Maintenance support device and maintenance support method

The maintenance support device addresses the lack of part arrival status and urgency indication by generating detailed maintenance plans based on abnormality signs, ensuring planned equipment maintenance.

JP2024140989AActive Publication Date: 2024-10-10HIATACHI POWER SOLUTIONS CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2023052393
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-28
Publication Date
2024-10-10
Estimated Expiration
2043-03-28

AI Technical Summary

Technical Problem

Existing maintenance support methods fail to indicate the arrival status of replacement parts and the degree of urgency for maintenance work, making it impossible to plan maintenance work effectively.

Method used

A maintenance support device and method that includes a processing unit to extract information from databases based on abnormality sign detection, determining maintenance work details, necessary parts, and urgency levels, generating support information in a predetermined format.

Benefits of technology

Enables planned maintenance actions to prevent equipment from sudden stops by providing timely information on parts availability and urgency levels.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024140989000001_ABST
    Figure 2024140989000001_ABST
Patent Text Reader

Abstract

To provide a maintenance support device which can avoid a sudden stop of mechanical equipment and take a countermeasure against an abnormality sign in a planned manner when detecting the abnormality sign in the mechanical equipment.SOLUTION: A maintenance support device 100 supports maintenance work when performing maintenance against an abnormality sign of mechanical equipment. A processing section 10 is configured to: acquire abnormality sign information 31 including diagnostic timing having detected the abnormality sign, an abnormality sign name indicating the name of the abnormality sign, and abnormality occurrence timing when an abnormality caused by the abnormality sign occurs; extract related information 210 on the maintenance work for taking a countermeasure against the abnormality sign from a maintenance work data base 21 on the basis of the diagnostic timing, the abnormality sign name, and the abnormality occurrence timing, and configure maintenance work information 2A; extract related information 220 on components required for the maintenance work from a component data base 22 and configure component information 2B; calculate a countermeasure urgent degree 2C indicating an urgent degree of the maintenance work; and generate maintenance support information 41 constituted of the maintenance work information 2A, the component information 2B, and the countermeasure urgent degree 2C.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a maintenance support device and a maintenance support method. [Background technology]

[0002] In production lines, numerous machines and equipment are installed to perform processing, etc., and abnormality sign diagnostic systems are being introduced to detect malfunctions of these machines and equipment before they occur. Accordingly, maintenance support methods for dealing with abnormality signs have been proposed.

[0003] Patent Document 1 discloses a maintenance support method that detects signs of abnormality in a storage element based on measurement data on the storage element that is sequentially stored in a storage device, determines at least one of the duration of maintenance work corresponding to the detected signs of abnormality, the number of workers, and items including replacement parts or tools required for the maintenance work, and notifies the maintenance workers of the determined items and the implementation of the maintenance work corresponding to the determined items. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] International Publication No. 2020 / 255980 Summary of the Invention [Problem to be solved by the invention]

[0005] In the technology disclosed in Patent Document 1, signs of abnormality in an energy storage element are detected based on accumulated data of past measurement data of the energy storage element, and the corresponding maintenance work period, number of workers, and replacement parts or tools required for the maintenance work are determined and notified to the workers, but the availability status of the replacement parts and the urgency of the maintenance work are not indicated. Therefore, the problem is that it is not possible to plan for systematically performing maintenance work.

[0006] The present invention has been made in consideration of the above-mentioned problems, and aims to provide a maintenance support device and a maintenance support method that can avoid sudden shutdown of mechanical equipment when signs of an abnormality are detected in the mechanical equipment, and can take measures against the signs of an abnormality in a planned manner. [Means for solving the problem]

