Electrothermal facility simulation system
The simulation system integrates solar power generation and storage devices by adjusting load factors and setting realistic operating conditions, addressing inefficiencies in thermoelectric equipment simulation and enabling efficient energy management.
Patent Information
- Application Number
- JP2024126209
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2022-10-21
- Filing Date
- 2024-08-01
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2043-10-06
Smart Images

Figure 2024149645000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a simulation system and an operation method for a heat and power supply facility, and more particularly to a heat and power supply facility simulation system and an operation method for the heat and power supply facility, which determines the relationship between the operation conditions of the heat and power supply equipment and the usage amount of the supplied energy or the production amount of the composite total energy in a heat and power supply facility to which a plurality of heat and power supply equipment are connected, to which at least electric power and fuel (hereinafter referred to as "supplied energy") are supplied, and to which at least two of electric power, low-temperature chilled water, chilled water, hot water, hot water, high-pressure steam, and low-pressure steam (hereinafter referred to as "composite total energy") are produced and supplied to utilization equipment. [Background technology]
[0002] The following Patent Document 1 is known regarding a simulation system and an operation method for a heat and power supply facility as described above. According to this document, an accurate simulation is performed by changing the load factor of the heat and power supply device so that the production amount of any one of the composite total energies converges to a target value set by the energy load setting unit, adjusting the balance of at least the composite total energy related to the heat and power supply device based on the changed load factor, and repeating the change in the load factor of the heat and power supply device and the adjustment until the production amount converges to the target value. This heat and power supply device also includes a photovoltaic power generation device and a solar heat collector, and it is possible to rationally integrate and use the solar-related device and other heat and power supply devices.
[0003] On the other hand, in recent years, the performance of photovoltaic power generation equipment and power storage equipment has improved dramatically, and the combined use of these equipment is also increasing. Accordingly, a system that can accurately perform simulations of heat and power facilities including photovoltaic power generation equipment and power storage equipment has become desirable. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Patent No. 6118973 Summary of the Invention [Problem to be solved by the invention]
[0005] In view of the above conventional circumstances, an object of the present invention is to provide a simulation system for a heat and power supply facility that is capable of rationally integrating and utilizing a photovoltaic power generation device and a power storage device with other heat and power supply devices. [Means for solving the problem]
[0006] In order to achieve the above object, the simulation system for a heat and power supply facility according to the present invention is characterized in that a plurality of heat and power supply devices are connected, at least electric power and fuel (hereinafter referred to as "supplied energy") are supplied, and at least two of electric power, low-temperature chilled water, chilled water, hot water, hot water, high-pressure steam, and low-pressure steam (hereinafter referred to as "composite total energy").a heat and power generation facility that generates and supplies heat energy to a utilization facility, the heat and power generation facility including at least a photovoltaic power generation device, a power storage device, and a heat and power generation device having at least a pump using a motor, the heat and power generation facility including an energy load setting unit that sets an amount of composite total energy required by the utilization facility for each time period on a daily basis, a process condition setting unit that sets process conditions including at least one of an outside air temperature or a wet-bulb temperature of the heat and power generation facility and the utilization facility, and an amount of solar radiation on a horizontal surface of the photovoltaic power generation device, an operation condition setting unit that sets whether or not to operate and an operation priority order for each of the heat and power generation devices for each time period, and a calculation unit that calculates at least the amount of composite total energy produced as a result of operating the heat and power generation facility in accordance with the operation conditions set by the operation condition setting unit, the operation condition setting unit further includes an electricity storage condition setting unit that sets a configuration and charge and discharge conditions of the electricity storage device, and a photovoltaic power generation output condition setting unit that sets an output efficiency of the photovoltaic power generation device and sets an output control of the photovoltaic power generation device to continuous control, any one of the power generation devices except the power storage device includes a partial load characteristic that varies depending on the process conditions, the solar power generation device has an output characteristic that varies depending on an oblique solar radiation amount based on the horizontal solar radiation amount and an outside air temperature, which are among the process conditions, and the calculation unit changes a load factor of the thermoelectric power generation device in accordance with the output fluctuation of the solar power generation device in the continuous control and the charge / discharge condition of the power storage device so that a production amount of any of the composite total energies converges to a target value set by the energy load setting unit and adjusts a balance of at least the composite total energy related to the thermoelectric power generation device based on the changed load factor, performs a convergence calculation that repeats the change and adjustment of the load factor of the thermoelectric power generation device until the production amount converges to the target value, determines, for each time zone, a charging amount and discharging amount of the power storage device that makes a daily total charging amount of the power storage device equal to a daily total discharging amount of the power storage device and that can maintain a balance of electric energy, adds the determined charging amount to an amount of electric energy usage for each time zone, and calculates a utility consumption based on the added amount of electric energy usage.
[0007] According to the above configuration, the thermoelectric device includes at least a photovoltaic power generation device, a power storage device, and a thermoelectric device having at least a pump using a motor. Among the thermoelectric devices, any one except the photovoltaic power generation device and the power storage device includes a partial load characteristic that varies depending on the process conditions, and the photovoltaic power generation device has an output characteristic that varies depending on the amount of inclined solar radiation based on the amount of solar radiation on a horizontal surface and the outside air temperature, which are among the process conditions. In addition, the amount of charge and discharge of the power storage device varies depending on its configuration and charging and discharging conditions. Furthermore, conventional photovoltaic power generation devices could only control the output in units of the number of photovoltaic power generation modules (arrays), which resulted in stepwise output control, and required purchasing electricity to a certain extent for adjustment. However, technological advances have made it possible to control the rated output in units of 1% in photovoltaic power generation devices including power conditioners, etc., making it possible to continuously control the output of photovoltaic power generation, and charging the power storage device has become more efficient. In the present invention, the operating condition setting unit further includes a power storage condition setting unit that sets the configuration of the power storage device and the charge / discharge conditions, and a photovoltaic power generation output condition setting unit that sets the output efficiency of the photovoltaic power generation device and sets the output control of the photovoltaic power generation device to continuous control. This makes it possible to set operating conditions and charge / discharge conditions that are in line with reality in a heat and power supply facility including the devices described above.
[0008] Then, based on the above settings, the calculation unit changes the load factor of the thermoelectric power supply device so that the production amount of any of the composite total energy converges to the target value set by the energy load setting unit in accordance with the output fluctuation of the photovoltaic power generation device and the charge / discharge condition of the power storage device in the continuous control, adjusts the balance of at least the composite total energy related to the thermoelectric power supply device based on the changed load factor, and performs a convergence calculation in which the change and adjustment of the load factor of the thermoelectric power supply device are repeated until the production amount converges to the target value, thereby determining the charge amount and discharge amount of the power storage device for each time period at which the daily total charge amount of the power storage device is equal to the daily total discharge amount of the power storage device and the balance of the electric energy can be maintained. Then, the charge amount and discharge amount of the power storage device for each time period at which the daily total charge amount of the power storage device is equal to the daily total discharge amount of the power storage device and the balance of the electric energy can be maintained. In this way, the output of each thermoelectric power supply device is adjusted in accordance with the output fluctuation of the photovoltaic power generation device and the charge / discharge condition of the power storage device in the continuous control, and the power balance and the electric storage balance are ensured. In addition, since the discharge from the power storage device can be regarded as power generation by the power generation device, the obtained charge amount is added to the amount of electric energy used for each time period, and the utility consumption is calculated based on the amount of electric energy used. In this way, it is possible to simulate the rational integration of the photovoltaic power generation device, the power storage device, and other thermoelectric devices.
[0009] The charging and discharging conditions include at least an operation method of the power storage device, a charging schedule of the power storage device, and an upper limit value of the received power, and the operation method includes selecting a peak cut operation for limiting the amount of purchased power so that the received power does not exceed the upper limit value, and the calculation unit may set the amount of power that exceeds the upper limit value as the discharge amount of the power storage device and calculate the charge amount for each time period excluding the time period during which the power storage device discharges based on the discharge amount. Peak cut operation is an operation method in which the purchased power of the heat and power supply equipment is suppressed to a certain value or less by discharging when the purchased power of the heat and power supply equipment exceeds a preset purchased power amount. In addition, the power storage device cannot charge and discharge at the same time. Therefore, the calculation unit may set the amount of power that exceeds the upper limit value as the discharge amount of the power storage device and calculate the charge amount for each time period excluding the time period during which the power storage device discharges based on the discharge amount, thereby making it possible to simulate the heat and power supply equipment even in peak cut operation.
[0010] In such a case, the charging schedule may include a charging start time of the power storage device and a maximum possible charging amount per time slot, and the calculation unit may determine a charging end time of the power storage device based on the total discharge amount in one day and the maximum possible charging amount, and may obtain a final charging amount in a time slot including the charging end time. In the above-mentioned peak cut operation, by setting a charging start time of the power storage device and a maximum possible charging amount per time slot as a charging schedule, and determining a charging end time and a final charging amount based on the total discharge amount in one day and the maximum possible charging amount, it is possible to simulate a heat and power supply facility even when setting such a charging schedule.
[0011] The charging schedule may include a charging start time, a charging end time, and a charge amount for each time slot between these times, and the calculation unit may determine the charge amount for the charging end time of the power storage device or at least one of the time slots based on the total discharge amount for one day and the charge amount for each time slot. In the above-mentioned peak-cut operation, by setting the charging start time, charging end time, and charge amount for each time slot between these times of the power storage device as a charging schedule, and determining the charge amount for the charging end time of the power storage device or at least one of the time slots based on the total discharge amount for one day and the charge amount for each time slot, it is possible to simulate a heat and power supply facility even when setting such a charging schedule.
[0012] The charging and discharging conditions include at least an operation method of the power storage device, a discharging time period of the power storage device, a maximum possible discharge amount for each of the discharging time periods, and a charging schedule for the power storage device, the operation condition setting unit sets an operation priority order for power generation devices including the power storage device in a time period including at least the discharging time period, and the operation method selects a scheduled discharge for discharging from the power storage device based on the discharging time period and the discharge amount, and the calculation unit calculates a charge amount of the power storage device for each time period except the discharging time period based on the charging schedule. Scheduled discharge is an operation method for discharging according to a preset discharge schedule (a discharging time period and a discharge amount for that time period). The power storage device cannot charge and discharge at the same time. Therefore, by setting an operation priority order for power generation devices including the power storage device in a time period including at least the discharging time period and calculating a charge amount of the power storage device for each time period except the discharging time period based on the charging schedule, it is possible to simulate, for example, peak shift operation or operation linked to a wholesale electricity market price. Peak shift operation is an operation aimed at leveling out purchased power, and is basically an operation in which electricity is discharged during times when the amount of purchased power is high and charged during times when the amount of purchased power is low. Wholesale market price linked operation is an operation in which electricity is discharged during times when the electricity rate is high and charged during times when the electricity rate is low. With the above configuration, it is possible to simulate a heat and power supply facility even with such an operating method.
[0013] The charging and discharging conditions include at least an operation method of the power storage device, a discharging time period of the power storage device, a maximum possible discharge amount for each discharging time period, and a charging schedule for the power storage device, and the operation condition setting unit further includes a power selling condition setting unit that sets a power selling amount of power to be supplied from the heat and power supply facility to the outside and a power selling time period for selling the power, and the operation condition setting unit sets an operation priority order of power generation equipment including the power storage device in a time period that includes at least the discharging time period, and the operation method selects a scheduled discharge for discharging from the power storage device based on the set discharging time period and the discharge amount, and the calculation unit determines the discharge amount of the power storage device based on the operation priority order so that the power selling amount is satisfied, and determines the charge amount of the power storage device for each time period excluding the discharging time period based on the charging schedule. Scheduled discharge is an operation method for discharging according to a preset discharge schedule (discharging time period and the discharge amount in that time period). In addition, the power storage device cannot be charged and discharged simultaneously. Therefore, by setting the amount of power sold by the heat and power generation facility to the outside and the operation priority order of power generation equipment including the power storage equipment for a time period including at least the discharge time period, and calculating the discharge amount of the power storage equipment based on the operation priority order so that the amount of power sold is satisfied, and calculating the charge amount of the power storage equipment for each time period excluding the discharge time period based on a charge schedule, it becomes possible to simulate VPP (Virtual Power Plant) power generation, for example. This makes it possible to set the VPP supply power as external power (reverse current) for each time period and consider the amount of power that can be supplied by the VPP for each monthly pattern, for example.
[0014] In the above configuration, the composite total energy may be calculated in the order of steam energy before electric power energy, and other energies before the steam energy. The thermoelectric device further includes cogeneration, and when the charge amount and discharge amount of the electric storage device are calculated by time period and the cogeneration is in partial load operation, the calculation unit performs the convergence calculation again. As described above, the electric load may be changed as a result of calculating the charge amount and discharge amount of the electric storage device by time period, which makes the total charge amount of the electric storage device equal to the total discharge amount of the electric storage device by day and can maintain the balance of electric energy. In such a case, for example, the cogeneration is in partial load operation due to a change in the electric load. Therefore, a more accurate simulation can be performed by performing the convergence calculation again based on the added electric energy usage amount.
