Temporary structure and building construction method

The temporary structure with offset strut bodies and connecting bodies allows for interference-free installation of handrails, enhancing construction efficiency and safety by avoiding pillar interference.

JP2024140718APending Publication Date: 2024-10-10DAIWA HOUSE INDUSTRY CO LTD

Patent Information

Application Number
JP2023052019
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-28
Publication Date
2024-10-10

AI Technical Summary

Technical Problem

Conventional temporary handrails for fall prevention during building construction often interfere with pillars and construction members, affecting construction efficiency and worker safety.

Method used

A temporary structure with first and second strut bodies extending vertically from the building frame, offset to avoid pillars, and a connecting body that bypasses pillars, allowing continuous installation without interference.

Benefits of technology

Improves construction efficiency and worker safety by enabling interference-free installation of temporary handrails, facilitating the attachment of external wall panels and floor members.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024140718000001_ABST
    Figure 2024140718000001_ABST
Patent Text Reader

Abstract

To provide a temporary structure for preventing falls that is easier to construct.SOLUTION: A temporary handrail 1 is used during construction of a building and is attached to a building frame B (beam B2). The temporary handrail 1 is attached onto the building frame B at a distance in the frontage direction of the building, and includes a first support body 10 and a second support body 20 that extend vertically from the building frame B, and a connecting body 30 that connects the extending portions of the first support body and the second support body. The first support body 10 and the second support body 20 each have a base portions 11, 21 that are attached to the upper surface of the building frame B, and support portions 14, 24 that extend vertically from the base portion. The portions of the support portions 14, 24 to which the connecting body 30 is connected are provided inside the base portions 11, 21 in the projection direction of the building.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a temporary structure and a building construction method, and more particularly to a temporary structure for preventing falls that is used during the construction of a building and is attached to the framework of the building, and a building construction method using the temporary structure. [Background technology]

[0002] 2. Description of the Related Art Conventionally, scaffolding, handrails, and the like for preventing falls that are attached to the framework of a building are known and are used during construction of a building or during maintenance after construction. For example, the temporary handrails described in Patent Documents 1 and 2 are attached to the beams of a building with a gap between them in the direction of the building's frontage, and comprise a first support body and a second support body extending upward from the beams, and a connecting body connecting the extending portions of the first support body and the second support body. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2022-83661 A [Patent Document 2] Patent Publication No. 2021-55454 Summary of the Invention [Problem to be solved by the invention]

[0004] Meanwhile, in the construction of buildings using temporary handrails for fall prevention as disclosed in Patent Documents 1 and 2, there has been a demand for improving ease of construction. For example, in the temporary handrails described in Patent Documents 1 and 2, the first support column and the second support column each extend linearly upward from the building frame (beam). Therefore, it was necessary to attach the temporary handrail so that the connector of the temporary handrail did not interfere with the pillar installed on the beam. This made it impossible to attach the temporary handrail around the pillar. Furthermore, when laying floor members (floor panels) on the beams of a building, workers sometimes came into contact with the connectors of the temporary handrails, affecting the construction work.

[0005] The present invention has been made in consideration of the above problems, and an object of the present invention is to provide a temporary structure and a building construction method which improve workability compared to conventional methods. [Means for solving the problem]

[0006] The above problem is solved by the temporary structure of the present invention, which is a temporary structure for preventing falls that is used during construction of a building and is attached to the main body of the building, comprising a first support body and a second support body that are attached to the main body at a distance in one direction of the building's frontage and projection and extend a long length in the vertical direction from the main body, and a connecting body that connects the extending portions of the first support body and the second support body, wherein the first support body and the second support body each have a base portion attached to the top or bottom surface of the main body and a support portion that extends a long length in the vertical direction from the base portion, and the portion of the support portion to which the connecting body is connected is located inside or outside the base portion in the other direction of the building's frontage and projection. With the above configuration, a temporary structure with improved workability can be realized. In more detail, the temporary structure comprises a first support body, a second support body, and a connecting body, and the portions of the support parts of the first support body and the second support body to which the connecting bodies are connected are offset to a position inside or outside the base part in the projection direction (frontage direction) of the building. Therefore, when the temporary structure is attached to the building frame, the temporary structure can be attached by avoiding the construction members that make up the frame so as not to interfere with the construction members.

