Nuclear power generation plant and output control device

The nuclear power plant and output control device automatically generate operation plans considering market prices and thermal limitations to optimize power generation, addressing the challenges of fluctuating renewable energy and maximizing profits by adjusting power output within operational constraints.

JP2024140978AActive Publication Date: 2024-10-10HITACHI GE NUCLEAR ENERGY LTD

Patent Information

Application Number
JP2023052378
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-28
Publication Date
2024-10-10
Estimated Expiration
2043-03-28

AI Technical Summary

Technical Problem

Nuclear power plants face challenges in adjusting output to match fluctuating renewable energy sources due to operational range restrictions and thermal limitations, leading to potential loss of profits and inability to maximize adjustment power, especially in electricity markets with varying demand and prices.

Method used

A nuclear power plant and output control device that includes an evaluation system for predicted market prices and reactor core/plant state, allowing for automatic generation of operation plans that consider thermal limitations and core conditions, using control rods, core flow rate, and other parameters to optimize power generation and maximize profits.

Benefits of technology

Enables quick and efficient generation of highly operable operation plans that maximize profits by adjusting power generation within allowable ranges, reducing the need for manual planning and personnel, and ensuring stable electricity supply.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024140978000001_ABST
    Figure 2024140978000001_ABST
Patent Text Reader

Abstract

To obtain an operation plan having high operability including width and a period of adjustment force.SOLUTION: A nuclear power generation plant 100 includes a power generation system 101 and an output control device 102. The output control device includes: an evaluation criterion input device 28 for inputting a market price prediction value of wholesale power and a consumption adjustment; an adjustment force setting device 26 for setting an adjustment force supply amount for adjusting consumption from information on a price prediction value and a reactor core / plant state including a margin for a thermal restriction of at least a reactor core and a control rod position; an operation plan evaluation device 25 for generating an operation plan from an adjustment force supply amount and evaluation propriety of the plan; a dynamic characteristic evaluation system 24 for evaluating a reactor core / plant state on the basis of an operation plan; and an operation plan output device 27 for outputting an operation plan obtained by a repeated evaluation of the adjustment force setting device and the operation plan evaluation device.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a nuclear power plant and an output control device. [Background technology]

[0002] Conventionally, there is a nuclear power plant that automatically generates an operation plan for bidding in the adjustment power market during operation of the plant.

[0003] As the introduction of renewable energy sources has expanded in recent years, electricity transmission and distribution companies have been adjusting various power sources and transferring electricity through transmission in order to match fluctuating power generation with electricity demand over time, including changes in power generation from solar and wind power in addition to traditional changes in demand.

[0004] When the amount of electricity that cannot be supplied to meet the demand of a region due to mutual exchange of electricity with other regions cannot be supplied, it is necessary to adjust the amount of electricity generated to meet the demand. The first type of adjustable power generation facility is hydroelectric power generation, including pumped storage. However, since the amount of electricity generated by hydroelectric power plants is not large enough to compensate for the variability of renewable energy, thermal power generation has traditionally been used mainly for this adjustment. Thermal power generation can provide a stable amount of electricity and can change the amount of electricity generated relatively quickly. However, thermal power plants are accompanied by carbon dioxide emissions. In recent years, as countries around the world have been promoting measures toward carbon neutrality, an increase in CO2 emissions from thermal power plants is undesirable. Therefore, there is a need to compensate for the fluctuations in the amount of electricity generated by renewable energy with nuclear power generation. Nuclear power plants have been used as baseload power sources, but France and Germany have a track record of operating plants that adjust the amount of electricity generated according to the load. The amount of electricity generated by nuclear power is adjusted by adjusting the output of the nuclear reactor, and this is done by controlling the insertion position of the control rods, the core flow rate, the boron concentration, etc. In particular, in boiling water reactors, the most common methods for adjusting power output are to control the density of the coolant in the core, which promotes the moderation of neutrons, by controlling the core flow rate, and to insert and remove control rods, which are neutron absorbers, into the core. When controlling power output by the core flow rate, there is a limit to the range of operation possible between the core thermal power and the core flow rate in order to maintain the integrity of the fuel, and it is necessary not to deviate from this limit. In addition, in order to maintain the integrity of the fuel, it is necessary to change the power distribution only within the range of the power distribution (envelope) when the nuclear fuel is run-in in advance. For this reason, it was considered to use a power change pattern that has been confirmed to be operable offline in advance (for example, high power constant operation for 14 hours, low power operation for 8 hours, and power change every 1 hour).

[0005] Patent Document 1 discloses a load-following operation method for providing a load-following operation method for a nuclear power plant that can realize operation as close as possible to actual power demand, and the method includes a core performance calculation evaluation unit that inputs plant data such as core flow rate, core pressure, and neutron flux obtained from various measuring instruments placed inside the reactor to calculate core state quantities such as current core thermal power and power distribution, an operation pattern estimation unit that estimates a load-following operation pattern based on the results of the calculation and requests from the operator, a prediction calculation unit that predicts changes in the core state when operating in accordance with the estimated operation pattern, and an operator's console equipped with an input unit for inputting requests from the operator and a display that displays the initial operation pattern and the initial prediction results. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] Japanese Patent Application Publication No. 165690 / 1983 Summary of the Invention [Problem to be solved by the invention]

[0007] In Japan, the liberalization of the electricity market was introduced in 2016, and the electricity generated is being traded in a market rather than through bilateral contracts. A system is being established in which the adjustment of supply and demand is also done through the market, and electricity transmission and distribution companies procure electricity through the market in order to match the electricity demand with the amount of electricity generated. In addition to the wholesale electricity market in which the amount of electricity is traded, there is also an adjustment capacity market in which the amount of electricity that can be adjusted to match the demand and supply exists. The electricity transmission and distribution companies procure the amount of electricity generated that can be increased or decreased at a certain time through this market, and when an adjustment is actually required, they request an increase or decrease in the amount of electricity generated. Meanwhile, the electricity generation companies can make a profit by providing adjustment capacity together with wholesale electricity according to the market price and receiving a selling price.

