Combustion facility, and method of controlling combustion facility
The combustion facility stabilizes combustion temperatures by using a catalyst to convert carbon dioxide and hydrogen into methane and adjusting fuel supply based on a methane concentration model, addressing catalyst degradation issues and maintaining consistent heat output.
Patent Information
- Application Number
- JP2023064744
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-12
- Publication Date
- 2024-10-25
AI Technical Summary
The degradation of catalysts in cement manufacturing equipment due to components in exhaust gas leads to a decrease in methane production, resulting in unstable combustion temperatures and reduced heat output.
A combustion facility with a methane generation section using a catalyst to convert carbon dioxide and hydrogen into methane, coupled with a control system that measures internal temperatures and adjusts auxiliary fuel supply based on a methane concentration model to stabilize combustion.
The system maintains consistent combustion temperatures by predicting methane concentration and adjusting fuel supply, ensuring stable heat output and homogeneous cement clinker quality.
Smart Images

Figure 2024151430000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a combustion facility and a method for controlling a combustion facility. [Background technology]
[0002] Patent Documents 1 and 2 disclose a method for producing cement clinker, which includes introducing carbon dioxide in exhaust gas generated in a cement manufacturing facility and hydrogen into a catalyst, and supplying methane produced by the reaction of carbon dioxide and hydrogen as fuel to a burner installed in front of the kiln. This reduces the emission of carbon dioxide, a greenhouse gas, and reduces the amount of fossil fuel used by using methane gas as an alternative fuel. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent Publication No. 2021-187720 [Patent Document 2] Patent Publication No. 2022-096846 Summary of the Invention [Problem to be solved by the invention]
[0004] However, in addition to carbon dioxide, exhaust gas contains components that deteriorate the catalyst. Therefore, as the deterioration of the catalyst progresses, the amount of methane produced decreases. Therefore, as described in Patent Documents 1 and 2, when the generated methane is used as fuel for a kiln, the amount of heat obtained by combustion decreases as the amount of methane produced decreases, and there is a concern that the combustion temperature will not be stable.
[0005] Therefore, the present disclosure describes a combustion facility capable of stabilizing the combustion temperature and a method for controlling the combustion facility. [Means for solving the problem]
[0006] An example of a combustion facility includes a combustion section where fuel is combusted, a catalyst that generates methane from carbon dioxide and hydrogen generated in the combustion section, and a reactor that houses the catalyst, and is configured to supply the generated methane as fuel to the combustion section, a supply section that is configured to supply auxiliary fuel to the combustion section, a measurement section that is configured to measure a temperature at a predetermined position in the reactor during generation of methane in the methane generation section, and a control section. The control section is configured to execute a first process of calculating a predicted value of the methane concentration based on a methane concentration model that represents the relationship between the temperature at the predetermined position of the catalyst and the concentration of methane generated in the methane generation section and the temperature measured by the measurement section, and a second process of adjusting the amount of auxiliary fuel supplied to the combustion section by the supply section based on the predicted value calculated in the first process. Effect of the Invention
[0007] According to the combustion equipment and the control method for the combustion equipment according to the present disclosure, it is possible to stabilize the combustion temperature. [Brief description of the drawings]
[0008] [Figure 1] FIG. 1 is a schematic diagram showing an example of a clinker production facility. [Diagram 2] FIG. 2 is a cross-sectional view showing an example of a methane production unit. [Diagram 3] FIG. 3 is a block diagram showing an example of a main part of a clinker production facility. [Figure 4] FIG. 4 is a schematic diagram illustrating an example of a hardware configuration of the controller. [Diagram 5] FIG. 5 is a graph plotting the change in internal reactor temperature as a function of distance from the upstream end of the reactor over a given time period. [Figure 6] FIG. 6(a) is a graph showing an example of the change in relative methane concentration over time, FIG. 6(b) is a graph showing an example of the change in maximum internal temperature in the reactor over time, and FIG. 6(c) is a graph showing an example of the change in position / inner diameter ratio over time. [Figure 7] FIG. 7 is a graph showing an example of the change in a / c relative to b / c. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] In the following description, the same elements or elements having the same functions are designated by the same reference numerals, and duplicated descriptions will be omitted. Note that in this specification, when referring to the top, bottom, right, and left of the figure, the directions of the reference numerals in the figure are used as the reference.
[0010] [Cement clinker manufacturing facility] First, an example of a clinker production facility 1, which is one form of combustion facility, will be described with reference to Figs. 1 to 4. The clinker production facility 1 is a part of a cement production facility, and is a device for producing cement clinker MT4 from cement raw materials MT1, as exemplified in Fig. 1. The clinker production facility 1 also has a function of treating exhaust gas discharged from itself internally, and also operates as an exhaust gas treatment device. The clinker production facility 1 includes a raw material storage area 10, a dryer 12 (dryer), a pulverizer 14 (dryer), a silo 16, an SP (suspension preheater) 18 (preheater; cement calcination furnace), a calcination section 20 (kiln), a power generation device 22, a dust collector 24, a chimney 26, a separation section 28, a methane generation section 30, an adjustment section 31, a temperature sensor SE (measurement section), a supply section 32, an output section 34, and a controller Ctr (control section).
[0011] The raw material storage yard 10 is configured to store raw cement material MT1. The raw cement material MT1 is a mixture of, for example, limestone, coal ash, silica stone, clay, iron oxide raw material, waste, etc., and has a size of about several centimeters to a dozen centimeters.
[0012] Dryer 12 is configured to supply hot air (e.g., about 400°C) to the cement raw materials MT1 introduced from raw material storage 10 to dry the cement raw materials MT1. The cement raw materials MT1 dried in dryer 12 become dried raw materials MT2. Exhaust gas G2 from power generation device 22 is introduced into dryer 12 and is used to dry the cement raw materials MT1. Meanwhile, exhaust gas G3 from dryer 12 is introduced into dust collector 24. The temperature of exhaust gas G3 when introduced into dust collector 24 is, for example, about 90°C.
[0013] The pulverizer 14 is configured to pulverize the dry raw material MT2 introduced from the dryer 12. Examples of the pulverizer 14 include a vertical roller mill and a ball mill. The dry raw material MT2 is pulverized by the pulverizer 14 into particles of 300 μm or less to become granular raw material MT3. When the dry raw material MT2 is pulverized in the pulverizer 14, the dry raw material MT2 comes into contact with exhaust gas G2 from the power generation device 22 and is further dried. The granular raw material MT3 is then introduced into the silo 16. Meanwhile, the exhaust gas G4 from the pulverizer 14 is introduced into the dust collector 24. The temperature of the exhaust gas G4 when introduced into the dust collector 24 is, for example, about 90° C.
