Construction cost reduced nuclear reactor based on construction cost reduction of modified BWR 4 and nuclear fuel rod aggregate interim storage
By relocating dynamic equipment outside the reactor building and implementing external cooling and temporary fuel rod storage, the modified BWR4 reactor achieves reduced construction and operational costs while maintaining safety and regulatory compliance.
Patent Information
- Application Number
- JP2023065168
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-12
- Publication Date
- 2024-10-25
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The challenge is to reduce the construction costs of nuclear power generation facilities without compromising safety or increasing output, particularly for modified BWR4 reactors, to make them economically competitive and pass regulatory inspections efficiently.
The proposed solution involves relocating dynamic equipment outside the reactor building, enhancing cooling mechanisms, and implementing a temporary storage facility for nuclear fuel rods to minimize reliance on dynamic equipment during accidents, thereby reducing construction costs and improving safety.
This approach reduces construction costs by minimizing the need for dynamic equipment inside the reactor building, enhances safety by allowing gravity-based cooling and external cooling of the pressure vessel, and decreases radiation exposure during inspections, thus lowering overall operational costs and improving regulatory compliance.
Smart Images

Figure 2024151651000001_ABST
Abstract
Description
[Technical field]
[0001] This invention relates to reducing the construction costs of the improved BWR4. [Background technology]
[0002] The construction of renewable energy power plants is becoming popular. However, the cost of generating electricity is high. Therefore, unless we build power plants that do not release carbon dioxide into the environment and have low generating costs, it will become difficult for ordinary people to live economically. This must be started as soon as possible. DISCLOSURE OF THEINVENTION [Problem to be solved by the invention]
[0003] Nuclear power generation is considered to be a cheap way to generate electricity without releasing carbon dioxide into the environment. We want to reduce the cost of generating electricity in order to manufacture products that are competitive overseas. When designing a new nuclear power plant that is safe and reliable, it takes a long time to go through regulations and inspections. The modified BWR4 reactor, which is a BWR4 type reactor with a containment vessel improved from the MARK-2, experienced the recent major earthquake at Fukushima Daini Site Units 3 and 4. Immediately after the earthquake, the reactor was shut down and a track record was gained regarding the integrity of the control rod system, nuclear fuel rod assembly arrangement, and core cooling system. The control rod system, nuclear fuel rod assembly arrangement, and core cooling system technologies can be considered proven. The ABWR, which aims to increase output and reduce power generation costs, is an improved version of the modified BWR4. So how can we reduce power generation costs without increasing output and compromising safety with the modified BWR4? We would like to make it applicable to conventional modified BWR4s as well. Can we reduce power generation costs by reducing construction costs? We would like to explore boiling water reactors such as RBWRs, which are renewal BWRs, rather than ABWRs, which are advanced BWRs. Renewals can be for existing BWRs or newly constructed BWRs. The aim is to partially apply this to the conventional modified BWR4 and gradually pass regulations and inspections in the short term. [Means for solving the problem]
[0004] Means 1 is a nuclear reactor with reduced construction costs related to cooling water circulation. This is a measure related to the modified BWR4. No active equipment will be placed inside the modified MARK-2 containment vessel (11) or the modified BWR reactor building (10). High-pressure main feed water from a condenser (25) via a number of main feed water pipes (100) from a number of main feed water pumps (101) located outside the modified BWR reactor building (10) is used as the driving water for a number of jet pumps (30) installed in the downcomer, and is sent to the core flow rate into the shroud (21). Furthermore, high-pressure main feed water from the condenser (25) via a number of main feed water pipes (100) from a number of main feed water pumps (301) using ECCS penetration pipes located outside the modified BWR reactor building (10) is used as driving water for a number of jet pumps (30) installed in the downcomer, and the core flow rate is sent into the shroud (21). A number of main steam control pipes (12), through which the main steam passes, extend from the BWR4 reactor (20) to the outside of the modified BWR4 reactor building (10), and the end of the extension is a freshwater pond, with a safety valve (620) installed midway. The main steam flows from the front of the safety valve (620) through the turbine pipe (112) toward the steam turbine (50), A part of the main steam (for removing decay heat) passing through the turbine pipe (112) is used to rotate a small generator (314) by a small turbine (313) during operation to generate electricity. This is a construction cost-reducing nuclear reactor with cooling water circulation. Even if the small diameter main steam control pipe (12) breaks, it can be left alone to allow the steam to be discharged. The heat in the core is removed by the latent heat of the steam. Steam can remove 700 times more heat than water. The steam just before the accident contains almost no radioactivity, so radioactive contamination is not a major problem. Since there are many gaps in the walls of the MARK-2 modified containment vessel (11) and the BWR reactor building (10), even if the internal pressure rises during an accident, it is unlikely that an explosion will occur due to steam leakage.