[0008] For example, a case may be considered in which variable renewable energy (VRE) such as solar and wind power generates a large amount of electricity, and wholesale electricity prices are almost zero to suppress other electricity, while the adjustment power (the power increase side) is expensive. Under such conditions, profits can be maximized by reducing the output to the minimum output and maximizing the adjustment power (the power increase side), but depending on the core state at that time, it may not be possible to increase the output to the maximum output after decreasing to the minimum output. For example, when the insertion position of the control rods is adjusted to increase the output, the output increases partially in the core, and there may be cases in which the output cannot be increased to the maximum output due to thermal restrictions to ensure the soundness of the fuel. Alternatively, there may be cases in which the core flow rate is controlled at the maximum (minimum) as the control state at that time, and therefore the output cannot be increased (decreased) by the core flow rate.

[0009] These core states and control states depend on past operating history, and it is necessary to evaluate the feasible adjustment capability and submit bids to the market, taking into account the ever-changing conditions. However, as mentioned above, such judgments must be made daily, and manual planning poses the problem of requiring a large number of personnel, or of not being able to evaluate quickly, resulting in loss of profits.

[0010] On the other hand, nuclear power plants have the above-mentioned operating range restrictions and thermal restrictions, and therefore may not be able to simply change output to maximize profits or create a standby state to exercise adjustment power.

[0011] The present invention has been made to solve the above-mentioned problems, and has as its main object to provide a nuclear power plant and an output control device that are capable of obtaining an operation plan with high operability, including the range and duration of adjustment capability. [Means for solving the problem]

[0012] In order to achieve the above-mentioned object, the present invention provides a nuclear power plant comprising a power generation system and an output control device, wherein the output control device is configured to have an evaluation criterion input device for inputting market price forecast values ​​for wholesale power and demand adjustment, an adjustment power setting device for setting an adjustment power supply amount for supply and demand adjustment from the price forecast values ​​and information on the core and plant state including at least the margin for the thermal limit of the core and the control rod position, an operation plan evaluation device for generating an operation plan from the adjustment power supply amount and evaluating the feasibility of the plan, a dynamic characteristic evaluation system for evaluating the core and plant state based on the operation plan, and an operation plan output device for outputting an operation plan obtained by iterative evaluation between the adjustment power setting device and the operation plan evaluation device. Other means will be described later. Effect of the Invention

[0013] According to the present invention, it is possible to provide a nuclear power plant and an output control device that are capable of obtaining an operation plan with high operability including the width and period of adjustment capability. [Brief description of the drawings]

[0014] [Figure 1] 1 is an overall configuration diagram of a nuclear power plant according to a first embodiment. [Diagram 2] 3 is a flowchart showing the operation of the nuclear power plant according to the first embodiment. [Diagram 3] FIG. 2 is an explanatory diagram showing an example of an input screen of an evaluation criterion input device. [Figure 4A] FIG. 1 is an explanatory diagram (1) of a method for setting an adjustment capability range and period in an adjustment capability setting device. [Figure 4B] FIG. 13 is an explanatory diagram (2) of a method for setting the adjustment capability range and period in the adjustment capability setting device. [Figure 5A] 3 is an explanatory diagram of an operation plan created by the operation plan evaluation device. FIG. [Figure 5B] FIG. 2 is an explanatory diagram of control rod group division. [Figure 5C] FIG. 4 is an explanatory diagram of a control rod operation procedure. [Figure 6]FIG. 2 is an explanatory diagram illustrating an example of an output screen of the operation plan output device. [Figure 7] FIG. 11 is an explanatory diagram of a dynamic characteristic evaluation system for a nuclear power plant according to a second embodiment. [Figure 8] FIG. 11 is an overall configuration diagram of a nuclear power plant according to a third embodiment. [Figure 9] FIG. 11 is an explanatory diagram of an operation plan selection device for a nuclear power plant according to a third embodiment. [Figure 10] FIG. 11 is an overall configuration diagram of a nuclear power plant according to a fourth embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0015] Hereinafter, an embodiment of the present invention (hereinafter referred to as "the present embodiment") will be described in detail with reference to the drawings. Note that each drawing is merely a schematic illustration to allow a sufficient understanding of the present invention. Therefore, the present invention is not limited to only the illustrated examples. In addition, in each drawing, common or similar components are given the same reference numerals, and duplicated explanations thereof will be omitted.

[0016] [Embodiment 1] <Nuclear power plant configuration> The configuration of a nuclear power plant 100 according to the first embodiment will be described below with reference to Fig. 1. Fig. 1 is an overall configuration diagram of the nuclear power plant 100 according to the first embodiment.

[0017] 1, a nuclear power plant 100 according to the first embodiment includes a power generation system 101 and a power output control device 102. The power output control device 102 outputs a control signal to the power generation system 101 for controlling the power output by manipulating any one of the control rods, the core flow rate, the reactor pressure, the feed water temperature, the bypass valve opening degree, and the reactor water boron concentration, or a combination of a plurality of these.

[0018] A reactor core 2 is held inside a boiling water reactor pressure vessel 1. A plurality of control rods 3 (only one is shown in FIG. 1) are attached to the reactor core 2 in a removable structure. The power generation system 101 includes a control rod control device 4, which controls the control rods 3 to be in predetermined positions.

