Target device and screw auger
The target device with a transparent plate and scale lines simplifies the alignment process for screw auger propulsion, ensuring accurate and efficient excavation by visually confirming alignment with the intended direction.
Patent Information
- Application Number
- JP2023063647
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-10
- Publication Date
- 2024-10-23
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing systems require complex and cumbersome processes to accurately determine and adjust the propulsion direction of the excavation bit in a screw auger, necessitating multiple measurements to ensure alignment with the intended direction.
A target device housed in the drilling bit of a screw auger, featuring a support body with a transparent plate and grid-like scale lines, allowing for quick visual confirmation of alignment using a transit telescope, and through holes for precise deviation detection.
Enables rapid determination of deviations in the propulsion direction, facilitating efficient and cost-effective excavation in the intended direction without the need for repeated adjustments.
Smart Images

Figure 2024150295000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a target device that is stored in a drilling bit of a screw auger used when drilling a drainage cross-pit, and to a screw auger equipped with this target device.
[0002] First, a description will be given of an excavator equipped with a target device according to the prior art, and a procedure for excavating a drain adit using this excavator, with reference to Figs. 5 to 10. FIG. 5 is an image diagram showing an outline of an excavator equipped with a target device according to the prior art. In recent years, the ST collection and drainage method has become known as a method for installing large-diameter collection and drainage pipes with a diameter of 300 to 600 mm underground. This ST collection and drainage method is related to the conventionally known landslide prevention work (groundwater drainage work). More specifically, it is a large-diameter collection and drainage method (horizontal tunnel) that efficiently drains large amounts of groundwater and suppresses landslide activity in places where a large amount of groundwater that induces landslides is concentrated. When excavating a drain adit by the ST collection and drainage method as described above, for example, a propulsion machine 20 as shown in FIG. 5 is used. More specifically, this propulsion machine 20 is installed on a frame 34 made of H-shaped steel or the like on the ground adjacent to a drainage well or an inclined surface, and is equipped with a rotating unit 25 consisting of, for example, a motor or the like that excavates and propels the screw auger 23 into the ground while rotating it about its central axis, an oil cylinder 26 (for spindle) that transmits the rotational force of this rotating unit 25 to the screw auger 23, and an oil cylinder 27 (for propulsion) that presses the steel pipe 21 (drainage collection pipe) that is provided integrally with the rotating unit 25 and contains the screw auger 23, into the ground in conjunction with the propulsion of the screw auger 23. Furthermore, a tip shoe 22 is provided at the tip (propulsion side) of the steel pipe 21 (drainage collection pipe). When using the above-mentioned thruster 20, a power wrench 28 is provided between the thruster 20 and a mouth pipe 29 which is the entrance of the steel pipe 21. Furthermore, as shown in FIG. 5, the screw auger 23 is provided at its tip with a drilling bit 24 housing a target device 30 according to the prior art.
[0003] Here, the structure of the drilling bit 24 provided at the tip of the screw auger 23 and the target device 30 according to the prior art will be described in more detail with reference to Figs. Fig. 6 is an image diagram of a drilling bit provided at the tip of a screw auger. Fig. 7(a) is a perspective view of a target device according to a conventional technique, and (b) is a cross-sectional view of the target device taken along line AA. Note that the same parts as those shown in Fig. 5 are given the same reference numerals, and the description of their configurations will be omitted. As shown in FIG. 6, the drilling bit 24 provided at the tip of the screw auger 23 is provided with a target device 30 according to the prior art inside the drilling bit 24 and on a central axis 8 coinciding with the advancing direction of the screw auger 23. As shown in Figures 7(a) and (b), the target device 30 includes a target 3 arranged on a central axis 8 which is the propulsion direction of the screw auger 23, a support 2 which supports the target 3, a frame member 5 for holding the support 2, and a light source 7 which illuminates the support 2. In the target device 30 according to the prior art, the frame member 5 comprises a frame main body 5a, which is, for example, a cylinder having a bottom, and four support arms 5b fixed to the peripheral side of the frame member 5, for example on all four sides, and a support body 2 is fixed to the inside of the four support arms 5b.
[0004] Next, a procedure for excavating a drain adit using the propulsion machine 20 shown in FIG. 5 will be described with reference to FIGS. 8 and 9. FIG. 8(a)-(c) and 9(a)-(c) are vertical cross-sectional views showing the procedure for excavating a drain adit using an excavator equipped with a target device according to the prior art. The same parts as those shown in Figs. 5 to 7 are given the same reference numerals, and the description of their configurations is omitted. To excavate a drainage tunnel in, for example, a water collection well 33 using the thruster 20 shown in Fig. 5, first, as shown in Fig. 8(a), a platform 34 made of, for example, H-shaped steel or the like is installed at the bottom of the water collection well 33. Next, as shown in Fig. 8(b), the thruster 20 and power wrench 28 shown in Fig. 5 are installed on the platform 34. Thereafter, as shown in FIG. 8( c ), a mouth pipe 29 for inserting the screw auger 23 and the steel pipe 21 is installed on the inner wall of the collection well 33 .
