Construction method of superstructure on water, and structure of superstructure

The method of using precast blocks with through holes and insertion members simplifies the construction of superstructures on water by stabilizing them on piles and absorbing positioning errors, enhancing efficiency and reducing water-based work complexity.

JP2024150200AActive Publication Date: 2024-10-23TOA KENSETSU KK
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2023063494
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-10
Publication Date
2024-10-23
Estimated Expiration
2043-04-10

AI Technical Summary

Technical Problem

Existing methods for constructing superstructures on water, such as piers supported by underwater piles, are inefficient due to complicated work on the water and difficulty in accurately positioning precast members, which are constrained by pile errors and require advanced crane operations.

Method used

A method involving precast blocks with through holes and insertion members that allow loose fitting onto piles, enabling easy installation and integration with concrete filling, absorbing pile position errors and reducing water-based work complexity.

Benefits of technology

This method allows for efficient construction of superstructures by simplifying the installation process, stabilizing precast blocks on piles, and accommodating positioning errors, thereby reducing labor and improving work efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024150200000001_ABST
    Figure 2024150200000001_ABST
Patent Text Reader

Abstract

To provide a method that can efficiently construct a superstructure at an upper end of a pile erected on a water bottom ground with complicated works on the water reduced while absorbing errors in a pile placement position, and to provide a structure of a superstructure.SOLUTION: By mounting a beam member 7 loosely fitted to a pile 50 and protruding inside a through hole 5 in a plan view, on an upper end of the pile 50, in the through hole 5 of a precast block 2, the precast block 2 is supported by an upper part of the pile 50. By loosely inserting a lower part of an insertion member 10 into an inside of the pile 50 and fitting a fitting portion 11 provided in the insertion member 10 to the beam member 7, the insertion member 10 is supported by the beam member 7. A superstructure 1 is constructed by filling an inside of the pile 50 above a partition plate 20 provided inside the pile 50 and the through hole 5 with infilling concrete 30.SELECTED DRAWING: Figure 10
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for constructing a superstructure above water and the structure of the superstructure, and more specifically, to a method for constructing a superstructure above water and the structure of the superstructure that can efficiently construct a superstructure by reducing complicated work above water while absorbing errors in the driving position of piles at the upper ends of piles erected in the waterbed. [Background technology]

[0002] One method for constructing a superstructure on water, such as a pier supported by piles erected on the waterbed, is to place members to support the formwork on the water, then install a bottom formwork, place reinforcing bars on top of it, install side formwork, and pour ready mixed concrete into the formwork at the construction site and allow it to harden. When constructing a superstructure on water with this type of cast-in-place concrete, there is a limit to how much work efficiency can be improved because there is a lot of complicated work to be done on the water.

[0003] Therefore, a method has been proposed in which the pile heads and the like are formed on land with precast concrete, and these precast members are fixed to the upper ends of piles erected on the bottom ground to construct a superstructure (see, for example, Patent Document 1). However, in the method proposed in Patent Document 1, in order to install the precast members at a predetermined position, it is necessary to perform notching on the upper ends of the piles on the water. In addition, since the outer diameter of the bottom formwork provided on the formwork support member inserted inside the pile is close to the inner diameter of the pile, and there is almost no gap between the inner surface of the pile and the outer surface of the bottom formwork, in order to insert the formwork support member (bottom formwork) into the pile, it is necessary to position the precast member (formwork support member) with high precision relative to the pile, which requires advanced crane work. Furthermore, after the support member is abutted against the recess at the upper end of the pile, it is necessary to rotate the precast member around the pile axis direction to engage the support member with the engagement notch of the pile, and this work also requires high skill. Furthermore, for example, to construct a superstructure that extends across multiple piles, it is necessary to form a cast-in-place concrete section that connects the precast members, and forming the cast-in-place concrete section requires work to place reinforcing bars and set up formwork on the water. Therefore, there is a relatively large amount of cumbersome work on the water, and there is room for improvement in terms of work efficiency.

[0004] In addition, the work of driving piles into the waterbed is affected by waves and tides, making it difficult to drive piles accurately in the planned positions, and errors in the driving positions of piles are likely to occur. In the method described in Patent Document 1, the outer diameter of the bottom formwork provided on the formwork support member is close to the inner diameter of the pile, and the precast members must be installed according to the driving positions of the upper ends of each pile. Since the precast members are attached while being strictly constrained to the positions of the piles, errors in the driving positions of the piles cannot be absorbed, and errors in the driving positions of the piles must be absorbed only by the cast-in-place concrete. Therefore, there is also the problem that it is difficult to construct the superstructure above the water in the correct position as designed. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2018-25042 A Summary of the Invention [Problem to be solved by the invention]

[0006] The object of the present invention is to provide a method for constructing a superstructure above water and a structure of the superstructure that can absorb errors in the driving position of the piles at the upper ends of the piles erected in the waterbed, while reducing complicated work on the water and constructing the superstructure more efficiently. [Means for solving the problem]

[0007] In order to achieve the above object, the present invention provides a method for constructing a superstructure on water, which constructs a superstructure fixed to and supported on the top of a cylindrical pile erected on the waterbed, comprising the steps of: preparing a precast block and an insert member to be loosely inserted inside the pile; the precast block is made of precast concrete and has a block body having a through hole penetrating vertically into which the pile can be loosely inserted; a beam member protrudes inward from the through hole in a plan view, a portion of the beam member located inside the through hole is exposed, and a portion of the beam member located outside the through hole is embedded in the block body; and during work in the construction water area, a partition plate is provided at a position at a predetermined depth from the top end of the pile to separate the inside of the pile into an upper part and an insert member is moved downward from above the pile. the precast block is supported on the top of the pile by loosely fitting the through hole into the pile and placing the beam member on the upper end of the pile, the insertion member is inserted into the inside of the through hole from above the through hole, the lower part of the insertion member is loosely inserted into the inside of the pile, and a locking part provided on the upper part of the insertion member is locked to the beam member so that the insertion member is supported on the beam member, and with the gap between the outer peripheral surface of the pile and the lower part of the through hole sealed, filler concrete is poured through the through hole and the inside of the pile above the partition plate and the through hole is filled with the filler concrete and allowed to solidify, thereby fixing the superstructure, which is an integral part of the precast block, the insertion member and the solidified filler concrete to the top of the pile.

