Delivery date setting device, delivery date setting method and program
The delivery date setting device addresses delivery date deviations and inventory issues by prioritizing orders based on historical compliance and inventory, optimizing delivery dates and reducing excess stock.
Patent Information
- Application Number
- JP2023064968
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-12
- Publication Date
- 2024-10-25
AI Technical Summary
Existing delivery date setting methods based on seat reservations prioritize early orders, leading to delivery date deviations and excessive inventory due to unmet delivery expectations, especially when multiple orders exceed production capacity on the same day.
A delivery date setting device that collects historical non-compliance data to prioritize orders based on the number of past delivery date failures, inventory levels, and delay duration, adjusting provisional delivery dates to official dates to minimize delays and inventory.
This approach reduces delivery date bias and inventory by prioritizing orders based on historical compliance data and inventory levels, ensuring more accurate delivery dates and minimizing excess stock.
Smart Images

Figure 2024151538000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a delivery date setting device, a delivery date setting method, and a program. [Background technology]
[0002] A method of replying to delivery dates by seat reservation is known as a method of setting delivery dates when selling manufactured products to consumers in response to their orders (for example, Patent Document 1). In the method of replying to delivery dates by seat reservation, a production plan that reflects the production capacity of a manufacturing base is likened to a seat, and the consumer's request is assigned to that seat.
[0003] The method of replying to delivery dates using seat reservations described in Patent Document 1 uses seat reservations that represent the manufacturing plan of a product as seats, as well as seat reservations for the components of the product to reply to delivery dates. It is explained that this makes it possible to quickly respond to fluctuations in demand for finished products that include common parts, and to improve delivery date satisfaction for customers. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2002-183256 A Summary of the Invention [Problem to be solved by the invention]
[0005] If multiple orders specify the same delivery date and the amount exceeds the available supply quantity of the product, the excess quantity must be set as the delivery date on the following day or later. In a delivery date response method based on seat reservation, including the method described in Patent Document 1, if an order is specified with a delivery date on the same day and production on that day is impossible, the earliest order is given priority in determining whether or not to supply the product.
[0006] This method of prioritizing early orders when setting delivery dates may result in uneven delivery delays for some customers, lowering customer satisfaction. In addition, it may induce sales outlets to take excessive inventory in anticipation of future sales to customers, resulting in the sales outlets holding excessive inventory.
[0007] The present disclosure has been made in consideration of the circumstances described above, and aims to provide a delivery date setting device, a delivery date setting method, and a program that can suppress bias in delivery date delays due to demand and reduce inventory levels. [Means for solving the problem]
[0008] In order to achieve the above object, the delivery date setting device of the present disclosure stores in a storage unit order information including the requested delivery date of an order for a stock production product and the number of non-compliance cases in which the demander related to the order failed to meet the requested delivery date during a certain past period, sets a tentative delivery date for the requested delivery date, and makes a tentative reservation. Furthermore, the delivery date setting device compares the number of non-compliance cases of the demander related to each order for multiple orders with the same tentative delivery date, assigns a higher priority to orders of demanders with a larger number of non-compliance cases, and sets the tentative delivery date as the official reply delivery date in order of priority. Effect of the Invention
[0009] According to the present disclosure, delivery dates are set using priorities established based on the number of cases of non-compliance with required delivery dates over a certain period of time in the past, thereby making it possible to suppress bias in delivery date delays due to demanders and reduce inventory levels. [Brief description of the drawings]
[0010] [Figure 1] FIG. 1 is a block diagram showing a configuration example of a delivery date setting device according to an embodiment of the present disclosure. [Diagram 2] Flow chart of ordering and delivery date response [Diagram 3] FIG. 1 is a diagram showing an example of a hardware configuration of a delivery date setting device. [Figure 4] (a) A diagram showing an example of order information, (b) a diagram showing an example of production information [Diagram 5] A diagram to explain the state in which a tentative delivery date for an order has been set [Figure 6] (a) is a diagram showing an example of model information, (b) is a diagram showing an example of inventory information, and (c) is a diagram showing an example of delay information. [Figure 7] Diagram to explain the prioritization procedure [Figure 8] Flowchart of delivery date setting process [Figure 9] Prioritization process flowchart [Figure 10] Flowchart of response delivery date correct setting process DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] (Embodiment) Hereinafter, embodiments of the present disclosure will be described in detail with reference to the drawings.