[0005] Next, as shown in FIG. 9(a), the oil cylinder 26 (for spindle) of the propulsion machine 20 is driven to propel the screw auger 23 in the direction of its central axis, while the oil cylinder 27 (for propulsion) is used to press the steel pipe 21 (sewer pipe) containing the screw auger 23 into the ground. At this time, whether or not the drilling bit 24 of the screw auger 23 is being advanced correctly in the originally intended direction can be determined by using a transit 31 installed on the base 23a (see Figure 5) side of the hollow shaft of the screw auger 23 to check the positional relationship between its aiming direction 32 and the position of the target 3 mounted on the target device 30 stored in the drilling bit 24. If the screw auger 23 (the drilling bit 24) is not advanced in the initially intended direction, the advancing direction of the drilling bit 24 (the central axis 8; see Figs. 6 and 7) must be adjusted.
[0006] After the excavation of the drain tunnel by the screw auger 23 and the installation of the steel pipe 21 are completed, as shown in Figure 9 (b), the screw auger 23 arranged between the thruster 20 and the power wrench 28 is disassembled and removed, and the screw auger 23 is completely removed from the steel pipe 21. Figure 9(c) shows the state after all of the screw augers 23 inside the steel pipe 21 have been removed, and the pusher 20 and other components inside the drainage well 33 have been removed, completing the installation of the steel pipe 21 (drainage pipe) underground.
[0007] Here, a procedure for adjusting the advancing direction of the drilling bit 24 of the screw auger 23 will be described with reference to FIG. 10(a) is an image showing a state where the collimation direction of the transit and the thrust direction of the drilling bit are aligned, (b) is an image showing a state where the thrust direction of the drilling bit transitions vertically upward with respect to the collimation direction of the transit, and (c) is an image showing a state where the thrust direction of the drilling bit is corrected vertically downward from the state shown in (b). Note that the same parts as those shown in Figures 5 to 9 are given the same reference numerals, and the description of their configurations will be omitted. As shown in Figure 10(a), when the drilling bit 24 is being advanced in the aiming direction 32 of the transit 31, i.e., in the originally intended direction, the aiming point P seen when looking through the telescope of the transit 31 coincides with the position of the target 3 on the target device 30, as shown on the left side of the page in Figure 10(a).
[0008] In contrast, for example, when the thrust direction of the drilling bit 24 transitions vertically upward parallel to the initial intended direction, when looking through the telescope of the transit 31, the support 2 and target 3 in the target device 30 are located vertically above (directly above) the aiming point P, as shown on the left side of the paper in Figure 10(b). Then, to return the propulsion direction of the drilling bit 24 from the state shown in Figure 10(b) to the originally intended direction, i.e., the aiming direction 32 of the transit 31 (towards the aiming point P), the orientation of the drilling bit 24 of the screw auger 23 can be remotely controlled to correct the propulsion direction of the drilling bit 24 vertically downward. In this case, as the drilling bit 24 advances, the position of the target 3 seen through the telescope of the transit 31 gradually approaches the aiming direction 32 (aiming point P) of the transit 31, and eventually returns to the state shown on the left side of the paper in Figure 10(a). In other words, the correction of the advancing direction of the drilling bit 24 of the screw auger 23 is completed.
[0009] On the other hand, when adjusting the advancing direction of the drilling bit 24 of the screw auger 23 by the series of steps shown in Figure 10 described above, and performing the operation shown in Figure 10(c) and then advancing the drilling bit 24 as is, the vertical direction will be reversed from the state shown in Figure 10(b). In other words, the advancing direction (central axis 8) of the drilling bit 24 is shifted at an angle vertically downward with respect to the initially intended direction (the collimation direction 32 of the transit 31). In this case, it is necessary to adjust the advancing direction of the drilling bit 24 of the screw auger 23 (the inclination of the central shaft 8) again. In other words, when using a screw auger 23 equipped with a target device 30 relating to the conventional technology for the drilling bit 24, if the thrust direction of the drilling bit 24 deviates from the initially intended direction, it was necessary to repeat the steps shown in Figures 10(b) to (c) in the subsequent drilling process. As a prior application capable of dealing with such a situation, for example, Patent Document 1 shown below is known.
[0010] Patent Document 1, entitled "Device for Measuring the Direction of Excavated Buried Object," discloses an idea for a device for measuring the direction of excavation, such as the excavation head of a non-soil-removal-pipe burial device or a shield excavation device. The device for measuring the thrust direction of a buried thrust body, which is an invention disclosed in Patent Document 1, will be described using the same symbols as in Figures 1 to 4 in the document. It is characterized in that a pair of targets (2, 3) consisting of a lamp (12) and a measurement transparent plate (9) having a lattice-shaped measurement line (8) that can only be seen when the lamp (12) is lit, are arranged side by side perpendicular to the thrust reference line (4-4), and a telescope (14) is provided behind the thrust body (1) along the tunnel reference line (15-15) and facing the thrust body (1). According to the device disclosed in Patent Document 1 having the above configuration, by turning on the lamps (12) of a pair of targets (2, 3), the intersection of the measurement line (8) of either one of the targets (2, 3) and the propulsion reference line (4-4) can be measured with a telescope (14) without moving the targets (2, 3). Therefore, according to the invention disclosed in Patent Document 1, the propulsion direction of the propelling body (1) can be measured simply and accurately. [Prior art documents] [Patent documents]
[0011] [Patent Document 1] Publication No. 49-147809 Summary of the Invention [Problem to be solved by the invention]
[0012] According to the invention disclosed in the above-mentioned Patent Document 1, the amount of deviation of the propulsion reference line (4) from the tunnel reference line (15; corresponding to the collimation direction 32) can be accurately grasped by measuring the amount of deviation of the propulsion reference line (4) using two targets (2, 3). However, even when confirming that the tunnel reference line (15) is aligned with the propulsion reference line (4), it is necessary to measure the amount of deviation twice using the two targets (2, 3), which is an extremely cumbersome task.