[0014] The silo 16 is configured to temporarily store the granular raw material MT3 from the crusher 14. The silo 16 supplies the granular raw material MT3 to the SP 18 at an appropriate time.
[0015] SP18 is a device that preheats granular raw material MT3 for the purpose of increasing the efficiency of firing the raw material in the firing section 20. SP18 includes multiple stages (e.g., about four to five stages) of cyclones 18a (separators) and a calciner 18b. Granular raw material MT3 is fed into cyclone 18a located at the top of the tower of SP18 and moves downward while passing through each stage of cyclones 18a and calciner 18b in sequence.
[0016] Exhaust gas from the calcination section 20 is introduced from the bottom of the SP18. The exhaust gas and the granular raw material MT3 are heat-exchanged in the cyclones 18a of each stage, and the granular raw material MT3 is preheated to, for example, about 850°C to become a preheat-treated raw material. The preheat-treated raw material produced in the SP18 is discharged from the cyclone 18a located at the bottom of the tower and introduced into the calcination section 20. Meanwhile, exhaust gas G1 from the SP18 is discharged from the cyclone 18a located at the top of the SP18. The temperature of the exhaust gas G1 is, for example, about 400°C.
[0017] The calciner 18b is provided between the lowest cyclone 18a and the calciner 20. The calciner 18b is configured to burn the methane generated in the methane generator 30 and the auxiliary fuel supplied from the supply unit 32 as fuel to calcinate the granular raw material MT3. This improves the production volume and calcination efficiency of the preheated raw material (described later). The calciner 18b is connected to the bottom 20b of the calciner 20 via the rising duct 18c. Therefore, the exhaust gas from the calciner 20 is introduced into the calciner 18b via the rising duct 18c.
[0018] The calcination section 20 includes a kiln 20a, a kiln end 20b, a clinker cooler 20c, and a burner 20d. The kiln 20a is configured to calcinate the preheated raw materials at a high temperature to generate cement clinker MT4. The kiln 20a may be, for example, a rotary kiln extending along the horizontal direction. The maximum temperature of the kiln 20a usually exceeds 2000°C. Therefore, in the kiln 20a, the preheated raw materials are heated to, for example, about 1450°C. Exhaust gas generated inside the kiln 20a by calcination is introduced into the SP18. The temperature of the exhaust gas when introduced into the SP18 is, for example, about 900°C to 1250°C.
[0019] The kiln butt 20b connects the rising duct 18c of the SP18 to the kiln 20a, and is configured to introduce the preheated raw materials preheated in the SP18 into the kiln 20a. The clinker cooler 20c is connected to the front of the kiln 20a, and is configured to introduce the cement clinker MT4 obtained by burning the preheated raw materials in the kiln 20a. The clinker cooler 20c is configured to cool the cement clinker MT4 by cooling air such as outside air. The cement clinker MT4 cooled in the clinker cooler 20c is discharged from the burning section 20.
[0020] The burner 20d is provided in the kiln 20a so as to extend horizontally at the front of the kiln 20a. The burner 20d is configured to burn the methane generated in the methane generating section 30 and the auxiliary fuel supplied from the supply section 32 as fuel, and form a flame in the kiln 20a. In the kiln 20a, the preheated raw materials are fired by the flame of the burner 20d. The exhaust gas generated in the kiln 20a during this firing process is introduced into the SP 18 through the kiln butt 20b. The exhaust gas contains carbon dioxide.
[0021] The power generation device 22 is configured to generate electricity by driving a power generation turbine with steam generated by heat exchange with the exhaust gas G1. Therefore, a part of the heat of the exhaust gas G1 is recovered as electric energy in the power generation device 22. The exhaust gas G2 from the power generation device 22 is introduced into the dryer 12 and the pulverizer 14, respectively.
[0022] The dust collector 24 is configured to separate granular materials (powders or particles) contained in the exhaust gases G3, G4 from the gas. The dust collector 24 may be, for example, an electric dust collector. A part of the exhaust gas G5 after passing through the dust collector 24 is discharged to the outside of the clinker production facility 1 through a chimney 26 as exhaust gas from the clinker production facility 1. On the other hand, the remaining part of the exhaust gas G5 after passing through the dust collector 24 is introduced into a separation section 28.
[0023] The separation unit 28 is configured to separate carbon dioxide from the exhaust gas G5 supplied from the dust collector 24. The separation unit 28 may contain, for example, an absorbing liquid capable of absorbing carbon dioxide. When recovering carbon dioxide from the absorbing liquid, the carbon dioxide may be extracted from the absorbing liquid by, for example, heating the absorbing liquid that adsorbs the carbon dioxide. The separation unit 28 may be configured to compress the recovered carbon dioxide to increase the concentration of carbon dioxide. The separation unit 28 may be configured to remove harmful components (for example, nitrogen oxides, sulfur oxides, etc.) contained in the exhaust gas G5 before separating carbon dioxide from the exhaust gas G5.
[0024] The methane generation unit 30 is configured to generate methane from the carbon dioxide recovered in the separation unit 28 and hydrogen supplied from the outside. The methane generation unit 30 is configured to supply the generated methane to at least one of the calciner 18b and the burner 20d (hereinafter simply referred to as the "combustion unit"). The methane generation unit 30 may utilize, for example, the Sabatier reaction (see the reaction formula below) in which carbon dioxide and hydrogen are reacted via a catalyst CT (described in detail later) to obtain methane. CO2+4H2→CH4+2H2O ΔH 289K =-164.9kJ / mol
[0025] As illustrated in FIG. 2, the methane generating section 30 includes a reactor 30a and a heat insulating material 30b. The reactor 30a includes an inner cylindrical portion 30a1 and an outer cylindrical portion 30a2. The inner cylindrical portion 30a1 and the outer cylindrical portion 30a2 are cylindrical and may be arranged concentrically when viewed from the central axis direction. The space between the inner cylindrical portion 30a1 and the outer cylindrical portion 30a2 is configured as a storage space for storing the catalyst CT.