[0007] In this case, the first support body and the second support body are attached with a gap in the frontage direction of the building, the base portion is attached to the upper surface of the beam that constitutes the main body, the support portion extends upward from the base portion, and the portion of the support portion to which the connecting body is connected is provided more inward than the base portion in the projection direction of the building, and when the temporary structure is attached to the upper surface of the beam, the connecting body is preferably positioned more inward than the column provided on the beam in the projection direction of the building, or more inward than the column provided between adjacent beams. With the above configuration, when the temporary structure is attached to a beam, the temporary structure (connecting body) can be attached by avoiding the pillars installed on the beam or the pillars installed between adjacent beams. In addition, as described above, by arranging the connectors on the inside of the columns on the beams in the projection direction of the building, workers can conveniently install the exterior wall panels. In other words, the temporary structure can be temporarily set up so that the temporary structure (connector) does not interfere with the columns.

[0008] In this case, the first support body and the second support body are attached with a gap in the frontage direction of the building, and the support body has a first extension portion extending upward from the base portion, a second extension portion extending from the tip of the first extension portion in a direction inclined from the extension direction of the first extension portion, and a third extension portion extending upward from the tip of the second extension portion, and the connecting body is connected to the third extension portion of the first support body and the third extension portion of the second support body, and when the temporary structure is attached to the main body, the connecting body is preferably positioned inside or outside the base portion and the first extension portion in the projection direction of the building. As described above, for example, by forming the first and second support columns in a crank shape, a temporary structure can be realized that does not interfere with the construction materials that make up the building frame. Therefore, it is possible to improve workability compared to conventional methods.

[0009] In this case, the base portion is attached to the upper surface of the beam that constitutes the main body, and the first support body and the second support body each further have a first protrusion and a second protrusion that are provided at a distance from each other on the base portion, protrude downward from the base portion, and are respectively inserted into through holes provided at a distance in the beam, and the first protrusion and the second protrusion are each inserted into the through holes formed at a distance in the upper part of the beam, and are each inserted into second through holes formed at a distance in the lower part of the beam and positioned at positions corresponding to the through holes. With the above configuration, the temporary structure can be firmly attached onto the beams of a building.

[0010] In this case, the first support body and the second support body are attached with a gap in the frontage direction of the building, the connecting body is connected in a state of abutment against the side of the first support body and the side of the second support body, and when the temporary structure is attached to the upper surface of the main body, the connecting body is positioned inside the first support body and the second support body in the projection direction of the building, and is supported by the first support body and the second support body from the outside in the projection direction of the building. With the above-mentioned configuration, the connecting body is firmly supported by the first support column and the second support column, so that the supporting force of the connecting body can be stabilized and the function of preventing the worker from falling can be improved.

[0011] In this case, the support portion has an engaging portion that detachably engages with the engaged portion provided on the connecting body, and the engaging portion preferably has a first engaging portion provided on a side surface of the support portion, and a second engaging portion provided on a side surface of the support portion opposite to the first engaging portion. With the above-mentioned configuration, the connector can be connected to any of the two side surfaces of the first support column and the second support column. Also, the components can be standardized. Effect of the Invention

[0012] According to the temporary structure and building construction method of the present invention, it is possible to improve workability compared to the conventional art during construction of a building and during maintenance after construction. Furthermore, even when constructing a building in a small space, it is possible to realize a temporary structure that is highly stable and can be easily attached and removed. [Brief description of the drawings]

