Angle brace, and earth retaining timbering structure

The H-shaped flint beam with prefabricated design addresses the inefficiencies of conventional strut-type shoring by reducing installation complexity and costs through enhanced rigidity and simplified alignment, while eliminating the need for buckling prevention piles.

JP2024150377APending Publication Date: 2024-10-23OHBAYASHI GUMI LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023063794
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-10
Publication Date
2024-10-23

AI Technical Summary

Technical Problem

Conventional strut-type shoring requires the installation of corner pieces and numerous flint beams, leading to increased construction time, material leasing costs, and restrictions on work space and equipment transport due to the need for anti-buckling piles and complex lifting operations.

Method used

A flint beam with an H-shaped cross-section and prefabricated design, featuring first and second receiving members to resist shear and tensile forces, respectively, allowing for easier alignment and reduced installation effort, and omitting the need for buckling prevention piles.

Benefits of technology

The solution enhances work efficiency and reduces temporary construction costs by minimizing the number of flint beams required, improving rigidity, and eliminating the need for buckling prevention piles, thereby optimizing productivity and material usage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024150377000001_ABST
    Figure 2024150377000001_ABST
Patent Text Reader

Abstract

To provide an angle brace and an earth retaining timbering structure that can improve efficiency of each work inside an excavation tunnel compared to conventional methods and reduce temporary construction costs related to a short strut type timbering.SOLUTION: An angle brace includes: a first angle tie receiving member 33A abutted against one wale 2A and capable of withstanding a shear force generated between the one wale and itself; a second angle tie receiving member 33B abutted against the other wale 2B and capable of withstanding a tensile force generated between the other wale and itself; and a main angle tie member 31 having a predetermined bending rigidity, having one end to which the first angle tie receiving member is connected and the other end to which the second angle tie receiving member is connected. The main angle tie member has an H-shaped cross-section and is a prefabricated earth retaining main member that is equipped with an end plate 313 having bolt holes 314 at the one end and the other end and that can be used repeatedly.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a fire beam and an earth retaining support structure that can be used in earth retaining supports. [Background technology]

[0002] Conventionally, as shown in Patent Document 1, there is a braced shoring as an earth retaining shoring constructed to surround an excavation area. Figure 1 shows a plan view of an example of a braced shoring in a conventional construction method. Corner pieces 4 are provided at the protruding corners, and multiple stop beams 3 are arranged as shown in the figure when a large earth pressure acts, such as when the span of the bottom part is large.

[0003] Fig. 2 shows a perspective view of the installation of a conventional fire strike beam 3 and corner piece 4. As shown in the figure, a corner piece 4 is installed at the protruding corner of a framework consisting of a wale 2, and the fire strike beam 3 is composed of a fire strike main material 31 and a pair of fire strike receiving pieces 32 connected to both ends of the main material.

[0004] The main fire stop material 31 and the fire stop piece 32 that constitute the conventional fire stop beam 3 described above are components manufactured exclusively as rental items for strut-type support materials, and are widely used at construction sites involving excavation as prefabricated earth retaining materials that can be reused repeatedly. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] Japanese Patent Application Publication No. 52-046612 Summary of the Invention [Problem to be solved by the invention]

[0006] However, as described above, conventional braced support requires the installation of corner pieces 4 at the corners, and in addition, when the span of the bottom part is large, it is necessary to install a large number of braced beams, as shown in Figure 1.

[0007] When the span of the bottom part is large, in addition to the need to install many fire beams, as shown in Fig. 1, if the fire beam is long, buckling prevention piles 5 are also required to prevent buckling. Therefore, various problems have arisen, such as the lengthening of the construction period due to the increased labor required for installation, the increase in the rental costs for the brace-type support materials due to the increase in the number of components, and the restriction of the working space for excavation machines and the route for bringing in materials and equipment for lifting work due to the placement of many brace-type support materials.