[0008] The structure of the superstructure on water of the present invention is a structure of the superstructure on water that is fixed to and supported on the top of a cylindrical pile erected on the bottom ground, and includes a precast block and an insert member that is loosely inserted inside the pile, the precast block is made of precast concrete and has a block body with a through hole that penetrates vertically so that the pile can be loosely inserted, a beam member protrudes inward from the through hole in a plan view, a portion of the beam member located inside the through hole is exposed, and a portion of the beam member located outside the through hole is embedded in the block body, the through hole of the precast block is loosely inserted into the pile, and the beam member is placed on the upper end of the pile. in a state in which the precast block is supported on the top of the pile, the insertion member is inserted into the inside of the through hole, the lower part of the insertion member is loosely inserted into the inside of the pile, the engagement portion provided on the upper part of the insertion member is engaged with the beam member, thereby supporting the insertion member on the beam member, a partition plate is provided at a position at a predetermined depth from the upper end of the pile to separate the inside of the pile into upper and lower parts, the fill concrete filled inside the pile above the partition plate and in the through hole has solidified, and the superstructure, in which the precast block, the insertion member and the solidified fill concrete are integrated, is fixed to the top of the pile. Effect of the Invention

[0009] According to the present invention, if the precast blocks and insertion members are prepared in advance, the work in the construction area can easily involve the steps of installing a partition plate on the piles, moving the precast block downward from above the piles so that the precast block is supported on the top of the piles, inserting the insertion member from above the through hole in the precast block, and filling the inside of the piles above the partition plate and the through hole with fill concrete, thereby enabling the superstructure above the water to be constructed easily.

[0010] In the work of supporting the precast block on the top of the pile, by providing a gap that allows the through hole to be loosely fitted into the pile, errors in the driving position of the pile can be absorbed. Furthermore, by placing a beam member on the upper end of the pile, the precast block can be easily and stably installed on the top of the pile. The insertion member can be easily supported by the beam member by simply inserting it inside the through hole, loosely inserting the lower part of the insertion member inside the pile, and engaging the engaging part provided on the upper part of the insertion member with the beam member. Therefore, it is possible to efficiently construct the superstructure while absorbing errors in the driving position of the pile and reducing the complicated work on the water. [Brief description of the drawings]

[0011] [Figure 1] 1 is an explanatory diagram illustrating, from a side view, a state in which an embodiment of a superstructure according to the present invention is fixed to and supported by the upper parts of a plurality of piles erected in the waterbed. FIG. [Diagram 2] 2 is an explanatory diagram illustrating, in a plan view, the state of the precast blocks and insertion members that constitute the superstructure of FIG. 1 before they are installed on a plurality of piles. FIG. [Diagram 3] FIG. 3 is a cross-sectional view taken along the line AA in FIG. 2. [Figure 4] FIG. 3 is a cross-sectional view taken along the line B-B in FIG. 2. [Diagram 5] 3 is an explanatory diagram illustrating, in a plan view, the state in which the precast blocks of FIG. 2 are installed on a plurality of piles. FIG. [Figure 6] FIG. 6 is a cross-sectional view taken along the line CC of FIG. 5. [Figure 7] 6 is an explanatory diagram illustrating a state in which the insertion member in FIG. 5 is inserted into the inside of the pile in a plan view. FIG. [Figure 8] FIG. 8 is a cross-sectional view taken along the line D-D of FIG. 7. [Figure 9] FIG. 8 is an explanatory diagram illustrating, in plan view, the state in which the reinforcing bars at the top of the precast blocks in FIG. 7 are connected with joint members and fill concrete is poured through the through holes in the precast blocks to construct a superstructure. [Figure 10] FIG. 10 is a cross-sectional view taken along the line E-E of FIG. 9. [Figure 11]10 is a cross-sectional view taken along the line F-F of FIG. 9. [Figure 12] 1 is an explanatory diagram illustrating, in a plan view, the state in which a sheath pipe and a beam member are placed on the formwork at the bottom of a precast block during the precast block manufacturing process. FIG. [Figure 13] 13 is a cross-sectional view taken along the line G-G of FIG. 12. [Figure 14] 13 is a cross-sectional view taken along the line HH in FIG. 12. [Figure 15] 1 is an explanatory diagram illustrating a plan view of the precast block manufacturing process in which the steel bars that make up the precast block are arranged, formwork for the sides of the precast block is installed, and concrete is poured. FIG. [Figure 16] 16 is a cross-sectional view taken along the line J-J in FIG. 15. [Figure 17] 16 is a cross-sectional view taken along the line K-K in FIG. 15. [Figure 18] 13 is an explanatory diagram illustrating another example of the arrangement of beam members that constitute a precast block in a plan view. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] Hereinafter, the method for constructing a superstructure above water and the structure of the superstructure of the present invention will be described based on the embodiment shown in the figures.

[0013] As illustrated in FIG. 1, the superstructure 1 on the water in the present invention is a pier or the like that is fixed to the upper part of a cylindrical pile 50 driven into the water bottom ground WB and supported by the pile 50. Examples of the cylindrical pile 50 include steel pipe piles and concrete piles. The superstructure 1 is constructed on the upper part of the pile 50 driven into the water bottom ground WB. In this embodiment, the upper part of the pile 50 protrudes above the water, but the upper part of the pile 50 may not protrude above the water. In this embodiment, the superstructure 1 is fixed to the upper part of two piles 50 and supported. As will be illustrated later in another embodiment, the superstructure 1 of the present invention can also be configured to be fixed to the upper part of three or more piles 50 and supported. The superstructure 1 of the present invention can also be configured to be fixed to the upper part of one pile 50 and supported, for example.

[0014] As shown in Figures 9 to 11, the superstructure 1 of the present invention is composed of a precast block 2, an insertion member 10 loosely inserted inside a pile 50, and a filling concrete 30. The superstructure 1 may be provided with other necessary members as appropriate. A partition plate 20 is provided at a position a predetermined depth from the top end of the pile 50 to separate the inside of the pile 50 into upper and lower parts.

