Molding sand storage method and molding sand storage system
The foundry sand storage method and system address the challenge of inconsistent aging times by using a controlled storage and supply process with sensors to manage the input and supply of sand, ensuring appropriate resting times and consistent aging.
Patent Information
- Application Number
- JP2023058003
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-31
- Publication Date
- 2024-10-15
AI Technical Summary
Existing methods fail to effectively manage the aging time of foundry sand, leading to inconsistent and inappropriate resting times due to the addition of new sand during the measurement period, which disrupts the aging process.
A foundry sand storage method and system that includes a storage process, acquisition process, and control process to manage the input and supply of foundry sand, setting threshold values based on aging time, and using sensors to accurately measure storage amounts, ensuring appropriate aging times by controlling the input and supply of sand to maintain consistent resting times.
Ensures appropriate aging times for foundry sand by accurately measuring and controlling the input and supply of sand, preventing new sand from being supplied before the aging time is complete, and maintaining consistent resting times across storage sections.
Smart Images

Figure 2024145583000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a foundry sand storage method and a foundry sand storage system. [Background technology]
[0002] Patent Document 1 discloses a molding sand reclamation device. This molding sand reclamation device includes a sand tank for maturation, which receives molding sand in a storage chamber and matures the molding sand while discharging it from a discharge port, and a rotary drive means for rotating the sand tank for maturation around a rotation center line. The molding sand discharged from the discharge port is transported to a mold manufacturing section by a molding sand transport means. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2005-046863 A Summary of the Invention [Problem to be solved by the invention]
[0004] Since the molding sand needs to be adjusted in temperature, moisture content, and other properties before being supplied from a storage unit such as a tank to a molding sand-related device, it is desirable for the molding sand to be stored in the storage unit for a resting time (maturation time). However, a method for appropriately managing the resting time of the molding sand has not been established. Even if it is possible to measure the resting time of the molding sand stored in the storage unit using a timer or the like, it is difficult to measure the time for each molding sand, for example, when new molding sand is added to the storage unit after the measurement of the resting time is started, or when molding sand is supplied from the storage unit to the molding sand-related device. For this reason, there are cases where the resting time of the molding sand cannot be appropriately secured. Therefore, there is a demand for a molding sand storage method and a molding sand storage system that can appropriately secure the resting time of the molding sand. [Means for solving the problem]
[0005] The molding sand storage method according to the present disclosure includes a storing step, an acquiring step, a setting step, and a controlling step. The storing step stores molding sand that can be supplied to a molding sand-related device in at least one storage unit. The acquiring step acquires a storage amount of molding sand in at least one storage unit, an input amount of molding sand to the storage unit, and a supply amount of molding sand to the molding sand-related device. The setting step sets a threshold value for the storage amount based on a predetermined resting time of the molding sand and the input amount and supply amount acquired in the acquiring step. The controlling step controls at least one of the input amount and the supply amount based on the storage amount acquired in the acquiring step and the threshold value set in the setting step.
[0006] A foundry sand storage system according to another aspect of the present disclosure includes at least one storage unit and a control device. The at least one storage unit stores foundry sand that can be supplied to a foundry sand-related device. The control device controls at least one of an input amount of foundry sand to the storage unit and an input amount of foundry sand to the foundry sand-related device. The control device includes an acquisition unit, a setting unit, and a control unit. The acquisition unit acquires the stored amount, input amount, and supply amount of foundry sand in the at least one storage unit. The setting unit sets a threshold value for the stored amount based on a predetermined resting time of the foundry sand and the input amount and supply amount acquired by the acquisition unit. The control unit controls at least one of the input amount and supply amount based on the stored amount and the threshold value acquired by the acquisition unit. Effect of the Invention
[0007] According to the present disclosure, it is possible to ensure an appropriate resting time for the foundry sand. [Brief description of the drawings]
[0008] [Figure 1] FIG. 1 is a diagram illustrating a molding sand storage system according to an embodiment. [Diagram 2] FIG. 2 is a schematic plan view showing an example of a foundry sand storage system according to the embodiment shown by line II-II in FIG. [Diagram 3]FIG. 3 is a schematic top view illustrating an example of a foundry sand storage system according to an embodiment. [Figure 4] FIG. 4 is a block diagram showing an example of a control device of the foundry sand storage system 1 according to the embodiment. [Diagram 5] FIG. 5 is a flowchart showing an example of a molding sand storing method using the molding sand storing system according to the embodiment. [Figure 6] FIG. 6 is a flow chart showing an example of the steps in the flow chart shown in FIG. [Figure 7] FIG. 7 is a flowchart showing an example of a molding sand storing method using the molding sand storing system according to the embodiment. [Figure 8] FIG. 8 is a flow chart showing an example of a process in the flow chart shown in FIG. [Figure 9] FIG. 9 is a flowchart showing an example of a molding sand storing method using a molding sand storing system according to a modified example. [Figure 10] FIG. 10 is a flowchart showing an example of a molding sand storing method using the molding sand storing system according to the modified example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] [Overview of the embodiment of the present disclosure] First, an overview of the embodiment of the present disclosure will be described.
[0010] (Clause 1) A molding sand storage method according to one aspect of the present disclosure includes a storing step, an acquiring step, a setting step, and a controlling step. The storing step stores molding sand that can be supplied to a molding sand-related device in at least one storage section. The acquiring step acquires a storage amount of molding sand in at least one storage section, an input amount of molding sand to the storage section, and a supply amount of molding sand to the molding sand-related device. The setting step sets a threshold value for the storage amount based on a predetermined resting time of the molding sand and the input amount and supply amount acquired in the acquiring step. The controlling step controls at least one of the input amount and the supply amount based on the storage amount acquired in the acquiring step and the threshold value set in the setting step.
[0011] According to this method for storing foundry sand, when foundry sand is newly charged in a state where foundry sand is already stored in the storage section, the newly charged foundry sand can be allowed to rest for a certain period of time while the already stored foundry sand is being supplied to the foundry sand-related device. In this case, for example, the amount of foundry sand supplied to the foundry sand-related device during the resting time of the newly charged foundry sand is controlled to be equal to or less than the amount of the already stored foundry sand, thereby preventing the newly charged foundry sand from being supplied from the storage section to the foundry sand-related device before the resting time has elapsed. In addition, by controlling the amount of sand charged, the amount of foundry sand stored in the storage section that can be supplied to the foundry sand-related device can be appropriately controlled. The amount of sand stored in the storage section increases by the amount of sand charged and decreases by the amount of sand supplied. Here, in the setting step, the threshold value for the amount of storage is set based on the resting time, the amount of sand charged, and the amount of sand supplied. In the control step, by controlling at least one of the input amount and the supply amount, for example, the amount of molding sand in the storage unit can be controlled to be equal to or greater than a threshold value. In this way, by controlling the amount of storage in the storage unit, an appropriate resting time for the molding sand can be ensured. Therefore, this molding sand storage method can ensure an appropriate resting time for the molding sand.
[0012] (Clause 2) The acquiring step may include a step of measuring the storage volume by at least one of a microwave sensor, a millimeter wave sensor, and a Saug-type level meter. In this case, since the storage volume is measured by at least one of a microwave sensor, a millimeter wave sensor, and a Saug-type level meter, it is possible to measure the storage volume more accurately than when the storage volume is measured by a level switch.
[0013] (Clause 3) The storing step may include storing the molding sand in one storage section as at least one storage section, and the controlling step may include a step of preparing the molding sand that can be charged into one storage section in the first charging section and the second charging section, a step of charging the molding sand from the first charging section into one storage section, and a step of charging the molding sand from the second charging section into the one storage section when it is determined that the amount of storage in the one storage section is less than the threshold. In this case, when controlling the charging amount for the storage amount in one storage section, when the storage amount is less than the threshold, in addition to charging the molding sand from the first charging section, charging of the molding sand from the second charging section is performed. As a result, more molding sand is charged into the one storage section than when the molding sand is charged into the one storage section only from the first charging section. Therefore, the storage amount in the one storage section can be made equal to or greater than the threshold in a shorter time, and the resting time of the charged molding sand can be appropriately secured.
[0014] (Clause 4) The storing step may include storing the molding sand in a plurality of storage sections as at least one storage section, and the controlling step may include a step of having a first input section prepare molding sand to be input to the plurality of storage sections, a step of inputting molding sand from the first input section to the plurality of storage sections, and a step of, when it is determined that the storage amount of at least one of the plurality of storage sections is less than a threshold value and the storage amount of another of the plurality of storage sections is equal to or greater than the threshold value, inputting molding sand from the first input section to the at least one storage section such that the input amount is greater than the input amount from the first input section to the at least one storage section before the determination. The resting time of the molding sand in a storage section having a smaller storage amount than the other storage sections may be shorter than the resting time of the molding sand in the other storage sections. According to the present disclosure, by feeding foundry sand from a first feeding section into a storage section with a small storage volume so that the feeding amount is greater than the amount fed into other storage sections, the storage volume can be increased to ensure a resting time equivalent to that of the foundry sand in the other storage sections.
[0015] (Clause 5) The storing step may include storing the molding sand in a plurality of storage sections as at least one storage section, and the controlling step may include a step of preparing the molding sand in the first and second input sections to be charged into the plurality of storage sections, a step of charging the molding sand from the first input section into the plurality of storage sections, and a step of charging the molding sand from the second input section into at least one of the plurality of storage sections when it is determined that the storage amount in each of the plurality of storage sections is less than the threshold. Even if the charge amount from the first input section to each storage section is changed when the storage amount in each of the plurality of storage sections is less than the threshold, if the total amount of molding sand charged from the first input section is constant, the time until the storage amount in each of the plurality of storage sections becomes equal to or greater than the threshold remains the same before and after the change. In the present disclosure, when controlling the charge amount for the storage amounts in the plurality of storage sections, when the storage amount in each of the plurality of storage sections is less than the threshold, in addition to charging the molding sand from the first input section, charging the molding sand from the second input section is performed. Therefore, compared to the case where the molding sand is fed into the multiple storage parts from only the first feed part, a larger amount of molding sand is fed into the multiple storage parts. Therefore, the storage amount of the multiple storage parts can be increased to the threshold value or more in a shorter time, and the storage amount of molding sand in the storage parts that can be supplied to the molding sand-related devices can be appropriately increased. In addition, the resting time of the molding sand fed thereafter can be appropriately secured.
[0016] (Clause 6) The step of controlling may include a step of causing the first input unit to input foundry sand to at least one of the plurality of storage units having a smaller storage amount than the other storage units such that the input amount is greater than the input amount from the first input unit to the at least one storage unit before the determination. In this case, by having the first input unit input foundry sand preferentially to the at least one storage unit having a smaller storage amount, the storage amount in the at least one storage unit can be increased in a shorter time, and the storage amount of foundry sand in the storage unit that can be supplied to the foundry sand-related device can be appropriately increased. In addition, the foundry sand input thereafter can be allowed to rest for a certain period of time.
[0017] (Clause 7) The step of controlling may include a step of causing the second input unit to input foundry sand to at least one of the plurality of storage units having a smaller storage amount than the other storage units such that the input amount is greater than the input amount from the second input unit to the at least one storage unit before the determination. In this case, by having the second input unit input foundry sand preferentially to the at least one storage unit having a smaller storage amount, the storage amount in the at least one storage unit can be increased in a shorter time, and the storage amount of foundry sand in the storage unit that can be supplied to the foundry sand-related device can be appropriately increased. In addition, the later input foundry sand can be allowed to rest for a certain period of time.
[0018] (Clause 8) The storing step may include storing the molding sand in one storage unit as at least one storage unit, and the controlling step may include a step of having the supply unit prepare molding sand that can be supplied to the molding sand-related device, a step of having the supply unit supply molding sand from one storage unit to the molding sand-related device, and a step of reducing the supply amount from one storage unit and supplying molding sand from the supply unit to the molding sand-related device when it is determined that the storage amount in one storage unit is less than the threshold value, so that the total amount of the supply amount from one storage unit and the supply amount from the supply unit becomes a predetermined set amount. In this case, the rate of decrease in the storage amount in one storage unit whose storage amount is less than the threshold value can be reduced, and the resting time of the molding sand in the one storage unit can be appropriately secured. In addition, by supplying molding sand from the supply unit to the molding sand-related device, a constant amount of molding sand can be supplied to the molding sand-related device by one storage unit and the supply unit.
[0019] (Clause 9) The storing step may include storing the molding sand in a plurality of storage parts as at least one storage part, and the controlling step may include a step of supplying molding sand from the plurality of storage parts to a molding sand-related device, and a step of controlling, when it is determined that the storage amount in at least one of the plurality of storage parts is less than a threshold value and the storage amounts in the other storage parts of the plurality of storage parts are equal to or greater than the threshold value, so that the total amount of the supply amounts from the plurality of storage parts becomes a predetermined set amount while reducing the supply amount from the at least one storage part from the supply amount from the at least one storage part before the determination. In this case, the resting time of the molding sand in a storage part having a smaller storage amount than the other storage parts may be shorter than the resting time of the molding sand in the other storage parts. According to the present disclosure, by reducing the amount of sand supplied from a storage section with a small storage volume to a foundry sand-related device compared to the amount of sand supplied from other storage sections to the foundry sand-related device, it is possible to suppress a reduction in the storage volume so as to ensure a resting time equivalent to that of the foundry sand in the other storage sections.
