Portable battery rental device
The portable battery lending device addresses demand fluctuations by integrating green power sources and weather-based forecasting to manage battery supply and delivery, preventing shortages through adaptive charging and scheduling.
Patent Information
- Application Number
- JP2023063470
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-10
- Publication Date
- 2024-10-23
AI Technical Summary
Existing battery lending systems face fluctuations in demand due to weather conditions, leading to potential shortages of lendable batteries before scheduled delivery times.
A portable battery lending device that includes a charging unit using green power sources with fluctuating power generation, a communication unit for weather-based demand forecasting, and a delivery management system to ensure timely replenishment of batteries.
The system effectively prevents battery shortages by adjusting delivery schedules and charging plans based on weather forecasts, ensuring a consistent supply of lendable batteries.
Smart Images

Figure 2024150187000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a portable battery lending device. [Background technology]
[0002] Patent Document 1 discloses that a charging station includes a power storage device, and selectively switches between charging a battery and charging the power storage device depending on the weather forecast. In Patent Document 1, the expected value of the batteries to be lent is calculated, and the number of batteries to be charged is determined based on the expected value. In Patent Document 1, the expected value of the batteries to be lent is calculated taking into account a weather forecast. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent No. 7030994 Summary of the Invention [Problem to be solved by the invention]
[0004] The present inventor has devised a system in which, while charging the battery in the rental device as described above, a delivery person periodically visits the rental device, collects used batteries from the rental device, and replenishes the rental device with charged batteries. In such a system, a demand forecast may fluctuate depending on future weather conditions, and a situation may arise in which the delivery person runs out of batteries available for rental earlier than the delivery time scheduled by the delivery person. Therefore, the present invention provides a rental device in which a delivery person collects used batteries from the rental device and replenishes the rental device with charged batteries, and in which there is little risk of a shortage of rental batteries. [Means for solving the problem]
[0005] According to one aspect of the present disclosure, a portable battery rental device includes: A portable battery rental device that allows a user to rent a charged battery and return a used battery, and allows a delivery person to collect the used battery and deliver the charged battery, a charging unit capable of charging the battery with a power source including a green power source whose power generation amount varies depending on the natural environment; A communication unit capable of communicating with a delivery management device of a delivery company, The communication unit transmits request information regarding the next delivery time to the delivery management device based on a weather forecast. Effect of the Invention
[0006] According to the present disclosure, a rental device is provided in which a delivery person collects used batteries from the rental device and replenishes the rental device with charged batteries, and in which there is little risk of a shortage of rental batteries. [Brief description of the drawings]
[0007] [Figure 1] FIG. 1 is a diagram showing an overview of a service in which a rental device is used. [Diagram 2] FIG. 13 is a diagram showing information exchange in a service in which a rental device is used. [Diagram 3] FIG. 2 is a block diagram of a rental device. [Figure 4] 13 is a diagram showing an example of an inventory prediction database used when the rental device creates request information regarding delivery. FIG. [Diagram 5] FIG. 11 is a diagram showing an example of a charging ratio of a power storage device and a battery based on a weather forecast. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0008] The present disclosure relates to a portable battery rental device 10. A portable battery is a battery that can be carried by a user. A portable battery is a battery used in a means of transportation such as a vehicle mounted on an electric motorcycle, an electric four-wheeled vehicle, an electric bicycle, an electric kick scooter, etc.
[0009] FIG. 1 is a diagram showing an overview of a service in which a rental device 10 is used. As shown in FIG. 1, the rental device 10 rents out a charged battery to a user and has the user return the used battery. The rental device 10 of the present disclosure charges the returned battery with power supplied from a commercial power source 2. The rental device 10 can also charge the returned battery with power supplied from a solar power generation facility 4. In the service of the present disclosure, a delivery person collects the used battery returned to the rental device 10 and delivers a new charged battery. The charging factory 3 picks up the used battery from the delivery person and charges the battery. The charged battery is delivered to the rental device 10 by the delivery person. The rental device 10 can also use a weather forecast obtained from a weather forecast providing service when creating a schedule for delivering the battery.
[0010] For convenience of drawing, a single rental device 10 is illustrated in Fig. 1, but in reality, multiple rental devices 10 are provided, and each rental device 10 rents out a battery to a user, and each rental device 10 receives and delivers batteries from a delivery person. Also, while Fig. 1 shows an example in which the solar power generation equipment 4 is provided outside the rental device 10, the rental device 10 may be configured to have the solar power generation equipment 4. Furthermore, power sources other than the commercial power source 2 include green power sources whose power generation amount fluctuates depending on the natural environment, and specifically include, in addition to solar power generation equipment, geothermal power generation equipment, biomass power generation equipment, wind power generation equipment, and the like.
[0011] 2 is a diagram showing information exchange in a service in which the rental device 10 is used. As shown in FIG. 2, the rental device 10 transmits a delivery request to the delivery management device 50 and receives a delivery schedule from the delivery management device 50. The delivery management device 50 transmits a transportation schedule to a deliverer. The deliverer may be configured to transmit the current location of the deliverer to the delivery management device 50.