[0019] The reactor pressure vessel 1 is equipped with a recirculation pump 5 that sends the cooling water flowing out from the outlet of the reactor core 2 back into the reactor core 2, and is controlled by a recirculation control device 6 to maintain a predetermined core flow rate.

[0020] Furthermore, multiple neutron flux detectors 7 (only one is shown in FIG. 1 ) are provided inside the core 2, and a power monitoring device 8 monitors the core power, power distribution, and margin against thermal limits of the core 2. The margin against thermal limits of the core 2 includes any one of the maximum linear power density of the core 2, the critical power ratio or critical heat flux ratio, the axial offset, the control rod position, the core coolant flow rate, the coolant temperature, and the boron concentration, or a combination of multiple of these.

[0021] The main steam flowing out from the core in the reactor pressure vessel 1 passes through a regulating valve 10, the opening of which is controlled by a pressure control device 9, and is sent to a high-pressure turbine 11. The main steam passing through the high-pressure turbine 11 is dried and heated in a moisture separator heater 12, and then sent to a low-pressure turbine 13. A generator 14 is attached to the high-pressure turbine 11 and the low-pressure turbine 13, and the electricity generated by the rotation of the high-pressure turbine 11 and the low-pressure turbine 13 is sent to the grid.

[0022] The main steam that has passed through the low-pressure turbine 13 is condensed in the condenser 15. Steam that is sent directly to the condenser 15 from the bypass valve 16 without being sent to the high-pressure turbine 11 is also condensed in the condenser 15. The condensed water condensed in the condenser 15 is returned to the reactor by the feedwater pump 17. At this time, in the low-pressure feedwater heater 18 and the high-pressure feedwater heater 19, the feedwater is heated by steam extracted from the main steam, improving the thermal efficiency of the turbine-condensate system.

[0023] 1, the nuclear power plant 100 is provided with an extraction valve 20 between the high-pressure turbine 11 and the high-pressure feedwater heater 19 for adjusting the amount of steam extracted from the high-pressure turbine 11 to the high-pressure feedwater heater 19, and the feedwater temperature is controlled by a feedwater temperature control device 21. The nuclear power plant 100 can control the output of the reactor by changing the void fraction (volume ratio of steam contained) of the cooling water inside the core 2 by changing the feedwater temperature.

[0024] The control rod control device 4, the recirculation control device 6, the power monitoring device 8, the pressure control device 9, the feedwater temperature control device 21, and the generator power output detector 22 attached to the generator are connected to a plant control device 23. The plant control device 23 controls the generator output of the nuclear power plant 100 using these devices.

[0025] A dynamic characteristic evaluation system 24 and an operation plan evaluation device 25 are connected to the plant control device 23. The momentary control state, the core power, the power distribution, and the margin for the thermal limit of the core 2 are sent to the dynamic characteristic evaluation system 24 and the operation plan evaluation device 25. The dynamic characteristic evaluation system 24 outputs the state of the core and plant during the evaluation period obtained according to the initial core and plant state and the operation plan based on the neutron kinetics calculation and the thermal-hydraulic kinetics calculation to the operation plan evaluation device 25. Alternatively, as will be described in the second embodiment with reference to FIG. 7, the dynamic characteristic evaluation system 24 may perform machine learning of the state of the core and plant during the evaluation period obtained according to the initial core and plant state and the operation plan based on the neutron kinetics calculation and the thermal-hydraulic kinetics calculation, and may output the state of the core and plant during the evaluation period to the operation plan evaluation device 25 by inputting the initial core and plant state and the operation plan.

[0026] In addition, the operation plan evaluation device 25 is connected to a control capability setting device 26 and an operation plan output device 27, and the control capability setting device 26 is connected to an evaluation criterion input device 28.

[0027] <Nuclear power plant operation> The output control device 102 of the nuclear power plant 100 operates, for example, according to the flow shown in Fig. 2. Fig. 2 is a flowchart showing the operation of the nuclear power plant. Fig. 2 shows the processing flow from input of the market price to output of an optimal operation plan in the output control device 102.

[0028] As shown in FIG. 2, when starting to control the nuclear power plant 100, the output control device 102 first communicates with an external device (not shown) and inputs from the external device a power price forecast value consisting of a future wholesale power price and an adjustment power price in the adjustment power market to the evaluation criterion input device 28 (step S1).

[0029] The power price forecast value is sent from the evaluation criterion input device 28 to the adjustment power setting device 26. The adjustment power setting device 26 sets the period and width of the adjustment power to be supplied based on the power price forecast value, the current control state sent from the operation plan evaluation device, and the margin for the thermal limit of the core 2 (step S2).

[0030] The period and width of the set adjustment capability are sent from the adjustment capability setting device 26 to the operation plan evaluation device 25. The operation plan evaluation device 25 creates an operation plan including operations of the control rods, core flow rate, etc. that realize the period and width of the set adjustment capability according to the same control algorithm as the plant control device 23 (step S3).

[0031] The created operation plan is input from the operation plan evaluation device 25 to the dynamic characteristic evaluation system 24. The dynamic characteristic evaluation system 24 calculates the control state of the reactor and the margin for the thermal limit of the core 2 when the operation plan is executed (step S4).

[0032] Thereafter, the dynamic characteristic evaluation system 24 sends the calculation results to the operation plan evaluation device 25. The operation plan evaluation device 25, which has received the calculation results, determines whether the control state and the margin for the thermal limit of the core 2 are within the allowable range (step S5).

[0033] If the determination in step S5 is that the control state and the margin for the thermal limits of the core 2 are outside the permissible range (if "No"), the operation plan evaluation device 25 determines whether it is possible to change the operation plan, such as changing the switching point between control rod operation and core flow rate operation or applying feedwater temperature control, within the range of the control algorithm built into the plant control device 23 (step S6).

