Hydrocarbon production apparatus

The hydrocarbon production apparatus addresses unstable catalyst activity by using controlled gas supply and recovery devices to maintain precise gas ratios, enhancing hydrocarbon purity and stability in the synthesis process.

JP2024150018APending Publication Date: 2024-10-23KK TOYOTA CHUO KENKYUSHO +4
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023063223
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-10
Publication Date
2024-10-23

AI Technical Summary

Technical Problem

Existing hydrocarbon production systems face issues with varying carbon dioxide concentrations in the desorption process, leading to unstable catalyst activity and potential deactivation, which affects the purity and stability of the hydrocarbon synthesis reaction.

Method used

A hydrocarbon production apparatus utilizing separate recovery devices for carbon dioxide adsorption and desorption, with controlled supply of carbon dioxide and hydrogen gases to the reactor, ensuring precise gas ratios and stable catalyst operation.

Benefits of technology

The system improves hydrocarbon purity by stabilizing the catalyst reaction, preventing deactivation, and maintaining efficient synthesis through precise gas ratio adjustment, even during catalyst warm-up phases.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024150018000001_ABST
    Figure 2024150018000001_ABST
Patent Text Reader

Abstract

To provide a technique capable of improving a degree of purity of hydrocarbon to be produced while suppressing the deactivation of catalytic reaction.SOLUTION: A hydrocarbon production apparatus includes: a first recovery unit connected to a supply source of mixed gas, storing a first absorbent for absorbing carbon dioxide, and not using purge gas for desorption of carbon dioxide; a second recovery unit connected to the supply source in parallel to the first recovery unit, storing a second absorbent for absorbing carbon dioxide, and using purge gas for desorption of carbon dioxide; a reactor storing a catalyst for accelerating synthetic reaction of hydrocarbon by using first supply gas supplied from the first recovery unit or second supply gas supplied from the second recovery unit; a hydrogen addition part for adding hydrogen to the first and second supply gas; and a control section for controlling the supply of the first gas to the reactor and the supply of the second gas to the reactor. The control section supplies the first gas to the reactor before supplying the second gas to the reactor.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a hydrocarbon production apparatus. [Background technology]

[0002] Conventionally, hydrocarbon production apparatuses that produce hydrocarbons from carbon dioxide and hydrogen have been known. For example, Patent Document 1 discloses a methane production apparatus that utilizes heating using thermal energy generated during the synthesis of hydrocarbons and purging with hydrogen when carbon dioxide is desorbed from an adsorber. Gas containing carbon dioxide desorbed from the adsorber by purging and hydrogen used for purging is supplied to a reactor and used in the synthesis reaction of hydrocarbons. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2019-142806 A Summary of the Invention [Problem to be solved by the invention]

[0004] In Patent Document 1, an adsorption process in which carbon dioxide is adsorbed in the adsorber and a desorption process in which carbon dioxide is desorbed from the adsorber are alternately repeated, and the adsorber is heated during the adsorption process to promote the desorption of carbon dioxide. The carbon dioxide concentration in the gas discharged from the adsorber during the desorption process varies depending on the temperature in the adsorber. For example, the carbon dioxide concentration in the gas discharged from the adsorber during the first desorption process of the adsorption process and the desorption process that are alternately repeated tends to be lower than the carbon dioxide concentration in the same gas during the subsequent desorption processes, because carbon dioxide is not easily desorbed from the adsorber that is not sufficiently heated and is at a relatively low temperature. In addition, during such a first desorption process, the reactor is not sufficiently heated due to the heat generated during the synthesis reaction, and the catalyst is also at a relatively low temperature, so the activity of the catalyst is unstable. If a gas with a low carbon dioxide concentration (a gas that is significantly different from the gas ratio suitable for the synthesis reaction) is supplied from the adsorber to a catalyst in such a state, there is a risk of deactivating the catalytic reaction. However, in the methane production apparatus of Patent Document 1, no consideration is given to the variation in the carbon dioxide concentration in the gas for each desorption process. For this reason, there has been a demand for a technology that can improve the purity of produced hydrocarbons while suppressing the deactivation of the catalytic reaction.

[0005] The present invention has been made to solve at least part of the above-mentioned problems, and has an object to provide a technique capable of improving the purity of produced hydrocarbons while suppressing deactivation of the catalytic reaction. [Means for solving the problem]

[0006] The present invention has been made to solve at least part of the above-mentioned problems, and can be realized in the following forms.

[0007] (1) According to one aspect of the present invention, there is provided a hydrocarbon production apparatus comprising: a first recovery vessel connected to a supply source of a mixed gas containing carbon dioxide, containing a first adsorbent that adsorbs carbon dioxide contained in the mixed gas, and not using a purge gas to desorb carbon dioxide from the first adsorbent; a second recovery vessel connected to the supply source in parallel with the first recovery vessel, containing a second adsorbent that adsorbs carbon dioxide contained in the mixed gas, and using a purge gas to desorb carbon dioxide from the second adsorbent; a reactor connected to the first recovery vessel and the second recovery vessel, containing a catalyst that promotes a synthesis reaction of hydrocarbons using a first supply gas supplied from the first recovery vessel or a second supply gas supplied from the second recovery vessel; a hydrogen addition unit capable of adding hydrogen to the first supply gas and the second supply gas; and a control unit that controls the supply of the first supply gas to the reactor and the supply of the second supply gas to the reactor, and the control unit controls the supply of the first supply gas to the reactor before the second supply gas is supplied to the reactor.