[0012] 1 is a block diagram showing a configuration example of a delivery date setting device 1 according to an embodiment of the present disclosure. The delivery date setting device 1 is a device that sets delivery dates for mass-produced products, including pre-order products that are produced before receiving an order based on a demand forecast or a sales plan.
[0013] As an example, Fig. 2 is a diagram showing the flow of orders and delivery date responses among the consumer 11, sales base 12, delivery base 13, and factory 14. As shown in Fig. 2, at the sales base 12, an order is placed to the factory 14 based on the order from the consumer 11, and a delivery date response is sent to the consumer 11 based on the production information from the factory 14.
[0014] The delivery date setting device 1 is provided, for example, at a sales base 12, and sets a delivery date based on various information including information on the consumer 11, production information from the factory 14, and inventory information at each base. In the following explanation, an order or an order case refers to an order received from the consumer 11, and a response delivery date refers to a delivery date presented to the consumer 11.
[0015] The delivery date setting device 1 is any computer having a delivery date setting function, such as a general-purpose computer, a tablet terminal, or a smartphone on which a delivery date setting program is installed.
[0016] Fig. 3 is a block diagram showing an example of the hardware configuration of the delivery date setting device 1. In the example of Fig. 3, the delivery date setting device 1 includes a processor 301, a primary storage device 302, a secondary storage device 303, an input unit 304, a display unit 305, and a communication interface 306, which are connected to each other via a bus 310.
[0017] The processor 301 includes, for example, a CPU (Central Processing Unit). The processor 301 loads a control program stored in the secondary storage device 303 into the primary storage device 302 and executes the program.
[0018] The primary storage device 302 includes, for example, a RAM (Random Access Memory), functions as a work memory for the processor 301, and temporarily stores the control program that the processor 301 reads from the secondary storage device 303.
[0019] The secondary storage device 303 includes, for example, an EEPROM (Electrically Erasable and Programmable Read Only Memory), a flash memory, etc. The secondary storage device 303 stores programs executed by the processor 301, parameters used for control, etc.
[0020] The input unit 304 includes, for example, a keyboard or a pointing device, and receives input from the manager of the delivery date setting device 1 and passes the input signal to the processor 301. The display unit 305 is any display device, for example, a liquid crystal display or an organic EL (Electro Luminescence) display. The input unit 304 and the display unit 305 may be an integrated touch panel.
[0021] The communication interface 306 is an interface of any communication method for transmitting and receiving data to and from any external computer, and includes, for example, a communication device such as Ethernet (registered trademark) or wireless LAN.
[0022] For example, the processor 301 and the primary storage device 302 cooperate to realize each function of the delivery date setting device 1 shown in Fig. 1. In addition, either or both of the primary storage device 302 and the secondary storage device 303 function as the storage unit 20 of the delivery date setting device 1.
[0023] Specifically, the delivery date setting device 1 functions as an information acquiring unit 101 that acquires various information including information on the demander 11 and the order and information on the production of the product, a tentative reservation processing unit 102 that makes a tentative reservation for the order from the demander 11, and a tentative reservation recording unit 103 that records information on the order including the tentative delivery date in the storage unit 20. Furthermore, the delivery date setting device 1 functions as a prioritization processing unit 104 that prioritizes orders with the same tentative delivery date, a production plan confirmation processing unit 105 that confirms the production plan, and an answered delivery date output unit 106 that outputs an answered delivery date. Each functional unit will be described in detail.
[0024] <Information acquisition section 101> The information acquiring unit 101 acquires order information 201 indicating the order contents when an order is received from a demander 11. The information acquiring unit 101 acquires, as the order information 201, information inputted to the input unit 304 by an administrator of the delivery date setting device 1 or information received from the outside via the communication interface 306.