[0015] As illustrated in Figs. 2 to 4, the precast block 2 and the insertion member 10 are each fabricated on land, on a ship, or the like before being installed on the pile 50. The precast block 2 has a block body 3 formed of precast concrete and having a through hole 5 penetrating vertically into which the pile 50 can be loosely inserted, and a beam member 7 protrudes inward from the through hole 5 in a plan view. The block body 3 of this embodiment further has a sheath pipe 6 extending vertically and fitted into the through hole 5, and the beam member 7 protrudes inward from the sheath pipe 6 in a plan view. The block body 3 constituting the precast block 2 of this embodiment has a plurality of through holes 5 penetrating vertically into which the respective piles 50 can be loosely inserted, and a beam member 7 protrudes inward from each through hole 5 in a plan view.

[0016] The block body 3 is made of precast concrete. In this embodiment, the block body 3 has a reinforced concrete structure in which reinforcing bars 4 are embedded in the precast concrete. In Figs. 2 to 4, the reinforcing bars 4 embedded in the precast concrete constituting the block body 3 are omitted, and only the reinforcing bars 4 protruding and exposed from the precast concrete are shown. For example, the block body 3 may have a structure without reinforcing bars 4. In this embodiment, the block body 3 is formed in a rectangular parallelepiped shape, but the shape of the block body 3 is not limited to the rectangular parallelepiped shape and may have other shapes.

[0017] In the block body 3, a through hole 5 larger than the outer dimension of the pile 50 in a plan view is formed at a position corresponding to the pile 50 on which the precast block 2 is to be installed. In this embodiment, the through holes 5 are formed in two places in the block body 3. In this embodiment, a lower hole 5b having a circular shape in a plan view is formed in the lower part of the block body 3 as the through hole 5, and a sheath pipe 6 is fitted into the lower hole 5b. Above the lower hole 5b, an upper hole 5a having a square shape in a plan view that is wider than the lower hole 5b is formed. The upper hole 5a and the lower hole 5b communicate with each other vertically. The shape of the upper hole 5a is not limited to a rectangle (square shape), and can be formed, for example, in a circular shape or an elliptical shape in a plan view. For example, the lower hole 5b and the upper hole 5a can be formed to have the same shape and the same size. The sheath pipe 6 can be provided arbitrarily as necessary. The sheath pipe 6 can be used when providing members required for the installation work of the precast block 2 later, so it may be left as a part of the precast block 2, but it may be removed after the precast block 2 is manufactured.

[0018] In this embodiment, before the precast block 2 is placed on the pile 50, the reinforcing bars 4 arranged in the upper part of the block body 3 at the positions corresponding to the upper holes 5a are removed, and the ends of the reinforcing bars 4 protrude from both sides of the inner surface of the upper holes 5a by about 5 cm to 30 cm. Note that it is also possible to configure the block body 3 so that no reinforcing bars 4 are provided in the upper part.

[0019] The upper part of the precast block 2 is provided with a number of hanging fittings 8 that are used when hoisting the precast block 2 with a crane or the like. In this embodiment, a hanging fitting 8 is provided at each of the four corners of the upper part of the precast block 2. The lower part of the hanging fittings 8 is embedded in the block body 3 (precast concrete), and the hanging fittings 8 are fixed to the block body 3. A groove is formed around each hanging fitting 8 that is recessed by several centimeters from the upper surface 2a of the precast block 2 (block body 3). Although not provided in this embodiment, if accessories such as mooring posts are to be provided to the superstructure 1, the accessories such as mooring posts can be integrated into the precast block 2.

[0020] As in this embodiment, the sheath pipe 6 placed in the precast block 2 may be, for example, a tubular member made of metal such as a steel pipe, a tubular member made of plastic, or a tubular member made of fiber-reinforced polymer. For example, in the case where the sheath pipe 6 is used as a form for the through hole 5 during production of the precast block 2 and is removed without being placed after production of the precast block 2, a tubular member made of wood may be used as the sheath pipe 6.

[0021] 3 and 4, in this embodiment, a sheath pipe 6 is fitted into a lower hole 5b formed in the block body 3. The outer circumferential surface of the sheath pipe 6 is bonded to the precast concrete constituting the block body 3, so that the sheath pipe 6 is fixed to the block body 3. In this embodiment, the lower end of the sheath pipe 6 is positioned above the bottom surface 2b of the precast block 2 (block body 3).

[0022] The inner dimensions of the through hole 5 (the inner dimensions of the sheath tube 6 if the sheath tube 6 is provided) are set to a dimension that allows the pile 50 to be loosely inserted. The inner dimensions of the through hole 5 (sheath tube 6) are preferably set to a dimension that allows a gap (clearance) of, for example, 5 cm to 20 cm, more preferably 10 cm to 15 cm, to be formed between the inner peripheral surface of the through hole 5 (sheath tube 6) and the outer peripheral surface of the pile 50 when the pile 50 is inserted into the through hole 5 with the center position of the through hole 5 and the center position of the pile 50 aligned in a plan view. That is, the through hole 5 (sheath tube 6) that can be loosely fitted into the pile 50 means that the inner dimensions of the through hole 5 (sheath tube 6) are set to a dimension that allows the aforementioned degree of clearance to be secured with respect to the outer dimensions of the pile 50.

[0023] The beam member 7 is made of steel such as an H-shaped steel or a channel steel. The beam member 7 extends horizontally. In plan view, the beam member 7 protrudes to the inside of the through hole 5. In this embodiment, the beam member 7 protrudes to the inside of each sheath pipe 6 in plan view. The beam member 7 is disposed at a position that avoids the position where the insertion member 10 is inserted. At least a portion of the beam member 7 extends to the outside of the through hole 5 in plan view.

[0024] 2, in this embodiment, a pair of beam members 7, 7 are arranged in parallel with a gap therebetween, and each beam member 7 spans across a plurality of through holes 5. In this embodiment, the widthwise separation distance between the beam members 7 is set to a distance that allows an insert member 10 to be inserted between the pair of beam members 7, 7. The widthwise separation distance between the beam members 7 is preferably set to be approximately 1 cm to 5 cm larger than the dimension of the insert member 10 in the width direction (the width direction of the beam member 7).