[0034] If it is determined in step S6 that the operation plan can be changed (if "Yes"), the process returns to step S2. In this case, the operation plan evaluation device 25 implements the change and sends the change result to the dynamic characteristic evaluation system 24. The dynamic characteristic evaluation system 24 calculates the reactor control state and the margin for the thermal limit of the core 2 when the operation plan is executed, and sends the calculation result to the operation plan evaluation device 25.

[0035] If it is determined in step S6 that the change of the operation plan is not possible (if "No"), the process returns to step S3. In this case, the operation plan evaluation device 25 outputs to the adjustment power setting device 26 the operation plan, the period of the adjustment power that can be supplied, the control state, and the maximum deviation value for the thermal limit, for the range of the set adjustment power.

[0036] If the judgment in step S5 described above indicates that the control state and the margin for the thermal limits of core 2 are within the allowable range ("Yes"), the operation plan evaluation device 25 outputs the operation plan and the control state and the margin for the thermal limits of core 2 to the operation plan output device 27 (step S7).

[0037] In the output control device 102 of the nuclear power plant 100, the adjustment power setting device 26 calculates the profit obtained by the operation plan based on the period during which the adjustment power can be supplied (the margin for the control state and the thermal limit of the core 2 is within the allowable value). In addition, in order to search for an operation plan that can obtain a higher profit, the output control device 102 narrows the range of the adjustment power to be supplied based on the deviation from the control state and the thermal limit. At this time, the range of the adjustment power is changed within a range in which the profit is not smaller than the profit evaluated based on the range and period of the feasible adjustment power before the change and the predicted value of the electricity price. By such repeated evaluation by the adjustment power setting device 26, the operation plan evaluation device 25, and the dynamic characteristic evaluation system 24, an operation plan that finally maximizes the profit is output to the operation plan output device 27. Such an output control device 102 can automatically generate an operation plan that can obtain the maximum profit among the feasible operation plans based on the latest market price trends and the core state and control state of the plant. As a result, the output control device 102 can control the power generation system 101 to efficiently obtain information on the range and period of adjustment power required for bidding in the adjustment power market quickly and without requiring a large number of personnel.

[0038] <Input screen of evaluation criteria input device> Hereinafter, the input screen of the evaluation criterion input device 28 will be described with reference to Fig. 3. Fig. 3 is an explanatory diagram showing an example of the input screen of the evaluation criterion input device 28. In the example shown in Fig. 1, the input screen of the evaluation criterion input device 28 includes a "Predicted value of wholesale electricity price" column, a "Predicted value of adjustment power price" column, and an "Evaluation execution" column.

[0039] The "Predicted wholesale electricity price" field is used to input a predicted wholesale electricity price for a predetermined time interval (every 3 hours in FIG. 3). The predicted price value can also be read from a file in CSV format, for example. The evaluation criteria input device 28 is equipped with a reading device such as a flash memory for inputting files, or is connected to a network to read file data.

[0040] The "Predicted control power price" field is where the predicted control power price for a given time interval is entered. Price predictions are entered in a file in the same way as for wholesale electricity prices. However, two types of predicted control power prices are entered: one for the increase in output side and one for the decrease in output side.

[0041] The "Evaluation" column has a "Thermal Limit" column, an "Output Control" column, a "Clear Input" button, and an "Evaluation" button. The "Thermal Limit" column is a column for specifying the thermal limit element to be used for output control. The "Output Control" column is a column for specifying the control element to be used for output control. When the plant manager selects a thermal limit element in the "Thermal Limit" column, selects a control element in the "Output Control" column, and presses the "Evaluation" button, the dynamic characteristic evaluation system 24 starts the evaluation.

[0042] <How to set the range and period of adjustment capacity> 4A and 4B, a method for setting the adjustment capability range and period in the adjustment capability setting device 26 will be described below. Figures 4A and 4B are explanatory diagrams of a method for setting the adjustment capability range and period in the adjustment capability setting device 26.

[0043] (1) FIG. 4A shows that the optimal supply amount (period and width) of the adjustment power at each time is set by the wholesale power price and the price of the adjustment power. As shown in FIG. 4A, first, the adjustment power setting device 26 sets the initial width and period of the adjustment power. At this time, an initial value is set so that the total selling price of the power and the adjustment power of the nuclear power plant 100 is maximized at each time. At that time, the optimal supply amount of the adjustment power at each time is set by the wholesale power price and the adjustment power price. For this supply amount of the adjustment power, the adjustment power setting device 26 obtains the calculation result by the dynamic characteristic evaluation system 24. Then, in determining the width of the adjustment power from the second time onwards, the adjustment power setting device 26 calculates the profit obtained by the operation plan based on the predicted values ​​of the wholesale power price and the adjustment power price during the period during which the adjustment power can be supplied (the margin for the control state and the thermal limit of the core 2 is within the allowable value).

[0044] (2) FIG. 4B shows that the supply amount of the regulation power (period and width) is adjusted so that the width of the regulation power is changed according to the deviation ratio. As shown in FIG. 4B, next, the regulation power setting device 26 changes the width and period of the regulation power. At this time, the regulation power setting device 26 reduces the width of the regulation power according to the period of the regulation power, the control state, and the deviation ratio of the deviation of the thermal limit value. However, the reduction of the regulation power is adjusted within a range in which the profit is not smaller than the profit obtained in the previous iteration. For example, in order to search for an operation plan that can obtain a higher profit, the regulation power setting device 26 reduces the width of the regulation power supplied according to the excess ratio for the control state and the thermal limit. Then, the regulation power setting device 26 creates an operation plan in the operation plan evaluation device 25 after adjusting the width of the regulation power, and compares the profit obtained as a result of the operation plan with the previous value. In this way, the regulation power setting device 26 repeats iterative evaluation with the operation plan evaluation device 25 until the width of the regulation power that maximizes the profit is obtained.