[0008] According to this configuration, since no purge gas is used for desorption of carbon dioxide from the first adsorbent, the first supply gas supplied from the first recovery vessel to the reactor contains only carbon dioxide. On the other hand, since a purge gas is used for desorption of carbon dioxide from the second adsorbent, the second supply gas supplied from the second recovery vessel to the reactor contains carbon dioxide and hydrogen. Of the first and second supply gases, the first supply gas, which has a constant carbon dioxide concentration, can be adjusted to a suitable gas ratio by the hydrogenation unit more accurately than the second supply gas, which has a carbon dioxide concentration that varies depending on the temperature in the second recovery vessel. Therefore, according to this configuration, since such a first supply gas is supplied to the reactor before the second supply gas, even if the catalyst in the reactor is in the warm-up process, the catalyst can be stably subjected to a synthesis reaction using the first supply gas, whose gas ratio has been accurately adjusted to approach a suitable gas ratio. In addition, when such a first supply gas is supplied, high purity hydrocarbons can be synthesized on the catalyst. That is, according to this configuration, the purity of the produced hydrocarbons can be improved while suppressing the catalytic reaction from being deactivated.

[0009] (2) In the hydrocarbon production apparatus of the above aspect, when the control unit determines that the synthesis reaction by the catalyst is stable, the control unit may stop supplying the first supply gas to the reactor and start supplying the second supply gas to the reactor. According to this configuration, the second supply gas is supplied to the reactor after it is determined that the synthesis reaction by the catalyst is stable. When the synthesis reaction by the catalyst is stable, the catalyst can be considered to be sufficiently warmed. Therefore, even if the gas ratio of the second supply gas cannot be accurately adjusted to a gas ratio suitable for the synthesis reaction when the second supply gas is supplied to the reactor, the catalyst can be caused to carry out the synthesis reaction using the second supply gas without deactivating the catalytic reaction, because the catalyst is already sufficiently warmed.

[0010] The present invention can be realized in various aspects, for example, in the form of a hydrocarbon production apparatus, a hydrocarbon production system, a hydrocarbon production method, a control method for a hydrocarbon production apparatus, a computer program for executing these apparatuses and methods, a server device for distributing this computer program, a non-transitory storage medium on which a computer program is stored, etc. [Brief description of the drawings]

[0011] [Figure 1] FIG. 1 is an explanatory diagram illustrating a configuration of a hydrocarbon production apparatus according to an embodiment of the present invention. [Diagram 2] FIG. 4 is an explanatory diagram showing in detail the configuration arranged around the first collector. [Diagram 3] FIG. 4 is an explanatory diagram showing in detail the configuration arranged around the second collector. [Figure 4] FIG. 4 is an explanatory diagram showing switching between an adsorption process and a desorption process in the first recovery vessel. [Diagram 5] FIG. 4 is an explanatory diagram showing switching between an adsorption process, a desorption process, and a cooling process in the second recovery vessel. [Figure 6] FIG. 4 is an explanatory diagram showing fluctuations in the carbon dioxide concentration in the second supply gas. [Figure 7] FIG. 4 is an explanatory diagram showing fluctuations in the gas ratio in a second supply gas. [Figure 8] 10 is a flowchart showing an example of a procedure for a supply gas control process. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] <Embodiment> 1 is an explanatory diagram illustrating the configuration of a hydrocarbon production apparatus 1 according to one embodiment of the present invention. The hydrocarbon production apparatus 1 is an apparatus for producing methane, which is a hydrocarbon, from carbon dioxide and hydrogen. The hydrocarbon production apparatus 1 includes a control unit 5, a combustion furnace CF, first recovery vessels 11 and 12, second recovery vessels 21, 22, and 23, a surge tank 30, a hydrogen addition unit 40, a reactor 50, and a methane tank 60. The control unit 5 is a computer including a ROM, a RAM, and a CPU, and performs various controls of the hydrocarbon production apparatus 1.

[0013] The combustion furnace CF combusts methane supplied from a methane tank 60 and discharges a mixed gas containing carbon dioxide and nitrogen. The first recovery vessels 11 and 12 are connected to the combustion furnace CF, which is a supply source of the mixed gas. The first recovery vessels 11 and 12 each accommodate a first adsorbent 11C or 12C that adsorbs carbon dioxide contained in the mixed gas (see FIG. 2). The second recovery vessels 21 to 23 are connected to the combustion furnace CF in parallel with the first recovery vessels 11 and 12. The second recovery vessels 21 to 23 each accommodate a second adsorbent 21C or 23C that adsorbs carbon dioxide contained in the mixed gas (see FIG. 3). Examples of the first adsorbents 11C and 12C and the second adsorbents 21C to 23C include zeolite, activated carbon, and silica gel.

[0014] 2 is an explanatory diagram showing in detail the configuration arranged around the first recovery vessels 11 and 12. The first recovery vessels 11 and 12 are connected to the combustion furnace CF via a mixed gas flow path CS1. The mixed gas flow path CS1 is a gas flow path for supplying the mixed gas discharged from the combustion furnace CF to the first recovery vessels 11 and 12, and is formed of a plurality of pipes. Of the pipes forming the mixed gas flow path CS1, the pipes forming the portions connected to each of the first recovery vessels 11 and 12 are provided with valves Va1 and Va2, respectively. The opening and closing of each of the valves Va1 and Va2 is controlled by the control unit 5.

[0015] In the mixed gas supplied from the combustion furnace CF to the first recovery device 11 via the valve Va1, carbon dioxide contained in the mixed gas is adsorbed by the first adsorbent 11C. The remaining components of the mixed gas that are not adsorbed are discharged to the outside from the discharge flow path CE11. The piping that forms the discharge flow path CE11 is provided with a valve Va3. On the other hand, in the mixed gas supplied from the combustion furnace CF to the first recovery device 12 via the valve Va2, carbon dioxide contained in the mixed gas is adsorbed by the first adsorbent 12C. The remaining components of the exhaust gas that are not adsorbed are discharged to the outside from the discharge flow path CE12. The piping that forms the discharge flow path CE12 is provided with a valve Va4. The opening and closing of each of the valves Va3 and Va4 is controlled by the control unit 5.