[0008] In view of the above-mentioned problems, the present invention aims to provide a fire-strike beam and earth-retaining support structure that can improve the efficiency of each work step inside an excavation tunnel compared to the conventional method and reduce the temporary construction costs associated with cut beam support work. [Means for solving the problem]

[0009] The invention related to (1) is a fire beam that is butted against adjacent wales in an earth retaining support structure, comprising a first fire beam receiving member that is butted against one of the wales and capable of withstanding the shear force generated between the one wales, a second fire beam receiving member that is butted against the other wales and capable of withstanding the tensile force generated between the other wales, and a main fire beam material that has a predetermined bending rigidity and has one end to which the first fire beam receiving member is connected and the other end to which the second fire beam receiving member is connected, wherein the main fire beam material is a prefabricated main earth retaining material that has an H-shaped cross section and is equipped with end plates with bolt holes at the one end and the other end and can be used repeatedly.

[0010] The invention related to (2) is the fire beam described in (1) above, in which the first fire beam, the second fire beam and the main fire beam all have an H-shaped cross section and the strong axis direction is horizontal.

[0011] The invention related to (3) is a firestrike beam described in (2) above, in which two or more of the firestrike main materials are connected horizontally, and the first firestrike receiving member is connected to one end of the firestrike main materials and the second firestrike receiving member is connected to the other end.

[0012] The invention related to (4) is the fire beam described in (3) above, wherein the horizontal width of the fire beam is at least twice the horizontal width of the one wale and / or the other wale.

[0013] The invention related to (5) is a retaining support structure comprising a fire beam that is butted against adjacent wales and a corner piece, the fire beam having a first fire receiving member that is butted against one wale and capable of withstanding the shear force generated between the one wale and a second fire receiving member that is butted against the other wale and capable of withstanding the tensile force generated between the other wale and a main fire beam having a predetermined length and having one end to which the first fire receiving member is connected and the other end to which the second fire receiving member is connected, the main fire beam being a prefabricated main fire beam material that has an H-shaped cross section and is equipped with end plates having bolt holes at the one end and the other end and that can be used repeatedly.

[0014] The invention related to (6) is the retaining support structure described in (5) above, in which the first fire strike member, the second fire strike member and the main fire strike member all have an H-shaped cross section and the strong axis direction is horizontal. Effect of the Invention

[0015] According to the invention related to (1) above, it is possible to omit the mechanism for resisting the shear force by providing a second flint support member capable of resisting the tensile force generated between the other wale and the main flint as shown in Fig. 5. This makes it easier to adjust the position of the flint beam, and it is possible to reduce the time and effort required for the past to open bolt holes by gas cutting in the wale and the flint support piece for alignment.

[0016] In addition, by using a prefabricated retaining material that can be reused as the main fire stop material, it is possible to effectively use leased items that have been used in the past and to efficiently install fire stop beams according to the required length of the fire stop beam.

[0017] According to the invention related to (2) above, for example, as shown in FIG. 3, the strong axis direction of the first fire striker member, the second fire striker member, and the main fire striker material is set to a horizontal direction different from the conventional direction, so that the rigidity is increased compared to the conventional fire striker beam, and it is possible to suppress the bending moment of the wale.

[0018] In addition, in the conventional fire beam, as shown in Fig. 1, it was necessary to drive buckling prevention piles 5 in consideration of the buckling of the main fire beam material. However, by using the main fire beam material according to the above-mentioned configuration of the present invention, the horizontal rigidity is large, and it is expected that the buckling prevention piles can be omitted. Therefore, in addition to omitting the work of driving and removing the buckling prevention piles, the presence of the buckling prevention piles that hinder the lateral movement of materials during and after excavation is eliminated, making it possible to improve work productivity.

[0019] In addition, it will be possible to reduce the number of fire-stopping beams that need to be installed compared to the conventional method, improving the efficiency of each work step inside the excavation tunnel and reducing the temporary costs associated with the braced support work.

[0020] According to the invention related to (3) above, for example as shown in Figures 6, 13 and 14, two or more main fire-strike members are joined horizontally, thereby further increasing the rigidity of the fire-strike beam and making it possible to suppress the bending moment of the wale.

[0021] According to the invention related to (4) above, for example, as shown by L' and H in Figure 6, if the horizontal width of the fire beam is more than twice the horizontal width of the wale (see Figures 6(b) and (c)), the rigidity of the fire beam can be further increased and the bending moment of the wale can be suppressed.