[0013] The present invention has been made in response to such conventional circumstances, and its purpose is to provide a target device and a screw auger equipped with the same that make it possible to determine at a glance whether the advancing direction of a drilling bit attached to the tip of the screw auger matches the originally intended direction when checking and adjusting the advancing direction of the drilling bit. [Means for solving the problem]
[0014] The target device, which is a first invention for solving the above problems, is a target device stored in a drilling bit provided at the tip of a screw auger, and includes a support having a plane perpendicular to a central axis that coincides with the propulsion direction of the drilling bit, a circular target provided on the plane of the support at a position intersecting the central axis, a light-transmitting plate that is arranged on the base side of the screw auger on the plane and is arranged parallel to the plane while being spaced apart from the plane, allowing the target to be seen through, and a holding structure for holding the support and the light-transmitting plate, wherein the light-transmitting plate has a lattice-shaped scale line whose origin is located at the position where it intersects with the central axis, and a circular through hole whose center is located at the origin and through which the target can be seen. In the first invention having the above configuration, the support has the function of holding the target, which has a circular outer shape when viewed in a plane, at a position intersecting with a central axis that coincides with the driving direction of the drilling bit. The target also has the function of indicating the driving direction of the drilling bit when the target device is viewed using the telescope of the transit from the base side of the hollow rotating shaft of the screw auger. The light-transmitting plate also has a scale and a through hole that perform the following functions while allowing the target arranged at the back side of the installation position to be seen through. Furthermore, the holding structure has the function of holding the support and the light-transmitting plate at a desired position. The grid-like scale lines formed on the surface of the light-transmitting plate have the effect of making it possible to measure the amount of deviation of the target based on the aiming direction (aiming point) of the transit when the target device is viewed through the transit's telescope from the base side of the hollow rotating shaft of the screw auger. Furthermore, the through hole, which is formed with its center position coinciding with the origin of the lattice-like scale lines on the translucent plate, makes it possible to determine whether the target can be seen through this through hole when viewing the target device using the transit telescope from the base side of the hollow rotating shaft of the screw auger, and thereby to determine whether the direction in which the drilling bit is advanced is angularly misaligned from the originally intended direction.
[0015] A second invention is the above-mentioned first invention, characterized in that the holding structure is a frame member that holds the support body and the light-transmitting plate. The second invention having the above configuration has the same effect as the first invention. Furthermore, in the second invention, the frame member has the effect of holding the support body and the light-transmitting plate at desired positions.
[0016] The third invention is the first invention described above, characterized in that the holding structure includes a frame member that holds the support body and a support shaft that is erected on the support body and holds the light-transmitting plate. The second invention having the above configuration has the same effect as the first invention. Furthermore, in the second invention, the frame member has the effect of holding the support in a desired position. Also, the support shaft has the effect of fixing the light-transmitting plate while maintaining a desired state with respect to the existing support, particularly when the light-transmitting plate is to be attached later.
[0017] A fourth invention is the above-mentioned third invention, characterized in that the support shaft is erected closer to the origin of the light-transmitting plate. The fourth invention having the above configuration has the same effect as the third invention described above. Furthermore, by providing the support shaft upright near the origin of the light-transmitting plate in the fourth invention, it has the effect of facilitating the arrangement of the light-transmitting plate on the plane of the support while aligning the target position supported on the plane of the support with the origin position of the light-transmitting plate when the support is viewed in a plan view.
[0018] A fifth invention is any one of the first to fourth inventions described above, characterized in that the periphery of the through hole has a border line. The fifth invention having the above configuration has the same effect as the respective first to fourth inventions. Furthermore, in the fifth invention, the periphery of the through hole has a border line, which makes it easier to visually confirm the boundary of the through hole when the target device is viewed from the base side of the hollow rotating shaft of the screw auger using the telescope of the transit.