[0016] The supply gas flow path SS1 is a flow path for supplying the first supply gas sent from each of the first recovery vessels 11 and 12 to the reactor 50, and is formed of a plurality of pipes. The first supply gas is a gas supplied from each of the first recovery vessels 11 and 12 to the reactor 50. Valves Va5 and Va6 are provided in the pipes forming the supply gas flow path SS1 that form the portions connected to each of the first recovery vessels 11 and 12. The opening and closing of each of the valves Va5 and Va6 is controlled by the control unit 5. In addition, a vacuum pump VP1 is provided downstream of the valves Va5 and Va6 in the pipes forming the supply gas flow path SS1. The vacuum pump VP1 can reduce the pressure inside either of the first recovery vessels 11 and 12 that are spatially connected to the vacuum pump VP1 by opening either of the valves Va5 and Va6. The execution and stop of the reduction in pressure by the vacuum pump VP1 is controlled by the control unit 5. The portion of the supply gas flow path SS1 downstream of the vacuum pump VP1 is connected to the supply gas flow path SS2 described later. The surge tank 30, the hydrogen addition section 40, and the reactor 50 will be described with reference to Fig. 3. Note that, in Fig. 2, the position where the mixed gas passage CS1 is connected to the first recovery vessels 11, 12 and the position where the supply gas passage SS1 is connected to the first recovery vessels 11, 12 are shown as being opposite each other, but since Fig. 2 is a schematic representation of the configuration of the hydrocarbon production apparatus 1, the mixed gas passage CS1 and the supply gas passage SS1 in the first recovery vessels 11, 12 do not have to be connected to each other at positions opposite each other, and may be connected to each other at any positions.

[0017] FIG. 3 is an explanatory diagram showing in detail the configuration arranged around the second recovery devices 21-23. The second recovery devices 21-23 are connected to the combustion furnace CF via a branch flow path CS2 branched from the mixed gas flow path CS1. That is, the second recovery devices 21-23 are connected to the combustion furnace CF in parallel with the first recovery devices 11 and 12. The branch flow path CS2 is a gas flow path for supplying the mixed gas discharged from the combustion furnace CF to the second recovery devices 21-23, and is formed of a plurality of pipes. Of the pipes forming the branch flow path CS2, the pipes forming the portions connected to each of the second recovery devices 21-23 are provided with valves Vb1, Vb2, and Vb3, respectively. The opening and closing of each of the valves Vb1-Vb3 is controlled by the control unit 5.

[0018] In the mixed gas supplied from the combustion furnace CF to the second recovery device 21 via the valve Vb1, the carbon dioxide contained in the mixed gas is adsorbed by the second adsorbent 21C. The remaining components of the mixed gas that are not adsorbed are discharged to the outside from the discharge flow path CE21. The piping forming the discharge flow path CE21 is provided with a valve Vb4. On the other hand, in the mixed gas supplied from the combustion furnace CF to the second recovery devices 22 and 23 via the valves Vb2 and Vb3, the carbon dioxide contained in the mixed gas is adsorbed by the second adsorbents 22C and 23C. The remaining components of the exhaust gas that are not adsorbed are discharged to the outside from the discharge flow paths CE22 and CE23, respectively. The piping forming the discharge flow paths CE22 and CE23 is provided with valves Vb5 and Vb6. The opening and closing of each of the valves Vb4 to Vb6 is controlled by the control unit 5.

[0019] The hydrogen supply source HR is a hydrogen tank. The hydrogen flow path HS is a gas flow path for supplying hydrogen supplied from the hydrogen supply source HR to the second recovery devices 21-23, and is formed of a plurality of pipes. Valves Vb7, Vb8, and Vb9 are provided in the pipes forming the hydrogen flow path HS that form the portions connected to each of the second recovery devices 21-23. The opening and closing of each of the valves Vb7-Vb9 is controlled by the control unit 5. The hydrogen supplied from the hydrogen supply source HR to the second recovery devices 21-23 via the valves Vb7-Vb9 is used as a purge gas for desorbing the carbon dioxide adsorbed in the second adsorbents 21C-23C.

[0020] The supply gas flow path SS2 is a flow path for supplying the second supply gas sent out from each of the second recovery devices 21-23 to the reactor 50, and is formed of a plurality of pipes. The second supply gas is a gas supplied to the reactor 50 from each of the second recovery devices 21-23. Valves Vb10, Vb11, and Vb12 are provided in the pipes forming the supply gas flow path SS2 that form the portions connected to each of the second recovery devices 21-23. The opening and closing of each of the valves Vb10-Vb12 is controlled by the control unit 5. In addition, a vacuum pump VP2 and a surge tank 30 are provided downstream of the valves Vb10-Vb12 in the pipes forming the supply gas flow path SS2. The vacuum pump VP2 can reduce the pressure inside any of the second recovery devices 21-23 that are spatially connected to the vacuum pump VP2 by opening any of the valves Vb10-Vb12. The control unit 5 controls the execution and stop of the reduction in pressure by the vacuum pump VP2. The surge tank 30 is a tank that is disposed downstream of the vacuum pump VP2 and can temporarily store the second supply gas. The supply gas flow path SS1 described in FIG. 2 is connected to the supply gas flow path SS2 at a position downstream of the surge tank 30 in the supply gas flow path SS2.

