Hydroelectric power generation system

The hydroelectric power generation system employs a noise prevention mechanism to control flow rates and avoid noise-producing rotational speeds, effectively managing noise and flow rates to enhance operational efficiency.

JP2024140282AActive Publication Date: 2024-10-10DAIKIN INDUSTRIES LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2023051347
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-28
Publication Date
2024-10-10
Estimated Expiration
2043-03-28

AI Technical Summary

Technical Problem

Existing hydroelectric power generation systems do not effectively control the flow rate in the channel and fail to suppress protruding noise, particularly at specific rotational speed ranges of the water turbine.

Method used

A noise prevention mechanism is implemented in the hydroelectric power generation system, which includes a control unit to adjust the flow rate and operation of the water turbine, using electric valves and a control unit to manage the flow path system, thereby controlling the flow rate to a target value and avoiding rotational speed ranges that produce protruding noise.

Benefits of technology

The system effectively suppresses noise levels above 9 dB and maintains the flow rate at a target value, enhancing operational efficiency and reducing noise pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024140282000001_ABST
    Figure 2024140282000001_ABST
Patent Text Reader

Abstract

To suppress a prominent sound (described later) while controlling a total flow rate in a flow passage where a hydroelectric power generation system is provided at a target value.SOLUTION: A hydroelectric power generation system includes: a power generator (50); a water turbine (60) connected to a flow passage system (1) in which a fluid flows, and which drives the power generator (50); and a noise prevention mechanism (20) for suppressing a prominent sound while controlling a total flow rate (QT) in the flow passage system (1) with a command value (Q*) being a target. The prominent sound is the sound which has a level equal to or greater than an average value of a sound pressure level by a predetermined value during an operation of the hydroelectric power generation system.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to hydroelectric power generation systems. [Background technology]

[0002] In hydroelectric power generation systems, operation control that avoids the natural vibration frequency range of the runner of a water turbine or pump-turbine is being studied (see, for example, Patent Document 1). In the example of Patent Document 1, a resonance range map is provided that stores in advance the resonance range of the runner of the pump-turbine. In the example of Patent Document 1, a discriminator is provided that, when the speed target value of the pump-turbine falls within the resonance range of the runner, outputs a speed target value that avoids the resonance range. Then, the speed of the pump-turbine is controlled so that it matches the speed target value from the discriminator. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Japanese Patent Application Publication No. 09-327198 Summary of the Invention [Problem to be solved by the invention]

[0004] In the example of Patent Document 1, no consideration is given to control of the flow rate in the flow path in which the hydroelectric power generation system is provided.

[0005] An object of the present disclosure is to suppress projection noise (described later) while controlling the total flow rate in a flow path in which a hydroelectric power generation system is provided to a target value. [Means for solving the problem]

[0006] A first aspect of the present disclosure provides a hydroelectric power generation system, comprising: A generator (50); a water turbine (60) connected to a flow path system (1) through which a fluid flows and driving the generator (50); a noise prevention mechanism (20) that controls a flow rate in the flow passage system (1) by targeting a command value (Q*) and suppresses a spike sound; Equipped with The prominent sound is a sound having a level equal to or higher than a predetermined level than the average sound pressure level during operation of the hydroelectric power generation system. It is a hydroelectric power generation system.

[0007] In the first aspect, it is possible to suppress outburst noise (described later) while controlling the flow rate in the flow passage system provided with the hydroelectric power generation system to a target value.

[0008] A second aspect of the present disclosure is a hydroelectric power generation system according to the first aspect, The prominent sound is a sound having a sound pressure level of 9 dB or more higher than the average value. It is a hydroelectric power generation system.

[0009] In the second aspect, noise having a sound pressure level 9 dB or more higher than the average value can be suppressed.

[0010] A third aspect of the present disclosure is a hydroelectric power generation system according to the first or second aspect, The noise prevention mechanism (20) avoids operation of the water turbine (60) in a rotation speed range of the water turbine (60) in which the projecting noise may occur and in a rotation speed range within a range of 100 rpm around the rotation speed range. It is a hydroelectric power generation system.

[0011] In the third aspect, noise can be suppressed in the rotational speed range of the water turbine (60) where a projecting sound may occur, and in a range of 100 rpm around the above rotational speed range.

[0012] A fourth aspect of the present disclosure is a hydroelectric power generation system according to any one of the first to third aspects, a motor-operated valve (15) connected in series to the water wheel (60); The noise prevention mechanism (20) adjusts the opening degree of the motor-operated valve (15) and controls the generator (50) to control the flow rate in the flow path system (1) to approach the command value (Q*), while avoiding operation of the water turbine (60) in a rotation speed range in which the spike noise occurs. It is a hydroelectric power generation system.

[0013] In the fourth aspect, the operating point of the water turbine (60) is controlled by a motor-operated valve (15) connected in series to the water turbine (60).

[0014] A fifth aspect of the present disclosure is a hydroelectric power generation system according to any one of the first to third aspects, a motor-operated valve (15) connected in series to the water wheel (60); The flow path system (1) comprises: a first flow path (12) in which the water wheel (60) and the motor-operated valve (15) are disposed; a second flow path (13) connected in parallel to the first flow path (12); Equipped with The noise prevention mechanism (20) is by adjusting the opening degree of the motor-operated valve (15) and controlling an operating point of the water turbine (60), the flow rate (Q1) in the first flow path (12) is controlled to be less than the command value (Q*), while avoiding operation of the water turbine (60) in a rotation speed range in which the outburst sound occurs; By adjusting the flow rate of the second flow path (13), a total flow rate (QT) in the flow path system (1) is controlled to approach the command value (Q*). It is a hydroelectric power generation system.