[0019] The screw auger of the sixth invention is characterized in that it has a drilling bit having a tip which is advanced while digging into the ground, and a target device of any of the first to fifth inventions described above which is stored within the drilling bit. In the sixth invention having the above configuration, the drilling bit is provided at the tip of the screw auger and has the function of advancing the drilling bit in the direction of its central axis while drilling into the soil. The screw auger also has the function of sending and discharging the soil cut out by the drilling bit from the tip side (the drilling bit) to the base side. Furthermore, the screw auger has a hollow rotating shaft, which has the effect of making it possible to view the target of the target device stored in the drilling bit from the base side of the rotating shaft. In addition, the target device has the same functions as those of the first to fifth aspects of the invention described above. Effect of the Invention
[0020] According to the first invention as described above, when the target device is viewed using the transit telescope from the base side of the hollow rotating shaft of the screw auger, if the aiming direction (aiming point), the position of the through hole formed in the translucent plate, and the position of the target all coincide, it can be determined that the drilling bit of the screw auger is being advanced in the originally intended direction. Furthermore, when the target device is viewed using the transit telescope from the base side of the hollow rotating shaft of the screw auger, if the position of the through hole formed in the translucent plate and the position of the target match, but the aiming direction (aiming point) does not match, it can be determined that the direction of thrust of the drilling bit is shifted from being parallel to the originally intended direction (event 1). Furthermore, when the target device is viewed using the transit's telescope from the base side of the hollow rotating shaft of the screw auger, if the position of the through hole formed in the translucent plate and the aiming direction (aiming point) match, but these do not match the position of the target, it can be determined that the direction of thrust of the drilling bit is angularly misaligned with the originally intended direction (event 2). Furthermore, when the target device is viewed using the transit telescope from the base side of the hollow rotating shaft of the screw auger, if the aiming direction (aiming point), the position of the through hole formed in the translucent plate, and the position of the target are all different, it can be determined that the direction of thrust of the drilling bit is simultaneously shifted parallel to and angularly shifted from the originally intended direction, i.e., the above-mentioned events 1 and 2 are occurring simultaneously. Therefore, by using the first invention, when the thrust direction of the drilling bit deviates from the originally intended direction, it is possible to determine at a glance whether the deviation is parallel to the originally intended direction (event 1), or angular (event 2), or whether a combination of these is occurring. As a result, it is possible to quickly and easily determine whether the advancing direction of the drilling bit is appropriate, and therefore it is possible to efficiently adjust the advancing direction of the drilling bit. Therefore, by using the screw auger equipped with the first aspect of the invention, the drain cross tunnel can be efficiently formed (excavated) in the originally intended direction.
[0021] The second invention has the same effects as those of the first invention described above. Furthermore, according to the second invention, it is possible to efficiently manufacture a target device including a light-transmitting plate having a lattice-like scale line and through holes.
[0022] The third invention has the same effect as the first invention. Furthermore, according to the third invention, it becomes easy to retrofit a light-transmitting plate having lattice-like scale lines and through holes to an existing target device (for example, the target device 30 shown in Figs. 6 and 7). Therefore, according to the third invention, by simply making simple improvements to the target device 30 according to the prior art, such as that shown in Figures 6 and 7 above, it can be used as a higher performance screw auger according to the present invention. Therefore, according to the third invention, the drain cross section can be efficiently formed in an appropriate direction by utilizing an existing screw auger without incurring a large amount of cost.
[0023] The fourth invention has the same effect as the third invention described above. Furthermore, according to the fourth invention, when modifying an existing target device (for example, the target device 30 shown in Figs. 6 and 7) to the target device according to the present invention, it is easy to align the position of the target provided on the support with the origin position of the lattice-like scale lines formed on the light-transmitting plate to be attached later. Therefore, according to the fourth aspect of the present invention, an existing target device (for example, the target device 30 shown in FIGS. 6 and 7) can be modified into the target device according to the present invention with little effort and labor.
[0024] The fifth invention has the same effects as those of the first to fourth inventions described above. Furthermore, according to the fifth invention, it is possible to improve the visibility of the periphery of the through hole when the target device is viewed using the telescope of the transit from the base side of the hollow rotating shaft of the screw auger. As a result, when the direction of advancement of the drilling bit is confirmed using the first invention, it is possible to more easily and reliably determine whether event 1 is occurring, event 2 is occurring, or events 1 and 2 are occurring simultaneously. Therefore, according to the fifth aspect of the invention, a target device with higher performance can be provided, as compared with a case in which the periphery of the through hole does not have a border line.
[0025] The sixth invention specifies a screw auger equipped with a target device according to each of the first to fifth inventions described above as a product invention. Therefore, according to the sixth aspect of the invention, the same effects as those of the first to fifth aspects of the invention are achieved. [Brief description of the drawings]
[0026] [Figure 1] FIG. 4A is a perspective view of a target device according to the present embodiment, and FIG. 4B is a cross-sectional view of the target device taken along line BB. [Diagram 2] 4 is an image diagram of a drilling bit provided at the tip of the screw auger according to the present embodiment. FIG. [Diagram 3] (a) An image showing the state where the aiming direction of the transit and the thrust direction of the drilling bit are aligned, and (b) an image showing the state where the thrust direction of the drilling bit transitions vertically upward relative to the aiming direction of the transit. [Figure 4] (a) is an image showing a state in which the direction of thrust of the drilling bit is misaligned by an angle θ1 with respect to the aiming direction of the transit, and (b) is an image showing a state in which the direction of thrust of the drilling bit is misaligned both horizontally and angularly with respect to the aiming direction of the transit. [Diagram 5] FIG. 1 is an image diagram showing an outline of an excavator equipped with a target device according to a conventional technique. [Figure 6] FIG. 2 is an image of a drilling bit provided at the tip of a screw auger. [Figure 7] FIG. 2A is a perspective view of a target device according to a conventional technique, and FIG. 2B is a cross-sectional view of the same target device taken along line AA. [Figure 8] 1(a) to 1(c) are vertical cross-sectional views showing a procedure for excavating a drain adit using an excavator equipped with a target device according to the prior art. [Figure 9] 1(a) to 1(c) are vertical cross-sectional views showing a procedure for excavating a drain adit using an excavator equipped with a target device according to the prior art. [Figure 10] (a) An image showing the state where the aiming direction of the transit and the thrust direction of the drilling bit are aligned, (b) an image showing the state where the thrust direction of the drilling bit transitions vertically upward relative to the aiming direction of the transit, and (c) an image showing the state where the thrust direction of the drilling bit has been corrected vertically downward from the state shown in (b). DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0027] A target device and a screw auger including the same according to an embodiment of the present invention will be described in detail with reference to FIGS. 1 to 4. FIG.