[0022] According to the inventions related to (5) and (6) above, as shown in Figures 17 to 19, particularly the oblique view of part A in Figure 18(b), by combining the fire-stop beam of the present invention with a conventional corner piece, it is possible to provide an earth retaining support structure that can strengthen the fire-stop structure while ensuring a larger internal space than before, thereby improving productivity and significantly reducing material and construction costs compared to before. [Brief description of the drawings]

[0023] [Figure 1] FIG. 1 is a plan view showing an example of a braced support structure according to a conventional construction method. [Diagram 2] FIG. 1(a) is a perspective view showing an example of the installation mode of a fire beam in a conventional construction method, FIG. 1(b) is a cross-sectional view along line AA of the fire beam piece in FIG. 1(a), FIG. 1(c) is a simulation image of the amount of displacement generated by a conventional fire beam, and FIG. 1(d) is a diagram and a table explaining the difference in girder height of a fire beam piece in a conventional construction method. [Diagram 3] FIG. 2 is a perspective view illustrating an installation mode of a flint beam in the first embodiment of the present invention. [Figure 4] 1A is a perspective view of a main flint member, FIG. 1B is a perspective view of a first flint receiver member, and FIG. 1C is a perspective view of a second flint receiver member in the first embodiment of the present invention. FIG. [Diagram 5] FIG. 2 is a plan view illustrating mechanical characteristics acting on a flint beam in the first embodiment of the present invention. [Figure 6] In the second embodiment of the present invention, (a) is an oblique view explaining the installation manner of the fire beam, (b) is a table showing the ratio of the girder height of the wale and the contact length of the fire beam in the conventional construction method (see Figure 2 (a)), and (c) is a table showing the ratio of the girder height of the wale and the contact length of the fire beam in the embodiment of (a). [Figure 7] 1 is a table comparing the rigidity ratio of the first and second embodiments of the present invention with that of a conventional flint piece. [Figure 8] 1 is a graph comparing the bending rigidity of the first and second embodiments of the present invention with that of a conventional flint piece. [Figure 9] 1 is a table comparing the rigidity ratio of the first and second embodiments of the present invention with that of a conventional main flint material. [Figure 10] 1 is a graph comparing the bending rigidity of the first and second embodiments of the present invention with that of a conventional main flint material. [Figure 11] 1A and 1B are simulation images illustrating the amount of displacement of the wale in each embodiment of the present invention, where (a) is a simulation image of a conventional construction method, (b) is a simulation image of the first embodiment, and (c) is a simulation image of the second embodiment. [Figure 12] 1A and 1B are simulation images illustrating the stress level and deflection amount σ of a fire beam in each embodiment of the present invention, where (a) is a simulation image of a conventional construction method, (b) is a simulation image of the first embodiment, and (c) is a simulation image of the second embodiment. [Figure 13] 1A and 1B are plan views comparing the braced shoring in the second embodiment of the present invention and the conventional construction method, where (a) is a plan view of the conventional construction method, and (b) is a plan view of the braced shoring in the second embodiment. [Figure 14] FIG. 11 is a table comparing the amount of steel used in a braced support in the second embodiment of the present invention and the conventional construction method, where (a) is a table explaining the amount of steel used in the conventional construction method, and (b) is a table explaining the amount of steel used and the steel reduction rate in the second embodiment. [Figure 15] FIG. 11 is a perspective view illustrating an installation mode of a flint beam in another embodiment of the present invention. [Figure 16] FIG. 11 is a perspective view illustrating an installation mode of a flint beam in another embodiment of the present invention. [Figure 17] FIG. 1(a) is a plan view showing an example of a strut-type support in a second embodiment of the present invention, and FIG. 1(b) is a plan view explaining the installation manner of a fire brace beam in conjunction with a corner piece in another embodiment of the present invention. [Figure 18] FIG. 1(a) is a plan view showing an example of a strut-type support structure in a conventional construction method, FIG. 1(b) is a plan view and an oblique view of part A showing an example of a strut-type support structure in which corner pieces are also used in another embodiment of the present invention, and FIG. 1(c) is a plan view showing an example of a strut-type support structure in which corner pieces are also used to reduce the size of the wale rise in another embodiment of the present invention. [Figure 19] 20 is a table and graph showing the results of a cost comparison between (a), (b), and (c) shown in FIG. 18. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0024] Hereinafter, each embodiment of the flint beam of the present invention will be described with reference to the drawings.