[0005] Means 2 is a reactor that in the event of an accident, cooling water and boric acid water can be injected into the pressure vessel (22) by gravity without relying on active equipment, thereby increasing safety and preventing long-term shutdowns due to major accidents, thereby indirectly reducing construction costs without increasing output. In the construction cost reduction reactor of the method 1, The suppression pool (4) that was previously located inside the MARK-2 modified containment vessel (11) has been removed to expand the space, giving it a pressure suppression capability. Drainage channels and support pillar holes have been dug in the former site of the suppression pool (4), allowing a shielding tent (700) to be erected during periodic inspections. The nuclear fuel storage pool (6) at the top of the MARK-2 modified containment vessel (11) is turned into a water pool (540) by not loading any nuclear fuel rod assemblies into it, and a part of the water pool (540) is separated by a partition to become a boric acid water tank (551). In the event of an accident, water from the water pool (540) is pumped into the BWR4 reactor (20) through a water fall pipe (609) and a main water supply pipe (100) by moving a water fall valve (600) installed at the bottom of the pool. In the event of an accident, the boric acid solution is injected into the pressure vessel (22) via the water pool (540) by opening the water port (610) installed in the bulkhead. An indirect construction cost reduction reactor that reduces construction costs by improving safety without increasing output.
[0006] Means 3 is an indirect construction cost reduction reactor in which the pressure vessel (22) is cooled from the outside. In the construction cost reduction reactor of the means 1 and 2, It consists of a spray nozzle (511) from a containment vessel spray pipe (510) penetrating from outside the modified BWR reactor building (10) into the modified MARK-2 containment vessel (11), and a containment vessel steam relief pipe (500) penetrating from outside the modified BWR reactor building (10) into the top of the modified MARK-2 containment vessel (11). The inside of the MARK-2 modified containment vessel (11) is cooled by releasing the heated steam sprayed from the spray nozzles (511) through the containment vessel steam relief pipe (500) to the outside. A reactor that indirectly reduces construction costs by increasing safety and reducing construction costs without increasing power output by cooling the pressure vessel (22) from the outside (the improved MARK-2 containment vessel (11)).
[0007] Method 4 is a temporary storage facility for nuclear fuel rod assemblies. The nuclear fuel rod assemblies removed from the nuclear fuel storage pool (6) by the means 2 are temporarily stored. In the construction cost reduction reactor of the means 1, 2 and 3, The nuclear fuel rod assembly temporary storage facility consists of an unburned nuclear fuel rod assembly storehouse (420) and a nuclear fuel rod assembly core arrangement storehouse (410). The unburned fuel rod assembly storehouse (420) and the fuel rod assembly core storage storehouse (410) are built as separate buildings on the artificial ground outside the modified BWR reactor building (10). The unburned nuclear fuel rod assembly storehouse (420) is composed of cross-shaped boron plates arranged in a square lattice pattern, and the unburned nuclear fuel rod assemblies are temporarily placed adjacent to the cross-shaped boron plates. The nuclear fuel rod assembly core arrangement storehouse (410) is a temporary nuclear fuel rod assembly storage facility characterized in that it is configured with cross-shaped boron suspension plates arranged in the same shape as the reactor core, and during regular reactor inspections, all of the nuclear fuel rod assemblies are temporarily placed adjacent to the cross-shaped boron suspension plates in the same positions as when they were arranged in the reactor core. Effect of the Invention
[0008] According to the first measure, since the active equipment is located outside the modified BWR reactor building (10), the radiation exposure of regular inspection personnel is reduced and the maintenance costs are reduced. The main active equipment is the main feedwater pump (101) and the ECCS penetration pipe-utilizing main feedwater pump (301), so the manufacturing cost is reduced. The reduction in the number of conventional recirculation pumps helps to reduce costs. The shift from electric computers to semiconductor computers has reduced the number of breakdowns and made calculations cheaper. The space expands by the volume of the pump, which helps with suppression. Space is the basis of safety. It helps to suppress pressure and reduce the concentration of harmful substances. The building is said to be a second containment vessel, and by loosening the airtightness, it can release reduced concentrations of harmful substances to the outside, or release high-temperature steam to the outside to suppress pressure. Since the active equipment is located outside the building, it is possible to respond to malfunctions even in the event of an accident. Since the main steam control pipe (12) is small in diameter, this rupture is unlikely to cause a major accident. The main steam control pipes (12) penetrate the walls of the MARK-2 modified containment vessel (11) and the modified BWR reactor building (10) in multiples or bundles, so gaps are likely to form in the walls. In the event of an accident, leaking steam is likely to leak into the outside world. The integrity of the vessel and building is improved. The steam itself has low radioactivity, so it does not significantly contaminate the outside world.