[0021] The hydrogen addition unit 40 is a hydrogen tank capable of adding hydrogen to the first supply gas or the second supply gas flowing through a portion of the supply gas flow path SS2 downstream of the position where the supply gas flow path SS1 is connected. The hydrogen addition unit 40 can add hydrogen so that the gas ratio (H2 / CO2 ratio) in the first supply gas or the gas ratio (H2 / CO2 ratio) in the second supply gas flowing through the same portion approaches a gas ratio (H2 / CO2 ratio) suitable for a synthesis reaction in the reactor 50. The control unit 5 controls the amount of hydrogen added by the hydrogen addition unit 40 based on the gas composition detected by a gas sensor arranged in the same portion, the temperature in the reactor 50, the composition of the gas flowing from the reactor 50 to the methane tank 60, etc.

[0022] The reactor 50 is connected to the first recovery units 11, 12 and the second recovery units 21-23 via the supply gas flow paths SS1, SS2 (see FIGS. 2, 3), and is a device that synthesizes hydrocarbons (methane in this embodiment) by a synthesis reaction using the first supply gas or the second supply gas. The reactor 50 contains a catalyst (not shown) that promotes the synthesis reaction of the hydrocarbons. The hydrocarbons synthesized in the reactor 50 are compressed by a compressor (not shown) and then filled into a methane tank 60 (see FIG. 1).

[0023] The heat medium flow path MF is a flow path through which a heat medium capable of heat exchange with the second adsorbents 21C-23C flows, and is formed of a plurality of pipes. Heat generated in the reactor 50 by a hydrocarbon synthesis reaction is supplied to the second recovery devices 21-23 via the heat medium flowing through the heat medium flow path MF. The pipes forming the heat medium flow path MF are provided with flow path switching valves TV1, TV2, TV3, and TV4. The flow path switching valves TV1-TV4 are all three-way valves, and switch the flow path through which the heat medium flows from among the first flow path MF1, the second flow path MF2, and the third flow path MF3 included in the heat medium flow path MF. The first to third flow paths MF1-MF3 are flow paths that pass between the outer and inner pipes of the second recovery devices 21-23 that are formed of double pipes. For example, when the flow path through which the heat medium flows is switched to the first flow path MF1, heat is supplied from the heat medium flowing through the first flow path MF1 to the second adsorbent 21C accommodated in the second recovery device 21. Further, a circulation pump CP is provided in the piping forming the heat medium flow path MF. The circulation pump CP promotes circulation in the flow paths spatially connected to the circulation pump CP by switching the flow path switching valves TV1-TV4 among the first to third flow paths MF1-MF3. The flow path switching by the flow path switching valves TV1-TV4 and the start and stop of the circulation promotion by the circulation pump CP are controlled by the control unit 5. Note that, in FIG. 3, the position where the branch flow path CS2 is connected to the second recovery devices 21-23 and the position where the supply gas flow path SS2 is connected to the second recovery devices 21-23 are shown as being opposite to each other, but since FIG. 3 is a schematic representation of the configuration of the hydrocarbon production apparatus 1, the branch flow path CS2 and the supply gas flow path SS2 do not have to be connected to each other at positions opposite to each other in the second recovery devices 21-23 and may be connected to each other at any positions.

[0024] 4 is an explanatory diagram showing switching between the adsorption process and the desorption process in the first recovery devices 11, 12. In the hydrocarbon production apparatus 1, the first recovery devices 11, 12 are each caused to perform an adsorption process in which carbon dioxide is adsorbed by the first adsorbent 11C or the first adsorbent 12C, and a desorption process in which carbon dioxide is desorbed from the first adsorbent 11C or the first adsorbent 12C after the adsorption process. As shown in FIG. 4, the first recovery devices 11, 12 repeat different processes in the order of cycle 1 and cycle 2. That is, the control unit 5 causes the first recovery devices 11, 12 to repeatedly perform the adsorption process and the desorption process.

[0025] When the first recovery vessel 11 is in the adsorption process, the valves Va1 and Va3 are open, and the valve Va5 is closed. In this state, the carbon dioxide contained in the mixed gas supplied from the combustion furnace CF to the first recovery vessel 11 is adsorbed by the first adsorbent 11C. The remaining components of the mixed gas that are not adsorbed are released to the outside from the exhaust passage CE11.

[0026] When the first recovery vessel 11 is in the desorption process, the valves Va1 and Va3 are closed and the valve Va5 is open. In this state, the vacuum pump VP1 is operated to reduce the pressure inside the first recovery vessel 11, whereby the carbon dioxide adsorbed in the first adsorbent 11C is desorbed.

[0027] On the other hand, when the first recovery vessel 12 is in the adsorption process and desorption process, each process is carried out by opening and closing various valves of the first recovery vessel 12 corresponding to the various valves of the first recovery vessel 11 and reducing the pressure by vacuum pump VP1, similar to the first recovery vessel 11 in the adsorption process and desorption process described above.

[0028] FIG. 5 is an explanatory diagram showing switching between the adsorption step, the desorption step, and the cooling step in the second recovery devices 21-23. In the hydrocarbon production apparatus 1, the second recovery devices 21-23 are caused to perform an adsorption step of adsorbing carbon dioxide to the second adsorbents 21C-23C, a desorption step of desorbing carbon dioxide from the second adsorbents 21C-23C while supplying hydrogen as a purge gas into the inside of the second recovery devices 21-23 after the adsorption step, and a cooling step of cooling the second adsorbents 21C-23C after the desorption step. As shown in FIG. 5, the second recovery devices 21-23 repeat different steps in the order of cycle 1, cycle 2, and cycle 3. That is, the control unit 5 causes the second recovery devices 21-23 to repeatedly perform the adsorption step, the desorption step, and the cooling step. Among the second recovery devices 21-23, a room temperature heat medium is supplied to the second recovery devices in the adsorption process and the cooling process through a flow path (different from the heat medium flow path MF) not shown formed in each of the second recovery devices 21-23. On the other hand, among the second recovery devices 21-23, heat is supplied from the heat medium through the heat medium flow path MF to the second recovery devices in the desorption process.

