Rock bolt installation method using dry drilling and dry drilling system

The method and system address the challenge of cutting powder sticking in waterless drilling by using a double pipe with a swivel joint and high-pressure water inlet to scrape and fluidize powder, ensuring stable and continuous drilling in swelling ground.

JP2024141731APending Publication Date: 2024-10-10TOBISHIMA CONSTRUCT +2
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2023053532
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-29
Publication Date
2024-10-10

AI Technical Summary

Technical Problem

Existing waterless drilling methods face challenges in effectively discharging cutting powder that tends to stick to the discharge route due to the presence of mudstone or groundwater, leading to clogging and difficulty in maintaining a stable drilling process, especially in geological formations prone to swelling.

Method used

A method and system utilizing a double pipe with a swivel joint that includes a high-pressure water inlet and protrusions on the inner rod to scrape off stuck cutting powder, combined with compressed air to facilitate discharge, and a drainage system to collect and separate cutting powder.

Benefits of technology

The method and system effectively prevent clogging of the discharge route by scraping off and fluidizing stuck cutting powder, ensuring stable and continuous drilling without water, even in ground prone to swelling, and maintaining an anhydrous environment during the process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024141731000001_ABST
    Figure 2024141731000001_ABST
Patent Text Reader

Abstract

To provide a rock bolt installation method using dry drilling that can discharge even rock powder that is generated due to drilling and easily adheres.SOLUTION: A rock bolt installation method using dry drilling comprises the steps of: installing a mouth processing device at a rock bolt installation position; drilling using a double pipe consisting of an inner rod and an outer rod; collecting the inner rod, filling it with mortar, and inserting the rock bolt; collecting the outer rod and mouth processing device and additionally injecting mortar; and attaching a bearing plate and a nut to the rock bolt. A swivel joint having a compressed air supply port, a discharge port for discharging compressed air blown back together with the rock powder into a drainage tank from a space between the inner rod and the outer rod, and a high-pressure water inlet for facilitating discharge of the rock powder from the discharge port is provided at a rear end of the double pipe, and protrusions for scraping off the rock powder are provided at an outer wall of the inner rod.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for driving rock bolts by waterless drilling and a waterless drilling system used therefor, and in particular to a method for driving rock bolts by waterless drilling that can discharge even ash that tends to stick when generated by drilling by providing a protrusion for scraping off ash that sticks to the discharge path of the double pipe used for drilling, and a high-pressure water inlet for promoting the discharge of ash toward a drainage tank, and a waterless drilling system used therefor. [Background technology]

[0002] In the construction of mountain tunnels, it is common to cast rock bolts to reinforce the surrounding ground. When casting rock bolts, holes are drilled to insert the rock bolts. The drilling of holes to insert rock bolts is carried out by attaching a rod with a bit at the end to a rock drill, rotating the rod and forcing it into the ground, and cutting the ground with the bit at the end. At this time, cutting water is poured in from the tip of the bit and circulated to discharge the chestnuts crushed by the bit. The cutting water also cools the rock drill and the bit, so it plays an important role in drilling holes to insert rock bolts.

[0003] However, in the case of strata where the ground is prone to swelling, it has been found that the supply of groundwater increases displacement, and injecting cutting water when drilling holes for inserting rock bolts can damage the ground and promote swelling. Therefore, when drilling holes in such ground, a "waterless" drilling method that does not use cutting water is required.

[0004] When drilling without water, compressed air is used instead of cutting water. The compressed air is ejected from the tip of the bit through the hollow rod, cooling the bit and picking up the chucks crushed by the bit, as it returns between the rod and the ground toward the base of the rod. When the compressed air reaches the open end of the drilling hole, it ejects from between the rod and the ground, so large chucks are deposited around the rod, while small chucks are dispersed into the air as dust.

[0005] For this reason, measures to prevent dust particles are necessary when drilling holes inside a tunnel, which is an enclosed space. In particular, when working to prevent bedrock swelling in an existing tunnel, work may be required while general traffic is passing through, and in such cases, measures to prevent dust particles are essential. In addition, in the case of ground that is prone to swelling, the drilled wall will deform in a direction that reduces the inner diameter, so measures to prevent wall deformation are necessary when drilling such ground. In other words, a drilling technique using a double pipe that includes an outer pipe (outer rod) to prevent deformation of the drilled inner wall is required.

[0006] Patent Document 1 discloses a hole-drilling device that uses a double tube, in which an outward gas flow path is formed within the inner tube (inner rod) and a return gas flow path is formed between the inner tube and the outer tube, and the bit member is formed with a soil discharge section that introduces soil generated when the bit member excavates the ground into the outward gas flow path, and a number of guide paths that guide gas that has circulated through the outward gas flow path from the outward gas flow path to the return gas flow path, and the hole-drilling device discloses a hole-drilling device in which soil is sucked towards the outward gas flow path via the soil discharge section as gas flows through the guide paths.