[0020] (Clause 10) The storing step may include storing the molding sand in a plurality of storage units as at least one storage unit, and the controlling step may include a step of having the supply unit prepare molding sand that can be supplied to the molding sand-related device, a step of having the supply unit supply molding sand from the plurality of storage units to the molding sand-related device, and a step of having the supply unit supply molding sand to the molding sand-related device when it is determined that the storage amounts of each of the plurality of storage units are less than a threshold value. In this case, when controlling the supply amount from the plurality of storage units to the molding sand-related device, when the storage amounts of each of the plurality of storage units are less than a threshold value, in addition to the supply of molding sand from the plurality of storage units to the molding sand-related device, the supply unit supplies molding sand to the molding sand-related device. Therefore, according to the above-mentioned configuration, for example, the supply amount of molding sand from the plurality of storage units to the molding sand-related device can be reduced compared to the case where the molding sand is supplied to the molding sand-related device only from the plurality of storage units. Therefore, the rate at which the amount of storage in the plurality of storage sections decreases can be suppressed, and the decrease in the amount of molding sand stored in the storage sections that can be supplied to molding sand-related devices can be appropriately suppressed.
[0021] (Clause 11) The step of controlling may include a step of supplying the foundry sand from the supply unit to the foundry sand-related device so that the total amount of the supply from the plurality of storage units and the supply from the supply unit is a predetermined set amount while reducing the supply amount from each of the plurality of storage units from the respective supply amounts before the determination. Even if the supply amount from at least one storage unit to the foundry sand-related device is reduced when the storage amount in each of the plurality of storage units is less than a threshold value, if the total amount of the foundry sand supplied from the entire plurality of storage units is constant, the supply amount from the other storage units only increases, and the time until the storage amount in each of the plurality of storage units becomes equal to or greater than the threshold value remains the same before and after the increase or decrease in the supply amount. In the present disclosure, a set amount of foundry sand is supplied to the foundry sand-related device by the plurality of storage units and the supply unit, so that the supply amount of foundry sand from the plurality of storage units to the foundry sand-related device can be reduced compared to the case where the foundry sand is supplied to the foundry sand-related device only from the plurality of storage units. Therefore, the rate at which the amount of storage in the plurality of storage sections decreases can be suppressed, and the decrease in the amount of molding sand stored in the storage sections that can be supplied to molding sand-related devices can be appropriately suppressed.
[0022] (Clause 12) A foundry sand storage system according to another aspect of the present disclosure includes at least one storage unit and a control unit. The at least one storage unit stores foundry sand that can be supplied to a foundry sand-related device. The control unit controls at least one of an amount of foundry sand charged to the storage unit and an amount of foundry sand supplied to the foundry sand-related device. The control unit includes an acquisition unit, a setting unit, and a control unit. The acquisition unit acquires the amount of foundry sand stored in the at least one storage unit, the amount of sand charged, and the amount of sand supplied. The setting unit sets a threshold value for the amount of foundry sand stored based on a predetermined resting time of the foundry sand and the amount of sand charged and the amount of sand supplied acquired by the acquisition unit. The control unit controls at least one of the amount of sand charged and the amount of sand supplied based on the amount of sand stored and the threshold value acquired by the acquisition unit.
[0023] (Clause 13) The apparatus may include at least one of a microwave sensor, a millimeter wave sensor, and a Sauding-type level meter, and may be equipped with a measuring device for measuring the storage volume, and the acquisition unit may acquire the storage volume measured by the measuring device. In this case, the same effects as those of Clause 2 are achieved.
[0024] (Clause 14) The measuring device may include a microwave sensor provided at a position capable of irradiating microwaves in a direction intersecting the inclined surface of the deposit of molding sand having an inclined surface with a formable angle of repose in at least one reservoir. In this case, by irradiating microwaves in a direction intersecting the inclined surface of the deposit of molding sand, the measuring device can receive microwaves reflected from the inclined surface with higher accuracy.
[0025] (Clause 15) The molding machine may further include a storage unit for storing the molding sand that exceeds the upper limit and is discharged from at least one of the storage units when the storage amount exceeds a predetermined upper limit. This makes it possible to prevent the molding sand from overflowing from the storage unit.
[0026] (Clause 16) As the at least one storage section, a first input section and a second input section capable of inputting molding sand into the one storage section may be provided, and the control section may cause the first input section to input molding sand into the one storage section, and when the amount of storage in the one storage section falls below a threshold, cause the second input section to input molding sand into the at least one storage section. In this case, the same action and effect as in Clause 3 is achieved.
[0027] (Clause 17) The at least one storage section may include a plurality of storage sections, and may further include a first input section capable of inputting molding sand into the plurality of storage sections, and when the control section controls the control section to input molding sand from the first input section into the plurality of storage sections, and determines that the storage volume of at least one of the plurality of storage sections is less than a threshold value and that the storage volumes of the other of the plurality of storage sections are equal to or greater than the threshold value, may control the control section to input molding sand from the first input section so that the input amount is greater than the input amount from the first input section into the at least one storage section before the determination. In this case, the same effects as those of clause 4 are achieved.
[0028] (Clause 18) The at least one storage section may include a plurality of storage sections, and may further include a first input section and a second input section capable of inputting molding sand into the plurality of storage sections, and the control section may cause the first input section to input molding sand into the plurality of storage sections, and when it is determined that the storage amounts of the plurality of storage sections are each less than a threshold value, cause the second input section to input molding sand into at least one of the plurality of storage sections. In this case, the same action and effect as in clause 5 is achieved.
[0029] (Clause 19) The at least one storage unit may include one storage unit and may further include a supply unit capable of supplying molding sand to a foundry-sand-related device, and the control unit may supply molding sand from one storage unit to the foundry-sand-related device, and when it is determined that the amount of storage in one storage unit is less than a threshold value, may reduce the amount of supply from one storage unit and supply molding sand from the supply unit to the foundry-sand-related device so that the total amount of the supply from one storage unit and the supply from the supply unit becomes a predetermined set amount. In this case, the same effect as in Clause 8 is achieved.
[0030] (Clause 20) The at least one storage section may include a plurality of storage sections, and may further include a supply section capable of supplying the foundry sand to the foundry sand-related device, and the control section may supply the foundry sand from the plurality of storage sections to the foundry sand-related device, and when it determines that the storage amount of at least one of the plurality of storage sections is less than a threshold value and the storage amounts of the other of the plurality of storage sections are equal to or greater than a threshold value, may control the total amount of the supply amounts from the plurality of storage sections to a predetermined set amount while reducing the supply amount from the at least one storage section from the supply amount from the at least one storage section before the determination. In this case, the same action and effect as in Clause 9 is achieved.
[0031] (Clause 21) The control unit may cause the first feeding unit to feed foundry sand to at least one of the plurality of storage units having a smaller storage amount than the other storage units such that the feeding amount is greater than the feeding amount from the first feeding unit to the at least one storage unit before the determination. In this case, the same effect as that of clause 6 is achieved.
[0032] (Clause 22) The control unit may cause the second feeding unit to feed foundry sand into at least one of the plurality of storage units having a smaller storage amount than the other storage units such that the amount of sand fed into the at least one storage unit is greater than the amount fed from the second feeding unit into the at least one storage unit before the determination. In this case, the same effect as that of clause 7 is achieved.
[0033] (Clause 23) The at least one storage section may include a plurality of storage sections, and may further include a supply section capable of supplying molding sand to the foundry-sand-related device, and the control section may supply the foundry sand from the plurality of storage sections to the foundry-sand-related device, and when it is determined that the amount of storage in each of the plurality of storage sections is less than a threshold value, may supply the foundry sand from the supply section to the foundry-sand-related device. In this case, the same effect as that of clause 10 is achieved.
[0034] (Clause 24) The control unit may supply foundry sand from the supply unit to the foundry-sand-related device so that the total amount of the supply from the plurality of storage units and the supply from the supply unit becomes a predetermined set amount while reducing the supply amount from each of the plurality of storage units from the amount before the determination. In this case, the same effect as that of clause 11 is achieved.
[0035] [Examples of the embodiments of the present disclosure] Hereinafter, an embodiment of the present disclosure will be described with reference to the drawings. In the following description, the same or equivalent elements are given the same reference numerals, and overlapping descriptions will not be repeated. The dimensional ratios of the drawings do not necessarily match those in the description. In the drawings, the X-axis direction and the Y-axis direction are the horizontal direction, and the Z-axis direction is the up-down direction. The X-axis direction, the Y-axis direction, and the Z-axis direction are mutually orthogonal.
[0036] [Outline of the casting sand storage system] FIG. 1 is a schematic diagram of a molding sand storage system according to an embodiment. The molding sand storage system 1 shown in FIG. 1 stores molding sand S to be used in a molding sand related device 2 and supplies the molding sand S to the molding sand related device 2. The molding sand related device 2 includes, for example, a molding machine or a kneading machine. The molding sand related device 2 may be other devices related to the molding sand S. The molding sand storage system 1 stores the molding sand S so that a predetermined resting time is ensured before supplying it to the molding sand related device 2. The term "resting" includes keeping the molding sand S in a state in which it is not transported to the molding sand related device 2 for a predetermined time. The term "resting" includes adjusting the moisture content, temperature, and the like of the molding sand S so that the moisture content and temperature are required when the molding sand S is used in the molding sand related device 2.
[0037] The foundry sand storage system 1 includes at least one storage unit 10 and a control device 80. The foundry sand storage system 1 further includes a storage unit 15, a first input unit 30, a second input unit 40, an unloading unit 50, a supply unit 60, and at least one measuring device 70. The foundry sand storage system 1 sets a threshold value based on the resting time of the foundry sand S, the input amount of the foundry sand S input into at least one storage unit 10, and the supply amount of the foundry sand S supplied to the foundry sand-related device 2 by the control device 80, and controls at least one of the input amount and the supply amount based on the threshold value and the storage amount of the foundry sand S in the at least one storage unit 10.
[0038] In the example shown in FIG. 1, the foundry sand storage system 1 includes a first storage section 10A and a second storage section 10B as at least one storage section 10. The first storage section 10A and the second storage section 10B are provided along the Y direction. The first storage section 10A is located in the positive direction of the Y axis, and the second storage section 10B is located in the negative direction of the Y axis. The first storage section 10A and the second storage section 10B are symmetrical with respect to a virtual line IF extending in the up-down direction between the first storage section 10A and the second storage section 10B. Hereinafter, the first storage section 10A will be described as an example, but the second storage section 10B also has a similar configuration.
[0039] The first storage section 10A includes a storage container 11, a first discharge section 12, and a second discharge section 20. The storage container 11 stores the molding sand S. In the example shown in FIG. 1, a deposit SV1 of the molding sand S having an inclined surface with an angle of repose formed by the molding sand S is stored in the storage container 11. The storage container 11 is, for example, a sand bin. The storage container 11 is a bottomed cylindrical member that penetrates in the vertical direction. In a top view, the lower end of the storage container 11 is inclined so that the space inside the storage container 11 expands upward. The outer shape of the upper part of the storage container 11 is cylindrical. The outer shape of the lower part of the storage container 11 is truncated cone. The shape of the storage container 11 is not limited.
[0040] A first inlet 11a and a second inlet 11b are formed at the upper end of the storage container 11. The molding sand S passes through the first inlet 11a and the second inlet 11b. The molding sand S is supplied from the first input part 30 into the storage container 11 through the first inlet 11a. The molding sand S is also supplied from the second input part 40 into the storage container 11 through the second inlet 11b.
[0041] When the storage amount is greater than a predetermined upper limit, the first discharge section 12 discharges the molding sand S that exceeds the upper limit from the first storage section 10A to the storage section 15. The first discharge section 12 is provided on the side surface of the upper part of the storage container 11. A first discharge port 12a is formed on the side surface of the upper part of the storage container 11. The first discharge port 12a is provided at a predetermined position of the storage container 11. The predetermined position is a position where a deposit SV2 of the molding sand S having an inclined surface with an angle of repose formed by the molding sand S contacts the side surface of the storage container 11 when the upper limit storage amount of the molding sand S is stored in the storage container 11. The predetermined position may be a position higher or lower than the above-mentioned position.
[0042] The first discharge section 12 has a first discharge pipe 12b connected to the first discharge outlet 12a. The first discharge pipe 12b is a pipeline connected to the storage section 15. When the stored amount is greater than the upper limit, the molding sand S that exceeds the upper limit passes through the first discharge outlet 12a and the first discharge pipe 12b and is discharged to the storage section 15. The storage section 15 stores the molding sand S that exceeds the upper limit in the storage container 11. The storage section 15 is, for example, a hopper. The storage section 15 stores the molding sand S discharged from the first discharge section 12.
[0043] The second discharge section 20 discharges the molding sand S from the storage container 11 when the molding sand S is supplied from the first storage section 10A to the molding sand related device 2. The second discharge section 20 is provided at the bottom 11c of the storage container 11. FIG. 2 is a schematic plan view showing an example of a molding sand storage system according to an embodiment shown by line II-II in FIG. 1. The second discharge section 20 shown in FIG. 2 is provided with a plurality of discharge gates 21, a rotary table 22, a drive section 23, and a supply guide member 24. The second discharge section 20 is provided with a second discharge port 20a for discharging the molding sand S to a chute 51 (described later) of the discharge section 50.