[0028] [1; Basic configuration of the present invention] First, a basic configuration of a target device according to an embodiment of the present invention (hereinafter simply referred to as "the present embodiment") will be described with reference to FIG. Fig. 1(a) is a perspective view of a target device according to this embodiment, and (b) is a cross-sectional view of the target device taken along line BB. Fig. 2 is an image diagram of a drilling bit provided at the tip of a screw auger according to this embodiment. Note that the same parts as those shown in Figs. 5 to 10 above are denoted by the same reference numerals, and description of their configurations will be omitted. The target device 1 of this embodiment is a target device 30 of the prior art shown in Figure 5 above, in which a light-transmitting plate 4 has been retrofitted to the front side of the support body 2, i.e., the side where the transit 31 is located when the target device is in use. More specifically, the target device 1 according to this embodiment is used by being stored in a drilling bit 10 (having the same structure as the drilling bit 24 shown in Figs. 6 and 10, etc.) provided at the tip of a screw auger 9 (having the same structure as the screw auger 23 shown in Figs. 6 and 10, etc.) shown in Fig. 2. The form of the screw auger 9 according to the present invention does not need to be limited to the form shown in Fig. 2. The target device 1 of this embodiment as described above includes a support 2 having a plane 2a perpendicular to a central axis 8 that coincides with the propulsion direction of the drilling bit 10, a target 3 having a circular planar shape that is provided at a position on the plane 2a of the support 2 that intersects with the central axis 8, and a translucent plate 4 that is arranged on the base side of the screw auger 9 on the plane 2a, is arranged parallel to the plane 2a of the support 2 while being spaced apart from the plane 2a, and allows the target 3 to be seen through. Furthermore, the light-transmitting plate 4 of the target device 1 according to this embodiment has a lattice-like scale line 4a whose origin is located at the position where it intersects with the central axis 8, and also has a circular through hole 4b whose center is at this origin and through which the target 3 can be viewed.
[0029] Moreover, the support body 2 of the target device 1 according to this embodiment is held by a frame member 5. More specifically, the frame member 5 comprises a frame main body 5a, which is, for example, a cylinder having a bottom, and four support arms 5b fixed, for example, on the four sides of the peripheral side of the frame main body 5a, and a support body 2 is fixed to the inside of each of the four support arms 5b. In addition, the target device 1 according to this embodiment includes a light source 7 between the support body 2 and the light-transmitting plate 4 .
[0030] Furthermore, the target device 1 of this embodiment is equipped with a support shaft 6a that is erected (perpendicular) on the support body 2 and a support shaft 6b that is extended from the end surface of the support arm 5b, and the light-transmitting plate 4 is held on the support body 2 by these support shafts 6a and 6b. In other words, the target device 1 of this embodiment is a target device 30 according to the conventional technology shown in FIGS. 6 and 7, to which a light-transmitting plate 4 having lattice-like scale lines 4a and through holes 4b is attached via support shafts 6a and 6b. Further, the frame member 5 (frame body 5a and support arm 5b) alone, or the frame member 5 and the support shaft (support shaft 6a and support shaft 6b) in the target device 1 according to this embodiment, is collectively referred to as the holding structure.
[0031] The target device 1 shown in Figures 1(a) and (b) is used by being stored within a drilling bit 10 provided at the tip of a screw auger 9 as shown in Figure 2, with the target 3 (its center position) and the origin of the scale line 4a (which is the same as the center position of the through hole 4b) arranged on a central axis 8 that coincides with the propulsion direction of the drilling bit 10 (see Figure 2).
[0032] [2. Method for using the present invention] Next, a method of using the target device 1 according to this embodiment will be described with reference to FIGS. FIG. 3(a) is an image showing a state where the collimation direction of the transit and the thrust direction of the drilling bit are the same, and FIG. 3(b) is an image showing a state where the thrust direction of the drilling bit is shifted vertically upward with respect to the collimation direction of the transit. FIG. 4(a) is an image showing a state where the thrust direction of the drilling bit is shifted by an angle θ1 with respect to the collimation direction of the transit, and FIG. 4(b) is an image showing a state where the thrust direction of the drilling bit is shifted horizontally and angularly with respect to the collimation direction of the transit. The same reference numerals are used for the same parts as those shown in FIG. 1 and FIG. 2, and FIG. 5 to FIG. 10, and the description of the configurations thereof will be omitted. Also, in FIG. 3 and FIG. 4, the screw auger 9 and the drilling bit 10 are omitted. When the propulsion direction (central axis 8) of the drilling bit 10 (screw auger 9) in this embodiment coincides with the originally intended drilling direction (aiming direction 32 by the transit 31) (see Figure 3(a)), when the target device 1 in this embodiment is observed from the base side of the hollow rotating shaft of the screw auger 9 using the telescope of the transit 31, as shown on the left side of the page in Figure 3(a), the aiming direction 32 (aiming point P) by the transit 31, (the center position of) the through hole 4b formed in the translucent plate 4, and (the center position of) the target 3 provided on the support body 2 all coincide.