[0009] Measure 2 allows cooling water and boric acid water to be injected into the pressure vessel (22) by gravity in the event of an accident, without relying on active equipment. This increases safety and prevents long-term shutdowns due to major accidents, resulting in a reactor with indirectly reduced construction costs without increasing output. After removing the suppression pool (4), a shielding tent (700) is set up during regular inspections to limit radiation exposure to inspectors. This improves work efficiency and reduces management costs. The spherical shape allows inspectors to remain inside the containment vessel. This reduces the number of times that inspectors must undergo radiation inspections and change clothes every time they enter and leave the containment vessel. The introduction of the boric acid water tank (551) may reduce the number of control rods.
[0010] According to the third method, the pressure vessel (22) is cooled from the outside to enhance safety and prevent a long-term shutdown due to a major accident, thereby indirectly reducing the construction cost of the reactor without increasing the output.
[0011] In the fourth method, the nuclear fuel rod assemblies removed from the nuclear fuel storage pool (6) are stored in a temporary nuclear fuel rod assembly storage facility, thereby reducing the radiation exposure of inspection workers and shortening the periodic inspection period, thereby reducing the periodic inspection management costs. If there are no fuel rod assemblies inside the reactor during regular inspection, the number of control rods can be reduced to a level that allows for hot standby during normal operation. BEST MODE FOR CARRYING OUT THEINVENTION
[0012] We were able to reduce the construction costs of the improved BWR4. We can also expect a reduction in the unit cost of electricity generation. Example 1
[0013] FIG. 1 is a schematic view of a cost-reduced improved nuclear reactor according to the present invention, which is a combination of the first to fourth embodiments.
[0014] 1 is an embodiment of the cost reduction relating to cooling water circulation in Means 1. The seismic resistance of the improved MARK-2 containment vessel (11) is the same as the conventional one, Rank S. The seismic resistance of the improved BWR reactor building (10) is the same as the conventional one, Rank B. A number of main feedwater pumps (101) are located outside the modified BWR reactor building (10). Recirculation pumps are located inside the modified MARK-2 containment vessel (11). The main feedwater that flows from the condenser (25) through the main feedwater pipes (100) is pumped by the main feedwater pumps (101) located outside the modified BWR reactor building (10) to the downcomer (a water-filled area between the shroud (21) and the pressure vessel (22)) to drive the jet pumps (30), which are pressurized and send the core flow into the shroud (21). The flow rate of the main feedwater pipes (100) can be changed by using an orifice. Furthermore, the main feed water from a number of ECCS penetration pipe-utilizing main feed water pumps (301) installed outside the modified BWR reactor building (10) serves as the driving water for the remaining number of jet pumps (30) installed in the downcomer, and sends the core flow rate into the shroud (21). The main water supply pump (101) and the ECCS penetration pipe main water supply pump (301) are equipped with vibration isolation devices to prepare for a large earthquake. The entire enclosure can be rated as earthquake-resistant class B or C. The earthquake resistance strength is about the same as that of a normal warehouse, and it is sufficient to withstand wind and rain. The main steam flows through a number of main steam control pipes (12) that extend outside the modified BWR4 reactor building (10) and flows out into a freshwater pond at the end of the extension. A safety valve (620) is installed in the middle of the main steam control pipes (12). When the main steam pressure in the main steam control pipe (12) rises excessively due to an accident, the safety valve (620) automatically opens and the main steam is released into the pond. In the initial stage, the main steam contains almost no radioactive material. The main steam flows from the front of the safety valve (620) through the turbine pipe (112) toward the steam turbine (50). During operation, a portion of the main steam (for removing decay heat) passing through the turbine pipe (112) rotates the small turbine (313) and the generator (114) to generate electricity. Even if the steam shutoff valve (312) (MO) closes in the event of a turbine accident, a portion of the main steam (for removing decay heat) is discharged to the condenser (25) and is injected into the pressure vessel (22) through the main feed water pipe (100), thereby maintaining water circulation. Example 2