[0025] As exemplified in Figs. 3 and 4, when a sheath pipe 6 is provided, the beam member 7 is disposed above the sheath pipe 6 or on the sheath pipe 6. In this embodiment, a groove into which the beam member 7 is fitted is formed on the upper part of each sheath pipe 6, and the beam member 7 is fitted into the groove. For example, the beam member 7 can also be placed on the sheath pipe 6. It is preferable that the beam member 7 and the sheath pipe 6 are joined by welding or the like. A portion of the beam member 7 located inside the through hole 5 (upper hole 5a) is exposed, and a portion of the beam member 7 located outside the through hole 5 is embedded in the block body 3 (precast block 2).

[0026] As illustrated in Figs. 2 to 4, the insertion member 10 is formed of a steel frame or the like. The insertion member 10 of this embodiment has a structure in which the ends of the webs of four T-shaped steels are welded together so that the four webs form a cross shape in a plan view. The insertion member 10 is not limited to the structure of this embodiment and can be formed of H-shaped steel or steel pipes, but is designed to be loosely inserted into the pile 50. The dimensions of the insertion member 10 may be set to provide a gap of, for example, 5 cm to 20 cm, more preferably 10 cm to 15 cm, between the inner peripheral surface of the pile 50 and the outer surface of the insertion member 10 when the insertion member 10 is inserted into the pile 50. That is, the insertion member 10 that can be loosely inserted into the pile 50 means that the outer dimensions of the insertion member 10 are set to a dimension that can ensure the above-mentioned degree of clearance with respect to the inner dimensions of the pile 50.

[0027] The upper part of the insertion member 10 is provided with a locking portion 11 that protrudes outward from the insertion member 10. The locking portion 11 is formed of, for example, a metal plate and is joined to the upper part of the insertion member 10 by welding or the like. In this embodiment, the end portions of the flanges of two opposing T-shaped steels out of the four T-shaped steels that constitute the insertion member 10 are provided with a plate-shaped locking portion 11 that protrudes outward from the flanges. The locking portion 11 can be provided, for example, not at the upper end of the insertion member 10 but at a midpoint in the vertical direction of the insertion member 10.

[0028] As illustrated in Figs. 9 to 11, when the superstructure 1 is constructed on the top of the pile 50, the through hole 5 (sheath pipe 6) of the precast block 2 is loosely fitted into the pile 50, and the beam member 7 is placed on the top end of the pile 50, so that the precast block 2 is supported on the top of the pile 50. When there are multiple piles 50 supporting the superstructure 1 as in this embodiment, the multiple through holes 5 of the precast block 2 are loosely fitted into different piles 50, and the beam member 7 is placed on the top end of each pile 50, so that the precast block 2 is supported on the top of the multiple piles 50. The insertion member 10 is inserted inside the through hole 5 (inside the tube of the sheath pipe 6), and the lower part of the insertion member 10 is loosely inserted inside the pile 50. The locking portion 11 provided on the upper part of the insertion member 10 is locked to the beam member 7, so that the insertion member 10 is supported by the beam member 7.

[0029] The height position of the upper end of the pile 50 driven into the water bottom ground WB is approximately at a preset target height, but since the pile 50 is driven by driving work on the water (sea), the height position of the upper end of the pile 50 may have a slight error (about several cm) from the target height. As a countermeasure for such a case, in this embodiment, as illustrated in Figures 10 and 11, a height adjustment plate 13 for adjusting the height position of the upper surface 2a of the precast block 2 is sandwiched between the upper end of the pile 50 and the lower surface of the beam member 7. The thickness of the height adjustment plate 13 and the number of plates to be installed can be determined appropriately. The height adjustment plate 13 can be provided as needed.

[0030] As illustrated in Figs. 9 to 11, in this embodiment, a pair of anti-slip members 12, 12 are provided on both sides of the insertion member 10 in the extension direction of the beam member 7 as members for preventing the insertion member 10 from shifting from the center of the pile 50 in the extension direction of the beam member 7 during the work of loosely inserting the lower part of the insertion member 10 into the center of the pile 50 in a plan view. The anti-slip members 12 are, for example, made of a metal plate or the like. Each anti-slip member 12 is fixed to the beam member 7 by a fastener. The anti-slip members 12 can be provided arbitrarily as necessary. In the case where the reinforcing bars 4 are provided on the upper part of the precast block 2 as in this embodiment, when the superstructure 1 is constructed on the upper part of the pile 50, the reinforcing bars 4 protruding from the inner peripheral surface of the upper hole 5a are joined to each other by the joint members 9.

[0031] 10 and 11, a partition plate 20 that separates the inside of the pile 50 into upper and lower portions is provided at a position a predetermined depth from the upper end of the pile 50. The outer dimensions of the partition plate 20 are set to be substantially the same as the inner dimensions of the pile 50. There are no particular limitations on the method for fixing the partition plate 20 inside the pile 50, but for example, the partition plate 20 can be easily fixed inside the pile 50 by supporting the partition plate 20 with a hanging material such as a wire suspended from the upper end of the pile 50.

[0032] When the superstructure 1 is constructed on the top of the pile 50, the filler concrete 30 filled inside the pile 50 above the partition plate 20 provided on the pile 50 and in the through hole 5 has solidified, and the superstructure 1, which is an integrated body of the precast block 2, the insertion member 10, and the solidified filler concrete 30, is fixed to the top of the pile 50. In Fig. 10 and Fig. 11, the portion filled with the filler concrete 30 is shown by the hatched portion. In Fig. 9, the hatched portion indicating the portion filled with the filler concrete 30 is not shown, and the inside of the through hole 5 is visualized and illustrated.

[0033] In this embodiment, when the superstructure 1 is constructed, the hanging fittings 8 that protrude above the upper surface 2a of the precast block 2 are cut and removed, and the grooves formed around the hanging fittings 8 are filled with concrete or mortar, forming the area where the hanging fittings 8 were provided into a flat surface at the same height as the surrounding upper surface 2a. For example, the hanging fittings 8 can be left as they are without being removed from the superstructure 1.

[0034] Next, the work procedure for constructing the above-water superstructure 1 will be described.