[0033] In contrast, if the thrust direction of the drilling bit 10 (screw auger 9) in this embodiment is horizontally misaligned with the aiming direction 32 (the initial intended drilling direction) of the transit 31 (see Figure 3(b)), when the target device 1 in this embodiment is observed from the base side of the hollow rotating shaft of the screw auger 9 using the telescope of the transit 31, as shown on the left side of the paper in Figure 3(b), the (center position of the) through hole 4b formed in the light-transmitting plate 4 and the (center position of the) target 3 provided on the support body 2 will coincide, but they will not coincide with the aiming direction 32 (aiming point P) of the transit 31. In this case, the deviation D1 of the thrust direction of the drilling bit 10 (screw auger 9) relative to the aiming direction 32 of the transit 31 can be grasped by reading the scale between the target 3 (its center position) and the aiming point P of the transit 31 (see the left side of the page in Figure 3(b)). In this case, the thrust direction of the drilling bit 10 may be adjusted by remote control in the same manner as described above with reference to Fig. 10(c). In other words, the thrust direction of the drilling bit 10 may be adjusted by remote control so that the target 3 is directed toward the aiming point P of the transit 31. Furthermore, after adjusting the thrust direction of the drilling bit 10, when the screw auger 9 is further thrusted and the target device 1 of this embodiment is observed from the base side of the hollow rotating shaft of the screw auger 9 using the telescope of the transit 31, if the state shown in Figure 3(a) is reached, the correction of the thrust direction of the drilling bit 10 is completed. That is, the drilling bit 10 is propelled in the originally intended direction.
[0034] Furthermore, if the thrust direction of the drilling bit 10 (screw auger 9) in this embodiment is deviated in an arbitrary angular direction (for example, vertically upward by an angle θ1) from the aiming direction 32 (the initially intended drilling direction) of the transit 31 (see Figure 4(a)), when the target device 1 in this embodiment is observed from the base side of the hollow rotating shaft of the screw auger 9 using the telescope of the transit 31, as shown on the left side of the page in Figure 4(a), the through hole 4b (its center position) formed in the light-transmitting plate 4 and the aiming direction 32 (aiming point P) of the transit 31 will coincide, but they will not coincide with the target 3 (its center position). In this case, the direction of deviation of the thrust direction of the drilling bit 10 (screw auger 9) relative to the collimation direction 32 of the transit 31 can be understood from the positional relationship between the center position of the through hole 4b formed in the translucent plate 4 and the target 3 (its center position) (see the left side of the paper in Figure 4(a)). In this case, the thrust direction of the drilling bit 10 may be adjusted by remote control in the same manner as described above with reference to Fig. 10(c). In other words, the thrust direction of the drilling bit 10 may be adjusted by remote control so that the target 3 is directed toward the aiming point P of the transit 31. Furthermore, after adjusting the thrust direction of the drilling bit 10, when the screw auger 9 is further thrusted and the target device 1 of this embodiment is observed from the base side of the hollow rotating shaft of the screw auger 9 using the telescope of the transit 31, if the state shown in Figure 3(a) is reached, the correction of the thrust direction of the drilling bit 10 is completed. That is, the drilling bit 10 is propelled in the originally intended direction.
[0035] Furthermore, if the thrust direction of the drilling bit 10 (screw auger 9) in this embodiment is simultaneously shifted horizontally and in an arbitrary angular direction relative to the aiming direction 32 (the initially intended drilling direction) of the transit 31 (see Figure 4(b)), when the target device 1 in this embodiment is observed from the base side of the hollow rotating shaft of the screw auger 9 using the telescope of the transit 31, as shown on the left side of the paper in Figure 4(b), the aiming direction 32 (aiming point P) of the transit 31, (the center position of) the through hole 4b formed in the translucent plate 4, and (the center position of) the target 3 provided on the support body 2 all do not coincide. In this case, the amount of parallel deviation of the thrust direction of the drilling bit 10 (screw auger 9) relative to the aiming direction 32 of the transit 31 can be grasped by reading the scale between the aiming point P of the transit 31 and the center position of the through hole 4b formed in the translucent plate 4 (see the left side of the paper in Figure 4(b)). In addition, the direction of deviation of the thrust direction of the drilling bit 10 (screw auger 9) relative to the collimation direction 32 of the transit 31 can be understood from the positional relationship between the center position of the through hole 4b formed in the translucent plate 4 and the target 3 (the center position) (see the left side of the paper in Figure 4(b)). In this case, the thrust direction of the drilling bit 10 may be adjusted by remote control in the same manner as described above with reference to Fig. 10(c). In other words, the thrust direction of the drilling bit 10 may be adjusted by remote control so that the target 3 is directed toward the aiming point P of the transit 31. Furthermore, after adjusting the thrust direction of the drilling bit 10, when the screw auger 9 is further thrusted and the target device 1 of this embodiment is observed from the base side of the hollow rotating shaft of the screw auger 9 using the telescope of the transit 31, if the state shown in Figure 3(a) is reached, the correction of the thrust direction of the drilling bit 10 is completed. That is, the drilling bit 10 is propelled in the originally intended direction.