[0044] The discharge gates 21 are provided on a circumference centered on the center of the bottom 11c of the storage container 11. Each discharge gate 21 is a plate-like member having an arc shape in a plan view. The discharge gates 21 of the first storage section 10A shown in FIG. 2 are provided in the positive direction of the X-axis from the center of the bottom 11c of the storage container 11. The discharge gates 21 of the second storage section 10B shown in FIG. 2 are provided in the negative direction of the X-axis from the center of the bottom 11c of the storage container 11. In the X-axis direction, the inner wall 11d of the storage container is provided on the opposite side of the discharge gates 21 from the center of the bottom 11c of the storage container 11. Each discharge gate 21 is provided so as to be movable up and down in the vertical direction relative to the bottom 11c. When the lower end of each discharge gate 21 is in contact with the bottom 11c, the gates are in a closed state in which the casting sand S is not discharged to the outside.
[0045] When the lower end of each discharge gate 21 is positioned at a position spaced apart above the bottom portion 11c, an opening is formed, which is an open state. In the open state, the molding sand S in the storage container 11 is discharged to the outside through the opening.
[0046] The turntable 22 rotates with the foundry sand S discharged from the multiple discharge gates 21 placed on it. The turntable 22 is provided at least outside the multiple discharge gates 21. The turntable 22 constitutes, for example, a part of the bottom 11c of the storage container 11. The turntable 22 rotates, for example, clockwise (rotation direction R in FIG. 2).
[0047] The drive unit 23 controls the lifting and lowering drive of the multiple discharge gates 21 and the rotation drive of the turntable 22. The drive unit 23 is, for example, an electric actuator. The drive unit 23 moves the multiple discharge gates 21 to an open position or a closed position. When at least the multiple discharge gates 21 are in an open position, the drive unit 23 rotates the turntable 22 in a rotation direction R.
[0048] The supply guide member 24 guides the casting sand S on the turntable 22 to a chute 51 (described later) of the discharge section 50. The supply guide member 24 is, for example, a scraper. The supply guide member 24 extends in a direction intersecting the rotation direction R of the turntable 22 and in the vertical direction. The supply guide member 24 contacts the bottom 11c of the storage container 11. The supply guide member 24 extends from a position adjacent to the discharge gate 21 that is closest to the second discharge outlet 20a, among the multiple discharge gates 21, toward an inlet 51a of a chute 51 (described later) of the discharge section 50.
[0049] Fig. 3 is a schematic top view showing an example of a foundry sand storage system according to an embodiment. As shown in Fig. 3, the first input section 30 is configured to be able to input the foundry sand S into each of the first storage section 10A and the second storage section 10B. The first input section 30 has a first supply source 31, an input path 32, a first input guide section 33, and a second input guide section 34. The first supply source 31 stores the foundry sand S that can be input into each of the first storage section 10A and the second storage section 10B. The first supply source 31 is, for example, a hopper. The first supply source 31 adjusts the amount of foundry sand S to be supplied depending on the opening degree of a gate (not shown).
[0050] The input path 32 transports the casting sand S from the first supply source 31 to the first inlet 11a of each of the first storage section 10A and the second storage section 10B. The input path 32 transports the casting sand S in the positive direction of the Y axis at a predetermined speed. At both ends of the input path 32 in the X axis direction, a wall portion 32a extending upward (in the positive direction of the Z axis) from the input path 32 is provided. The wall portions 32a, 32a prevent the casting sand S placed on the input path 32 and transported from falling. The input path 32 is, for example, a belt conveyor. The input path 32 transports the casting sand S supplied from the first supply source 31 at a predetermined speed.
[0051] The first charging guide 33 guides the foundry sand S placed on the charging path 32 to the first inlet 11a of the first storage section 10A. The first charging guide 33 is provided, for example, directly above the first storage section 10A, at the end of the charging path 32. The first charging guide 33 guides the foundry sand S transported in the positive direction of the Y axis downward (the negative direction of the Z axis). The first charging guide 33 guides, for example, all the foundry sand S that has been transported to directly above the first storage section 10A, to the first storage section 10A.
[0052] The second charging guide 34 guides the casting sand S placed on the charging path 32 to the first inlet 11a of the second storage section 10B. The second charging guide 34 is provided, for example, directly above the second storage section 10B and in the middle of the charging path 32. The second charging guide 34 guides the casting sand S transported in the positive direction of the Y axis to the second storage section 10B below. The second charging guide 34 has a charging gate 35 and a chute 36. The charging gate 35 is provided above the charging path 32 in the Z axis direction. The charging gate 35 is movable along the Z axis direction and can move toward or away from the charging path 32. The charging gate 35 extends in the vertical direction. The charging gate 35 has a V-shape when viewed from above. The charging gate 35 has a base end 35a and a pair of tip ends 35b. The base end 35a is provided in the center of the input path 32 in the X-axis direction. The base end 35a is provided in the negative direction of the Y-axis from the tip end 35b.
[0053] The input gate 35 moves up and down by, for example, being driven by an actuator such as an air cylinder (not shown). When the input gate 35 is in an open state, the input gate 35 is provided above the input path 32 in the Z-axis direction. The open state is a state in which the molding sand S on the input path 32 is not input into the second storage section 10B. The input gate 35 can be moved downward to approach the input path 32. When the input gate 35 is in a closed state, the input gate 35 is provided at a position closest to the input path 32 in the Z-axis direction. The closed state is a state in which at least a part of the molding sand S on the input path 32 is guided to the second storage section 10B, and the amount of sand input into the first storage section 10A is reduced.
[0054] The chute 36 is a cylindrical member that penetrates in the vertical direction. An opening 36a is formed at the upper end of the chute 36. In the X-axis direction, the opening 36a is longer than both ends of the input path 32 and extends in the positive and negative directions of the X-axis. In the Y-axis direction, the opening 36a is longer than the input gate 35 and extends in the positive and negative directions of the Y-axis. The lower end of the chute 36 is connected to the upper end of the second storage section 10B.
[0055] Referring again to FIG. 1, the second input section 40 is configured to be able to input the casting sand S into each of the first storage section 10A and the second storage section 10B. When both the storage amount of the first storage section 10A and the storage amount of the second storage section 10B are less than the respective thresholds, the second input section 40 inputs the casting sand S into the storage section whose storage amount is less than the threshold. The second input section 40 has a second supply source 41. The second supply source 41 stores the casting sand S that can be input into each of the first storage section 10A and the second storage section 10B. The second supply source 41 is, for example, a hopper. The second supply source 41 adjusts the amount of casting sand S to be supplied depending on the opening degree of a gate (not shown). The second input section 40 transports the casting sand S from the second supply source 41 to the second inlet 11b of each of the first storage section 10A and the second storage section 10B.
[0056] The discharge unit 50 will be described with reference to Figures 1 and 2. The discharge unit 50 receives the foundry sand S from the first storage unit 10A and the second storage unit 10B, transports the foundry sand S toward the foundry sand related device 2, and supplies the foundry sand S to the foundry sand related device 2.
[0057] The discharge section 50 has a chute 51, a discharge gate 52, and a discharge path 53. The chute 51 is a hollow member that collects the molding sand S supplied by each of the rotary tables 22 and each of the supply guide members 24 of the first storage section 10A and the second storage section 10B. The chute 51 is provided between the first storage section 10A and the second storage section 10B. For example, two inlets 51a, 51a and one outlet 51b are formed in the chute 51. The molding sand S from the first storage section 10A and the second storage section 10B, respectively, flows into each of the two inlets 51a, 51a. The molding sand S that has flowed into the chute 51 flows out toward the discharge path 53 through the outlet 51b.
[0058] The discharge gate 52 is provided at the outlet 51b of the chute 51 and adjusts the opening degree of the outlet 51b. When the discharge gate 52 is in a closed state, the supply of the molding sand S from the chute 51 to the discharge passage 53 is stopped. When the discharge gate 52 is in an open state, the molding sand S is supplied from the chute 51 to the discharge passage 53.
[0059] The discharge path 53 transports the foundry sand S supplied from the first storage section 10A and the second storage section 10B to the foundry sand related device 2. The discharge path 53 is, for example, a belt conveyor. In the example shown in Fig. 1, the discharge path 53 transports the foundry sand S in the positive direction of the Y axis. The discharge path 53 is provided, for example, below the first storage section 10A and the second storage section 10B.
[0060] The supply unit 60 shown in FIG. 1 is configured to supply the foundry sand S to the foundry sand related device 2. The supply unit 60 causes the foundry sand related device 2 to supply the foundry sand S when the amount of the foundry sand S supplied from the first storage unit 10A and the second storage unit 10B to the foundry sand related device 2 is less than a predetermined set amount. The supply unit 60 has a third supply source 61. The third supply source 61 stores the foundry sand S that can be supplied to the foundry sand related device 2. The foundry sand S includes the foundry sand S previously supplied from the first storage unit 10A and the second storage unit 10B. The foundry sand S includes the foundry sand S for which an appropriate resting time has been ensured. The third supply source 61 is, for example, a hopper. The third supply source 61 adjusts the amount of foundry sand S to be supplied depending on the opening degree of a gate (not shown). The supply unit 60 transports the foundry sand S from the third supply source 61 to the foundry sand related device 2.
[0061] The molding sand storage system 1 includes two measuring instruments 70, 70 as at least one measuring instrument 70. The two measuring instruments 70, 70 measure the storage amount in the first storage section 10A and the second storage section 10B. Each measuring instrument 70 includes at least one of a microwave sensor, a millimeter wave sensor, and a Sauging type level meter. Each measuring instrument 70 in this embodiment is a microwave sensor. Each measuring instrument 70 is provided at a position where it can irradiate microwaves in a direction intersecting the inclined surface of the deposit SV1 of molding sand S formed inside each of the first storage section 10A and the second storage section 10B. The angle of repose is the angle between the inclined surface of the deposit SV1 formed when the molding sand S put into the storage container 11 remains stable without spontaneously collapsing and the horizontal plane. Each measuring device 70 is provided at a position where it can irradiate microwaves in a direction intersecting the inclined surface of the deposit SV1 of molding sand S formed inside each of the first storage portion 10A and the second storage portion 10B. The direction intersecting the inclined surface may be, for example, approximately perpendicular to the inclined surface.
[0062] Each measuring device 70 irradiates microwaves onto the pile SV1 and receives the microwaves reflected by the pile SV1. Each measuring device 70 measures the amount of foundry sand S stored in the storage container 11 (the size of the pile SV1) by measuring the time from when the microwaves are emitted until they are received, the angle of incidence when the reflected microwaves are received, etc. Each measuring device 70 outputs the measured amount of foundry sand S stored to the control device 80.
[0063] The control device 80 controls the entire foundry sand storage system 1. As an example, the control device 80 is configured as a PLC (Programmable Logic Controller). The control device 80 may be configured as a normal computer system including a CPU (Central Processing Unit), main storage devices such as a RAM (Random Access Memory) and a ROM (Read Only Memory), input devices such as a touch panel and a keyboard, output devices such as a display, and auxiliary storage devices such as a hard disk.
[0064] The control device 80 is provided with, for example, an operation panel that can be operated by an operator. The control device 80 is communicably connected to the second input unit 40, the discharge unit 50, the supply unit 60, and the two measuring devices 70, 70. The control device 80 outputs control signals to the second input unit 40, the discharge unit 50, the supply unit 60, and the two measuring devices 70, 70, and controls the operation of each component. The control device 80 reads a program prepared in advance and operates the second input unit 40, the discharge unit 50, the supply unit 60, and the two measuring devices 70, 70. The control device 80 may operate the second input unit 40, the discharge unit 50, the supply unit 60, and the two measuring devices 70, 70 in response to a command operation of an operator received by an operation unit (not shown).
[0065] Fig. 4 is a block diagram showing an example of a control device of the foundry sand storage system 1 according to the embodiment. As shown in Fig. 4, the control device 80 has an acquisition unit 81, a setting unit 83, and a control unit 84. The control device 80 further has a storage unit 82.
[0066] The acquisition unit 81 acquires the amounts of the molding sand S stored in the first storage unit 10A and the second storage unit 10B, the amounts of the molding sand S put into the first storage unit 10A and the second storage unit 10B, and the amounts of the molding sand S supplied from the first storage unit 10A and the second storage unit 10B to the molding sand-related device 2. The acquisition unit 81 acquires the amounts of the molding sand S stored in the first storage unit 10A and the second storage unit 10B measured by the two measuring devices 70, 70. The acquisition unit 81 acquires from the memory unit 82 the amounts of the casting sand S put in and the amount of the casting sand S supplied that were set at the time when the amounts of the casting sand S stored in the first storage unit 10A and the second storage unit 10B were measured by the two measuring devices 70, 70.
[0067] The memory unit 82 stores the storage amounts of the molding sand S in the first storage unit 10A and the second storage unit 10B acquired by the acquisition unit 81. The memory unit 82 stores a predefined resting time for the molding sand S. The memory unit 82 stores predefined set values for the amounts of the molding sand S supplied from the first storage unit 10A and the second storage unit 10B to the molding sand related device 2. The resting time and the set values are set by an operator or the like according to, for example, the type, temperature, and moisture content of the molding sand S, and the use of the molding sand S in the molding sand related device 2. The memory unit 82 stores values set by the setting unit 83 and the control unit 84. The memory unit 82 stores, for example, a program for operating each component. The memory unit 82 stores the input amount and the supply amount set by a input control unit 86 and a supply control unit 88, which will be described later.
[0068] The setting unit 83 sets a threshold value for the storage amount based on a predetermined resting time of the foundry sand S and the input and supply amounts acquired by the acquisition unit 81. The threshold value is, for example, a value that is set so that the amount of foundry sand S stored in the storage container 11 is equal to or greater than the supply amount supplied to the foundry sand-related device 2 during the resting time of newly input foundry sand S.