[0007] In order to achieve the above object, the maintenance support device of the present invention is a maintenance support device that supports maintenance work when performing maintenance for a sign of abnormality of a mechanical equipment, the maintenance support device includes a processing unit, the processing unit acquires abnormality sign information including a diagnosis time when the abnormality sign is detected, an abnormality sign name indicating a name of the abnormality sign, and an abnormality occurrence time when an abnormality caused by the abnormality sign occurs, extracts related information of maintenance work for dealing with the abnormality sign from a maintenance work database based on the diagnosis time, the abnormality sign name, and the abnormality occurrence time to configure maintenance work information, extracts related information of parts required for the maintenance work from a parts database to configure parts information, calculates a countermeasure urgency indicating a degree of urgency of the maintenance work, and generates maintenance support information composed of the maintenance work information, the parts information, and the countermeasure urgency. Other aspects of the present invention will be described in the embodiments described later. Effect of the Invention

[0008] According to the present invention, when a sign of an abnormality is detected in mechanical equipment, the mechanical equipment can be prevented from suddenly stopping, and measures can be taken to deal with the sign of an abnormality in a planned manner. [Brief description of the drawings]

[0009] [Figure 1] 1 is a diagram illustrating a configuration of a maintenance support device according to an embodiment of the present invention. [Diagram 2] FIG. 1 is a diagram illustrating a database structure. [Diagram 3] 13 is a flowchart showing a maintenance support process. [Figure 4] FIG. 13 is a diagram illustrating a method for calculating the urgency of a countermeasure. [Diagram 5]FIG. 13 is a diagram showing a format for printing details of maintenance support information. [Figure 6] FIG. 2 is a diagram illustrating an example of a database. [Figure 7] FIG. 13 is a diagram illustrating an example of an output of maintenance support information. [Figure 8] FIG. 11 is a diagram showing another example of output of maintenance support information. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment for carrying out the present invention will be described in detail with reference to the accompanying drawings. 1 is a diagram showing the configuration of a maintenance support device 100 according to this embodiment. The maintenance support device 100 has a processing unit 10, a storage unit 20, an input unit 30, and an output unit 40. The maintenance support device 100 is a device that receives anomaly sign information 31 from an anomaly sign diagnosis system 500 as input, and outputs maintenance support information 41. The anomaly sign diagnosis system 500 is a system that diagnoses anomaly signs in a plurality of pieces of mechanical equipment 600.

[0011] The maintenance support device 100 of this embodiment is a maintenance support device that cooperates with an abnormality sign diagnosis system 500 that diagnoses abnormality signs of mechanical equipment 600, and performs preventive maintenance to avoid sudden stoppage due to the occurrence of an abnormality in the mechanical equipment 600 and to perform planned stoppage. Also, the maintenance support device is a maintenance support device that supports maintenance work when performing maintenance for abnormality signs of the mechanical equipment 600.

[0012] The maintenance support device 100 includes a processing unit 10, which acquires abnormality sign information 31 including a diagnosis time 311 when an abnormality sign was detected, an abnormality sign name 312 indicating the name of the abnormality sign, and an abnormality occurrence time 313 when an abnormality caused by the abnormality sign occurs, and based on the diagnosis time 311, the abnormality sign name 312, and the abnormality occurrence time 313, extracts related information 210 of maintenance work to deal with the abnormality sign from a maintenance work database 21 to configure maintenance work information 2A, extracts related information 220 of parts required for the maintenance work from a parts database 22 to configure parts information 2B, calculates a countermeasure urgency 2C indicating the degree of urgency of the maintenance work, and generates maintenance support information 41 consisting of the maintenance work information 2A, the parts information 2B, and the countermeasure urgency 2C.

[0013] The maintenance support device 100 is configured as a general computer system (computer), and as described above, includes the processing unit 10 (central processing unit), the storage unit 20, the input unit 30, and the output unit 40. The abnormality sign diagnosis system 500 may be configured within the same computer system, or may be configured as a separate computer system.

[0014] Each part will be explained in detail. The maintenance support device 100 acquires abnormality sign information 31 from the abnormality sign diagnosis system 500 via the input unit 30. The abnormality sign information 31 is acquired as a signal including a diagnosis time 311 indicating the time when the abnormality sign was detected, an abnormality sign name 312 indicating the name of the abnormality sign, and an abnormality occurrence time 313 when the abnormality caused by the abnormality sign occurs.