[0013] [Figure 1] FIG. 13 is a diagram showing the state in which a temporary handrail is attached to the building frame. [Diagram 2] FIG. [Diagram 3] 3 is an enlarged view of a main portion of FIG. 2, showing a support body and a protrusion body. FIG. [Figure 4] This is a process diagram showing a building construction method using temporary handrails. [Figure 5A] FIG. 2 is a side view of the structure, showing the state before the temporary handrail is installed. [Figure 5B] FIG. 13 is a diagram showing the state in which a temporary handrail is attached to a beam. [Figure 5C] FIG. 13 is a diagram showing how exterior wall panels are attached to beams and columns. [Figure 5D] FIG. 13 is a diagram showing the exterior wall panel after installation. [Figure 5E] FIG. 13 shows the state after the temporary handrail has been removed. [Figure 6] 13 is a diagram showing the state in which a temporary handrail is attached to a structure during floor panel installation work. FIG. [Figure 7] This is a diagram showing the temporary handrail hung and attached to the structure (beam). [Figure 8] FIG. 11 is a perspective view of a temporary handrail according to a second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] Hereinafter, an embodiment of the present invention will be described with reference to FIGS. The present embodiment relates to a "temporary structure" that is a temporary structure for preventing falls that is used during construction of a building and is attached to the building's framework, and that enables improved workability compared to conventional methods. The present embodiment also relates to a "building construction method using a temporary structure." In this embodiment, the "temporary handrail" corresponds to the temporary structure.

[0015] <Overall composition> As shown in Figures 1 to 3, the temporary handrail 1 is a temporary structure for preventing falls used during construction of a building, which is attached to the building frame B before attaching the exterior wall panel B4 and is removed from the frame B after the exterior wall panel B4 is attached. Below, the structure B of the building will be described first, and then the temporary handrail 1 will be described in detail.

[0016] As shown in Figure 1, the building's structure B is equipped with long columns B1 arranged at intervals in the frontage direction of the building, beams B2 connecting the columns B1 and extending in the frontage direction of the building's structure B, floor panels B3 fixed onto the beams B2, and exterior wall panels B4 attached to the columns B1 and beams B2 via panel fixing brackets B5 and arranged in a row along the frontage direction.

[0017] The pillar B1 is disposed at a position where it overlaps (is at the same position as) the beam B2 in the projection direction of the body B. Specifically, the pillar B1 is disposed between adjacent beams B2. Note that when the pillar B1 is a partition (small pillar), the pillar B1 may be attached onto the beam B2. The floor panel B3 is disposed inside the column B1 and the beam B2 in the projection direction of the body B. Specifically, the floor panel B3 is disposed at a position not overlapping with the column B1, and is placed so as to overlap partially with the upper surface of the upper flange B2a of the beam B2.

[0018] The exterior wall panel B4 is a plate-like exterior wall material that constitutes the structure B, and is disposed outside the columns B1 and beams B2 in the width direction of the structure B. Specifically, the exterior wall panel B4 has a rectangular panel frame B4a and a finishing surface material B4b fixed to the surface of the panel frame B4a. As shown in FIGS. 5C and 5D, fixing shafts B4c and B4d for fixing to panel fixing metal fittings B5 (panel fixing holes B5a) are provided at the lower end of the rear surface of the panel frame B4a. Furthermore, a fixing nut B4e for fixing to the second panel fixing metal fitting B6 (panel fixing hole B6a) is provided at the upper end on the rear surface of the panel frame B4a.

[0019] In the above-mentioned skeleton B, as shown in Fig. 1, the temporary handrail 1 is attached to the upper surface of the beam B2. Then, when the temporary handrail 1 is attached to the upper surface of the beam B2, a part of the temporary handrail 1 (connector 30) is positioned offset inward from the column B1 in the projection direction of the skeleton B. In other words, a part of the temporary handrail 1 can avoid the column B1, and the temporary handrail 1 can be continuously extended along the beam B2. Therefore, the temporary handrail 1 can be temporarily installed continuously even near the pillar B1. This allows workers to install the exterior wall panel B4 with greater safety.

[0020] <Details of temporary handrails> As shown in Figures 1 to 3, the temporary handrail 1 comprises a first support body 10 and a second support body 20 which are attached to the main body B (beam B2) with a gap therebetween in the width direction and extend longitudinally from the beam B2 in the vertical direction, and a connecting body 30 which connects the extending portions of the first support body 10 and the second support body 20. The connectors 30 are provided at intervals in the vertical direction and connect the upper and central portions of the support columns 10, 20, respectively.

[0021] As shown in Figures 1 to 3, the first support body 10 has a base portion 11 attached to the upper surface of the beam B2, a first protrusion portion 12 and a second protrusion portion 13 protruding downward from the base portion 11 and inserted into the beam B2, a support portion 14 extending upward from the base portion 11, and an engagement shaft 15 provided in the upper portion of the support portion 14 for connecting the connecting body 30. The second support column 20 has a similar shape to the first support column 10, and has a base portion 21, a first protruding portion 22, a second protruding portion 23, and a support portion 24.