[0069] The control unit 84 controls at least one of the input amount and the supply amount, based on the storage amount of the casting sand S in the first storage unit 10A and the second storage unit 10B acquired by the acquisition unit 81 and the threshold value set by the setting unit 83. The control unit 84 has a input determination unit 85, an input control unit 86, a supply determination unit 87, and a supply control unit 88.
[0070] The input determination unit 85 determines whether the storage amount of each of the first storage unit 10A and the second storage unit 10B is less than a threshold value. The input determination unit 85 also determines whether the storage amount of one storage unit 10 is less than the storage amount of another storage unit 10.
[0071] The input control unit 86 controls the input amounts of casting sand S to the first storage unit 10A and the second storage unit 10B. For example, the input control unit 86 controls the input amounts of casting sand S to at least one of the first input unit 30 and the second input unit 40. The input control unit 86 stores the controlled input amounts of casting sand S to the first storage unit 10A and the second storage unit 10B in the memory unit 82. The input control unit 86 controls the opening degree of the input gate 35 in the second input guide unit 34 for the first input unit 30. The input control unit 86 controls the opening degree of the gate that adjusts the amount of casting sand S, and the transport speed to each of the first storage unit 10A and the second storage unit 10B for the second input unit 40.
[0072] The input control unit 86 calculates each input amount based on the above-mentioned control contents. The input amounts include the input amount by the first input unit 30 and the input amount by the second input unit 40. The input amount by the first input unit 30 is calculated based on, for example, the opening degree of the gate at the first supply source 31, the transport speed of the molding sand S at the input path 32, and the opening degree of the input gate 35. The input amount by the second input unit 40 is calculated based on the opening degree of the gate at the second supply source 41 and the transport speed of the molding sand S.
[0073] The supply determination unit 87 determines whether or not the amount of each of the first storage unit 10A and the second storage unit 10B supplied to the foundry sand related device 2 is less than a threshold value. In addition, the supply determination unit 87 determines whether or not the storage amount of one storage unit 10 is less than the storage amount of another storage unit 10.
[0074] The supply control unit 88 controls the amounts of foundry sand S supplied from the first storage unit 10A and the second storage unit 10B to the foundry sand related device 2. For example, the supply control unit 88 controls the amount of foundry sand S supplied to at least one of the second discharge unit 20 and the supply unit 60. The supply control unit 88 stores the controlled amounts of foundry sand S in the storage unit 82. Specifically, the supply control unit 88 controls the opening degree of the opening formed by each discharge gate 21 and the bottom 11c of the second discharge unit 20, the rotation speed of the turntable 22, etc. The supply control unit 88 controls the opening degree of the gate that adjusts the amount of foundry sand S, the transport speed to the foundry sand related device 2, etc. of the supply unit 60.
[0075] The supply control unit 88 calculates each supply amount based on the above-mentioned control contents. The supply amount includes the supply amount from the first storage unit 10A and the second storage unit 10B to the foundry sand related device 2 and the supply amount from the supply unit 60 to the foundry sand related device 2. The supply amount from the first storage unit 10A (second storage unit 10B) to the foundry sand related device 2 is calculated based on, for example, the opening degree of each discharge gate 21 and the rotation speed of the turntable 22. The input amount by the supply unit 60 is calculated based on the opening degree of the gate of the third supply source 61 and the transport speed of the foundry sand S.
[0076] [Method of storing casting sand] The molding sand storage system 1 executes a step of controlling at least one of the input amount and the supply amount. FIG. 5 is a flowchart showing an example of a molding sand storage method according to an embodiment. The molding sand storage method MT1 shown in FIG. 5 is executed by the molding sand storage system 1 of this embodiment. The molding sand storage method MT1 is a method of controlling the input amount of molding sand S from at least one of the first input unit 30 and the second input unit 40 to the first storage unit 10A and the second storage unit 10B by the control device 80. The molding sand storage method MT1 is started by the control device 80 at a predetermined timing, for example, in a state in which the molding sand S is stored in the first storage unit 10A and the second storage unit 10B and the molding sand S is supplied to the molding sand-related device 2 from at least one of the first storage unit 10A and the second storage unit 10B and the supply unit 60. The amount of the foundry sand S supplied from at least one of the first storage section 10A, the second storage section 10B, and the supply section 60 to the foundry sand related device 2 is stored in the memory section 82 by the supply control section 88.
[0077] First, in a preparation step (S10), the input control unit 86 causes the first input unit 30 and the second input unit 40 to prepare the foundry sand S that can be input to the first storage unit 10A. The preparation step (S10) is an example of a preparation step. The input control unit 86 measures the amount, issues a supply instruction, etc. so that an appropriate amount of foundry sand S is stored in the first supply source 31 and the second supply source 41.
[0078] Next, in a basic charging step (S11), the charging control unit 86 controls the first charging unit 30 to charge a predetermined amount of foundry sand S into the first storage unit 10A and the second storage unit 10B. The basic charging step (S11) is an example of a step of charging foundry sand from the first charging unit into multiple storage units. The charging control unit 86 controls the memory unit 82 to store the amount of foundry sand S charged from the first charging unit 30 to the first storage unit 10A and the amount of foundry sand S charged from the first charging unit 30 to the second storage unit 10B.
[0079] Next, in an acquisition step (S12), the acquisition unit 81 acquires the amount of the molding sand S stored in the first storage section 10A and the second storage section 10B, the amount of the molding sand S introduced into the first storage section 10A and the second storage section 10B, and the amount of the molding sand S supplied to the molding sand related device 2. The acquisition step (S12) is an example of an acquisition step. The amount of the molding sand S introduced into the first storage section 10A and the second storage section 10B includes the amount of the molding sand S introduced from the first introduction section 30 into the first storage section 10A and the second storage section 10B, and the amount of the molding sand S introduced from the second introduction section 40 into the first storage section 10A and the second storage section 10B. The supply amount of the foundry sand S to the foundry sand related device 2 includes the supply amount of the foundry sand S from the first storage section 10A to the foundry sand related device 2, the supply amount of the foundry sand S from the second storage section 10B to the foundry sand related device 2, and the supply amount of the foundry sand S from the supply section 60 to the foundry sand related device 2. The acquisition step (S12) includes a measurement step of measuring the storage amount in the first storage section 10A and the storage amount in the second storage section 10B by two measuring devices 70, 70. The measurement step is an example of a measuring step. The acquisition section 81 acquires the storage amount in the first storage section 10A and the storage amount in the second storage section 10B measured by the measuring device 70 in the measurement step. The acquisition unit 81 acquires from the memory unit 82 each of the input amounts and each of the supply amounts that were set at the time when the respective storage amounts of the casting sand S in the first storage unit 10A and the second storage unit 10B were measured by the measuring device 70.
[0080] Next, in a setting step (S13), the setting unit 83 sets a threshold value for each storage amount based on the resting time, the input amount and the supply amount acquired in the acquisition step (S12). The setting step (S13) is an example of a setting step. The setting unit 83 sets a threshold value for the storage amount of the first storage unit 10A based on the resting time, the input amount to the first storage unit 10A, and the supply amount from the first storage unit 10A to the foundry sand related device 2. The setting unit 83 sets a threshold value for the storage amount of the second storage unit 10B based on the resting time, the input amount to the second storage unit 10B, and the supply amount from the second storage unit 10B to the foundry sand related device 2. In this embodiment, the size of the first storage unit 10A and the size of the second storage unit 10B are set to be the same, and the threshold values for the storage amount of the first storage unit 10A and the storage amount of the second storage unit 10B are also set to be the same.
[0081] Next, in a first input determination step (S14), the input determination unit 85 determines whether the storage amount in the first storage section 10A and the storage amount in the second storage section 10B are equal to or greater than a threshold value. If the input determination unit 85 determines that the storage amount in the first storage section 10A and the storage amount in the second storage section 10B are equal to or greater than the threshold value, the input control unit 86 proceeds to an initialization step (S15) as the next process of the foundry sand storage method MT1. If the input determination unit 85 determines that the storage amount in the first storage section 10A and the storage amount in the second storage section 10B are not equal to or greater than the threshold value, the input control unit 86 proceeds to a input amount control step (S20) as the next process of the foundry sand storage method MT1.
[0082] When it is determined in the first input determination step (S14) shown in Fig. 5 that the storage amount in the first storage section 10A and the storage amount in the second storage section 10B are not equal to or greater than the threshold, an input amount control step (S20) shown in Fig. 5 and Fig. 6 is performed. Fig. 6 is a flowchart showing an example of the steps in the flowchart shown in Fig. 5. Hereinafter, the input amount control step (S20) will be described with reference to Fig. 6.
[0083] In the second input determination step (S21), which is the first step of the input amount control step (S20), the input determination unit 85 determines whether or not only the storage amount in the first storage unit 10A is less than the threshold value. If the input determination unit 85 determines that only the storage amount in the first storage unit 10A is less than the threshold value, the input control unit 86 proceeds to a first priority input step (S22) as the next process of the foundry sand storage method MT1. If the input determination unit 85 determines that only the storage amount in the first storage unit 10A is not less than the threshold value, the input control unit 86 proceeds to a third input determination step (S23) as the next process of the foundry sand storage method MT1.
[0084] When it is determined in the second input determination step (S21) that only the amount of storage in the first storage section 10A is less than the threshold, a first priority input step (S22) is executed. In the first priority input step (S22), the input control section 86 controls the first input section 30 to input foundry sand preferentially to the first storage section 10A compared to the second storage section 10B. For example, the input control section 86 controls the first input section 30 to input foundry sand to the first storage section 10A so that the amount of sand input from the first input section 30 to the first storage section 10A after the second input determination step (S21) is greater than the amount of sand input from the first input section 30 to the first storage section 10A before the second input determination step (S21). For example, the input control unit 86 controls the first input unit 30 so that the proportion of the amount of casting sand input to the first storage unit 10A is greater than the proportion of the amount of casting sand input to the second storage unit 10B out of the total amount of casting sand input from the first input unit 30 to the input path 32. Specifically, the input control unit 86 moves the input gate 35 away from the input path 32 so that the opening degree of the input gate 35 becomes closer to the open state than to the closed state. When the first priority input step (S22) is completed, the input amount control step (S20) is ended, and the acquisition step (S32) shown in FIG. 5 is executed again.
[0085] If it is determined in the second input determination step (S21) that only the storage amount in the first storage section 10A is not less than the threshold, a third input determination step (S23) is executed. In the third input determination step (S23), the input determination unit 85 determines whether or not only the storage amount in the second storage section 10B is less than the threshold. If the input determination unit 85 determines that only the storage amount in the second storage section 10B is less than the threshold, the input control unit 86 proceeds to a second priority input step (S24) as the next process of the casting sand storage method MT1. If the input determination unit 85 determines that only the storage amount in the second storage section 10B is not less than the threshold, the input control unit 86 proceeds to a fourth input determination step (S25) as the next process of the casting sand storage method MT1. In the third input judgment process (S23), the input judgment unit 85 judges that only the storage amount in the second storage section 10B is not less than the threshold value when the storage amount in the first storage section 10A and the storage amount in the second storage section 10B are each less than the threshold value.
[0086] When it is determined in the third input determination step (S23) that only the amount of storage in the second storage section 10B is less than the threshold, a second priority input step (S24) is executed. In the second priority input step (S24), the input control section 86 controls the first input section 30 to input foundry sand preferentially to the second storage section 10B compared to the first storage section 10A. For example, the input control section 86 controls the first input section 30 to input foundry sand to the second storage section 10B such that the amount of sand input from the first input section 30 to the second storage section 10B after the third input determination step (S23) is greater than the amount of sand input from the first input section 30 to the second storage section 10B before the third input determination step (S23). For example, the input control unit 86 controls the first input unit 30 so that the proportion of the amount of casting sand input to the second storage unit 10B is greater than the proportion of the amount of casting sand input to the first storage unit 10A out of the total amount of casting sand input from the first input unit 30 to the input path 32. Specifically, the input control unit 86 moves the input gate 35 closer to the input path 32 so that the opening degree of the input gate 35 becomes closer to the closed state than to the open state. When the second priority input step (S24) is completed, the input amount control step (S20) is ended, and the acquisition step (S32) shown in Fig. 5 is executed again.
[0087] In the third input determination step (S23), if it is determined that only the storage amount of the second storage section 10B is not less than the threshold value, a fourth input determination step (S25) is executed. In the fourth input determination step (S25), the input determination unit 85 determines whether or not the storage amount of the first storage section 10A is less than the storage amount of the second storage section 10B. In the case where the input determination unit 85 determines that the storage amount of the first storage section 10A is less than the storage amount of the second storage section 10B, the input control unit 86 proceeds to a third priority input step (S26) as the next process of the casting sand storage method MT1. In the case where the input determination unit 85 determines that the storage amount of the first storage section 10A is not less than the storage amount of the second storage section 10B, the input control unit 86 proceeds to a fourth input determination step (S27) as the next process of the casting sand storage method MT1.