[0045] <Operation plan> 5A, an operation plan created by the operation plan evaluation device 25 will be described. FIG. 5A is an explanatory diagram of an operation plan created by the operation plan evaluation device 25.

[0046] In the example shown in FIG. 5A, the horizontal axis is time, the vertical axis is generator output, the thick line represents core flow control, the thin line represents control rod control, and the dashed line represents the plan when the adjustment capability is executed. The operation plan evaluation device 25 creates and updates the operation plan so as to conform to the adjustment capability set by the adjustment capability setting device 26. In the example shown in FIG. 5A, the operation plan is set to bid on the adjustment capability market under the condition of a 50% output increase from 6 hours to 12 hours after the start of the operation plan, and to provide power to the wholesale power market during the rest of the time. The operation plan evaluation device 25 incorporates an output control algorithm that performs core flow control from 100% to 70% when changing the output, and performs control rod control when changing the output from 70% to 50%. In this embodiment, the output control algorithm incorporated in the operation plan evaluation device 25 and the output control algorithm incorporated in the plant control device 23 are described as being the same. The power generation system 101 reduces its power output by using the core diversion 5 hours after the start of the operation plan, and when the power output reaches 70%, it switches to reducing the power output by inserting control rods.

[0047] <Control rod group division> Hereinafter, the control rod group division will be described with reference to Fig. 5B. Fig. 5B is an explanatory diagram of the control rod group division. As shown in Fig. 5B, in the power adjustment by the control rods, a plurality of control rods belonging to any control rod group are simultaneously operated (inserted or withdrawn).

[0048] <Control rod operation procedure> The control rod operation procedure will be described below with reference to Fig. 5C. Fig. 5C is an explanatory diagram of the control rod operation procedure. As shown in Fig. 5C, the operation sequence is predetermined, and the rods are inserted in this order when reducing the power output. When the power output has decreased to 50% six hours after the start of the operation plan, the reactor enters a standby state for the supply of regulating power.

[0049] The numbers 1 to 30 written in one horizontal row in FIG. 5C indicate the procedure numbers. The values ​​Gr1 to Gr8 written in one vertical column indicate the control rod groups (see FIG. 5B). Incidentally, the left diagram of FIG. 5B shows the grouping and arrangement of the control rods of Gr1 to Gr5, and the right diagram of FIG. 5B shows the grouping and arrangement of the control rods of Gr6 to Gr8. The values ​​"32" and "4" written in two horizontal rows and two vertical columns in FIG. 5C indicate that "32" represents the withdrawal limit, which is the stop position for continuous operation, and "4" represents the number of steps in block operation in which multiple steps are operated at once (0 to 32 steps are operated in four steps at a time). The control rod control device 4 operates the number of steps shown in FIG. 5C in one operation based on the command of the operation method from the plant control device 23, that is, the designation of continuous operation, block operation, or one-step operation. The values ​​written in the columns other than the two horizontal rows and two vertical columns in FIG. 5C are similar to these.

[0050] In the standby state for supply of the control power, the operation plan evaluation device 25 creates operation plans for multiple cases in order to confirm that the output increase of the designated control power can be realized at any time. For example, the operation plan evaluation device 25 creates a total of eight operation plans, including seven operation plans in which the control power is supplied with a 50% output increase every hour, such as after 6 hours and 7 hours, and one operation plan in which the output is returned to the original 100% without executing the control power. Then, the dynamic characteristic evaluation system 24 sequentially performs dynamic characteristic calculations. The operation plan evaluation device 25 reads, from the dynamic characteristic evaluation system 24, the operation range of the control rods and the change range of the core flow rate as the control state of each case, and the strictest value of the margin (or deviation amount) for the thermal limit of the core 2 as the core state. At this time, if the read control state and core state can be improved by applying a special control algorithm different from the usual one incorporated in the plant control device 23 and there is a possibility that the period of the control power can be increased, the operation plan evaluation device 25 re-creates an operation plan using the special control algorithm.

[0051] The special control algorithm referred to here is an algorithm that changes the operation plan as follows. For example, when the core flow rate exceeds the normal control range and becomes a low flow rate in the high power state after the power is increased, the special control algorithm increases the power by operating (increasing) the recirculation flow rate in the power range where the power is increased by operating (withdrawing) the control rods, and changes the operation plan so that the recirculation flow rate is within the normal control range in the high power state. Conversely, when the recirculation flow rate becomes higher than the normal control range in the high power state after the power is increased, the special control algorithm decreases the recirculation flow rate in the high power state and changes the operation plan so that it is within the normal control range by increasing the power by using the control rods (withdrawing) in the power range where the power is increased by the recirculation flow rate.

[0052] Also, for example, if the vertical power distribution after a power increase is biased toward the upper portion and thus exceeds the thermal limit value in the upper portion, in the power range in which the power increases with the core flow rate, the coolant temperature at the core inlet is lowered by controlling the feedwater temperature to increase the power, thereby lowering the recirculation flow rate in the high power state and shifting the vertical power distribution downward to avoid exceeding the thermal limit value in the upper portion. Furthermore, if the core flow rate exceeds the control range when controlling the power with the core flow rate due to the influence of xenon, a control algorithm can be applied that temporarily controls the feedwater temperature to increase or decrease the power, and returns the feedwater temperature to its original state after the influence of xenon has decreased over time.