[0015] In the fifth embodiment, the total flow rate (QT) is adjusted by adjusting the flow rate of the second flow path (13).

[0016] A sixth aspect of the present disclosure is a hydroelectric power generation system according to any one of the first to third aspects, The flow path system (1) comprises: a first flow path (12) in which the water turbine (60) is disposed; a second flow path (13) connected in parallel to the first flow path (12), The flow path system (1) is connected to a flow rate control mechanism (100) that is not under the control of the hydroelectric power generation system, The noise prevention mechanism (20) changes the flow rate of the second flow path (13) and controls the operating point of the water turbine (60) to repeat an adjustment operation that induces a change in the adjustment amount by the flow rate adjustment mechanism (100), thereby avoiding operation of the water turbine (60) in a rotation speed range in which the spike noise occurs. It is a hydroelectric power generation system.

[0017] In the sixth aspect, the flow rate of the second flow path (13) is changed and the operating point of the water turbine (60) is controlled to induce a change in the amount of adjustment by the flow rate adjustment mechanism (100).

[0018] A seventh aspect of the present disclosure is a hydroelectric power generation system according to any one of the first to sixth aspects, The noise prevention mechanism (20) controls the operating point of the water turbine (60) in a direction in which the generated electric power (P) by the generator (50) increases. It is a hydroelectric power generation system.

[0019] In the seventh aspect, it is possible to increase the efficiency of power generation.

[0020] An eighth aspect of the present disclosure is a hydroelectric power generation system according to any one of the first to third aspects, The noise prevention mechanism (20) is a first operation in which the water turbine (60) is operated at a rotation speed higher than an upper limit of a rotation speed range of the water turbine (60) at which the projection sound is generated; a second operation in which the water turbine (60) is operated at a rotation speed lower than a lower limit of a rotation speed range of the water turbine (60) in which the spike sound is generated; and While switching between these, the integrated flow rate (Qs) is controlled for a given period. It is a hydroelectric power generation system.

[0021] In the eighth aspect, suppression of the projection sound and maintenance of the integrated flow rate (Qs) for a predetermined period of time are compatible.

[0022] A ninth aspect of the present disclosure is a hydroelectric power generation system according to any one of the first to eighth aspects, The noise prevention mechanism (20) controls the generator (50) so as to generate a torque that is in the opposite phase to the cogging torque generated in the generator (50). It is a hydroelectric power generation system.

[0023] In the ninth aspect, the noise (vibration) caused by the cogging torque is suppressed. [Brief description of the drawings]

[0024] [Figure 1] FIG. 1 is a diagram showing a schematic configuration of a flow path system including a hydroelectric power generation system according to a first embodiment. [Diagram 2] FIG. 2 is a power system diagram of a hydroelectric power generation system. [Diagram 3] FIG. 3 is a diagram illustrating an example of a system loss curve. [Figure 4] FIG. 4 is a diagram illustrating an example of a change in the system loss curve when the first motor-operated valve is closed. [Diagram 5] FIG. 5 is a flowchart showing the process in the second control. [Figure 6] FIG. 6 is a diagram illustrating the operating point control in the second control. [Figure 7] FIG. 7 is a diagram illustrating the operating point control in the second control. [Figure 8] FIG. 8 is a diagram illustrating a flow path system according to the third embodiment. [Figure 9] FIG. 9 is a flowchart showing the process in the third control. [Figure 10] FIG. 10 is a diagram illustrating the operating point control in the third control. [Figure 11] FIG. 11 is a diagram illustrating an example of an operating point in the first mode and an operating point in the second mode. [Figure 12]FIG. 12 is a diagram showing an example of switching between the first mode and the second mode by the operating point control unit. [Figure 13] FIG. 13 is a diagram for explaining the principle of suppressing the cogging torque. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0025] Hereinafter, an embodiment of a hydroelectric power generation system will be described with reference to the drawings.

[0026] First Embodiment FIG. 1 is a diagram showing a schematic configuration of a flow path system (1) including a hydroelectric power generation system (10) according to the first embodiment.

[0027] The flow path system 1 is a flow path through which a fluid flows with a head. In this embodiment, the flow path system 1 is a part of a water supply system 4. The fluid flowing through the flow path system 1 is water.

[0028] The flow path system (1) is composed of a metal pipe (e.g., a ductile cast iron pipe) or a non-metallic pipe (e.g., a resin pipe). A storage tank (2) is provided upstream of the flow path system (1), and a water receiving tank (3) is provided downstream of the flow path system. The flow path system (1) includes an inlet pipe (11), a first branch pipe (12), a second branch pipe (13), and an outlet pipe (14).

[0029] Hydroelectric Power Generation System (10) The hydroelectric power generation system (10) includes a generator (50), a water turbine (60) (fluid machine), a first motor-operated valve (15), a second motor-operated valve (16), a first flow meter (17), and a second flow meter (18).

[0030] The water turbine (60) is disposed in the flow path system (1). In the hydroelectric power generation system (10), an axial flow pump is used as the water turbine (60). The water turbine (60) includes an impeller (not shown). A rotating shaft (19) is fixed to the impeller.