[0007] Patent document 2 discloses a waterless drilling system which includes a drilling machine, a double pipe, an air compressor, a mouth treatment device, and a dust collection means, and which has an outlet that discharges compressed air that is diverted between the outer rod and the ground together with ash to the dust collection means, and a new compressed air supply inlet that opens into a space common to the outlet.

[0008] According to the drilling device described in Patent Document 1, the outer tube of the double pipe makes it possible to drill holes while suppressing deformation of the ground side wall during drilling, and the ash generated by drilling is discharged toward the soil discharge section by gas supplied from the inner pipe, making it possible to drill holes stably even in ground that is prone to swelling as long as the geology is not greatly affected by groundwater.

[0009] According to the waterless drilling system described in Patent Document 2, the ash discharged by the compressed air diverted between the outer rod and the ground is promoted by newly supplied compressed air, making it possible to realize waterless drilling in which ash can be discharged stably.

[0010] However, whether using the drilling equipment described in Patent Document 1 or the waterless drilling system described in Patent Document 2, when the ground being drilled contains mudstone or groundwater, the chuck dust contains a lot of moisture and is likely to adhere to the walls of the gas return pipe between the inner and outer pipes, or in the discharge pipe leading from the double pipe to the chuck dust collection device.As the amount of adhesion increases, it eventually becomes difficult to discharge the chuck dust.

[0011] Therefore, it is desirable to provide a drilling system that enables waterless, dust-free double-tube drilling that can also be applied to reinforcing the interior of tunnels in natural ground that is prone to hardening due to the influence of geology and groundwater, and to rock bolt installation technology using the same. [Prior art documents] [Patent documents]

[0012] [Patent Document 1] JP 2006-328756 A [Patent Document 2] JP 2022-34953 A Summary of the Invention [Problem to be solved by the invention]

[0013] The present invention has been made in consideration of the problems with the conventional drilling methods and drilling systems described above, and the object of the present invention is to provide a method for driving rock bolts using waterless drilling, which can discharge even ash that tends to stick when generated by drilling, by providing protrusions for scraping off ash that sticks to the discharge path of the double pipe used for drilling, and a high-pressure water inlet for promoting the discharge of ash toward a drainage tank, and a waterless drilling system for use therein. [Means for solving the problem]

[0014] In order to achieve the above object, the method of installing rock bolts by drilling holes without water according to the present invention is a method of drilling holes without water and installing rock bolts in a tunnel, and includes the steps of installing a mouth treatment device at the rock bolt attachment position, drilling holes using a double tube consisting of an inner rod with an inner bit at its tip and an outer rod with an outer bit at its tip, retrieving the inner rod, filling it with mortar, and inserting the rock bolt, retrieving the outer rod and the mouth treatment device and injecting additional mortar, and attaching a bearing plate and a nut to the rock bolt. The rear end of the double tube is equipped with a swivel joint having a compressed air supply port to be supplied into the inner rod during the drilling step, an exhaust port to discharge the compressed air that blows back through the space between the inner rod and the outer rod together with the ash into a drainage tank together with the ash, and an inlet for high-pressure water to promote the discharge of the ash from the exhaust port, and the outer wall of the inner rod is equipped with a protrusion for scraping off the ash that protrudes along the longitudinal direction of the inner rod toward the inner wall of the outer rod.

[0015] The step of drilling holes using the double pipe preferably includes a hole drilling step in which the inner rod and the outer rod are rotated and advanced while compressed air is supplied from the compressed air supply port of the swivel joint to drill holes and discharge the shavings generated during the drilling, and a shavings removal step in which shavings adhering to the inner wall of the outer rod during drilling are scraped off after every certain distance of drilling.

[0016] It is preferable that the chuck removal step includes the steps of stopping the supply of compressed air and the rotation of the outer rod, rotating only the inner rod while moving in the axial direction of the inner rod, and scraping off the chuck sticking to the inner wall of the outer rod with the chuck scraping protrusions, and supplying compressed air and discharging the scraped off chuck.

[0017] The chuck dust generated by drilling holes or the chuck dust shaved off is discharged by supplying compressed air from the compressed air supply port of the swivel joint, and as the compressed air is ejected from the tip of the inner rod and passes between the inner rod and the outer rod, it engulfs the chuck dust generated by drilling holes or the chuck dust shaved off, and by injecting high-pressure water from the high-pressure water inlet of the swivel joint, and it is preferable that the injection of high-pressure water is only performed when compressed air is being supplied.