[0026] The catalyst CT may be, for example, a cylindrical pellet with a diameter and height of about several mm. The catalyst CT may be made of a material having high activity in the methanation reaction of carbon dioxide, for example, Ni or a Ni alloy supported on a catalyst support. The catalyst support may be, for example, Al2O3, Cr2O3, SiO2, MgAl2O4, TiO2, ZrO2, etc.
[0027] As illustrated in Fig. 2, when carbon dioxide recovered in the separation section 28 and hydrogen supplied from the outside are introduced from above the reactor 30a, they flow downstream while coming into contact with the catalyst CT in the reactor 30a. In this process, the carbon dioxide and hydrogen react with each other via the catalyst CT to generate methane in the reactor 30a. The generated methane is discharged from the bottom of the reactor 30a and supplied to the burner 20d as fuel. The hydrogen may be, for example, hydrogen stored in a cylinder, or hydrogen obtained by electrolysis of water.
[0028] The heat insulating material 30b is provided on the outer peripheral surface of the reactor 30a (outer cylindrical portion 30a2). The heat insulating material 30b may be provided on the entire outer peripheral surface, or on most of the outer peripheral surface. The heat insulating material 30b is configured to suppress heat dissipation from the reactor 30a to the outside, thereby promoting the progress of the methanation reaction in the reactor 30a.
[0029] The adjustment unit 31 is configured to operate based on an instruction signal from the controller Ctr and adjust the concentration of methane generated in the methane generation unit 30. Specifically, the adjustment unit 31 is configured to mix an inert gas with the methane generated in the methane generation unit 30 as necessary to reduce the concentration of the methane. The inert gas mixed with the methane in the adjustment unit 31 may be, for example, nitrogen, carbon dioxide, or the like.
[0030] The temperature sensor SE is configured to measure the internal temperature in the reactor 30a. As illustrated in FIG. 2, the temperature sensor SE may be configured to measure the internal temperature at the tip of the temperature sensor SE in a state where the tip is inserted into the inside of the inner cylindrical portion 30a1. The temperature sensor SE is capable of measuring the internal temperature at various internal positions of the reactor 30a by changing the insertion depth into the inside of the inner cylindrical portion 30a1. The temperature sensor SE may be configured, for example, by a thermocouple. The data of the temperature measured by the temperature sensor SE is transmitted to the controller Ctr as illustrated in FIG. 1.
[0031] The supply unit 32 is configured to operate based on an instruction signal from the controller Ctr and supply auxiliary fuel to the combustion unit. The amount of auxiliary fuel supplied from the supply unit 32 to the combustion unit is appropriately adjusted based on an instruction signal from the controller Ctr. The auxiliary fuel may be, for example, coal such as pulverized coal, coke, or the like.
[0032] The output unit 34 is configured to operate based on an instruction signal from the controller Ctr and perform a predetermined display or a predetermined notification. The output unit 34 may be, for example, a display or a speaker.
[0033] As shown in Fig. 3, the controller Ctr has a reading unit M1, a storage unit M2, a processing unit M3, and an instruction unit M4 as functional modules. These functional modules are merely a division of the functions of the controller Ctr into a plurality of modules for convenience, and do not necessarily mean that the hardware constituting the controller Ctr is divided into such modules. Each functional module is not limited to being realized by the execution of a program, and may be realized by a dedicated electric circuit (e.g., a logic circuit) or an integrated circuit (ASIC: Application Specific Integrated Circuit) that integrates the same.
[0034] The reading unit M1 is configured to read a program from a computer-readable recording medium RM. The recording medium RM records a program for operating each part of the clinker production facility 1. The recording medium RM may be, for example, a semiconductor memory, an optical recording disk, a magnetic recording disk, or a magneto-optical recording disk. In the following, each part of the clinker production facility 1 may include an adjustment unit 31, a supply unit 32, and an output unit 34.
[0035] The memory unit M2 is configured to store various data. For example, the memory unit M2 may store a program read from the recording medium RM by the reading unit M1, setting data input by an operator via an external input device (not shown), and the like. The memory unit M2 may store data on the internal temperature of the reactor 30a measured by the temperature sensor SE. The memory unit M2 may store a methane concentration model that represents the relationship between the internal temperature of the reactor 30a and the concentration of methane generated in the methane generation unit 30. Details of the methane concentration model will be described later.
[0036] The processing unit M3 is configured to process various data. For example, the processing unit M3 may generate instruction signals for operating each part of the clinker production equipment 1 based on the various data stored in the memory unit M2.
[0037] The instruction unit M4 is configured to transmit the instruction signal generated in the processing unit M3 to each part of the clinker production facility 1.
[0038] The hardware of the controller Ctr may be configured, for example, by one or more control computers. The controller Ctr may include a circuit C1 as a hardware configuration as shown in Fig. 4. The circuit C1 may be configured by electric circuit elements. The circuit C1 may include, for example, a processor C2, a memory C3, a storage C4, a driver C5, and an input / output port C6.
[0039] The processor C2 may be configured to execute a program in cooperation with at least one of the memory C3 and the storage C4 and to input and output signals via the input / output port C6, thereby realizing each of the above-mentioned functional modules. The memory C3 and the storage C4 may function as the storage unit M2. The driver C5 may be a circuit configured to drive each of the components of the clinker manufacturing equipment 1. The input / output port C6 may be configured to mediate the input and output of signals between the driver C5 and each of the components of the clinker manufacturing equipment 1.
[0040] The clinker production facility 1 may include one controller Ctr, or may include a controller group (control unit) composed of multiple controllers Ctr. When the clinker production facility 1 includes a controller group, each of the above-mentioned functional modules may be realized by one controller Ctr, or may be realized by a combination of two or more controllers Ctr. When the controller Ctr is composed of multiple computers (circuits C1), each of the above-mentioned functional modules may be realized by one computer (circuit C1), or may be realized by a combination of two or more computers (circuits C1). The controller Ctr may have multiple processors C2. In this case, each of the above-mentioned functional modules may be realized by one processor C2, or may be realized by a combination of two or more processors C2.
[0041] [How to generate the methane concentration model] Next, a method for generating a methane concentration model will be described with reference to Figures 5 to 7. In generating the methane concentration model, the above-mentioned clinker production facility 1 may be used, or a separately prepared experimental facility equipped with a small reactor 30a may be used.