[0053] <Output screen of the operation plan output device> Hereinafter, the output screen of the operation plan output device 27 will be described with reference to FIG. 6. FIG. 6 is an explanatory diagram showing an example of the output screen of the operation plan output device 27. In the example shown in FIG. 6, the output screen of the operation plan output device 27 is configured to add the adjustment reserve supply amount of each operation plan in addition to the operation plans created by the operation plan evaluation device 25. By providing such an output screen to the plant manager, the output control device 102 can allow the plant manager to immediately understand the period for bidding in the adjustment reserve market and the range of adjustment reserve that can be supplied, and can allow the plant manager to bid quickly. As a result, the output control device 102 can maximize profits and provide a stable supply of power. In addition, the output control device 102 can reduce the plant manager's bidding decision work and concentrate human resources on work such as ensuring safety.

[0054] 6, a "download" button (button for sending the operation plan) is displayed on the output screen. When the plant manager presses the "download" button, the output control device 102 causes the plant control device 23 to read the operation plan created by the operation plan output device 27, and the plant control device 23 can automatically operate the power generation system 101 according to the optimal operation plan.

[0055] <Major features of nuclear power plants> (1) As shown in Fig. 1, a nuclear power plant 100 according to this embodiment includes a power generation system 101 and an output control device 102. The output control device 102 includes an evaluation criterion input device 28 for inputting market price forecast values ​​for wholesale power and demand adjustment, an adjustment power setting device 26 for setting an adjustment power supply amount for supply and demand adjustment based on the price forecast values ​​and information on the core and plant state including at least the margin for the thermal limit of the core 2 and the control rod position, an operation plan evaluation device 25 for generating an operation plan from the adjustment power supply amount and evaluating the feasibility of the plan, a dynamic characteristic evaluation system 24 for evaluating the core and plant state based on the operation plan, and an operation plan output device 27 for outputting an operation plan obtained by iterative evaluation of the adjustment power setting device 26 and the operation plan evaluation device 25.

[0056] The nuclear power plant 100 according to this embodiment can automatically generate an operation plan that can obtain the maximum profit among feasible operation plans based on, for example, the latest market price trends and the reactor core state and control state of the plant. This allows the nuclear power plant 100 to obtain an operation plan with high operability that includes the range and period of adjustment power required for bidding in the adjustment power market.

[0057] (2) In the nuclear power plant 100 according to this embodiment, the margin of the thermal limitations of the core 2 includes any one of the maximum linear power density, the critical power ratio or the critical heat flux ratio, the axial offset, the control rod position, the core coolant flow rate, the coolant temperature, and the boron concentration of the core 2, or a combination of a plurality of these.

[0058] The nuclear power plant 100 according to this embodiment can create an operation plan in which these items are treated as thermal limiting elements or control elements used for output control.

[0059] (3) In the nuclear power plant 100 according to this embodiment, the power control device 102 outputs a control signal to the power generation system 101 to control the power output by manipulating any one of the control rods, the core flow rate, the reactor pressure, the feedwater temperature, the bypass valve opening, and the reactor water boron concentration, or a combination of two or more of these.

[0060] The nuclear power plant 100 according to this embodiment can create an operation plan in which these items are treated as thermal limiting elements or control elements used for output control.

[0061] (4) As shown in FIG. 1 , in the nuclear power plant 100 according to this embodiment, the dynamic characteristic evaluation system 24 outputs the initial core and plant state and the core and plant state for the evaluation period obtained according to the operation plan to the operation plan evaluation device 25 based on the neutron kinetics calculation and the thermal-hydraulic kinetics calculation.

[0062] The nuclear power plant 100 according to this embodiment can repeatedly change and evaluate the range of adjustment capability in the operation plan between the dynamic characteristic evaluation system 24 and the operation plan evaluation device 25 so as to maximize profits, thereby making it possible to obtain an optimal operation plan.

[0063] As described above, according to the nuclear power plant 100 of the first embodiment, it is possible to obtain an operation plan with high operability that includes the width and period of adjustment capability. In addition, by submitting bids based on operation plans that take into account the latest market trends and plant conditions, profits can be maximized, contributing to a stable supply of electricity. It also reduces the workload of plant managers in deciding on bids, allowing them to concentrate human resources on tasks such as ensuring safety.

[0064] [Embodiment 2] In the second embodiment, a nuclear power plant 100A (see FIG. 7) is provided in which an AI (Artificial Intelligence) function is incorporated into the dynamic characteristic evaluation system 24 (see FIG. 1) of the nuclear power plant 100 according to the first embodiment described above.

[0065] The configuration of the nuclear power plant 100A according to the second embodiment will be described below with reference to Fig. 7. Fig. 7 is an explanatory diagram of a dynamic characteristic evaluation system 24 for the nuclear power plant 100A according to the second embodiment.

[0066] As shown in FIG. 7, a nuclear power plant 100A according to the second embodiment differs from the nuclear power plant 100 according to the first embodiment (see FIG. 1) in that a power control device 102A is provided instead of the power control device 102.

[0067] The output control device 102A of the second embodiment is a device in which an AI function (machine learning function) is built into the dynamic characteristic evaluation system 24.

[0068] As shown in FIG. 7, in the second embodiment, the dynamic characteristic evaluation system 24 of the power control device 102A has an input layer 24a, an intermediate layer 24b, and an output layer 24c. In the example shown in FIG. 7, the input layer 24a has five input nodes, and input parameters of the cycle burnup, the initial core flow rate, the initial control rod position, the margin to the initial thermal limit, and the operation plan created by the operation plan evaluation device 25 are input to each node. The intermediate layer 24b has three intermediate nodes. The output layer 24c has four output nodes, and output parameters of the minimum margin (deviation amount) to the thermal limit, the maximum withdrawal amount of the control rod, the range of the core flow rate, and the period during which the adjustment power can be supplied are output from each node.