[0035] As illustrated in Figs. 2 to 4, cylindrical piles 50 are erected in the water bottom ground WB in the area where the superstructure 1 is to be constructed. The number and arrangement of the piles 50 are appropriately determined depending on the size and shape of the superstructure 1 to be constructed. In this embodiment, two piles 50 are driven side by side with a gap between them into the water bottom ground WB. The piles 50 are driven by a known driving method. The piles 50 are driven into a set planar position (target position), but since the piles are driven by driving work on the water (sea), the planar position where the piles 50 are actually driven may have a slight error (about several centimeters) from the target position.

[0036] In the method for constructing a superstructure 1 on water of the present invention, the precast blocks 2 and insertion members 10 having the above-mentioned configuration are prepared in advance on land or on a ship according to the target position for driving the piles 50 and the size of the piles 50. Then, the precast blocks 2 and the insertion members 10 to be inserted into the piles 50 are transported to the construction waters where the piles 50 that will construct the superstructure 1 are erected. The specific method for preparing the precast blocks 2 will be explained later.

[0037] During work in the construction water area where the superstructure 1 is to be constructed, the partition plate 20 is provided at a position at a predetermined depth from the upper end of the pile 50. The partition plate 20 is fixed inside the pile 50, for example, by supporting the partition plate 20 with a hanging material such as a wire suspended from the upper end of the pile 50.

[0038] Next, a wire rope hoisting device suspended from a crane is connected to each of the hoisting fittings 8 provided on the precast block 2, and the precast block 2 is hoisted above the piles 50 by the crane. Then, as illustrated in Figs. 5 and 6, the precast block 2 is moved downward with the through hole 5 (lower hole 5b) provided in the precast block 2 aligned with the piles 50, and the through hole 5 (sheath pipe 6) provided in the precast block 2 is loosely fitted into the piles 50, and the beam member 7 is placed on the upper end of the piles 50. This brings the precast block 2 into a state supported by the upper part of the piles 50. When the precast block 2 is placed on the upper part of the piles 50, a worker can stand on the precast block 2 and perform work.

[0039] If there is an error in the height position of the upper end of the pile 50 with respect to the target height, when the beam member 7 is placed on the upper end of the pile 50, the height position of the upper surface 2a of the precast block 2 is adjusted by sandwiching a height adjustment plate 13 between the upper end of the pile 50 and the lower surface of the beam member 7. That is, the height adjustment plate 13 is placed on the upper end of the pile 50, and the beam member 7 is placed on the height adjustment plate 13.

[0040] Next, as illustrated in FIG. 7 and FIG. 8, the insert member 10 is inserted from above the through hole 5 (upper hole 5a) of the precast block 2 into the inside of the through hole 5 (the inside of the sheath pipe 6), the lower part of the insert member 10 is loosely inserted into the inside of the pile 50, and the locking part 11 provided on the upper part of the insert member 10 is locked to the beam member 7, so that the insert member 10 is supported by the beam member 7. In this embodiment, the insert member 10 is inserted between a pair of beam members 7, 7, and the pair of locking parts 11, 11 provided on the insert member 10 are locked to the pair of beam members 7, 7. In this embodiment, a pair of anti-slip members 12, 12 are installed on both sides of the insert member 10 in the extension direction of the beam member 7 in order to prevent the insert member 10 from shifting from the center of the pile 50 in the longitudinal direction of the beam member 7 during the operation of loosely inserting the lower part of the insert member 10 into the center of the pile 50 in a plan view. The work of installing the insert member 10 and the work of installing the anti-slip member 12 described above can be easily performed by a worker standing on the precast block 2.

[0041] Also, the gap between the outer peripheral surface of the pile 50 and the lower part of the through hole 5 (lower hole 5b) of the precast block 2 is closed. In this embodiment, a blocking member 14 is provided on the lower side of the bottom surface 2b of the precast block 2, which is fixed in a state of being fitted on the pile 50, thereby blocking the gap between the outer peripheral surface of each pile 50 and the lower part of the through hole 5. The blocking member 14 is composed of a plurality of divided members, and each divided member is abutted against the outer peripheral surface of the pile 50 and then the divided members are connected to each other, so that the blocking member 14 can be easily fixed to the pile 50. The work of installing the blocking member 14 is performed by, for example, a diver. The method of blocking the gap between the outer peripheral surface of the pile 50 and the lower part of the through hole 5 is not limited to the method of this embodiment, and can be performed by other methods. For example, a member that blocks the gap between the outer peripheral surface of the pile 50 and the lower part of the through hole 5 can be provided inside the lower part of the through hole 5 of the precast block 2.

[0042] Next, as illustrated in Figures 9 to 11, the ends of the reinforcing bars 4 protruding from the upper side of the through hole 5 (upper hole 5a) are connected together with joint members 9 to connect the reinforcing bars 4 arranged on the upper part of the block body 3. In this embodiment, the ends of the reinforcing bars 4 are connected together using known mechanical joint members 9. If no reinforcing bars 4 are provided on the upper part of the precast block 2, the above-mentioned work is not necessary. If it is not desired to leave the hanging fittings 8 on the superstructure 1, the hanging fittings 8 protruding above the upper surface 2a of the precast block 2 are cut and removed.

[0043] Next, as illustrated in Figs. 9 to 11, filler concrete 30 is poured from through hole 5 (upper hole 5a) to fill the inside of pile 50 above partition plate 20 and through hole 5 (upper hole 5a and lower hole 5b) with filler concrete 30 and harden it. This fixes superstructure 1, in which precast block 2, insert member 10 and hardened filler concrete 30 are integrated, to the top of pile 50. When hanging hardware 8 is removed from precast block 2, the groove formed around hanging hardware 8 is filled with concrete or mortar to form the part where hanging hardware 8 was provided into a flat surface at the same height as upper surface 2a around it. Blocking member 14 may be left as it is as part of superstructure 1, or may be removed from pile 50 after hardening of filler concrete 30. With the above, construction of superstructure 1 is completed.

[0044] Next, a method for producing the precast block 2 will be described.