[0042] First, carbon dioxide and hydrogen are introduced into the reactor 30a to generate methane, while measuring the concentration of methane generated in the reactor 30a. Specifically, a methane concentration MC0 at the start of use of the catalyst CT (time t0) and methane concentrations MC1, MC2, . . . , MCn at multiple different times (times t1, t2, . . . , tn (n is a natural number)) after the start of use of the catalyst CT are measured. The methane concentration may be measured, for example, by a gas chromatograph.
[0043] Here, the parameters MC, MC0, and a are MC: Concentration of methane produced in the methane production section 30 at a given time point after the catalyst CT starts to be used MC0: Concentration of methane produced in the methane production section 30 at the time the catalyst CT starts to be used a:MC / MC0 (hereinafter referred to as "relative methane concentration") Then, the relative methane concentrations a1, a2, . . . , an at time t1, t2, . . . , tn are respectively a1=MC1 / MC0 a2=MC2 / MC0 ... an=MCn / MC0 Figure 6(a) shows an example of the change in relative methane concentration a over time.
[0044] Next, while carbon dioxide and hydrogen are introduced into the reactor 30a to generate methane, the internal temperature at a plurality of internal positions in the reactor 30a is measured by the temperature sensor SE. An example of the measurement result is shown in FIG. 5. The curve L0 illustrated in FIG. 5 shows the change in the internal temperature of the reactor 30a according to the internal position of the reactor 30a at the start of use of the catalyst CT. The curve L1 illustrated in FIG. 5 shows the change in the internal temperature of the reactor 30a according to the internal position of the reactor 30a after a predetermined time has elapsed from the start of use of the catalyst CT (for example, at time t1). The curve L2 illustrated in FIG. 5 shows the change in the internal temperature of the reactor 30a according to the internal position of the reactor 30a after a further predetermined time has elapsed from the creation of the curve L2 (for example, at time t2). The curve L3 illustrated in FIG. 5 shows the change in the internal temperature of the reactor 30a according to the internal position of the reactor 30a after a further predetermined time has elapsed from the creation of the curve L3 (for example, at time t3).
[0045] As illustrated in FIG. 5, the curves L0 to L3 move downward in this order. The reason is as follows. That is, when carbon dioxide and hydrogen are introduced from above the reactor 30a, the catalyst CT in the vicinity of the upstream end of the reactor 30a is mainly used for the methanation reaction. Therefore, the catalyst CT in the vicinity of the upstream end of the reactor 30a is deteriorated. Therefore, as time passes from the start of use of the catalyst CT, the catalyst CT used for the methanation reaction moves to the downstream side of the reactor 30a. As a result, in FIG. 5, the vertical axis represents the distance from the upstream end of the reactor 30a, and in FIG. 5, the entire curve L1 transitions downward from the curve L0, the entire curve L2 transitions downward from the curve L1, and the entire curve L3 transitions downward from the curve L2.
[0046] Here, the parameter b is b: The maximum internal temperature of the reactor 30a at the specified time (hereinafter, also simply referred to as the "maximum internal temperature"). In the example of Fig. 5, the internal temperature Tm0 showing the maximum temperature on the curve L0, the internal temperature Tm1 showing the maximum temperature on the curve L1, the internal temperature Tm2 showing the maximum temperature on the curve L2, and the internal temperature Tm3 showing the maximum temperature on the curve L3 each conform to the definition of the maximum internal temperature b. That is, the maximum internal temperatures b1, b2, , bn at the times t1, t2, , tn are respectively defined as b1: the highest internal temperature Tm1 among the internal temperatures in the reactor 30a measured by the temperature sensor SE at time t1 b2: The highest internal temperature Tm2 among the internal temperatures in the reactor 30a measured by the temperature sensor SE at time t2 ... bn: the highest internal temperature Tmn among the internal temperatures in the reactor 30a measured by the temperature sensor SE at time tn In other words, Figure 6(b) shows an example of the change in maximum internal temperature b over time.
[0047] In addition, the parameters X, R, and c are X: the internal position of the reactor 30a where the internal temperature of the reactor 30a at the predetermined time point is a predetermined value R: An index showing the internal size of the reactor 30a c: The value obtained by dividing X by R (hereinafter, also referred to as the "position / inner diameter ratio") In the example of Fig. 5, when 500°C is selected, the internal position X0 of the reactor 30a when the curve L0 indicates 500°C, the internal position X1 of the reactor 30a when the curve L1 indicates 500°C, the internal position X2 of the reactor 30a when the curve L2 indicates 500°C, and the internal position X3 of the reactor 30a when the curve L3 indicates 500°C each meet the definition of the parameter X.
[0048] On the other hand, the parameter R may be, for example, the inner diameter of the reactor 30a or the cross-sectional area inside the reactor 30a. In the embodiment of FIG. 2, the reactor 30a has a constant size in its extension direction, so that the inner diameter and cross-sectional area of the reactor 30a do not change at any internal position of the reactor 30a. Therefore, the parameter R in this case is a constant. On the other hand, when the shape of the reactor 30a changes in its extension direction, the parameter R may be the inner diameter, cross-sectional area, etc. of the reactor 30a at the internal position of the parameter X.
[0049] Considering the above, the position / inner diameter ratios c1, c2, . . . , cn at times t1, t2, . . . , tn are respectively c1=X1 / R c2=X3 / R ... cn=Xn / R Figure 6(c) shows an example of the change in the position / inner diameter ratio c over time.
[0050] After obtaining the parameters a, b, and c through the above procedure, each data is plotted with b / c on the horizontal axis and a / c on the vertical axis. In this case, as shown in FIG. 7, b / c and a / c show a strong positive correlation. Therefore, by calculating a linear approximation line from each data using, for example, the least squares method, b / c and a / c can be expressed by the following relational expression 1. a / c=α×b / c+β (α, β are any real numbers) (1) The linear approximation line between b / c and a / c thus obtained is the methane concentration model. The linear approximation line AL shown in FIG. 7 is expressed as follows: α=0.16 β=-6.76 The coefficient of determination R 2 is 0.997.
[0051] [Control method for clinker production equipment] Next, a description will be given of a method for controlling the clinker production plant 1. First, the methane concentration model (relational formula 1) generated in advance by the above procedure is stored in the memory unit M2. In addition, the parameter R in the reactor 30a of the clinker production plant 1 that is actually in operation is acquired in advance and stored in the memory unit M2.