[0015] In any of the above characteristic configurations, the photovoltaic power generation output condition setting unit may further include a connection state selection unit that selects one of AC connection and DC connection for the connection between the photovoltaic power generation device and the power storage device, and when DC connection is selected, the output efficiency of the photovoltaic power generation device may be set to 1. As shown in Figs. 1c and 1d, the photovoltaic power generation device and the power storage device may be connected in an AC connection in which the photovoltaic power generation power is converted into alternating current (AC) and connected to the power storage device via an AC bus of a heat and power supply facility, or in a DC connection in which the photovoltaic power generation power is directly connected to the power storage device as it is as a direct current (DC). In the AC connection, a conversion loss occurs, but in the DC connection, no conversion loss occurs. Therefore, according to the above configuration, simulation is possible regardless of which connection method is selected, and it is also possible to compare them.
[0016] In any of the above characteristic configurations, the power storage condition setting unit can set the configuration of the power storage device in two series, and the calculation unit can regard the two series of power storage devices, in which charge / discharge amounts are distributed so that the state of charge (SOC) of the power storage devices in each series is equal, as one power storage device. In a heat and power supply facility, the power storage devices may not only be in one series (one type), but may also be increased by one series, for example, by expansion. With the above configuration, it is possible to simulate even a heat and power supply facility provided with two series of power storage devices.
[0017] Furthermore, in the above configuration, if the conversion efficiencies of the DC-AC converters connected to the power storage devices of each series are different, the calculation unit may calculate the overall efficiency of the two series of power storage devices as a whole during charging and discharging, and use the calculated overall efficiency during charging and discharging to treat the two series of power storage devices as a whole as a single power storage device. When two series of power storage devices are provided, the conversion efficiencies of the DC-AC converters of the power storage devices do not necessarily match. With the above configuration, it is possible to simulate a thermoelectric facility provided with two series of power storage devices, even if the conversion efficiencies of the DC-AC converters of the power storage devices do not match. Effect of the Invention
[0018] According to the above-mentioned features of the heat and power supply facility simulation system of the present invention, it is possible to rationally integrate and use photovoltaic power generation equipment and power storage equipment with other heat and power supply equipment. In addition, the simulation of photovoltaic power generation equipment and power storage equipment has become more accurate, and it is now possible to evaluate the introduction of these equipment, evaluate their installation in advance, and simulate efficient installation.
[0019] Other objects, configurations and effects of the present invention will become apparent from the following detailed description of the preferred embodiments of the present invention. [Brief description of the drawings]
[0020] [Figure 1a] 1 is a general system diagram of a heat and power supply facility that is a target of a simulation system according to the present invention. [Figure 1b]FIG. 2 is a block diagram of an example of a heat and power supply facility. [Figure 1c] 1 is a schematic diagram showing a configuration of an electricity storage device and a flow of power in a heat and power supply facility in which a photovoltaic power generation device is AC-connected to the electricity storage device; [Figure 1d] 1 is a schematic diagram showing a configuration of an electricity storage device and a flow of power in a thermoelectric power supply facility in which a photovoltaic power generation device is DC-connected to the electricity storage device; [Figure 2a] FIG. 2 is a business data flow diagram of the simulation system according to the present invention. [Figure 2b] FIG. 1 is a diagram showing the hardware configuration of a simulation system according to the present invention. [Figure 2c] FIG. 2 is a diagram showing the software configuration of the simulation system according to the present invention. [Figure 3a] FIG. 4 is a flowchart showing a setting procedure of each setting unit. [Figure 3b] FIG. 4 is a flow chart showing a setting procedure in an operating condition setting unit. [Figure 4] FIG. 4 is a diagram illustrating an example of heat and power load data. [Figure 5a] 1 is a partial load characteristic graph of power generation efficiency, steam yield, and waste hot water yield of equipment performance data of gas engine cogeneration. [Figure 5b] 1 is a graph showing partial load characteristics of Genelink. [Figure 6] FIG. 2 is a schematic diagram illustrating switching selection of power loads. [Figure 7] FIG. 13 is a diagram showing the settings of the operating conditions of the power generation equipment including the power storage equipment, where (a) shows an example of settings from 8:00 to 18:00, (b) shows an example of settings from 18:00 to 22:00, and (c) shows an example of settings from 22:00 to 8:00. [Figure 8a] FIG. 1 shows an overall general logic flow. [Figure 8b] FIG. 1 is a general logic flow diagram for cold and hot water energy balance. [Figure 8c] FIG. 2 is a general logic flow diagram for low pressure steam energy balance. [Figure 8d] FIG. 1 is a general logic flow diagram of gas engine exhaust hot water energy balance. [Figure 8e] FIG. 1 is a general logic flow diagram for hot water energy balance and power energy balance. [Figure 9a] 1 is a graph showing an example of a time-zone-based power balance during peak-cut operation. [Figure 9b] 11 is a report showing an example of a time-zone-based power balance during peak-cut operation. [Figure 9c] 11 is a report showing an example of a time-zone-based charge-discharge balance of an electricity storage device during peak-cut operation. [Figure 10a] 1 is a graph showing an example of a time-of-day power balance in VPP power generation. [Figure 10b] This is a report showing an example of the time-of-day power balance for VPP power generation. [Figure 10c] This is a report showing an example of the time-of-day charge and discharge balance of energy storage equipment in VPP power generation. [Figure 11a] 1 is a graph showing an example of a power balance by time period in peak shift operation in which the power storage device has the first priority. [Figure 11b] 13 is a report showing an example of a time-zone-based power balance in peak-shift operation in which the power storage device has the first priority. [Figure 11c] 11 is a report showing an example of a time-zone-based charge-discharge balance of an energy storage device in peak shift operation in which the energy storage device has first priority. [Figure 11d] 1 is a graph showing an example of a power balance by time period in peak shift operation in which a gas engine has first priority. [Figure 11e] 13 is a report showing an example of a power balance by time period during peak-shift operation in which a gas engine has first priority. [Figure 11f] 13 is a report showing an example of the time-zone-based charge and discharge balance of an energy storage device during peak-shift operation in which the gas engine has first priority. [Figure 12a] 1 is a graph showing an example of a time-of-day power balance in an operation linked to the wholesale power market price with the power storage device given first priority. [Figure 12b]13 is a report showing an example of a time-of-day power balance in an operation linked to the wholesale electricity market price with the first priority being given to power storage equipment. [Figure 12c] 13 is a report showing an example of the time-zone-based charge and discharge balance of an energy storage device in an operation linked to the wholesale electricity market price with the energy storage device being given first priority. [Figure 13a] 1 is a graph showing an example of a power balance by time period in the case of utilizing surplus solar power generation. [Figure 13b] 13 is a report showing an example of a time-of-day power balance when utilizing surplus solar power generation. [Figure 13c] 13 is a report showing an example of the time-zone-based charge-discharge balance of an energy storage device when utilizing surplus solar power generation. [Figure 14a] FIG. 13 is a diagram illustrating an example of AC connection of two series of power storage devices. [Figure 14b] FIG. 13 is a diagram showing an example of DC connection of two series of power storage devices. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0021] Next, an embodiment of the present invention will be described with reference to FIGS. Fig. 1a shows an example of a general system diagram of a heat and power supply facility to which the present invention is applied. The heat and power supply facility M is composed of multiple heat and power supply devices. As shown in Table 1a below, the heat and power supply facility M shown in the figure is supplied with steam R (high pressure steam R1 and low pressure steam R2), fossil fuels and other fuels (hereinafter simply referred to as "fuel") R3, electricity R4, cold water R5, and hot water R6, and produces steam S (high pressure steam S1 and low pressure steam S2), cold water S3,4, hot water S5,6, hot water S7, and electricity S8, which are supplied to utilization facilities (buildings, factories, district heating and cooling, etc.).
[0022] [Table 1a]
[0023] The thermoelectric devices are roughly classified by system into power generation system equipment M100, boiler system equipment M200, chilled water system equipment M300, hot water system equipment M400, low chilled water system equipment M500, hot water supply system equipment M600, cooling tower system equipment M700 (group cooling tower), heat storage system equipment M800, pump system equipment M900, and solar power related equipment M1000, and the above-mentioned thermoelectric facility is constructed by appropriately combining these. In the present invention, the power storage device (SB) M190 is included in the power generation system equipment M100. The thermoelectric devices included in each system M100 to 1000 are listed in, for example, Table 1b. Note that Table 1b is merely an example, and it is also possible to provide a low chilled water system electric turbo chiller or a low chilled water system electric heat pump as the low chilled water system equipment so that low chilled water is supplied. Genelink (registered trademark) is a waste hot water input type absorption chiller that effectively uses waste hot water of 100°C or less generated from gas cogeneration (gas engine, fuel cell) to perform cooling. The solar-related equipment M1000 includes a solar power generation equipment M1100 that supplies electric power R4 to other thermoelectric equipment, and a solar heat collector M1200 that supplies solar hot water R7 to a solar hot water utilization equipment as another thermoelectric equipment. The solar hot water utilization equipment that receives the supply of solar hot water R7 includes a solar Genelink (solar hot water input type absorption chiller) and / or a solar hot water heat exchanger. In this specification, the heat source equipment refers to thermoelectric equipment excluding power generation equipment including power storage equipment and solar power generation equipment. Each equipment is specified by the energy it receives and the energy it produces and supplies, and is classified by system as described above.
[0024] [Table 1b]
[0025] Here, the simulation system 1 is configured as shown in Fig. 2a, with a plurality of user terminals 2 and an administrator terminal 3 connected to a DB server 4 via a network 5. The hardware configuration of the user terminals 2, administrator terminal 3, etc. is configured as shown in Fig. 2b and Table 1c. The hardware of each terminal roughly comprises a user interface 6, a CPU 7, etc., and runs data and programs, etc. 7x to 7z to perform processing.
[0026] [Table 1c]
[0027] The user interface 6 includes a monitor 6a, a keyboard 6b, and a mouse 6c, and is used by the user to operate buttons and input fields on a display screen, which will be described later. The user interface 6 is connected to a CPU 7, a temporary storage memory 7b, a HDD 7c, a network adapter 7d, and the like, via a bus 7a, which includes a data bus and an address bus. The CPU 7, the temporary storage memory 7b, the HDD 7c, and the like cooperate to form a calculation unit 7p, which operates the above data, application programs, and the like.
[0028] As shown in FIG. 2a, the database group 100 of the DB server 4 (hereinafter, "database" will be abbreviated to "DB") includes an electricity price etc. DB 101, an environmental load DB 102, and an equipment performance DB 103. The electricity price etc. DB 101 stores and preserves information related to the price of energy supply, such as electricity prices. The environmental load DB 102 stores environmental load data (unit environmental load) created from various published data and the like. Furthermore, the equipment performance DB 103 stores partial load characteristics of equipment, changes in equipment efficiency due to outside air temperature and wet bulb temperature, internal power consumption, and constraints of equipment incorporated into the system, sorted by model, fuel, and capacity of major manufacturers.
[0029] A user of this system accesses the DB server 4 via a network 5 such as TCP / IP, reads the electricity rate data file 101a, the environmental load data file 102a, and the manufacturer / device data template file 103a from each of the DBs 101 to 103, and saves them as read data 100a. By reading these data, it is possible to use data that is not listed in the catalog, data on updated devices, data on new models, etc.
[0030] The electricity rate data and environmental load data can also be manually changed to each user's own evaluation data to perform a simulation, and are saved in a case file 106. In this way, the conditions and parameters set in each setting unit, which will be described later, can be recorded as a case file in the HDD 7c, which is an electronic recording medium. Note that the electronic recording medium is not limited to the HDD 7c, and various removable disks such as magnetic disks, optical disks, and RAM can also be used as the electronic recording medium.
[0031] In the calculation unit 7p, a processing application 7y and a load creation application 7z are operated. The load creation application 7z creates a thermoelectric load according to the situation and saves it in a thermoelectric load file 104. Then, by operating these, the user can save the simulation data modified to match the energy system to be evaluated as a case file 106 and a thermoelectric load file 104. For evaluation, output can be performed as an output graph, a report display 155, a simple print 156, and a file (table format) 157. The user can read the case file 106 at any time to evaluate the energy saving effect, etc. In addition, any of the thermoelectric devices other than the photovoltaic power generation device and the storage device of the energy system includes a partial load characteristic, and the photovoltaic power generation device has an output characteristic that varies depending on the amount of inclined solar radiation and the outside air temperature described later, and the calculation unit 7p changes the load rate of the thermoelectric device so that the production amount of any of the composite total energy becomes the target value set in the energy load setting unit according to the output characteristic of the photovoltaic power generation device in continuous control and the charge and discharge condition of the storage device, and performs a convergence calculation. The calculation unit 7p also includes a calculation determination unit 7q that determines the number of heat and power supply devices and changes the number so that the convergence calculation is completed.
[0032] For example, if an excessive number of units or an inappropriate type of heat and power supply equipment is selected in the operating condition setting unit 40, it is possible that the convergence calculation will not converge to the target value. In such a case, the heat source equipment starts up only the number of units that corresponds to the heat load according to the set priority order, and the calculation unit 7p performs the convergence calculation again based on that number. The power generation equipment can be processed by purchasing electricity, and is configured not to perform automatic start-up in order to reduce the load of the convergence calculation.
[0033] On the other hand, if it is determined that the capacity of the set heat and power supply devices is low or the number of devices is small, the calculation result does not reach the target value (for example, the target chilled water load) and the convergence calculation is not completed, the calculation determination unit 7q increases the number of heat source devices with the lowest priority set by one and performs the convergence calculation again. This is repeated until the convergence calculation can be completed, and the number is increased to match the load. Here, the heat source device with the lowest priority is usually of low importance in the system configuration of the heat and power supply facility, and is considered to have a small impact on the entire heat and power supply facility. In addition, since it is only the number of heat source devices with the lowest priority that is increased, recalculation can be easily performed. As a result, a simulation can be performed quickly without having a large impact on the entire heat and power supply facility.