[0031] The impeller rotates by receiving the flow of fluid flowing in from a fluid inlet (not shown) formed in a casing of the water turbine (60), thereby rotating the rotating shaft (19). The fluid that has flowed into the water turbine (60) is discharged from a fluid outlet (not shown) formed in the casing.

[0032] The generator (50) includes a rotor with embedded permanent magnets and a stator having a coil (both not shown). The generator (50) is coupled to the rotating shaft (19) and is driven to rotate. The generator (50) generates electricity in response to the rotation.

[0033] The inflow end of the inflow pipe (11) is connected to the storage tank (2). The outflow end of the outflow pipe (14) is connected to the water tank (3). The outflow end of the inflow pipe (11) is connected to the inflow end of the first branch pipe (12) and the inflow end of the second branch pipe (13). The inflow end of the outflow pipe (14) is connected to the outflow end of the first branch pipe (12) and the outflow end of the second branch pipe (13). The first branch pipe (12) and the second branch pipe (13) are connected in parallel to each other. In other words, the first branch pipe (12) and the second branch pipe (13) are connected in parallel to each other between the inflow pipe (11) and the outflow pipe (14).

[0034] The first branch pipe (12) constitutes a flow path through which the fluid that drives the water turbine (60) flows. Hereinafter, the first branch pipe (12) may be referred to as the first flow path (12). In the first flow path (12), a first flow meter (17), a first motor-operated valve (15), and the water turbine (60) (more specifically, a fluid inlet of the water turbine (60)) are arranged in this order from upstream to downstream. The outlet pipe (14) is connected to the fluid outlet of the water turbine (60).

[0035] The second branch pipe (13) is a flow path connected in parallel to the first branch pipe (12). The second branch pipe (13) constitutes a detour path (bypass flow path) for diverting the fluid away from the hydraulic turbine (60). Hereinafter, the second branch pipe (13) may be referred to as the second flow path (13). A second flow meter (18) and a second motor-operated valve (16) are arranged in the second flow path (13) in this order from upstream to downstream.

[0036] The first flow meter (17) detects the flow rate of the fluid flowing through the water turbine (60). The second flow meter (18) detects the flow rate of the fluid flowing through the second branch pipe (13). The sum of the flow rate (Q1) detected by the first flow meter (17) and the flow rate (Q2) detected by the second flow meter (18) is the total flow rate (QT) of the fluid flowing out of the flow path system (1).

[0037] The first motor-operated valve (15) and the second motor-operated valve (16) control the flow rate of the fluid by driving a valve element with a motor. The first motor-operated valve (15) is controlled to a closed state, for example, during maintenance of the water turbine (60), to prohibit the inflow of the fluid into the water turbine (60). The first motor-operated valve (15) is opened at a predetermined opening degree (described later) during operation of the hydroelectric power generation system (10).

[0038] The second motor-operated valve (16) controls the flow rate of the fluid flowing through the second branch pipe (13). For example, when the hydroelectric power generation system (10) is being inspected, or when no fluid is flowing through the hydraulic turbine (60), the second motor-operated valve (16) is opened to a predetermined opening degree (for example, fully open).

[0039] FIG. 2 is a power system diagram of the hydroelectric power generation system (10). The hydroelectric power generation system (10) supplies generated power to a power system. In this example, the power system is a commercial power source (5). The hydroelectric power generation system (10) sells power by supplying power to the commercial power source (5) (so-called reverse power flow).

[0040] As shown in FIG. 2, the hydroelectric power generation system (10) includes a control unit (20) and an inverter section (30).

[0041] The control unit 20 functions as a noise prevention mechanism for suppressing predetermined noise (prominent noise, described below) in the hydroelectric power generation system 10. The control unit 20 also controls the total flow rate (QT).

[0042] In controlling the total flow rate (QT), the hydroelectric power generation system (10) is required to control the total flow rate (QT) at a predetermined timing to a command value (Q*). In other words, the hydroelectric power generation system (10) is required to control the sum (total flow rate (QT)) of the instantaneous value of the flow rate (Q1) and the instantaneous value of the flow rate (Q2) to the command value (Q*). In other words, the control unit (20) controls the flow rate in the flow path system (1) to target the command value (Q*), while suppressing a spike sound (described later).

[0043] The control unit (20) includes an AC / DC converter section (21). The AC / DC converter section (21) includes a plurality of switching elements. The AC / DC converter section (21) converts the power (generated power (P)) generated by the generator (50) into DC power by switching operations of the switching elements.

[0044] This DC power is smoothed by a smoothing capacitor (not shown) and then supplied to the inverter unit (30). The inverter unit (30) supplies power to the commercial power source (5).

[0045] The control unit (20) also includes a CPU (microcomputer) and a semiconductor memory (both not shown). The semiconductor memory stores a program for operating the CPU (hereinafter referred to as a control program), data, and the like.

[0046] The CPU of the control unit (20) executes a control program to function as an operating point control section (25). The operating point control section (25) receives the rotation speed (hereinafter, rotation speed (N)) of the generator (50), the detection value (flow rate (Q1)) of the first flow meter (17), the detection value (flow rate (Q2)) of the second flow meter (18), and a command value (Q*). The operating point control section (25) appropriately uses this information to control the AC / DC converter section (21), the first motor-operated valve (15), and the second motor-operated valve (16), etc.