[0012] The rental device 10 transmits inventory information to the reservation management device 70 and receives reservation information from the reservation management device 70. The reservation management device 70 accepts reservation requests from user terminals 40 (such as mobile phones, smartphones, tablet terminals, and PCs) and transmits reservation information to the rental device 10. In response to the reservation request, the reservation management device 70 transmits a reservation receipt notification to the user terminal 40.
[0013] The rental device 10 receives a weather forecast from the weather forecast providing device 80. The rental device 10 generates a delivery request based on the received weather forecast and transmits it to the delivery management device 50. The delivery management device 50 and the reservation management device 70 may be configured as an integrated management device, or may be separately prepared management devices. The rental device 10, the charging factory 3, the deliverer, and the reservation management device 70 may all be operated by the same business operator, or each may be operated by a different business operator.
[0014] Fig. 3 is a block diagram of the rental device 10. As shown in Fig. 3, the rental device 10 has a rack unit 11 that houses a battery, a charging unit 12 that charges the battery, a reading unit 13 that reads identification information capable of identifying a user from a user terminal 40, a recording unit 14 that records various databases, and a control unit 20 that controls the operation of each unit. The rental device 10 also has a power storage device 15 that can be charged with power.
[0015] The control unit 20 has an inventory management unit 21, a charging control unit 22, and a communication unit 23. The inventory management unit 21 grasps the inventory status of batteries in the rental device 10. The charging control unit 22 controls the operation of the charging unit 12, such as which battery should be charged and when, and what the ratio of the amount of power supplied to the battery and the power storage device 15 should be. The communication unit 23 communicates with the delivery management device 50 and the reservation management device 70.
[0016] The power storage device 15 has a storage battery that can be charged by a power source (commercial power source 2, solar power generation facility 4, etc.). The power storage device 15 may be charged via the charging unit 12 like a battery, or via a charger (not shown). The power charged in the power storage device 15 can also be charged into a battery via the charging unit 12 or the charger. The rack unit 11 may also be provided with a locking unit that prevents the battery from being stolen, and an unlocking unit that unlocks the battery only when it is lent out.
[0017] Fig. 4 is a diagram showing an example of an inventory prediction database operated when the rental device 10 creates request information related to delivery. As shown in Fig. 4, the rental device 10 records in the inventory prediction database a weather forecast predicted at each time and battery information of the rental device 10 in association with each other. In the inventory prediction database, battery information of the rental device 10, such as predicted charging capacity, number of batteries available for rental, number of batteries to be delivered, and predicted number of batteries in demand, are recorded. It is assumed that the current time in this example is 8:00, and the inventory prediction database shown in Fig. 4 is prediction data as of 8:00.
[0018] The weather forecast is weather prediction information transmitted from the weather forecast providing device 80, and for example, hourly predicted weather is transmitted. The weather forecast includes prediction information such as sunny, cloudy, rainy, etc.
[0019] The charging capacity prediction is a predicted value of the capacity with which the charging unit 12 can charge one battery per hour. The charging capacity of the charging unit 12 is determined according to the contract between the rental device 10 and the power company. Alternatively, when the rental device 10 is connected to a power source whose power generation capacity changes with time, such as a solar power generation facility, the charging capacity of the charging unit 12 may change with time, weather, and the like.
[0020] In this example, the charging unit 12 charges the battery using the commercial power source 2 and the solar power generation equipment 4. The charging unit 12 is also capable of charging one battery using the commercial power source 2 such that the charging rate increases by 5% per hour. The charging unit 12 is also capable of charging one battery using the solar power generation equipment 4 such that the charging rate increases by 5% per hour in sunny weather, by 3% in cloudy weather, and by 1% in rainy weather. The charging unit 12 is also capable of charging one battery such that the charging rate increases by 5% per hour in sunny weather, by 3% in cloudy weather, and by 1% in rainy weather. At night when the sun has set (after 5 p.m. in this example), the charging unit 12 has a 0% capacity to increase the charging rate of the battery using the solar power generation equipment 4 regardless of the weather.
[0021] 4, for example, at 8:00 a.m., the weather forecast is cloudy, so the predicted charging capacity is 8%, which is the sum of 5% from the commercial power source 2 and 3% from the solar power generation equipment 4. At 9:00 a.m., the weather forecast is sunny, so the predicted charging capacity is 10%, which is the sum of 5% from the commercial power source 2 and 5% from the solar power generation equipment 4. At 12:00 p.m., the weather forecast is rain, so the predicted charging capacity is 6%, which is the sum of 5% from the commercial power source 2 and 1% from the solar power generation equipment 4. At 17:00 to 0:00 a.m., it is night, so regardless of the weather forecast, the predicted charging capacity is 5%, which is the sum of 5% from the commercial power source 2 and 0% from the solar power generation equipment 4.
[0022] The number of batteries available for lending is the number of batteries (inventory) that can be lent to a user at that time. In this example, batteries with a charge rate of 90% or more are lent to users. At the current time of 8:00, the inventory of batteries available for lending in this lending device 10 is three.