[0034] Fig. 1b shows an example of a block flow of the heat and power generation facility M. This heat and power generation facility M is composed of a gas engine cogeneration system M150 (hereinafter, also referred to as "GE cogeneration", "gas engine cogeneration", or "gas engine"), a low-pressure boiler M220, an absorption chiller M310, a turbo chiller M350, a Genelink M380, a solar power generation device M1100, and a power storage device M190. The gas engine cogeneration system M150 is equipped with a waste heat boiler M150a.
[0035] The photovoltaic power generation device M1100 (photovoltaic power generation unit) includes a photovoltaic power generation module (array) and a power conditioner M1101 or a DC-DC converter M1102. The photovoltaic power generation device M1100 may be connected to an AC bus Ab after converting the power into alternating current (AC) as shown in FIG. 1c (AC connection), or may be connected to a power storage device M190 as a direct current (DC) as shown in FIG. 1d (DC connection). In the case of AC connection, the power generated by the photovoltaic power is supplied (charged) to the power storage device M190 via the power conditioner M1101 and the AC bus Ab. Therefore, conversion loss occurs because the power is converted from DC to AC to DC. On the other hand, in the case of DC connection, the power generated by the photovoltaic power is supplied (charged) directly to the power storage device M190 via the DC-DC converter M1102, and a part (surplus) is supplied to the AC bus Ab. Therefore, conversion loss is small. In the present invention, it is possible to switch between AC connection and DC connection by setting a connection state selection unit 42a, which will be described later, and to perform simulation and comparison.
[0036] As shown in Fig. 2c, the software configuration of the simulation system 1 according to the present invention mainly includes an energy load setting unit 10, a basic condition setting unit 20, a system configuration setting unit 30, an operation condition setting unit 40, an operation result output unit 50, a case file etc. creation unit 60, and a display control unit 70. The DB group 100 is the same as that shown in Fig. 2a.
[0037] The basic condition setting unit 20 includes a utility cost setting unit 21, a process condition setting unit 22, an environmental load setting unit 23, and a temperature data setting unit 24. The utility cost setting unit 21 includes an electric power cost setting unit 21a and a fuel cost setting unit 21b. The operating condition setting unit 40 includes an electric power storage condition setting unit 41 that sets the configuration and charge / discharge conditions of the power storage device M190, a photovoltaic power generation output condition setting unit 42 that sets the output efficiency of the photovoltaic power generation device M1100 and sets the output control of the photovoltaic power generation device M1100 to continuous control, and a power selling condition setting unit 43 that sets the amount of power sold to be supplied from the heat and power supply facility to the outside and the power selling time period during which the power is sold. The photovoltaic power generation output condition setting unit 42 further includes a connection state selection unit 42a that selects either AC connection or DC connection for the connection between the photovoltaic power generation device M1100 and the power storage device M190.
[0038] FIG. 3a shows the setting procedure for each setting section of the simulation system. As shown in FIG. 2c and FIG. 3a, in this setting procedure, first, the energy load is set by the energy load setting unit 10 (S201). Next, the process conditions of the heat medium are set by the process condition setting unit 22 (S202). Then, the environmental load setting unit 23 and the utility cost setting unit 21 set the environmental load data and the utility cost by reading them from the environmental load DB 102 and the power rate DB 101 (S203, 204). After these are set, the system construction setting unit 30 selects the heat and power equipment and reads the equipment performance data to construct the heat and power equipment (S206, 207), and the operating conditions of the constructed heat and power equipment are set by the operating condition setting unit 40 (S208). The construction status of the heat and power equipment is displayed on the flow chart via the display control unit 70 as appropriate. The conditions set in each of the above steps can be appropriately saved by the case file creation unit 60 as individual data 100b such as the user equipment template file 103b, the heat and power load file 104, and the case file 106. Furthermore, in the above steps, various data in the DB group 100 is used for setting, but it is also possible to perform various settings using the stored individual data 100b.
[0039] Here, in the case where the heat and power supply facility M includes the power storage device M190 as shown in FIG. 1b, the setting by the operating condition setting unit 40 (S208) is as shown in FIG. 3b, in which the operating conditions of the power storage device M190 are set by the power storage condition setting unit 41 (S2081), and the operating conditions of other heat and power supply devices are set (S2082), and the calculation unit 7p executes an initial simulation calculation (S2083). Then, the calculation unit 7p calculates the charge amount and discharge amount of the power storage device M190 for each time period to calculate the charge and discharge balance (S2084), and adds the calculated charge amount to the power energy usage (power load) for each time period (S2085). Then, the utility consumption is calculated and output based on the added power energy usage (power load) (S210). The utility consumption refers to the consumption of the supply energy required to produce the composite total energy. The supplied energy includes electricity, fuel, and received heat (steam, cold water, hot water, and waste hot water).
[0040] On the other hand, if it becomes necessary to balance the energy (S2086), the calculation unit 7p executes a simulation by time period and / or by year based on these new set conditions and the added amount of power energy usage (S209). The results are output by the operation result output unit 50 in the form of a graph or a report as shown in FIG. 9 and the like (S210). It is also possible to change the conditions and perform the simulation repeatedly. In such a case, the operation priority order, whether or not operation is possible, the minimum power purchase amount, the power main, the heat main, etc., and the operation conditions of the power storage device are changed (S211) in the operation conditions, and the addition, change, and deletion of devices for comparison and consideration (S212) are performed in the system construction settings. Then, the simulation is executed again and output (S209, 210).
[0041] Here, a general balance calculation process procedure in the above simulation will be described with reference to Fig. 8. The energy balance step will be abbreviated as "EB" hereinafter. As shown in the figure, the general processing procedure consists of cold water EB (S01), hot water EB (S02), low pressure steam EB (S03), high pressure steam EB (S04), gas engine waste hot water EB (S05), hot water supply EB (S06), and electric power EB (S07). In this way, the composite total energy is calculated in the order of steam energy before electric power energy, and other energies before the steam energy, based on the set conditions at each step above.
[0042] In the energy load setting (S201), the energy load setting unit 10 sets the amount of composite energy required by the utilization facility for each time period by month, day, and pattern. For example, as shown in Fig. 4, the outside air temperature, wet bulb temperature, and chilled water load, steam load, power load, chilled water supply temperature, and chilled water return temperature are set as thermoelectric load data. The outside air temperature is related to the intake air temperature of the gas turbine, and the intake air temperature is a parameter for the gas turbine power generation amount.
[0043] The wet bulb temperature affects the cooling water temperature and is a variable for the performance (COP) of absorption chillers and turbo chillers, and is related to the amount of electricity and fossil fuel consumption. In the equipment performance data described below, the cooling water temperature is specified as the wet bulb temperature + an arbitrary temperature, for example +5°C. The outside air temperature and wet bulb temperature are set using data downloaded from the Japan Meteorological Agency website, for example. In addition to the outside air temperature and wet bulb temperature, the temperatures of river water, sea water, sewage water, well water, etc. can also be set by month and by time period.
[0044] In addition, when the heat and power equipment is already in operation, the heat and power load data such as the cold water load, low cold water load, hot water load, low pressure steam, high pressure steam, hot water load, and power load can be set using the heat and power load data collected during operation. In addition, this energy load setting can be set with 24-hour data for up to 31 patterns of load for each month for 12 months, and further, the load for the summer design day and the winter design day can be set. Here, the summer design day is the predicted maximum load of cold heat, for example, a load of 15% increase in August is set. Similarly, the winter design day is the predicted maximum load of warm heat, for example, a load of 15% increase in February is set. In addition, the supply temperature and return temperature of each of the cold water, low cold water, and hot water can be set in the same way.
[0045] Next, in process condition setting (S202), the process condition setting unit 22 sets process conditions for the heat medium, such as basic conditions, fuel data, electric system, steam system, and type of recovered steam from gas engines, gas turbines, fuel cells, etc. This process condition setting unit 22 selects whether to use the temperature difference of the heat medium, the outside air temperature, and the wet-bulb temperature of the energy load setting unit 10, and sets each target temperature difference between the supply temperature and return temperature of cold water, hot water, and low cold water, and a minimum bypass flow rate. In addition, the process condition setting unit 22 selects whether to use the temperature difference of the heat medium, the outside air temperature, and the wet-bulb temperature of the energy load setting unit 10, and sets each target temperature difference between the supply temperature and return temperature of cold water, hot water, and low cold water, and a minimum bypass flow rate.
[0046] Next, in process condition setting (S202), the process condition setting unit 22 sets the process conditions of the heat medium, such as basic conditions, fuel data, electric system, steam system, and type of recovered steam for gas engines, gas turbines, fuel cells, etc. This process condition setting unit 22 selects whether to use the temperature difference of the heat medium, the outside air temperature, and the wet-bulb temperature of the energy load setting unit 10, and sets the target temperature difference between the supply temperature and return temperature of cold water, hot water, and low cold water, and the minimum bypass flow rate. In addition, it sets the conditions of high-pressure and low-pressure steam (pressure MpaG, steam enthalpy kJ / kg, return water enthalpy kJ / kg, steam recovery rate %).
[0047] Here, in the calculation process procedure for steam enthalpy, first the steam pressure is set, and when either saturated steam or superheated steam is selected as the steam type, it is determined whether the steam pressure is superheated steam or saturated steam. If it is saturated steam, the saturated steam enthalpy is calculated based on the set pressure, and the calculation result is input as the steam enthalpy. On the other hand, if it is superheated steam, the superheated steam enthalpy is calculated when the superheated steam temperature is input, and the calculation result is input as the steam enthalpy. Note that the high-pressure steam and low-pressure steam pressures can be set separately, and the calculation procedure is the same for both.
[0048] The fuel process conditions include the calorific value and specific gravity of gas, heavy oil, kerosene, other oils, and hydrogen. For the electric system and steam system, the electric load of the heat and power load data, the breakdown of the low pressure steam load, the supply destination of the generated electricity, the type of recovered steam such as gas engine, gas turbine, and fuel cell, and the recovery of electricity by steam pressure reduction are set.
[0049] The breakdown of the power load in the heat and power load data is selected based on whether the power load set by the energy load setting unit 10 is a power load supplied to a facility other than the heat and power supply facility, or a power load including power of the heat and power supply facility. By setting a load other than the heat and power supply facility, the power load set by the energy load setting unit 10 is set as power supplied to the utilization facility.
[0050] Similarly, for the breakdown of the low-pressure steam load in the heat and power load data, select whether the low-pressure steam load is a steam load supplied to equipment other than the heat and power supply equipment, or a steam load generated by the heat and power supply equipment. In cases where the load is only supplied to equipment other than the heat and power supply equipment, the set steam load is the steam supplied to the utilization equipment. In addition, when selecting the total steam load (steam load from the steam generator), this is the case where steam is supplied to the utilization equipment and used in the heat and power supply equipment, and is set as the total flow rate generated from the steam generating equipment. The above-mentioned power load and steam load are used in a simulation, and the results are output to reports, etc.
[0051] In addition, power recovery by steam pressure reduction is set for power recovery equipment that can recover power when excess high-pressure steam occurs and is reduced to low-pressure steam. In such cases, the amount of high-pressure steam and the enthalpy of exhaust steam required for maximum power generation and partial load power generation are set.
[0052] For each recovered steam type, select whether the steam generated from the power generation equipment (gas engine, gas turbine, and fuel cell) is to be low-pressure steam or high-pressure steam. For example, when "low-pressure steam" is selected, it is specified that the steam supply destination from the exhaust heat boiler M150a of the gas engine M150 is to be supplied to the low-pressure steam side.
[0053] Furthermore, the process condition setting unit 22 sets the horizontal plane solar radiation as a process condition of the solar-related equipment. The horizontal plane solar radiation data includes common data including the latitude, longitude, altitude, and number of consecutive days from New Year's Day of the place where the equipment is installed, as well as hourly data of the data time, temperature, horizontal plane global solar radiation, horizontal plane global solar radiation direct component, horizontal plane global solar radiation sky scattering component, and wind speed. Furthermore, in cold regions, snowfall data may be included. For the hourly data, for example, solar radiation data downloaded from a solar radiation database published by a public institution or the like is used. In addition, the tilt angle (for example, horizontal is 0 degrees) and direction (for example, due south is 0 degrees, westward is positive, -90 to 90 degrees) of the photovoltaic power generation module (or solar heat collector body) are also set. Since the direction and tilt angle can be set arbitrarily, it is also possible to easily perform simulations using the direction and tilt angle as parameters. For example, the optimal direction and tilt angle can be considered at the same point.
[0054] Based on the horizontal solar radiation data, the inclination angle and the direction, the direct solar radiation component, the sky scattered component of the solar radiation, and the ground reflected component of the solar radiation are calculated, and the solar radiation is calculated by adding them up. The details of the calculation are as described in Japanese Patent No. 6118973 by the applicant of the present application.
[0055] The destination of generated electricity is set to determine where the electricity generated by the power generation equipment will be supplied and used, and can be selected from either sharing the power of both the heat and power supply equipment, sharing the power of only the heat and power supply equipment, or sharing the power of only the power supply equipment. For example, if "share of power of the heat and power supply equipment and the consumer (power supply equipment)" is selected, electricity will be supplied to both the power supply equipment and the heat and power supply equipment. The setting is that electricity will be generated for the total power, and any shortfall will be purchased.