[0015] This is an embodiment in which the suppression pool (4) of the second measure is removed. The suppression pool (4) that was previously present in the MARK-2 modified containment vessel (11) has been eliminated, expanding the space capacity, giving the vessel pressure suppression capability. Simply draining the water and emptying the vessel expands the space. During regular inspections, shielding tents (700) are set up to limit the radiation exposure of inspectors, improving work efficiency and reducing management costs. The nuclear fuel storage pool (6) at the top of the MARK-2 modified containment vessel (11) is turned into a water pool (540) by not loading any nuclear fuel rod assemblies into it, and a part of the water pool (540) is separated by a partition to make it into a boric acid water tank (551). In the event of an accident, water from the water pool (540) is pumped into the BWR4 reactor (20) through the water drop pipe (609) and the main feed water pipe (100) by moving (shifting horizontally or vertically) the water drop valve (600) installed at the bottom of the pool. In the event of an accident, the boric acid solution is injected into the pressure vessel (22) via the water pool (540) by opening the water port (610) installed in the bulkhead. Example 3
[0016] This is an embodiment in which the pressure vessel (22) of means 3 is cooled from the outside. The cooling inside the MARK-2 modified containment vessel (11) in the event of an emergency in the reactor, which reduces the construction costs of the means 1 and 2, is as follows: A spray nozzle (511) from a containment vessel spray pipe (510) penetrating the bottom of the MARK-2 modified containment vessel (11) from outside the modified BWR reactor building (10), It consists of a containment vessel steam relief pipe (500) that penetrates from the outside of the modified BWR reactor building (10) to the top of the modified MARK-2 containment vessel (11). The inside of the MARK-2 modified containment vessel (11) is cooled by releasing the heated steam sprayed from the spray nozzles (511) through the containment vessel steam relief pipe (500) to the outside. The pressure vessel (22) is cooled from the outside. Example 4
[0017] 4 is an embodiment of a temporary storage facility for nuclear fuel rod assemblies according to the fourth embodiment. In method 2, the nuclear fuel pool (6) is partially renovated to become a water pool (540). The nuclear fuel is immediately transferred to a reprocessing plant or temporarily stored somewhere other than the nuclear fuel pool. In this method, the nuclear fuel rod assemblies are temporarily stored somewhere on the power plant premises other than the nuclear fuel pool (6). In the construction cost reduction reactor of the means 1, 2 and 3, the nuclear fuel rod assembly temporary storage facility comprises an unburned nuclear fuel rod assembly storehouse (420) and a nuclear fuel rod assembly core arrangement storehouse (410). The unburned fuel rod assembly storehouse (420) and the fuel rod assembly core storage storehouse (410) are to be built in separate buildings on the artificial ground outside the modified BWR reactor building (10). The earthquake resistance is to be rank B. The cooling system is air-cooled. The unburned nuclear fuel rod assembly storehouse (420) has cross-shaped boron plates arranged in a square lattice, and the unburned nuclear fuel rod assemblies are temporarily placed adjacent to the cross-shaped boron plates. The cross-shaped boron plates may be used control rods. The nuclear fuel rod assembly core arrangement storehouse (410) is a temporary storage facility for nuclear fuel rod assemblies, characterized in that cross-shaped boron suspension plates are arranged in the same shape as the reactor core, and during regular reactor inspections, all of the nuclear fuel rod assemblies are temporarily placed adjacent to the cross-shaped boron suspension plates in the same positions as when they were arranged in the reactor core. Example 5