[0025] Fig. 4(a) is a diagram showing an example of order information 201. For example, as shown in Fig. 4(a), the order information 201 includes an order number given to each order, a consumer name which is the name of the consumer 11, a requested number which is the number of products requested by the consumer 11, a requested product which is the product model requested by the consumer 11, an order date and time when the consumer 11 ordered the product, a requested delivery date which is the delivery date requested by the consumer 11, and information on whether partial shipment is possible. The information on whether partial shipment is possible is information showing the intention of the consumer 11, indicating whether or not it is acceptable to divide the shipment and ship the products that have been produced when the requested number cannot be produced within the daily production capacity of the factory 14.
[0026] The information acquiring unit 101 further acquires production information 202 for the requested product held by the factory 14. Fig. 4(b) is a diagram showing the production information 202 for the requested product included in the order information 201 shown in Fig. 4(a). As shown in Fig. 4(b), the production information 202 includes, for example, a construction number which is a number for one-to-one correspondence between the order case of the consumer 11 and the construction case at the factory 14, a production method which indicates whether the requested product is a stock production product or a made-to-order product, and the daily production capacity of the factory for the requested product. The production information 202 is stored in association with the order number, the requested product, and the requested quantity.
[0027] <Tentative reservation processing unit 102> The tentative reservation processing unit 102 sets a tentative delivery date based on the order information 201 and production information 202 acquired by the information acquisition unit 101, and makes a tentative reservation for the order. Specifically, the tentative reservation processing unit 102 calculates a tentative delivery date by allocating orders for stock production products and made-to-order products from the demander 11 to seats set based on the production capacity and manufacturing process of the factory 14, using a conventional seat reservation delivery date response method.
[0028] Here, for stock production items, no upper limit is set on the number of orders based on production capacity, and the tentative reservation processing unit 102 sets tentative delivery dates based on a schedule that satisfies the requested delivery date on a first-come, first-served basis. Fig. 5 is a diagram for explaining the state in which the tentative delivery dates for orders A to E are set to month b and month c at the time of tentative reservation. Depending on the order situation, as shown in Fig. 5, the total requested quantity of orders with the same tentative delivery date (orders C to E on month c) may exceed the production capacity of the factory.
[0029] <Provisional reservation recording unit 103> The tentative reservation recording unit 103 records the tentative delivery date calculated for the order by the tentative reservation processing unit 102 in the storage unit 20. The tentative delivery date is stored as one element of the order information 201 shown in FIG.
[0030] When the product ordered by the consumer 11 is a made-to-order product, the tentative delivery date recorded by the tentative reservation recording unit 103 is set as the answered delivery date to be replied to the consumer 11 without the prioritization processing being performed by the prioritization processing unit 104, and the answered delivery date is passed to the production plan confirmation processing unit 105.
[0031] On the other hand, if the product ordered by the consumer 11 is a stock-produced product, the memory unit 20 holds the order information 201 including the tentative delivery date, and the priority order setting processing unit 104 executes the priority order setting process based on each piece of information stored in the memory unit 20. The process of the priority order setting processing unit 104 will be described later.
[0032] Here, various information used in the priority order processing is stored in the storage unit 20. As shown in Fig. 1, in addition to the above-mentioned order information 201 and production information 202, the storage unit 20 stores model information 203 of the product related to the order, inventory information 204 of the product at each base, and delay information 205 of the consumer 11 who placed the order. Figs. 6(a), (b), and (c) are diagrams showing examples of the model information 203, inventory information 204, and delay information 205, respectively.
[0033] As shown in Fig. 6(a), model information 203 includes the product model, a production method indicating whether it is a made-to-order product or a made-to-order product, and daily production capacity. As shown in Fig. 6(b), inventory information 204 includes the product model, inventory at factory 14, inventory at distribution base 13, and inventory at sales base 12, and is information that is updated periodically. Model information 203 and inventory information 204 are information stored for each product.
[0034] The delay information 205 is information related to delays stored for each order and each consumer 11, and includes the number of days the tentative delivery date is delayed from the requested delivery date, and the number of cases in which the requested delivery date has not been met during a certain period of the past. The number of days the tentative delivery date is delayed from the requested delivery date is the difference in number of days between the tentative delivery date calculated by the tentative reservation processing unit 102 and the requested delivery date of the consumer 11. The number of cases in which the requested delivery date has not been met during a certain period of the past is the number of cases in which the answered delivery date was delayed from the delivery date requested by the consumer related to the order, and the requested delivery date could not be met during a certain period of time prior to the order. The period for counting the cases in which the requested delivery date has not been met is arbitrary, and may be, for example, one year as shown in FIG. 6(c). The cases in which the requested delivery date has not been met are tallied each time an order is delivered or periodically.
