Fixing structure for deck plates of hanging slabs

The deck plate fixing structure for protruding slabs in steel-framed buildings addresses cost and time inefficiencies by using cantilevered welds with rotational rigidity, eliminating the need for reinforcing hardware and maintaining stability.

JP2024141738APending Publication Date: 2024-10-10NIPPON STEEL METAL PROD CO LTD

Patent Information

Application Number
JP2023053541
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-29
Publication Date
2024-10-10

AI Technical Summary

Technical Problem

Existing deck plate fixing structures for protruding slabs in steel-framed buildings are costly, time-consuming, and interfere with maintenance due to the need for reinforcing hardware, which also complicates installation and increases construction time.

Method used

A deck plate fixing structure that supports the deck plate with cantilevered welds to the steel beam without reinforcing hardware, incorporating rotational rigidity calculations and specific joint configurations to resist rotational moments and deflection.

Benefits of technology

The structure securely fixes the deck plate to the steel beam, reducing installation costs and time, minimizing interference with maintenance, and ensuring stability against rotational loads.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024141738000001_ABST
    Figure 2024141738000001_ABST
Patent Text Reader

Abstract

To provide a fixing structure for deck plates of hanging slabs that does not interfere with maintenance work, reduces man-hour and installation costs.SOLUTION: In a fixing structure for deck plates of hanging slabs, where a base of a deck plate of a hanging slab whose tip is hanging out due to cantilever support, is fixed to a steel beam, the cantilever support is made without reinforcement using reinforcement hardware S2 and by simply connecting the base of the deck plate to the steel beam.SELECTED DRAWING: Figure 4
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a deck plate fixing structure, and more particularly to a deck plate fixing structure for a protruding slab that fixes the deck plate of a protruding slab that protrudes from a steel beam in a steel-framed building to the beam. [Background technology]

[0002] In the steel frame structure of a building, the slab ends (protruding parts) around the exterior of the building and around openings are usually welded with concrete retainers made of thin steel plate bent into an L-shape and installed so that they protrude from the steel beams, and concrete is poured inside to create the protruding slab.

[0003] In addition, if the overhang is long and there is a risk of deformation during concrete pouring, it is necessary to reinforce the structure by installing reinforcing metal fittings S2 such as round bars or angle irons at an angle as shown in Figure 17(a) (see Steel Construction Technical Guidelines: Construction Site). Such reinforcing metal fittings S2 must be welded and installed in advance by the fabricator who produces the concrete stop plate PL, or the reinforcing metal fittings S2 must be welded at the construction site, either way resulting in increased manufacturing costs and longer construction periods. Moreover, the reinforcing metal fittings S2 become an obstacle to equipment piping, etc., which not only increases installation costs by requiring longer equipment piping to be routed around, but also impedes maintenance work.

[0004] Patent Document 1 also discloses a reinforced concrete floor slab structure in which a deck plate floor 14 is constructed by overhanging it from the inside of the room to the main beam 11, and reinforcing bars are arranged from the small beam 13 toward the tip of the overhanging part serving as a balcony or corridor, forming a reinforced concrete cantilever slab floor as the floor of the overhanging part, and is integrated with the deck plate floor 14. (See claim 1 of Patent Document 1, paragraphs

[0015] to

[0030] of the specification, and Figures 1 to 3 of the drawings, etc.)

[0005] However, the floor slab structure described in Patent Document 1 is a measure to integrate the floor slab after the concrete has hardened, and it is necessary to install formwork and attach reinforcing materials to support the formwork to the framework such as girders while the concrete is hardening, which results in increased manufacturing costs and longer construction times.

[0006] Furthermore, Patent Document 2 discloses a deck plate fixing structure in which a deck plate 10 is fixed to a steel beam (cross member 14) with adhesive 16 (see claim 1 of Patent Document 2, paragraphs

[0008] to

[0018] of the specification, Figure 2 of the drawings, etc.).

[0007] However, while the deck plate fixing structure described in Patent Document 2 does indeed eliminate the need for the use of firearms, it not only requires a place to transport and temporarily store the deck plates and makes determining the order in which to apply the adhesive and the construction cumbersome, but it also creates new problems in that redoing the work is difficult and incorrect installation results in a lot of rework.