[0015] 1, when the abnormality sign diagnosis system 500 is diagnosing multiple pieces of machinery and equipment 600, for example, the site name and the machine number are linked as header information of the abnormality sign information 31. Therefore, the maintenance support device 100 can support the maintenance work when performing maintenance on multiple pieces of machinery and equipment 600 in response to abnormality signs of the machinery and equipment.

[0016] Upon acquiring the abnormality sign information 31, the processing unit 10 extracts related information 210 of maintenance work to deal with the abnormality from the maintenance work database 21 constructed in the storage unit 20, and extracts related information 220 of parts necessary for the maintenance work from the parts database 22 constructed in the storage unit 20. Furthermore, the processing unit 10 calculates a countermeasure urgency 2C indicating the degree of urgency of the maintenance work to deal with the abnormality. Furthermore, the processing unit 10 generates maintenance support information 41 from maintenance work information 2A which is related information of the maintenance work, part information 2B which is related information of the necessary parts, and the countermeasure urgency 2C. Then, the processing unit 10 prints and outputs the maintenance support information 41 in a prescribed format.

[0017] FIG. 2 is a diagram showing the database structure. Each record in the maintenance work database 21 is made up of fields for an abnormality sign name 211, number of maintenance work days 212, parts to be maintained 213, number of personnel required 214, and maintenance work content 215. The number of maintenance work days 212 indicates the number of work days required to take measures against the abnormality sign indicated by the abnormality sign name, the parts to be maintained 213 indicates replacement parts required to take measures against the abnormality sign, the number of personnel required 214 indicates the number of replacement parts required to take measures against the abnormality sign, and the maintenance work content 215 indicates the specific maintenance content.

[0018] Each record in the parts database 22 is made up of fields for part name 221, stock quantity 222, arrival date 223, and supplier 224. The parts database 22 is a database that accumulates information on parts related to maintaining the machine equipment to be maintained, and the stock quantity 222 indicates the number of parts indicated by the part name that are on hand, the arrival date 223 indicates the number of days required for the part to arrive when it is ordered, and the supplier 224 indicates the manufacturer ordering the part, etc.

[0019] If only one of each part is installed on a piece of machinery, the target part can be identified simply by the part name. If multiple identical parts are installed on a piece of machinery, they can be identified by (1) the part name and installation coordinates, and (2) the device number assigned to each part.

[0020] Fig. 3 is a flowchart showing the maintenance support process S10. Fig. 1 and Fig. 2 are referred to as appropriate. When the processing unit 10 acquires the abnormality sign information 31 from the abnormality sign diagnosis system 500 (step S11), the processing unit 10 searches the maintenance work database 21 for the same abnormality sign name using the abnormality sign name included in the abnormality sign information 31 as a key, and extracts the number of maintenance work days 212, the maintenance target parts 213, the number of required personnel 214, and the maintenance work content 215 linked to the abnormality sign name (step S12). Furthermore, the processing unit 10 searches the parts database 22 for the same part name 221 using the maintenance target parts 213 as a key, and extracts the inventory quantity 222, the arrival date 223, and the order destination 224 linked to the part name (step S13).

[0021] After extracting these data, the processing unit 10 constructs maintenance work related information 210 based on the abnormality sign name 211, number of days for maintenance work 212, parts to be maintained 213, number of personnel required 214, and maintenance work content 215 (step S14), and constructs required parts related information 220 based on the part name 221, stock quantity 222, number of days until arrival 223, and supplier 224 (step S15).

[0022] Furthermore, the processing unit 10 calculates the urgency 2C of measures against the abnormality sign based on the number of maintenance work days 212, the parts to be maintained 213, and the number of required personnel 214 in the maintenance work database 21, and the stock quantity 222 and the number of days until arrival 223 in the parts database 22 (step S16, see FIG. 4).Then, the processing unit 10 composes maintenance support information 41 (step S17) and outputs it by printing it in a predetermined format (step S18).

[0023] Next, a method for calculating the countermeasure urgency level 2C will be explained. Fig. 4 is a diagram showing a method for calculating the countermeasure urgency 2C. Fig. 4 shows countermeasure urgency determination conditions 51 and a diagram explaining the number of possible response days 52. The number of possible response days is calculated as the number of days from the detection of a sign of abnormality, which is the diagnosis time, to the time when the abnormality is actually predicted to occur.