[0035] <Priority Assignment Processing Unit 104> The prioritization processing unit 104 prioritizes the order cases for stock production products based on various information stored in the storage unit 20. The prioritization here refers to determining the order in which the tentative delivery dates given by the tentative reservation processing unit 102 are processed to become the official delivery dates.
[0036] The prioritization processing unit 104 first determines which orders are to be prioritized, then performs the prioritization process for the order cases, and sets the tentative delivery date to the official delivery date according to the determined priority. Whether or not an order is to be prioritized is determined based on the following condition I.
[0037] Condition I: It is not possible to accept production for all orders with a tentative delivery date of the same day with a confirmed delivery date of the same day.
[0038] In other words, among order cases with a tentative delivery date of the same day, all order cases that exceed the production capacity at the time of the tentative delivery date of the product related to the order are determined to be subject to prioritization. The specific determination method is as shown in FIG. 5, where the vertical axis represents the number of units and the horizontal axis represents the tentative delivery date calculated by the tentative reservation processing unit 102, and the requested number of units for orders of products to be produced in advance is added up. If the total requested number is equal to or less than the production capacity at the time of the tentative delivery date, it is determined that all order cases with that tentative delivery date are not subject to prioritization. On the other hand, if the total requested number exceeds the production capacity, it is determined that all order cases with that tentative delivery date are subject to prioritization.
[0039] 5, since the total number of units requested by orders A and B on the tentative delivery date of month a, date b is less than the production capacity, the prioritization processing unit 104 determines that orders A and B are not to be prioritized. On the other hand, since the total number of units requested by orders C, D, and E on the tentative delivery date of month a, date c exceeds the production capacity, the prioritization processing unit 104 determines that orders C, D, and E are to be prioritized.
[0040] If condition I is not met, that is, if the total number of units requested for all orders with tentative delivery dates on the same day is equal to or less than the production capacity at the time of the tentative delivery date, prioritization will not be performed. In this case, the tentative delivery dates for all orders with tentative delivery dates on the same day will be set as the official reply delivery date. If condition I is met, that is, if the total number of units requested for all orders with tentative delivery dates on the same day exceeds the production capacity at the time of the tentative delivery date, prioritization will be performed. Priorities are determined based on the following three variables:
[0041] The first variable is the number of cases where the demander 11 related to the order failed to meet the requested delivery date during a certain period in the past. The certain period for counting the number of non-compliance cases can be any period, for example, one year. The second variable is the inventory amount of the product related to the order. The inventory amount may be the total of the factory inventory, the distribution base inventory, and the sales base inventory. The third variable is the number of days the tentative delivery date is delayed from the requested delivery date, i.e., the number of days difference between the tentative delivery date and the requested delivery date.
[0042] The first variable and the third variable are obtained from information associated with the consumer 11 related to the order to be prioritized among delay information 205 stored for each consumer 11 in the storage unit 20. The second variable is obtained from information associated with the product model related to the order among inventory information 204 stored for each product model in the storage unit 20.
[0043] The prioritization processing unit 104 determines the priority of the order items to be prioritized based on the first variable, the second variable, and the third variable. The prioritization procedure is arbitrary. For example, the first variable, the second variable, and the third variable may each be ranked in ascending order starting from 1, and an order item with a smaller total ranking may be given a higher priority than an order item with a larger total ranking. FIG. 7 is a diagram for explaining an example of the prioritization procedure.
[0044] In the example of Figure 7, the first variable is ranked in ascending order according to the number of cases that do not meet the required delivery date, which is the first variable. Similarly, the second variable is ranked in ascending order according to the amount of product inventory that is the second variable, which is the least, and the third variable is ranked in ascending order according to the number of days that the tentative delivery date is delayed from the required delivery date, which is the third variable. Note that for any of the variables, two or more order cases that have the same variable value may be ranked with the same number close to 1.
[0045] After that, the prioritization processing unit 104 determines the overall priority of the order from any combination of the priorities based on the first variable, the second variable, and the third variable. In the example of Fig. 7, the total of the ranks of each variable is calculated, and the overall priority is determined by giving the highest rank to the smallest total value.