[0018] The waterless drilling system of the present invention, which has been made to achieve the above-mentioned object, is a waterless drilling system used for drilling holes for driving rock bolts in tunnels, and is equipped with a drilling machine, a double pipe attached to the drilling machine and equipped with an inner rod and an outer rod, each equipped with a bit at the tip, an air compressor which supplies compressed air to the inner rod during drilling, a swivel joint attached to the rear end of the double pipe for a supply port for compressed air to be supplied into the inner rod, an outlet for discharging the compressed air that blows back through the space between the inner rod and the outer rod together with the ash into a drainage tank together with the ash, an inlet for high-pressure water to promote the discharge of the ash from the outlet, and a dust collection means for separating and recovering the discharged ash, and is characterized in that the outer wall of the inner rod is equipped with a protrusion for scraping off the ash that protrudes along the longitudinal direction of the inner rod toward the inner wall of the outer rod. Effect of the Invention

[0019] According to the method for installing rock bolts by waterless drilling of the present invention, a double pipe is used and compressed air is used instead of cutting water to discharge ash while drilling, so that drilling can be performed without damaging the ground by injecting cutting water. If the ground to be drilled contains mudstone or groundwater, the ash tends to stick to the ash discharge path of the double pipe, but since the outer wall of the inner rod is provided with a protrusion for scraping off the ash that protrudes toward the inner wall of the outer rod, it is possible to rotate only the inner rod between drillings to scrape off the stuck ash and prevent the ash discharge path from clogging.

[0020] In addition, the swivel joint of the waterless drilling system of the present invention has a supply port for compressed air to be supplied into the inner rod, a discharge port for discharging the compressed air that blows back through the space between the inner rod and the outer rod together with the ash into a drainage tank together with the ash, and a high-pressure water inlet for promoting the discharge of the ash from the discharge port.Therefore, in the case of ash that tends to stick, high-pressure water can be supplied to fluidize it and discharge it, making it possible to prevent the discharge path from the double pipe to the discharge tank from becoming clogged.

[0021] According to the method of driving rock bolts by waterless drilling of the present invention, high-pressure water is injected into the swivel joint only when compressed air is being supplied from the supply port, so even when high-pressure water is injected, it does not flow into the double pipe, and a waterless environment can be maintained during drilling. [Brief description of the drawings]

[0022] [Figure 1] 1 is a diagram showing a schematic configuration of a waterless drilling system according to an embodiment of the present invention; [Diagram 2] 1 is a schematic diagram showing a structure of a swivel joint according to an embodiment of the present invention. [Diagram 3] 3 is a diagram illustrating a schematic cross section of the swivel joint shown in FIG. 2 taken along line AA'. FIG. [Figure 4] 4A to 4C are diagrams illustrating an example of a protrusion of an inner rod according to an embodiment of the present invention. [Diagram 5] 1 is a flowchart for explaining a method for installing rock bolts by waterless drilling according to an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0023] Next, a specific example of a form for implementing the rock bolt driving method by waterless drilling according to the present invention and the waterless drilling system used therein will be described in detail with reference to the drawings. FIG. 1 is a diagram showing a schematic configuration of a waterless drilling system according to an embodiment of the present invention. Referring to Figure 1, a waterless drilling system 1 according to an embodiment of the present invention comprises a drilling machine 10, an air compressor 20, a high-pressure washer 30, a double pipe 40 attached to the drilling machine 10, a swivel joint 11 attached to the double pipe 40, a mouth treatment device 50, and a drainage tank 60.

[0024] The rock bolt installation method by waterless drilling according to the present invention is a rock bolt installation method applicable to reinforcing a tunnel installed in a stratum where ground swelling is likely to occur, and utilizes a drilling method using a double pipe 40 for drilling holes for inserting rock bolts without using cutting water that may damage the natural ground 70, and for reliably drilling deep holes with a specified inner diameter even in easily deformed ground. The double pipe 40 comprises a hollow outer rod 45 and a hollow inner rod 41 provided with a gap inside the hollow outer rod 45, and the two spaces inside and outside the inner rod 41 are used for supplying, returning, and discharging cutting fluid such as cutting water.

[0025] In the waterless drilling system 1 according to the embodiment of the present invention, compressed air 23 is used instead of cutting water to discharge ash generated during drilling, and the ash generated by the double pipe 40 is carried by the flow of compressed air 23 that is supplied through the inner space of the inner rod 41 and blows back from the tip of the drilling hole, and is discharged from the discharge port (14, 54). However, some natural ground 70 contains mudstone and groundwater, and drilling such natural ground 70 generates clayey ash that adheres to the wall of the discharge path, narrowing the discharge path, and eventually making it difficult to discharge the ash.

[0026] Therefore, in the waterless drilling system 1 according to an embodiment of the present invention, the space between the inner rod 41 and the outer rod 45, which is the main discharge path for the ash, is provided with a protrusion 43 for scraping off the ash on the outer wall of the inner rod 41, and the next discharge path from the swivel joint 11 is provided with an inlet 13 for high-pressure water 32 at the swivel joint 11 to promote the discharge of the ash, making it possible to properly perform drilling without clogging the discharge path even if clay-like ash is generated.

[0027] In this embodiment, a drilling machine 10 equipped with a rotary percussion function is used as the drilling machine 10 equipped in the waterless drilling system 1. The drilling machine 10 is equipped with clamping means (not shown) for independently clamping the inner rod 41 and the outer rod 45 so that the double pipe 40 equipped with the inner rod 41 and the outer rod 45 can be attached.