[0047] Specifically, the operating point control unit (25) controls the total flow rate (QT) and takes measures against noise (described later) in the hydroelectric power generation system (10). To realize the control of the total flow rate (QT) and the noise reduction measures, the operating point control unit (25) has a function of controlling the operating point of the hydraulic turbine (60).

[0048] -Principle of operating point control- In explaining the principle of operating point control, the system loss curve (S) and the like will be explained. The system loss curve (S) is a flow resistance characteristic line. Figure 3 is a diagram showing an example of a system loss curve (S). In Figure 3, the vertical axis is the effective head (H) and the horizontal axis is the flow rate (Q).

[0049] In the system loss curve (S), the effective head (H) when the flow rate (Q) = 0 is the total head (Ho). The system loss curve (S) has the characteristic that the effective head (H) decreases quadratically as the flow rate (Q) increases.

[0050] The unconstrained curve in Fig. 3 is a curve formed by connecting operating points at which the torque value of the generator (50) is 0. The maximum generated power curve (E) will be described in detail in an embodiment described later.

[0051] The operating point of the water turbine (60) exists on the system loss curve (S). In the hydroelectric power generation system (10), when the switching operation in the AC / DC converter unit (21) is controlled, the operating point of the water turbine (60) moves on the system loss curve (S). In other words, in the hydroelectric power generation system (10), the total flow rate (QT) and the generated power (P) (in other words, the rotation speed (N) and torque) change by controlling the AC / DC converter unit (21).

[0052] In the hydroelectric power generation system (10), changing the opening of the first motor-operated valve (15) changes the system loss curve (S). For example, closing the first motor-operated valve (15) by a predetermined amount increases the amount of decrease in the available head (H) in response to an increase in the flow rate (Q). Since the operating point of the hydraulic turbine (60) is on the system loss curve (S), a change in the system loss curve (S) also changes the operating point.

[0053] As described above, in the hydroelectric power generation system (10), the operating point (in other words, the generated power (P)) of the water turbine (60) (generator (50)) can be controlled by adjusting the opening degree of the first electric valve (15) and controlling the switching operation of the AC / DC converter section (21).

[0054] -Operating point control in this embodiment- In the hydroelectric power generation system (10), noise (vibration) occurs when the water turbine (60) and the generator (50) are driven. The sound pressure level of this noise becomes particularly high when the rotation speed (N) of the generator (50) enters a certain rotation speed range. In this rotation speed range, it is believed that resonance occurs in the hydroelectric power generation system (10).

[0055] In the hydroelectric power generation system (10), measures are taken to prevent protruding noise within a range of rotation speeds of the water turbine (60) in which the protruding noise may occur, plus a predetermined margin. Here, the protruding noise is a sound having a level equal to or higher than a predetermined level than the average sound pressure level during operation of the hydroelectric power generation system (10). The average sound pressure level is the average sound pressure level for each rotation speed within the range of rotation speeds during operation. In this embodiment, the protruding noise is a sound having a sound pressure level equal to or higher than the average sound pressure level by 9 dB.

[0056] In this embodiment, the margin is set to a rotation speed range of 100 rpm around the rotation speed range where the protruding noise occurs. In the hydroelectric power generation system (10), noise countermeasures are implemented for the rotation speed range of the water turbine (60) where the protruding noise may occur and for rotation speed ranges of 100 rpm around the said rotation speed range. Of course, the 100 rpm rotation speed range described as the margin is merely an example. Other rotation speed ranges may be set as the margin.

[0057] Fig. 3 shows a schematic example of the rotation speed range in which the protrusive sound occurs. In Fig. 3, the range between two straight lines (dotted lines) is the rotation speed range in which the protrusive sound occurs. The boundary line of the rotation speed range in which the protrusive sound occurs is actually a curved line, but in Fig. 3, the boundary line is shown as a schematic straight line. In the example of Fig. 3, the operating point of the water turbine (60) is included in the rotation speed range in which the protrusive sound occurs.

[0058] The operating point control unit (25) controls the operating point of the water turbine (60) until the rotation speed (N) is outside the rotation speed range in which a spike sound occurs and the total flow rate (QT) converges to the command value (Q*). In this embodiment, the operating point control by the operating point control unit (25) is called a first control (OP1). In the first control (OP1), the operating point control unit (25) repeats the operating point control including the following steps (S1-1) to (S1-3).

[0059] (Step S1-1) Flow control In step S1-1, the operating point control section (25) controls the operation of the AC / DC converter section (21) until the flow rate (Q1) converges to the command value (Q*). In the process of performing this step, the rotation speed (N) of the generator (50) changes.

[0060] (Step S1-2) Determine whether the rotation speed (N) is within the range of rotation speeds that produce a prominent sound. In step S1-2, the operating point control unit (25) determines whether or not the rotation speed (N) is within a rotation speed range that generates a protruding sound (hereinafter, referred to as rotation speed determination). If the rotation speed (N) is not within the rotation speed range that generates a protruding sound, the operating point control unit (25) performs the rotation speed determination again after a predetermined period of time has elapsed. If the rotation speed (N) is within the rotation speed range that generates a protruding sound, the operating point control unit (25) performs the process of step S1-3.

[0061] (Step S1-3) Controlling the opening degree of the first electric valve (15) In step S1-3, the operating point control unit (25) changes the opening of the first motor-operated valve (15) by a predetermined amount. For example, the operating point control unit (25) closes the first motor-operated valve (15) by a predetermined amount. This changes the shape of the system loss curve (S).