[0046] Note that when the totals of the ranks are the same, the order may be based on the order of any one of the first, second and third variables. When referring to the order of multiple variables, the order of the variables to be referred to is determined in advance. For example, if it is determined in advance that the order of the first variable will be used when the totals of the ranks are the same, the overall priority is determined to be higher in the order of order C, order E and order D in the example of FIG. 7. If the overall priority cannot be determined by referring to the first, second and third variables, the order times may be compared, and the higher overall priority may be set for the order that was placed first.
[0047] As another procedure for prioritizing order items, the order may be prioritized in ascending order of the number of items not meeting the required delivery date, which is the first variable, and, if the first variables have the same value, the order may be prioritized in ascending order of the inventory amount of the product, which is the second variable. Furthermore, if the second variables have the same value, the order may be prioritized in ascending order of the number of days the tentative delivery date is delayed from the required delivery date, which is the third variable. In this way, the comparison of each variable for prioritization may be performed in the order of the first variable, the second variable, and the third variable, but the order of the first variable, the second variable, and the third variable may be interchanged.
[0048] The prioritization processing unit 104 performs processing to set the tentative delivery date of an order item to the officially replied delivery date, in descending order of priority or total priority, within the range that does not exceed production capacity. Specifically, it adds up the requested quantity of an order item, in descending order of priority or total priority, and sets the tentative delivery date to the officially replied delivery date for an order item for which the requested quantity does not exceed the available quantity in production capacity. Furthermore, for an order item for which the requested quantity exceeds production capacity as a result of adding up the requested quantity, it refers to the order information 201 and determines whether partial shipment is possible.
[0049] If partial shipment is possible, the priority order setting processor 104 divides the requested quantity by the number of units available in production capacity, sets the tentative delivery date as the officially responded delivery date, and changes the tentative delivery date for any units that exceed the remaining amount of available production capacity to the next day or later. For order items for which partial shipment is not possible, the tentative delivery dates for the entire requested quantity are changed to the next day or later. In this way, the priority order setting processor 104 determines the officially responded delivery date in order of the earliest tentative delivery date and in order of the priority of tentative delivery dates on the same date.
[0050] <Production plan confirmation processing unit 105> The production plan confirmation processing unit 105 confirms the production plan for the order item for which the official reply delivery date has been determined. The confirmed production plan is sent to the delivery base 13 and the factory 14, and the factory 14 produces the stock products or made-to-order products based on the production plan.
[0051] <Answer due date output section 106> The answered delivery date output unit 106 outputs the formal answered delivery dates determined by the prioritization processing unit 104 as a final answer, in the order of the order cases whose production plans have been confirmed. The output formal answered delivery dates are sent to the demander 11.
[0052] The operation of the delivery date setting device 1 configured as above will be described with reference to the flowcharts shown in Figures 8 to 10. Figure 8 is a flowchart of the delivery date setting process.
[0053] First, when the information acquisition unit 101 of the delivery date setting device 1 receives an order from the consumer 11, it acquires the order information 201 indicating the order contents and the production information 202 regarding the production of the product related to the order (step S1). The order information 201 is information inputted to the input unit 304 by the administrator of the delivery date setting device 1 or information received from the outside via the communication interface 306, and includes, as shown in Fig. 4(a), the order number given to each order, the consumer name which is the name of the consumer 11, the requested number which is the number of products requested by the consumer 11, the requested product which is the name of the product requested by the consumer 11, the order date and time when the consumer 11 ordered the product, the requested delivery date which is the delivery date requested by the consumer 11, and the possibility of partial shipment.
[0054] The production information 202 is production information held by the factory 14 regarding the requested product, and includes, as shown in FIG. 4(b), a construction number which is a number that creates a one-to-one correspondence between an order from the consumer 11 and a construction project at the factory 14, a production method which indicates whether the requested product is a pre-made product or a made-to-order product, and the daily production capacity of the factory 14 for the requested product.