[0088] If it is determined in the fourth charging determination step (S25) that the storage amount of the first storage section 10A is less than the storage amount of the second storage section 10B, a third priority charging step (S26) is executed. In the third priority charging step (S26), the charging control section 86 controls the second charging section 40 to charge the casting sand into at least one of the first storage section 10A and the second storage section 10B. At this time, the charging control section 86 controls the second charging section 40 to charge the casting sand into the first storage section 10A with priority over the second storage section 10B. For example, the charging control section 86 may control the second charging section 40 to charge the casting sand only into the first storage section 10A. For example, the input control unit 86 may cause the second input unit 40 to input foundry sand into the first storage unit 10A such that the amount of sand input from the second input unit 40 to the first storage unit 10A is greater than the amount of sand input from the second input unit 40 to the second storage unit 10B. For example, the input control unit 86 may cause the second input unit 40 to input foundry sand into the first storage unit 10A such that the amount of sand input from the second input unit 40 to the first storage unit 10A after the fourth input determination step (S25) is greater than the amount of sand input from the second input unit 40 to the first storage unit 10A before the fourth input determination step (S25).
[0089] In addition, in the third priority feeding step (S26), for example, the feeding control unit 86 feeds the casting sand from the first feeding unit 30 to the first storage unit 10A so that the amount of casting sand fed from the first feeding unit 30 to the first storage unit 10A after the fourth feeding determination step (S25) is greater than the amount of casting sand fed from the first feeding unit 30 to the first storage unit 10A before the fourth feeding determination step (S25). For example, the feeding control unit 86 controls the first feeding unit 30 so that the ratio of the amount of casting sand fed to the first storage unit 10A is greater than the ratio of the amount of casting sand fed to the second storage unit 10B among the total amount of casting sand fed from the first feeding unit 30 to the feeding path 32. Specifically, the feeding control unit 86 separates the feeding gate 35 from the feeding path 32 so that the opening degree of the feeding gate 35 is closer to the open state than to the closed state. When the third priority supply step (S26) is completed, the supply amount control step (S20) is ended, and the acquisition step (S32) shown in FIG. 5 is executed again.
[0090] If it is determined in the fourth charging determination step (S25) that the storage amount of the first storage section 10A is not less than the storage amount of the second storage section 10B, a fourth priority charging step (S27) is executed. In the fourth priority charging step (S27), the charging control section 86 controls the second charging section 40 to charge the casting sand S into at least one of the first storage section 10A and the second storage section 10B. At this time, the charging control section 86 controls the second charging section 40 to charge the casting sand into the second storage section 10B with priority over the first storage section 10A. For example, the charging control section 86 may control the second charging section 40 to charge the casting sand only into the second storage section 10B. For example, the input control unit 86 may cause the second input unit 40 to input foundry sand into the second storage unit 10B such that the amount of sand input from the second input unit 40 to the second storage unit 10B is greater than the amount of sand input from the second input unit 40 to the first storage unit 10A. For example, the input control unit 86 may cause the second input unit 40 to input foundry sand into the second storage unit 10B such that the amount of sand input from the second input unit 40 to the second storage unit 10B after the fourth input determination step (S25) is greater than the amount of sand input from the second input unit 40 to the second storage unit 10B before the fourth input determination step (S25).
[0091] In the fourth priority feeding step (S27), for example, the feeding control unit 86 feeds the casting sand from the first feeding unit 30 to the second storage unit 10B so that the amount of casting sand fed from the first feeding unit 30 to the second storage unit 10B after the fourth feeding determination step (S25) is greater than the amount of casting sand fed from the first feeding unit 30 to the second storage unit 10B before the fourth feeding determination step (S25). For example, the feeding control unit 86 controls the first feeding unit 30 so that the ratio of the amount of casting sand fed to the second storage unit 10B is greater than the ratio of the amount of casting sand fed to the first storage unit 10A among the total amount of casting sand fed from the first feeding unit 30 to the feeding path 32. Specifically, the feeding control unit 86 moves the feeding gate 35 closer to the feeding path 32 so that the opening degree of the feeding gate 35 is closer to the closed state than the open state. When the fourth priority supply step (S27) is completed, the supply amount control step (S20) is ended, and the acquisition step (S32) shown in FIG. 5 is executed again.
[0092] 5 again. In the first input determination step (S14), when the input determination unit 85 determines that the storage amount of the first storage unit 10A and the storage amount of the second storage unit 10B are equal to or greater than the threshold value, the input control unit 86 executes the initialization step (S15). When the first priority input step (S22), the second priority input step (S24), the third priority input step (S26), and the fourth priority input step (S27) are executed before the initialization step (S15), the input control unit 86 changes the input amount from the first input unit 30 to the first storage unit 10A and the second storage unit 10B in each of the above steps to the input amount from the first input unit 30 to the first storage unit 10A and the second storage unit 10B in the basic input step (S11). In addition, if the third priority input step (S26) and the fourth priority input step (S27) are performed before the initialization step (S15), the input control unit 86 stops input from the second input unit 40 to the first storage unit 10A and the second storage unit 10B in each of the above-mentioned steps. In addition, if the first priority input step (S22), the second priority input step (S24), the third priority input step (S26), and the fourth priority input step (S27) are not performed before the initialization step (S15), none of the above-mentioned processes are performed and the process is completed. When the initialization step (S15) is completed, the input control unit 86 ends the flowchart shown in FIG. 5.
[0093] Fig. 7 is a flow chart showing an example of a molding sand storage method according to an embodiment. The molding sand storage method MT2 shown in Fig. 7 is executed by the molding sand storage system 1 of this embodiment. The molding sand storage method MT2 is a method for controlling the amount of molding sand S supplied to the molding sand-related device 2 from at least one of the first storage unit 10A and the second storage unit 10B and the supply unit 60 by the control device 80. The molding sand storage system 1 executes at least one of the molding sand storage methods MT1 and MT2. That is, the molding sand storage system 1 may execute the molding sand storage methods MT1 and MT2 simultaneously, or may execute either one of the molding sand storage methods MT1 and MT2. The foundry sand storing method MT2 is started by the control device 80 at a predetermined timing, for example, in a state in which the foundry sand S is stored in the first storage section 10A and the second storage section 10B and the foundry sand S is being supplied to the first storage section 10A and the second storage section 10B from at least one of the first input section 30 and the second input section 40. The input amounts of the foundry sand S from the first input section 30 and the second input section 40 to the first storage section 10A and the second storage section 10B are stored in the memory section 82 by the input control section 86.
[0094] First, in a preparation step (S30), the supply control unit 88 causes the supply unit 60 to prepare the molding sand S that can be supplied to the molding sand related device 2. The supply control unit 88 performs, for example, measurement of the amount of molding sand S stored in the third supply source 61, instructions for supply, and the like.
[0095] Next, in a basic supply step (S31), the supply control unit 88 controls the first storage unit 10A and the second storage unit 10B to supply a predetermined amount of foundry sand S to the foundry sand related device 2. The basic supply step (S31) is an example of a step of supplying foundry sand from a plurality of storage units to the foundry sand related device. The supply control unit 88 controls the memory unit 82 to store the amount of foundry sand S supplied from the first storage unit 10A to the foundry sand related device 2 and the amount of foundry sand S supplied from the second storage unit 10B to the foundry sand related device 2.
[0096] Next, in an acquisition step (S32), the acquisition unit 81 acquires the amount of foundry sand S stored in the first storage section 10A and the second storage section 10B, the amount of foundry sand S introduced into the first storage section 10A and the second storage section 10B, and the amount of foundry sand S supplied to the foundry-sand-related device 2. The acquisition step (S32) is the same process as the acquisition step (S12) shown in FIG.
[0097] Next, in a setting step (S33), the setting unit 83 sets a threshold value for the storage amount based on the resting time and the input amount and the supply amount acquired in the acquisition step (S32). The setting step (S33) is an example of a setting step. The setting step (S33) is the same process as the setting step (S13) shown in FIG. 5.
[0098] Next, in a first supply determination step (S34), the supply determination unit 87 determines whether the storage amount in the first storage unit 10A and the storage amount in the second storage unit 10B are equal to or greater than a threshold value. If the supply determination unit 87 determines that the storage amount in the first storage unit 10A and the storage amount in the second storage unit 10B are equal to or greater than the threshold value, the supply control unit 88 proceeds to an initialization step (S35) as the next process of the foundry sand storage method MT2. If the supply determination unit 87 determines that the storage amount in the first storage unit 10A and the storage amount in the second storage unit 10B are not equal to or greater than the threshold value, the supply control unit 88 proceeds to a supply amount control step (S40) as the next process of the foundry sand storage method MT2.
[0099] When it is determined in the first supply determination step (S34) shown in Fig. 7 that the storage amount in the first storage section 10A and the storage amount in the second storage section 10B are not equal to or greater than the threshold, a supply amount control step (S40) shown in Fig. 7 and Fig. 8 is performed. Fig. 8 is a flowchart showing an example of the steps in the flowchart shown in Fig. 7. The supply amount control step (S40) will be described below with reference to Fig. 8.
[0100] In the second supply determination step (S41), which is the first step of the supply amount control step (S40), the supply determination unit 87 determines whether or not only the storage amount in the first storage unit 10A is less than the threshold value. If the supply determination unit 87 determines that only the storage amount in the first storage unit 10A is less than the threshold value, the supply control unit 88 proceeds to a first priority supply step (S42) as the next process of the foundry sand storage method MT2. If the supply determination unit 87 determines that only the storage amount in the first storage unit 10A is not less than the threshold value, the supply control unit 88 proceeds to a third supply determination step (S43) as the next process of the foundry sand storage method MT2.
[0101] In the second supply determination step (S41), when it is determined that only the storage amount in the first storage unit 10A is less than the threshold value, a first priority supply step (S42) is executed. In the first priority supply step (S42), the supply control unit 88 preferentially reduces the supply amount from the first storage unit 10A to the foundry sand related device 2 compared to the supply amount from the second storage unit 10B to the foundry sand related device 2. For example, the supply control unit 88 controls the first storage unit 10A to supply the foundry sand S to the foundry sand related device 2 so that the supply amount from the first storage unit 10A to the foundry sand related device 2 after the second supply determination step (S41) is less than the supply amount from the first storage unit 10A to the foundry sand related device 2 before the second supply determination step (S41). For example, the supply control unit 88 controls the second discharge unit 20 of the first storage unit 10A so that the ratio of the amount of foundry sand S supplied from the first storage unit 10A to the foundry sand related device 2 is smaller than the ratio of the amount of foundry sand S supplied from the second storage unit 10B to the foundry sand related device 2 in the total amount of foundry sand S supplied to the discharge path 53 of the discharge unit 50. Specifically, the supply control unit 88 executes at least one of the following processes for the second discharge unit 20 of the first storage unit 10A: lowering each discharge gate 21 so as to reduce the degree of opening of each discharge gate 21, and reducing the rotation speed of the turntable 22. At this time, the supply amount of foundry sand S supplied from the second storage unit 10B to the foundry sand related device 2 is increased in order to keep the supply amount of foundry sand S to the foundry sand related device 2 in the discharge path 53 constant. Specifically, the supply control unit 88 executes at least one of the following processes for raising each discharge gate 21 so as to increase the degree of opening of each discharge gate 21 for the second discharge unit 20 of the second storage unit 10B, and for increasing the rotation speed of the turntable 22. As a result, for example, the supply control unit 88 can increase or decrease the supply amount of the first storage unit 10A and the supply amount of the second storage unit 10B without changing the total amount of the molding sand S supplied from the first storage unit 10A and the second storage unit 10B to the molding sand related device 2, which is supplied to the discharge path 53 of the discharge unit 50. When the first priority supply step (S42) is completed, the supply amount control step (S40) is ended, and the acquisition step (S32) shown in FIG. 7 is executed again.
[0102] In the second supply determination step (S41), if it is determined that only the storage amount in the first storage section 10A is not less than the threshold, a third supply determination step (S43) is executed. In the third supply determination step (S43), the supply determination unit 87 determines whether or not only the storage amount in the second storage section 10B is less than the threshold. In the supply determination unit 87, if it is determined that only the storage amount in the second storage section 10B is less than the threshold, the supply control unit 88 proceeds to a second priority supply step (S44) as the next process of the foundry sand storage method MT2. In the supply determination unit 87, if it is determined that only the storage amount in the second storage section 10B is not less than the threshold, the supply control unit 88 proceeds to a third priority supply step (S45) as the next process of the foundry sand storage method MT1. In the third supply judgment process (S43), the supply judgment unit 87 judges that only the storage amount in the second storage section 10B is not less than the threshold value when the storage amount in the first storage section 10A and the storage amount in the second storage section 10B are each less than the threshold value.
[0103] When it is determined in the third supply determination step (S43) that only the storage amount in the second storage unit 10B is less than the threshold value, a second priority supply step (S44) is executed. In the second priority supply step (S24), the supply control unit 88 preferentially reduces the supply amount from the second storage unit 10B to the foundry sand related device 2 compared to the supply amount from the first storage unit 10A to the foundry sand related device 2. For example, the supply control unit 88 controls the supply of the foundry sand S from the second storage unit 10B to the foundry sand related device 2 so that the supply amount from the second storage unit 10B to the foundry sand related device 2 after the third supply determination step (S43) is less than the supply amount from the second storage unit 10B to the foundry sand related device 2 before the third supply determination step (S43). For example, the supply control unit 88 controls the second discharge unit 20 of the second storage unit 10B so that the ratio of the amount of foundry sand S supplied from the second storage unit 10B to the total amount of foundry sand S supplied to the discharge path 53 of the discharge unit 50 is smaller than the ratio of the amount of foundry sand S supplied from the first storage unit 10A. Specifically, the supply control unit 88 executes at least one of the following processes for the second discharge unit 20 of the second storage unit 10B: lowering each discharge gate 21 so as to reduce the degree of opening of each discharge gate 21, and reducing the rotation speed of the turntable 22. At this time, the supply amount of foundry sand S supplied from the first storage unit 10A to the foundry sand related device 2 is increased in order to keep the supply amount of foundry sand S to the foundry sand related device 2 in the discharge path 53 constant. Specifically, the supply control unit 88 executes at least one of the following processes for raising each discharge gate 21 of the second discharge unit 20 of the first storage unit 10A so as to increase the degree of opening of each discharge gate 21 and for increasing the rotation speed of the turntable 22. As a result, for example, the supply control unit 88 can increase or decrease the supply amount from the first storage unit 10A to the foundry sand related device 2 and the supply amount from the second storage unit 10B to the foundry sand related device 2 without changing the total amount of the supply of the foundry sand S from the first storage unit 10A and the second storage unit 10B to the discharge path 53 of the discharge unit 50. When the second priority supply step (S44) is completed, the supply amount control step (S40) is ended, and the acquisition step (S32) shown in FIG. 7 is executed again.