[0023] The number of batteries that can be lent out through charging refers to the number of batteries that can be charged to a charging rate of 90% or more that can be lent out based on the charging schedule of the charging control unit 22. This number is related to a weather forecast and can change depending on the predicted value of the charging capacity of the charging unit 12. In this example, the charging control unit 22 creates a charging schedule such that the charging unit 12 starts charging the batteries accommodated in the rack unit 11 in descending order of charging rate. In addition, the charging control unit 22 creates a charging schedule based on, for example, a weather forecast, future demand forecast information based on the lending history to users, and a delivery schedule. The number of batteries that can be lent out through charging at the current time 8:00 is one.
[0024] The number of batteries to be delivered is the number of newly charged batteries to be delivered by the deliverer to the rental device 10. In this example, the current delivery time is 8:00, the next delivery time is scheduled for 13:00, and the delivery time after that is scheduled for 19:00. The number of batteries to be delivered in the current delivery is four, the number of batteries to be delivered in the next delivery is scheduled for five, and the number of batteries to be delivered in the delivery after that is scheduled for three.
[0025] The predicted number of batteries in demand is the predicted number of batteries to be rented (the predicted number of batteries in demand), and is the number predicted based on, for example, a weather forecast and future demand forecast information based on past rental history. The predicted number of batteries in demand at the current time 8:00 is 3.
[0026] Based on such battery information, the battery information at each time is calculated by the inventory management unit 21 as follows. For example, the number of batteries available for loan at 9:00 is calculated as 3+1+4-3=5 based on the number of batteries available for loan at 8:00 (3), the number of batteries that will become available for loan after charging (1), the number of batteries to be delivered (4), and the predicted number of batteries in demand (3). The number of batteries that will become available for loan after charging at 9:00 is calculated to be 2. As no batteries are scheduled to be delivered by the delivery company at 9:00, the number of batteries to be delivered at 9:00 is calculated to be 0. The predicted number of batteries in demand at 9:00 is calculated to be 5.
[0027] From these calculated numbers of batteries, the number of batteries available for loan in this rental device 10 at 9:00 is seven, which is the sum of the number of loanable batteries (five) and the number of batteries that can be loaned by charging (two). In contrast, the predicted number of batteries in demand in this rental device 10 at 9:00 is five, which is less than the number of batteries available for loan. Therefore, the inventory management unit 21 determines that there will be no shortage of batteries to loan between the current time of 8:00 and 9:00, and that there is no need to change the contents of the delivery request for the next delivery time.
[0028] Similarly, for example, the number of batteries available for loan at 13:00 is calculated as 1+2+0-1=2 based on the number of batteries available for loan at 12:00 (1), the number of batteries that will become available for loan after charging (2), the number of batteries to be delivered (0), and the predicted number of batteries in demand (1). The number of batteries that will become available for loan after charging at 13:00 is calculated to be 1. The next delivery of batteries from the deliverer is scheduled for 13:00, and the number of batteries to be delivered at 13:00 is calculated to be 5. The predicted number of batteries in demand at 13:00 is calculated to be 1.
[0029] From these calculated numbers of batteries, the number of batteries available for rental in this rental device 10 at 13:00 is eight, which is the sum of the two rental batteries, the one battery that will become available for rental through charging, and the five batteries to be delivered. In contrast, the predicted number of batteries in demand in this rental device 10 at 13:00 is one, which is less than the number of batteries available for rental. Therefore, the inventory management unit 21 determines that there will be no shortage of batteries to rent between the current time of 8:00 and 13:00, and that there is no need to change the content of the delivery request for the next delivery time.
[0030] Similarly, for example, the number of batteries available for loan at 18:00 is calculated as 6+1+0-4=3 based on the number of batteries available for loan at 17:00 (6), the number of batteries that will become available for loan after charging (1), the number of batteries to be delivered (0), and the predicted number of batteries in demand (4). The number of batteries that will become available for loan after charging at 18:00 is calculated to be 1. Furthermore, because no batteries are scheduled to be delivered by the delivery company at 18:00, the number of batteries to be delivered at 18:00 is calculated to be 0. The predicted number of batteries in demand at 18:00 is calculated to be 5.
[0031] From these calculated numbers of batteries, the number of batteries that can be lent out at this rental device 10 at 18:00 is four, which is the sum of the three rental batteries and the one battery that can be lent out after charging. In contrast, the predicted number of batteries in demand at 18:00 at this rental device 10 is five, which is more than the number of batteries that can be lent out. Therefore, at the 18:00 stage, the inventory management unit 21 determines that there is a shortage of batteries to lend, and therefore that it is necessary to change the content of the delivery request for the delivery time after next (19:00).
[0032] The number of batteries available for loan at 19:00 is calculated as 3+1+0-5=-1 based on the number of batteries available for loan at 18:00 (3), the number of batteries that will become available for loan after charging (1), the number of batteries to be delivered (0), and the predicted number of batteries in demand (5). This calculated negative number indicates that there will be a shortage of batteries available for loan between 18:00 and 19:00.