[0055] Next, the tentative reservation processing unit 102 sets a tentative delivery date based on the order information 201 and production information 202 acquired by the information acquisition unit 101 (step S2; tentative delivery date setting step), and the tentative reservation recording unit 103 records the tentative reservation information including the tentative delivery date in the storage unit 20. For example, the tentative reservation processing unit 102 calculates the tentative delivery date by allocating orders for stock production products and made-to-order products from the demander 11 to seats set based on the production capacity of the factory 14 using a conventional seat reservation delivery date reply method.
[0056] Here, for stock-produced products, no upper limit is set based on production capacity, and the tentative reservation processing unit 102 tentatively reserves the answered delivery date on a first-come, first-served basis, based on a schedule that satisfies the requested delivery date. For this reason, depending on the order situation, the total number of requested units for order cases with the same tentative delivery date may exceed the production capacity of the factory 14. Therefore, if the product related to the order case is a stock-produced product (step S3: No), the answered delivery date of the order case is adjusted by the prioritization process (step S4; prioritization step).
[0057] On the other hand, if the product related to the order is a made-to-order product (step S3: Yes), the tentative reservation recording unit 103 sets the tentative delivery date set in step S2 as the official delivery date.
[0058] The priority order assignment process in step S4 will be described in detail with reference to Fig. 9. Fig. 9 is a flowchart of the priority order assignment process.
[0059] First, the prioritization processing unit 104 sorts the order cases in ascending order of the tentative delivery dates set by the tentative reservation processing unit 102 in step S2 of Fig. 8 (step S101). Next, the prioritization processing unit 104 selects t (day), which is the earliest date, from among the tentative delivery dates of the orders for which the official reply delivery date has not been determined, and selects the orders whose tentative delivery dates are set to t (day) (step S102).
[0060] Next, the prioritization processing unit 104 acquires the production capacity at the time of the tentative delivery date t (day) (step S103) and compares it with the sum of the requested quantities of the order items whose tentative delivery date is t (day) (step S104). If the sum of the requested quantities of the order items whose tentative delivery date is t (day) exceeds the production capacity at the time of t (day) (step S104: Yes), the prioritization processing unit 104 performs prioritization (step S105).
[0061] On the other hand, if the sum of the requested quantities of the orders with a tentative delivery date of t (days) is equal to or less than the production capacity as of day t (step S104: No), all the orders with a tentative delivery date of t (days) can be supplied, so the tentative delivery date t (days) is set as the officially replied delivery date (step S106).
[0062] As described above, the prioritization in step S105 is performed using at least one of the first variable, which is the number of orders from consumers 11 that did not meet the required delivery date during a certain period in the past, the second variable, which is the inventory amount of the product related to each order, and the third variable, which is the number of days the tentative delivery date t (days) is delayed from the required delivery date.
[0063] Here, the prioritization processing unit 104 obtains the first variable and the third variable from information associated with the consumer related to the order to be prioritized, among the delay information 205 stored in the storage unit 20 for each consumer 11. Also, the prioritization processing unit 104 obtains the second variable from information associated with the product model related to the order, among the inventory information 204 stored in the storage unit 20 for each product model.
[0064] The prioritization processing unit 104 sets a higher priority the greater the number of cases not meeting the required delivery date, which is the first variable. Or, the lower the product inventory, which is the second variable, the higher the priority. Or, the greater the number of days the tentative delivery date is delayed from the required delivery date, which is the third variable, the higher the priority. Or, the overall priority is determined by combining the priorities based on the first to third variables. In the following processing, the priority refers to the priority based on each variable or the overall priority.
[0065] For the order items for which the priority has been assigned, a correct setting process for the reply delivery date is performed (step S107). The correct setting process for the reply delivery date will be described in detail with reference to FIG.
[0066] In the flowchart of Fig. 10, first, 1 is substituted into the variable n indicating the priority (step S201). Next, the prioritization processing unit 104 selects the order case x with the priority order n determined in step S105 of the flowchart of Fig. 9 (step S202), and judges whether the requested quantity of the order case x exceeds the available quantity of the production capacity as of date t (step S203).
[0067] If the number of units requested for the order x is equal to or less than the available capacity of the production capacity as of day t (step S203: No), the priority order assignment processing unit 104 sets the reply due date of the order x to t (step S204). If the number of units requested for the order x exceeds the available capacity of the production capacity as of day t (step S203: Yes), it determines whether partial shipment is possible (step S205). Information indicating whether partial shipment is possible is based on the request of the consumer 11 at the time of ordering, and is stored in the order information 201.