[0036] [3; About the action and effect of the basic structure of this invention] By using the target device 1 of this embodiment as described above and the screw auger 9 equipped with it, when the thrust direction of the drilling bit 10 deviates from the originally intended direction, it is possible to easily determine whether the deviation is parallel to the originally intended direction (event 1), whether it is an angular deviation (event 2), or whether a combination of these is occurring. In other words, it is possible to quickly and easily determine whether the advancing direction of the drilling bit 10 is appropriate. Furthermore, this also allows the advancing direction of the drilling bit 10 to be adjusted efficiently. In other words, by using the target device 1 of this embodiment and the screw auger 9 equipped with it, it is possible to check at a glance whether there is any misalignment in the thrust direction of the drilling bit 10 and whether the correction of the misalignment has been completed. Therefore, by using the screw auger 9 equipped with the target device 1 according to the present embodiment described above, a drain cross section can be formed accurately and efficiently in the initially intended direction.
[0037] Furthermore, according to the target device 1 of this embodiment, the target device 1 of this embodiment can be easily constructed by simply adding a light-transmitting plate 4, and support shafts 6a and 6b to a target device 30 of the conventional technology as shown in Figures 6 and 7 above. In other words, it is possible to provide a target device 1 with higher performance by effectively utilizing the target device 30 according to the conventional technology. In this case, there is also an advantage that the manufacturing cost can be significantly reduced compared to the case where the target device 1 according to this embodiment is manufactured from scratch.
[0038] [4;Details of the basic structure of the present invention] The basic configuration of the target device 1 according to this embodiment as described above may include the following detailed structures, optional additional items, or modified configurations, either alone or in combination, as necessary. <4-1; How to install the light-transmitting plate (1)> 1 to 4, an example has been described in which a target device 1 according to this embodiment is constructed by providing a light-transmitting plate 4 having scale lines 4a and through holes 4b via support shafts 6a and 6b on an existing target device 30 (see FIGS. 6 and 7), but this target device 1 may have a form other than that described above. More specifically, in the target device 1 according to another embodiment, for example, the length of the support arms 5b in the direction of the central axis 8 in the target device 30 shown in Figures 6 and 7 may be set longer, and the light-transmitting plate 4 having the scale lines 4a and the through holes 4b may be held by these four support arms 5b (optional component). In this case as well, the same actions and effects as in the case of using the target device 1 according to the present embodiment shown in FIGS. 1 to 4 are achieved. In this case, there is an advantage that the manufacturing cost can be reduced when the target device 1 according to this embodiment is produced from scratch. In this specification, an example is given in which the frame member 5 has four support arms 5b, but as long as the positional relationship between the support body 2 and the light-transmitting plate 4 can be properly maintained, the number of support arms 5b should be at least two.
[0039] <4-2; How to install the light-transmitting plate (2)> Furthermore, in the target device 1 of this embodiment, an example has been described in which one of the two support shafts (support shaft 6a and support shaft 6b) is erected (vertically) on the support body 2 and the other is extended to the end face of the support arm 5b, but both of the two support shafts (support shaft 6a and support shaft 6b) may be erected (vertically) on the support body 2, or both of the two support shafts (support shaft 6a and support shaft 6b) may be individually extended to the end face of the support arm 5b (optional components). In this case as well, the same functions and effects as those of the target device 1 according to the present embodiment shown in FIGS. 1 to 4 can be achieved.
[0040] <4-3; How to install the light-transmitting plate (3)> In addition, in the target device 1 of this embodiment, when the light-transmitting plate 4 is fixed using two support shafts (support shaft 6a and support shaft 6b), and when the support shaft 6a is erected (perpendicular) on the support body 2 and the support shaft 6b is extended to the end face of the support arm 5b, the support shaft 6a may be arranged closer to the through hole 4b of the light-transmitting plate 4 (closer to the origin) (optional component). In this case, for example, when a light-transmitting plate 4 having scale lines 4a and through holes 4b is retrofitted to a target device 30 according to the conventional technology as shown in Figures 6 and 7 above, there is an advantage that the work of positioning the through holes 4b (the center positions of the through holes 4b) of the light-transmitting plate 4 directly above the target 3 provided on the flat surface 2a of the support 2 can be easily performed. Therefore, in this case, when manufacturing the target device 1 of this embodiment by retrofitting a light-transmitting plate 4 having scale lines 4a and through holes 4b to a target device 30 of the conventional technology as shown in Figures 6 and 7 above, the work of attaching the light-transmitting plate 4 can be performed accurately and efficiently.
[0041] <4-4: Modifications of the light-transmitting plate> As shown in FIG. 1(a), the periphery of a through-hole 4b formed in a light-transmitting plate 4 in a target device 1 according to this embodiment may have a border line (optional component). In this case, as shown in Figures 3 and 4 above, when checking the target device 1 of this embodiment from the base side of the hollow rotating shaft of the screw auger 9 using the telescope of the transit 31, the visibility of the periphery of the through hole 4b can be improved. As a result, when forming a drain adit 11 using a screw auger 9 equipped with the target device 1 of this embodiment, the task of checking whether the drilling bit 10 provided at the tip of the screw auger 9 is advancing in the originally intended direction can be performed more efficiently. In addition, instead of providing a border line around the periphery of the through hole 4b of the light-transmitting plate 4, the same effect can be achieved by making the light-transmitting plate 4 a color other than transparent (as long as the target 3 can be seen through it).