[0024] The countermeasure urgency determination conditions 51 are as follows. As (Condition 1), when (inventory quantity ≧ number of required personnel) and (number of maintenance work days ≦ number of available days) are met, the urgency of the countermeasure is determined to be low. If the inventory quantity on hand is sufficient for the number of personnel required for the parts to be maintained, there is no need to place a new order for the parts to be maintained. Furthermore, if the number of available days is guaranteed to be equal to or greater than the number of maintenance work days, the machinery equipment to be maintained can be shut down as planned to carry out the maintenance work, so the urgency of the countermeasure 2C can be determined to be low.

[0025] As (Condition 2), the urgency of countermeasures is judged to be low when (inventory quantity < number of required personnel) and ((number of days for arrival + number of days for maintenance work) <= number of days available for response) are also met. If the inventory quantity on hand, that is, the number of days required for the parts to be maintained, is not sufficient for the number of personnel required for the parts to be maintained, then new orders for the parts to be maintained must be placed. Under this condition, the number of days required for the parts to be maintained is an important factor. In other words, if the number of days available for response is ensured to be equal to or greater than (number of days for arrival + number of days for maintenance work), then even if (inventory quantity < number of required personnel), it is possible to systematically shut down the machinery and equipment to be maintained and carry out maintenance work, so it is possible to judge the urgency of countermeasures 2C as low.

[0026] When (Condition 1) or (Condition 2) is not satisfied, the urgency of the countermeasure is determined to be 2C, which is high, and the urgency of the maintenance work is conveyed to the maintenance worker.

[0027] Although the method for determining the urgency of countermeasures has been described above, various methods can be used. The number of possible response days is the maximum number of days that the machinery and equipment can be stopped based on its importance. For example, the response urgency can be set to high for emergency power generation equipment in a hospital, and low for consumer products such as air conditioners. It is a good idea to set the response urgency for each piece of machinery and equipment in advance, without having to calculate the number of days.

[0028] In addition, the degree of urgency of response may be set in advance based on the contents of the abnormality sign. It is advisable to set the degree of urgency of response high if the abnormality that actually occurs based on the abnormality sign that has occurred is a major malfunction, and set the degree of urgency of response low if the abnormality that actually occurs based on the abnormality sign that has occurred is a minor malfunction.

[0029] The processing unit 10 constructs maintenance work-related information and necessary part-related information, calculates the degree of urgency of countermeasures, and outputs the information by printing it on a prescribed format 41P. Based on the printed format, the worker starts preparations for taking countermeasures against the abnormality signs.

[0030] 5 is a diagram showing a form 41P on which details of maintenance support information are printed. The form 41P has columns for maintenance work related information 210, necessary parts related information 220, and countermeasure urgency 2C. The maintenance work related information 210 has columns for abnormality sign name 211, number of maintenance work days 212, parts to be maintained 213, number of personnel required 214, and maintenance work content 215. The necessary parts related information 220 has columns for part name 221, number in stock 222, number of days until arrival 223, and supplier 224.

[0031] <Example> Fig. 6 is a diagram showing an example of the database, with reference to Fig. 1 as necessary. This example shows an example of an emergency power generation facility. The maintenance support device 100 acquires abnormality sign information 31 from an abnormality sign diagnosis system 500 that monitors the emergency power generation facility (see FIG. 1). The abnormality sign information 31 includes cooling pipe damage as the abnormality sign name 312, three days before as the diagnosis time 311, and 30 days after as the abnormality occurrence time 313.

[0032] The processing unit 10 searches for "cooling pipe damage" from the abnormality sign name 211 in the maintenance work database 21 shown in Fig. 6, and extracts "5" as the number of associated maintenance work days 212, "cooling hose" and "tube connector" as the maintenance target parts 213, "1" and "2" as the number of required personnel 214, and "replacement of pipe" as the maintenance work content 215. Furthermore, the processing unit 10 extracts "3" as the stock quantity 222, "7" as the number of days until arrival 223, and "Company A" as the supplier 224 for "cooling hose" from the parts database 22, and extracts "10" as the stock quantity 222, "3" as the number of days until arrival 223, and "Company A" as the supplier 224 for "tube connector."