[0018] Although they say they will provide detailed explanations to the public, there is nothing written in a way that is easy for ordinary people to understand. For reference, an overview of an existing BWR4 modified reactor is shown in Figure 2. The seismic strength of the MARK-2 modified containment vessel (11) is ranked S. The BWR4 reactor (20) is a type of reactor BWR4 in which nuclear fuel rod assemblies are housed within a shroud (21), which is a structure within a pressure vessel (22). The modified BWR4 reactor building (10) is a building of seismic rank B that houses the BWR4 reactor (20). It contains the main cooling systems. It also contains the emergency core cooling system (ECCS). The modified MARK-2 containment vessel (11) is a containment vessel of seismic rank S and of the modified MARK-2 type, which is built into the modified BWR4 reactor building (10). The core cooling water is driven by two recirculation pumps (5) (RP). There are many jet pumps (30) installed in the downcomer, which is the water-filled space between the inner wall of the BWR4 reactor (20) and the shroud (21). One RP drives JP1 to JP4, and the other RP drives JP5 to JP8, accelerating the flow rate of the reactor core. There may be as many as 12 pumps, such as JP1 to JP12. A number of main feedwater pumps (101) are located outside the modified BWR reactor building (10). The main feed water passing through a number of main feed water pipes (100) from the condenser (25) is pressurized by a main feed water pump (101) as the driving water for a number of jet pumps (30) installed in the downcomer (a water-filled area between the shroud (21) and the pressure vessel (22)), thereby forming the core flow rate in the shroud (21). In the event of an accident, cooling water from the numerous ECCS pumps (9) located outside the modified BWR reactor building (10) is pumped to the top of the shroud (21) and the downcomer. The cooling water source is the pressure suppression pool (4) and a water tank located outside the modified BWR reactor building (10). The main steam coming out of the pressure vessel (22) is bundled together from multiple main steam control pipes (12) into one main steam pipe (2), which then travels through the main steam turbine pipe (13) outside the modified BWR4 reactor building (10) toward the steam turbine (50). The diameter of the main steam pipe (2) is larger than that of the main steam control pipe (12). Therefore, a rupture of the main steam pipe (2) is likely to lead to a major accident. An electric shutoff valve (MO) is attached to the main steam pipe (2) to shut off the main steam when an abnormality occurs in the steam turbine (50). A safety relief valve (3) (RV) is installed on the main steam pipe (2). When the motor-operated shutoff valve (MO) closes, the main steam that has nowhere to go is released to the condenser (25) or pressure suppression pool (4). This prevents damage to the main steam pipe (2). The nuclear fuel rod assemblies are stored in a nuclear fuel pool (6) in a modified BWR4 reactor building (10) with seismic resistance class B. The rear control rod system was installed in the modified BWR4 reactor building (10) outside the modified MARK-2 containment vessel (11) in case the control rods were not fully inserted into the reactor core. The boric acid water pump (41) pumps boric acid water from the boric acid water tank into the shroud (21) from the bottom of the pressure vessel (22). [Industrial Applicability]
[0019] Nuclear power generation is a candidate for a cheap power source that does not emit carbon dioxide. The cost-saving BWR4 MARK-2 modified nuclear reactor of the present invention is required. If we do nothing in Ukraine, the West will either send us a bill for the money we don't need or demand Fukushima-level reconstruction aid. Repairing, removing, or building new nuclear power plants is difficult. Japan needs to provide patrol boats, submarines that were not sold to Australia, and old Aegis ships as surveillance ships for the Crimean Peninsula as soon as possible, before the conflict ends and it is not a war. If they are not equipped with artillery shells, they are not offensive. Current weapons are designed to be operated directly by humans. Their effectiveness is questionable in the current age when drones have appeared. Cannons, machine guns, and rifles are remotely controlled. They are the most effective counterterrorism measures. Conversely, terrorists also use remote-controlled weapons. This is a good opportunity to discard conventional weapons and change to remote-controlled weapons. Apart from weapons, new industries will also be born. Unmanned submarines equipped with missiles (because there are no people, there is no need to consider oxygen for breathing, carbon dioxide gas exhaled, drinking water, or food. Costs can be reduced by neglecting safety. By increasing the internal