[0022] The base portion 11 is a base member that ensures the mounting strength (bending strength) of the temporary handrail 1, and is in contact with the upper surface of the beam B2. Specifically, the base portion 11 has a first base portion 11a protruding on both sides in the width direction from the lower end of the first support body 10, and a second base portion 11b provided on the inner surface of the lower end of the first support body 10 and connecting the lower end of the first support body 10 and the first base portion 11a.

[0023] The first base portion 11a and the second base portion 11b are each made of a plate-like member and are in contact with the upper surface of the beam B2. A first protruding portion 12 and a second protruding portion 13 are welded to the first base portion 11a at a position facing the through hole B2b (B2d) of the beam B2. The second base portion 11b has a substantially trapezoidal shape, and is inclined and widens in the vertical direction from the support portion 14 side toward the beam B2 side.

[0024] As shown in FIG. 3, the first protruding portion 12 and the second protruding portion 13 are rod-shaped members that are long in the vertical direction, and are disposed on the base portion 11 with a gap therebetween. The first protruding portion 12 protrudes so as to be longer than the second protruding portion 13. Furthermore, the tip portions 12a, 13a of the first protruding portion 12 and the second protruding portion 13 respectively have a tapered shape, becoming thinner toward the tip.

[0025] The first protrusion 12 and the second protrusion 13 each protrude downward from the base 11 and are inserted into through holes B2b provided at an interval in the upper flange B2a of the beam B2. The first protrusion 12 and the second protrusion 13 each are inserted into second through holes B2d provided at an interval in the lower flange B2c and located at positions corresponding to the through holes B2b. Therefore, it is possible to realize a temporary handrail 1 that is highly stable and can be easily attached and removed.

[0026] As shown in FIGS. 2 and 3, the support portion 14 is a long hollow body having a rectangular cross section, and extends upward from the base portion 11. The support portion 14 has a crank shape and has a first extension portion 14a extending upward from the base portion 11, a second extension portion 14b extending from the tip of the first extension portion 14a in a direction inclined from the extension direction of the first extension portion 14a, and a third extension portion 14c extending upward from the tip of the second extension portion 14b.

[0027] The second extending portion 14b is bent from the tip of the first extending portion 14a and extends so as to incline upward toward the inside in the projection direction of the building relative to the first extending portion 14a. Specifically, the second extending portion 14b extends so as to be inclined at approximately 45 degrees with respect to the first extending portion 14a.

[0028] The third extending portion 14c is bent and extends upward from the tip end of the second extending portion 14b. Specifically, the third extending portion 14c extends so as to be inclined at approximately 45 degrees with respect to the second extending portion 14b. An engagement shaft 15 (engagement portion) for detachably engaging engagement holes 31, 32 provided at the extending end of the connector 30 is provided at the upper central portion of the third extending portion 14c.

[0029] The engagement shaft 15 is, for example, a spring-type gravity lock, and has a first engagement shaft 15a provided on the inner surface of the support portion 14 and protruding inwardly of the body B, and a second engagement shaft 15b provided on the outer surface of the support portion 14 and protruding outwardly of the body B.

[0030] The base portion 21, the first protruding portion 22, the second protruding portion 23, the support portion 24 and the engagement shaft 25 of the second support body 20 have the same shapes as those of the first support body 10. The support portion 24 has a crank shape and includes a first extending portion 24a, a second extending portion 24b, and a third extending portion 24c.

[0031] As shown in Figs. 1 to 3, the connector 30 is formed as a long plate-like body, and extends along the longitudinal direction of the beam B2. At both ends in the extending direction of the connecting body 30, engagement holes 31, 32 are formed which detachably engage with engagement shafts 15, 25 provided on the first support body 10 and the second support body 20, respectively.