[0062] Fig. 4 is a diagram illustrating an example of a change in the system loss curve (S) when the first motor-operated valve (15) is closed. As shown in Fig. 4, when the first motor-operated valve (15) is closed, the system loss curve (S) drops downward. The operating point also changes in response to the change in the system loss curve (S). After adjusting the first motor-operated valve (15), the operating point control unit (25) returns to the process of step S1-1.

[0063] <Example of operation> When the hydroelectric power generation system (10) is started, the operating point control unit (25) receives a command value (Q*). The command value (Q*) is provided, for example, by a waterworks operator. The command value (Q*) may also be input by an operator of the hydroelectric power generation system (10).

[0064] The operating point control unit (25) controls the opening of the first motor-operated valve (15) to an initial value (for example, fully open). When the first motor-operated valve (15) is open, a fluid is supplied to the water turbine (60), causing the water turbine (60) to rotate. The generator (50) also rotates in accordance with the rotation of the water turbine (60).

[0065] The operating point control unit (25) executes a first control (OP1). As a result, the rotation speed (N) (operating point) of the generator (50) falls outside the rotation speed range in which a spike sound occurs. The total flow rate (QT) (=flow rate (Q1)) converges to the command value (Q*). In other words, the operating point control unit (25) adjusts the opening of the motor-operated valve (15) and controls the generator (50) to control the flow rate in the flow path system (1) to approach the command value (Q*), while avoiding operation of the water turbine (60) in the rotation speed range in which a spike sound occurs.

[0066] Effects of this embodiment In this embodiment, by executing the first control (OP1), the total flow rate (QT) in the flow path system (1) in which the hydroelectric power generation system (10) is provided can be controlled to a target value (command value (Q*)) while suppressing the projection noise.

[0067] Second Embodiment The hardware configuration of the hydroelectric power generation system (10) of the second embodiment is similar to that of the hydroelectric power generation system (10) of the first embodiment. The hydroelectric power generation system (10) of the present embodiment differs from that of the first embodiment in the function (control contents to be performed) of the operating point control unit (25).

[0068] In this embodiment, the operating point control section (25) uses the second motor-operated valve (16) in addition to the first motor-operated valve (15) when controlling the operating point. Specifically, the following process is performed.

[0069] When the hydroelectric power generation system (10) is started up, the operating point control unit (25) controls the opening degrees of the first motor-operated valve (15) and the second motor-operated valve (16) to initial values ​​defined for each of them. For example, the operating point control unit (25) controls the first motor-operated valve (15) to be fully open and the second motor-operated valve (16) to be fully closed.

[0070] Thereafter, the operating point control unit (25) repeatedly performs the operating point control of the water turbine (60). In this embodiment, the operating point control performed by the operating point control unit (25) is called second control (OP2). Fig. 5 is a flowchart showing the process performed in the second control (OP2).

[0071] In step S2-1, the operating point control unit (25) determines whether the total flow rate (QT) has reached the target flow rate (command value (Q*)). If the total flow rate (QT) has not reached the target flow rate, the operating point control unit (25) performs the process of step S2-2. In step S2-2, the operating point control unit (25) moves the operating point of the water turbine (60) to a side where the total flow rate (QT) approaches the target flow rate.

[0072] If it is determined in step S2-1 that the total flow rate (QT) has reached the target flow rate, the operating point control unit (25) performs the process of step S2-3. In step S2-3, the operating point control unit (25) determines whether or not the rotation speed (N) is within a rotation speed range that generates a protruding sound (rotation speed determination). If the rotation speed (N) is not within the rotation speed range that generates a protruding sound, the operating point control unit (25) performs the rotation speed determination again after a predetermined period has elapsed. If the rotation speed (N) is within the rotation speed range that generates a protruding sound, the operating point control unit (25) performs the process of step S2-4.

[0073] In step S2-4, the operating point control unit (25) checks whether the current operating point is on the side of a larger flow rate than the operating point with the highest efficiency characteristics. The operating point with the highest efficiency characteristics is the intersection of the maximum power generation curve (E) and the system loss curve (S). The maximum power generation curve (E) is a curve connecting the apexes of a plurality of iso-power generation curves. The iso-power generation curve is a curve connecting operating points at which a certain value of power generation (P) can be obtained. An example of the iso-power generation curve is shown in FIG. 6.

[0074] As shown in Fig. 6, each constant power generation curve is a downward convex curve. When the intersection of the maximum power generation curve (E) and the system loss curve (S) is the operating point, the power generation (P) is maximum.

[0075] When the operating point is on the side of a higher flow rate than the point of maximum efficiency characteristics, the operating point control unit (25) moves the operating point of the water turbine (60) to the side of a lower flow rate (step S2-5), as shown in Fig. 6. Specifically, the operating point control unit (25) controls the switching operation of the AC / DC converter unit (21) so as to reduce the flow rate (Q1), thereby moving the operating point to the point of maximum efficiency characteristics. In other words, the operating point control unit (25) controls the operating point in the direction in which the generated power (P) increases.

[0076] On the other hand, when the operating point is on the point of maximum efficiency characteristics, the operating point control unit (25) shifts the operating point of the hydraulic turbine (60) to the lower flow rate side while maintaining the maximum efficiency characteristics (step S2-6). In this case, the operating point control unit (25) controls the first motor-operated valve (15) to change the system loss curve (S) (see FIG. 7). Furthermore, the operating point control unit (25) controls the switching operation of the AC / DC converter unit (21).