[0028] An inner bit 42 is provided at the tip of the inner rod 41, and an outer bit 46 arranged in a ring shape is provided at the tip of an outer rod 45 that surrounds the inner rod 41 at a distance with a certain space therebetween. Both the inner bit 42 and the outer bit 46 advance hole drilling by the rotational force and impact force applied from the drill head of the drilling machine 10.

[0029] The outer bit 46 is installed so that the outermost diameter of the outer bit 46 is larger than the outer diameter of the outer rod 45 in order to form a gap between the outer rod 45 and the natural ground 70 during drilling. By forming such a gap, the occurrence of rotational resistance due to friction between the outer rod 45 and the natural ground 70 during drilling is prevented.

[0030] A swivel joint 11 is attached to the rear end of the double pipe 40. As described later with reference to Figures 2 and 3, the swivel joint 11 according to an embodiment of the present invention includes an inner structure that is attached to the double pipe 40 and rotates together with the double pipe 40, and an outer shell that surrounds the inner structure and is configured not to rotate together with the inner structure even when the inner structure rotates, and the outer shell has a supply port 12 that supplies compressed air 23 into the inner rod 41, a discharge port 14 that discharges the compressed air 23 that blows back together with the oak powder through the space between the inner rod 41 and the outer rod 45 into the drain tank 60 together with the oak powder, and an inlet 13 for high-pressure water 32 that promotes the discharge of the oak powder from the discharge port 14.

[0031] Compressed air 23 supplied from the air compressor 20 passes through the supply pipe 21 and is supplied from the supply port 12 to the inner rod 41. Here, the pipe is a general term for a hollow tube including a flexible hose. The compressed air 23 passing through the inner space of the inner rod 41 cools the inner bit 42 and the outer bit 46 at the tip of the inner rod 41, and transports the chuck generated by drilling toward the discharge port 14 while returning through the first path 44, which is the space between the inner rod 41 and the outer rod 45. At this time, a part of the compressed air 23 passing through the inner space of the inner rod 41 returns through the second path 47, which is the space between the outer rod 45 and the natural ground 70, toward the discharge port 54 of the mouth treatment device 50 while transporting a part of the chuck.

[0032] If the chestnut powder is clayey, it is likely to stick to the inner wall of the outer rod 45 in the first passage 44, which is the main discharge passage for the chestnut powder. However, in the double pipe 40 according to the embodiment, the outer wall of the inner rod 41 is provided with a protrusion 43 for scraping off the chestnut powder, which protrudes toward the inner wall of the outer rod 45 along the longitudinal direction of the inner rod 41. If the rotation speeds of the inner rod 41 and the outer rod 45 are different during drilling, the chestnut powder stuck to the inner wall of the outer rod 45 can be scraped off even during drilling, but since the inner rod 41 and the outer rod 45 are usually fixed together and rotated, it is difficult to scrape off the chestnut powder during drilling. In the embodiment, the supply of compressed air 23 and the rotation of the outer rod 45 are stopped every certain distance, for example, every 1 m, and the inner rod 41 is rotated alone while moving (sliding rotation) the inner rod 41 in the axial direction (up and down) to scrape off the chestnut powder. At this time, the exposed portion of the outer rod 45 is temporarily cut off so that the inner rod 41 can slide and rotate independently. Then, the supply of the compressed air 23 is resumed, and the scraped off starch is transported by the compressed air 23 toward the discharge port 14.

[0033] The ash during drilling and the ash scraped off enter the swivel joint 11 from the double pipe 40 and are discharged from the discharge port 14 through the discharge pipe 61 to the drainage tank 60, but they may become stuck inside the swivel joint 11 or the discharge pipe 61 during this time. Therefore, in this embodiment, high-pressure water 32 generated by the high-pressure washer 30 is injected into the injection port 13 through the high-pressure water supply pipe 31. By injecting the high-pressure water 32 only when the compressed air 23 is being supplied, the injected high-pressure water 32 does not flow from the double pipe 40 into the natural ground 70. The injected high-pressure water 32 fluidizes the stuck ash, and the fluidized ash flows easily through the discharge pipe 61 and is discharged into the drainage tank 60.

[0034] The mouth processing device 50 is a device that guides the compressed air 23 mixed with chestnut powder, which flows through the second path 47 passing through the gap between the outer rod 45 and the natural ground 70, to the discharge port 54 without leaking.

[0035] The mouth treatment device 50 is installed at the starting point of drilling with the double pipe 40, but if it is simply fixed, the compressed air 23 mixed with ash powder will leak out from the gap between the mouth treatment device 50 and the ground surface, causing dust generation. Therefore, in one embodiment, a cylindrical core is drilled out of the roadbed concrete 72 up to the roadbed 71, a short drill rod 80 is driven into the cored part to attach the mouth treatment device 50, the mouth treatment device 50 is attached to the top of the drill rod 80 so that the compressed air 23 does not leak, and finally, mortar 81 is applied to the bottom of the cored part around the driven drill rod 80 to prevent the compressed air 23 from leaking from the gap between the natural ground 70 and the drill rod 80, so that the mouth treatment device 50 is installed without leakage.