[0032] In the above configuration, as shown in Figures 1 and 3, when the temporary handrail 1 is attached to the upper surface of the main body B (beam B2), the portions (third extension portions 14c, 24c) of the first support body 10 and the second support body 20 to which the connector 30 is connected are located more inward than the base portion 11 in the projection direction of the main body B. The connector 30 is disposed on the inside of the pillar B1 in the width direction of the body B. By doing so, the temporary handrail 1 can be temporarily installed so that the temporary handrail 1 (connector 30) and the pillar B1 do not interfere with each other. Also, workers can suitably perform the work of attaching the exterior wall panel B4.

[0033] In the above configuration, as shown in Figures 1 and 3, when the temporary handrail 1 is attached to the upper surface of the main body B (beam B2), the connecting body 30 is connected in a state in which it abuts against the inner surface of the first support body 10 and the inner surface of the second support body 20. The connecting body 30 is positioned inside the first support body 10 and the second support body 20 in the projection direction of the body B, and is supported by the first support body 10 and the second support body 20 from the outside in the projection direction of the body B. In this way, the connector 30 is firmly supported by the first support column 10 and the second support column 20. Therefore, the supporting force of the connector 30 can be stabilized.

[0034] <Building construction method using temporary structures> Next, a building construction method using the temporary handrail 1 will be described with reference to Fig. 4 and Figs. 5A to 5E. Specifically, the building construction method will be described in which the temporary handrail 1 is temporarily installed on the frame B (beam B2) and an exterior wall panel B4 is attached. This construction method includes at least a "handrail installation process," an "exterior wall panel installation process," and a "handrail removal process." In addition, explanations of construction steps other than those mentioned above regarding the construction of a building will be omitted.

[0035] In the "handrail installation process", as shown in Figs. 5A and 5B, a worker installs a temporary handrail 1 on the upper surface of a beam B2 that constitutes the framework B (Step 1 (S1)). Specifically, a worker attaches the first support body 10 and the second support body 20 with a gap between them in the frontage direction of the body B. Then, the connector 30 is offset inward from the column B1 provided on the beam B2 in the projection direction of the body B, and the connector 30 is attached so as to straddle the column B1. By doing so, it is possible to avoid pillar B1 and extend temporary handrail 1 continuously.

[0036] In the "exterior wall panel attachment process", as shown in Figs. 5C and 5D, a worker attaches an exterior wall panel B4 to a portion of the beam B2 that is located outside the temporary handrail 1 on the framework B (Step 2). Specifically, a worker attaches the exterior wall panel B4 to the panel fixing metal fittings B5 and second panel fixing metal fittings B6 provided on the pillars B1 and beams B2. When attaching the exterior wall panel B4, first, the fixing shafts B4c, B4d at the lower end of the exterior wall panel B4 are fitted into the panel fixing holes B5a, B6a as shown in Fig. 5C. Then, the exterior wall panel B4 is pulled toward the frame B, and as shown in Fig. 5D, the fixing nut B4e at the upper end of the exterior wall panel B4 is connected to the panel fixing hole B6a of the second panel fixing bracket B6 provided separately, and fixed by the fixing bolt B7. When attaching the exterior wall panel B4, the temporary handrail 1 extending in the frontage direction relative to the structure B can be used as a positioning member.

[0037] In the "handrail removal process", as shown in FIG. 5E, a worker removes the temporary handrail 1 from the beam B2 (Step 3). This construction process is completed through steps 1 to 3 above. The above-mentioned building construction method can realize a building construction method with improved workability. Specifically, by making the first support body 10 and the second support body 20 into a crank shape, it is possible to realize a temporary handrail 1 that does not interfere with the construction members (e.g., pillar B1) that constitute the structure B.

[0038] <Other uses of temporary handrails> Next, an embodiment in which the temporary handrail 1 is attached to the framework B during the work of laying the floor panel B3 will be described with reference to FIG. As shown in FIG. 6, the temporary handrail 1 is attached to the upper surface of the beam B2. The third extension portion 14c of the first support column body 10 (support column portion 14) is offset outward from the first extension portion 14a in the width direction of the body B. Similarly, the third extension portion 24c of the second support column body 20 is offset outward from the first extension portion 24a.

[0039] With the above-mentioned configuration, the connector 30 is disposed outside the beams B2 in the width direction of the body B. This makes it possible to prevent interference between the connector 30 of the temporary handrail 1 and the worker when laying the floor panel B3 on the beam B2. This makes it easier for the worker to secure a work area, allowing the worker to optimally perform the work of laying the floor panel B3.