[0068] The prioritization processing unit 104 refers to the order information 201, and if partial shipment is not possible (step S205: No), it updates the tentative delivery date of the order item x to t+1 (step S206). On the other hand, if partial shipment is possible (step S205: Yes), it divides the order by the number of units available in the production capacity at time t (step S207). The prioritization processing unit 104 sets the officially responded delivery date for the divided number of units to t (step S208), and changes the tentative delivery dates for the remaining number of units that exceeds the available number in the production capacity to t+1 (step S209).
[0069] After setting the reply delivery date for order x in step S204, or setting the tentative delivery date in steps S206 and S209, it is determined whether the order for which the prioritization process has been performed is the last (step S210). If there are orders that have not yet been processed and the order is not the last order (step S210: No), n is changed to n+1 (step S211) and the process returns to step S202. If the order is the last order (step S210: Yes), the process ends.
[0070] After the process of correcting the replied delivery date is completed, the process returns to the flowchart of Fig. 9, and in step S108, it is determined whether t (day) is the last day of the tentative delivery dates set for all order items. If t (day) is not the last day (step S108: No), the tentative delivery date t for which the priority is assigned is updated to t+1 (step S109), and the process returns to step S102 to continue processing the orders with tentative delivery date t+1. On the other hand, if t (day) is the last day (step S108: Yes), the process ends.
[0071] After the priority setting process is completed (step S4), the process returns to the flowchart of Fig. 8, and the production plan confirmation processing unit 105 confirms the production plan for the order for which the official reply delivery date has been determined (step S5). The confirmed production plan is sent to the delivery base 13 and the factory 14, and the factory 14 produces the stock products or made-to-order products based on the production plan.
[0072] Next, the answered delivery date output unit 106 outputs the official answered delivery date determined by the prioritization processing unit 104 as an official answer, starting from the order cases whose production plans have been confirmed (step S6). The output official answered delivery date is sent to the demander. Here, if the official answered delivery date determined by the prioritization processing unit 104 does not comply with the requested delivery date, the answered delivery date output unit 106 adds 1 to the number of non-compliance cases in the delay information 205. This makes it possible to tally up the number of non-compliance cases over a certain period of time in the past, and to reflect this in future prioritization.
[0073] As described above, in the delivery date setting device 1 according to the present embodiment, the information acquisition unit 101 acquires the order information 201 including the requested delivery date of the order and the production information 202 of the product related to the order, and the provisional reservation processing unit 102 provisionally reserves the order by setting the provisional delivery date to the requested delivery date. The prioritization processing unit 104 determines the priority order for multiple orders with the same provisional delivery date for stock production products based on at least one of the number of non-compliance cases of the requested delivery date of the consumer 11 related to each order, the inventory amount of the product of each order, and the difference between the provisional delivery date and the requested delivery date, and sets the provisional delivery date as the officially answered delivery date in descending order of the order with the highest priority. This makes it possible to suppress bias in delivery date delays by consumers and reduce the inventory amount.
[0074] In the above embodiment, the priority order is determined based on at least one of the number of cases of non-compliance with the required delivery date by the consumer 11 for each order, the inventory amount of the product for each order, and the difference between the provisional delivery date and the required delivery date. However, the priority order may be determined based on other variables as well.
[0075] In the above embodiment, the tentative delivery date and the official reply delivery date are set by date, but this is not limited to this. They may be set by week or month, or may be set by morning and afternoon of a day, or by hour.
[0076] The hardware configuration and the flowchart shown in the above embodiment are merely examples and can be changed or modified as desired. Each function realized by the delivery date setting device 1 can be realized by using a normal computer system, not a dedicated system.
[0077] For example, a computer capable of implementing each function may be configured by distributing a program for executing the operations of the above-described embodiments by storing it on a computer-readable recording medium such as a CD-ROM (Compact Disc Read-Only Memory), a DVD (Digital Versatile Disc), an MO (Magneto Optical Disc), or a memory card, and installing the program on a computer. In addition, when each function is implemented by sharing the work between an OS (Operating System) and an application, or by cooperation between the OS and an application, only the parts other than the OS may be stored on the recording medium.
