
[0067] The present invention may be applied to a system consisting of multiple devices, or to a single device. Furthermore, the present invention may be applied to a case where an information processing program for implementing the functions of the embodiment is supplied to a system or device and executed by a built-in processor. Therefore, the technical scope of the present invention includes a program installed on a computer to implement the functions of the present invention with a computer, a medium storing the program, a WWW (World Wide Web) server that downloads the program, and a processor that executes the program. In particular, at least a non-transitory computer readable medium storing a program that causes a computer to execute the processing steps included in the above-mentioned embodiment is included in the technical scope of the present invention.
Claims
1. a design data acquisition unit that acquires design data of an area to be excavated during excavation; A reflected light data acquisition unit that acquires reflection time data and reflection direction data of reflected light of laser light irradiated to four reflectors installed around the excavation target area so as to surround the excavation target area; a laser beam coordinate derivation unit that derives a first laser beam coordinate of a first reflector, a second laser beam coordinate of a second reflector, a third laser beam coordinate of a third reflector, and a fourth laser beam coordinate of a fourth reflector in a laser beam coordinate system based on an irradiation source of the laser beam from the acquired reflection time data and reflection direction data; an absolute coordinate derivation unit that derives first absolute coordinates, second absolute coordinates, third absolute coordinates, and fourth absolute coordinates by converting the first laser beam coordinates, the second laser beam coordinates, the third laser beam coordinates, and the fourth laser beam coordinates into an absolute coordinate system that is a coordinate system in the design data; an excavation state determination unit that determines an excavation state of the excavation target area based on at least one of the first absolute coordinates, the second absolute coordinates, the third absolute coordinates, and the fourth absolute coordinates; A completed form management device equipped with the above.
2. The finished product management device according to claim 1, wherein three of the four reflectors are arranged on the same plane, and the remaining one reflector is arranged vertically above or vertically below any of the three reflectors.
3. A design data acquisition step of acquiring design data of an area to be excavated during excavation; A reflected light data acquisition step of acquiring reflection time data and reflection direction data of reflected light of laser light irradiated to four reflectors installed around the excavation target area so as to surround the excavation target area; a laser beam coordinate derivation step of deriving a first laser beam coordinate of a first reflector, a second laser beam coordinate of a second reflector, a third laser beam coordinate of a third reflector, and a fourth laser beam coordinate of a fourth reflector in a laser beam coordinate system based on an irradiation source of the laser beam from the acquired reflection time data and reflection direction data; an absolute coordinate derivation step of deriving first absolute coordinates, second absolute coordinates, third absolute coordinates, and fourth absolute coordinates by converting the first laser beam coordinates, the second laser beam coordinates, the third laser beam coordinates, and the fourth laser beam coordinates into an absolute coordinate system that is a coordinate system in the design data; an excavation state determination step of determining an excavation state of the excavation target area based on at least one of the first absolute coordinate, the second absolute coordinate, the third absolute coordinate, and the fourth absolute coordinate; A method for managing completed work, including:
4. A design data acquisition step of acquiring design data of an area to be excavated during excavation; A reflected light data acquisition step of acquiring reflection time data and reflection direction data of reflected light of laser light irradiated to four reflectors installed around the excavation target area so as to surround the excavation target area; a laser beam coordinate derivation step of deriving a first laser beam coordinate of a first reflector, a second laser beam coordinate of a second reflector, a third laser beam coordinate of a third reflector, and a fourth laser beam coordinate of a fourth reflector in a laser beam coordinate system based on an irradiation source of the laser beam from the acquired reflection time data and reflection direction data; an absolute coordinate derivation step of deriving first absolute coordinates, second absolute coordinates, third absolute coordinates, and fourth absolute coordinates by converting the first laser beam coordinates, the second laser beam coordinates, the third laser beam coordinates, and the fourth laser beam coordinates into an absolute coordinate system that is a coordinate system in the design data; an excavation state determination step of determining an excavation state of the excavation target area based on at least one of the first absolute coordinate, the second absolute coordinate, the third absolute coordinate, and the fourth absolute coordinate; A completed work management program that causes a computer to execute the above.
Citation Information
Patent Citations
Surveying system between steel tower support points
JP1995198384A
System for measuring topographical form and guidance system
JP2002328022A
Lining space measuring method for tunnel construction
JP2022061417A
Calibration of a coordinate measuring machine using a calibration laser head at the tool centre point
US20170010094A1
Measurement system, method for measurement, information processor, and program
JP2022151963A