[0008] Furthermore, Patent Document 3 discloses a fixing structure for a deck plate in which a fixing bracket 100 is used for a flange 12 of a steel beam 10, and an end of a deck plate 50 is inserted between the insertion portion 110 of the fixing bracket 100 and the clamping portion 120 to fix the end (see claim 1 of Patent Document 3, paragraphs

[0022] to

[0028] of the specification, Figures 2 and 3 of the drawings, etc.).

[0009] However, it is unclear whether the deck plate fixing structure described in Patent Document 3 is strong enough when applied to a cantilever slab, and the construction time required per location is longer than with the general burn-out plug welding used to fix the deck plate to the steel beams, which poses the problem of increased installation costs. [Prior art documents] [Patent documents]

[0010] [Patent Document 1] JP 2014-9502 A [Patent Document 2] Japanese Utility Model Application Publication No. 5-3422 [Patent Document 3] JP 2019-31848 A Summary of the Invention [Problem to be solved by the invention]

[0011] Therefore, the present invention has been devised in consideration of the above-mentioned problems, and its object is to provide a deck plate fixing structure for a protruding slab that does not interfere with maintenance work, reduces the number of labor hours, and reduces installation costs. [Means for solving the problem]

[0012] The deck plate fixing structure for a cantilever slab of the first invention is a deck plate fixing structure for a cantilever slab in which the deck plate at the base end of the cantilever slab, the tip of which is cantilevered, is fixed to a steel beam, and is characterized in that the deck plate is cantilevered only by the base end of the deck plate being joined to the steel beam without being reinforced with reinforcing metal fittings to reinforce the cantilever support.

[0013] The deck plate fixing structure for a cantilever slab according to the second invention is characterized in that, in the first invention, the welded joint takes into account rotational rigidity in deflection calculations and is capable of resisting rotational moments due to design loads.

[0014] The deck plate fixing structure for a cantilever slab according to the third invention is characterized in that, in the second invention, the deflection ratio aδ / cδ, which is the ratio of the deflection amount aδ of the simulation or experimental result to the allowable deflection amount cδ, is 1 or less.

[0015] The deck plate fixing structure for a cantilever slab according to the fourth invention is characterized in that, in the second or third invention, the joints are joined in at least two rows spaced a predetermined joint stance apart in the cantilever direction.

[0016] The deck plate fixing structure for a cantilever slab according to the fifth invention is characterized in that, in the fourth invention, the joint is a welded joint and the specified joint stance is 20 mm or more.

[0017] The deck plate fixing structure for a cantilever slab of the sixth invention is characterized in that, in the fourth invention, the joint is a welded joint, and the average pitch of a predetermined weld along the longitudinal direction of the steel beam of the welded joint is 200 mm or less.

[0018] The deck plate fixing structure for a cantilever slab according to the seventh invention is characterized in that, in the fourth invention, the joining is performed by burn-out plug welding.

[0019] The deck plate fixing structure for a cantilever slab of the eighth invention is characterized in that, in the seventh invention, when there is an area in the valley portion of the deck plate where the two rows of burn-out plug welds are not applied, the areas where the burn-out plug welds are not applied are staggered so that two rows of alternating areas appear.

[0020] The ninth invention relates to a deck plate fixing structure for a protruding slab, which is the fourth invention, and is characterized in that the thickness of the deck plate is 1.0 mm or more and 1.6 mm or less. Effect of the Invention

[0021] According to the first to ninth inventions, the deck plate of the cantilever slab can be fixed to the steel beam by simply welding it to the steel beam. This eliminates the need for reinforcing metal fittings and does not interfere with maintenance work. In addition, since the installation work of reinforcing metal fittings is no longer necessary, the number of steps can be reduced, reducing the installation cost of the cantilever slab deck plate and shortening the construction period.

[0022] In particular, according to the second aspect of the present invention, the rotational stiffness is taken into consideration in the calculation of deflection, so that it is possible to counter the rotational moment due to the design load.

[0023] In particular, according to the third aspect of the invention, deflection of the deck plate can be suppressed when a load is generated due to pouring concrete or the like.

[0024] In particular, according to the fourth invention, the joint between the deck plate and the steel beam, which was previously a pin joint, can be made into a semi-rigid joint that can be expected to have rotational rigidity, and the deck plate can be fixed firmly to the steel beam with a cantilever support. This eliminates the need for reinforcing metal fittings, and does not interfere with maintenance work. In addition, since the installation work for reinforcing metal fittings is no longer necessary, the number of man-hours required can be reduced, reducing the installation cost of the deck plate for the cantilever slab and shortening the construction period.