[0036] The double pipe 40 is inserted into the insertion hole 51 of the mouth processing device 50, and the mouth processing device 50 further includes a leakage prevention means 52, which blocks the area around the double pipe 40, which rotates and moves axially during drilling, i.e., the area around the outer rod 45, to prevent leakage of the compressed air 23 without impeding the operation of the double pipe 40. The leakage prevention means 52 may be realized, for example, by a pre-pender having a tube that expands with air pressure.

[0037] In the embodiment of the mouth processing device 50, a supply port 53 is further provided to which a supply pipe 22 for directing compressed air 23 supplied from an air compressor 20 is connected, and the compressed air 23 promotes the flow of ash from the discharge port 54 through the discharge pipe 62 toward the drainage tank 60.

[0038] The drainage tank 60 stores the high-pressure water (mud water or discharge water) 32 mixed with chestnut powder discharged from the discharge outlet 14, and allows the chestnut powder to settle. The compressed air 23 mixed with chestnut powder discharged from the discharge outlet 14 or discharge outlet 54 passes through the water stored in the drainage tank 60 to remove the chestnut powder before being released to the outside. Therefore, the chestnut powder generated during drilling is not released into the tunnel as dust.

[0039] Fig. 2 is a schematic diagram showing the structure of a swivel joint according to an embodiment of the present invention, in which Fig. 2(a) is a plan view of the swivel joint and Fig. 2(b) is a front view of the swivel joint, and Fig. 3 is a schematic diagram showing a cross section along line A-A' of the swivel joint shown in Fig. 2.

[0040] 2 and 3, a swivel joint 11 according to an embodiment of the present invention includes an outer shell portion 15 located on the outer periphery, and an inner portion 16 located inside the outer shell portion 15 and configured to be rotatable relative to the outer shell portion 15.

[0041] The outer shell 15 is provided with a supply port 12 for compressed air 23, an inlet 13 for high-pressure water 32, and an outlet 14 for the chestnut powder discharged together with the compressed air 23 or the high-pressure water 32. In the area where the supply port 12 for compressed air 23 is located, a ring-shaped circumferential groove 18-1 is provided in accordance with the position of the supply port 12, and in the area where the inlet 13 for high-pressure water 32 and the outlet 14 for the chestnut powder are located, a ring-shaped circumferential groove 18-2 is provided in accordance with the positions of the inlet 13 and the outlet 14. The circumferential grooves 18-1 and 18-2 are formed so that their heights, i.e., their positions in the vertical direction in FIG. 3, are different. The inlet 13 and the outlet 14 are also provided in such a position that they share the ring-shaped circumferential groove 18-2.

[0042] The inner structure 16 is a portion that is directly attached to the end of the double pipe 40, and the ends of the inner rod 41 and the outer rod 45 are screwed and fixed, respectively. This allows the inner structure 16 to rotate together with the double pipe 40.

[0043] A cylindrical space is provided in a state where the inner rod 41 is connected to the inner space of the inner rod 41 at the end of the screwed end, i.e., above the end of the inner rod 41 in FIG. 3, and a through hole 19-1 is formed from the outer periphery of the internal structure 16 to the cylindrical space, which serves as a supply path for the compressed air 23. The through hole 19-1 is provided at a position that matches the ring-shaped circumferential groove 18-1 of the outer shell part 15, thereby forming a supply path for the compressed air 23 that connects the supply port 12 of the compressed air 23 to the inner space of the inner rod 41 via the ring-shaped circumferential groove 18-1 of the outer shell part 15 and the through hole 19-1. In FIG. 3, the through hole 19-1 is shown in the left-right direction and the depth direction of FIG. 3, but the position and number of the through hole 19-1 are not limited thereto as long as the compressed air 23 can be supplied.

[0044] A cylindrical space is provided at the end where the outer rod 45 is screwed, in a manner that is continuous with the space between the inner rod 41 and the outer rod 45. When the inner rod 41 is fixed, the cylindrical space is formed into a ring-shaped space because the inner rod 41 penetrates through it. A through hole 19-2 is formed from the outer periphery of the internal structure 16 toward this ring-shaped space, which serves as a discharge path for the compressed air 23. The through hole 19-2 is provided at a position that matches the ring-shaped circumferential groove 18-2 of the outer shell part 15, thereby forming a discharge path for the chuck from the space between the inner rod 41 and the outer rod 45 through the through hole 19-2 and the ring-shaped circumferential groove 18-2 to the discharge port 14. The ring-shaped circumferential groove 18-2 is also connected to the inlet 13 for the high-pressure water 32, so a structure is also formed that promotes the discharge of the chuck by the high-pressure water 32 injected from the inlet 13.