[0052] Next, when the preheated raw material is calcined in the calcination section 20, the exhaust gas generated by the calcination is heat-exchanged in the SP 18, the power generation device 22, the dryer 12, the pulverizer 14, and the dust collector 24 in sequence. When at least a part of the exhaust gas G5 discharged from the dust collector 24 is introduced into the separation section 28, carbon dioxide is separated from the exhaust gas G5. The carbon dioxide separated in the separation section 28 and hydrogen are introduced into the methane generation section 30, and react with each other via the catalyst CT to generate methane. The generated methane is supplied from the methane generation section 30 to the burner 20d as fuel. At this time, the concentration MC0 of methane generated in the methane generation section 30 is measured at the start of use of the catalyst CT and stored in the memory section M2.
[0053] During the generation of methane in the methane generation unit 30, the temperature sensor SE measures the internal temperature at each of a plurality of internal positions in the reactor 30a and transmits the measurement results to the controller Ctr. The controller Ctr stores the highest internal temperature among the internal temperatures in the reactor 30a at that time in the memory unit M2 as the maximum internal temperature b. The controller Ctr also stores, as the parameter X, the internal position of the reactor 30a indicating the temperature (500° C. in the above example) selected to obtain the parameter X when generating the methane concentration model in the memory unit M2.
[0054] From the above, the parameters other than the parameter MC are known in the relational expression 1. Therefore, the controller Ctr calculates a predicted value (parameter MC) of the concentration of methane produced in the methane production unit 30 at the time of measurement by the temperature sensor SE by substituting the known parameters into the relational expression 1.
[0055] Next, the controller Ctr controls the adjustment unit 31 based on the calculated predicted value, and adjusts the amount of inert gas mixed into methane by the adjustment unit 31. For example, the controller Ctr may determine whether the calculated predicted value is higher than a predetermined threshold value Th1. When the controller Ctr determines that the calculated predicted value is higher than the predetermined threshold value Th1, the controller Ctr may adjust the amount of inert gas mixed into methane so that the concentration of methane generated in the methane generation unit 30 is equal to or lower than the threshold value Th1.
[0056] The controller Ctr controls the supply unit 32 based on the calculated predicted value, and adjusts the amount of auxiliary fuel supplied to the combustion unit by the supply unit 32. For example, the controller Ctr may determine whether the calculated predicted value is lower than a predetermined threshold value Th2. When the controller Ctr determines that the calculated predicted value is lower than the predetermined threshold value Th2, the controller Ctr may adjust the amount of auxiliary fuel supplied to the combustion unit so as to obtain the amount of heat in the combustion unit when methane having a concentration equal to or higher than the threshold value Th2 is supplied to the combustion unit.
[0057] During operation of the clinker production facility 1, as described above, the measurement of the internal temperature by the temperature sensor SE, the calculation of a predicted value based on the measured internal temperature and the methane concentration model, and the adjustment of the supply amount of auxiliary fuel based on the predicted value are performed intermittently (e.g., about once a week) or continuously.
[0058] [Effect] According to the above example, by acquiring the methane concentration model in advance, a predicted value of the concentration of methane generated in the methane generating unit 30 can be acquired at a time based on the methane concentration model and the temperature at a predetermined position of the reactor 30a measured by the temperature sensor SE. Therefore, even if the amount of methane generated decreases with the progression of deterioration of the catalyst CT, the amount of heat obtained by combustion in the combustion unit is maintained approximately constant by adjusting the amount of auxiliary fuel supplied to the combustion unit according to the predicted value. Therefore, it is possible to stabilize the combustion temperature in the combustion unit of the clinker production facility 1. As a result, it is possible to homogenize the quality of the cement clinker MT4.
[0059] According to the above example, by acquiring the methane concentration model in advance, a predicted value of the concentration of methane generated in the methane generating unit 30 can be acquired at the appropriate time based on the methane concentration model and the temperature at a predetermined position of the reactor 30a measured by the temperature sensor SE. Therefore, even if the concentration of methane generated in the methane generating unit 30 is higher than necessary, the amount of heat obtained by combustion in the combustion unit is maintained approximately constant by adjusting the mixing amount of the inert gas according to the predicted value. Therefore, it is possible to stabilize the combustion temperature in the combustion unit of the clinker production facility 1. As a result, it is possible to homogenize the quality of the cement clinker MT4.
[0060] According to the above example, the amount of auxiliary fuel supplied to the combustion section is calculated more accurately by using the methane concentration model defined by the relationship between a / c and b / c. This makes it possible to further stabilize the combustion temperature in the clinker production facility 1.
[0061] According to the above example, the parameter c is obtained by dividing the internal position of the reactor 30a by an index indicating the internal size of the reactor 30a, so that the influence of the size of the reactor 30a is removed from the methane concentration model. That is, the influence of the concentration distribution of the methane concentration at the internal position of the reactor 30a is removed. Therefore, when creating the methane concentration model, it is sufficient to use an experimental facility equipped with a small reactor 30a. As a result, it is possible to easily obtain the methane concentration model at low cost.
[0062] According to the above example, the carbon dioxide separated from the exhaust gas G5 in the separation section 28 is supplied to the methane generation section 30. Therefore, the concentration of carbon dioxide supplied to the methane generation section 30 is higher than in a case where the exhaust gas G5 is simply supplied to the methane generation section 30. Therefore, a higher concentration of methane is generated in the methane generation section 30. As a result, the proportion of methane supplied to the combustion section is increased, making it possible to reduce the amount of auxiliary fuel used.
[0063] [Variations] The disclosure in this specification should be considered to be illustrative and not restrictive in all respects. Various omissions, substitutions, modifications, etc. may be made to the above examples without departing from the scope of the claims and the gist thereof.
[0064] (1) The controller Ctr may determine whether the calculated predicted value falls below a predetermined threshold. When the controller Ctr determines that the calculated predicted value falls below the predetermined threshold, the controller Ctr may cause the output unit 34 to output a warning indicating that the predicted value falls below the predetermined threshold. For example, if the output unit 34 is a display, a warning message in text or the like may be displayed on the display. If the output unit 34 is a speaker, a voice guidance sound, a warning sound such as an alarm, or the like may be emitted from the speaker.
[0065] (2) With respect to the parameter c, the parameter X does not have to be divided by the parameter R. In other words, the parameter c may be defined by the parameter X.
[0066] (3) The temperature sensor SE may include multiple measurement points. In this case, the multiple measurement points are attached (for example, glued) to the inner tubular portion 30a1 at a predetermined interval, so that the internal temperature at multiple internal positions of the reactor 30a can be measured without changing the insertion depth of the temperature sensor SE inside the inner tubular portion 30a1.