[0040] In addition, as shown in FIG. 7, the temporary handrail 1 can be attached so as to be suspended from the bottom surface of the frame B (beam B2). This makes it possible to use it as a temporary structure to prevent falls, for example on the landing (mezzanine floor) of a staircase in a building.

[0041] <Second embodiment of temporary handrail> Next, a temporary handrail 101 according to a second embodiment will be described with reference to FIG. In addition, explanations of the contents that overlap with those of the above-mentioned temporary handrail 1 will be omitted.

[0042] The temporary handrail 101 is attached to the upper surface of the beam B2 and comprises a first support body 110 and a second support body 120 that extend longitudinally in the vertical direction, and a connector 130. The first support body 110 has a base portion 111, a first protrusion portion 112 and a second protrusion portion 113 which protrude downward from the base portion 111 and are inserted into the beam B2, a support portion 114 extending upward from the base portion 111, and an engagement axis 115 provided on the upper portion of the support portion 114.

[0043] As shown in FIG. 8, the support portion 114 has an F-shape in side view and has a first extension portion 114a extending upward from the base portion 111, and second extension portions 114b, 114c protruding horizontally from the tip and center of the first extension portion 114a in the extension direction. The second extending portions 114b and 114c each bend and extend in a direction perpendicular to the extending direction of the first extending portion 114a. The engagement shaft 115 is attached to the tip end of the second extending portions 114b and 114c.

[0044] Even with the above simple configuration, when the temporary handrail 101 is attached to the top surface of the beam B2, a part of the temporary handrail 1 (connector 130) is positioned offset inward from the pillar B1 in the projection direction of the body B. In other words, a part of the temporary handrail 1 can avoid the pillar B1, and the temporary handrail 1 can be continuously extended along the beam B2.

[0045] <Other embodiments> In the above embodiment, as shown in FIG. 1, the temporary handrail 1 is described as being equivalent to the "temporary structure", but this is not particularly limited and can be modified. For example, a temporary scaffold may be used instead of a temporary handrail, or a temporary ladder, a temporary wall, or the like may be used. When the "temporary structural body" is used as a temporary scaffold, it is preferable that the connector 30 is configured as a flat scaffold base (top surface base).

[0046] In the above embodiment, as shown in FIG. 1, the temporary handrail 1 (support body 10, 20) is attached to the beam B2 of the structure B, but is not particularly limited and may be attached to a specified construction member of the structure B.

[0047] In the above embodiment, as shown in FIG. 1, the first support body 10 and the second support body 20 are attached with a gap therebetween in the frontage direction of the main body B, but this is not particularly limited, and they may also be attached with a gap therebetween in the projection direction of the main body B. In that case, the connector 30 connected to the first support column 10 and the second support column 20 is offset inward or outward from the base portion 11 in the width direction of the main body B. The mounting position and mounting direction of the temporary handrail 1 within the structure B may be changed as described above.

[0048] In the above embodiment, the temporary structure and the building construction method according to the present invention have been mainly described. However, the above embodiment is merely an example for facilitating understanding of the present invention, and does not limit the present invention. The present invention can be modified or improved without departing from the spirit of the present invention, and the present invention naturally includes equivalents thereof. [Explanation of symbols]

[0049] B. Structure (building structure) B1 pillar B2 Beam (construction material) B2a Top flange B2b through hole (first through hole) B2c Lower Flange B2d Second through hole B3 Floor Panel B4 Exterior wall panel B4a Panel Frame B4b Finishing Surface Material B4c, B4d Fixed axis B4e Fixing nut B5 Panel Fixing Bracket B5a Panel fixing hole B6 Second panel fixing bracket B6a Panel fixing hole B7 Fixing bolt 1 Temporary handrails (temporary structures) 10 1st pillar body 11 Base 11a First base part 11b Second base part 12 1st protrusion 12a Tip 13 Second protrusion 13a Tip 14 Support section 14a First extension 14b Second extension 14c Third extension 15 Engagement shaft (engagement part) 15a First engagement shaft (first engagement part) 15b Second engagement shaft (second engagement part) 20 Second pillar body 21 Base 22 1st protrusion 23 Second protrusion 24 Pillar section 24a 1st extension part 24b 2nd extension 24c 3rd extension 25 Engagement shaft 30 Concatenation 31, 32 Engagement hole (engaged part) 101 Temporary handrails (temporary structures) 110 1st pillar body 111 Base 112 1st protrusion 113 Second protrusion 114 Pillar section 114a 1st extension part 114b, 114c 2nd extension 115 Engagement shaft (engagement part) 120 Second pillar body 130 Concatenation