[0033] In this way, the inventory management unit 21 calculates the number of batteries available for lending at each time, the number of batteries that can be lent out after charging, and the predicted number of batteries in demand based on the weather forecast. As described above, the inventory management unit 21 determines that the predicted number of batteries in demand (5 batteries) exceeds the number of batteries available for lending (3+1=4 batteries) in calculating the number of batteries at 18:00. Therefore, the inventory management unit 21 determines that there will be a shortage of batteries available for lending between 18:00 and 19:00. Therefore, the inventory management unit 21 calculates, for example, 18:00 as the desired delivery time so that the batteries are delivered before 19:00, the time when there will be a shortage of batteries available for lending. The communication unit 23 transmits the calculated desired delivery time (18:00) to the delivery management device 50 of the deliverer as request information related to the delivery time after the next one.
[0034] In this example, the rental device 10 receives a delivery schedule related to the delivery time of the battery from the delivery management device 50. The rental device 10 also calculates the number of batteries that can be rented out after charging at each time based on a weather forecast using the inventory management unit 21. The inventory management unit 21 determines whether the number of batteries that can be rented out after charging is likely to be insufficient for the predicted number of batteries in demand. Based on this determination result, the inventory management unit 21 may then determine whether to make the delivery time earlier or later than the next delivery time. Based on the determination result of whether to make the delivery time earlier or later, the communication unit 23 may transmit correction request information requesting correction of the next delivery time to the delivery management device 50 as request information.
[0035] For example, when the weather is cloudy or rainy and the charging capacity of the power source (solar power generation facility 4) is low, the batteries cannot be charged, and the number of batteries available for rental is likely to be insufficient, revision request information requesting that the next delivery time in the delivery schedule be brought forward is transmitted to the delivery management device 50. Also, when the weather is sunny and the charging capacity of the power source (solar power generation facility 4) is high, and the batteries are likely to be fully charged, revision request information requesting that the next delivery time in the delivery schedule be postponed is transmitted to the delivery management device 50.
[0036] Furthermore, in this example, the rental device 10 may perform inventory management to change the delivery time depending on whether or not the interval between the most recent battery delivery receipt time and the next delivery time is equal to or longer than a predetermined time, with respect to the battery delivery schedule received from the delivery management device 50. The communication unit 23 may transmit correction request information requesting correction of the next delivery time to the delivery management device 50 as request information depending on whether or not the interval between the most recent battery delivery receipt time and the next delivery time is equal to or longer than a predetermined time.
[0037] 4, for example, there is a five-hour interval between the current delivery time of 8:00 and the next delivery time of 13:00. In contrast, there is a six-hour interval between the next delivery time of 13:00 and the delivery time after that of 19:00. Therefore, if the delivery interval for the battery in the delivery schedule is six hours or longer, modification request information is sent to the delivery management device 50 to shorten the delivery interval and bring forward the delivery time after that (19:00).
[0038] Furthermore, in this example, the rental device 10 calculates, based on the weather forecast, a predicted number of batteries in demand N1, which is the number of batteries to be rented out by the next delivery time, using the inventory management unit 21. Furthermore, the rental device 10 calculates, based on the weather forecast, the number of batteries N2 that will be available for rental through charging by the next delivery time. The inventory management unit 21 may perform inventory management to request delivery of a number of batteries equal to or greater than N1-N2. The communication unit 23 may transmit the number equal to or greater than N1-N2 to the delivery management device 50 as the desired number of batteries to be delivered.
[0039] For example, in the case shown in FIG. 4, the predicted number N1 of batteries to be rented from the current time 8:00 to the next delivery time 13:00 is 3+5+4+1+1=14 batteries, which is the sum of the predicted number of batteries to be rented from 8:00 to 12:00. The number N2 of batteries that can be rented by charging from the current time 8:00 to the next delivery time 13:00 is 1+2+3+1+2=9 batteries, which is the sum of the number of batteries that can be rented by charging from 8:00 to 12:00. Therefore, the communication unit 23 transmits the desired number of batteries to be delivered, N1-N2=14-9=5 or more, to the delivery management device 50. However, since there are three batteries available for rent at the current time 8:00 and four batteries to be delivered, the desired number of batteries to be delivered at the next delivery may be calculated including these numbers of batteries. In the inventory prediction database shown in FIG. 4, five batteries are stored as the number of batteries to be delivered at the next delivery time 13:00.
[0040] Also, in this example, the rental device 10 may calculate the delivery time of the battery based on the weather forecast for each time up to the next delivery time of 13:00 and the weather forecast for each time up to the delivery time after 19:00 by the inventory management unit 21. Similarly, the rental device 10 may calculate the number of batteries to be delivered based on the weather forecast for each time up to the next delivery time of 13:00 and the weather forecast for each time up to the delivery time after 19:00 by the inventory management unit 21. The communication unit 23 may transmit the correction request information and the desired number of batteries to be delivered calculated based on the weather forecast for the next delivery time and the delivery time after the next as request information to the delivery management device 50.