[0067] (4) The temperature sensor SE may be a thermography camera capable of measuring the internal temperature of the reactor 30a.
[0068] (5) In the above example, the reactor 30a has a cylindrical shape, but a reactor 30a having another shape may be used. For example, the reactor 30a may be a plate-type reactor composed of a pair of plate-like bodies. In this case, for example, the catalyst CT may be filled between the pair of plate-like bodies, and the entirety of these may be housed in a housing to form the methane generation section 30. When a plate-type reactor 30a is used, the parameter R may be, for example, the internal cross-sectional area of the reactor 30a.
[0069] (6) A part or all of the methane generated in the methane generation unit 30 may be sold to another business operator, so that the methane may be used in a facility other than the clinker production facility 1. In this case, too, a predicted value of the concentration of methane generated in the methane generation unit 30 may be calculated by the controller Ctr, and the methane may be used in the other facility together with the predicted value.
[0070] (7) The technology described in this specification may be applied to other combustion facilities other than the clinker production facility 1. Examples of other combustion facilities include power generation facilities and casting facilities.
[0071] (8) The methane generation unit 30 may include a first methane generation unit configured to supply the generated methane to the calciner 18b, and a second methane generation unit configured to supply the generated methane to the burner 20d. That is, methane may be supplied independently to the calciner 18b and the burner 20d.
[0072] (9) The supply unit 32 may include a first supply unit configured to supply the auxiliary fuel to the calciner 18b and a second supply unit configured to supply the auxiliary fuel to the burner 20d. That is, the auxiliary fuel may be supplied independently to the calciner 18b and the burner 20d.
[0073] (10) The clinker production facility 1 may not include the adjustment unit 31, and the amount of inert gas mixed into methane may not be adjusted, but the amount of auxiliary fuel supplied to the combustion unit may be adjusted based on a predicted value of the methane concentration. Alternatively, the amount of inert gas mixed into methane may not be adjusted based on a predicted value of the methane concentration, but the amount of auxiliary fuel supplied to the combustion unit may be adjusted.
[0074] (11) In the above example, the SP 18 is a new suspension preheater including the calciner 18b. However, the SP 18 may be a normal suspension preheater that does not include the calciner 18b.
[0075] [Other examples] Example 1. An example of a combustion facility includes a combustion section where fuel is burned, a catalyst for generating methane from carbon dioxide and hydrogen generated in the combustion section, and a reactor that houses the catalyst, and includes a methane generation section configured to supply the generated methane as fuel to the combustion section, a supply section configured to supply auxiliary fuel to the combustion section, a measurement section configured to measure the internal temperature of the reactor during the generation of methane in the methane generation section, and a control section. The control section is configured to execute a first process of calculating a predicted value of the methane concentration based on a methane concentration model that represents the relationship between the internal temperature of the reactor and the concentration of methane generated in the methane generation section and the temperature measured in the measurement section, and a second process of adjusting the amount of auxiliary fuel supplied to the combustion section by the supply section based on the predicted value calculated in the first process. In this case, by acquiring the methane concentration model in advance, a predicted value of the concentration of methane generated in the methane generation section can be acquired in a timely manner based on the methane concentration model and the temperature at a predetermined position of the reactor measured by the measurement section. Therefore, even if the amount of methane produced decreases as the catalyst deteriorates, the amount of heat obtained by combustion in the combustion section is kept substantially constant by adjusting the amount of auxiliary fuel supplied to the combustion section in accordance with the predicted value, thereby making it possible to stabilize the combustion temperature in the combustion equipment.
[0076] Example 2 In the combustion facility of Example 1, the combustion section includes a kiln configured to burn cement raw materials to produce cement clinker, and a calciner configured to calcinate the cement raw materials to be supplied to the kiln, the methane generation section is configured to supply the generated methane as fuel to at least one of the calciner and the burner of the kiln, the supply section is configured to supply auxiliary fuel to the calciner, and the second process may include adjusting the amount of auxiliary fuel supplied by the supply section to at least one of the calciner and the burner based on the predicted value calculated in the first process. In this case, the combustion temperature in the combustion section of the clinker production facility is stabilized, making it possible to homogenize the quality of the cement clinker.
[0077] Example 3. Another example of the combustion equipment includes a combustion section where combustion is performed, a catalyst for generating methane from carbon dioxide and hydrogen generated in the combustion section, and a reactor that accommodates the catalyst, and is configured to supply the generated methane to the combustion section as fuel, an adjustment section configured to mix an inert gas with the methane generated by the methane generation section to adjust the concentration of the methane, a measurement section configured to measure the internal temperature of the reactor during the generation of methane in the methane generation section, and a control section. The control section is configured to execute a first process of calculating a predicted value of the methane concentration based on a methane concentration model that represents the relationship between the internal temperature of the reactor and the concentration of methane generated in the methane generation section and the internal temperature measured in the measurement section, and a second process of adjusting the amount of the inert gas mixed into the methane by the adjustment section based on the predicted value calculated in the first process. In this case, by acquiring the methane concentration model in advance, a predicted value of the concentration of methane generated in the methane generation section can be acquired in a timely manner based on the methane concentration model and the temperature at a predetermined position of the reactor measured by the measurement section. Therefore, even if the concentration of methane generated in the methane generating section is higher than necessary, the amount of heat obtained by combustion in the combustion section is kept substantially constant by adjusting the amount of inert gas mixed in accordance with the predicted value. Therefore, it is possible to stabilize the combustion temperature in the combustion equipment.
[0078] Example 4: In any of the combustion facilities in Examples 1 to 3, the methane concentration model has parameters a, b, and c, respectively: a: The value obtained by dividing the methane concentration generated in the methane generation section at a given time point after the catalyst started to be used by the methane concentration generated in the methane generation section at the time the catalyst started to be used b: Maximum internal temperature of the reactor at a given time c: The internal position of the reactor where the internal temperature of the reactor reaches a predetermined value at a predetermined time is defined by the relationship between a / c and b / c, and the measurement unit may be configured to measure the internal temperature at an internal position of the reactor during the generation of methane in the methane generation unit. In this case, a / c and b / c show a relatively strong correlation. Therefore, by using a methane concentration model defined by the relationship between a / c and b / c, the amount of auxiliary fuel supplied to the combustion unit can be calculated more accurately. Therefore, it is possible to further stabilize the combustion temperature in the combustion equipment.