[0056] If the power supply destination is selected as "Supply to heat and power equipment," the power is balanced so that the power generation equipment generates power according to the amount of power consumed by the heat and power equipment. Similarly, if "Consumers only" is selected, the power is balanced so that the power generation equipment generates power according to the amount of power other than that of the heat source. In other words, the amount of power generated by the power generation equipment changes depending on the supply destination of the generated power.
[0057] As shown in FIG. 6, assuming that the amount of power consumed by the heat and power supply equipment M is CE1, the amount of power consumed by the utilization equipment F is CE2, and the amount of power generated by the power generation equipment M100 and the solar power generation equipment M1100 is GEa (GEa1-3), when power is used only by the heat and power supply equipment M (for example, supply to the turbo chiller M350), convergence calculation is performed so as to prevent reverse power supply if GEa1>CE1. When power is used by both the heat and power supply equipment M and the utilization equipment F, convergence calculation is performed so as to prevent reverse power supply if GEa2>CE1+CE2. When power is used only by the utilization equipment F, convergence calculation is performed so as to prevent reverse power supply if GEa3>CE2. In other words, the amount of power to be converged will differ. The same applies to steam.
[0058] In this way, for power loads, energy evaluation can be performed by switching between a power load used only in the utilization equipment or a power load used in both the utilization equipment and the heat and power generation equipment, and for steam loads, energy evaluation can be performed by switching between a steam load used only in the utilization equipment or a steam load used in both the utilization equipment and the heat and power generation equipment.
[0059] 1b, when the heat power supply facility M includes an electricity storage device M190, the electricity storage device M190 receives electricity from an AC bus Ab (AC connection) or a solar power generation device M1100 (DC connection) of the heat power supply facility M and stores the electricity. That is, the amount of electricity CE1 consumed by the heat power supply facility M includes the amount of electricity stored by the electricity storage device M190. Therefore, the amount of electricity CE1 consumed by the heat power supply facility M changes according to the configuration and charging / discharging conditions of the electricity storage device M190, and the amount of electricity to be converged also differs depending on the electricity storage device M190.
[0060] Additionally, for heat and power equipment M in Figure 1b, the basic conditions are set to the target temperature difference of the cold water, the low pressure steam pressure, and its enthalpy. The fuel data is set to the gas lower heating value and specific gravity. The conditions for the electrical and steam systems are set so that the breakdown of the power load is set to only loads other than the heat and power equipment (utilization equipment), and the breakdown of the steam load is set to use other than the heat and power equipment (utilization equipment). The type of recovered steam from a gas engine, etc. is set to low pressure steam.
[0061] In the environmental load data setting (S203), the environmental load data setting unit 23 sets the environmental load data. Specifically, the data is set to output the environmental load (primary energy, CO2, NOx, SOx) by multiplying the electricity consumption (amount used) and the fossil fuel and other fuel consumption amounts obtained under the conditions set by the energy load setting unit 10, the basic condition setting unit 20, the system construction setting unit 30, and the operating condition setting unit 40 by the environmental load data (unit environmental load). The data to be set are the emission intensity and crude oil equivalent value of CO2, NOx, and SOx for electricity, gas, kerosene, heavy oil, other oils, and hydrogen. For electricity, a primary energy equivalent value is further set. Furthermore, electricity can be set by time period, for example, daytime and nighttime.
[0062] Next, in setting utility costs (S204), the power cost setting unit 21a and the fuel cost setting unit 21b set the power and fuel costs.
[0063] In system construction setting (S206), the system construction setting unit 30 constructs a system configuration of the heat and power supply facility M. This system construction setting unit 30 can arbitrarily set multiple heat and power supply devices of the same model, models with different capabilities, models with different energy requirements for operation, or models from different manufacturers, and operate each of them according to the operation conditions of the operation condition setting unit 40.
[0064] Each performance data of the heat and power supply devices is stored in the device performance DB 103 of the DB group 100, and is set by reading this performance data in the device data reading (S207). The device performance DB 103 stores data categorized by device, manufacturer, model number, fuel, capacity, and performance for each of the above-mentioned device systems. The performance data is read by selecting one of these categories via the system construction setting unit 30 and the display control unit 70.
[0065] 1a, and configures a system for the heat and power supply facility on the flow chart. This flow chart is a diagram in which multiple types of heat and power supply devices that can configure the heat and power supply facility M, the supply energy supplied to the heat and power supply facility M and received by each heat and power supply device, and the composite total energy produced by the heat and power supply facility M and supplied to the utilization facility are connected and associated with each other by connection lines.
[0066] The type of energy that these heat power supply devices receive and the energy that they produce and supply are specified by the type of the heat power supply device. Therefore, it is possible to create a flow diagram of a heat power supply facility in which each heat power supply device and the energy received and / or produced by the heat power supply device are associated and connected with connection lines in advance. The connection lines are assigned to each type of energy received and / or produced.
[0067] By selecting a thermoelectric device on the flow diagram as described above, the set thermoelectric device and energy are displayed in a distinguishable manner, so that the relationship between the thermoelectric device and the energy can be visually understood. Therefore, even if one is not a highly skilled expert, it is possible to construct a system of the thermoelectric facility M. The solid lines in FIG. 1b indicate the internal power of each device M150, M220, M310, M380, etc. In addition, the output characteristics of the solar-related device vary depending on the amount of inclined solar radiation based on the horizontal surface solar radiation data and the outside air temperature, and the produced power and solar hot water heat amount vary. In addition, the charge and discharge amount change depending on the charge and discharge conditions of the storage device, and the power usage (power load) also changes. The internal power and the output characteristics of the solar-related device and the charge and discharge amount of the storage device are factors that cause changes in the energy balance, and the energy balance is maintained by convergence calculation. The flow diagrams shown in FIGS. 1a and 1b are merely examples, and can be set as appropriate, and multiple types of flow diagrams may be created and stored in advance.
[0068] Since the heat and power supply devices constituting the heat and power supply facility are classified by system and organized by device type, by selecting devices classified by system as at least a power generation system, a boiler system, a chilled water system, a hot water system, a low-temperature chilled water system, a hot water supply system, and a solar-related system, and reading the device data, the devices are regarded as devices selected for that system, and the heat and power supply devices and the combined total energy system and the energy supply can be associated and set according to the function of each system. As a result, when each device is read, it is appropriately connected and can play a role in sharing the load of the balance result of the system. However, the selection of devices only constitutes the heat and power supply facility, and the devices are operated according to the priority order set by the operation condition setting unit 40.
[0069] Here, the device performance data of the heat and power supply devices read from the device performance DB 103 as described above will be described. The equipment performance data of the gas engine cogeneration M150 is determined by a polynomial regression equation at four load factors shown in FIG. 5a, including the power generation efficiency, steam recovery rate, and waste hot water recovery rate.
[0070] Also, set the minimum load rate, auxiliary power consumption, and startup loss. For auxiliary power consumption, set the output percentage at rated load and partial load (50% load operation). Also, set the minimum load rate at which the gas engine must be stopped. Set how many minutes of energy loss at startup (equivalent to rated operation (load rate 100%)) will be.
[0071] In addition, you can set the capacity, number, and fuel of the main engines, the NOx value, the capacity per gas engine, and the blowdown amount from the waste heat boiler used to calculate water consumption. Also, you can set whether to use the steam and waste heat from the gas engines for external use.
[0072] The equipment performance data of the gas engine cogeneration M150 is read by the system construction setting unit 30 by selecting the power generation system, capacity, manufacturer, etc. from the equipment performance DB 103. The data is set by reading this data. The steam generated from the cogeneration waste heat boiler is supplied to the low-pressure steam set by the type of gas engine recovered steam in the process condition setting unit 22. The pressure and enthalpy of the generated low-pressure steam are set at a low-pressure steam pressure of 0.785 MPaG and a low-pressure steam enthalpy of 2770.9 kJ / kg, which are set in the process condition setting unit 22. The waste hot water HHW generated from the gas engine M150 is supplied to the waste hot water header H3.
[0073] The equipment performance data of the low-pressure boiler M220 sets the thermal efficiency % at multiple arbitrary load factor % of the low-pressure boiler. Also, as above, the blowdown amount, capacity, number, and fuel of the main engine, NOx value, power consumption of the auxiliary equipment, and energy loss at startup are set. The performance data of the low-pressure boiler M220 equipment is also set by reading data as above. The destination of the steam generated from the low-pressure boiler and the pressure and enthalpy of the low-pressure steam are set according to the conditions set in the process condition setting unit 22 as above.
[0074] The equipment performance data of the absorption chiller M310 sets the COP during chilled water mode operation at any of a plurality of partial load factors. By setting these, the relationship between the COP in each mode and the chilled water temperature as parameters is set, as in the above regression equation, and the changing COP%. Also, each design temperature difference between the chilled water and the chilled water is set. The chilled water temperature can be set, for example, wet bulb temperature + 5°C, by adding any temperature to the outside air wet bulb temperature, river water, and seawater temperature data, and the lower limit at which the equipment can be operated is also set. Also, the CPO and outlet temperature in each mode may be added as parameters. The same applies to each of the following equipment.
[0075] The relationship between the chilled water mode COP and the COP% which changes with the cooling water temperature as a parameter, and the relationship between the cooling tower capacity with the wet-bulb temperature as a parameter are similarly obtained using the above regression equation. In addition, the number of main units, the design capacity and actual capacity (capacity in the event of aging, etc.), the capacity and power consumption per fan of the auxiliary cooling tower, the cooling tower capacity, and the makeup water concentration ratio of the auxiliary cooling tower are set. The relationship between the outside air wet-bulb temperature of the auxiliary cooling tower and the cooling capacity is set using the above regression equation.
[0076] Furthermore, the pump power consumption, etc. are set. For the pump power consumption, the head of each of the chilled water pump and cooling water pump is set. Since the head differs depending on the equipment, it is input manually. In addition, the pump flow control method is set to, for example, constant flow rate. Furthermore, the power consumption of the auxiliary equipment of the absorption chiller and the energy loss at start-up are set in the same manner as above.
[0077] Here, in the pump efficiency calculation process, when the above heads are set, the pump efficiency etc. are automatically calculated and set. Note that pump efficiency is used as an example, but motor efficiency is calculated in the same way. In this example, the specific gravity of chilled water and cooling water is set to 1 because they are both water.
[0078] First, the pump capacity is calculated. This is calculated internally from the amount of heat processed by the thermoelectric machine and the temperature difference. The pump efficiency is calculated using the calculated pump capacity. The JIS B8313 A efficiency is approximated by a logarithmic cubic expression of the pump capacity. Next, the motor shaft power is calculated, and the motor margin is calculated based on the pump shaft power. The pump head is referenced to the value entered above. The motor required power is calculated from the calculated motor margin and motor shaft power. The motor efficiency is calculated based on the calculated motor required power. Then, the motor and pump overall efficiency is calculated from the calculated motor efficiency and pump efficiency, and the calculation result is set as the pump efficiency. The pump capacity, pump shaft power, and motor required power calculated in the above steps are stored as internal data.
[0079] Furthermore, the location where the heat generated by the absorption chiller is to be discharged is set. It is possible to select either the heat discharged from the auxiliary cooling tower or the heat discharged from the group cooling tower. It is also possible to select the direct heat discharged from the river water / sea water, which is the externally usable water W shown in FIG. 1a, and the indirect heat discharged from the river water / sea water (through a heat exchanger) instead of the heat discharged from the cooling tower. The externally usable water W includes sewage, well water, treated sewage water, etc., in addition to river water / sea water. When river water / sea water is selected, the heat is discharged using the temperature data set by the temperature data setting unit 24 of the basic condition setting unit 20. In the case of direct heat discharge to seawater, seawater is selected and the heat is discharged to seawater under the temperature conditions described and released to the sea. In the case of indirect heat discharge, the water pump M960 in FIG. 1a is added to the heat and power equipment to exchange the heat discharged to the sea in the same manner.
[0080] When the thermoelectric facility is equipped with a heat pump such as an air-cooled heat pump or an electric heat pump, the heat extraction setting can be performed in the same way. An air-cooled heat pump is a device that extracts heat from the outside air temperature (air) to produce hot water (hot heat). An electric heat pump is a device that can also extract heat from a cooling tower or externally used water W to produce hot water (hot heat). Hot water is used for heating and the load is large in winter, so the COP of an air-cooled heat pump that extracts heat from air with a low outside air temperature is small and the efficiency is low. On the other hand, the externally used water W is higher than the outside air temperature even in winter, so by extracting heat from the externally used water W with an electric heat pump, it is possible to efficiently produce hot water with a high COP. For example, the heat extraction source of the electric heat pump is set by selecting river water / seawater. The performance data of the absorption chiller M310 is also set by reading the data in the same way as above. The supply of steam, the pressure and enthalpy of the low-pressure steam are the same as above.
[0081] The equipment performance data for the turbo chiller M350 is set by setting the main unit capacity and number of units. In addition, the partial load rate and COP during chilled water operation are set, and the relationship between the chilled water COP and COP% which changes with the chilled water COP and chilled water temperature as parameters is set. The design chilled water temperature difference, chilled water temperature difference, and chilled water temperature are set. These settings are the same as for absorption chillers. The relationship between the chilled water COP and the load rate as parameters, and the relationship between the chilled water COP and the chilled water temperature as parameters, are also determined similarly using regression equations. The pump efficiency and exhaust heat destination are also set in the same way as absorption chillers, and are set by reading in the equipment data.