[0045] 12 to 14, an edge cutting material 40 for the bottom surface 2b of a precast block 2 (block body 3) is laid on the top surface of a work platform such as a concrete foundation on land or on a ship. When a sheath pipe 6 is placed on the precast block 2 as in this embodiment and a metallic sheath pipe 6 is used, an annular bottom raising frame 42 for positioning the lower end of the sheath pipe 6 above the bottom surface 2b of the precast block 2 is placed on the edge cutting material 40, and the sheath pipe 6 is placed on the bottom raising frame 42. It is preferable that the bottom raising frame 42 has the strength and width to allow the sheath pipe 6 to be placed thereon.

[0046] When using a bottom-raising frame 42 that does not have enough strength or width to support the sheath tube 6, it is preferable to provide a plurality of protrusions 43 protruding downward from the sheath tube 6 on the inner peripheral surface of the lower part of the sheath tube 6 as in this embodiment, so that the weight of the sheath tube 6 is not applied to the bottom-raising frame 42. For example, a steel mold or the like is used for the protrusions 43, and the tips of the protrusions 43 are placed on the edge-cutting material 40, so that the protrusions 43 support the weight of the sheath tube 6. Since the protrusions 43 provided on the sheath tube 6 are members used to manufacture the precast block 2, they are removed from the sheath tube 6 after the precast block 2 is manufactured. In this embodiment, the bottom-raising frame 42 is provided with grooves through which the respective protrusions 43 are inserted. The protrusions 43 and the bottom-raising frame 42 provided on the sheath tube 6 can be provided arbitrarily, and when a sheath tube 6 made of plastic or continuous fiber reinforced polymer is used, for example, the sheath tube 6 may be placed directly on the edge-cutting material 40 without providing the protrusions 43 and the bottom-raising frame 42.

[0047] When the sheath pipes 6 are placed in the precast blocks 2, the number and arrangement of the sheath pipes 6 are appropriately determined according to the number and arrangement of the piles 50 that construct the superstructure 1. When the sheath pipes 6 are not placed in the precast blocks 2, the sheath pipes 6 are placed directly on the edge cutting material 40, and are removed from the precast blocks 2 after the precast blocks 2 are fabricated. In this case, in addition to sheath pipes 6 made of steel, plastic, or continuous fiber reinforced polymer, wooden sheath pipes 6 can also be used.

[0048] Next, the beam member 7 is placed on the upper part of the sheath pipe 6 or on the sheath pipe 6. When the sheath pipe 6 is placed in the precast block 2 as in this embodiment, the beam member 7 and the sheath pipe 6 may be joined by welding or the like. In this embodiment, a groove into which the beam member 7 is fitted is formed in the upper part of each sheath pipe 6, and the beam member 7 is fitted in the groove. Then, the beam member 7 and the sheath pipe 6 are joined by welding. When the sheath pipe 6 is not placed in the precast block 2, the beam member 7 is placed on the sheath pipe 6.

[0049] 15 to 17, when fabricating a block body 3 of a reinforced concrete structure, the reinforcing bars 4 that constitute the block body 3 are arranged on the outside of the sheath pipe 6. The number, arrangement, and reinforcing bar structure of the reinforcing bars 4 are not limited to this embodiment and can be appropriately determined according to the conditions required for the superstructure 1 to be constructed. When fabricating a block body 3 without reinforcing bars 4, the above-mentioned reinforcing bar 4 arrangement work is not necessary.

[0050] Next, as illustrated in Figs. 15 to 17, a formwork 41 is installed on the side of the precast block 2 (block body 3). When providing reinforcing bars 4 on the upper part of the precast block 2 as in this embodiment, a formwork 41 is installed to form a through hole 5 (upper hole 5a) above the sheath pipe 6. In this embodiment, the upper hole 5a is shown in a rectangular shape in plan view, since this makes it easier to assemble the reinforcing bars 4 during the manufacture of the precast block 2 and after installation on site. Also, the hanging metal fitting 8 is placed in a predetermined position, and a formwork 41 is installed to form a groove to be provided around the hanging metal fitting 8. The hanging metal fitting 8 is left hanging using a wire or the like.

[0051] Concrete 31 is then poured between the forms 41 that form the sides of the precast block 2 (block body 3), and the concrete 31 is allowed to harden. After the concrete 31 has hardened, the forms 41, the bottom raising frame 42, and the protrusions 43 are removed. If the sheath pipe 6 is not to be placed in the precast block 2, the sheath pipe 6 is also removed from the precast block 2. The precast block 2 can be produced by the above steps.

[0052] In this way, in the present invention, if the precast blocks 2 and the insertion members 10 are prepared in advance on land or on a ship, the work in the construction water area can easily involve only the steps of attaching the partition plate 20 to the piles 50, moving the precast block 2 downward from above the piles 50 so that the precast block 2 is supported on the top of the piles 50, inserting the insertion members 10 from above the through holes 5 in the precast blocks 2, and filling the inside of the piles 50 above the partition plate 20 and the through holes 5 in the precast blocks 2 with filler concrete 30.

[0053] Furthermore, in the work of supporting the precast block 2 on the top of the pile 50, a gap (clearance) is provided in which the through hole 5 (sheath pipe 6) can be loosely fitted into the pile 50, thereby absorbing errors in the driving position of the pile 50. Therefore, even if the through hole 5 (sheath pipe 6) is not positioned with high precision relative to the pile 50, the through hole 5 (sheath pipe 6) can be loosely fitted into the pile 50 without interfering with the pile 50. In other words, in the present invention, the driving of the pile 50 can be performed based on conventional management standards, and high precision is not required.

[0054] Furthermore, by placing the beam member 7 on the upper end of the pile 50, the precast block 2 can be easily and stably installed on the top of the pile 50. After the precast block 2 is installed on the top of the pile 50, workers can stand on the precast block 2 to perform work.

[0055] The insertion member 10 can be easily supported by the beam member 7 by simply inserting it into the inside of the through hole 5 (the inside of the sheath tube 6), loosely inserting the lower part of the insertion member 10 into the inside of the pile 50, and engaging the locking part 11 provided on the upper part of the insertion member 10 with the beam member 7. In this way, each step of the method for constructing the superstructure 1 of the present invention can be performed simply and efficiently. The present invention is very useful to those skilled in the art because it makes it possible to efficiently construct the superstructure 1 by reducing complicated work on water while absorbing errors in the driving position of the pile 50.