[0029] When the second recovery device 21 is in the adsorption process, the valves Vb1 and Vb4 are open, and the valves Vb7 and Vb10 are closed. In this state, the carbon dioxide contained in the mixed gas supplied from the combustion furnace CF to the second recovery device 21 is adsorbed by the second adsorbent 21C. The remaining components of the mixed gas that are not adsorbed are discharged to the outside from the exhaust flow path CE21. During the adsorption process, a room temperature heat medium is supplied to the second recovery device 21 through a flow path (different from the heat medium flow path MF) not shown in the figure formed in the second recovery device 21 to cool the second adsorbent 21C. During the adsorption process, the flow path through which the heat medium flows is switched to the second flow path MF2 by switching the flow path switching valves TV1 to TV4.

[0030] When the second recovery device 21 is in the desorption process, the valves Vb1 and Vb4 are closed, and the valves Vb7 and Vb10 are open. In this state, hydrogen supplied to the second recovery device 21 from the hydrogen supply source HR desorbs the carbon dioxide adsorbed in the second adsorbent 21C as a purge gas. The desorbed carbon dioxide is sent to the supply gas flow path SS1 as a second supply gas together with hydrogen. During the desorption process, the vacuum pump VP2 is operated to reduce the pressure inside the second recovery device 21, and the flow path through which the heat medium flows is switched to the first flow path MF1 by switching the flow path switching valves TV1 to TV4. At this time, heat is supplied to the second adsorbent 21C accommodated in the second recovery device 21 from the heat medium flowing through the first flow path MF1 by the circulation pump CP.

[0031] When the second recovery device 21 is in the cooling process, at least the valves Vb1 and Vb7 are in a closed state. During the cooling process, the flow path through which the heat medium flows is switched from the first flow path MF1 to the third flow path MF3 by switching the flow path switching valves TV1 to TV4. During the cooling process, the heat medium at room temperature is supplied to the second recovery device 21 through a flow path (not shown in the figure, which is a flow path different from the heat medium flow path MF) formed in the second recovery device 21 to cool the second adsorbent 21C.

[0032] When the second recovery vessels 22, 23 are performing the adsorption process, desorption process, and cooling process, respectively, each process is carried out by opening, closing, and switching the various valves of the second recovery vessels 22, 23 corresponding to the various valves of the second recovery vessel 21, similar to the second recovery vessel 21 when it is performing the adsorption process, desorption process, and cooling process described above.

[0033] As described above, since no purge gas is used for desorption of carbon dioxide from the first adsorbents 11C and 12C, the first supply gas supplied from the first recovery vessels 11 and 12 to the reactor 50 contains only carbon dioxide. Therefore, the carbon dioxide concentration in the first supply gas is constant (the first supply gas is pure carbon dioxide gas). On the other hand, as described above, since a purge gas is used for desorption of carbon dioxide from the second adsorbents 21C to 23C, the second supply gas supplied from the second recovery vessels 21 to 23 to the reactor 50 contains carbon dioxide and hydrogen. Therefore, the carbon dioxide concentration in the second supply gas varies depending on the amount of carbon dioxide desorbed in the desorption step. The amount of carbon dioxide desorbed varies depending on the temperature in the second recovery vessels 21 to 23 during the desorption step and the amount of carbon dioxide adsorbed in the second adsorbents 21C to 23C immediately before each desorption step. The control unit 5 controls the supply of the first supply gas to the reactor 50 and the supply of the second supply gas to the reactor 50 by controlling the opening and closing of various valves and the vacuum pumps VP1 and VP2.

[0034] FIG. 6 is an explanatory diagram showing the fluctuation of the carbon dioxide concentration in the second supply gas sent out from the second recovery device 21. The vertical axis of FIG. 6 indicates the carbon dioxide concentration in the second supply gas. The horizontal axis of FIG. 6 indicates time. FIG. 6 shows the fluctuation of the carbon dioxide concentration in the second supply gas during the desorption process when one cycle (see FIG. 5) of the desorption process is executed. The timing t0 is a timing after a long time has elapsed since the last synthesis reaction of hydrocarbons was performed in the reactor 50. At the timing t0, the reactor 50 (and the catalyst accommodated in the reactor 50) is in a relatively low temperature state. At the timing t0, the second adsorbent 21C is also in a relatively low temperature state. This is because a long time has elapsed since the second adsorbent 21C was last supplied with heat from the heat medium via the heat medium flow path MF. An example of such a timing t0 is the timing when the production of hydrocarbons by the hydrocarbon production apparatus 1 is started for the first time on that day. Since carbon dioxide is difficult to desorb from the second adsorbent 21C, which has a relatively low temperature, the carbon dioxide concentration in the second supply gas when the desorption process is performed from timing t0 tends to be lower than the carbon dioxide concentration in the second supply gas when the desorption process is performed thereafter. In addition, the carbon dioxide concentration in the second supply gas is also affected by the amount of carbon dioxide adsorbed to the second adsorbent 21C at the start of the desorption process, so the fluctuations for each desorption process are also complex. In order to mitigate such fluctuations, a surge tank 30 capable of temporarily storing the second supply gas is provided downstream of the second recovery vessel 21.