[0082] The Genelink M380 equipment performance data includes the relationship between the amount of exhaust heat recovery and the load factor, as shown in Figure 5b, and the relationship between the fuel consumption rate and the load factor, as shown in the same figure. When the load factor is in the range below point P1, cold water can be produced using only the waste hot water, but when it exceeds that point, the waste hot water is also recovered while consuming fuel.
[0083] The equipment performance data of the photovoltaic power generation equipment M1100 includes the type of solar cell panel (e.g., crystalline or amorphous), the total rated output per unit, the solar radiation intensity under standard test conditions, the minimum solar radiation amount that can extract power, the module conversion efficiency, the output efficiency (effective efficiency) of the power conditioner M1101, the power consumption, and the rated output. These data are stored in the equipment DB103, and are set by reading them. The number of units and the array installation method (mounting, rooftop, roof-integrated, etc.) are also set. Then, the effective power generation is calculated based on these settings and the inclined solar radiation amount (set slope) based on the horizontal surface solar radiation amount data of the process condition setting unit 22, the outside air temperature, and the wind speed. In this way, the photovoltaic power generation equipment has output characteristics that vary depending on the inclined solar radiation amount, the outside air temperature, and the wind speed. The details of the calculation are as described in Japanese Patent No. 6118973 by the applicant of the present application.
[0084] The device performance data of the power storage device M190 includes the power storage capacity and the charge / discharge efficiency, and is set, for example, via an input form. Note that the charge / discharge conditions of the power storage device M190 are set by a power storage condition setting unit 41, which will be described later.
[0085] The operating condition setting unit 40 sets whether or not to operate each of the heat and power supply devices and / or the operating priority order for each time period for each month, day, and pattern in setting the operating conditions (S208). An operation plan for the heat and power supply devices is created by setting these operating conditions. As shown in Fig. 7(a)(b), the daytime operation plan of the power generation equipment and the boiler equipment is set. In this setting screen, the daytime hours (for example, from 8:00 to 22:00) are divided into two arbitrary time slots, and up to the 8th priority is arbitrarily set for each time slot according to the load situation of each time slot. Note that the figure is only one example of the setting, and the number of time slots and the priority that can be set can be increased or decreased as appropriate. For example, it is possible to divide 8:00 to 22:00 into six arbitrary time slots and set up to the 8th priority for each time slot. In addition, the operation method of the power generation equipment is selected and set from power purchase control operation, maximum power generation operation, and heat main operation (heat load priority). In the figure, the operation of the low pressure boiler and the gas engine cogeneration is set from 8:00 to 18:00, and the operation of the power generation equipment is set to power purchase control operation. In addition, as shown in the figure(c), the operation of the low pressure boiler is set for the nighttime (for example, from 22:00 to 8:00), and the operation method of the power generation equipment is selected to be power purchase control operation. The item for setting the minimum amount of purchased power specifies the minimum amount of purchased power to be purchased from the power company, and is set to 0 kW in the figure.
[0086] In addition, the load sharing method of the power generation equipment, which specifies the operation control method of the multiple power generation equipment, is selected and set. The figure shows an example where "partial load only for the last equipment" is set. "Partial load only for the last equipment" is set when the power generation amount is adjusted by partial load operation of the equipment specified at the end of the operation priority order. In addition, "same load operation of all GT / all GE" and "uniform load only for the last model" can also be set. "Same load operation of all GT / all GE" is set when the power generation amount is adjusted by operating all the set generator gas turbines and gas engines at the same load. In addition, the setting of "uniform load only for the last model" is set when there are multiple equipments specified at the end of the priority order among multiple generators, and the power generation amount is adjusted by these multiple equipments with the last priority order. In this way, when multiple power generation equipment is set, various generator control methods can be considered. Note that the night time (for example, from 22:00 to 8:00) can also be set in the same way as above. The daytime and nighttime time periods can be freely changed, and daylight saving time can also be supported.
[0087] Operating conditions are also set for chilled water and hot water equipment. For example, daytime hours (8:00 to 22:00) are arbitrarily divided into four time slots, and up to the 20th priority is set for each time slot depending on the load situation. Note that the number of time slots and priorities set can be increased or decreased as appropriate, as above. In addition to the priorities, the outlet temperature of each device is also set. Low-temperature chilled water equipment can be set in the same way.
[0088] 1b, when the heat and power supply facility M includes an electric power storage device M190, the operation condition setting unit 40 regards the electric power storage device M190 as one type of power generation device and determines the priority order with respect to other power generation devices. Note that the time period for setting the operation priority order of the electric power storage device is a time period that includes at least the time period during which the electric power storage device discharges. This is because discharging from the electric power storage device can be regarded as being equivalent to power generation by the power generation device.
[0089] The power storage condition setting unit 41 also sets the storage capacity and charge / discharge efficiency as the configuration of the power storage device, and the setting method of the operation parameters as the charge / discharge conditions. Furthermore, the power storage condition setting unit 41 sets the operation method, minimum storage amount, upper limit of received power during peak cut operation, charge schedule, and discharge schedule as the charge / discharge conditions. Peak cut operation, scheduled discharge, etc. can be selected as the operation method. The charge schedule may set the charging start time and the maximum possible charge amount per time zone, or may set the charge amount for each arbitrary time zone. The discharge schedule sets the maximum possible discharge amount that can be discharged for each arbitrary time zone.
[0090] As shown in Fig. 1b, when a photovoltaic power generation device M1100 is included in the heat and power supply facility M, the operation condition setting unit 40 forcibly prioritizes the photovoltaic power generation device over the power generation devices, regardless of the operation conditions (operation order) set by the user as shown in Fig. 7. This applies regardless of the time of day. Since the supply amount of solar energy cannot be adjusted, the power generated by the solar-related devices is prioritized over other priorities in order to effectively utilize the power and absorb its fluctuations.
[0091] Also, the photovoltaic power generation output condition setting unit 42 sets the output control of the photovoltaic power generation device M1100. Here, the output restriction is, for example, a case where a power company requests a photovoltaic power generation company to suppress (limit) the output of photovoltaic power generation. In particular, when the heat and power generation facility M includes the power storage device M190, the output control of the photovoltaic power generation device is set to continuous control. Conventional output control of photovoltaic power generation devices can only be controlled in units of the number of modules (arrays) of photovoltaic power generation, resulting in stepwise output control, which requires a considerable amount of purchased power for adjustment. However, with the advancement of technology, it has become possible to control the rated output in units of 1% in a power conditioner, and it has become possible to control the output of photovoltaic power generation continuously. In the present invention, the rated output control in units of 1% in a power conditioner is set as the continuous control of photovoltaic power generation. As a result, even when the heat and power generation facility M including the power storage device M190 is subjected to output restrictions of photovoltaic power generation by the power company, it is possible to simulate the heat and power generation facility.
[0092] Furthermore, the connection state selection unit 42a selects whether the connection between the photovoltaic power generation device and the power storage device is AC connection or DC connection. When DC connection is selected, the output efficiency (effective efficiency) of the power conditioner is set to 1. The DC-DC converter in DC connection is equivalent to the power conditioner in AC connection, and almost no conversion loss occurs in the DC-DC converter. This selection makes it easy to perform a comparative simulation between AC connection and DC connection.
[0093] The amount of high-pressure steam, low-pressure steam, cold water, hot water, and electricity that can be used from the outside is set. For each amount of intake, multiple arbitrary time periods are set, and the amount of intake for each time period is set. For example, if a maximum of 1 t / h of low-pressure steam is set to be received from the waste incineration facility during the day and night, when the amount of low-pressure steam used by the heat and power generation facility is less than 1 t / h, only the amount of steam required for the heat and power generation facility is accepted. On the other hand, when the amount of low-pressure steam used by the heat and power generation facility is greater than 1 t / h, the maximum amount of low-pressure steam of 1 t / h is accepted, and the shortage is balanced by the heat and power generation facility. The total combined energy amount that can be produced by the heat and power generation facility and supplied to other facilities is set in the same way. These set values are taken into consideration to balance the supply energy and the total combined energy. High-pressure steam, cold water, hot water, and electricity are all processed in the same way. This allows the operation condition setting unit 40 to set an operation plan for the heat and power generation facility while referring to the energy load set by the energy load setting unit 10.
[0094] In the heat and power supply facility M shown in FIG. 1b, in the example shown in FIG. 7(a) and (b), a gas engine and a low-pressure boiler are set. Furthermore, since the photovoltaic power generation equipment generates electricity by the amount of solar radiation regardless of the time of day or night, when the photovoltaic power generation equipment is incorporated into the heat and power supply facility, the photovoltaic power generation equipment is treated as a device with the first priority during the daytime hours, and is treated as a device with priority over power generation equipment. Therefore, the gas engine is given priority after the photovoltaic power generation equipment. In addition, the minimum power purchase amount is set to 0 kW. On the other hand, in the example shown in FIG. 7(c), only the low-pressure boiler is displayed during the night, and the photovoltaic power generation equipment is treated as the device with the first priority even during the nighttime hours. The minimum power purchase amount is not set, and the shortage of power is set to be purchased. In addition, the equipment used for the daytime cold water and hot water is set to Genelink, absorption chiller, and electric turbo chiller. On the other hand, only the absorption chiller is set at night. These are set for 12 months. Since the heat and power supply facility includes a power storage device, the priority order can be set between the gas engine and the power storage device at least during the discharge time period of the power storage device.
[0095] After the operating conditions are set in each step, a simulation is performed and the results are output. In the output step (S210), the operating result output unit 50 outputs the simulation results by time period and / or as annual calculations. The output format may be a graph, a report, or the like.
[0096] The results of the time-of-day and annual calculation output can include power balance, low-pressure steam balance, fuel consumption, chilled water balance, number of operating units, metered charges (utility costs), detailed power consumption, and power consumption (utility consumption). It is also possible to output the charge / discharge balance of power storage devices, the amount of power generated by solar power generation, etc.
[0097] Here, with reference to Figs. 2c, 3, 8a-e, and 9, the operation condition setting by the operation condition setting unit 40 (S208) and the simulation calculation procedure by the calculation unit 7p will be described below. These are composed of steps S01-07 in Fig. 8a, and each step corresponds to Figs. 8b-e. In the following description, the power purchase control operation is an operation in which no reverse flow of power occurs, and the maximum power generation operation is an operation in which the power generation equipment is operated at 100% load and allows reverse flow of power. In addition, in describing each step, only steps related to the example using the heat and power supply equipment in Fig. 1b are shown first, and the case of the power purchase control operation in August is illustrated. As shown in Fig. 1c, in this heat and power supply equipment M, the photovoltaic power generation equipment is AC-connected to the AC bus via a conditioner. When both the photovoltaic power generation equipment and the power storage equipment are included like this heat and power supply equipment M, power priority operation is performed, and YES is selected in steps S34 and S72 in Figs. 8c and 8e. Therefore, the description of the heat-dominant operation will be omitted. Details of the heat-dominant operation are as described in Japanese Patent No. 6118973 by the present applicant.
[0098] "Cold water EB (S01, Fig. 8b)" First, the chilled water heat load and the return temperature difference are read (S11), and the required chilled water flow rate is calculated (S12). Next, the number of chillers to be operated that satisfies both the chilled water heat load and the chilled water flow rate is determined based on the chiller operation priority (S13), and the operating load factor and COP of each chiller to be operated are calculated (S14). In this calculation, if the chilled water outlet temperature setting is the same, a uniform load factor is used. Then, the cold heat production amount of each chiller to be operated, the consumption of electricity, fuel, and steam, the exhaust heat of the cooling tower, the hot water recovery heat amount of the heat recovery HP, etc. are calculated (S15), and the process moves to the hot water energy balance step (S2). The exhaust heat of the cooling tower can also be exhausted to the water for external use as mentioned above.
[0099] "Low pressure steam EB (S03, Fig. 8c)" As shown in the figure, first, the low-pressure process steam heat load is read (S31a), and the amount of low-pressure process steam is calculated (S31b). The amount of low-pressure steam consumption is calculated from the sum of the amount of low-pressure process steam and the amount of low-pressure steam for driving the thermoelectric equipment (S31c), and it is determined whether the power generation equipment is in low-pressure steam recovery (S32a). If it is not in low-pressure steam recovery, the number of low-pressure boilers to be operated that satisfies the low-pressure boiler load is determined based on the low-pressure boiler operation priority (S33a), the operation load factor of each low-pressure boiler to be operated (partial load factor for only one boiler) is calculated (S33b), and the steam production amount, power and fuel consumption amount, etc. of each low-pressure boiler to be operated are calculated (S33c).
[0100] On the other hand, if the power generation equipment is a low-pressure steam recovery system, the low-pressure boiler load S2 is calculated by subtracting the low-pressure steam intake amount from the low-pressure steam consumption amount, and the steam generation amount, power consumption amount, fuel, etc. of the low-pressure boiler are calculated (S32b). Here, the low-pressure steam intake amount can include exhaust steam intake from outside. Then, it is determined whether the operation is power-dominated or heat-dominated (S34).
[0101] In the case of power purchase control operation (power priority), steps S35a to S35f and power EB of S71 to S73 surrounded by a dashed line are executed. Note that power EB07 is shown in FIG. 8e, but will be described here for ease of understanding. The operating devices and the number of operating devices are set from the target power generation amount (S35a), and the power generation devices other than the power storage device are set to the maximum load factor (100%) (S35b). Then, steps S35c to S35f, 71, and 73 are executed, and if the surplus power is within a certain error range (for example, 1 kW) (S73), the process ends and moves to the subsequent steps. Here, the power generation amount of the photovoltaic power generation device and the discharge amount of the power storage device are added to the power generation amount in steps S35c and S71. On the other hand, the charge amount of the power storage device is added to the power consumption amount. If the surplus power is not within the error range (S73), the load factor P1 of the power generation equipment is changed as described below, and a convergence calculation is performed in which steps S35c to S35f and 71 to 74 are repeated until the surplus power is within the error range.