[0025] First embodiment Fig. 3 shows a perspective view of the installation of the flint beam 3 in the first embodiment of the present invention. In addition, Fig. 4 shows a perspective view of the components constituting the flint beam 3, with Fig. 4(a) showing the main flint material, Fig. 4(b) showing the first flint receiving member, and Fig. 4(c) showing the second flint receiving member.

[0026] In other words, the fire beam 3 which abuts against adjacent wale rises 2A, 2B has a first fire beam receiving member 33A which abuts against one wale rise 2A and is capable of withstanding the shear force generated between said one wale rise 2A, and a second fire beam receiving member 33B which abuts against the other wale rise 2B and is capable of withstanding the tensile force generated between said other wale rise 2B.

[0027] Furthermore, between the first fire strike receiving member 33A and the second fire strike receiving member 33B, there is a main fire strike member 31 having a predetermined length and having one end to which the first fire strike receiving member 33A is connected and the other end to which the second fire strike receiving member 33B is connected.

[0028] In addition, the fire-stop main material 31 has an H-shaped cross-section and is equipped with an end plate 313 having bolt holes 314 at the one end and the other end, making it a prefabricated retaining main material that can be used repeatedly.

[0029] The above-mentioned prefabricated main retaining materials are components that have traditionally been manufactured specifically for use as leased items for strut-type support materials. After the strut-type support is removed, they are reused at other construction sites and are widely used at construction sites involving excavation.

[0030] In addition, the first fire strike receiving member 33A, the second fire strike receiving member 33B and the main fire strike member 31 constituting the fire strike beam 3 of this embodiment have an H-shaped cross section as shown in Figures 3 and 4, and the webs 331 of the first fire strike receiving member 33A and the second fire strike receiving member 33B and the webs 311 of the main fire strike member 31 are arranged in a horizontal position.

[0031] 3 and 4, the first flint receiving member 33A described above has a shear resistance plate 335A at the end facing the flange of one of the wales 2A, and a round bolt hole 336 is formed for connecting to the wales 2A. Also, an end plate 334 for connecting to the main flint 31 is installed at the end facing the end plate 313 of the main flint 31 of the first flint receiving member 33A, and a round bolt hole 336 is formed.

[0032] On the other hand, as shown in Figures 3 and 4, the second flint receiving member 33B is provided with a tension resistance plate 335B at the end facing the flange of the other wale 2B, and has a bolt hole 336 formed as a long hole for connecting to the wale 2B. Also, at the end of the second flint receiving member 33B facing the end plate 313 of the main flint 31, an end plate 334 for connecting to the main flint 31 is provided, and a bolt hole 336 formed as a round hole is formed.

[0033] The effects of the above-mentioned first and second fire receiving members 33A and 33B will be described below with reference to the plan view of Fig. 5. That is, when earth pressure acts on the retaining wall 1 from the surrounding ground, one wale 2A and the other wale 2B each exhibit the following behavior.

[0034] As shown by the dashed line in the figure, the other wale 2B exhibits deformation behavior in which the middle part in the longitudinal direction moves toward the excavation area, and the vicinity of the end part on the side that abuts against the one wale 2A moves toward the retaining wall 1. In other words, the other wale 2B is subjected to substantially only a tensile force at the joint with the second fire support member 33B.

[0035] Therefore, it is possible to omit the connecting structure for resisting shear force, and the plate 335B for tensile resistance shown in FIG. 4(c) can be connected to the flange of the rib 2B by bolting through the bolt hole 336 consisting of a long hole provided in the plate 335B.

[0036] As shown by the broken line in the figure, the side surface near the end of one wale 2A abuts against the end surface of the other wale 2B. Therefore, as shown in Figure 5, when earth pressure acts on one wale 2A, the middle part in the longitudinal direction moves toward the excavation area while the end vicinity of one wale 2A is restrained. In other words, the shear force acts mainly on the joint part of one wale 2A with the first fire support member 33A.

[0037] Therefore, as a connection structure that resists shear forces, the shear resistance plate 335A shown in FIG. 4(b) can be connected to the flange of the wale 2A by bolting through the round bolt holes 336 provided in the plate.

[0038] As described above, by making the bolt hole 336 of the tension resistance plate 335B of the second fire strike member 33B an elongated hole, even if the bolt hole 336 is misaligned due to the construction error of each of the wales 2A and 2B, the second fire strike member 33B can be easily connected to the other wale 2B, and the work efficiency can be improved. In addition, it is possible to reduce the labor required to open bolt holes by gas cutting in the wales 2A and 2B and the fire strike piece 32 for alignment, as in the conventional case.