[0104] When it is determined in the third supply determination step (S43) that only the storage amount in the second storage unit 10B is not less than the threshold value, a third priority supply step (S45) is executed. In the third priority supply step (S45), the supply control unit 88 controls the supply unit 60 to supply the molding sand to the molding sand related device 2. At this time, the supply control unit 88 reduces the supply amount from the first storage unit 10A to the molding sand related device 2 and the supply amount from the second storage unit 10B to the molding sand related device 2, respectively, from the supply amount from the first storage unit 10A to the molding sand related device 2 and the supply amount from the second storage unit 10B to the molding sand related device 2 before the third supply determination step (S43). For example, the supply control unit 88 reduces the amount of foundry sand S supplied from the first storage unit 10A to the foundry sand related device 2 and the amount of foundry sand S supplied from the second storage unit 10B to the foundry sand related device 2, depending on the amount of foundry sand S stored in the first storage unit 10A and the amount of foundry sand S stored in the second storage unit 10B. Furthermore, the supply control unit 88 controls the supply unit 60 to supply the foundry sand S to the foundry sand related device 2 so that the total amount of the amount of foundry sand S supplied from the first storage unit 10A and the second storage unit 10B to the foundry sand related device 2 and the amount of foundry sand S supplied from the supply unit 60 to the foundry sand related device 2 becomes a preset amount. The supply control unit 88 increases the opening degree of the gate of the supply unit 60 that adjusts the amount of foundry sand S, and sets the transport speed to the foundry sand related device 2 to an appropriate value. The set amount is stored in the memory unit 82, for example. For example, the supply control unit 88 causes the supply unit 60 to supply the foundry sand related device 2 by the amount that is the reduction of the amount of foundry sand S supplied from the first storage unit 10A and the second storage unit 10B to the foundry sand related device 2. As a result, the supply control unit 88 can reduce the amount of foundry sand S supplied from the first storage unit 10A to the foundry sand related device 2 and the amount of foundry sand S supplied from the second storage unit 10B to the foundry sand related device 2 without changing the total amount of foundry sand S supplied from the first storage unit 10A and the second storage unit 10B to the foundry sand related device 2, which is supplied to the discharge path 53 of the discharge unit 50, from the set amount. When the third priority supply step (S45) is completed, the supply amount control step (S40) is terminated, and the acquisition step (S32) shown in FIG. 7 is executed again.
[0105] 7 again. In the first supply determination step (S34), when the supply determination unit 87 determines that the storage amount of the first storage unit 10A and the storage amount of the second storage unit 10B are equal to or greater than the threshold value, the supply control unit 88 executes the initialization step (S35). In the case where the first priority supply step (S42), the second priority supply step (S44), and the third priority supply step (S45) are executed before the initialization step (S35), the supply control unit 88 changes the supply amount from the first storage unit 10A and the second storage unit 10B to the foundry sand related device 2 in each of the above steps to the supply amount from the first storage unit 10A and the second storage unit 10B to the foundry sand related device 2 in the basic supply step (S31). In addition, in the case where the third priority supply step (S45) is executed before the initialization step (S35), the supply control unit 88 stops the supply from the supply unit 60 to the foundry sand related device 2. Note that, if the first priority supply step (S42), the second priority supply step (S44), and the third priority supply step (S45) have not been executed before the initialization step (S35), none of the processes are executed. When the initialization step (S35) is completed, the supply control unit 88 ends the flowchart shown in FIG.
[0106] As described above, according to the foundry sand storage methods MT1 and MT2 and the foundry sand storage system 1, when foundry sand S is newly charged while foundry sand S is already stored in the first storage section 10A and the second storage section 10B, the newly charged foundry sand S can be allowed to rest for a certain period of time while the already stored foundry sand S is being supplied to the foundry sand related device 2. In this case, in the foundry sand storage method MT2, the amount of foundry sand S supplied to the foundry sand related device 2 during the resting time is controlled to be equal to or less than the amount of the already stored foundry sand S, thereby preventing the newly charged foundry sand S from being supplied to the foundry sand related device 2 from the first storage section 10A and the second storage section 10B before the resting time has elapsed. The threshold value in the foundry sand storage methods MT1 and MT2 is, for example, the amount of foundry sand S supplied to the foundry sand related device 2 during the resting time of the newly charged foundry sand S. Therefore, if the amount of storage in each of the first storage section 10A and the second storage section 10B is equal to or greater than the threshold value, the resting time of newly charged foundry sand S can be appropriately ensured.
[0107] In the foundry sand storage method MT1, the input amount is controlled, thereby making it possible to appropriately control the respective storage amounts of the foundry sand S in the first storage section 10A and the second storage section 10B that can be supplied to the foundry sand related device 2. In this manner, the respective storage amounts in the first storage section 10A and the second storage section 10B increase by the input amount and decrease by the supply amount.
[0108] In the setting steps (S13, S23), the threshold value for the storage amount is set based on the resting time, the amount of each of the inputs to the first storage section 10A and the second storage section 10B, and the amount of supply to the foundry sand related device 2. In addition, by executing at least one of the control of the input amount by the input amount control step (S20) of the foundry sand storage method MT1 and the control of the supply amount by the supply amount control step (S40) of the foundry sand storage method MT2, for example, the storage amount of the foundry sand S in the first storage section 10A (second storage section 10B) can be controlled to be equal to or greater than the threshold value. In this way, by controlling the storage amount in the first storage section 10A (second storage section 10B), the resting time of the foundry sand can be appropriately secured. Therefore, the foundry sand storage system 1 and the foundry sand storage methods MT1, MT2 can appropriately secure the resting time of the foundry sand.
[0109] The molding sand storage system 1 also includes a measuring device 70 that includes at least one of a microwave sensor, a millimeter wave sensor, and a Sauding-type level meter and measures the storage amount of each of the first storage section 10A and the second storage section 10B in a measurement step in the acquisition step (S12, S32). As a result, the molding sand storage methods MT1, MT2 and the molding sand storage system 1 can appropriately measure the storage amount regardless of the type of molding sand S. The measuring device 70 can also measure the storage amount more accurately than when a level switch measures the storage amount. Furthermore, the measuring device 70 can suppress the occurrence of problems due to the influence of interference compared to when an ultrasonic sensor measures the storage amount.
[0110] The measuring device 70 also includes a microwave sensor provided at a position where it can irradiate microwaves in a direction intersecting the inclined surface of the deposit SV1 of the foundry sand S having an inclined surface with an angle of repose that can be formed in the first reservoir 10A. In this case, by irradiating microwaves in a direction intersecting the inclined surface of the deposit SV1 of the foundry sand S, the measuring device 70 can receive the microwaves reflected by the inclined surface with higher accuracy.
[0111] In the foundry sand storage methods MT1, MT2 and the foundry sand storage system 1, when the storage amount of the first storage section 10A (second storage section 10B) is greater than a predetermined upper limit value, the first discharge section 12 discharges the foundry sand S that exceeds the upper limit value from the first storage section 10A (second storage section 10B) to the storage section 15. In this case, the storage amount of the foundry sand S in the first storage section 10A (second storage section 10B) can be kept below the upper limit value. This makes it possible to prevent the foundry sand S from overflowing from the first storage section 10A (second storage section 10B). Note that the discharge of the foundry sand S that exceeds the upper limit value by the first discharge section 12 may be performed at any time during the execution of the foundry sand storage methods MT1, MT2.
[0112] In addition, the control process of the foundry sand storage method MT1 and the foundry sand storage system 1 includes, when it is determined in the second input determination process (S21) that the storage volume in the first storage section 10A is less than a threshold value and the storage volume in the second storage section 10B is equal to or greater than a threshold value, a first priority input process (S22) in which foundry sand S is input from the first input section 30 to the first storage section 10A so that the amount of input from the first input section 30 to the first storage section 10A after the second input determination process (S21) is greater than the amount of input from the first input section 30 to the first storage section 10A before the second input determination process (S21). Furthermore, the control process of the foundry sand storage method MT1 and the foundry sand storage system 1 includes, as a second priority feeding process (S24), a process of feeding the foundry sand S from the first feeding section 30 to the second storage section 10B so that the feeding amount from the first feeding section 30 to the second storage section 10B after the third feeding determination process (S23) is greater than the feeding amount from the first feeding section 30 to the second storage section 10B before the third feeding determination process (S23), when it is determined in the third feeding determination process (S23) that the storage amount in the second storage section 10B is less than the threshold value and the storage amount in the first storage section 10A is equal to or greater than the threshold value. The resting time of the foundry sand S in a storage section 10 having a smaller storage amount than the other storage sections 10 may be shorter than the resting time of the foundry sand in the other storage sections 10. According to the present disclosure, by feeding foundry sand S from a first feeding section 30 into a storage section 10 with a small storage volume so that the feeding amount is greater than the amount fed into other storage sections 10, the storage volume can be increased so as to ensure a resting time equivalent to that of the foundry sand S in the other storage sections 10.
[0113] The foundry sand storage method MT1 and the control process of the foundry sand storage system 1 include, when it is determined in the third input determination process (S25) that the storage amounts in the first storage section 10A and the second storage section 10B are less than the thresholds, a third priority input process (S26) and a fourth priority input process (S27) in which foundry sand is input from the second input section 40 to at least one of the first storage section 10A and the second storage section 10B. Even if the input amounts from the first input section 30 to the first storage section 10A and the second storage section 10B are changed when the respective storage amounts in the first storage section 10A and the second storage section 10B are less than the thresholds, the time until the respective storage amounts in the first storage section 10A and the second storage section 10B become equal to or greater than the thresholds remains the same before and after the change, provided that the total amount of foundry sand S input from the first input section 30 is constant. In the present disclosure, when the input amount is controlled for each of the storage amounts in the first storage section 10A and the second storage section 10B, in addition to input of the molding sand S from the first input section 30, the molding sand is input from the second input section 40 when each of the storage amounts in the first storage section 10A and the second storage section 10B is less than a threshold value. Therefore, more molding sand S is input to the first storage section 10A and the second storage section 10B than when the molding sand S is input to the first storage section 10A and the second storage section 10B only from the first input section 30. Therefore, the storage amounts in the first storage section 10A and the second storage section 10B can be made equal to or greater than the threshold value in a shorter time, and the storage amounts in the first storage section 10A and the second storage section 10B that can be supplied to the molding sand-related device 2 can be appropriately increased. In addition, the resting time of the molding sand S input thereafter can be appropriately secured.
[0114] In addition, the control process of the foundry sand storage method MT1 and the foundry sand storage system 1 includes a third priority input process (S26) in which foundry sand S is input from the first input section 30 to the first storage section 10A, which has a smaller storage volume compared to the storage volume in the second storage section 10B, so that the amount of input from the first input section 30 to the first storage section 10A after the third input determination process (S25) is greater than the amount input from the first input section 30 to the first storage section 10A before the third input determination process (S25). The foundry sand storage method MT1 also includes, as a fourth preferential charging step (S27), a step of charging the foundry sand S from the first charging section 30 to the second storage section 10B, which has a smaller storage amount than the storage amount of the first storage section 10A, so that the amount of the foundry sand S charged from the first charging section 30 to the second storage section 10B after the third charging determination step (S25) is greater than the amount of the foundry sand S charged from the first charging section 30 to the second storage section 10B before the third charging determination step (S25). In this case, the first charging section 30 charges the foundry sand S preferentially to at least one storage section 10 having a smaller storage amount, so that the storage amount in the at least one storage section 10 increases in a shorter time, and the storage amount of the foundry sand S in the storage section 10 that can be supplied to the foundry sand-related device 2 can be appropriately increased. In addition, the laying time can be secured for the foundry sand S charged thereafter.
[0115] In addition, the control process of the foundry sand storage method MT1 and the foundry sand storage system 1 includes a third priority input process (S26) in which foundry sand S is input from the second input section 40 to the first storage section 10A, which has a smaller storage volume compared to the storage volume in the second storage section 10B, so that the amount of sand S input from the second input section 40 to the first storage section 10A after the third input determination process (S25) is greater than the amount input from the second input section 40 to the first storage section 10A before the third input determination process (S25). The foundry sand storage method MT1 also includes, as a fourth preferential charging step (S27), a step of charging the foundry sand S from the second charging section 40 to the second storage section 10B, which has a smaller storage amount than the storage amount of the first storage section 10A, so that the amount of the foundry sand S charged from the second charging section 40 to the second storage section 10B after the third charging determination step (S25) is greater than the amount of the foundry sand S charged from the second charging section 40 to the second storage section 10B before the third charging determination step (S25). In this case, the second charging section 40 charges the foundry sand S preferentially to at least one storage section 10 having a smaller storage amount, so that the storage amount in the at least one storage section 10 increases in a shorter time, and the storage amount of the foundry sand S in the storage section 10 that can be supplied to the foundry sand-related device 2 can be appropriately increased. In addition, the laying time can be secured for the foundry sand S charged thereafter.