[0102] Here, the convergence calculation of the power purchase control operation using the heat and power supply facility M in Fig. 1b related to steps S35a to S74 will be described in more detail. The number of chillers required and the load factor are calculated from the chilled water load and the chilled water temperature difference, and the generic M380 and the absorption chiller M310 are determined to be one unit. Then, the required amount of low-pressure steam S2 (t / h) is calculated from the load factor at this time (S32b).
[0103] The difference (Ea-W1) kW between the power consumption Ea in the system and the minimum power purchase amount W1 is set as the target power generation amount, and the number of gas engine cogeneration M150 and other operating units is determined by subtracting the power generation amount of the photovoltaic power generation and the discharge amount of the power storage device from this (S35a). The power consumption Ea in the system includes the internal power consumption of the devices M150, M220, M310, M350, M380, etc., and the power load S8. Furthermore, this power load S8 includes the charge amount of the power storage device. The load rate of the power generation system devices excluding the power storage device such as the gas engine M150 is set to 100% (S35b). Then, the power generation amount G1 (kW / h), the amount of recovered steam S1 (t / h), the internal power consumption, the fuel consumption, etc. of the set gas engine are obtained from the performance curve (S35c).
[0104] From the results of this calculation, the recoverable amount of low-pressure steam S1(t) is calculated, and S1 and S2 are compared to determine whether excess steam is being generated (S35d). If there is excess steam, it is discarded outside the facility (S35e). If there is a shortage of steam, the low-pressure boiler M220 equivalent to S3(t / h)=S2-S1 is operated, and the amount of steam generated, internal power consumption, fuel consumption, etc. are calculated (S35f). Then, from the results above, the power consumption Ea within the system, including the amount of charge in the power storage device, is integrated (S71a).
[0105] Although not shown in the figure, only in the first loop of S35c to S71 and S73, the gas engine cogeneration determines whether or not the amount of power generation is insufficient, taking into account the amount of solar power generation Es and the amount of charge and discharge of the power storage device. If G1≦Ea-W1-Es, the insufficient power is purchased and the calculation ends. On the other hand, if G1>Ea-W1-Es, it is determined whether ABS(G1-(Ea-W1-Es)) is within the allowable error range α. In this embodiment, the allowable error range α is within ±1 kW, and if it is within the error range, the calculation ends.
[0106] If the tolerance is not within ±1kW, the load factor P1 of the gas engine cogeneration system is changed and the load factor P1 is calculated so that G1 = Ea - W1 - Es. However, if the load factor P1 is changed and the recovered steam volume S1 fluctuates, the internal power consumption fluctuates with the fluctuations in the operating conditions of the gas engine cogeneration system and other equipment, and the power consumption Ea within the system also fluctuates, and as a result, the original purpose of preventing reverse power through power purchase control operation cannot be achieved. In addition, the amount of power generated by photovoltaic power generation equipment fluctuates depending on the amount of solar radiation on the slope, the outside air temperature, and the wind speed. Therefore, until convergence is achieved in S73, it is necessary to change the load factor P1 in S74 as follows and repeat S35c to S71 to perform convergence calculations.
[0107] The load factor % can be obtained from the target power generation, which is created as a quadratic equation using each explanatory variable, as a solution to the quadratic equation. If the power generation is smaller than the target power generation, the target load factor % is obtained by a convergent calculation using a binary search with Pmin = Pmid. At the same time, the allowable error for the difference between the power generation kW at Pmid% and the target power generation kW is 1kW or less. Note that the maximum number of convergence calculations is set to 20 in consideration of cases where convergence is not possible, but the number of convergences can be set appropriately. If convergence is achieved, the process proceeds to the next step (S36a).
[0108] The binary search method is merely one example of a convergence calculation method using the algebraic equation numerical calculation method. The convergence calculation method using the algebraic equation numerical calculation method is a numerical calculation of an equation that does not include differential or integral calculus, such as a high-order algebraic equation, a fractional equation, an irrational equation, or a transcendental equation. Other representative methods that may be used include the Newton-Raphson method, the binary search method, the Regula-Falsi method, the Bairstow-Hitchcock method, the Lin method, the Bernoulli method, and the Greffe method. All of the convergence calculations in the present invention can use each of these methods.
[0109] Here, an example will be described in which "peak cut operation" is selected as the operating method for the charge and discharge conditions of the power storage device. Peak cut operation is an operating method in which the purchased power of the heat and power generation facility is discharged when the purchased power exceeds a preset amount of power purchased, thereby suppressing the purchased power to a certain value or less. For example, Figs. 9a to 9c show graphs and reports in which the configuration of the power storage device is set to a storage capacity of 6500 kWh and a charge and discharge efficiency of 95%, and the charging and discharging conditions are set to a maximum received power value of 2000 kW during peak cut operation, a charging schedule starting charging at 10 p.m., and a maximum possible charging amount per time slot of 800 kW.
[0110] In the example shown in the figure, power is purchased from 16:00 to 17:00 because the power generation amount of the gas engine alone cannot cover the power consumption, but the power storage device is discharged so that the power reception upper limit (power purchase amount) does not exceed 2000 kW, and power balance is achieved. From 18:00 to 20:00, all power consumption is covered by purchased power, but the power storage device is discharged so that the power purchase amount does not exceed 2000 kW, and power balance is achieved. That is, the calculation unit determines the amount of power that exceeds the power reception upper limit as the discharge amount of the power storage device. Here, in the charging schedule, the charging start time is set at 22:00 and the charge amount is set to 800 kW, but since the power storage device cannot charge and discharge at the same time, discharging is prioritized. Also, in the time slot from 0:00 to 1:00, the charge amount is less than the set value. This is because it is sufficient to secure a charge amount that corresponds to the total discharge amount of the day, so the charge amount is adjusted and charging is completed at 1:00. In this way, the calculation unit calculates the charge amount for each time slot except the time slot in which the power storage device discharges based on the above-mentioned discharge amount. Then, the charging end time of the storage device is determined based on the total discharge amount and the maximum possible charging amount for the day, and the final charging amount for the time period including the charging end time is also determined. Note that the values in the graphs and reports are DC-based values, and since the photovoltaic power generation device and the storage device in this example are AC-connected, the effective efficiency of the conditioner is taken into consideration for charging and discharging. For example, the charging is 800 kW from 22:00 to 23:00, so 800 kW / 0.95 (effective efficiency) = 842.1 kW from the AC bus. Also, 855.4 kW is discharged from the storage device from 18:00 to 19:00, so it is multiplied by the effective efficiency of 0.95 to be converted to 812.6 kW in AC conversion.
[0111] In addition, between 7 and 8 am and 11 and 12 noon, solar power generation is relatively high compared to power consumption. Here, solar power generation takes priority over the gas engine, which is a power generation device, so partial load operation is performed to suppress the power generation of the gas engine so that no reverse current occurs. This causes the amount of steam generation to change during those times, and a convergence calculation is performed to achieve a steam energy balance.
[0112] In this way, the charging and discharging amounts of the energy storage device are calculated by time period so that the daily charging and discharging amounts of the energy storage device are equal and the power balance is maintained. Then, by incorporating the charging amount of the energy storage device into the power load calculation, it becomes possible to simulate a cogeneration facility equipped with a solar power generation device and an energy storage device, and it becomes possible to calculate the utility consumption based on the amount of power energy used after addition.
[0113] Compare the relationship between the first solar power generation amount Es + the power generation amount G1 of the gas turbine generator, the required power Ea in the system including the charging amount of the energy storage device as described above, and the minimum power purchase amount W1 of the operation condition setting unit 40. For example, when reverse power occurs from 7:00 to 8:00, this corresponds to G1 + Es > Ea - W1. Perform a convergence calculation by sequentially changing the load factor of the gas engine generator to Pmid described above so that the power generation amount from the generator and solar power generation does not flow back to the power company as surplus electricity. When G1 + Es < Ea - W, complete the convergence calculation. In this way, by adjusting the load factor of the cogeneration device (gas engine cogeneration M150), it is possible to absorb fluctuations in the generated power of the solar power generation device and prevent reverse power flow of the generated power.
[0114] Due to the configuration of the cogeneration facility, other balance calculation steps shown in Fig. 8a are performed. Below, steps other than those described above will be explained.
[0115] "Hot water EB (S02)" As shown in Fig. 8b, read the hot water heat load and the return temperature difference (S21), and calculate the required hot water flow rate (S22). Next, based on the operation priority order of the hot water system devices, determine the number of operating hot water system devices that satisfy both the hot water heat load and the hot water flow rate (S23), and calculate the operation load factor of each operating hot water system device (S24). In this calculation, if the hot water outlet temperature setting is the same, it is set as a uniform load factor, and the load factor of the heat recovery HP may be different from others. Then, calculate the heat production amount, power, fuel, steam consumption, heat extraction amount, etc. of each operating hot water system device (S25), and shift to the previous low-pressure steam EB (S03). Note that the heat extraction amount can also be from external use water (such as seawater, river water, etc.).
[0116] "High-pressure steam EB" This is omitted from the illustration because it is almost the same except that the "low pressure steam" in the low pressure steam EB of S03 is replaced with "high pressure steam". However, it differs in that the amount of steam that is decompressed in the header and accepted as low pressure steam does not become surplus steam in the previous step S35e. From reference B of the low pressure steam EB (S03), the gas engine exhaust hot water EB (S05) is executed after reference C via the high pressure steam EB (S04) not shown in detail.
[0117] "Gas engine wastewater EB (S05, Fig. 8d)" First, in the chilled water EB (S01), the number of operating units and the load factor of each chilled water system equipment are calculated, and the chilled water heat amount (production amount Ma) A of the waste hot water injection type absorption chiller and the chilled water heat amount of other chilled water system equipment are determined (S13-S15). Also, in the hot water EB (S02), the number of operating units and the load factor of each hot water system equipment are calculated, and the hot water heat amount B of the hot water recovery heat exchanger is determined (S23-S25).
[0118] Next, it is determined whether the waste hot water injection type absorption chiller is operating (S51a). If it is operating, the amount of waste hot water from the gas engine is calculated, and the amount of cold water heat A' generated by the waste hot water injection type absorption chiller that can be generated with that amount of waste hot water is calculated (S52a). Then, it is determined whether the generated cold water heat A' is insufficient for the previous amount of cold water heat A (S53a), and if it is not insufficient, the process proceeds to S55a. On the other hand, if it is insufficient, the number of operating units and the load factor of other chilled water equipment are determined based on the operating priority order of the chilled water equipment so that the insufficient amount of cold water heat is produced by other chilled water equipment (S54a), and the process proceeds to S55a. The amount of steam required by other chilled water equipment S2 and the amount of steam generated by the steam generating equipment S1 are calculated (S55a, S56), and it is determined whether the difference between the amount of steam generated S1 and the amount of steam required S2 is within a predetermined error range α (S57). The unit and value of the error range α differ depending on the energy.
[0119] If the difference is not within the error range α, the load factor of the steam generating equipment is changed (S58), and the process returns to step S52a via the path indicated by the symbol SR58a. The above steps S52a to S58 are repeated until the shortage of cold water heat quantity is resolved and falls within the error range α. That is, the load factor of the steam generating equipment is changed so that the generated steam quantity S1 converges to the required steam quantity S2, and a convergence calculation is performed to determine the number of operating units of the chilled water system equipment and / or the load factor that balances the chilled water and steam. If the difference falls within the error range α, the process proceeds to hot water supply EB (S06).
[0120] On the other hand, if the waste hot water injection type absorption chiller is not operating, it is determined whether the hot water recovery heat exchanger is operating (S51b). If the hot water recovery heat exchanger is operating, the procedure is the steps S52b to S58, route SR58b, enclosed by the dashed line in the figure. This procedure is the same as for the chilled water system equipment described above, and the load factor of the steam generating equipment is changed and a convergence calculation is performed to determine the number of operating hot water system equipment and / or the load factor that can balance both hot water and steam. If the hot water recovery heat exchanger is not operating, the procedure proceeds to hot water supply EB (S06).
[0121] "Hot water supply EB (S06, Fig. 8e)" First, the hot water heat load, hot water supply temperature, and water temperature are read (S61), and the water supply flow rate and the temperature inside the hot water tank are calculated (S62). Next, the operation / stop of the water heaters and the number of units to be operated / stopped are determined based on the temperature inside the hot water tank (S63), and additional water heaters are operated so that the heat storage in the hot water tank is full at the specified time (S64). Then, the amount of heat produced, electricity, and fuel consumed by each operating water heater are calculated (S65), and the process moves to the next power EB (S07).
[0122] "Electricity EB (S07)" Here, after S71 described above, it is determined whether or not the system is in power-dominant operation (S72), and this is generally as explained for the low-pressure steam EB above. If the system is in heat-dominant operation (S72), the amount of electricity purchased is calculated (S75), and the process ends. When the load factor P1 is reset in power-dominant operation, for convenience of explanation, it is set to return to the position before S35c of the low-pressure steam EB03 (K), but as long as no inconsistencies occur in the calculation, it may be set to return to the initial position (K') of the chilled water EB01, for example. It is meaningful to reset the conditions and adjust the operating conditions again in the equipment of all systems so that the specific composite total energy converges to the target value.