[0025] In particular, according to the fifth and sixth inventions, the specified welding stance is 20 mm or more or the specified average pitch of the welding is 200 mm or less, so that the deflection increase coefficient α can be suppressed and rotational rigidity can be reliably ensured, and the deck plate can be fixed firmly to the steel beam with cantilever support.

[0026] In particular, according to the eighth aspect of the present invention, the balance of the arrangement of the burn-out plug welds is improved, and the rotational rigidity can be improved with a small number of welded locations.

[0027] In particular, according to the ninth aspect of the present invention, the thickness of the deck plate is set to 1.0 mm or more, so that the performance as a formwork is fully guaranteed and sufficient penetration can be ensured by burn-out plug welding. Also, the thickness of the deck plate is set to 1.6 mm or less, so that rotational rigidity can be reliably secured and the deck plate can be sufficiently and firmly fixed to the steel beam by cantilever support. [Brief description of the drawings]

[0028] [Figure 1] FIG. 1 is a vertical cross-sectional view showing a deck plate fixing structure for a cantilever slab according to a first embodiment of the present invention, taken along an orthogonal cross section of a steel beam. [Diagram 2] FIG. 2 is a vertical cross-sectional view showing the configuration of the above-mentioned protruding slab. [Diagram 3]FIG. 3(a) is a plan view mainly showing the joint of the deck plate fixing structure of the above-mentioned cantilever slab, and FIG. 3(b) is a front view of the deck plate fixing structure of the above-mentioned cantilever slab as viewed in the cantilever direction. [Figure 4] FIG. 4 is a perspective view showing the deck plate fixing structure of the above-mentioned protruding slab. [Diagram 5] FIG. 5(a) is a vertical cross-sectional view showing a conventional deck plate fixing structure, and FIG. 5(b) is an explanatory diagram showing problems with the conventional deck plate fixing structure. [Figure 6] FIG. 6 is a vertical cross-sectional view showing a deck plate fixing structure for a protruding slab according to a second embodiment of the present invention, taken along an orthogonal cross section of a steel beam. [Figure 7] FIG. 7 is a vertical cross-sectional view showing the configuration of the above-mentioned protruding slab. [Figure 8] FIG. 8(a) is a plan view mainly showing the joint of the deck plate fixing structure of the above-mentioned cantilever slab, and FIG. 8(b) is a front view of the deck plate fixing structure of the above-mentioned cantilever slab as viewed in the cantilever direction. [Figure 9] FIG. 9 is a perspective view showing the deck plate fixing structure of the above-mentioned protruding slab. [Figure 10] FIG. 10 is a schematic diagram showing an analytical model of double-row welding. [Figure 11] FIG. 11 is a graph showing the effect of the welding stance S on the deflection increase factor α. [Figure 12] FIG. 12 is an enlarged graph showing a portion of FIG. [Figure 13] FIG. 13 is a graph showing the relationship between the deflection increase coefficient α and the end lift value. [Figure 14] FIG. 14 is a graph showing the effect of staggered and parallel arrangements on the deflection increase factor α. [Figure 15] FIG. 15 is a graph showing the relationship between the allowable span L, the weld stance S, and the thickness of the concrete peak when the average welding pitch P is 150 mm. [Figure 16]FIG. 16 is a graph showing the relationship between the allowable span L, the weld stance S, and the thickness of the concrete peak when the average welding pitch P is 200 mm. [Figure 17] FIG. 17 is a diagram showing a method of reinforcing a conventional cantilever slab using reinforcing metal fittings, where (a) is a vertical cross-sectional view perpendicular to the steel beam showing the cantilever slab, and (b) is a vertical cross-sectional view showing the other end of the cantilever slab. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0029] Hereinafter, a deck plate fixing structure for a protruding slab according to an embodiment of the present invention will be described in detail with reference to the drawings.

[0030] <Deck plate fixing structure for protruding slab> [First embodiment] 1 to 4, a deck plate fixing structure 1 for a protruding slab according to a first embodiment of the present invention (hereinafter, also simply referred to as the deck plate fixing structure 1) will be described.