[0045] As the hole is drilled, the inner structure 16 rotates together with the double pipe 40, but the outer shell 15 does not rotate. Although not shown in Fig. 3, a ball bearing may be provided between the inner structure 16 and the outer shell 15 to facilitate smooth rotation of the inner structure 16. In either case, since there is a small gap between the inner structure 16 and the outer shell 15 to enable rotation, sealing materials 17 are provided in multiple places on the outer shell 15, particularly to sandwich the ring-shaped circumferential grooves (18-1, 18-2), to prevent leakage of the compressed air 23 and high-pressure water 32 from this gap.

[0046] Figure 4 is an exemplary diagram showing a protrusion of an inner rod according to an embodiment of the present invention, where Figure 4(a) is a diagram showing only the outer rod of a double tube cut along the diameter to show the appearance of the inner rod, and Figure 4(b) is a cross-sectional view of the double tube cut along line B-B' without cutting the outer rod of Figure 4(a).

[0047] Referring to FIG. 4, the outer wall of the inner rod 41 is provided with protrusions 43 for scraping off the chestnuts, which protrude along the longitudinal direction of the inner rod 41 toward the inner wall of the outer rod 45. The protrusions 43 protrude at a height that does not nearly come into contact with the outer rod 45, making it possible to effectively scrape off the chestnuts. In one embodiment, the protrusions 43 are formed in three directions as shown in FIG. 4(b), but in other embodiments, more or less protrusions may be formed. In any case, however, it is preferable to provide multiple protrusions 43 at positions that are symmetrical to the rotation of the outer wall of the inner rod 41. In addition, since the protrusions 43 are provided in the first path 44, which is the main discharge path for the chestnuts, if the number of protrusions 43 is increased too much, the effective area of ​​the first path 44 will decrease. Therefore, it is preferable to provide the protrusions 43 in two or three places. Even if the protrusions 43 are provided, the first path 44 is secured as a space between the protrusions 43, so the chestnuts are still discharged through the first path 44 during drilling.

[0048] The stuck chestnut crumbs are scraped off by stopping the rotation of the outer rod 45 between drilling holes and rotating only the inner rod 41. At this time, since the inner rod 41 is also moved in the axial direction, it is not necessary to provide the protrusion 43 over the entire length of the inner rod 41. As the hole is drilled deeper, the double pipe 40 is lengthened by adding additional double pipes 40. It is preferable to provide each of the additional inner rods 41 with a protrusion 43. The projection 43 does not need to have a complicated shape like an auger, and may be linear, and can be formed relatively easily, for example, by welding a reinforcing bar of an appropriate diameter to the inner rod 41.

[0049] FIG. 5 is a flowchart illustrating a method for driving rock bolts by waterless drilling according to an embodiment of the present invention. 5, in step S500, the mouth treatment device 50 is installed at the location where the rock bolts are to be driven. In the case of the mouth treatment device 50 attached to the top of the drill rod 80, first, the roadbed concrete 72 is cored, and then the cylindrical drill rod 80 is driven with its central axis aligned with the center of the cored hole, and mortar 81 is applied to the bottom of the cored hole around the drill rod 80 to prevent leakage of the compressed air 23, before the mouth treatment device 50 is attached to the top of the drill rod 80.

[0050] In addition to the above-mentioned mounting method, the mouth treatment device 50 may be mounted directly to the roadbed concrete 72 as described in the above-mentioned Patent Document 2. In this case, anchors are driven into the roadbed concrete 72 corresponding to the positions of the anchor holes in the lower end flange of the mouth treatment device 50, and then the flange is installed so that the anchors pass through the anchor holes and fastened with nuts. At this time, a packing is sandwiched and the device is mounted so that the compressed air 23 does not leak from the gap between the roadbed concrete 72 and the lower end flange of the mouth treatment device 50. In another embodiment, a rubber part may be attached to the lower end of the mouth treatment device 50, and the guide cell of the drilling machine 10 may be used to press the mouth treatment device 50 when drilling, thereby preventing exhaust gas from leaking from the outer rod 45.

[0051] After installation of the mouth treatment device 50, waterless drilling of rock bolt insertion holes is performed using a drilling machine 10 equipped with a double tube 40 consisting of an inner rod 41 with an inner bit 42 and an outer rod 45 with an outer bit 46 at its tip, and ash is discharged together with compressed air 23 from a first path 44 between the inner rod 41 and the outer rod 45 and a second path 47 between the outer rod 45 and the natural ground 70 (step S510).