[0039] As shown in FIG. 2(a), the conventional fire beam 3 has a vertical strong axis and a small bending rigidity in the horizontal direction. In addition, as shown in the cross-sectional configuration of FIG. 2(b), the conventional fire beam piece 32 has only three webs and does not have a steel plate on the side, so that the bending rigidity is small. Furthermore, as can be seen from the diagram and table explaining the difference in the girder height of the fire beam piece 32 in the conventional construction method in FIG. 2(d), the height of the conventional fire beam piece 32 is about 10% smaller than the flaps 2A and 2B and the main fire beam material 31, and as shown in the simulation image of the generated displacement in FIG. 2(c), the flange of the main fire beam material 31 is deformed so as to be pushed out. On the other hand, the fire beam 3 of this embodiment is arranged so that the strong axis direction of the fire beam 3 is horizontal, as shown in FIG. 3, and the girder height of the first fire beam member 33A and the second fire beam member 33B is the same as that of the main fire beam material 31. This provides a stable structure that does not cause stress concentration, and makes it possible to effectively suppress the bending moment of the wales 2A and 2B.

[0040] The above-mentioned fire stop beam 3 of the present embodiment makes it possible to use the fire stop main material 31 made of a conventional existing main material for the earth retaining structure, while significantly reducing the number of fire stop beams 3 to be installed due to the effect of improving rigidity and suppressing bending moment. This makes it possible to improve the efficiency of each work in the excavation tunnel and reduce the temporary construction costs related to the braced support structure.

[0041] Second Embodiment Next, a second embodiment of the present invention will be described below, in which configurations and effects common to the first embodiment will be omitted.

[0042] Fig. 6(a) shows a perspective view of the installation of the fire beam 3 in the second embodiment of the present invention. In addition, Fig. 6(b) shows a table showing the ratio (L / H) of the girder height H of the wales 2A and 2B and the contact length L of the fire beam 3 in the conventional construction method (see Fig. 2(a)), and Fig. 6(c) shows a table showing the ratio (L' / H) of the girder height H of the wales 2A and 2B and the contact length L' of the fire beam in the embodiment of (a) above. As shown in the figure, in this embodiment, two fire beam main members 31 are connected horizontally, and similarly, two first fire beam receiving members 33A and two second fire beam receiving members 33B are also connected horizontally and arranged. And each of these members is rigidly connected by a bolt. In other words, if the horizontal width of the fire stop beam 3 is made more than twice the horizontal width of the wales 2A, 2B, the proportion of the contact length L' of the fire stop beam 3 will increase, further increasing the rigidity of the fire stop beam 3 and making it possible to suppress the bending moment of the wales 2A, 2B.

[0043] FIG. 7(a) shows the horizontal cross-sectional rigidity (bending rigidity Io) for each size of the conventional flint piece 32 shown in FIG. 2, and FIG. 7(b) shows the horizontal cross-sectional rigidity (bending rigidity I' and I'') for each size of the first flint receiving member 33A and the second flint receiving member 33B in this embodiment. Furthermore, the rigidity ratios (I' / Io and I'' / Io) of the first flint receiving member 33A and the second flint receiving member 33B in this embodiment when used alone and when used in pairs, respectively, are shown with respect to the conventional type. In addition, FIG. 8 shows a graph comparing the bending rigidity of the conventional flint receiving piece 32 and the flint receiving members 33A and 33B in this embodiment when used alone and when used in pairs.

[0044] As can be seen from Figures 3, 6(a), 7 and 8, the flint receiving members 33A and 33B of this embodiment have bending rigidity that is about 2 to 7 times that of the conventional flint receiving piece 32. Furthermore, as described above, in this embodiment, the strong axis direction of the flint beam 3 is horizontal as shown in Figures 3 and 6. In other words, by providing a steel plate on the side of the flint beam 3, it is possible to strengthen the bending rigidity.

[0045] Fig. 9(a) shows the horizontal cross-sectional rigidity (bending rigidity Io) for each size of the steel material of the conventional main flint material 31 shown in Fig. 2, and Fig. 9(b) shows the horizontal bending rigidity (bending rigidity I' and I'') for each size of the steel material of the main flint material 31 in this embodiment, in which the strong axis direction is horizontal as shown in Fig. 3, Fig. 6(a), etc. In addition, Fig. 10 shows a graph comparing the bending rigidity of the conventional main flint material 31 with that of the main flint material 31 in this embodiment, when one piece is used and when two pieces are used.