[0035] FIG. 7 is an explanatory diagram showing the fluctuation of the gas ratio (H2 / CO2 ratio) in the second supply gas sent out from the surge tank 30. The vertical axis of FIG. 7 shows the gas ratio in the second supply gas. The horizontal axis of FIG. 7 shows time. FIG. 7 shows the fluctuation of the gas ratio in the second supply gas flowing through a position (see FIG. 3) between the position of the supply gas flow passage SS2 to which the supply gas flow passage SS1 is connected and the surge tank 30. This gas ratio is detected by a gas sensor arranged at the same position. The timing t0 in FIG. 7 is the same as the timing t0 in FIG. 6. In addition, the target value TV shown in FIG. 7 is a value of the gas ratio suitable for the synthesis reaction in the reactor 50, and the control upper limit value UL is a control upper limit value of hydrogen addition by the hydrogen addition unit 40, and is a value beyond which it is considered that it is impossible to adjust the gas ratio in the second supply gas to the target value TV. The control upper limit value UL is set based on the length of the delay time from when the gas sensor detects the gas composition of the second supply gas until it actually outputs it, and the accuracy of adjustment of hydrogen addition by the hydrogen addition unit 40.

[0036] Since the carbon dioxide concentration in the second supply gas when the desorption process is performed from timing t0 tends to be low (see FIG. 6), the gas ratio in the second supply gas delivered from the surge tank 30 continues to rise immediately after timing t0. At this time, as timing t1 approaches, the gas ratio in the second supply gas approaches the control upper limit value UL, and the length of the adjustment width AD (shown in FIG. 7) by the hydrogen addition unit 40 becomes shorter, making it difficult to adjust the hydrogen addition by the hydrogen addition unit 40. In this way, the carbon dioxide concentration in the second supply gas when the desorption process is performed from timing t0 tends to be low, and adjustment of the gas ratio in the second supply gas is difficult.

[0037] As described above, at time t0, the reactor 50 (and the catalyst accommodated in the reactor 50) are also in a relatively low temperature state, and therefore the activity of the catalyst immediately after time t0 is unstable. When the catalyst is in such a state, sufficient heat cannot be supplied from the heat medium to the second adsorbents 21C-23C via the heat medium flow path MF, and therefore it is difficult to desorb carbon dioxide from the second adsorbents 21C-23C. Furthermore, when the second supply gas used when the desorption process is performed from time t0 is supplied to the catalyst in the same state, the carbon dioxide concentration in the second supply gas tends to be low, and it is difficult to adjust the gas ratio in the second supply gas, which may result in a decrease in the purity of the synthesized hydrocarbons and deactivation of the catalytic reaction.

[0038] To address the above-mentioned problem, a method of further mitigating the fluctuation of the carbon dioxide concentration in the second feed gas by increasing the capacity of the surge tank 30 can be considered. However, in such a case, costs increase due to the increase in size of the hydrocarbon production apparatus 1 and the increase in the capacity of the surge tank 30. Another method is to discard the second feed gas when the desorption process is performed from the timing t0, without supplying it to the reactor 50, outside the hydrocarbon production apparatus 1. However, discarding the second feed gas is not preferable because it reduces the yield when hydrocarbons are synthesized using the mixed gas discharged from the combustion furnace CF.

[0039] For this reason, in the hydrocarbon production apparatus 1, the control unit 5 supplies the first supply gas to the reactor 50 before supplying the second supply gas to the reactor 50. Specifically, at the timing t0 described in FIGS. 6 and 7, the control unit 5 causes each of the first recovery units 11 and 12 to execute an adsorption process and a desorption process in a state in which at least the valves Vb10 to Vb12 are closed (see FIG. 3) to stop the supply of the second supply gas to the reactor 50, thereby supplying the first supply gas to the reactor 50. At this time, the first supply gas containing only carbon dioxide is more easily adjusted to a suitable gas ratio by the hydrogenation unit 40 with high accuracy than the second supply gas whose carbon dioxide concentration varies depending on the temperature in the second recovery units 21 to 23, so that even if the catalyst in the reactor 50 is in the warm-up process (relatively low temperature state), the catalyst can stably perform a synthesis reaction using the first supply gas that is accurately adjusted to approach a gas ratio suitable for the catalyst in such a state. As the synthesis reaction using the first supply gas continues, the temperature of the catalyst in the reactor 50 continues to rise by utilizing the heat generated during the synthesis reaction, and thereafter the synthesis reaction by the catalyst becomes stable.

[0040] Furthermore, when the control unit 5 determines that the synthesis reaction by the catalyst is stable, it stops the supply of the first supply gas to the reactor 50 and starts the supply of the second supply gas to the reactor 50. Specifically, the control unit 5 determines that the synthesis reaction by the catalyst is stable when the temperature of the catalyst is included within a reference temperature range within a unit time of a preset length. The control unit 5 may also determine that the synthesis reaction by the catalyst is stable when the concentration of hydrocarbons, the concentration of unreacted hydrogen, and the concentration of unreacted carbon dioxide contained in the gas flowing from the reactor 50 to the methane tank 60 are each included within a reference concentration range within the same unit time. When it is determined that the synthesis reaction by the catalyst is stable based on such criteria, the control unit 5 stops the supply of the first supply gas to the reactor 50 by closing at least the valves Va5 and Va6 (see FIG. 2), and starts the supply of the second supply gas to the reactor 50 by causing any one of the second recovery units 21 to 23 to perform an adsorption process. Thereafter, the control unit 5 causes each of the second recovery devices 21-23 to repeatedly execute the adsorption step, the desorption step, and the cooling step, thereby allowing the second supply gas to continue to be supplied to the reactor 50. Even if the gas ratio of the second supply gas cannot be accurately adjusted to a gas ratio suitable for the synthesis reaction when the second supply gas is supplied, the synthesis reaction by the catalyst is stable because the first supply gas has been supplied in advance (the catalyst has already been sufficiently warmed), so that the catalyst can be caused to execute a synthesis reaction using the second supply gas without deactivating the catalytic reaction. Compared to the first recovery devices 11 and 12, the second recovery devices 21-23 use heating by the heat medium flowing through the heat medium flow path MF and purging by hydrogen during the desorption step, and therefore have a higher energy efficiency required for desorbing carbon dioxide than the first recovery devices 11 and 12. For this reason, it is preferable to synthesize hydrocarbons using the second supply gas from the viewpoint of energy efficiency.