[0033] Furthermore, the processing unit 10 confirms that the inventory of "cooling hoses" and "tube connectors" is equal to or greater than the number of maintenance work parts required and that (number of maintenance work days≦number of available days) is satisfied, and determines the urgency of countermeasures 2C to be low.

[0034] 7 is a diagram showing an output example 41A of the maintenance support information 41. The processing unit 10 prints and outputs the above-mentioned information in a predetermined format 41P.

[0035] FIG. 8 is a diagram showing another output example 41B of the maintenance support information 41. As shown in FIG. The processing unit 10 searches for "heat exhaust unit damage" from the abnormality sign name 211 in the maintenance work database 21, and extracts "10" as the number of associated maintenance work days 212, "heat exhaust unit" and "spark plug" as the maintenance target parts 213, "1" and "1" respectively as the required number of personnel 214, and "replacement of heat exhaust unit and adjustment of ignition timing" as the maintenance work content 215. Furthermore, the processing unit 10 extracts "0" as the stock quantity 222, "20" as the number of days until arrival 223, and "Company B" as the supplier 224 for the "heat exhaust unit" from the parts database 22, and extracts "20" as the stock quantity 222, "10" as the number of days until arrival 223, and "Company C" as the supplier 224 for the "spark plug".

[0036] Furthermore, the processing unit 10 confirms that the inventory of "spark plugs" is equal to or greater than the number of personnel required for maintenance work parts and that (number of days for maintenance work≦number of days available for response) is satisfied, and judges the level of urgency of countermeasures to be low. The processing unit 10 also confirms that the inventory of "heat dissipation units" is "0" and that (condition 2) (inventory quantity<number of personnel required) is satisfied. Next, the processing unit 10 checks the above-mentioned (condition 2) ((number of days for arrival + number of days for maintenance work)≦number of days available for response), and if this is not satisfied, judges the level of urgency of countermeasures to be high. As a result, the comment "Order heat dissipation units immediately" is entered in the level of urgency of countermeasures 2C.

[0037] As described above, the maintenance support device 100 and the maintenance support method of the present embodiment have the following features. (1) A maintenance support device 100 that supports maintenance work when performing maintenance for a sign of abnormality of mechanical equipment, the maintenance support device 100 includes a processing unit 10, the processing unit 10 acquires abnormality sign information 31 including a diagnosis time 311 at which an abnormality sign was detected, an abnormality sign name 312 indicating the name of the abnormality sign, and an abnormality occurrence time 313 at which an abnormality caused by the abnormality sign occurs, extracts related information 210 of maintenance work for dealing with the abnormality sign from a maintenance work database 21 based on the diagnosis time 311, the abnormality sign name 312, and the abnormality occurrence time 313, configures maintenance work information 2A, extracts related information 220 of parts required for the maintenance work from a parts database 22, configures parts information 2B, calculates a countermeasure urgency 2C indicating the degree of urgency of the maintenance work, and generates maintenance support information 41 consisting of the maintenance work information 2A, the parts information 2B, and the countermeasure urgency 2C. This makes it possible to avoid a sudden stop of the mechanical equipment when an abnormality sign is detected in the mechanical equipment, and to systematically address the abnormality sign.

[0038] (2) In (1) above, maintenance work related information 210 includes abnormality sign name 211, number of maintenance work days required for the maintenance work 212, maintenance target parts 213 indicating the names of the parts to be maintained, number of required personnel 214 indicating the number of parts to be maintained, and maintenance work content 215 indicating the specific content of the maintenance work, and related information 220 of required parts includes part name 221 indicating the name of the part, inventory quantity 222 indicating the number of parts on hand, number of days required from ordering the part until it arrives 223, and supplier 224.