[0123] Each device is incorporated into the model of related devices, and is operated and calculated according to the operating conditions (load factor) of each device, or within the range of the limiting conditions, if any. For example, the amount of recovered waste hot water, the amount of gas (fuel), the amount of electricity, the amount of water used, and the amount of cold water output of a waste hot water injection type absorption chiller operated while taking into consideration the auxiliary power, cold water pump, cooling water pump, and individual cooling tower as related devices of the waste hot water injection type absorption chiller, and the start-up loss and the lower limit of the operable cooling water temperature as limiting conditions. If the cold water flow rate of one waste hot water injection type absorption chiller is insufficient in the load setting unit, other chillers (e.g., absorption chillers) start up in the order of chillers set in the operating condition setting unit 40 to balance the amount of cold water. If the cold water balance is still not achieved, the last device in the priority order (e.g., turbo chiller) is automatically started up again to balance the amount of cold water.
[0124] The steam supplied to the absorption chiller is configured to be supplied from steam generated in the boiler system and power generation system based on the required steam balance. As with the chilled water system, each device in the boiler system and power generation system is modeled, and the amount of rising steam and the amount of power generation are balanced in the order set by the operating condition setting unit 40. If the steam balance cannot be achieved, the boiler system device, which has the last priority, is configured to start up again to achieve balance. The power generation system devices can be handled by purchasing electricity, and are configured not to start up again to reduce the burden of convergence calculations. If surplus power remains even when the gas engine generator is stopped, the output of the solar power generation device is reduced to achieve power balance.
[0125] In this way, the procedure for calculating the system balance is to assemble the thermoelectric balance for each system in order, for example, cold water, hot water, low pressure steam, high pressure steam, hot water supply, and electricity. If any changes occur to the assembled conditions, a convergence calculation is performed using a multivariable algebraic equation numerical analysis method to calculate the thermoelectric balance for all systems. Based on the balance results, the output of each device operated at its load is organized into the required information and output by the operation result output unit 50 as described above. The output is in the form of a graph or report by time period and annual calculation output as described above.
[0126] Next, other embodiments of the present invention will be described. The same members as those in the above-described embodiment are denoted by the same reference numerals. In the above embodiment, the charging schedule for the peak cut operation of the power storage device is set based on the charging start time of the power storage device and the maximum possible charging amount per time slot. However, the setting of the charging schedule is not limited to this, and may be set based on the charging start time and charging end time of the power storage device and the charging amount for each time slot between these times. In such a case, the charging end time of the power storage device or the charging amount in at least one or more time slots is changed based on the total discharging amount in one day and the charging amount for each time slot, so that the total charging amount in one day and the total discharging amount in one day of the power storage device are made equal.
[0127] In the above embodiment, the method of operating the power storage device is peak cut operation, but the present invention is not limited to this, and for example, scheduled discharge can also be selected. Scheduled discharge is an operation method in which discharge is performed according to a preset discharge schedule (discharge time period and discharge amount during that time period). In scheduled discharge, the discharge time period of the power storage device, the discharge amount for each discharge time period, and the charging schedule for the power storage device are set. These settings make it possible to simulate, for example, (1) VPP (Virtual Power Plant) power generation, (2) peak shift operation, and (3) operation linked to the wholesale electricity market price.
[0128] (1) VPP power generation As an example, Figures 10a to 10c show graphs and reports of the power balance when the configuration of the power storage equipment is set to a storage capacity of 8000kwh and a charge / discharge efficiency of 95%, and the charge / discharge conditions are set to a charging start time of 8 p.m., a maximum possible charging amount per time slot of 800kw, and a discharge schedule of a maximum possible discharging amount of 1800kw from 10 a.m. to 1 p.m. and a maximum possible discharging amount of 2000kw from 1 p.m. to 4 p.m. In the example in the figures, the two gas engine cogeneration units are given priority over the power storage equipment during the time slot that includes the discharging time slot.
[0129] In the VVP power generation, the power selling condition setting unit 43 further sets the amount of power selling and the power selling time period during which power is supplied (sold) from the heat and power generation facility to the outside.
[0130] For example, a setting is made such that 1000 kW is sold from 10:00 to 13:00, and 1500 kW is sold from 13:00 to 16:00. As shown in Figs. 10a and 10b, during the power selling time period set by the power selling condition setting unit 43, the set amount of power sold is supplied to the outside (power consumption), while the power storage device is discharged based on the discharge schedule so that the power selling condition is satisfied and the power balance is ensured. In the example of the figure, 1000 kW of power supply (power sale) is required as VPP power generation from 10:00 to 12:00, but the amount of solar power generation is relatively large compared to the amount of power consumption including the supply power. As in the above embodiment, since solar power generation has a priority (condition) over the gas engine of the power generation system device, partial load operation is performed to suppress the amount of power generation of the gas engine so that reverse power does not occur. As a result, the amount of steam generation changes during the time period, and a convergence calculation is performed so that the steam energy balance is achieved. Note that partial load operation is also performed from 8:00 to 12:00 to suppress the amount of power generation of the gas engine so that reverse power does not occur.
[0131] On the other hand, between 12:00 and 16:00, as the amount of power consumed increases and there is a power shortage even with the addition of solar power generation, the power balance is achieved by discharging from the power storage device. Here, the charging schedule is set to start charging at 20:00 and charge amount of 800 kW, but since the power storage device cannot charge and discharge at the same time, discharging is prioritized. Also, in the time slot between 0:00 and 1:00, the charge amount is less than the set value. This is because it is sufficient to secure a charge amount that corresponds to the total discharge amount for the day, so the charge amount is adjusted and charging is completed at 1:00. In this way, the calculation unit calculates the charge amount for each time slot excluding the time slot during which the power storage device discharges based on the above-mentioned discharge amount.
[0132] That is, the calculation unit calculates the discharge amount of the power storage device so that the power selling amount is satisfied, and calculates the charge amount of the power storage device for each time period excluding the discharge time period based on the charging schedule. In this way, the VPP supply power can be set as external power (reverse power) for each time period, and the amount of power that can be supplied by the VPP can be considered for each monthly pattern. Then, a quantitative contract can be made with the power company based on the results of this consideration.
[0133] (2) Peak shift operation Peak shift operation is an operation that aims to level out the amount of purchased power, and is basically an operation in which power is discharged during time periods when the amount of purchased power is high, and charged during time periods when the amount of purchased power is low. The settings in this case are the same as those described above, and the discharge time periods of the power storage device, the maximum possible discharge amount for each discharge time period, and the charging schedule for the power storage device are set. An operating priority order is set between the power storage device and other power generation devices for a time period that includes at least the set discharge time period. Then, the calculation unit obtains the charge amount of the power storage device for each time period excluding the discharge time period based on the set charging schedule, and balances the power. In this example, a gas engine cogeneration system will be described below as an example of the other power generation device.
[0134] In the example shown in Fig. 11a to c, charging is performed between 10 pm and 7 am according to the set charging schedule, and is added as an electric power load. Then, discharging starts after 8 am according to the set discharge schedule, and the amount of power generated by photovoltaic power generation also increases. Therefore, if the power storage device is set as the first priority of the power generation device, the gas engine cogeneration system will operate at 100% in the time zone between 7 am and 10 am, but since photovoltaic power generation is sufficient in the time zone between 10 am and 3 pm, the gas engine cogeneration system will operate at partial load without purchasing electricity, and the power balance will be achieved. Furthermore, because this partial load operation reduces the amount of low-pressure steam and waste hot water generated (supplied), convergence calculations are performed to balance these energies with other devices.
[0135] On the other hand, if the gas engine cogeneration system is set as the first priority (100% load) of the power generation equipment, as shown in the example of Figures 11d to 11f, solar power generation is sufficient between 10:00 and 12:00, so the gas engine cogeneration system operates at partial load without discharging from the power storage equipment, and the power balance is achieved. During other times, the power storage equipment discharges as necessary to match the power load.
[0136] (3) Operation linked to wholesale electricity market prices Some electricity rates are set in conjunction with the wholesale market price in the wholesale electricity market. For example, the electricity rate is set to effectively 0 yen / kWh during daytime hours when solar power generation is high, and the electricity rate is set higher during other hours when solar power generation is low. This operation linked to the wholesale market price is an operation in which electricity is discharged during hours when electricity rates are high and charged during hours when electricity rates are low, and is similar to peak shift operation that aims to level out purchased electricity. Therefore, in this case, as with the peak shift operation described above, the discharge time period of the energy storage device, the maximum possible discharge amount for each discharge time period, and the charging schedule for the energy storage device are set.
[0137] In the example shown in Fig. 12a to 12c, the charging start time is set to 8:00, when solar power generation is high, and charging is performed between 8:00 and 16:00 according to the maximum possible charging amount per time slot, and is added as an electric power load. In addition, since the electric power rate is set low during this time slot, the gas engine cogeneration system is not operated and purchased electric power is used to reduce running costs. In addition, according to the set discharge schedule, electric power is discharged from the electric storage device during the time slots of 5:00 to 8:00 and 16:00 to 21:00. Therefore, if the electric storage device is set as the first priority of the power generation system devices, the gas engine cogeneration system operates at 100% during the time slot of 21:00 to 1:00, and the amount of purchased electric power is minimized. Then, in the time slot of 1:00 to 5:00, following the decrease in the electric power consumption of the utilization equipment, the gas engine cogeneration system operates at partial load without purchasing electric power, and electric power balance is achieved. Furthermore, because the amount of low-pressure steam and waste hot water generated (supplied) also decreases due to this partial load operation, convergence calculations are performed to balance these energies with other devices. In addition, between 4:00 p.m. and 9:00 p.m., thermal power generation is used instead of solar power generation, which also results in reduced CO2 emissions.
[0138] Furthermore, in each of the above embodiments, the power storage device is of one series. However, the simulation can be performed similarly for two series, not limited to one series. In such a case, the power storage condition setting unit 41 sets the power storage capacity and the charge / discharge efficiency of each series. Then, the calculation unit 7p regards the two series of power storage devices, in which the charge / discharge amount is distributed so that the state of charge (SOC) of the power storage devices of each series is equal, as one power storage device. When two series of power storage devices are used, they are connected in parallel and charging / discharging is performed.
[0139] Here, the charging rate of the power storage device is the remaining (stored) amount of electricity divided by the capacity of the power storage device and expressed as a percentage, and can also be expressed as SOC (State Of Charge) or remaining capacity. In the simulation of the present invention, the amount of stored electricity that the power storage device can actually discharge (charge) is set to 100% (fully charged) to 0% (fully discharged). Therefore, for example, if a catalog or technical documentation for the power storage device states that the device is "used at SOC 30% to 80%, this "30% to 80%" corresponds to "0% to 100%" in the present invention.
[0140] Furthermore, when the conversion efficiency of the DC-AC converters connected to the power storage devices of each series is different, the calculation unit 7p calculates the overall efficiency of the two series of power storage devices as a whole during charging and discharging, and uses the calculated overall efficiencies during charging and discharging to treat the two series of power storage devices as a whole as a single power storage device.
[0141] As shown in FIG. 14a, when the photovoltaic power generation device is AC-connected to the storage device, first, the AC-based discharge amount of the first series storage device is P D1 , the conversion efficiency η of the bidirectional DC-AC converter of the first series of energy storage devices A1 Then, the DC-based discharge amount of the first-system power storage device is expressed by the following formula 1.
[0142]
number
[0143] In addition, the charge amount P of the first series of storage equipment on an AC basis C1 is expressed by the following formula 2.
[0144]
number
[0145] In order to discharge the two series of storage devices so that their SOCs are equal, the DC-based discharge power is set to P' D1 ,P' D2 [kW], the storage capacity of each storage device is QB1 ,Q B2 [kWh] must satisfy the following formula 3.
[0146]
number
[0147] And the discharge amount on an AC basis is P D1 ,P D2 Then, the above formula 3 becomes the following formula 4, and the discharge power ratio (P D2 / P D1 )
[0148]
number
[0149] Therefore, the overall efficiency during discharge is calculated by the following formula 5.
[0150]
number
[0151] On the other hand, in order to charge the two series of storage devices so that their SOCs are equal, the DC-based charging power for each series must be P' C1 ,P' C2 [kW], the storage capacity of each storage device is Q B1 ,Q B2 If the efficiency is expressed in kWh, the following formula 6 must be satisfied. This formula 6 becomes formula 7, which is the ratio of charging efficiencies. The overall efficiency during charging can also be calculated using the following formula 8, just like during discharging.
[0152]
number
[0153]
number
[0154]
number
[0155] On the other hand, as shown in Fig. 14b, when the photovoltaic power generation device is DC-connected to the storage device, the output P PV Of this, the portion that flows to the storage device is the charging power P' C is expressed by the following formula 9. Then, the distribution of the photovoltaic power generation power at this time is expressed by the following formula 10. As a result, the overall efficiency can be found even in the case of DC connection of two series.
[0156]
number
[0157]
number
[0158] In the above-described embodiments, the thermoelectric equipment includes a cogeneration system as a power generation system equipment. However, it is also possible to simulate surplus utilization of solar power generation in a thermoelectric power generation facility that does not include a power generation system equipment such as a cogeneration system, but includes a power storage device, a solar power generation device, and a heat source device.