[0056] In addition, for example, when using a precast member having a structure in which the sheath pipe protrudes downward from the precast member body as proposed in Patent Document 1, when placing the sheath pipe on the ground and forming the precast member body on it, it is necessary to place a formwork for forming the precast member body in the air, so it is necessary to construct a formwork support to support the formwork. Therefore, it is relatively time-consuming to manufacture the precast member described in Patent Document 1. As a method for manufacturing a precast member without constructing a formwork support, a method is conceivable in which a formwork for forming the precast member body is installed on the ground and the sheath pipe is placed on the precast member body to manufacture the precast member upside down, but in this case, it is necessary to turn the manufactured precast member upside down, which requires a lot of work. In contrast, the precast block 2 of the present invention can be easily manufactured in the orientation in which it is installed on the pile 50. Therefore, it is also advantageous in reducing the labor and work hours required for preparation before construction.

[0057] As in the construction procedure for the superstructure 1 described above, if the precast block 2 is supported by the pile 50 and then the insertion member 10 is inserted inside the through hole 5 (inside the sheath pipe 6), after the precast block 2 is placed on top of the pile 50, a worker can check the position of the pile 50 from above the precast block 2 and later insert the insertion member 10. Therefore, the positioning of the insertion member 10 relative to the pile 50 can be performed very easily and efficiently.

[0058] In the present invention, the construction procedure of the superstructure 1 is not limited to the above-described one. For example, the insertion member 10 may be installed on the pile 50 in a state where it is integrated with the precast block 2. Specifically, before the precast block 2 is moved downward from above the pile 50, the insertion member 10 is inserted into the inside of the through hole 5 (inside the tube of the sheath tube 6) and the locking portion 11 provided on the upper part of the insertion member 10 is locked to the beam member 7, so that the insertion member 10 is supported by the beam member 7. Then, with the lower part of the insertion member 10 protruding downward from the bottom surface 2b of the precast block 2, the integrated precast block 2 and the insertion member 10 are moved downward from above the pile 50, so that the lower part of the insertion member 10 is loosely inserted inside the pile 50, so that the precast block 2 is supported by the pile 50.

[0059] This method is more advantageous in reducing the number of work steps on the water. In addition, the precast block 2 and the insertion member 10 can be aligned with the pile 50 while checking the positional relationship between the lower part of the insertion member 10 that protrudes below the bottom surface 2b of the precast block 2 and the pile 50, making it easier to install the precast block 2 relative to the pile 50.

[0060] As in this embodiment, by configuring the block body 3 constituting the precast block 2 to have a plurality of through holes 5 extending vertically through which each pile 50 can be inserted, as in the case of the previous embodiment, it is possible to easily construct a superstructure 1 above water that extends across a plurality of piles 50.

[0061] In this embodiment, when the beam member 7 is placed on the upper end of each pile 50, a height adjustment plate 13 is sandwiched between the upper end of the pile 50 and the underside of the beam member 7. By adjusting the thickness and number of height adjustment plates 13 to be sandwiched, it becomes possible to easily adjust the height position of the upper surface 2a of the precast block 2 to the desired height position even if there is an error in the height position of the upper end of the pile 50 compared to the target height.

[0062] When placing a metal sheath pipe 6 in a precast block 2 as in this embodiment, if the lower end of the sheath pipe 6 is positioned above the bottom surface 2b of the precast block 2, when the construction of the superstructure 1 is completed, the lower end of the sheath pipe 6 will be embedded in the fill concrete 30 and will not be exposed to the outside, which is advantageous in reducing the risk of the metal sheath pipe 6 rusting.

[0063] When the beam members 7 are embedded in the precast blocks 2 and spanned across the multiple through holes 5 as in this embodiment, the beam members 7 function as structural members that support the load applied to the superstructure 1. Also, when a pair of beam members 7, 7 arranged in parallel and spaced apart on the inside in plan view overhang the through holes 5 as in this embodiment, the insert member 10 is inserted between the pair of beam members 7, 7 and the pair of locking portions 11, 11 provided on the insert member 10 are locked to the pair of beam members 7, 7, so that the insert member 10 is supported by the pair of beam members 7, 7 in a very stable manner.

[0064] In this embodiment, a case where one precast block 2 without concrete joints is placed on the pile 50 to construct the superstructure 1 is illustrated, but in the present invention, for example, the precast block 2 can be divided into a plurality of divided blocks on the top and bottom. In this case, a plurality of relatively thin divided blocks constituting the precast block 2 are prepared in advance. A beam member 7 is provided on the divided block constituting the bottom layer of the precast block 2. Then, in the work in the construction water area, the beam member 7 provided on the divided block of the bottom layer is placed on the upper end of the pile 50, so that the divided block of the bottom layer is supported on the top of the pile 50. After that, the other divided blocks constituting the precast block 2 are stacked in order on the divided block of the bottom layer, and the divided blocks are fixed to each other, so that the precast block 2 having a structure in which a plurality of divided blocks are stacked on the pile 50 is installed.

[0065] When constructing a relatively large superstructure 1, as described above, if the precast block 2 is divided into a plurality of divided blocks, the weight of each divided block can be made relatively light, making it easier to install the precast block 2 (divided block) on the pile 50. Therefore, this is effective when constructing a relatively large superstructure 1.

[0066] In the present invention, the number and arrangement of the beam members 7 constituting the precast block 2 are not limited to the embodiment exemplified above, as long as the beam member 7 protrudes inward from the through hole 5 in a plan view, and the locking portion 11 of the insertion member 10 is locked to the beam member 7 when the insertion member 10 is inserted into the inside of the pile 50. For example, the number of beam members 7 protruding inward from the through hole 5 may be one, and the insertion member 10 may be supported by one beam member 7. Also, for example, the number of beam members 7 may be two beam members 7 arranged so as to intersect inside the through hole 5 in a plan view, and the insertion member 10 may be supported by the two intersecting beam members 7. Also, for example, as illustrated in FIG. 18, the end of the beam member 7 may be arranged inside the through hole 5 in a plan view, and the beam member 7 may not cross the through hole 5. Also, for example, as illustrated in FIG. 18, the beam members 7 protruding inward from each through hole 5 may be separate beam members 7 for each through hole 5.