[0031] FIG. 1 is a vertical cross-sectional view showing the deck plate fixing structure 1 of the cantilever slab according to this embodiment in an orthogonal cross section of a steel beam 2, and FIG. 2 is a vertical cross-sectional view showing the configuration of a cantilever slab 10. FIG. 3(a) is a plan view mainly showing the joint of the deck plate fixing structure 1 of the cantilever slab according to this embodiment, and FIG. 3(b) is a front view of the deck plate fixing structure 1 of the cantilever slab 10 according to this embodiment seen in the cantilever direction. And FIG. 4 is a perspective view showing the deck plate fixing structure 1 of the cantilever slab 10 according to the embodiment of the present invention. In each figure, the arrow X indicates the axial direction (longitudinal direction) of the steel beam 2 which is the support structure, the arrow Y indicates the cantilever direction Y which is the horizontal direction perpendicular to the axial direction X, and the arrow Z indicates the up-down direction.

[0032] As shown in Figures 1 and 2, the deck plate fixing structure 1 is a fixing structure to a steel beam 2 of a cantilevered deck plate 3 constituting a cantilevered slab 10 that cantilevers outward from a steel beam 2 that forms the slab end of the building's periphery and openings. This cantilevered slab 10 is made of reinforced concrete by installing a predetermined reinforcing bar S1 on the cantilevered deck plate 3 and pouring concrete C1 of a predetermined strength. This cantilevered slab 10 cantilevers outward from the flange end face of the steel beam 2 by a cantilever span L. In the illustrated embodiment, L = 600 mm is shown as an example.

[0033] (Steel beam) The steel beam 2 is an H-shaped steel specified in JIS G3192, made of rolled steel for general structure, rolled steel for welded structure, rolled steel for architectural structure, weather-resistant hot-rolled steel for welded structure, etc., and in the illustrated embodiment, an H-shaped steel with height H=300 mm×width B=300 mm is exemplified. Of course, the steel beam 2 is a main structural material of a frame structure such as a girder arranged on the periphery of a steel-framed building, and may be any steel cross member made of shaped steel or the like.

[0034] (Deck plate) The deck plate 3 (3') is a deck plate for concrete slabs that is spanned over shaped steel as a pouring formwork that does not require dismantling and is used by pouring concrete on the top surface in order to construct a concrete slab for a structure such as a floor slab of a building. Here, as shown in Figure 1, a normal deck plate that spans between normal steel beams 2 is called a normal deck plate 3', and a deck plate that constitutes a cantilever slab 10 is called a cantilever deck plate 3.

[0035] These deck plates 3 (3') are made by bending thin steel plates of about 1.0 mm to 1.6 mm that have been treated with an anti-rust treatment, such as hot-dip galvanized steel plate (JIS G3302), and forming them into a roughly rectangular shape in plan view with a specified length that corresponds to the shape of the structure.

[0036] 2, the zigzag shape is formed with a peak 3a that is convex upward, a valley 3b that is convex downward, and an inclined portion 3c that connects them. The flat member located at the peak 3a is the upper flange 31, the flat member located at the valley 3b is the lower flange 32, and the flat member located at the inclined portion 3c is the web 33.

[0037] In this embodiment, the step between the upper flange 31 and the lower flange 32, i.e., the distance between them in the vertical direction, is 50 mm. Additionally, the upper flange 31, the lower flange 32, and the web 33 are formed with shear keys along the longitudinal direction of the deck plate 3 to engage with the hardened concrete C1 so as not to shift.

[0038] These shear keys are provided to prevent the deck plate 3 and the concrete C1 from shifting due to shear force at their interface, and to prevent the hardened concrete C1 from jumping up due to bending stress. However, these shear keys also have the function of increasing the bending rigidity of the deck plate 3.

[0039] (Fixed structure) Next, we will explain the joint between the steel beam 2 and the deck plate 3 of the deck plate fixing structure 1. The deck plate fixing structure 1 cantilever-supports the fixed load of the protruding slab 10 protruding outward from the steel beam 2 and the design load such as the construction load during concrete pouring.

[0040] Conventionally, steel beams and deck plates are generally joined by burn-out plug welding. As shown in Fig. 5(a), this burn-out plug welding requires a deck plate to be overlapped by the steel beam with a distance D1 of 50 mm, and a distance D2 of 25 mm from the center of the burn-out plug weld to the edge of the deck plate. However, in the case of Fig. 5(a), the burn-out plug welding is a pin joint, and no rotational rigidity can be expected.