[0046] As shown in Figures 9 and 10, the main flint material 31 in this embodiment can increase the rigidity ratio (I' / Io and I'' / Io) by approximately 3 to 9 times. The flint beam 3 composed of the flint receiving members 33A, 33B and the main flint material 31 of this embodiment described above can increase the bending rigidity more than the conventional flint beam 3, and can suppress the bending moment of the wales 2A, 2B more significantly than the conventional flint beam 3.

[0047] (Comparison of each embodiment with the prior art) Next, Fig. 11 shows a simulation image of the displacement of the flint beam 3 and the wales 2A and 2B under a certain earth pressure. As shown in the figure, the displacement of the wales 2B is a maximum of 79 mm when the flint beam 3 according to the conventional construction method (shown in (a)) is used, a maximum of 74 mm when the flint beam 3 of the first embodiment (shown in (b)) is used, and a maximum of 71 mm when the flint beam 3 of the second embodiment (shown in (c)) is used, and it can be seen that the displacement is effectively reduced.

[0048] 12 shows a simulation image of the amount of displacement generated in each of the flint beams 3. As shown in the figure, the amount of deflection σ generated in the flint beams 3 is σ1 in the conventional construction method (illustrated in (a))>σ2 in the first embodiment (illustrated in (b))>σ3 in the second embodiment (illustrated in (c)), and it can be seen that the amount of deflection σ is effectively reduced.

[0049] In addition, as shown in the figure, the stress generated in each of the beams 3 is 326 N / mm 2 In contrast, in the first embodiment (illustrated in (b)), the 2 , and in the second embodiment (illustrated in (c)), it is 135 N / mm 2 It can be seen that the generated stress is significantly reduced.

[0050] Next, Fig. 13(a) shows a plan view of an example of a braced support using a conventional construction method, and Fig. 13(b) shows a plan view of an example of a braced support using the braced beam 3 of the second embodiment described above. As shown in the figure, by using the braced beam 3 with high bending rigidity of the present invention, it is not necessary to install the conventional corner piece 4, and further, it is possible to reduce the cross-sectional dimensions of the steel used for the wale 2.

[0051] To explain in more detail, Fig. 14(a) shows the weight of the support in the conventional braced shoring method, and Fig. 14(b) shows the weight of the support when the fire stop beam 3 of the present invention is used. As shown in the table, by using the fire stop beam 3 of the present invention, it is possible to reduce the total amount of steel used in the shoring by about 20%. Therefore, it is possible to suppress material costs (lease fees, etc.) and installation labor, and reduce temporary costs related to the braced shoring.

[0052] (Another embodiment) Although the embodiments of the fire beam of the present invention have been described above, the fire beam is not necessarily limited to the above-described configurations, and the following modifications are possible.

[0053] For example, as shown in Fig. 15, when two main flint members 31 are joined horizontally, the width dimensions of the first flint receiving member 33A and the second flint receiving member 33B may be integrally formed to match the width dimensions of the joined two main flint members 31. This makes it possible to further reduce the installation work of the flint beam 3.

[0054] In addition, as shown in Fig. 16, when two main fire stoppers 31 are joined horizontally, it is possible to make the two first and second fire stoppers 33A and 33B have the same size and shape, and to use a main fire stopper 31 with a shorter length as one of the main fire stoppers 31 joined horizontally. In this way, it is not necessary to manufacture multiple types of first and second fire stoppers 33A and 33B with different lengths, and it is possible to effectively use existing main fire stoppers 31 with the required length. This further reduces material costs (lease fees, etc.) and installation labor, and reduces temporary construction costs related to the strut-type support.

[0055] In addition, in each of the above-mentioned embodiments, the installation of the conventional corner piece 4 as shown in Fig. 2(a) can be omitted by using the fire beam 3 of the present invention. However, the present invention does not necessarily deny the installation of the corner piece 4, and it is possible to use the fire beam 3 of each of the above-mentioned embodiments and the corner piece 4 together.