[0116] In addition, the control process of the foundry sand storage method MT2 and the foundry sand storage system 1 includes a first priority supply process (S42) in which, when it is determined in the second supply determination process (S41) that the storage volume in the first storage section 10A is less than a threshold value and the storage volume in the second storage section 10B is equal to or greater than a threshold value, the total amount of the supply from the first storage section 10A and the second storage section 10B to the foundry sand related device 2 is controlled to a predetermined set amount while reducing the supply volume from the first storage section 10A to the foundry sand related device 2 from the supply volume from the first storage section 10A to the foundry sand related device 2 compared to the supply volume from the first storage section 10A to the foundry sand related device 2 before the second supply determination process (S41). The control process of the foundry sand storage method MT2 and the foundry sand storage system 1 includes, as a second priority supply process (S44), a control process in which, when it is determined in the third supply determination process (S43) that the storage amount in the second storage section 10B is less than a threshold value and the storage amount in the first storage section 10A is equal to or greater than a threshold value, the total amount of the supply amounts from the first storage section 10A and the second storage section 10B to the foundry sand related device 2 is a predetermined set amount while reducing the supply amount from the second storage section 10B to the foundry sand related device 2 from the second storage section 10B to the foundry sand related device 2 compared to the supply amount from the second storage section 10B to the foundry sand related device 2 before the third supply determination process (S43). In this case, the resting time of the foundry sand S in the storage section 10 having a smaller storage amount than the other storage sections 10 may be shorter than the resting time of the foundry sand S in the other storage sections 10. According to the present disclosure, by reducing the amount of storage space 10 with a smaller storage volume supplied to the foundry sand-related device 2 compared to the amount of storage space 10 supplied to the foundry sand-related device 2 from the other storage sections 10, it is possible to suppress the reduction in the storage volume so as to ensure a resting time equivalent to that of the foundry sand S in the other storage sections 10.
[0117] The control process of the foundry sand storage method MT2 and the foundry sand storage system 1 includes a third priority supply process (S45) in which, when it is determined in the third supply determination process (S43) that the storage amounts in the first storage section 10A and the second storage section 10B are less than the threshold, the foundry sand is supplied from the supply section 60 to the foundry sand related device 2. In this case, when controlling the supply amount from the multiple storage sections 10 to the foundry sand related device 2, when the storage amounts in the multiple storage sections 10 are less than the threshold, the foundry sand S is supplied from the supply section 60 to the foundry sand related device 2 in addition to the supply of the foundry sand S from the multiple storage sections 10 to the foundry sand related device 2. Therefore, according to the above-mentioned configuration, the supply amount of the foundry sand S from the multiple storage sections 10 to the foundry sand related device 2 can be reduced compared to the case where the foundry sand S is supplied to the foundry sand related device 2 only from the multiple storage sections 10. Therefore, the rate at which the amount of storage in the multiple storage sections 10 decreases can be suppressed, and the decrease in the amount of the molding sand S stored in the storage sections 10 that can be supplied to the molding sand related device 2 can be appropriately suppressed.
[0118] In addition, the control process of the foundry sand storage method MT2 and the foundry sand storage system 1 includes, as a third priority supply process (S45), a process of supplying foundry sand S from the supply unit 60 to the foundry sand related device 2 while reducing the supply amount from the first storage unit 10A and the second storage unit 10B to the foundry sand related device 2 from each of the first storage unit 10A and the second storage unit 10B compared to the supply amount from each of the first storage unit 10A and the second storage unit 10B to the foundry sand related device 2 before the third supply determination process (S43), so that the total amount of the supply from the first storage unit 10A and the second storage unit 10B to the foundry sand related device 2 and the supply amount from the supply unit 60 to the foundry sand related device 2 becomes a predetermined set amount. Even if the supply amount from at least one of the storage units 10 to the foundry sand related device 2 is reduced when the storage amount of each of the multiple storage units 10 is less than the threshold value, if the total amount of the foundry sand S supplied from all of the multiple storage units 10 is constant, the supply amount from the other storage units 10 to the foundry sand related device 2 only increases, and the time until the storage amount of each of the multiple storage units 10 becomes equal to or greater than the threshold value remains the same before and after the increase or decrease in the supply amount. In the present disclosure, a set amount of the foundry sand S is supplied to the foundry sand related device 2 by the multiple storage units 10 and the supply unit 60, so that the supply amount of the foundry sand S from the multiple storage units 10 to the foundry sand related device 2 can be reduced compared to the case where the foundry sand S is supplied to the foundry sand related device 2 only from the multiple storage units 10. Therefore, the speed at which the storage amount of the multiple storage units 10 decreases can be suppressed, and the decrease in the storage amount of the foundry sand S in the storage units 10 that can be supplied to the foundry sand related device 2 can be appropriately suppressed.
[0119] [Modifications of the inspection method and inspection system] Although the present embodiment has been described above, the present invention is not limited to the present embodiment, and can be modified in various ways without departing from the spirit of the present invention. The driving unit 23 does not have to control the lifting and lowering of at least the discharge gates 21. For example, an operator may operate the discharge gates 21 to move the discharge gates 21 to an open or closed position. The input control unit 86 may change the input amount by a process in the first input unit 30 in addition to the process of controlling the opening degree of the input gate 35 in the second input guide unit 34. When changing the input amount, the input control unit 86 may control the opening degree of the gate that adjusts the amount of the molding sand S in the first supply source 31, the transport speed of the molding sand S in the input path 32, etc., for the first input unit 30. The third supply source 61 does not have to adjust the amount of the molding sand S to be supplied by the opening degree of the gate (not shown). In this case, in the third priority supply step (S45), the supply unit 60 may supply a preset amount to the foundry sand related device 2. In this case, the supply unit 60 only needs to realize both the gate open state and the gate closed state without finely adjusting the gate opening degree. In this case, the supply control unit 88 reduces the supply amount from the first storage unit 10A to the foundry sand related device 2 and the supply amount from the second storage unit 10B to the foundry sand related device 2, depending on the supply amount from the supply unit 60 to the foundry sand related device 2.
[0120] For example, the foundry sand storage system 1 may include three or more storage parts 10. For example, the foundry sand storage system 1 may include one storage part 10. Hereinafter, a foundry sand storage system according to a modified example will be described with reference to Figs. 9 and 10. The foundry sand storage system according to the modified example includes one storage part as at least one storage part, and differs from the foundry sand storage system 1 shown in Fig. 1 in that the first input part 30, the second input part 40, and the discharge part 50 do not have the configuration for the second storage part 10B. The one storage part in the foundry sand storage system according to the modified example has the same configuration as the first storage part 10A. In the following description, the one storage part in the foundry sand storage system according to the modified example will be referred to as the storage part 10. The symbols of the other components in the foundry sand storage system according to the modified example are the same as the respective components of the foundry sand storage system 1 described above.
[0121] FIG. 9 is a flow chart showing an example of a molding sand storage method by a molding sand storage system according to a modified example. The molding sand storage method MT3 shown in FIG. 9 is executed by the molding sand storage system according to a modified example. The molding sand storage method MT3 is a method in which the control device 80 controls the amount of molding sand S charged to the storage unit 10 from at least one of the first charging unit 30 and the second charging unit 40. The molding sand storage method MT3 is started by the control device 80 at a predetermined timing, for example, in a state in which the molding sand S is stored in the storage unit 10 and the molding sand S is supplied to the molding sand related device 2 from at least one of the storage unit 10 and the supply unit 60. The amount of the molding sand S supplied to the molding sand related device 2 from at least one of the storage unit 10 and the supply unit 60 is stored in the memory unit 82 by the supply control unit 88.
[0122] First, in a preparation step (S50), the input control unit 86 causes the first input unit 30 and the second input unit 40 to prepare foundry sand S that can be input to the reservoir unit 10. The preparation step (S50) is the same process as the acquisition step (S10) shown in FIG.
[0123] Next, as a basic charging step (S51), the charging control unit 86 controls the first charging unit 30 to charge a predetermined amount of foundry sand S into the storage unit 10. The basic charging step (S51) is an example of a process for charging foundry sand from the first charging unit into one storage unit. The charging control unit 86 controls the memory unit 82 to store the amount of foundry sand S charged from the first charging unit 30 to the storage unit 10.
[0124] Next, in an acquisition step (S52), the acquisition unit 81 acquires the amount of the molding sand S stored in the storage unit 10, the amount of the molding sand S introduced into the storage unit 10, and the amount of the molding sand S supplied to the molding sand related device 2. The acquisition step (S52) is an example of an acquisition step. The amount of the molding sand S introduced into the storage unit 10 includes the amount of the molding sand S introduced from the first introduction unit 30 into the storage unit 10 and the amount of the molding sand S introduced from the second introduction unit 40 into the storage unit 10. The amount of the molding sand S supplied to the molding sand related device 2 includes the amount of the molding sand S supplied from the storage unit 10 to the molding sand related device 2 and the amount of the molding sand S supplied from the supply unit 60 to the molding sand related device 2. The acquisition step (S51) includes a measurement step of measuring the amount of the storage in the storage unit 10 by the measuring device 70. The measurement step is an example of a measurement step. The acquiring unit 81 acquires the amount of the molding sand S stored in the storage unit 10 measured by the measuring device 70 in the measurement process. The acquiring unit 81 acquires from the memory unit 82 the input amount and the supply amount that were set at the time when the amount of the molding sand S stored in the storage unit 10 was measured by the measuring device 70.
[0125] Next, in a setting step (S53), the setting unit 83 sets a threshold value for the storage amount based on the resting time, and the input amount and supply amount acquired in the acquisition step (S52). The setting step (S51) is an example of a setting step. The setting unit 83 sets a threshold value for the storage amount in the storage unit 10 based on the resting time, the input amount to the storage unit 10, and the supply amount from the storage unit 10 to the foundry sand related device 2.
[0126] Next, in a charging determination step (S54), charging determination unit 85 determines whether the storage amount in storage unit 10 is equal to or greater than a threshold. If charging determination unit 85 determines that the storage amount in storage unit 10 is equal to or greater than the threshold, charging control unit 86 transitions to an initialization step (S55) as the next process in foundry sand storage method MT3. If charging determination unit 85 determines that the storage amount in storage unit 10 is not equal to or greater than the threshold (is less than the threshold), charging control unit 86 transitions to a charging amount control step (S56) as the next process in foundry sand storage method MT3.
[0127] If it is determined in the charging determination step (S54) that the storage amount in one storage section 10 is not equal to or greater than the threshold (is less than the threshold), an additional charging step (S56) is performed. As the additional charging step (S56), the charging control section 86 controls the second charging section 40 to charge foundry sand S into the storage section 10. When the additional charging step (S56) is completed, the acquisition step (S52) is executed again.
[0128] In the input determination step (S54), when the input determination unit 85 determines that the storage amount in the storage unit 10 is equal to or greater than the threshold, the input control unit 86 executes the initialization step (S55). If the additional input step (S56) is executed before the initialization step (S55), the input control unit 86 stops input from the second input unit 40 to the storage unit 10 in the additional input step (S56). Note that, if the additional input step (S56) is not executed before the initialization step (S55), the above-mentioned processing is not executed and is completed. When the initialization step (S55) is completed, the input control unit 86 ends the flowchart shown in FIG. 9.
[0129] FIG. 10 is a flow chart showing an example of a molding sand storage method by a molding sand storage system according to a modified example. The molding sand storage method MT4 shown in FIG. 10 is executed by the molding sand storage system according to the modified example. The molding sand storage method MT4 is a method for controlling the supply amount of molding sand S from at least one of the storage unit 10 and the supply unit 60 to the molding sand related device 2 by the control device 80. The molding sand storage system according to the modified example executes at least one of the molding sand storage methods MT3 and MT4. That is, the molding sand storage system according to the modified example may execute the molding sand storage methods MT3 and MT4 simultaneously, or may execute either one of the molding sand storage methods MT3 and MT4. The molding sand storage method MT4 is started by the control device 80 at a predetermined timing, for example, when the molding sand S is stored in the storage unit 10 and the molding sand S is being supplied to the storage unit 10 from at least one of the first input unit 30 and the second input unit 40. The amounts of the foundry sand S charged from the first charging section 30 and the second charging section 40 to the reservoir section 10 are stored in the memory section 82 by the charging control section 86.
[0130] First, in a preparation step (S60), the supply control unit 88 causes the supply unit 60 to prepare foundry sand S that can be supplied to the foundry sand related device 2. The preparation step (S60) is the same process as the acquisition step (S30) shown in FIG.
[0131] Next, as a basic supply step (S61), the supply control unit 88 controls the storage unit 10 to supply a predetermined amount of foundry sand S to the foundry sand related device 2. The basic supply step (S61) is an example of a step of supplying foundry sand from one storage unit to the foundry sand related device. The supply control unit 88 controls the memory unit 82 to store the amount of foundry sand S supplied from the storage unit 10 to the foundry sand related device 2.
[0132] Next, in an acquisition step (S62), the acquisition unit 81 acquires the amount of the molding sand S stored in the storage unit 10, the amount of the molding sand S introduced into the storage unit 10, and the amount of the molding sand S supplied to the molding sand related device 2. The acquisition step (S62) is the same process as the acquisition step (S52) shown in FIG.