[0069] The dynamic characteristic evaluation system 24 of the output control device 102A calculates dynamic characteristics by changing the five parameters selected as input nodes, and performs learning offline in advance using the results of the dynamic characteristic calculation. This allows the dynamic characteristic evaluation system 24 of the output control device 102A to obtain results such as the period during which regulation power can be supplied and the margin for thermal limitations directly from the five input parameters without performing physical calculations.

[0070] The dynamic characteristic evaluation system 24 of the power control device 102A can perform machine learning of the core and plant state during the evaluation period obtained according to the initial core and plant state and the operation plan based on, for example, neutron kinetics calculation and thermal hydraulic kinetics calculation. The dynamic characteristic evaluation system 24 of the power control device 102A can output the core and plant state during the evaluation period to the operation plan evaluation device 25 by inputting the initial core and plant state and the operation plan.

[0071] Since the output control device 102A of this embodiment 2 has a dynamic characteristic evaluation system 24 incorporating such an AI function, the response time of the dynamic characteristic evaluation system 24 can be shortened compared to the output control device 102 of the above-mentioned embodiment 1, enabling quick bidding that is close to real time.

[0072] [Embodiment 3] In the second embodiment, a nuclear power plant 100B (see FIG. 8) is provided that includes an operation plan selecting device 29 instead of the dynamic characteristic evaluation system 24 (see FIG. 1) and the operation plan evaluating device 25 (see FIG. 1).

[0073] Hereinafter, the configuration of the nuclear power plant 100B according to the present embodiment 3 will be described with reference to Fig. 8 and Fig. 9. Fig. 8 is an overall configuration diagram of the nuclear power plant 100B according to the present embodiment 3. Fig. 9 is an explanatory diagram of the operation plan selection device 29 of the nuclear power plant 100B according to the present embodiment 3.

[0074] As shown in FIG. 8, a nuclear power plant 100B according to the third embodiment differs from the nuclear power plant 100 according to the first embodiment (see FIG. 1) in that it is equipped with an output control device 102A instead of the output control device 102.

[0075] The output control device 102B of this embodiment 3 differs from the output control device 102 of the embodiment 1 described above in that it has an operation plan selection device 31 instead of the dynamic characteristic evaluation system 24 (see Figure 1) and the operation plan evaluation device 25 (see Figure 1).

[0076] The operation plan selection device 29 selects an operation plan pattern that satisfies the period of the control power required by the control power setting device 26. The operation plan selection device 31 stores a large number of operation plans that can be realized from rated operation that have been previously evaluated offline. For example, the operation plan selection device 31 stores in advance a number of operation plan patterns that can comply with thermal limits and achieve a controlled state even under the most severe conditions that can be assumed for the initial core and plant state. Then, the operation plan selection device 31 selects an operation plan pattern that satisfies the period of the control power required by the control power setting device 26 from these patterns.

[0077] 9, when the operation plan selection device 31 selects a pattern that satisfies the period of adjustment power requested by the adjustment power setting device 26, it outputs the selected pattern to the adjustment power setting device 26. In other words, the adjustment power setting device 26 acquires the operation plan stored in the operation plan selection device 29 from the operation plan selection device 29. In addition, the adjustment power setting device 26 communicates with an external device (not shown) and acquires a predicted value of the electricity market price from the external device.

[0078] An output control device 102B having such an operation plan selection device 31 can automatically select an operation plan pattern that satisfies the period of adjustment power requested by the adjustment power setting device 26, based on the predicted value of the electricity market price obtained from an external device.

[0079] In addition, in other embodiments other than the above-mentioned embodiment 1 (for example, the nuclear power plant 100A according to embodiment 2 shown in FIG. 7), an operation plan selection device 31 may be provided instead of the dynamic characteristic evaluation system 24 and the operation plan evaluation device 25.

[0080] [Embodiment 4] In the fourth embodiment, a nuclear power plant 100C (see FIG. 10) equipped with a power price prediction device 30 is provided.

[0081] The configuration of the nuclear power plant 100C according to the fourth embodiment will be described below with reference to Fig. 10. Fig. 10 is an overall configuration diagram of the nuclear power plant 100C according to the fourth embodiment.

[0082] As shown in FIG. 10, a nuclear power plant 100C according to this embodiment 4 differs from the nuclear power plant 100 according to the above-described embodiment 1 (see FIG. 1) in that it is equipped with an output control device 102C instead of the output control device 102.

[0083] The output control device 102C of the fourth embodiment differs from the output control device 102 of the first embodiment in that it includes a power price prediction device 30.

[0084] The electricity price prediction device 30 predicts the electricity market price that has been input from outside in the nuclear power plant 100 (see FIG. 1) according to the above-described embodiment 1, and inputs it to the evaluation criterion input device 28. The electricity price prediction device 30 predicts the future electricity market price based on any one of past price information in the electricity market, electricity demand information, operation and failure information of other power generation facilities, and weather information, or a combination of a plurality of these. Then, the electricity price prediction device 30 outputs the predicted future electricity market price to the evaluation criterion input device 28.

[0085] The output control device 102C having such a power price prediction device 30 can automatically obtain a price prediction value in the power market based on the latest information at a timing when an operation plan needs to be evaluated by the power price prediction device 30. Therefore, the output control device 102C can improve the prediction accuracy more than the output control device 102 (see FIG. 1) of the above-mentioned embodiment 1.

[0086] The power price prediction device 30 may also be provided in other embodiments other than the first embodiment (for example, the nuclear power plant 100A according to the second embodiment shown in FIG. 7 and the nuclear power plant 100B according to the third embodiment shown in FIG. 8).