[0052] Compressed air 23 for discharging the chestnut crumbs is supplied from an air compressor 20 to the inside of the inner rod 41 via a swivel joint 11, and after being ejected from the nozzle at the tip of the inner rod 41, is divided into a first path 44 and a second path 47. The compressed air 23 flowing through the first path 44 entrains a portion of the chuck material being cut out by the inner bit 42 or the outer bit 46, and is discharged together with the chuck material into the discharge pipe 61 from the discharge port 14 of the swivel joint 11 attached to the top of the outer rod 45. The compressed air 23 flowing through the second path 47 entrains the remaining chuck crumbs cut out by the inner bit 42 or the outer bit 46, and after flowing into the mouth processing device 50, it is mixed with new compressed air 23 supplied from the supply port 53, accelerated, and discharged together with the new compressed air 23 and the chuck crumbs from the discharge port 54 into the discharge pipe 62.

[0053] If the ground 70 contains mudstone or groundwater, the chestnut powder may not be discharged smoothly in the above-mentioned manner, and some of the clayey chestnut powder may become stuck along the way. Regarding the discharge route, which returns to the swivel joint 11 via the first route 44 and is then discharged from the discharge port 14 to the discharge pipe 61, high-pressure water 32 is injected from the inlet 13 of the swivel joint 11 while compressed air 23 is being supplied, thereby increasing the fluidity of the clayey chestnut powder and facilitating its discharge.

[0054] On the other hand, it is difficult to discharge the stuck ash during drilling in the first path 44 between the inner rod 41 and the outer rod 45. Therefore, in the embodiment, drilling and discharging of the ash by the double pipe 40 are performed for a certain distance in step S510, and then removal of the stuck ash is performed in step S520.

[0055] Although not shown in Figure 5, the removal of stuck chestnut crumbs includes the steps of stopping the supply of compressed air 23 and the rotation of the outer rod 45, and moving only the inner rod 41 in the axial direction while rotating, and scraping off the chestnut crumbs stuck to the inner wall of the outer rod 45 with the chestnut crumb scraping protrusions 43, and supplying compressed air 23 to discharge the scraped off chestnut crumbs.

[0056] The scraped off starch is discharged by supplying compressed air 23 from the supply port 12 of the swivel joint 11 and injecting high-pressure water 32 from the injection port 13 of the swivel joint 11. The injection of high-pressure water 32 is performed only when compressed air 23 is being supplied, so that the high-pressure water 32 does not flow into the double pipe 40.

[0057] The chestnut powder, whose fluidity has been increased by the injection of high-pressure water 32, is transported together with compressed air 23 and high-pressure water 32 from outlet 14 through discharge pipe 61 to drainage tank 60. The chestnut powder that passes through second path 47 and is discharged from outlet 54 is also transported to drainage tank 60 via discharge pipe 61. In drainage tank 60, the chestnut powder is separated by settling in the water, and does not scatter from drainage tank 60 to the outside.

[0058] After removing the stuck chestnut crumbs in step S520, it is determined in step S530 whether the required distance of the hole has been drilled, and if the hole has not been drilled, the process returns to step S510 to repeat the steps of drilling and removing the chestnut crumbs. If the length of the double pipe 40 is insufficient as the hole is drilled, additional double pipes 40 are sequentially added to deepen the hole.

[0059] If it is determined in step S530 that drilling to the required depth has been completed, the inner rod 41 is retrieved in step S540, and mortar for fixing the rock bolt is filled into the rock bolt insertion hole, followed by inserting the rock bolt. When filling with mortar, the tip of the injection hose is inserted to the bottom of the rock bolt insertion hole before injection. This allows any spring water in the hole to be replaced with mortar. If the spring water replaced by the injection of mortar rises up to the hole's opening, it can be removed by suction with a small vacuum.

[0060] During the process of step S540, even if the natural ground 70 tries to deform, the outer rod 45 supports the outer wall of the drilled hole, so workability is not affected. By attaching a spacer to the rock bolt, it is possible to insert it while maintaining the appropriate position in the insertion hole. Also, if a long rock bolt is required, it is possible to use a coupler to connect rock bolts of an appropriate length that are easy to handle. An electric winch mounted on the rotary percussion drill type drilling machine 10 may be used to insert the rock bolts.

[0061] After the insertion of the rock bolts is completed and the tops of the rock bolts are measured to confirm that the rock bolts have been inserted to a specified depth, the outer rod 45 and the mouth treatment device 50 are withdrawn in step S550. At this point, the mortar has not yet hardened, and when the outer rod 45 is withdrawn, the mortar may seep into gaps and cracks on the outside of the outer rod 45, causing the top surface of the mortar to drop. In this case, after waiting for the mortar to settle, additional mortar is injected up to the specified height.

[0062] When the mortar has hardened to the appropriate height, the bearing plate is fastened to the head of the rock bolt with a nut in step S560, and the casting of the rock bolt is completed. At this point, the reinforcing effect of the rock bolt is exerted.