[0039] (3) In (2) above, the processing unit 10 searches the maintenance work database 21 for the abnormality sign name 211, and extracts the number of maintenance work days 212, the parts to be maintained 213, the number of personnel required 214, and the maintenance work content 215 linked to the abnormality sign name.

[0040] (4) In the above (2), the processing unit 10 searches the parts database 22 for a part name 221 that matches the maintenance target part 213, and extracts the stock quantity 222, arrival date 223, and supplier 224 linked to the part name.

[0041] (5) In (2) above, when calculating the countermeasure urgency 2C, the processing unit 10 judges the countermeasure urgency to be low when condition 1 is satisfied: (stock quantity ≧ number of required personnel) and (number of maintenance work days ≦ number of available days), and judges the countermeasure urgency to be low when condition 2 is satisfied: (stock quantity < number of required personnel) and ((number of days for arrival + number of maintenance work days) ≦ number of available days), and judges the countermeasure urgency to be high when neither condition 1 nor condition 2 is satisfied. This enables the maintenance personnel to take appropriate measures.

[0042] (6) In the above (1), if the machinery and equipment is emergency equipment, it is advisable to set the urgency of the countermeasures to high, so that maintenance personnel can take prompt action.

[0043] (7) In the above (1), the urgency of the countermeasure may be preset based on the content of the abnormality sign based on the abnormality sign name. This allows for quick judgment.

[0044] (8) In (2) above, the processing unit 10 can print and output the details of the maintenance support information 41 in a specified format.

[0045] (9) In the above (2), the processing unit 10 can transmit details of the maintenance support information 41 to the information terminal of the maintenance staff, thereby enabling the maintenance staff to take prompt action.

[0046] (10) A maintenance support method for supporting maintenance work when performing maintenance for a sign of abnormality of mechanical equipment, in which a computer acquires abnormality sign information 31 including a diagnosis time 311 when the sign of abnormality was detected, an abnormality sign name 312 indicating the name of the abnormality sign, and an abnormality occurrence time 313 when an abnormality caused by the abnormality sign occurs, extracts related information 210 of maintenance work for dealing with the abnormality sign from a maintenance work database 21 based on the diagnosis time 311, the abnormality sign name 312, and the abnormality occurrence time 313 to configure maintenance work information 2A, extracts related information 220 of parts required for the maintenance work from a parts database 22 to configure parts information 2B, calculates a countermeasure urgency 2C indicating the degree of urgency of the maintenance work, and generates maintenance support information 41 consisting of the maintenance work information 2A, the parts information 2B, and the countermeasure urgency 2C. According to this, when a sign of abnormality is detected in the mechanical equipment, it is possible to avoid the mechanical equipment from suddenly stopping, and to systematically address the abnormality sign.

[0047] The present invention is not limited to the above-described embodiment, but includes various modified examples. The above-described embodiment has been described in detail to clearly explain the present invention, and the present invention is not necessarily limited to those including all of the configurations described. It is also possible to add, delete, or replace part of the configuration of each embodiment with other configurations. [Explanation of symbols]

[0048] 2A Maintenance work information 2B Parts Information 2C Urgency of measures 10 Processing section 20 Memory section 21 Maintenance Work Database 22 Parts Database 30 Input section 31 Abnormality Prediction Information 40 Output section 41 Maintenance support information Page 41 Format 41A Output Example 41B Output example 51 Criteria for determining the urgency of measures 52 Available days explanation diagram 100 Maintenance support equipment 210 Related information for maintenance work 211 Abnormal Sign Name 212 Maintenance work days 213 Maintenance parts 214 Required Number of Personnel 215 Maintenance work details 220 Related information for required parts 221 Part Name 222 Quantity in stock 223 Days to arrive 224 Supplier 311 Time of diagnosis 312 Abnormal Sign Name 313 Abnormal occurrence time 500 Abnormality Prediction Diagnostic System 600 Machinery and Equipment S10 Maintenance support process