[0041] As described above, the portable battery rental device 10 according to this embodiment has the following features: A portable battery rental device 10 that allows a user to rent a charged battery and return a used battery, and allows a delivery person to collect the used battery and deliver the charged battery, a charging unit 12 capable of charging the battery with a power source including a green power source whose power generation amount varies depending on the natural environment; A communication unit 23 capable of communicating with a delivery management device 50 of a delivery company, The communication unit 23 transmits request information regarding the next delivery time to the delivery management device 50 based on the weather forecast.
[0042] According to the rental device 10 of this embodiment, the battery charging plan and the battery demand forecast may change depending on future weather. Therefore, the rental device 10 corrects the charging plan and the demand forecast based on the weather forecast, notifies the delivery management device 50 of request information regarding the shortage of batteries, and has the deliverer replenish the required number of charged batteries, so that a situation in which batteries available for rental to users are insufficient is unlikely to occur. In addition, since the deliverer delivers charged batteries, the rental device 10 itself does not need to charge a large number of batteries. Since the rental device 10 does not need a large charging device or a contract with a power company to receive a large amount of power, the rental device 10 can be installed at low cost. Therefore, the required number of batteries can be prepared while suppressing charging costs.
[0043] Moreover, according to the lending device 10 according to this embodiment, The communication unit 23 calculates a desired delivery time before the time when the rented battery will run short based on the weather forecast, and transmits the desired delivery time to the delivery management device 50 as request information regarding the next delivery time.
[0044] In the above-described embodiment, for example, the number of batteries calculated by adding the "number of batteries available for rental" at each time to the "number of batteries that can be rented out through charging" and the "predicted number of batteries in demand" at each time are calculated, and it is determined whether there will be a shortage of batteries available for rental by the next delivery time (19:00). Then, an example was described in which a desired delivery time for the next delivery is transmitted as request information at 18:00, a time before the shortage of batteries at 19:00. With this configuration, the desired delivery time calculated based on a weather forecast can be transmitted as request information, so that charged batteries can be delivered before there is a shortage of batteries to rent, making it less likely that a battery shortage will occur.
[0045] Moreover, according to the lending device 10 according to this embodiment, The communication unit 23 receives the next delivery time from the delivery management device 50, The communication unit 23 transmits request information for making the delivery time earlier or later than the next delivery time based on the weather forecast.
[0046] In the above-described embodiment, an example was described in which the "number of batteries that can be rented out by charging" calculated based on a weather forecast is compared with the "predicted number of batteries in demand" to determine whether or not the required number of batteries can be secured by charging. Then, an example was described in which correction request information is transmitted as request information to advance the delivery time in the delivery schedule when the weather is bad and the batteries cannot be fully charged, and to delay the delivery time in the delivery schedule when the weather is good and the batteries can be fully charged. With this configuration, correction request information for the delivery time calculated based on a weather forecast can be transmitted as request information, so that charged batteries can be delivered without causing a shortage of batteries to be rented out, making it difficult for a battery shortage to occur.
[0047] Moreover, according to the lending device 10 according to this embodiment, The communication unit 23 receives the next delivery time from the delivery management device 50, The communication unit 23 transmits to the delivery management device 50 request information according to whether or not the interval between the most recent delivery receipt time and the next delivery time is equal to or longer than a predetermined time.
[0048] In the above-described embodiment, for example, since the interval between the next delivery time 13:00 and the delivery time after that 19:00 is long at 6 hours, a correction request information for moving up the delivery time after that (19:00) in the delivery schedule is transmitted as request information. With this configuration, correction request information for correcting the next delivery time of the battery can be transmitted as request information based on the interval between delivery times, so that charged batteries can be delivered without causing a shortage of batteries to be lent, making it difficult for a battery shortage to occur.
[0049] Moreover, according to the lending device 10 according to this embodiment, The communication unit 23 receives the next delivery time from the delivery management device 50, The communication unit 23 predicts, based on a weather forecast, the number N1 of batteries to be lent out by the next delivery time, and the number N2 of batteries to be charged until they are available for lending by the next delivery time; The communication unit 23 transmits the number equal to or greater than N1-N2 to the delivery management device 50 as the desired number of items to be delivered.
[0050] In the above-described embodiment, for example, the predicted number of batteries in demand to be rented out by the next delivery time of 13:00, N1=14, and the number of batteries that can be rented out by charging, N2=9, are calculated, and a desired number of batteries to be delivered, N1-N2=5 or more, is transmitted. With this configuration, the desired number of batteries to be delivered calculated based on a weather forecast can be transmitted as request information, so that charged batteries can be delivered without a shortage of batteries to rent out, making it difficult for a battery shortage to occur.
[0051] Moreover, according to the lending device 10 according to this embodiment, The communication unit 23 receives the next delivery time from the delivery management device 50, The communication unit 23 receives a first weather forecast until the next delivery time and a second weather forecast after the next delivery time, The communication unit 23 transmits request information based on the first weather forecast and the second weather forecast.