[0041] Furthermore, even if the overlap distance D1 is made larger than specified, as shown in Figure 5(b), with one-point fixing by burn-out plug welding, the deck plate 3' made of thin steel plate will rise significantly from the steel beam 2, and rotational rigidity cannot be expected, and as mentioned in the background art, it will not be able to withstand design loads such as the construction load during concrete pouring without installing reinforcing metal fittings S2 as shown in Figure 17. However, as mentioned above, installing reinforcing metal fittings S2 increases manufacturing costs and impedes maintenance.

[0042] Therefore, in the deck plate fixing structure 1, the deck plate 3 is not reinforced with the reinforcing metal fittings S2 shown in Fig. 17 for reinforcing the cantilever support, but is cantilevered simply by welding the base end 3d of the deck plate 3 to the steel beam 2, as shown in Fig. 3 and Fig. 4. The reference symbol 3e denotes the protruding tip 3e of the deck plate 3.

[0043] In addition, the welded joints of the deck plate fixing structure 1 take into account rotational rigidity in calculating deflection, as described below, and can withstand rotational moments due to design loads such as the construction load when pouring concrete for the cantilever slab 10.

[0044] Specifically, as shown in Figures 1, 3 and 4, the joint is welded with two rows of burn-out plug welds 30 spaced apart by a specified stance S in the protruding direction Y. As will be described in detail later, in order to make a semi-rigid joint that can withstand rotational moments, the stance S is preferably large, and is preferably 20 mm or more. However, since it is restricted by the width of the flange of the steel beam 2, it is preferable that the stance S be 270 mm or less, which is the size of the steel beam 2 that is generally used (assuming a beam width of up to 400 mm).

[0045] In addition, the average pitch of the intervals of the burn-out plug welds 30 in the axial direction X of the steel beam 2 converted to one deck plate is as follows, since the width of one deck plate 3 is 600 mm and only the lower flange 32 of the valley portion 3b of the deck plate 3 is in contact with the steel beam 2, as shown in FIG. 2. In other words, considering that the diameter of the burn-out plug welds 30 needs to be about 18 mm, the burn-out plug welds 30 can be provided in the axial direction X at one location per lower flange 32 of one deck plate with a width of 600 mm, and a maximum of four locations can be provided. Therefore, the welded joints of the deck plate fixing structure 1 when the number of welded locations is maximized have an average pitch of 600 mm / 4 locations, or 150 mm pitch, converted to one deck plate. In addition, if one of the lower flanges 32 is skipped as shown in FIG. 3, the average pitch of the intervals of the deck plate converted to one deck plate is 600 mm / 3 locations, or 200 mm pitch. In other words, the average welding pitch for the deck plate 3 (3') is 150 mm or more and 200 mm or less. If the average pitch per deck plate is 600 mm / 3 locations, which is a 200 mm pitch, any desired location of the bottom flange 32 can be skipped, and of course it can be skipped regularly.

[0046] [Second embodiment] Next, a deck plate fixing structure 1' for a cantilever slab according to a second embodiment of the present invention (hereinafter, simply referred to as the deck plate fixing structure 1') will be described. The deck plate fixing structure 1' according to the second embodiment differs from the above-mentioned deck plate fixing structure 1 mainly in that the cross-sectional shape of the deck plate 4 is different from the above-mentioned deck plate 3, so this point will be described, and the same components will be given the same reference numerals and detailed explanations will be omitted.

[0047] Fig. 6 is a vertical cross-sectional view showing the deck plate fixing structure 1' for the cantilever slab according to this embodiment in an orthogonal cross section of the steel beam 2, and Fig. 7 is a vertical cross-sectional view showing the configuration of the cantilever slab 11. Fig. 8(a) is a plan view mainly showing the joint of the deck plate fixing structure 1' for the cantilever slab according to this embodiment, and Fig. 8(b) is a front view of the deck plate fixing structure 1' for the cantilever slab 11 according to this embodiment, seen in the cantilever direction. And Fig. 9 is a perspective view showing the deck plate fixing structure 1' for the cantilever slab 11 according to the embodiment of the present invention.

[0048] As shown in Figures 6 and 7, the deck plate fixing structure 1' is a fixing structure to the steel beam 2 of a protruding deck plate 4 constituting a protruding slab 11 protruding outward from the aforementioned steel beam 2 by cantilever support. This protruding slab 11 protrudes outward from the flange end face of the steel beam 2 by a protruding span L, similar to the aforementioned protruding slab 10. In the illustrated embodiment, L = 600 mm is shown as an example.