Claims

1. A maintenance support device that supports maintenance work when performing maintenance on a mechanical equipment for a symptom of abnormality, The maintenance support device includes a processing unit, The processing unit includes: acquiring abnormality sign information including a diagnosis time when the abnormality sign was detected, an abnormality sign name indicating a name of the abnormality sign, and an abnormality occurrence time when an abnormality caused by the abnormality sign occurs; extracting information related to a maintenance operation for dealing with the abnormality sign from a maintenance operation database based on the diagnosis time, the abnormality sign name, and the abnormality occurrence time, thereby forming maintenance operation information; Extracting information related to the parts required for the maintenance work from a parts database to configure parts information; Calculating a countermeasure urgency indicating a degree of urgency of the maintenance work; generating maintenance support information consisting of the maintenance work information, the part information, and the urgency of the countermeasure; A maintenance support device comprising:

2. The maintenance support device according to claim 1 , The maintenance work related information includes the name of the abnormality sign, the number of days required for the maintenance work, maintenance target parts indicating the names of the parts to be maintained, the number of required personnel indicating the number of the maintenance target parts, and maintenance work contents indicating specific contents of the maintenance work, The information related to the necessary parts includes a part name indicating the name of the part, an inventory number indicating the number of the parts on hand, the number of days required for the parts to arrive after ordering, and a supplier. A maintenance support device comprising:

3. The maintenance support device according to claim 2, The processing unit searches the maintenance work database for the abnormality sign name, and extracts the number of maintenance work days, the maintenance target parts, the required number of personnel, and the maintenance work content, which are linked to the abnormality sign name. A maintenance support device comprising:

4. The maintenance support device according to claim 2, The processing unit searches the parts database for a part name that matches the part to be maintained, and extracts the inventory quantity, the arrival date, and the supplier that are linked to the part name. A maintenance support device comprising:

5. The maintenance support device according to claim 2, When calculating the measure urgency, the processing unit As a condition 1, when (the inventory quantity ≧ the required number of personnel) is satisfied and (the number of maintenance work days ≦ the number of days available for maintenance) is satisfied, the urgency of the countermeasure is judged to be low; As a second condition, when (the number of stocks<the number of required personnel) is satisfied and ((the number of days required for arrival+the number of days required for maintenance work)≦the number of days available for response) is satisfied, the urgency of the countermeasure is judged to be low; a maintenance support device that determines the degree of urgency of the countermeasure to be high when neither the condition 1 nor the condition 2 is satisfied.

6. The maintenance support device according to claim 1 , If the mechanical equipment is an emergency equipment, the urgency of the countermeasure is set to high. A maintenance support device comprising:

7. The maintenance support device according to claim 1 , The urgency of the countermeasure is set in advance based on the content of the abnormality sign based on the abnormality sign name. A maintenance support device comprising:

8. The maintenance support device according to claim 2, The processing unit prints and outputs details of the maintenance support information in a predetermined format. A maintenance support device comprising:

9. The maintenance support device according to claim 2, The processing unit transmits details of the maintenance support information to an information terminal of a maintenance worker. A maintenance support device comprising:

10. A maintenance support method for supporting maintenance work when performing maintenance for a symptom of abnormality in mechanical equipment, comprising: The computer acquiring abnormality sign information including a diagnosis time when the abnormality sign was detected, an abnormality sign name indicating a name of the abnormality sign, and an abnormality occurrence time when an abnormality caused by the abnormality sign occurs; extracting information related to a maintenance operation for dealing with the abnormality sign from a maintenance operation database based on the diagnosis time, the abnormality sign name, and the abnormality occurrence time, thereby forming maintenance operation information; Extracting information related to the parts required for the maintenance work from a parts database to configure parts information; Calculating a countermeasure urgency indicating a degree of urgency of the maintenance work; A maintenance support method comprising: generating maintenance support information made up of said maintenance work information, said part information, and said urgency of countermeasures.

Citation Information

Patent Citations

  • Information processing system and program

    JP2017016238A

  • Method for supporting maintenance, maintenance supporting system, maintenance supporting device, and computer program

    JP2021002141A

  • Maintenance support system

    JP2022107423A

  • Preventive maintenance support system and preventive maintenance support method

    US20220299979A1

  • Work machine maintenance management system

    WO2022080400A1