Claims

1. A temporary structure for preventing falls that is used during construction of a building and is attached to a skeleton of the building, A first support body and a second support body are attached to the building body at an interval in one of the frontage direction and the overhang direction of the building and extend vertically from the building body; A connector that connects the extending portions of the first support body and the second support body, The first support body and the second support body each have a base portion attached to the top surface or the bottom surface of the body, and a support portion extending long in the vertical direction from the base portion, A temporary structure characterized in that the portion of the support column to which the connector is connected is located inside or outside the base portion in the other direction of the building's frontage and overhang.

2. The first support body and the second support body are attached at intervals in a frontage direction of the building, The base portion is attached to an upper surface of a beam that constitutes the skeleton, The support portion extends upward from the base portion, The portion of the support column to which the connector is connected is provided on the inside of the base portion in the projection direction of the building, A temporary structure as described in claim 1, characterized in that when the temporary structure is attached to the upper surface of the beam, the connector is positioned more inward than a column provided on the beam in the projection direction of the building, or more inward than a column provided between adjacent beams.

3. The first support body and the second support body are attached at intervals in a frontage direction of the building, the support portion has a first extension portion extending upward from the base portion, a second extension portion extending from a tip end of the first extension portion in a direction inclined with respect to the extension direction of the first extension portion, and a third extension portion extending upward from a tip end of the second extension portion, The connector is connected to the third extension portion of the first support column and the third extension portion of the second support column, The temporary structure according to claim 1, characterized in that, when the temporary structure is attached to the main body, the connecting body is positioned inside or outside the base portion and the first extension portion in the projection direction of the building.

4. The base portion is attached to an upper surface of a beam that constitutes the skeleton, The first support column and the second support column each further have a first protruding portion and a second protruding portion that are provided on the base portion with a gap therebetween, protrude downward from the base portion, and are inserted into through holes provided on the beam with a gap therebetween, The temporary structure described in claim 1, characterized in that the first protrusion and the second protrusion are each inserted into the through holes formed at a distance from each other in the upper part of the beam, and each inserted into a second through hole formed at a distance from each other in the lower part of the beam and positioned at a position corresponding to the through holes.

5. The first support body and the second support body are attached at intervals in a frontage direction of the building, The connector is connected to a side surface of the first support body and a side surface of the second support body in abutting contact therewith, A temporary structure as described in claim 1, characterized in that when the temporary structure is attached to the upper surface of the main body, the connecting body is positioned inside the first support body and the second support body in the projection direction of the building, and is supported by the first support body and the second support body from the outside in the projection direction of the building.

6. The support portion has an engaging portion that detachably engages with an engaged portion provided on the connector, The temporary structure described in claim 5, characterized in that the engagement portion has a first engagement portion provided on a side surface of the support portion, and a second engagement portion provided on a side surface of the support portion opposite the first engagement portion.

7. A building construction method using the temporary structure according to any one of claims 1 to 6, Attaching the temporary structure to a beam constituting the skeleton; a step of attaching an exterior wall panel to a portion of the beam that is located outside the body of the building relative to the temporary structure; and removing the temporary structure from the beam. In the step of attaching the temporary structure, The connector is disposed on the inner side of a column provided on the beam in the width direction of the building, or the connector is disposed on the inner side of a column provided between adjacent beams, A building construction method comprising attaching the connector so as to straddle the pillar.

Citation Information

Patent Citations

  • Building construction method, and temporary structure used in building construction method

    JP2021055454A

  • Temporary structure, temporary structure assembly structure and building construction method

    JP2022083661A

Cited By

  • Temporary structure arrangement plan supporting program and information processing apparatus for executing the program

    JP2026093815A