[0077] When the process of step 2-5 or step 2-6 is performed, the total flow rate (QT) becomes less than the command value (Q*) (a shortage of flow rate occurs). The operating point control unit (25) compensates for the shortage of flow rate by flowing fluid into the second branch pipe (13) (step S2-7). Specifically, the operating point control unit (25) controls the opening degree of the second motor-operated valve (16) so that the flow rate (Q2) = command value (Q*) - flow rate (Q1). After completing step S2-7, the operating point control unit (25) performs the process of step S2-3 again.

[0078] Effects of this embodiment In this embodiment, by executing the second control (OP2), the total flow rate (QT) in the flow path system (1) in which the hydroelectric power generation system (10) is provided can be controlled to a target value (command value (Q*)) while suppressing the projection noise.

[0079] In this embodiment, the operating point is controlled in the direction in which the generated power (P) increases, so that the generated power (P) can be maximized.

[0080] From the viewpoint of suppressing the projection noise, it is not always necessary to control the operating point to the point of maximum efficiency characteristics.

[0081] Third Embodiment The hardware configuration of the hydroelectric power generation system (10) of the third embodiment is similar to that of the hydroelectric power generation system (10) of the first embodiment. The hydroelectric power generation system (10) of the present embodiment differs from that of the first embodiment in the function (control contents to be performed) of the operating point control unit (25).

[0082] 8 is a diagram illustrating a flow path system (1) according to an embodiment 3. In this embodiment, an on-off valve (100) is connected to a water supply system (4). The on-off valve (100) is provided downstream of a hydroelectric power generation system (10).

[0083] The on-off valve (100) is a valve (flow rate control mechanism) that is managed by the water utility. In other words, the on-off valve (100) is a flow rate control mechanism that is not managed by the hydroelectric power generation system (10). The opening degree (adjustment amount) of the on-off valve (100) is automatically controlled so that the flow rate or pressure downstream of the on-off valve (100) becomes a value desired by the water utility.

[0084] When the hydroelectric power generation system (10) is started, the operating point control unit (25) controls the opening degrees of the first motor-operated valve (15) and the second motor-operated valve (16) to initial values ​​defined for each of them. For example, the operating point control unit (25) controls the first motor-operated valve (15) to be fully open and the second motor-operated valve (16) to be fully closed. The operating point control unit (25) controls the AC / DC converter unit (21) so that the generated power (P) becomes the maximum generated power.

[0085] Thereafter, the operating point control section (25) repeatedly performs the following operating point control. In this embodiment, the operating point control performed by the operating point control section (25) is referred to as a third control (OP3). Fig. 9 is a flowchart showing the process in the third control (OP3).

[0086] In step S3-1, the operating point control unit (25) determines whether or not the rotation speed (N) is within the rotation speed range that generates a protruding sound (rotation speed determination). If the rotation speed (N) is not within the rotation speed range that generates a protruding sound, the operating point control unit (25) performs the rotation speed determination again after a predetermined period of time has elapsed. If the rotation speed (N) is within the rotation speed range that generates a protruding sound, the operating point control unit (25) performs the process of step S3-2.

[0087] In step S3-2, the operating point control unit (25) increases the opening degree of the second motor-operated valve (16) by a predetermined amount. This increases the flow rate downstream of the on-off valve (100). When the flow rate increases downstream of the on-off valve (100), the on-off valve (100) is automatically controlled to reduce its opening degree. In other words, the operating point control unit (25) changes the flow rate of the second flow path (13) and controls the operating point of the water turbine (60) to induce a change in the adjustment amount by the flow rate adjustment mechanism (100).

[0088] The smaller the opening of the on-off valve (100), the smaller the flow rate of the water turbine (60), and the rotation speed (N) of the generator (50) (water turbine (60)) also varies. When the opening of the on-off valve (100) becomes smaller, the shape of the system loss curve (S) changes. Fig. 10 is a diagram for explaining the operating point control in the third control (OP3).

[0089] In step S3-3, the operating point control section (25) controls the AC / DC converter section (21) so as to maintain the operating point on the maximum power generation curve (see FIG. 10). In other words, the operating point control section (25) controls the operating point in a direction in which the generated power (P) increases. After completing step S3-3, the operating point control section (25) performs the process of step S3-1 again.

[0090] Effects of this embodiment As described above, by executing the third control (OP3), the hydroelectric power generation system (10) can suppress the burst noise while controlling the total flow rate (QT) in the flow path system (1) to a target value (command value (Q*)).

[0091] In this embodiment, the operating point is controlled in the direction in which the generated power (P) increases, so that the generated power (P) can be maximized.

[0092] In this embodiment, from the viewpoint of suppressing the projection noise, it is not always necessary to control the operating point to the point of maximum efficiency characteristics.

[0093] In the present embodiment, the first motor-operated valve (15) may be replaced with a manual on-off valve. In the case where the first motor-operated valve (15) is replaced with a manual on-off valve, an operator sets the on-off valve to a predetermined opening degree before starting operation of the hydroelectric power generation system (10).