[0041] 8 is a flowchart showing an example of the procedure of the supply gas control process. The supply gas control process is a process for switching the first supply gas supplied to the reactor 50 to the second supply gas in response to the stabilization of the synthesis reaction by the catalyst. The supply gas control process is executed when the control unit 5 receives an instruction from an operator to start the production of hydrocarbons.

[0042] When the supply gas control process is started, the control unit 5 first starts the supply of the first supply gas to the reactor 50 (step S10). At this time, the control unit 5 is in a state where the supply of the second supply gas to the reactor 50 is stopped by stopping the supply of the second supply gas to the reactor 50 by closing at least the valves Vb10 to Vb12 (see FIG. 3), and by causing one of the first recovery units 11 and 12 to execute an adsorption process, thereby starting the supply of the first supply gas to the reactor 50. Thereafter, the control unit 5 continues the supply of the first supply gas to the reactor 50 by repeatedly causing each of the first recovery units 11 and 12 to execute an adsorption process and a desorption process until a positive determination is made in the process of step S20 described next (see FIG. 4).

[0043] While supplying the first supply gas to the reactor 50, the control unit 5 judges whether or not the synthesis reaction caused by the catalyst contained in the reactor 50 is stable (step S20). When it is judged that the synthesis reaction is not stable (step S20: NO), the control unit 5 performs the process of step S20 again. On the other hand, when it is judged that the synthesis reaction is stable (step S20: YES), the control unit 5 stops the supply of the first supply gas to the reactor 50 and starts the supply of the second supply gas to the reactor 50 (step S30). Specifically, the control unit 5 stops the supply of the first supply gas to the reactor 50 by closing at least the valves Va5 and Va6 (see FIG. 2), and starts the supply of the second supply gas to the reactor 50 by causing any one of the second recovery units 21 to 23 to perform an adsorption process. Thereafter, the control unit 5 causes each of the second recovery units 21-23 to repeatedly execute the adsorption step, the desorption step, and the cooling step, thereby continuing the supply of the second supply gas to the reactor 50 (see FIG. 5). Thereafter, the control unit 5 ends the supply gas control process.

[0044] According to the hydrocarbon production apparatus 1 of the embodiment described above, since the purge gas is not used for desorption of carbon dioxide from the first adsorbents 11C and 12C, the first supply gas supplied from the first recovery vessels 11 and 12 to the reactor 50 contains only carbon dioxide. On the other hand, since the purge gas is used for desorption of carbon dioxide from the second adsorbents 21C to 23C, the second supply gas supplied from the second recovery vessels 21 to 23 to the reactor 50 contains carbon dioxide and hydrogen. Of the first and second supply gases, the first supply gas, which has a constant carbon dioxide concentration, can be adjusted to a suitable gas ratio by the hydrogenation unit 40 more accurately than the second supply gas, which has a carbon dioxide concentration that varies depending on the temperature in the second recovery vessels 21 to 23. Therefore, according to the hydrocarbon production apparatus 1, since the first supply gas is supplied to the reactor 50 before the second supply gas, even if the catalyst in the reactor 50 is in the warm-up process, the catalyst can stably perform a synthesis reaction using the first supply gas, whose gas ratio has been accurately adjusted to approach a suitable gas ratio. Moreover, when the first supply gas is supplied in this manner, high-purity hydrocarbons can be synthesized in the catalyst. That is, according to the hydrocarbon production apparatus 1, it is possible to improve the purity of the produced hydrocarbons while suppressing deactivation of the catalytic reaction.

[0045] In addition, in the hydrocarbon production apparatus 1, when the control unit 5 determines that the synthesis reaction by the catalyst is stable, it stops the supply of the first supply gas to the reactor 50 and starts the supply of the second supply gas to the reactor 50. Therefore, the second supply gas is supplied to the reactor 50 after it is determined that the synthesis reaction by the catalyst is stable. When the synthesis reaction by the catalyst is stable, it can be considered that the catalyst is sufficiently warmed. Therefore, even if the gas ratio of the second supply gas cannot be accurately adjusted to a gas ratio suitable for the synthesis reaction when the second supply gas is supplied to the reactor 50, the catalyst is already sufficiently warmed, so that the synthesis reaction using the second supply gas can be performed on the catalyst without deactivating the catalytic reaction.

[0046] <Modifications of this embodiment> The present invention is not limited to the above-described embodiment, and can be embodied in various forms without departing from the spirit and scope of the invention. For example, the following modifications are also possible.

[0047] In the above embodiment, the hydrocarbon production apparatus 1 is an apparatus for producing methane, but is not limited thereto. For example, the hydrocarbon production apparatus may be an apparatus for producing methanol or ethanol, which are hydrocarbons other than methane.

[0048] In the above embodiment, a dehydrator may be provided in the pipes forming the mixed gas flow passage CS1 and the branch flow passage CS2. In this case, the mixed gas discharged from the combustion furnace CF may be dehumidified by the dehydrator while flowing through the mixed gas flow passage CS1 and the branch flow passage CS2, and then may be supplied to the first recovery vessels 11, 12 and the second recovery vessels 21-23.