[0052] According to this configuration, it is possible to transmit information on a desired revision of the delivery time based not only on the weather forecast up to the next delivery time of 13:00 but also on the weather forecast up to the delivery time after that of 19:00, so that the batteries can be delivered at a more appropriate time, making it less likely that a battery shortage will occur. Also, if a battery shortage is predicted at the delivery time after that of 19:00, it is possible to transmit the desired number of batteries to be delivered so that the number of batteries to make up for the shortage in the delivery after that is delivered at the next delivery (13:00), making it even less likely that a battery shortage will occur.
[0053] (Charging ratio between the power storage device 15 and the battery) The rental device 10 charges the storage device 15 and the battery using power from a power source (commercial power source 2, solar power generation equipment 4, etc.), and in that case, the ratio of the amount of power supplied to the storage device 15 and the amount of power supplied to the battery is changed based on weather forecast predictions.
[0054] Fig. 5 is a diagram showing an example of a charging ratio of the power storage device 15 and the battery based on a weather forecast. In this example, as shown in Fig. 5, the rental device 10 changes the charging ratio of the power storage device 15 and the battery based on the current weather, the weather from the next time onwards (tomorrow), the power storage rate of the power storage device 15, and a demand forecast until the next delivery.
[0055] For example, as shown in Situation No. (1), when the current weather and the weather after the next delivery time are good, the amount of power generated by the solar power generation facility 4 is high, and the amount of power generated by the entire power source is high, in a situation where the charging rate of the power storage device 15 is high and there is a high demand forecast until the next delivery, the power storage device 15 is not charged, and only the battery is charged, and the charging ratio of the power storage device 15 to the battery is set to 0:100. This is because if the weather continues to be good and the power storage device 15 is also charged, there is no need to charge the power storage device 15. Also, as shown in situation No. (2), when the weather is good and the amount of power generated by the power source is large, as in (1), the charge rate of the power storage device 15 is high, but in a situation where the demand forecast for the next delivery is low, the power storage device 15 is also charged, and the charging ratio of the power storage device 15 and the battery is set to 25:75. This is because, even if the weather continues to be good and the charge rate of the power storage device 15 is high, if the demand for the battery is predicted to be low, the power storage device 15 may be charged.
[0056] Also, as shown in situation No. (3), when the weather is good and the amount of power generated by the power source is large, as in (1), if the charging rate of the power storage device 15 is low and the demand forecast for the next delivery is high, the power storage device 15 is also charged and the charging ratio of the power storage device 15 and the battery is set to 25:75. This is because, even if the weather is good and the demand for the battery is forecast to be high in the future, it is better to charge the power storage device 15 when its charge is insufficient. Also, as shown in situation No. (4), when the weather is good and the amount of power generated by the power source is large, as in (1), if the charging rate of the power storage device 15 is low and the demand forecast for the next delivery is low, the charging of the power storage device 15 is increased and the charging ratio of the power storage device 15 to the battery is set to 62.5:37.5. This is because, if the weather is predicted to be good and the demand for the battery is low in the future, it is better to charge the insufficiently charged power storage device 15.
[0057] Also, as shown in situation No. (5), when the weather is good at present but the weather will worsen after the time of the next delivery, so that the amount of power generated by the power source will be reduced, and in a situation where the charging rate of the power storage device 15 is high and there is a high demand forecast until the time of the next delivery, the charging of the power storage device 15 is reduced and the charging ratio of the power storage device 15 and the battery is set to 25:75. This is because, when the weather is going to worsen in the future but the power storage device 15 is sufficiently charged, it is better to prioritize charging the battery. Also, as shown in situation No. (6), in the same way as in (5), when the weather worsens after the next delivery time and the amount of power generation decreases, the charge rate of the power storage device 15 is high, but in a situation where the demand forecast for the time of the next delivery is low, the charge to the power storage device 15 is increased and the charge ratio between the power storage device 15 and the battery is set to 50:50. This is because, when the weather is bad and the demand for the battery is predicted to be low even if the charge rate of the power storage device 15 is high, it is better to charge the power storage device 15.
[0058] Also, as shown in situation No. (7), similar to (5), when the weather worsens after the next delivery time and the amount of power generation decreases, in a situation where the charging rate of the power storage device 15 is low and the demand forecast for the next delivery time is high, the charging ratio of the power storage device 15 and the battery is set to 50:50 in order to charge the power storage device 15 and the battery. This is because, even if the weather is predicted to be bad and the demand for the battery is high in the future, it is better to charge the power storage device 15 now if the charge of the power storage device 15 is insufficient. Also, as shown in situation No. (8), in the same way as in (5), when the weather worsens after the next delivery time and the amount of power generation decreases, in a situation where the charging rate of the power storage device 15 is low and the demand forecast until the next delivery time is low, the charging of the power storage device 15 is further increased and the charging ratio of the power storage device 15 to the battery is set to 87.5:12.5. This is because, when the weather is forecast to worsen in the future and the demand for the battery is forecast to be low, it is better to prioritize charging the power storage device 15 when the charging of the power storage device 15 is insufficient.