[0042] <4-5;Other> In the target device 1 according to this embodiment, as shown in FIG. 1 and FIG. 2, etc., a bolt and a nut may be used as the support shaft 6a, and a bolt may be used as the support shaft 6b (optional components). In this case, when the light-transmitting plate 4 is attached to the target device 30 according to the conventional technology (see, for example, FIGS. 6 and 7), general-purpose bolts or the like can be used as the support shafts 6a and 6b. As a result, the manufacturing cost of the target device 1 can be further reduced.
[0043] Furthermore, when the construction method for forming a drain adit 11 (see, for example, Figures 3 and 4) using a screw auger 9 equipped with the target device 1 of this embodiment is particularly the ST collection and drainage construction method, the expected diameter R of the drain adit 11 is 300 to 600 mm, and the maximum length (total length) S is 80 m. Furthermore, in the target device 1 of this embodiment, the greater the distance L (see Figure 3(a)) from the target 3 provided on the support 2 to the translucent plate 4, the more accurately it is possible to determine whether or not there is an angular misalignment in the propulsion direction of the drilling bit 10 relative to the collimation direction 32 (the initially intended propulsion direction of the drilling bit 10) by the transit 31. On the other hand, since the target device 1 according to this embodiment is stored in the drilling bit 10 when used, the length of the target device 1 in the direction of the central axis 8 is restricted by the length of the drilling bit 10 in the direction of the central axis 8 . Therefore, when constructing the target device 1 of this embodiment by retrofitting a light-transmitting plate 4 to a target device 30 of the prior art as shown in Figures 6 and 7 above, it is advisable to set the above distance L to at least 100 mm (optional component).
[0044] In addition, in the target device 1 of this embodiment, the smaller the diameter X of the target 3 and the diameter Y of the through hole 4b, the more accurately the parallel deviation and angular deviation of the thrust direction of the drilling bit 10 relative to the collimation direction 32 (the initially intended thrust direction of the drilling bit 10) by the transit 31 can be grasped. However, if these are too small, it becomes difficult for the transit 31 to see them. Therefore, when the diameter R and the total length S (maximum value) of the drain adit 11 formed using the screw auger 9 equipped with the target device 1 according to this embodiment are specified as described above, the diameter X of the target 3 and the diameter Y of the through hole 4b should both be set to at least 10 mm (see FIG. 3(a) for both).
[0045] In this embodiment, in order to easily understand the action and effect of the target device 1, an example is given in which the parallel misalignment and angular misalignment of the drilling bit 10 with respect to the collimation direction 32 occurs only in the vertical direction, but the parallel misalignment and angular misalignment of the drilling bit 10 with respect to the collimation direction 32 can occur in any direction based on the collimation direction 32. In either case, by using the target device 1 according to the present invention, the specific amount and direction of deviation can be easily grasped. [Industrial Applicability]
[0046] INDUSTRIAL APPLICABILITY As described above, the present invention provides a target device and a screw auger equipped with the same that can easily check whether the direction of thrust of a drilling bit provided at the tip of the screw auger matches the originally intended direction when adjusting the direction of thrust of the drilling bit, and can be used in technical fields related to drainage equipment and its construction techniques. [Explanation of symbols]
[0047] 1...Target device 2...Support 2a...Flat surface 3...Target 4...Light-transmitting plate 4a...Scale mark 4b...Through hole 5...Frame member 5a...Frame body 5b...Support arm 6a, 6b...Support shaft 7...Light source 8...Central axis (propulsion direction) 9...Screw auger 10...Drilling bit 11...Drainage adit 20...Propulsion machine 21...Steel pipe (drainage collection pipe) 22...Tip shoe 23...Screw auger 23a...Base 24...Drilling bit 25...Rotating part (motor) 26...Oil cylinder (for spindle) 27...Oil cylinder (for propulsion) 28...Power wrench 29...Nose pipe 30...Target device 31...Transit 32...Collimation direction 33...Collecting well 34...Rack
Claims
1. A target device stored in a drilling bit provided at the tip of a screw auger, A support having a plane perpendicular to a central axis that coincides with the thrust direction of the drill bit; a circular target provided on the plane of the support at a position intersecting the central axis; a light-transmitting plate that is disposed on the base side of the screw auger on the plane, is disposed parallel to the plane while being spaced apart from the plane, and allows the target to be seen through; a holding structure for holding the support body and the light-transmitting plate, The light-transmitting plate is A grid-like scale line having an origin at a position where the scale line intersects with the central axis; A targeting device, centered at the origin and including a circular through hole for viewing the target.
2. 2. The target device according to claim 1, wherein the holding structure is a frame member that holds the support body and the light-transmitting plate.
3. The holding structure includes: A frame member for holding the support body; 2. The target device according to claim 1, further comprising a support shaft that is erected on the support and holds the light-transmitting plate.
4. 4. The target device according to claim 3, wherein the support shaft is erected on the light-transmitting plate near the origin.
5. 5. The target device according to claim 1, wherein a periphery of the through hole has a border line.
6. A drilling bit having a tip portion that is advanced while excavating the ground; A screw auger comprising a target device according to any one of claims 1 to 3 housed within the drilling bit.