[0049] In the above embodiment, the hydrogen supply source HR is a hydrogen tank, but is not limited to this. For example, the hydrogen supply source HR may be a water electrolysis device.

[0050] In the above embodiment, the hydrogen addition section 40 is arranged so as to be able to add hydrogen to the first supply gas or the second supply gas flowing between the surge tank 30 and the reactor 50, but this is not limited thereto. For example, in the case of a hydrocarbon production apparatus in which a plurality of reactors 50 are connected in series between the surge tank 30 and the methane tank 60, the hydrogen addition section 40 may be arranged in each of the pipes connecting the reactors 50 to each other.

[0051] In the above embodiment, the second recovery devices 21-23 are heated by the heat medium flowing through the heat medium flow path MF, but this is not limited thereto. For example, the second recovery devices 21-23 may be provided with an electric heater for heating the inside of the second recovery devices 21-23 in addition to the heat medium flow path MF or instead of the heat medium flow path MF, and may be heated by the electric heater. In addition, in the desorption process performed on the second recovery devices 21-23, only one of heating by the heat medium flow path MF or the electric heater and reducing the internal pressure of the second recovery devices 21-23 by the vacuum pump VP2 may be performed.

[0052] In the above embodiment, the first recovery vessels 11, 12 are depressurized by the vacuum pump VP1 in the desorption process performed on the first recovery vessels 11, 12, but this is not limited to the above. For example, the first recovery vessels 11, 12 may include a heat medium flow path similar to the heat medium flow path MF in the second recovery vessels 21-23 and the above-mentioned electric heater, and in the desorption process, in addition to or instead of depressurization by the vacuum pump VP1, heating by the heat medium flow path or the electric heater may be performed. Even in such a case, since no purge gas is used for desorption of carbon dioxide from the first adsorbents 11C, 12C, the first supply gas supplied from the first recovery vessels 11, 12 to the reactor 50 contains only carbon dioxide.

[0053] In the above embodiment, the vacuum pump VP1 is provided downstream of the valves Va5 and Va6 in the piping forming the supply gas flow passage SS1, but this is not limited thereto. For example, a compressor, a surge tank, and a flow meter (mass flow controller) may be provided, in this order from the upstream side, between the position where the supply gas flow passage SS1 is connected to the supply gas flow passage SS2 and the vacuum pump VP1. That is, in this embodiment, the first supply gas passes through the vacuum pump VP1, the compressor, the surge tank, and the flow meter, in this order from the upstream side, and then heads toward the reactor 50. In addition, in the above embodiment, the vacuum pump VP2 and the surge tank 30 are provided downstream of the valves Vb10 to Vb12 in the piping forming the supply gas flow passage SS2, but this is not limited thereto. For example, a compressor may be provided between the vacuum pump VP2 and the surge tank 30, and a flow meter may be provided between the position where the supply gas flow passage SS1 is connected to the supply gas flow passage SS2 and the surge tank 30.

[0054] Although the present aspect has been described above based on the embodiment and modified examples, the above-mentioned embodiment of the aspect is intended to facilitate understanding of the present aspect and does not limit the present aspect. The present aspect may be modified or improved without departing from the spirit and scope of the claims, and equivalents are included in the present aspect. Furthermore, if a technical feature is not described as essential in this specification, it may be deleted as appropriate. [Explanation of symbols]

[0055] 1...Hydrocarbon production equipment 5. Control section 11,12…First collector 11C,12C…1st adsorbent 21, 22, 23…Second collector 21C, 22C, 23C…Second adsorbent 30…Surge tank 40…Hydrogenation section 50…Reactor 60…Methane tank CE11, CE12...Discharge flow path CE21, CE22, CE23...Discharge flow path CF: Combustion furnace CP: Circulation pump CS1: Mixed gas flow path CS2: Branch channel HR: Hydrogen source HS: Hydrogen flow path MF: Heat transfer medium flow path MF1: ​​First flow path MF2: Second flow path MF3: Third flow path SS1: Supply gas flow path SS2: Supply gas flow path TV1, TV2, TV3, TV4...Flow path switching valve VP1…Vacuum pump VP2…Vacuum pump Va1~Va6…Valve Vb1~Vb12...Valves

Claims

1. 1. A hydrocarbon production apparatus, comprising: a first recovery vessel connected to a supply source of a mixed gas containing carbon dioxide, housing a first adsorbent that adsorbs carbon dioxide contained in the mixed gas, and not using a purge gas to desorb carbon dioxide from the first adsorbent; a second recovery vessel connected in parallel to the first recovery vessel with respect to the supply source, containing a second adsorbent that adsorbs carbon dioxide contained in the mixed gas, and using a purge gas to desorb carbon dioxide from the second adsorbent; a reactor connected to the first recovery vessel and the second recovery vessel and containing a catalyst for promoting a synthesis reaction of hydrocarbons using the first feed gas supplied from the first recovery vessel or the second feed gas supplied from the second recovery vessel; a hydrogen addition unit capable of adding hydrogen to the first supply gas and the second supply gas; a control unit that controls the supply of the first supply gas to the reactor and the supply of the second supply gas to the reactor, The control unit controls the supply of the first supply gas to the reactor before the supply of the second supply gas to the reactor.

2. The hydrocarbon production apparatus according to claim 1, When the control unit determines that the synthesis reaction by the catalyst is stable, it stops the supply of the first supply gas to the reactor and starts the supply of the second supply gas to the reactor.

Citation Information

Patent Citations

  • Methane production apparatus and methane production method

    JP2019142806A