[0159] When simulating the use of surplus solar power, the settings include, for example, the discharge time period of the power storage device, the discharge amount for each discharge time period, and the charging schedule for the power storage device. In this example, surplus solar power is charged and discharged in the evening when power is insufficient.
[0160] As shown in Fig. 13a, the charge amount is set for each arbitrary time period as a charging schedule. The amount of surplus solar power generation predicted (simulated) in advance based on the sunshine conditions, etc. is set as the charge amount. As described above, technological advances have made it possible to control the rated output (continuous control) in units of 1% in a power conditioner. Therefore, by using the solar power generation condition setting unit 42 to control the output of the solar power generation device continuously, it becomes possible to simulate the power load taking into account storage and discharge in the heat and power supply facility M that includes at least a solar power generation device and a power storage device.
[0161] In this example, as shown in Figures 13b and 13c, the power load is not covered by solar power generation from 8:00 to 10:00, so the power balance is achieved by purchasing power. On the other hand, the power load is covered by solar power generation from 7:00 to 8:00, 10:00 to 13:00, and 14:00 to 15:00, so purchasing power is not necessary. The surplus is then discharged after 16:00, when the unit price of electricity is high, to balance the power load. In this way, by setting the charging schedule taking into account solar radiation forecasts and the like and assuming a predicted value for the amount of surplus power, it is also possible to simulate an operation in which surplus solar power generation is used for charging.
[0162] When simulating the utilization of surplus solar power, the configuration of the simulation system for heat and power generation equipment is as follows.
[0163] A simulation system for a heat and power supply facility in which a plurality of heat and power supply devices are connected, at least electric power and fuel (hereinafter referred to as "supplied energy") are supplied, and at least two of electric power, low-temperature chilled water, chilled water, hot water, hot water, high-pressure steam, and low-pressure steam (hereinafter referred to as "composite total energy") are produced and supplied to a utilization facility, the simulation system determining a relationship between an operating condition of the heat and power supply device and an amount of supplied energy used or an amount of produced composite total energy, the thermoelectric device includes at least a solar power generation device, a power storage device, and a thermoelectric device including at least a pump using a motor, an energy load setting unit that sets the amount of composite total energy required by the utilization equipment for each time period on a daily basis; a process condition setting unit that sets process conditions including at least one of an outside air temperature or a wet-bulb temperature of the heat and power supply facility and the utilization facility, and a horizontal surface solar radiation amount of the photovoltaic power generation device; an operation condition setting unit that sets whether or not to operate each of the heat and power supply devices and an operation priority order for each of the heat and power supply devices for each time period; a calculation unit that calculates at least a usage amount of the supply energy as a result of operating the heat and power supply equipment in accordance with the operating conditions of the operating condition setting unit, the operating condition setting unit further includes a power storage condition setting unit that sets a configuration of the power storage device and charge / discharge conditions, and a photovoltaic power generation output condition setting unit that sets an output efficiency of the photovoltaic power generation device and sets an output control of the photovoltaic power generation device to continuous control, any one of the thermoelectric devices other than the solar power generation device and the power storage device includes a partial load characteristic that varies depending on the process condition; the photovoltaic power generation device has output characteristics that vary depending on an amount of inclined solar radiation based on the amount of solar radiation on a horizontal surface and an outside air temperature, among the process conditions; The calculation unit is a load factor of the heat power supply device is changed in accordance with output fluctuations of the photovoltaic power generation device and the charge / discharge conditions of the power storage device during the continuous control so that the amount of production of any of the composite total energies becomes the target value set by the energy load setting unit, thereby calculating the amount of electric power energy used by the heat power supply facility; and determining the amount of charge and discharge of the power storage device by time period so that the total amount of charge and the total amount of discharge of the power storage device in one day are equal and the balance of electric energy can be maintained; Adding the obtained charging amount to the amount of electric energy used for each time period; A simulation system for heat and power facilities that calculates utility consumption based on the added amount of electrical energy used.
[0164] In the above embodiment, the user inputs the panel inclination and orientation of the solar-related equipment, and the amount of inclined solar radiation is calculated based on the input values (eigenvalues). However, for example, in the case of a solar-tracking type solar power generation equipment, these angles vary by season (month) or time. In that case, it is better to calculate the optimal panel inclination and orientation for each month and hour, for example, instead of the user's input, and calculate the amount of inclined solar radiation based on the calculated values. [Industrial Applicability]
[0165] The present invention can be used as a simulation system for a heat and power supply facility in which a plurality of heat and power supply devices are connected, at least electric power and fossil fuels are supplied, and electric power, low-temperature chilled water, chilled water, hot water, hot water, high-pressure steam, and low-pressure steam are produced and supplied to a utilization facility, the heat and power supply facility having at least a solar-related device, and simulating the amount of energy used to produce any of the composite total energy. The present invention can also be used as a system for simulating an environmental load (primary energy, CO2, NOx, SOx) by multiplying the amount of electric power consumption, the amount of fossil fuel and other fuel consumption obtained under the conditions of the energy load setting unit, the basic condition setting unit, the system construction setting unit, and the operating condition setting unit, and the unit environmental load of the environmental load data setting unit. Furthermore, the present invention can be used for operation diagnosis by simulating the current state of the heat and power supply devices, energy saving by changing the operating method, improvement by equipment renewal and its energy saving, evaluation of reduction of environmental load, and consultation on optimal design of the heat and power supply facility. [Explanation of symbols]
[0166] 1: Simulation system, 2: User terminal, 3: Administrator terminal, 4: DB server, 5: Network, 6: User interface, 6a: Monitor, 6b: Keyboard, 6c: Mouse, 7: CPU (calculation means), 7a: Bus, 7b: Temporary storage memory, 7c: HDD, 7d: Network adapter, 7p: Calculation unit, 7q: Calculation judgment unit, 7x: Data file, 7y: Processing application (calculation means), 7z: Load creation application, 10: Energy load setting unit, 20: Basic condition setting unit, 21: Utility cost setting unit, 21 a: power cost setting unit, 21b: fuel cost setting unit, 22: process condition setting unit, 23: environmental load data setting unit, 24: temperature data setting unit, 30: system construction setting unit, 40: operation condition setting unit, 41: power storage condition setting unit, 42: photovoltaic power generation output condition setting unit, 42a: connection state selection unit, 43: power selling condition setting unit, 50: operation result output unit, 60: case file etc. creation unit, 70: display control unit, 71: display window, 100: database group, 100a: read data, 110: individual data group, 200: customer database, 201: case file database, Ab: AC bus, Db: DC bus, F: utilization equipment, M: thermoelectric equipment, M120a: waste heat boiler, M190: power storage device, M190a: bidirectional DC-AC converter, M1101: power conditioner, M1102: DC-DC converter
Claims
1. A simulation system for a heat and power supply facility in which a plurality of heat and power supply devices are connected, at least electric power and fuel (hereinafter referred to as "supply energy") are supplied, and at least two of electric power, low-temperature chilled water, chilled water, hot water, hot water, high-pressure steam, and low-pressure steam (hereinafter referred to as "composite total energy") are produced and supplied to a utilization facility, the simulation system determining a relationship between an operating condition of the heat and power supply device and an amount of supplied energy used or an amount of produced composite total energy, the simulation system comprising: the thermoelectric device includes at least a solar power generation device, a power storage device, and a thermoelectric device including at least a pump using a motor, an energy load setting unit that sets the amount of composite total energy required by the utilization equipment for each time period on a daily basis; a process condition setting unit that sets process conditions including at least one of an outside air temperature or a wet-bulb temperature of the heat and power supply facility and the utilization facility, and a horizontal surface solar radiation amount of the photovoltaic power generation device; an operation condition setting unit that sets whether or not to operate each of the heat and power supply devices and an operation priority order for each of the heat and power supply devices for each time period; a calculation unit that calculates at least the amount of combined total energy produced as a result of operating the heat and power supply equipment in accordance with the operating conditions of the operating condition setting unit, the operating condition setting unit further includes a power storage condition setting unit that sets a configuration of the power storage device and charge / discharge conditions, and a photovoltaic power generation output condition setting unit that sets an output efficiency of the photovoltaic power generation device and sets an output control of the photovoltaic power generation device to continuous control, any one of the thermoelectric devices other than the solar power generation device and the power storage device includes a partial load characteristic that varies depending on the process condition; the photovoltaic power generation device has output characteristics that vary depending on an amount of inclined solar radiation based on the amount of solar radiation on a horizontal surface and an outside air temperature, among the process conditions; The calculation unit is a load factor of the thermoelectric power supply device is changed in accordance with output fluctuations of the photovoltaic power generation device and the charge / discharge conditions of the power storage device during the continuous control so that the production amount of any of the composite total energies converges to a target value set by the energy load setting unit, and a balance of at least the composite total energy related to the thermoelectric power supply device is adjusted based on the changed load factor; a convergence calculation is performed in which the change in the load factor of the thermoelectric power supply device and the adjustment are repeated until the production amount converges to the target value, and the charge amount and discharge amount of the power storage device are determined for each time period so that a daily total charge amount of the power storage device and a daily total discharge amount of the power storage device become equal and a balance of electric energy can be maintained; Adding the obtained charging amount to the amount of electric energy used for each time period; A simulation system for heat and power facilities that calculates utility consumption based on the added amount of electrical energy used.
2. 2. The simulation system for a heat and power facility according to claim 1, wherein the charge and discharge conditions include at least an operation method of the power storage device, a charging schedule for the power storage device, and an upper limit value of received power, and the operation method includes selecting peak cut operation that limits the amount of purchased power so that the received power does not exceed the upper limit value, and the calculation unit determines the amount of power that exceeds the upper limit value as the discharge amount of the power storage device and calculates the charge amount for each time period excluding the time period during which the power storage device discharges based on the discharge amount.
3. 3. The simulation system for a heat and power supply facility according to claim 2, wherein the charging schedule includes a charging start time of the power storage device and a maximum possible charging amount per time period, and the calculation unit determines a charging end time of the power storage device based on the total discharge amount in one day and the maximum possible charging amount, and calculates a final charging amount in the time period including the charging end time.
4. 3. The simulation system for a heat and power facility according to claim 2, wherein the charging schedule includes a charging start time, a charging end time, and a charging amount for each time zone between these times, and the calculation unit calculates the charging end time of the power storage device or the charging amount for at least one of the time zones based on the total discharge amount for one day and the charging amount for each time zone.
5. 2. The simulation system for a heat and power supply facility as described in claim 1, wherein the charge and discharge conditions include at least an operation method of the power storage device, a discharge time period of the power storage device, a maximum possible discharge amount for each of the discharge time periods, and a charging schedule for the power storage device, the operation condition setting unit sets an operation priority order for power generation equipment including the power storage device in a time period that includes at least the discharge time periods, the operation method includes selecting a scheduled discharge for discharging from the power storage device based on the discharge time periods and the discharge amount, and the calculation unit calculates the charge amount of the power storage device for each time period excluding the discharge time periods based on the charging schedule.
6. 2. The simulation system for a heat and power supply facility according to claim 1, wherein the charge and discharge conditions include at least an operation method of the power storage device, a discharge time period of the power storage device, a maximum possible discharge amount for each of the discharge time periods, and a charging schedule for the power storage device, and the operating condition setting unit further includes a power selling condition setting unit that sets an amount of power sold to be supplied from the heat and power supply facility to the outside and a power selling time period for selling the power, and the operating condition setting unit sets an operating priority order of power generation equipment including the power storage device for a time period that includes at least the discharge time period, and the operation method includes selecting a scheduled discharge for discharging from the power storage device based on the set discharge time period and the discharge amount, and the calculation unit determines the discharge amount of the power storage device based on the operation priority order so that the power selling amount is satisfied, and determines the charge amount of the power storage device for each time period excluding the discharge time period based on the charging schedule.
7. The simulation system for a heat and power supply facility according to claim 1 , wherein the composite total energy is calculated in the following order: steam energy before electric power energy, and other energies before the steam energy.
8. The thermoelectric device further includes a cogeneration device; 8. The heat and power supply facility simulation system according to claim 7, wherein when the cogeneration system is in partial load operation as a result of determining the charge amount and discharge amount of the power storage device for each time period, the calculation unit performs the convergence calculation again.
9. The solar power generation output condition setting unit further has a connection state selection unit that selects the connection between the solar power generation device and the power storage device as either an AC connection or a DC connection, and when a DC connection is selected, the output efficiency of the solar power generation device is set to 1. The simulation system for a heat and power facility described in any one of claims 1 to 8.
10. The simulation system for a heat and power facility according to any one of claims 1 to 8, wherein the storage condition setting unit is capable of setting the configuration of the storage device in two series, and the calculation unit regards the storage devices of the two series as one storage device in which the charge and discharge amounts are distributed so that the charging rates (SOC) of the storage devices of each series are equal.
11. The simulation system for a heat and power facility according to claim 10, wherein when the conversion efficiencies of the DC / AC converters connected to the storage devices of each series are different, the calculation unit calculates an overall efficiency of the two series of storage devices as a whole during charging and discharging, and regards the two series of storage devices as a whole as a single storage device using the calculated overall efficiencies during charging and discharging.
Citation Information
Patent Citations
Method for simulating system having solar generator / wind generator / cogenerator
JP2008083971A
Simulation system of electrothermal facility and electrothermal facility operation method
JP2015203874A
Simulation system for thermoelectric facilities
WO2009128548A1
Optimization and regulation method and system for thermoelectric heat pump-thermoelectricity combined system
WO2022048127A1
Recording method using photoconductive toner
JP1986018973A