[0049] This protruding deck plate 4 is bent from a single thin steel plate of approximately 1.0 mm to 1.6 mm that has been treated with an anti-rust coating, such as hot-dip galvanized steel plate, and is formed into a roughly rectangular shape in plan view with a predetermined length that corresponds to the shape of the structure.

[0050] As shown in Figures 6 and 7, the deck plate 4 of this embodiment is composed of a rectangular, flat slab support portion (44, 45) that supports the underside of the concrete slab, a reinforcing rib 41 that protrudes along the longitudinal direction of the slab support portion (44, 45) in the out-of-plane direction, and a pair of left and right engagement ribs 42, 43 that protrude along the longitudinal edges of the slab support portion (44, 45) in the out-of-plane direction.

[0051] 6 and 7, this deck plate 4 has a single reinforcing rib 41 protruding from the center of the slab support portion (44, 45), and the slab support portion (44, 45) is divided into a first slab support portion 44 and a second slab support portion 45 by this reinforcing rib 41. In addition, each of the first slab support portion 44 and the second slab support portion 45 is formed with a pair of trapezoidal peaks 44a, 45a and central valleys 44b, 45b in order to increase rigidity.

[0052] (Fixed structure) Next, we will explain the joint between the steel beam 2 and the deck plate 4 of the deck plate fixing structure 1'. Like the deck plate fixing structure 1 described above, the deck plate fixing structure 1' cantilever-supports the fixed load of the protruding slab 11 protruding outward from the steel beam 2 and design loads such as the construction load during concrete pouring.

[0053] That is, in the deck plate fixing structure 1', the deck plate 4 is not reinforced with the reinforcing metal fittings S2 shown in Fig. 17 for reinforcing the cantilever support, but is cantilevered simply by welding the base end 4a of the deck plate 4 to the steel beam 2 as shown in Fig. 8 and Fig. 9. The reference symbol 4b denotes the protruding tip 4b of the deck plate 4.

[0054] In addition, as with the deck plate fixing structure 1, the welded joints of the deck plate fixing structure 1' take into account rotational rigidity in calculating deflection, as described below, and are capable of resisting rotational moments due to design loads such as the construction load when pouring concrete for the protruding slab 11.

[0055] Specifically, as shown in Figures 6, 8 and 9, the joint is welded with two rows of burn-out plug welds 40 spaced apart by a specified stance S in the protruding direction Y. As will be described in detail later, in order to make a semi-rigid joint that can withstand rotational moments, the stance S is preferably large, and is preferably 20 mm or more. However, since it is restricted by the width of the flange of the steel beam 2, it is preferable that the stance S be 270 mm or less, which is the size of the steel beam 2 that is generally used (assuming a beam width of up to 400 mm).

[0056] Also, considering that the burn-out plug welds 40 need to have a diameter of about 18 mm, in the deck plate 4, welding can only be performed at the aforementioned valley portions 44b, 45b that are in contact with the steel beam 2. In other words, while the width of one deck plate 4 is 400 mm, burn-out plug welds 40 can only be provided in a maximum of two locations in the axial direction X within a width of 400 mm. In short, the average pitch, which is the spacing in the axial direction X of the steel beam 2 of the burn-out plug welds 40 converted per deck plate, is 400 mm / 2 locations, or a pitch of 200 mm, in the case of the deck plate 4, as shown in Figure 8.

[0057] [FEM analysis] Next, the effectiveness of two rows of burn-out plug welds spaced apart by a given stance S in the protrusion direction Y was examined using FEM (Finite Element Method) analysis. The diameter of the burn-out plug welds was set to 18 mm for the analysis.

[0058] (Analysis model) The analytical model for the FEM analysis was a shell model of our own manufactured Super E Deck (EZ50) for deck slabs, similar to the deck plate 3 of the above-mentioned deck plate fixing structure 1, with a plate thickness of 1.2 mm and a deck width of 600 mm, as shown in Fig. 10. Fig. 10 is a schematic diagram showing the analytical model for two-row welding.

[0059] (Loading conditions) The loading conditions were as follows: 1470N / m2 load during construction on the deck overhang in the range of L=600mm in Figure 10. 2 A uniform load of 2521N / m is applied to the top of the crest of 80mm thick reinforced concrete. 2 The analysis was carried out assuming that a fixed load of 1000 mm was applied.