[0094] Fourth Embodiment The hardware configuration of the hydroelectric power generation system (10) of the fourth embodiment is similar to that of the hydroelectric power generation system (10) of the first embodiment. The hydroelectric power generation system (10) of the present embodiment differs from that of the first embodiment in the function (control contents to be performed) of the operating point control unit (25).

[0095] In this embodiment, the meaning of the command value (Q*) is different from that in the first embodiment. In this embodiment, it is required to control the integrated flow rate (Qs) of the fluid flowing through the hydroelectric power generation system (10) to a predetermined command value (Q*) per a predetermined period (named the management period (T)). The management period (T) is, for example, one day.

[0096] The operating point control by the operating point control section (25) (called fourth control (OP4) in this embodiment) is performed by switching between a first mode (M1) and a second mode (M2) which will be described below.

[0097] The first mode (M1) is a control mode for performing a first operation in which the water turbine (60) is operated at a rotation speed (N) higher than the upper limit of the rotation speed range in which a protruding sound occurs, and the second mode (M2) is a control mode for performing a second operation in which the water turbine (60) is operated at a rotation speed (N) lower than the upper lower limit of the rotation speed range in which a protruding sound occurs.

[0098] The operating points in the first mode (M1) and the second mode (M2) may be set arbitrarily as long as they avoid the rotation speed range in which the protruding sound occurs. Fig. 11 is a diagram illustrating an example of the operating points in the first mode (M1) and the second mode (M2). In the example of Fig. 11, the operating points in the first mode (M1) and the second mode (M2) are set near the rotation speed range in which the protruding sound occurs and outside the rotation speed range in which the protruding sound occurs.

[0099] The operating point control unit (25) appropriately switches between the first mode (M1) and the second mode (M2) to control the integrated flow rate (Qs) during the management period (T) to converge to the command value (Q*). Specifically, the operating point control unit (25) allocates the number of executions of the first mode (M1) and the second mode (M2) during the management period (T) and the duration of each execution.

[0100] <Example of operation> FIG. 12 is a diagram showing an example of switching between the first mode (M1) and the second mode (M2) by the operating point control unit (25). FIG. 12 schematically shows the flow rate change (instantaneous value) accompanying the mode switch.

[0101] In FIG. 12, for the sake of convenience of explanation, the flow rate change is shown as a rectangular wave, but in reality, it is necessary to change the flow rate over a predetermined time. Therefore, it is desirable that the difference between the flow rate (Q1) in the first mode (M1) and the flow rate (Q1) in the second mode (M2) be as small as possible. The smaller the flow rate difference, the shorter the mode switching time can be.

[0102] In the example of FIG. 12, during the management period (T), the first mode (M1) and the second mode (M2) are alternately executed twice each. The execution time of the second mode (M2) is T1 each time. The execution time of the first mode (M1) is T2 for the first time and T3 (T3 < T2), which is shorter than T2, for the second time. The operating point control unit (25) appropriately adjusts T1, T2, and T3 to suppress the protruding sound while ensuring the integrated flow rate (Qs).

[0103] <Effect in this embodiment> In the hydroelectric power generation system (10) of this embodiment, by executing the fourth control (OP4), it is possible to suppress the protruding sound while controlling the integrated flow rate (Qs) during the management period (T) to the command value (Q*).

[0104] <<Embodiment 5>> The hardware configuration of the hydraulic power generation system (10) of the fifth embodiment is similar to that of the hydraulic power generation system (10) of the first embodiment. The hydraulic power generation system (10) of the present embodiment differs from that of the first embodiment in the method of suppressing noise. The method of suppressing noise in the present embodiment can be used in combination with the methods of the first to fourth embodiments.

[0105] In this embodiment, noise caused by the cogging torque generated in the generator (50) is suppressed. In this embodiment, in order to suppress this noise, the operating point control section (25) attempts to suppress the cogging torque.

[0106] Fig. 13 is a diagram for explaining the principle of suppressing cogging torque. In Fig. 13, the horizontal axis represents the rotation angle of the rotor (not shown) of the generator (50), and the vertical axis represents the torque value. In Fig. 13, the solid line represents the value of the cogging torque of the generator (50).

[0107] In this embodiment, the operating point control section (25) applies a current to the generator (50) so that a torque in phase opposite to the cogging torque (hereinafter referred to as a correction torque) is applied to the generator (50). In Fig. 13, the dashed dotted line indicates the value of the correction torque.

[0108] Effects of this embodiment As described above, by generating a correction torque in the opposite phase to the cogging torque in the generator (50), the cogging torque is suppressed in the hydroelectric power generation system (10). As a result, noise (vibration) caused by the cogging torque is suppressed in the hydroelectric power generation system (10).

[0109] Other Embodiments A mixed flow pump or a centrifugal pump may be used for the water turbine (60) instead of the axial flow pump. When a mixed flow pump is used, the same control as in the hydroelectric power generation system (10) equipped with an axial flow pump may be performed. When a centrifugal pump is used, the positional relationship between the unconstrained curve and the maximum power generation curve is reversed from that in the case of an axial flow pump (see the example shown in FIG. 3, etc.). When a centrifugal pump is used, it is necessary to control the operating point taking into account the positional relationship.

[0110] When control is performed to change the system loss curve (S) (such as in the first embodiment), the system loss curve (S) may be changed by opening the first motor-operated valve (15).

[0111] The control unit (20) (control program) may be configured to execute two or more of the controls of the first to fourth embodiments. For example, it is possible to allow the user to select the control to be executed by the operating point control unit (25) from among the first control (OP1), the second control (OP2), the third control (OP3), and the fourth control (OP4).