[0133] Next, in a setting step (S63), the setting unit 83 sets a threshold value for the storage amount based on the resting time and the input amount and the supply amount acquired in the acquisition step (S62). The setting step (S63) is an example of a setting step. The setting step (S63) is the same process as the setting step (S53) shown in FIG.
[0134] Next, in a supply determination step (S64), the supply determination unit 87 determines whether the storage amount in the storage unit 10 is equal to or greater than a threshold. If the supply determination unit 87 determines that the storage amount in the storage unit 10 is equal to or greater than the threshold, the supply control unit 88 transitions to an initialization step (S65) as the next process in the foundry sand storage method MT4. If the supply determination unit 87 determines that the storage amount in the storage unit 10 is not equal to or greater than the threshold (is less than the threshold), the supply control unit 88 transitions to an additional supply step (S66) as the next process in the foundry sand storage method MT4.
[0135] If it is determined in the supply determination step (S64) that the storage amount in one storage section 10 is not equal to or greater than the threshold (is less than the threshold), an additional supply step (S66) is performed. In the additional supply step (S66), the supply control section 88 controls the supply section 60 to supply the foundry sand S to the foundry sand related device 2. At this time, the supply control section 88 reduces the supply amount from one storage section 10, and controls the supply section 60 to supply the foundry sand S to the foundry sand related device 2 so that the total amount of the supply amount from one storage section 10 to the foundry sand related device 2 and the supply amount from the supply section 60 to the foundry sand related device 2 becomes a predetermined set amount. When the additional supply step (S66) is completed, the acquisition step (S62) is executed again.
[0136] When the supply determination unit 87 determines in the supply determination step (S64) that the storage amount in the storage unit 10 is equal to or greater than the threshold, the supply control unit 88 executes the initialization step (S65). When the additional supply step (S66) is executed before the initialization step (S65), the supply control unit 88 stops the supply of sand from the supply unit 60 to the foundry sand related device 2 in the additional supply step (S66). Note that when the additional supply step (S66) is not executed before the initialization step (S65), the above-mentioned processing is not executed and is completed. When the initialization step (S65) is completed, the supply control unit 88 ends the flowchart shown in FIG. 10.
[0137] As described above, in the foundry sand storage system and foundry sand storage methods MT3 and MT4 according to the modified examples, the laying time of the foundry sand can be appropriately ensured by the same action as in the foundry sand storage system 1 and the foundry sand storage methods MT1 and MT2 described above. The control process of the foundry sand storage method MT3 and the foundry sand storage system 1 includes a process of feeding foundry sand S from the second feeding section 40 to one of the storage sections 10 as an additional feeding process (S56) when it is determined in the feeding determination process (S54) that the storage amount of one of the storage sections 10 is less than the threshold value. In this case, when controlling the feeding amount for the storage amount in one of the storage sections 10, in addition to feeding of the foundry sand S from the first feeding section 30, feeding of foundry sand from the second feeding section 40 is performed when the storage amount is less than the threshold value. As a result, a larger amount of foundry sand S is fed into one storage section 10, compared to a case in which the foundry sand S is fed into one storage section 10 only from the first feeding section 30. Therefore, the amount of storage in the one storage section 10 can reach or exceed the threshold in a shorter time, and the resting time of the fed foundry sand S can be appropriately secured.
[0138] Furthermore, the control process of the foundry sand storage method MT4 and the foundry sand storage system 1 includes, as an additional supply process (S66), a process of decreasing the supply amount from one of the storage sections 10 and supplying the foundry sand S from the supply section 60 to the foundry sand related device 2 so that the total amount of the supply amount from one of the storage sections 10 and the supply amount from the supply section 60 becomes a predetermined set amount when the supply determination process (S64) determines that the storage amount in one of the storage sections 10 is less than the threshold. In this case, the speed at which the storage amount in one of the storage sections 10, whose storage amount is less than the threshold, decreases can be reduced, and the resting time of the foundry sand S in the one of the storage sections 10 can be appropriately secured. Furthermore, by supplying the foundry sand from the supply section 60 to the foundry sand related device 2, a constant amount of foundry sand can be supplied to the foundry sand related device 2 by one of the storage sections 10 and the supply section 60. [Explanation of symbols]
[0139] 1...molding sand storage system, 2...molding sand related device, 10...storage section, 10A...first storage section, 10B...second storage section, 15...storage section, 20...second discharge section, 30...first input section, 40...second input section, 60...supply section, 70...measuring device, 80...control device, 81...acquisition section, 82...memory section, 83...setting section, 84...control section, 85...input determination section, 86...input control section, 87...supply determination section, 88...supply control section, MT1, MT2, MT3, MT4...molding sand storage method, S...molding sand, SV1, SV2...deposits.
Claims
1. storing in at least one reservoir molding sand which can be supplied to a molding sand-related device; acquiring a storage amount of the molding sand in the at least one storage unit, an input amount of the molding sand to the storage unit, and a supply amount of the molding sand to the molding sand-related device; setting a threshold value for the storage amount based on a predetermined resting time of the foundry sand and the input amount and the supply amount acquired in the acquiring step; controlling at least one of the input amount and the supply amount based on the storage amount acquired in the acquiring step and the threshold value set in the setting step; A method for storing foundry sand, comprising:
2. 2. The method for storing foundry sand according to claim 1, wherein the acquiring step includes a step of measuring the stored amount by at least one of a microwave sensor, a millimeter wave sensor, and a Sauding type level meter.
3. The storing step includes storing the molding sand in one storage portion as the at least one storage portion; The controlling step includes: preparing the molding sand capable of being charged into the one storage unit in a first charge unit and a second charge unit; A step of charging the casting sand from the first charging portion into the one storage portion; When it is determined that the amount of the molding sand stored in the one of the storage sections is less than the threshold value, the molding sand is charged from the second charging section to the one of the storage sections; The method for storing foundry sand according to claim 1 or 2, comprising:
4. The storing step includes storing the molding sand in a plurality of storage sections as the at least one storage section; The controlling step includes: preparing the molding sand in a first input section so that the molding sand can be input into the plurality of storage sections; A step of charging the casting sand from the first charging portion into the plurality of storage portions; a step of charging the casting sand from the first charging part to the at least one storage part such that the charging amount is greater than the charging amount from the first charging part to the at least one storage part before the determination, when the storage amount in at least one storage part among the plurality of storage parts is less than the threshold value and the storage amount in the other storage parts among the plurality of storage parts is equal to or greater than the threshold value; The method for storing foundry sand according to claim 1 or 2, comprising:
5. The storing step includes storing the molding sand in a plurality of storage sections as the at least one storage section; The controlling step includes: preparing the molding sand in a first input section and a second input section so that the molding sand can be input into the plurality of storage sections; A step of charging the casting sand from the first charging portion into the plurality of storage portions; a step of charging the casting sand from the second charging section into at least one of the plurality of storage sections when it is determined that the storage amount in each of the plurality of storage sections is less than the threshold value; The method for storing foundry sand according to claim 1 or 2, comprising:
6. 6. The foundry sand storage method according to claim 5, wherein the controlling step includes a step of feeding the foundry sand from the first feeding part into at least one of the plurality of storage parts, the storage amount of which is smaller than the other storage parts, so that the feeding amount is greater than the feeding amount from the first feeding part to the at least one storage part before the determination.
7. 6. The foundry sand storage method according to claim 5, wherein the controlling step includes a step of feeding the foundry sand from the second feeding portion into at least one of the plurality of storage portions, the storage portion having a smaller storage amount than the other storage portions, so that the feeding amount is greater than the feeding amount from the second feeding portion to the at least one storage portion before the determination.
8. The storing step includes storing the molding sand in one storage portion as the at least one storage portion; The controlling step includes: a step of preparing the foundry sand in a supply section so that the foundry sand can be supplied to the foundry sand-related device; supplying the molding sand from the one reservoir to the molding sand-related device; a step of reducing the supply amount from the one storage unit when it is determined that the storage amount in the one storage unit is less than the threshold value, and supplying the foundry sand from the supply unit to the foundry sand-related device so that the total amount of the supply amount from the one storage unit and the supply amount from the supply unit becomes a predetermined set amount; The method for storing foundry sand according to claim 1 or 2, comprising:
9. The storing step includes storing the molding sand in a plurality of storage sections as the at least one storage section; The controlling step includes: supplying the molding sand from the plurality of reservoirs to the molding sand-related device; When it is determined that the storage amount in at least one of the plurality of storage portions is less than the threshold value and the storage amount in the other storage portions of the plurality of storage portions is equal to or greater than the threshold value, a step of controlling the total amount of the supply amounts from the plurality of storage portions to a predetermined set amount while reducing the supply amount from the at least one storage portion from the supply amount from the at least one storage portion before the determination; The method for storing foundry sand according to claim 1 or 2, comprising:
10. The storing step includes storing the molding sand in a plurality of storage sections as the at least one storage section; The controlling step includes: a step of preparing the foundry sand in a supply section so that the foundry sand can be supplied to the foundry sand-related device; supplying the molding sand from the plurality of reservoirs to the molding sand-related device; supplying the foundry sand from the supply unit to the foundry sand-related device when it is determined that the storage amount in each of the plurality of storage units is less than the threshold value; The method for storing foundry sand according to claim 1 or 2, comprising:
11. the step of controlling includes a step of supplying the foundry sand from the supply unit to the foundry sand-related device while reducing the supply amount from each of the plurality of storage units from a value lower than that from each of the plurality of storage units before the determination, so that the total amount of the supply amount from the plurality of storage units and the supply amount from the supply unit becomes a predetermined set amount; The method for storing foundry sand according to claim 10, comprising:
12. At least one storage unit for storing foundry sand that can be supplied to a foundry sand-related device; a control device that controls at least one of an amount of the molding sand charged into the storage section and an amount of the molding sand supplied to the molding-sand-related device; Equipped with The control device includes: an acquisition unit that acquires the amount of the casting sand stored in the at least one storage unit, the input amount, and the supply amount; a setting unit that sets a threshold value for the storage amount based on a predetermined resting time of the foundry sand and the input amount and the supply amount acquired by the acquisition unit; A control unit that controls at least one of the input amount and the supply amount based on the storage amount and the threshold value acquired by the acquisition unit; A foundry sand storage system having
13. A measuring device including at least one of a microwave sensor, a millimeter wave sensor, and a Saudi type level meter for measuring the storage amount is provided; The foundry sand storage system according to claim 12 , wherein the acquisition unit acquires the storage amount measured by the measuring device.
14. The foundry sand storage system according to claim 13, wherein the measuring device includes a microwave sensor provided at a position capable of irradiating microwaves in a direction intersecting a sloping surface of the deposit of foundry sand having an angle of repose that can be formed in the at least one storage section.
15. The foundry sand storage system according to any one of claims 12 to 14, further comprising a storage section for storing the casting sand in an amount exceeding the upper limit value discharged from at least one of the storage sections when the storage amount is greater than a predetermined upper limit value.
16. The at least one storage section includes one storage section, The casting machine further includes a first input section and a second input section capable of inputting the casting sand into the one storage section, The control unit is The molding sand is poured from the first pouring portion into the one storage portion; The foundry sand storage system according to any one of claims 12 to 14, wherein when the storage amount in one of the storage sections becomes less than the threshold value, the foundry sand is charged from the second charging section to the at least one of the storage sections.
17. The at least one storage section includes a plurality of storage sections, a first input section capable of inputting the casting sand into the plurality of storage sections; The control unit is The casting sand is poured from the first pouring portion into the plurality of storage portions; A foundry sand storage system as described in any one of claims 12 to 14, wherein when it is determined that the storage volume of at least one of the plurality of storage sections is less than the threshold value and the storage volume of other storage sections of the plurality of storage sections is equal to or greater than the threshold value, the foundry sand is added from the first input section so that the amount of sand added is greater than the amount of sand added from the first input section to the at least one storage section before the determination.
18. The at least one storage section includes a plurality of storage sections, a first input section and a second input section capable of inputting the casting sand into the plurality of storage sections; The control unit is The casting sand is poured from the first pouring portion into the plurality of storage portions; A foundry sand storage system as described in any one of claims 12 to 14, wherein when it is determined that the storage amounts in the multiple storage sections are each less than the threshold value, the foundry sand is charged from the second charging section to at least one of the multiple storage sections.
19. The at least one storage section includes one storage section, A supply unit capable of supplying the molding sand to the molding sand-related device is further provided, The control unit is supplying the molding sand from the one storage unit to the molding sand-related device; A foundry sand storage system as described in any one of claims 12 to 14, wherein when it is determined that the storage amount in one of the storage sections is less than the threshold value, the supply amount from the one of the storage sections is reduced, and the foundry sand is supplied from the supply section to the foundry sand-related device so that the total amount of the supply amount from the one of the storage sections and the supply amount from the supply section becomes a predetermined set amount.
20. The at least one storage section includes a plurality of storage sections, A supply unit capable of supplying the molding sand to the molding sand-related device is further provided, The control unit is Supplying the molding sand from the plurality of storage units to the molding sand-related device; A foundry sand storage system as described in any one of claims 12 to 14, wherein when it is determined that the storage volume of at least one of the plurality of storage sections is less than the threshold value and the storage volume of other storage sections of the plurality of storage sections is equal to or greater than the threshold value, the supply volume from the at least one storage section is reduced from the supply volume from the at least one storage section before the determination, while controlling so that the total volume of the supply volumes from the plurality of storage sections becomes a predetermined set volume.
Citation Information
Patent Citations
Casting sand regeneration device
JP2005046863A