[0079] Example 5. In any of the combustion facilities in Examples 1 to 3, the methane concentration model has parameters a, b, and c, respectively: a: The value obtained by dividing the methane concentration generated in the methane generation section at a given time point after the catalyst started to be used by the methane concentration generated in the methane generation section at the time the catalyst started to be used b: Maximum internal temperature of the reactor at a given time c: The value obtained by dividing the internal position of the reactor where the internal temperature of the reactor at a given time is a given value by an index indicating the internal size of the reactor. When the above definition is made, the relationship between a / c and b / c is used, and the measuring unit may be configured to measure the internal temperature at the internal position of the reactor during the generation of methane in the methane generation unit. In this case, the same effect as in Example 2 can be obtained. In this case, the internal position of the reactor is divided by an index indicating the internal size of the reactor to obtain the parameter c, so that the influence of the size of the reactor is removed from the methane concentration model. That is, the influence of the concentration distribution of the methane concentration at the internal position of the reactor is removed. Therefore, when creating the methane concentration model, it is sufficient to use an experimental facility equipped with a small reactor. As a result, it is possible to easily obtain the methane concentration model at low cost.
[0080] Example 6 The combustion equipment of any one of Examples 1 to 5 may further include a separation section configured to separate carbon dioxide from the exhaust gas from the combustion section and supply the separated carbon dioxide to the methane generation section. In this case, the concentration of carbon dioxide supplied to the methane generation section is increased compared to a configuration in which the exhaust gas from the combustion section is simply supplied to the methane generation section. Therefore, a higher concentration of methane is generated in the methane generation section. Therefore, the proportion of methane supplied to the combustion section is increased, making it possible to reduce the amount of auxiliary fuel used.
[0081] Example 7. An example of a method for controlling a combustion facility includes a first step of supplying carbon dioxide and hydrogen generated in a combustion section where fuel is combusted to a catalyst in a reactor of a methane generation section to generate methane, a second step of supplying the methane generated in the first step to the combustion section as fuel, a third step of measuring the internal temperature of the reactor by a measurement section during the generation of methane in the first step, a fourth step of calculating a predicted value of the methane concentration based on a methane concentration model that represents the relationship between the internal temperature of the reactor and the concentration of methane generated in the methane generation section and the internal temperature measured by the measurement section, and a fifth step of adjusting the amount of auxiliary fuel supplied to the combustion section by the supply section based on the predicted value calculated in the fourth step. In this case, the same action and effect as the combustion facility of Example 1 can be obtained.
[0082] Example 8 In the method of Example 7, the combustion unit may include a kiln configured to burn cement raw materials to produce cement clinker, and a calciner configured to calcinate the cement raw materials to be supplied to the kiln, the second step may include supplying the methane generated in the first step as fuel to at least one of the calciner and a burner of the kiln, and the fifth step may include adjusting the amount of auxiliary fuel supplied by the supply unit to at least one of the calciner and the burner based on the predicted value calculated in the fourth step. In this case, the same effects as those of the combustion equipment of Example 2 can be obtained.
[0083] Example 9: Another example of a method for controlling a combustion facility includes a first step of supplying carbon dioxide and hydrogen generated in a combustion section where fuel is combusted to a catalyst in a reactor of a methane generation section to generate methane, a second step of measuring the internal temperature of the reactor by a measurement section during the generation of methane in the first step, a third step of calculating a predicted value of the methane concentration based on a methane concentration model that represents the relationship between the internal temperature of the reactor and the concentration of methane generated in the methane generation section and the internal temperature measured by the measurement section, and a fourth step of adjusting the amount of inert gas mixed into the methane generated in the first step by an adjustment section based on the predicted value calculated in the third step, and supplying the adjusted gas to the combustion section as fuel. In this case, the same action and effect as the combustion facility of Example 3 can be obtained.
[0084] Example 10 In any of the methods of Examples 7 to 9, the methane concentration model defines parameters a, b, and c as follows: a: The value obtained by dividing the methane concentration generated in the methane generation section at a given time point after the catalyst started to be used by the methane concentration generated in the methane generation section at the time the catalyst started to be used b: Maximum internal temperature of the reactor at a given time c: The internal position of the reactor where the internal temperature of the reactor reaches a predetermined value at a predetermined time is defined by the relationship between a / c and b / c, and the measurement unit may be configured to measure the internal temperature at an internal position of the reactor during the production of methane in the methane production unit. In this case, the same effects as those of the combustion equipment of Example 4 can be obtained.
[0085] Example 11 In any of the methods of Examples 7 to 9, the methane concentration model is such that the parameters a, b, and c are a: The value obtained by dividing the methane concentration generated in the methane generation section at a given time point after the catalyst started to be used by the methane concentration generated in the methane generation section at the time the catalyst started to be used b: Maximum temperature inside the reactor at a given time c: The value obtained by dividing the internal position of the reactor where the internal temperature of the reactor at a given time is a given value by an index indicating the internal size of the reactor. is defined by the relationship between a / c and b / c, and the measurement unit may be configured to measure the internal temperature at an internal position of the reactor during the production of methane in the methane production unit. In this case, the same effects as those of the combustion equipment of Example 5 can be obtained.
[0086] Example 12 In any of the methods of Examples 7 to 11, the first step may include separating carbon dioxide from the exhaust gas of the combustion section by a separation section, and supplying the separated carbon dioxide to a catalyst to produce methane. In this case, the same effects as those of the combustion equipment of Example 6 can be obtained. [Explanation of symbols]
[0087] Reference Signs List: 1...clinker production equipment (combustion equipment), 18...SP, 18b...calciner (combustion section), 20...calcination section, 20a...kiln (combustion section), 20d...burner, 28...separation section, 30...methane generation section, 30a...reactor, 31...adjustment section, 32...supply section, CT...catalyst, Ctr...controller (control section), MT1...cement raw material, MT4...cement clinker, SE...temperature sensor (measurement section).
Claims
1. a combustion section in which fuel is combusted; A methane generating unit including a catalyst for generating methane from carbon dioxide generated in the combustion unit and hydrogen, and a reactor that accommodates the catalyst, and configured to supply the generated methane to the combustion unit as fuel; a supply section configured to supply auxiliary fuel to the combustion section; A measurement unit configured to measure an internal temperature of the reactor during the production of methane in the methanation unit; A control unit. The control unit is A first process of calculating a predicted value of a methane concentration based on a methane concentration model representing a relationship between an internal temperature of the reactor and a methane concentration generated in the methane generation unit and the internal temperature measured in the measurement unit; and a second process of adjusting the amount of the auxiliary fuel supplied to the combustion section by the supply section based on the predicted value calculated in the first process.