[0059] Also, as shown in situation No. (9), when the current weather is bad but the weather will improve after the next delivery time and the amount of power generated by the power source will be high, the charging rate of the power storage device 15 is high, and there is a high demand forecast until the next delivery time, the power storage device 15 is not charged, and only the battery is charged, and the charging ratio of the power storage device 15 to the battery is set to 0:100. This is because, although the current weather is bad, if the weather will improve in the future and the power storage device 15 is also charged, there is no need to charge the power storage device 15. Also, as shown in situation No. (10), in the same way as in (9), when the weather improves after the next delivery time and the amount of power generation increases, the charge rate of the power storage device 15 is high, but in a situation where the demand forecast for the time of the next delivery is low, the power storage device 15 is also charged, and the charging ratio of the power storage device 15 and the battery is set to 25:75. This is because, when the weather improves in the future and the demand for the battery is predicted to be low even if the charge rate of the power storage device 15 is high, it is acceptable to charge the power storage device 15.
[0060] Also, as shown in situation No. (11), in the same way as in (9), when the weather improves after the next delivery time and the amount of power generation increases, if the charging rate of the power storage device 15 is low and the demand forecast for the next delivery time is high, the power storage device 15 is not charged and only the battery is charged, and the charging ratio of the power storage device 15 to the battery is set to 0:100. This is because, when the weather improves and the demand for the battery is forecast to be high even if the power storage device 15 is not charged, it is better to prioritize charging the battery. Also, as shown in situation No. (12), in the same way as in (9), when the weather improves after the next delivery time and the amount of power generation increases, if the charging rate of the power storage device 15 is low and the demand forecast for the next delivery time is low, the power storage device 15 is also charged and the charging ratio of the power storage device 15 and the battery is set to 37.5:62.5. This is because, if the weather is good in the future and the power storage device 15 is not charged, and the demand for the battery is predicted to be low, it is better to charge the power storage device 15 while charging the battery more now.
[0061] Also, as shown in situation No. (13), when the current weather and the weather after the next delivery time are both bad and the amount of power generation is low, the charging rate of the power storage device 15 is high, and the demand forecast for the next delivery time is high, the power storage device 15 is not charged, and only the battery is charged, and the charging ratio of the power storage device 15 and the battery is set to 0:100. This is because, even if the weather is bad in the future, as long as the power storage device 15 is charged, it is better to prioritize charging the battery when the demand for the battery is forecast to be high. Also, as shown in situation No. (14), when the weather is bad and the amount of power generation is low, similar to (13), the charge rate of the power storage device 15 is high, but in a situation where the demand forecast for the next delivery is low, the power storage device 15 is also charged, and the charging ratio of the power storage device 15 and the battery is set to 25:75. This is because, even if the weather is bad in the future and the charge rate of the power storage device 15 is high, when the demand for the battery is predicted to be low, the power storage device 15 may be charged.
[0062] Also, as shown in situation No. (15), when the weather is bad and the amount of power generation is low, as in (13), the charge rate of the power storage device 15 is low, but in a situation where the demand forecast for the next delivery is high, the power storage device 15 is not charged and only the battery is charged, and the charging ratio of the power storage device 15 and the battery is set to 0:100. This is because, when the weather is bad in the future and the demand for the battery is predicted to be high, even if the power storage device 15 is not charged, it is better to prioritize charging the battery. Also, as shown in situation No. (16), when the weather is bad and the amount of power generation is low, similar to (13), the charging rate of the power storage device 15 is low, and the demand forecast for the next delivery is low, the charging of the power storage device 15 is increased and the charging ratio of the power storage device 15 to the battery is set to 62.5:37.5. This is because, when the weather is bad in the future but the demand for the battery is forecast to be low, it is better to charge the insufficiently charged power storage device 15.
[0063] Note that, for example, when the power storage device 15 is provided with a plurality of storage batteries, the control of the ratio of charging current flowing to the power storage device 15 side, i.e., the control of the charging ratio to the power storage device 15 in charging the power storage device 15 and the battery, may be changed according to the number of batteries mounted in the power storage device 15. For example, when the power storage device 15 is provided with a plurality of storage batteries and the predicted demand for batteries until the next delivery is low, the ratio at which the power storage device 15 is charged may be increased as the number of storage batteries increases.
[0064] According to the lending device 10 of this embodiment, The rental device 10 includes: A power storage device 15 that can be charged by a power source; a charger that charges the battery with power from a power source and power from a power storage device 15, and also charges the power storage device 15 with power from the power source; The communication unit 23 transmits the request information taking into account the amount of stored power in the power storage device 15 as well.