[0112] A margin is not required in the speed range where the loud noise occurs.

[0113] The hydroelectric power generation system (10) can also be installed in an industrial water supply, a recycled water supply, or a sewerage system.

[0114] The fluid supplied to the fluid machine (for example, the water turbine (60)) is not limited to water.

[0115] Although the embodiment and the modified examples have been described above, it will be understood that various modifications in form and details are possible without departing from the spirit and scope of the claims. Elements of the above embodiment, modified examples, and other embodiments may be appropriately combined or substituted. [Industrial Applicability]

[0116] INDUSTRIAL APPLICABILITY As described above, the present disclosure is useful for hydroelectric power generation systems. [Explanation of symbols]

[0117] 1. Fluid system 10 Hydroelectric Power System 12 First branch pipe (first flow path) 13 Second branch pipe (second flow path) 15 First motor-operated valve (motor-operated valve) 20 Control unit (noise prevention mechanism) 50 Generator 60 Waterwheel 100 Opening and closing valve (flow rate control mechanism) N Number of revolutions P Power generation Q* command value Q1 Flow rate Q2 Flow rate Qs Accumulated flow rate QT total flow

Claims

1. In hydroelectric power generation systems, A generator (50); a water turbine (60) connected to a flow path system (1) through which a fluid flows and driving the generator (50); a noise prevention mechanism (20) that suppresses outburst noise while controlling a flow rate in the flow passage system (1) with a command value (Q*) as a target; Equipped with The prominent sound is a sound having a level equal to or higher than a predetermined level than the average sound pressure level during operation of the hydroelectric power generation system. Hydroelectric power system.

2. 2. The hydroelectric power generation system of claim 1, The prominent sound is a sound having a sound pressure level of 9 dB or more higher than the average value. Hydroelectric power system.

3. In the hydroelectric power generation system according to claim 1 or 2, The noise prevention mechanism (20) avoids operation of the water turbine (60) in a rotation speed range of the water turbine (60) in which the projecting noise may occur and in a rotation speed range within a range of 100 rpm before and after the rotation speed range. Hydroelectric power system.

4. In the hydroelectric power generation system according to claim 1 or 2, a motor-operated valve (15) connected in series to the water turbine (60); The noise prevention mechanism (20) adjusts the opening of the motor-operated valve (15) and controls the generator (50) to control the flow rate in the flow path system (1) to approach the command value (Q*), while avoiding operation of the water turbine (60) in a rotation speed range in which the spike noise occurs. Hydroelectric power system.

5. In the hydroelectric power generation system according to claim 1 or 2, a motor-operated valve (15) connected in series to the water turbine (60); The flow path system (1) comprises: a first flow path (12) in which the water turbine (60) and the motor-operated valve (15) are disposed; a second flow path (13) connected in parallel to the first flow path (12); Equipped with The noise prevention mechanism (20) comprises: by adjusting the opening degree of the motor-operated valve (15) and controlling an operating point of the water turbine (60), the flow rate (Q1) in the first flow path (12) is controlled to be less than the command value (Q*), while avoiding operation of the water turbine (60) in a rotation speed range in which the outburst sound is generated; By adjusting the flow rate of the second flow path (13), a total flow rate (QT) in the flow path system (1) is controlled so as to approach the command value (Q*). Hydroelectric power system.

6. In the hydroelectric power generation system according to claim 1 or 2, The flow path system (1) comprises: a first flow path (12) in which the water turbine (60) is disposed; a second flow path (13) connected in parallel to the first flow path (12), The flow path system (1) is connected to a flow rate control mechanism (100) that is not under the control of the hydroelectric power generation system, The noise prevention mechanism (20) changes the flow rate of the second flow path (13) and controls the operating point of the water turbine (60) to repeat an adjustment operation that induces a change in the adjustment amount by the flow rate adjustment mechanism (100), thereby avoiding operation of the water turbine (60) in a rotation speed range in which the protruding sound occurs. Hydroelectric power system.

7. In the hydroelectric power generation system according to claim 1 or 2, The noise prevention mechanism (20) controls an operation point of the water turbine (60) in a direction in which the generated electric power (P) by the generator (50) increases. Hydroelectric power system.

8. In the hydroelectric power generation system according to claim 1 or 2, The noise prevention mechanism (20) comprises: a first operation in which the water turbine (60) is operated at a rotation speed higher than an upper limit of a rotation speed range of the water turbine (60) at which the projection sound is generated; a second operation in which the water turbine (60) is operated at a rotation speed lower than a lower limit of a rotation speed range of the water turbine (60) at which the spike sound is generated; and While switching between these, the integrated flow rate (Qs) for a given period is controlled. Hydroelectric power system.

9. In the hydroelectric power generation system according to claim 1 or 2, The noise prevention mechanism (20) controls the generator (50) so as to generate a torque that is in the opposite phase to the cogging torque generated in the generator (50). Hydroelectric power system.

Citation Information

Patent Citations

  • Operation of hydraulic turbine

    JP1983018567A

  • Method for grinding and heating butter and device therefor

    JP1995023710A

  • Noise control system and hydroelectric power generation system for hydroelectric power station

    JP2002070714A

  • Hydraulic power generation system

    JP2016223368A

  • Hydraulic power generating system

    JP2018119409A