[0056] For example, FIG. 17(a) shows the installation mode of the fire beam 3 in the second embodiment of the present invention described above. By using the corner piece 4 in combination, as shown in the oblique view of part A in FIG. 17(b) and FIG. 18(b), it is possible to use a single fire beam main material 31 and a single fire beam receiving material 33A, 33B, thereby reducing the amount of steel used and the labor required for installation.

[0057] For example, Figure 18(a) is a plan view showing an example of a strut-type support in a conventional construction method, (b) is a plan view showing an example of a strut-type support in conjunction with a corner piece in another embodiment of the present invention (case 1), and (c) is a plan view showing an example of a strut-type support in conjunction with a corner piece and with a further reduced size of the wale rise in another embodiment of the present invention. The results of a cost comparison of each of these embodiments are shown in Figure 19.

[0058] That is, in case 1 in Fig. 18(b), the fire stop beam 3 and corner piece 4 of the present invention are used together to strengthen the fire stop structure, and the inner space is secured wider than before, improving productivity. Furthermore, in case 2 in Fig. 18(c), the inner space is slightly narrower than in case 1, and the size of the wale 2 is reduced, reducing costs.

[0059] According to the above-mentioned Case 1 and Case 2, as shown in FIG. 19, it is possible to reduce the material costs of various steel materials (lease costs, etc.) and the construction costs of the strut-type support work compared to the conventional methods. In Case 1, the material and construction costs can be reduced by 14% compared to the conventional methods, and in Case 2, a reduction effect of as much as 41% can be obtained.

[0060] The above describes the embodiments of the present invention. The scope of the present invention is indicated by the claims, not by the description of the above embodiments, and further includes all modifications within the meaning and scope of the claims. In addition, the specific materials, dimensions, shapes, etc. described in the above embodiments can be modified within the scope of solving the problems of the present invention. [Explanation of symbols]

[0061] 1 Retaining wall 2. Belly Raising 2A Belly Raise 2B Sit up 3. Flint 31 Main material for flint 311 Web 312 Flange 313 End Plate 314 Bolt hole 32 Flint piece 33A First flint support member 33B Second flint support member 331 Web 332 Flange 334 End Plate 335A Shear Resistant Plate 335B Tensile Resistance Plate 336 Bolt hole 4 Corner Pieces 5 Buckling prevention pile

Claims

1. A fire brace beam that is butted against adjacent wales in an earth retaining support structure, A first flint support member that is abutted against one of the wales and is capable of resisting a shear force generated between the first flint support and the one of the wales; A second flint support member that is abutted against the other flint and is capable of resisting a tensile force generated between the other flint support member and the second flint support member; A main flint member having a predetermined bending rigidity, one end of which is connected to the first flint member and the other end of which is connected to the second flint member; The main flint material is A prefabricated main retaining material that has an H-shaped cross section and is equipped with end plates having bolt holes at the one end and the other end and can be used repeatedly. A flint beam characterized by:

2. The first fire strike member, the second fire strike member and the main fire strike member all have an H-shaped cross section and the strong axis direction is horizontal.

2. The flint beam of claim 1.

3. Two or more of the main flint members are joined together in a horizontal direction, and the first flint receiving member is joined to one end of the main flint members, and the second flint receiving member is joined to the other end of the main flint members.

3. The flint beam according to claim 2.

4. The horizontal width of the fire beam is at least twice the horizontal width of the one wale and / or the other wale.

4. The flint beam according to claim 3.

5. The structure has a joist and a corner piece that are butted against adjacent ribs, The flint beam is A first flint support member that is abutted against one of the wales and is capable of resisting a shear force generated between the first flint support and the one of the wales; A second flint support member that is abutted against the other flint and is capable of resisting a tensile force generated between the other flint support member and the second flint support member; A main flint having a predetermined length, one end of which is connected to the first flint receiving member and the other end of which is connected to the second flint receiving member; The main flint material is A prefabricated main retaining material that has an H-shaped cross section and is equipped with end plates having bolt holes at the one end and the other end and can be used repeatedly. This is a retaining support structure characterized by:

6. The first fire strike member, the second fire strike member and the main fire strike member all have an H-shaped cross section and the strong axis direction is horizontal. The earth retaining support structure according to claim 6.

Citation Information

Patent Citations

  • Construction of mounting corner waling beam in land slide protection timbering

    JP1977046612A