[0087] The present invention is not limited to the above-described embodiment, and includes various modified examples. For example, the above-described embodiment has been described in detail to easily explain the present invention, and is not necessarily limited to having all of the configurations described. In addition, it is possible to replace a part of the configuration of the embodiment with another configuration, and it is also possible to add another configuration to the configuration of the embodiment. In addition, it is possible to add, delete, or replace a part of each configuration with another configuration. [Explanation of symbols]

[0088] 1. Reactor Pressure Vessel 2. Core 3. Control Rods 4. Control Rod Control Device 5 Recirculation Pump 6 Recirculation control device 7. Neutron Flux Detector 8. Output monitoring device 9 Pressure Control Device 10. Regulating valve 11 High Pressure Turbine 12 Moisture separation heater 13 Low Pressure Turbine 14. Generator 15 Condenser 16 Bypass valve 17 Water Pump 18 Low pressure feed water heater 19 High pressure feed water heater 20 Bleed valve 21 Water supply temperature control device 22 Generator output detector 23 Plant Control Device 24 Dynamic characteristics evaluation system 24a Input layer 24b Middle class 24c output layer 25 Operation plan evaluation device 26 Adjustment force setting device 27 Operation plan output device 28 Evaluation criteria input device 29 Operation plan selection device 30 Electricity price forecasting device 100, 100A, 100B, 100C Nuclear Power Plant 101 Power Generation System 102, 102A, 102B, 102C Output control device

Claims

1. A power generation system; An output control device, The output control device includes: an evaluation criterion input device for inputting market price forecast values ​​for wholesale electricity and demand adjustment; an adjustment power setting device that sets an adjustment power supply amount for adjusting supply and demand based on information on the price forecast value and the core / plant state including at least the margin for the thermal limit of the core and the control rod position; an operation plan evaluation device that generates an operation plan from the adjustment power supply amount and evaluates the feasibility of the plan; a dynamic characteristic evaluation system for evaluating a reactor core / plant state based on the operation plan; and an operation plan output device that outputs an operation plan obtained by iterative evaluation by the adjustment power setting device and the operation plan evaluation device.

1. A nuclear power plant comprising:

2. 2. The nuclear power plant according to claim 1, The margin for the thermal constraints of the core includes any one of the maximum linear power density of the core, the critical power ratio or the critical heat flux ratio, the axial offset, the control rod position, the core coolant flow rate, the coolant temperature, and the boron concentration, or a combination of a plurality of these.

1. A nuclear power plant comprising:

3. 2. The nuclear power plant according to claim 1, The power control device outputs a control signal to the power generation system to control the power output by manipulating any one of the control rods, the core flow rate, the reactor pressure, the feed water temperature, the bypass valve opening degree, and the reactor water boron concentration, or a combination of a plurality of these.

1. A nuclear power plant comprising:

4. 2. The nuclear power plant according to claim 1, The dynamic characteristic evaluation system outputs to the operation plan evaluation device an initial core / plant state and a core / plant state during an evaluation period obtained according to the operation plan based on a neutron dynamic characteristic calculation and a thermal hydraulic dynamic characteristic calculation.

1. A nuclear power plant comprising:

5. 2. The nuclear power plant according to claim 1, The dynamic characteristic evaluation system performs machine learning on the initial core / plant state and the core / plant state during the evaluation period obtained according to the operation plan based on neutron dynamic characteristic calculations and thermal hydraulic dynamic characteristic calculations, and outputs the core / plant state during the evaluation period to the operation plan evaluation device by inputting the initial core / plant state and the operation plan.

1. A nuclear power plant comprising:

6. A power generation system; An output control device, The output control device includes: an evaluation criterion input device for inputting market price forecast values ​​for wholesale electricity and demand adjustment; an adjustment power setting device that sets an adjustment power supply amount for adjusting supply and demand based on information on the price forecast value and the core / plant state including at least the margin for the thermal limit of the core and the control rod position; and an operation plan selection device that stores in advance a plurality of operation plan patterns that can comply with thermal limits and realize a control state even under the most severe conditions that can be imagined for an initial core / plant state, and selects a pattern that satisfies the period of adjustment power required by the adjustment power setting device from these patterns.

1. A nuclear power plant comprising:

7. The nuclear power plant according to claim 1 or 6, The output control device includes: The present invention further includes an electricity price prediction device that predicts future electricity market prices based on any one of past price information in the electricity market, electricity demand information, operation and failure information of other power generation facilities, and weather information, or a combination of a plurality of these, and outputs the prediction results to the evaluation criterion input device.

1. A nuclear power plant comprising:

8. an evaluation criterion input device for inputting market price forecast values ​​for wholesale electricity and demand adjustment; an adjustment power setting device that sets an adjustment power supply amount for adjusting supply and demand based on information on the price forecast value and the core / plant state including at least the margin for the thermal limit of the core and the control rod position; an operation plan evaluation device that generates an operation plan from the adjustment power supply amount and evaluates the feasibility of the plan; a dynamic characteristic evaluation system for evaluating a reactor core / plant state based on the operation plan; and an operation plan output device that outputs an operation plan obtained by iterative evaluation by the adjustment power setting device and the operation plan evaluation device.

2. An output control device for a nuclear power plant comprising:

9. 9. The output control device for a nuclear power plant according to claim 8, The present invention further includes an electricity price prediction device that predicts future electricity market prices based on any one of past price information in the electricity market, electricity demand information, operation and failure information of other power generation facilities, and weather information, or a combination of a plurality of these, and outputs the prediction results to the evaluation criterion input device.

2. An output control device for a nuclear power plant comprising:

Citation Information

Patent Citations

  • Load follow-up operation system of nuclear power plant

    JP1986165690A

  • Operation designing device for nuclear power plant

    JP1987293197A

  • Preparing equipment of reactor operation plan

    JP1993232291A

  • Output control apparatus and method for nuclear power plant

    JP2017194312A