pressure, they can dive deeper. Since they do not require movement or living space for the crew, collapse can be suppressed by installing low-density materials. They can remain submerged for long periods of time. They will be on par with nuclear submarines. They can be powered by the hazardous substances hydrogen and oxygen.) can be operated by wires or sonic waves from several manned submarines. Even if they are discovered, they can be operated from another manned submarine. Even if sea lanes are blocked, hydrogen and oxygen can be produced with the nuclear reactor of this invention. Considering the deployment of tactical nuclear weapons and Russia's specialty special forces, we must consider close-quarters combat between friend and foe. If possible, all weapons possessed by the Self-Defense Forces should be provided, including land artillery, gunpowder, military vehicles, and current weapons (for example, large-caliber self-propelled guns installed in the center of the country for defense). Since it will take time to provide them, instead of importing them from abroad, domestic companies should be made to massively increase production of unmanned remote-controlled defense weapons. The number of Self-Defense Force personnel will decrease, so weapons will be buried in warehouses. In that case, they should be sent to Ukraine, which needs weapons right now. This is because Japan is far from Ukraine and can do so. Europe must prepare for further expansion of the conflict. Land weapons are acceptable as there is no intention to invade China or neighboring countries. This can be covered by the Ministry of Self-Defense's budget. For citizens who have no recollection of issuing IOUs, fiscal consolidation is either unnecessary or manageable, but the Ministry of Finance has a duty to be reluctant to spend (otherwise each ministry's budget would be sky-high). The reduction in weapons would be used to support the US and the families of the abducted people in starting up special forces companies. As an aside, it seems that a paper currency economy without gold backing can continue for about 80 years. If interest rates are raised, banks and insurance companies will make profits and it will be easier to accept the government. The government and the progressive opposition party will gain votes through welfare. Therefore, in most countries that do not want to see the straw mat flag, welfare budgets will continue to rise. It is natural that the budget will be in the red. If buried treasure or oil is discovered, the finances will be temporarily enriched. The know-how of the Higashikuni Cabinet during Japan's recent defeat can be offered to the losers, whether they are Ukraine or Russia. Ukraine is not someone else's problem. The Mitsubishi Group is drawing up strategies for decades. Canon Global Research Institute, Nomura Research Institute, and Hitachi are probably doing the same. They will likely be taking the whole of Japan into account. Unforeseen circumstances can occur suddenly and for a long time. At that time, this invention will also be of help in responding to them. [Brief description of the drawings]
[0020] [Figure 1] Overview of the cost-saving improved reactor of the present invention [Diagram 2] Overview of existing BWR4 modified reactor [Explanation of symbols]
[0021] 2 is the main steam pipe 3 is a relief valve (RV) 4 is the pressure suppression pool 5 is the recirculation pump 6 is the nuclear fuel pool 8 is an ECCS (emergency core cooling system) pipe 9 is ECCS pump (ECCSP) 10 is a modified BWR4 reactor building 11 is MARK-2 modified containment vessel 12 is the main steam control valve 13 is the main turbine tube 20 is BWR4 reactor 21 is Shroud 22 is a pressure vessel 25 is the condenser 30 is jet pump (JP1-4, JP5~8, JB9~12J) 41 is a boric acid water pump 50 is a steam turbine 100 is the main water supply pipe 101 is the main water pump (WP) 302 is ECCS penetration pipe application main water supply pump (ECCSWP) 312 is a steam shutoff valve 313 is a small turbine 314 is a small generator (G) 315 is a small turbine tube 410 is the nuclear fuel rod assembly core storage facility 420 is the unburned nuclear fuel rod assembly storehouse 500 is the containment vessel steam relief pipe 510 is the containment vessel spout pipe 511 is a spray nozzle 540 is a water pool 550 is for fresh water, sea water and boric acid water 551 is a boric acid water tank 560 is the boric acid water injection pipe 600 is a water release valve 601 is a tension rod 609 is a waterfall 610 is the water outlet 611 is the opening and closing rod 620 is a safety valve (RV) 690 is the post-accident water injection pipe 700 is a shielding tent for regular inspections