2. The combustion section includes: a kiln configured to calcine the cement raw materials to produce cement clinker; a calciner configured to calcinate the cement raw material to be supplied to the kiln, The methane generation unit is configured to supply the generated methane to at least one of the calciner and the burner of the kiln as fuel, The supply unit is configured to supply the auxiliary fuel to the calciner, 2. The combustion facility according to claim 1, wherein the second process includes adjusting an amount of the auxiliary fuel supplied by the supply unit to at least one of the calciner and the burner based on the predicted value calculated in the first process.
3. A combustion section in which combustion takes place; A methane generating unit including a catalyst for generating methane from carbon dioxide generated in the combustion unit and hydrogen, and a reactor that accommodates the catalyst, and configured to supply the generated methane to the combustion unit as fuel; An adjustment unit configured to mix an inert gas with the methane generated by the methane generation unit to adjust the concentration of the methane; A measurement unit configured to measure an internal temperature of the reactor during the production of methane in the methanation unit; A control unit. The control unit is A first process of calculating a predicted value of a methane concentration based on a methane concentration model representing a relationship between an internal temperature of the reactor and a methane concentration generated in the methane generation unit and the internal temperature measured in the measurement unit; and a second process of adjusting the amount of the inert gas mixed into the methane by the adjustment unit based on the predicted value calculated in the first process.
4. The methane concentration model defines parameters a, b, and c as follows: a: A value obtained by dividing the methane concentration generated in the methane generation unit at a predetermined time point after the start of use of the catalyst by the methane concentration generated in the methane generation unit at the start of use of the catalyst b: the maximum internal temperature of the reactor at the given time c: the internal position of the reactor where the internal temperature of the reactor at the predetermined time indicates a predetermined value is defined by the relationship between a / c and b / c, The combustion equipment according to any one of claims 1 to 3, wherein the measurement unit is configured to measure an internal temperature at the internal position of the reactor during production of methane in the methanation unit.
5. The methane concentration model defines parameters a, b, and c as follows: a: A value obtained by dividing the methane concentration generated in the methane generation unit at a predetermined time point after the start of use of the catalyst by the methane concentration generated in the methane generation unit at the start of use of the catalyst b: the maximum internal temperature of the reactor at the given time c: A value obtained by dividing the internal position of the reactor where the internal temperature of the reactor at the predetermined time shows a predetermined value by an index indicating the internal size of the reactor. is defined by the relationship between a / c and b / c, The combustion equipment according to any one of claims 1 to 3, wherein the measurement unit is configured to measure an internal temperature at the internal position of the reactor during production of methane in the methanation unit.
6. The combustion facility according to claim 1 or 2, further comprising a separation section configured to separate carbon dioxide from the exhaust gas of the combustion section and supply the separated carbon dioxide to the methane production section.
7. A first step of supplying carbon dioxide generated in a combustion section where fuel is combusted and hydrogen to a catalyst in a reactor of a methanation section to generate methane; a second step of supplying the methane generated in the first step to the combustion section as fuel; a third step of measuring an internal temperature of the reactor by a measuring unit during the production of methane in the first step; a fourth step of calculating a predicted value of the methane concentration based on a methane concentration model representing a relationship between the internal temperature of the reactor and the concentration of methane generated in the methane generation unit and the internal temperature measured in the measurement unit; and a fifth step of adjusting an amount of auxiliary fuel supplied to the combustion section by a supply section based on the predicted value calculated in the fourth step.
8. The combustion section includes: a kiln configured to calcine the cement raw materials to produce cement clinker; a calciner configured to calcinate the cement raw material to be supplied to the kiln, The second step includes supplying the methane produced in the first step as fuel to at least one of the calciner and a burner of the kiln, 8. The method according to claim 7, wherein the fifth step includes adjusting a supply amount of the auxiliary fuel to at least one of the calciner and the burner by the supply unit based on the predicted value calculated in the fourth step.
9. A first step of supplying carbon dioxide generated in a combustion section where fuel is combusted and hydrogen to a catalyst in a reactor of a methanation section to generate methane; a second step of measuring an internal temperature of the reactor by a measuring unit during the production of methane in the first step; a third step of calculating a predicted value of the methane concentration based on a methane concentration model representing a relationship between the internal temperature of the reactor and the concentration of methane generated in the methane generation unit and the internal temperature measured in the measurement unit; and a fourth step of adjusting an amount of inert gas mixed into the methane produced in the first step by an adjustment unit based on the predicted value calculated in the third step, and supplying the adjusted gas to the combustion unit as fuel.
10. The methane concentration model defines parameters a, b, and c as follows: a: A value obtained by dividing the methane concentration generated in the methane generation unit at a predetermined time point after the start of use of the catalyst by the methane concentration generated in the methane generation unit at the start of use of the catalyst b: the maximum internal temperature of the reactor at the given time c: the internal position of the reactor where the internal temperature of the reactor at the predetermined time indicates a predetermined value is defined by the relationship between a / c and b / c, The method according to any one of claims 7 to 9, wherein the measurement unit is configured to measure an internal temperature at the internal location of the reactor during production of methane in the methanation unit.
11. The methane concentration model defines parameters a, b, and c as follows: a: A value obtained by dividing the methane concentration generated in the methane generation unit at a predetermined time point after the start of use of the catalyst by the methane concentration generated in the methane generation unit at the start of use of the catalyst b: the maximum internal temperature of the reactor at the given time c: A value obtained by dividing the internal position of the reactor where the internal temperature of the reactor at the predetermined time shows a predetermined value by an index indicating the internal size of the reactor. is defined by the relationship between a / c and b / c, The method according to any one of claims 7 to 9, wherein the measurement unit is configured to measure an internal temperature at the internal location of the reactor during production of methane in the methanation unit.
12. The method according to any one of claims 7 to 9, wherein the first step includes separating carbon dioxide from the exhaust gas of the combustion section by a separation section, and supplying the separated carbon dioxide to the catalyst to produce methane.
Citation Information
Patent Citations
Co2 utilization method in cement manufacture waste gas and co2 utilization system
JP2021187720A
Cement clinker manufacturing system
JP2022096846A