[0078] The present disclosure is not limited to the above-described embodiment, and various modifications are possible without departing from the gist of the present disclosure. [Explanation of symbols]
[0079] 1 delivery date setting device, 11 consumer, 12 sales base, 13 distribution base, 14 factory, 20 memory unit, 101 information acquisition unit, 102 tentative reservation processing unit, 103 tentative reservation recording unit, 104 prioritization processing unit, 105 production plan confirmation processing unit, 106 response delivery date output unit, 201 order information, 202 production information, 203 model information, 204 inventory information, 205 delay information, 301 processor, 302 primary storage device, 303 secondary storage device, 304 input unit, 305 display unit, 306 communication interface, 310 bus.
Claims
1. A storage unit that stores order information including a required delivery date of an order for a stock production product and a number of non-compliance cases in which the required delivery date was not met for a certain period of time in the past by a consumer related to the order; a tentative reservation processing unit that sets a tentative delivery date for the requested delivery date and makes a tentative reservation; and a prioritization processing unit which compares the number of non-compliance cases of the consumer related to each order for a plurality of orders having the same tentative delivery date, assigns a higher priority to orders of consumers having a larger number of non-compliance cases, and sets the tentative delivery dates as official reply delivery dates in the order of the highest priority. Delivery date setting device.
2. The storage unit further stores inventory information of the product related to the order, the prioritization processing unit assigns a higher priority to an order relating to a product with a smaller stock amount, and sets the tentative delivery date as the answered delivery date in descending order of overall priority determined from a combination of the priority based on the number of non-compliance cases and the priority based on the stock amount.
2. The delivery date setting device according to claim 1.
3. the prioritization processing unit assigns a higher priority to an order with a larger difference between the tentative delivery date and the requested delivery date, and sets the tentative delivery date as the answered delivery date in descending order of overall priority determined from a combination of the priority based on the number of non-compliance cases and the priority based on the difference between the tentative delivery date and the requested delivery date; 2. The delivery date setting device according to claim 1.
4. The storage unit further stores production information including a production capacity of the factory at the time of the tentative delivery date, the prioritization processing unit obtains the sum of the requested quantities of the multiple orders having the same tentative delivery date, and if the sum of the requested quantities does not exceed the available quantity of the production capacity, sets the tentative delivery dates of the multiple orders as the answered delivery dates without prioritizing the multiple orders. The delivery date setting device according to any one of claims 1 to 3.
5. When the sum of the requested quantities exceeds the available quantity of the production capacity, the prioritization processing unit obtains the requested quantities of the orders in descending order of priority, and sets the tentative delivery date to the answered delivery date for the orders in which the requested quantities do not exceed the available quantity of the production capacity.
5. The delivery date setting device according to claim 4.
6. The order information stored in the storage unit includes information indicating whether partial shipment is possible, the prioritization processing unit acquires the requested number of units for each order in descending order of priority, and when the requested number of units exceeds the available number of units in the production capacity, if the divided shipment is possible for the order, divides the requested number by the available number of units in the production capacity, sets the tentative delivery date to the answered delivery date, and changes the tentative delivery date for the remaining number of units to the next day or later. The delivery date setting device according to claim 5.
7. A tentative delivery date setting step for setting a tentative delivery date for a requested delivery date of an order for a stock production product; and a prioritization step of assigning a higher priority to orders from a consumer who has a larger number of non-compliance cases in which the requested delivery date has not been met in a certain past period, for a plurality of orders having the same tentative delivery date, and setting the tentative delivery dates as official answered delivery dates in order of priority. How to set delivery dates.
8. Computer, A storage unit that stores a required delivery date of an order for a stock production product and a number of non-compliance cases in which a demander related to the order was unable to comply with the required delivery date during a past certain period; a tentative reservation processing unit that sets a tentative delivery date for the requested delivery date; a prioritization processing unit that assigns higher priorities to orders from consumers with a larger number of non-compliance cases for a plurality of orders having the same tentative delivery date, and sets the tentative delivery dates as official reply delivery dates in the order of priority; A program that functions as a
Citation Information
Patent Citations
Delivery date answering system by seat reservation method
JP2002183256A