[0063] After this, in order to flatten the road surface for use as a road, the tops of the rock bolts are filled with roadbed mortar and the pavement base is filled with ultra-high-early-strength concrete. At this time, rebar is driven diagonally downward from above the tops of the rock bolts toward the side walls of the cored section, and then the heads of the rebars are bent so as to fit inside the cored section, and the tops of the rock bolts, including this rebar, are filled with roadbed mortar and the pavement base is filled with ultra-high-early-strength concrete. By reinforcing with rebar in this way, it is possible to prevent the roadbed mortar and ultra-high-early-strength concrete embedded in the tops of the rock bolts from sinking even after the area is opened to traffic.

[0064] Although the embodiments of the present invention have been described in detail above with reference to the drawings, the present invention is not limited to the above-described embodiments and can be modified in various ways without departing from the technical scope of the present invention. [Explanation of symbols]

[0065] 1. Waterless drilling system 10 Drilling Machine 11 Swivel joint 12, 53 Supply port 13 Inlet 14, 54 outlet 15 Outer shell 16 Internal premises 17 Sealing material 18-1, 18-2 Circumferential groove 19-1, 19-2 Through holes 20. Air Compressor 21, 22 Supply pipe 23 Compressed Air 30. High Pressure Washer 31 High pressure water supply pipe 32 High Pressure Water 40 double tube 41 Inner Rod 42 Inner Bit 43 Protrusion 44 Route 1 45 Outer Rod 46 Outer Bit 47 Route 2 50 Mouth processing device 51 Insertion hole 52 Leak prevention measures 60 Drain tank 61, 62 Exhaust pipe 70 Natural ground 71 Roadbed 72 Roadbed concrete 80 Drill Rod 81 Mortar

Claims

1. A method for drilling holes and installing rock bolts in a tunnel without water, comprising the steps of: Installing a mouth treatment device at a rock bolt installation position; A step of drilling a hole using a double tube consisting of an inner rod having an inner bit at its tip and an outer rod having an outer bit at its tip; retrieving the inner rod, filling it with mortar, and inserting a rock bolt; Recovering the outer rod and the mouth treatment device and injecting additional mortar; and attaching a bearing plate and a nut to the lock bolt. The rear end of the double pipe is provided with a swivel joint having a compressed air supply port to be supplied into the inner rod during the drilling stage, a discharge port to discharge the compressed air blown back through the space between the inner rod and the outer rod together with the ash into a drain tank, and an inlet for high-pressure water to promote the discharge of the ash from the discharge port; This method for driving rock bolts by waterless drilling is characterized in that the outer wall of the inner rod is provided with a protrusion for scraping off chestnuts, which protrudes along the longitudinal direction of the inner rod toward the inner wall of the outer rod.

2. The step of drilling holes using the double pipe includes: a drilling step of drilling holes by rotating and advancing the inner rod and the outer rod while supplying compressed air from a compressed air supply port of the swivel joint, and discharging chips generated by drilling the holes; The method for driving rock bolts by waterless drilling as described in claim 1, characterized in that it includes a chipping removal step of chipping off chips adhered to the inner wall of the outer rod during drilling every certain distance.

3. The oyster removal step includes: a step of stopping the supply of compressed air and the rotation of the outer rod, and moving only the inner rod in the axial direction while rotating the inner rod, and scraping off the chestnut crumbs adhering to the inner wall of the outer rod with the protrusion for scraping off the chestnut crumbs; 3. The method for driving rock bolts by waterless drilling according to claim 2, further comprising the steps of supplying compressed air and discharging the scraped off ash.

4. The discharge of the chucks generated by drilling holes or the shaved chucks is carried out by supplying compressed air from the compressed air supply port of the swivel joint, and when the compressed air is ejected from the tip of the inner rod and passes between the inner rod and the outer rod, the chucks generated by drilling holes or the shaved chucks are entangled in the compressed air, and high-pressure water is injected from the high-pressure water inlet of the swivel joint; The method for driving rock bolts by waterless drilling according to claim 3, characterized in that the injection of high-pressure water is carried out only when compressed air is being supplied.

5. 1. A waterless drilling system for use in drilling holes for installing rock bolts in a tunnel, comprising: A drilling machine; A double tube having an inner rod and an outer rod each having a bit at the tip, which are attached to a drilling machine; an air compressor for supplying compressed air to the inner rod during drilling; a swivel joint attached to the rear end of the double pipe and having a compressed air supply port for supplying air into the inner rod, a discharge port for discharging the compressed air blown back through the space between the inner rod and the outer rod together with the ash into a drain tank, and an inlet for injecting high-pressure water to promote the discharge of the ash from the discharge port; and a dust collecting means for separating and collecting the discharged chestnut crumbs. This waterless drilling system is characterized in that the outer wall of the inner rod is provided with a protrusion for scraping off chestnut crumbs, which protrudes toward the inner wall of the outer rod along the longitudinal direction of the inner rod.

Citation Information

Patent Citations

  • Drilling device and drilling method

    JP2006328756A

  • Rock bolt installation method using anhydrous drilling, anhydrous drilling system used therefor, and drilling opening treatment device

    JP2022034953A