[0067] The superstructure 1 of the present invention can be configured to be supported by, for example, one pile 50, or to extend across three or more piles 50. In the present invention, the same effects as those of the above-exemplified embodiment can be achieved even when the superstructure 1 is constructed to be fixed and supported on the top of one pile 50 or three or more piles 50. In addition, in the present invention, it is also possible to construct a wider superstructure by bridging girder members or plate members between superstructures 1 constructed on water, for example. Since the work of connecting adjacent girder members can be performed on the superstructure 1, a wider superstructure can be constructed with high work efficiency.

[0068] The shape and size of the superstructure 1 (precast blocks 2) are not limited to the embodiment exemplified above, and various other configurations are possible. For example, the superstructure 1 may be constructed in an L-shape, polygonal shape, circular shape, or the like when viewed from above. Also, for example, by constructing multiple superstructures 1 adjacent to each other, a wide-area superstructure in which multiple superstructures 1 are connected can be constructed. [Explanation of symbols]

[0069] 1 Superstructure 2. Precast Blocks 2a Top side 2b Bottom 3 Block letters 4. Steel Bars 5 Through hole 5a Upper hole 5b Lower hole 6 sheath tube 7 Beam members 8 Hanging hardware 9 Joint members 10 Insertion member 11 Locking part 12 Anti-slip member 13 Height adjustment plate 14 Closure member 20 Partition 30 Filling concrete 31 Concrete 40 Edge cutting material 41 Formwork 42 Bottom-up frame 43 Protrusion 50 stakes WB Underwater ground

Claims

1. A method for constructing a superstructure on water, which is fixed to and supported by the upper part of a cylindrical pile erected on the waterbed, comprising: A precast block and an insert member to be loosely inserted into the inside of the pile are prepared in advance, The precast block has a block body formed of precast concrete and having a through hole penetrating vertically so that the pile can be inserted freely, a beam member protruding inward from the through hole in a plan view, a portion of the beam member located on the inside of the through hole being exposed, and a portion of the beam member located on the outside of the through hole being embedded in the block body, In the work in the construction water area, a partition plate is provided at a position at a predetermined depth from the upper end of the pile to separate the inside of the pile into upper and lower parts, and the precast block is moved downward from above the pile so that the through hole is loosely fitted into the pile, and the beam member is placed on the upper end of the pile, so that the precast block is supported on the upper part of the pile, The insertion member is inserted into the through hole from above, and the lower part of the insertion member is loosely inserted into the inside of the pile. The locking portion provided on the upper part of the insertion member is locked to the beam member, so that the insertion member is supported by the beam member. A method for constructing a superstructure above water, characterized in that, while sealing the gap between the outer surface of the pile and the lower part of the through hole, filler concrete is poured through the through hole, filling the inside of the pile above the partition plate and the through hole with the filler concrete and allowing it to solidify, thereby fixing the superstructure, which is an integrated unit of the precast block, the insertion member and the solidified filler concrete, to the top of the pile.

2. The method for constructing a superstructure above water according to claim 1, further comprising inserting the insert member into the inside of the through hole after the precast block is supported by the pile.

3. Before the precast block is moved downward from above the pile, the insertion member is inserted into the inside of the through hole, and a locking portion provided at the upper part of the insertion member is locked to the beam member, so that the insertion member is supported by the beam member; A method for constructing a superstructure above water as described in claim 1, in which, with the lower part of the insertion member protruding downwardly below the precast block, the precast block and the insertion member are moved downwardly from above the pile, so that the lower part of the insertion member is loosely inserted inside the pile, and the precast block is supported by the upper part of the pile.

4. A method for constructing a superstructure above water as described in any of claims 1 to 3, wherein a pair of beam members are arranged in parallel and spaced apart inwardly from the through hole in a plan view, and the insertion member is inserted between the pair of beam members and a pair of engaging portions provided on the upper part of the insertion member are engaged with the pair of beam members, thereby supporting the insertion member on the pair of beam members.

5. A method for constructing a superstructure above water as described in any of claims 1 to 3, in which when the beam members are placed on the upper ends of each of the piles, the height position of the upper surface of the precast blocks is adjusted by sandwiching a height adjustment plate between the upper ends of the piles and the underside of the beam members.

6. A method for constructing a superstructure above water as described in any of claims 1 to 3, wherein there are a plurality of piles supporting the superstructure, and the precast block is composed of a block body having a plurality of through holes passing vertically through which each of the piles can be inserted.

7. In the structure of a superstructure above water, which is fixed and supported by the top of a cylindrical pile erected in the waterbed, The method includes the steps of: (a) forming a precast block; and (b) inserting a member loosely inserted into the inside of the pile; The precast block has a block body formed of precast concrete and having a through hole penetrating vertically so that the pile can be inserted freely, a beam member protruding inward from the through hole in a plan view, a portion of the beam member located on the inside of the through hole being exposed, and a portion of the beam member located on the outside of the through hole being embedded in the block body, The through-hole of the precast block is loosely fitted onto the pile, and the beam member is placed on the upper end of the pile, and the precast block is supported on the upper part of the pile, The insertion member is inserted into the through hole, a lower portion of the insertion member is loosely inserted into the inside of the pile, and a locking portion provided on an upper portion of the insertion member is locked to the beam member, thereby supporting the insertion member on the beam member; A superstructure structure above water, characterized in that a partition plate that separates the inside of the pile into upper and lower parts is provided at a position at a predetermined depth from the upper end of the pile, the fill concrete filled inside the pile and in the through hole above the partition plate has solidified, and the superstructure, in which the precast block, the insertion member and the solidified fill concrete are integrated, is fixed to the top of the pile.

8. A structure of a superstructure above water as described in claim 7, wherein there are a plurality of piles supporting the superstructure, and the block body constituting the precast block has a plurality of through holes passing vertically through which each of the piles can be inserted freely.

Citation Information

Patent Citations

  • Artificial ground

    JP1996218342A

  • Pile head joint structure for pile supporting structural object