[0060] (Variables under consideration) The analysis variables (parameters) were the welding stance S and average welding pitch P of the two rows of burn-out plug welds mentioned above, and the analysis was performed with welding stance S set to 0mm, 90mm, 180mm, and 270mm, and average welding pitch P set to 200mm and 150mm. Here, welding stance S = 0mm refers to a single burn-out plug weld, which is a conventional pin joint. In addition, the welding stances of 90mm, 180mm, and 270mm are assumed to be cases where the beam width of the steel beam 2 mentioned above is 200mm, 300mm, and 400mm, respectively.

[0061] (Deflection Increase Coefficient) In addition, in order to ensure rotational rigidity in deflection calculations, the deflection increase coefficient α was defined as: (design deflection amount) / (FEM analysis result deflection amount) (see Table 1 below). By considering the influence of the welding stance S and the average welding pitch P on the deflection increase coefficient α, the deflection increment was quantified and the effectiveness of two-row burn-out plug welding was examined.

[0062] [Table 1]

[0063] Here, the design deflection value is the calculated value when assuming that the connection between the steel beam 2 and the deck plate 3 is a rigid connection, and the analytical value is the calculated value when simulating the deflection amount using the analytical model of the two-row weld mentioned above.

[0064] The results of analysis using the above-mentioned deflection increment quantification method are shown in Fig. 11 to Fig. 14. Fig. 11 is a graph showing the effect of the welding stance S on the deflection increase coefficient α, and Fig. 12 is an enlarged graph showing a portion of the graph. Fig. 13 is a graph showing the relationship between the deflection increase coefficient α and the end lift value, and Fig. 14 is a graph showing the effect of staggered and parallel arrangements on the deflection increase coefficient α.

[0065] As is clear from Figures 11 and 12, even with a welding stance S = 20mm, the deflection increase factor α is less than 50 times, which means that the deflection increase factor α can be suppressed and rotational rigidity can be ensured, and the deck plate can be securely fixed to the steel beam with cantilever support. Also, compared to conventional burn-out plug welding, the amount of deflection can be reduced by 85% with a welding stance S = 90mm, 92% with a welding stance S = 180mm, and 94% with a welding stance S = 270mm, showing that a welding stance S of 90mm or less is even more preferable.

[0066] Furthermore, as is clear from Figure 13, reducing the amount of lift of the deck plate from the steel beam leads to a reduction in the amount of deflection.

[0067] As is clear from Figure 14, when the average welding pitch P is 200 mm, i.e. when there are two rows of places in the valleys of the deck plate where there are no burn-out plug welds, the amount of deflection can be reduced by using a well-balanced staggered arrangement. Here, staggered arrangement refers to an arrangement where the places where there are no burn-out plug welds are arranged in two alternating rows, and parallel arrangement refers to an arrangement where the places where there are no burn-out plug welds are lined up next to each other in the same valley.

[0068] In addition, the scope of application of the present invention was considered based on the deflection increase coefficient α, which is the aforementioned quantification method. Specifically, the range of allowable overhang span L in the actual design when using our own Super E Deck (EZ50) for deck slabs with a plate thickness of 1.2 for the overhanging part applied to the analysis model is shown in Figures 15 and 16. In other words, the range below the graphs of each stance S in Figures 15 and 16 is the value of the allowable overhang span L.

[0069] The scope of application of this invention is considered to be a deflection ratio aδ / cδ, which is the ratio of the deflection aδ of the simulation result of FEM analysis to the allowable deflection cδ, of 1 or less. In addition, the thickness of the concrete on the top of the slab is stipulated to be 50 mm or more and 100 mm or less in the scope of application.

[0070] Although the finite element method has been described as an example of the simulation method, it goes without saying that other simulation methods such as CAE (Computer Aided Engineering) analysis may also be used. In addition, the method is not limited to simulation, and deflection and the like may be measured and obtained through experiments.

[0071] According to the above-described deck plate fixing structure 1, 1' of the embodiment of the present invention, the deck plate of the cantilever slab can be fixed to the steel beam by simply welding it to the steel beam. Therefore, reinforcing metal fittings are not required, and they do not interfere with maintenance work. In addition, since the installation work of reinforcing metal fittings is not required, the number of steps can be reduced, and the installation cost of the deck plate of the cantilever slab can be reduced.