[0065] For example, in the above-described embodiment, a desired delivery time for the next delivery time may be calculated based on the number of batteries required until the next delivery calculated based on the current weather (an example of a first weather forecast) and the next and subsequent weather (an example of a second weather forecast) and the charging rate of the power storage device 15, and transmitted as request information to the delivery management device 50. Similarly, correction request information for requesting a correction to the next delivery time or a desired delivery number for the next delivery may be calculated based on the number of batteries required until the next delivery calculated based on the current weather and the next and subsequent weather and the charging rate of the power storage device 15, and transmitted as request information to the delivery management device 50.
[0066] According to this configuration, the battery can be charged not only by the power source (commercial power source 2, solar power generation equipment) but also by the power storage device 15. For this reason, the rental device 10's battery charging plan and battery demand forecast may vary depending on future weather and the charging rate of the power storage device 15. The rental device 10 modifies the charging plan and demand forecast based on the weather forecast and the charging state of the power storage device 15, and transmits request information regarding the shortage of batteries to the delivery management device 50. This allows the rental device 10 to receive the required number of charged batteries from the deliverer, making it less likely that there will be a shortage of batteries available for rental to users.
[0067] Moreover, according to the lending device 10 according to this embodiment, The rental device 10 includes: A charging control unit 22 that controls the operation of the charger, The charging control unit 22 changes the ratio between the amount of power from the power source to be supplied to the power storage device 15 and the amount of power from the power source to be supplied to the battery, based on a weather forecast.
[0068] In the above-described embodiment, an example has been described in which the charging ratio between charging the power storage device 15 and charging the batteries is changed based on, for example, the current weather, the next weather (tomorrow) and thereafter, the charging rate of the power storage device 15, and the demand forecast until the next delivery. With this configuration, it is possible to increase the number of batteries that can be lent out through charging while increasing the charging rate of the power storage device 15. This makes it possible to prevent a situation in which there is a shortage of batteries available to be lent to users.
[0069] Although the embodiment of the present disclosure has been described above, it goes without saying that the technical scope of the present disclosure should not be interpreted as being limited by the description of the present embodiment. The present embodiment is merely an example, and it is understood by those skilled in the art that various modifications of the embodiment are possible within the scope of the invention described in the claims. The technical scope of the present disclosure should be determined based on the scope of the invention described in the claims and its equivalents. [Explanation of symbols]
[0070] 2 Commercial power supply 3. Charging Factory 4. Solar power generation facilities 10 Rental Equipment 11 Rack section 12 Live parts 13 Reading unit 14 Recording section 15 Energy storage device 20 Control section 21 Inventory Management Department 22 Charging control unit 23 Communications Department 40 User terminal 50 Delivery management device 70 Reservation Management Device 80 Weather forecast providing device
Claims
1. A portable battery rental device that allows a user to rent a charged battery and return a used battery, and allows a delivery person to collect the used battery and deliver the charged battery, a charging unit capable of charging the battery with a power source including a green power source whose power generation amount varies depending on the natural environment; A communication unit capable of communicating with a delivery management device of a delivery company, The communication unit transmits request information regarding the next delivery time to the delivery management device based on a weather forecast.
2. The communication unit receives a next delivery time from the delivery management device, The rental device according to claim 1 , wherein the communication unit transmits request information for making the delivery time earlier or later than the next delivery time based on a weather forecast.
3. The communication unit receives a next delivery time from the delivery management device, The rental device according to claim 1 , wherein the communication unit transmits to the delivery management device the request information according to whether or not an interval between a most recent delivery receipt time and the next delivery time is equal to or longer than a predetermined time.
4. The rental device of claim 1 , wherein the communication unit calculates a desired delivery time before the time when the rental battery will run short based on a weather forecast, and transmits the desired delivery time to the delivery management device as request information regarding the next delivery time.
5. The communication unit receives a next delivery time from the delivery management device, The communication unit receives a first weather forecast until the next delivery time and a second weather forecast after the next delivery time, The rental device according to claim 1 , wherein the communication unit transmits the request information based on the first weather forecast and the second weather forecast.
6. The communication unit receives a next delivery time from the delivery management device, The communication unit predicts, based on a weather forecast, a number N1 of batteries to be lent out by the next delivery time, and a number N2 of batteries to be charged until they are available for lending by the next delivery time; The rental device according to claim 1 , wherein the communication unit transmits a number equal to or greater than N1-N2 as the desired number of items to be delivered to the delivery management device.
7. The rental device includes: a power storage device that can be charged by the power source; a charger that charges a battery with the power of the power source and the power of the power storage device, and also charges the power storage device with the power of the power source, The rental device according to claim 1 , wherein the communication unit transmits the request information taking into account an amount of stored power in the power storage device.
8. The rental device includes: A charge control unit that controls an operation of the charger, The rental device according to claim 7 , wherein the charging control unit changes a ratio of an amount of power from the power source to be supplied to the power storage device and an amount of power from the power source to be supplied to the battery, based on a weather forecast.
Citation Information
Patent Citations
Battery delivery system and battery delivery method
JP2022026887A
Information processing device
JP2023001490A
Battery distribution system, and battery distribution method
JP2023026119A
Charging system, charging device, charging method, and program
JP7030994B2