Claims
1. In the modified BWR4, No active equipment will be placed in the modified MARK-2 containment vessel (11) or the modified BWR reactor building (10), High-pressure main feed water from a number of main feed water pumps (101) installed outside the modified BWR reactor building (10) is used as the driving water for a number of jet pumps (30) installed in the downcomer, and the core flow rate is sent into the shroud (21), Furthermore, high-pressure main water is supplied from a number of ECCS penetration pipe-utilizing main water supply pumps (301) located outside the modified BWR reactor building (10), which serve as the driving water for a number of jet pumps (30) installed in the downcomer, and the core flow rate is sent into the shroud (21). A number of main steam control pipes (12) through which the main steam passes extend from the BWR4 reactor (20) to the outside of the modified BWR4 reactor building (10), and the end of the extension is a freshwater pond, with a safety valve (620) installed along the way. The main steam flows from the front of the safety valve (620) through the turbine pipe (112) toward the steam turbine (50), A construction cost-reducing nuclear reactor with cooling water circulation, characterized in that a portion of the main steam passing through the turbine pipe (112) is used during operation to rotate a small generator (314) using a small turbine (313) to generate electricity.
2. In the construction cost reducing reactor of claim 1, The MARK-2 modified containment vessel (11) now has pressure suppression capabilities due to the expansion of its spatial volume by eliminating the pressure suppression pool (4) that was previously present there. The nuclear fuel storage pool (6) at the top of the MARK-2 modified containment vessel (11) is turned into a water pool (540) by not loading nuclear fuel rod assemblies therein, and a part of the water pool (540) is separated by a partition to turn it into a boric acid water tank (551). In the event of an accident, the water in the water pool (540) is pumped into the BWR4 reactor (20) through the main feed water pipe (100) from the water fall pipe (609) by moving the water fall valve (600) installed at the bottom of the pool, and the boric acid water is injected into the pressure vessel (22) via the water pool (540), thereby indirectly reducing construction costs and improving safety without increasing power output.
3. In the construction cost reducing reactor of claim 1 and claim 2, The modified BWR reactor building (10) is connected to a spray nozzle (511) from a containment vessel spray pipe (510) penetrating into the modified MARK-2 containment vessel (11) from outside the modified BWR reactor building (10), and a containment vessel steam relief pipe (500) penetrating into the upper part of the modified MARK-2 containment vessel (11) from outside the modified BWR reactor building (10). The steam sprayed with water from the spray nozzles (511) is released to the outside through the containment vessel steam relief pipe (500), thereby cooling the inside of the MARK-2 modified containment vessel (11). A nuclear reactor that indirectly reduces construction costs by cooling the pressure vessel (22) from the outside, thereby increasing safety and reducing construction costs without increasing output.
4. In the construction cost reducing reactor of claim 1, claim 2 and claim 3, The nuclear fuel rod assembly temporary storage facility consists of an unburned nuclear fuel rod assembly storehouse (420) and a nuclear fuel rod assembly core arrangement storehouse (410), The unburned nuclear fuel rod assembly storehouse (420) and the nuclear fuel rod assembly core arrangement storehouse (410) are installed as separate buildings on the artificial ground outside the modified BWR reactor building (10). The unburned nuclear fuel rod assembly storage (420) is configured by arranging cross-shaped boron plates in a square lattice pattern, and the unburned nuclear fuel rod assembly is temporarily placed adjacent to the cross-shaped boron plates, The nuclear fuel rod assembly core arrangement storehouse (410) is characterized in that it is configured by arranging cross-shaped boron suspension plates in the same shape as the reactor core, and that during regular reactor inspections, all of the nuclear fuel rod assemblies are temporarily placed adjacent to the cross-shaped boron suspension plates in the same positions as when they were arranged in the reactor core.