[0072] Furthermore, according to the deck plate fixing structure 1, 1' of the cantilever slab, the rotational rigidity is taken into consideration in the calculation of deflection, so that it is possible to resist the rotational moment due to the design load such as the construction load.

[0073] Furthermore, with the deck plate fixing structure 1, 1', the joint between the deck plate and the steel beam, which was previously a pin joint, can be made into a semi-rigid joint that is expected to have rotational rigidity, and the deck plate can be fixed firmly to the steel beam with a cantilever support. This eliminates the need for reinforcing metal fittings, and does not interfere with maintenance work. In addition, since the installation work for reinforcing metal fittings is no longer necessary, the labor hours can be reduced, and the installation cost of the deck plate for the cantilever slab can be reduced.

[0074] The above describes in detail the deck plate fixing structures 1, 1' for the cantilever slab according to the embodiment of the present invention, but the above-mentioned or illustrated embodiments are merely examples of the present invention. Therefore, the technical scope of the present invention should not be interpreted as being limited by the illustrated embodiments. In particular, the deck plate is described as being a deck plate on which reinforcement is arranged and concrete is poured, but it can also be applied as a structure that supports the weight of a finishing material (such as plywood) on a cantilever when the finishing material is placed on the deck plate. [Explanation of symbols]

[0075] 10, 11: Projecting slab 1, 1': Deck plate fixing structure (for protruding slab) 2: Steel beam 3: (Protruding) Deck plate 3': (General) Deck plate 3a:Yamabe 3b: Tanibe 3c: Inclined part 3d: proximal end 3e: Tip 31: Top flange 32: Lower flange 33: Web 30, 40: Quench plug welding 4: (Protruding) Deck plate 4': (General) Deck plate 4a: Proximal end 4b:Tip 41: Reinforcement rib 42, 43: Engagement rib 44: First slab support 44a: Yamabe 44b: Tanibe 45: Second slab support 45a: Yamabe 45b: Tanibe S: Stance S1: Reinforcement PL: Concrete stop plate S2: Reinforcement hardware

Claims

1. A deck plate fixing structure for a cantilevered slab in which the deck plate at the base end of the cantilevered slab is fixed to a steel beam, The deck plate is supported in a cantilevered position by simply connecting the base end of the deck plate to the steel beam, without being reinforced with reinforcing hardware to reinforce the cantilevered position. A deck plate fixed structure with a protruding slab.

2. The joints must be able to withstand rotational moments caused by design loads, with rotational rigidity taken into account in deflection calculations. The deck plate fixing structure of claim 1 .

3. The deflection ratio aδ / cδ, which is the ratio of the deflection aδ of the simulation or experimental result to the allowable deflection cδ, is 1 or less. The deck plate fixing structure for a protruding slab according to claim 2.

4. The joints are joined in at least two rows spaced apart by a predetermined joint stance in the protruding direction. The deck plate fixing structure for a protruding slab according to claim 2 or 3.

5. the joint is a welded joint, The predetermined joint stance is 20 mm or more. The deck plate fixing structure for a protruding slab according to claim 4.

6. the joint is a welded joint, The average pitch of the predetermined welds along the longitudinal direction of the steel beam of the welded joint is 200 mm or less. The deck plate fixing structure for a protruding slab according to claim 4.

7. The said joint is performed by burn-out plug welding. The deck plate fixing structure for a protruding slab according to claim 4.

8. If there are any areas in the valleys of the deck plate where the two rows of burnout plug welds are not applied, the areas where the burnout plug welds are not applied shall be staggered so that the two rows appear alternately. The deck plate fixing structure for a protruding slab according to claim 7.

9. The thickness of the deck plate must be between 1.0 mm and 1.6 mm. The deck plate fixing structure for a protruding slab according to claim 4.

Citation Information

Patent Citations

  • Ribbed concrete stopper around the slab

    JP1993040498U

  • Welding jig

    JP2021159954A

  • Concrete flow preventive frame

    JP2022168506A

  • Stay-in-Place Fascia Forms and Methods and Equipment for Installation Thereof

    US20150159386A1

  • Deck plate fixing structure

    JP1993003422U

Cited By

  • Cantilevered slab structure

    JP2026164106A

  • Roof structure

    JP2026164110A

  • Synthesis bed structure

    JP2026164158A