AI Technical Summary
Conventional concrete pouring methods result in voids forming in areas far from upright structures, necessitating additional work to fill these voids with grout, increasing work costs and labor.
A concrete pouring structure and method that includes inlets and burying pipes to fill concrete into spaces between upright bodies, with a connecting pipe for detachable connection, angled burying pipes to prevent water ingress, and a water stop member to ensure complete filling and structural integrity.
The method effectively fills voids during concrete pouring, reducing the need for post-pouring void removal and lowering work costs while ensuring the quality and design integrity of the concrete structure.
Smart Images

Figure 2024152085000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a concrete pouring structure and a concrete pouring method. [Background technology]
[0002] A technique for filling the casting space located between a pair of standing bodies using multiple inlets and a concrete feed pipe provided on one of the pair of standing bodies has been proposed as one technique for pouring concrete into the casting space located between the pair of standing bodies (see, for example, Patent Document 1). In this technique, concrete sent from a concrete pump through the concrete feed pipe is filled into the casting space through the inlet, so that among the parts of the casting space, the parts closer to the standing body provided with the inlet are filled with concrete preferentially over the parts farther from the standing body. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Japanese Patent Application Publication No. 06-173449 Summary of the Invention [Problem to be solved by the invention]
[0004] Here, in the above-mentioned conventional technology, as described above, among the parts of the casting space, the parts close to the standing body are filled with concrete preferentially over the parts far from the standing body, so that the parts far from the standing body are not filled with concrete and voids tend to remain, and therefore it becomes necessary to take measures to remove the voids after filling with concrete (for example, filling the voids with grout, etc.), which may increase the work costs (specifically, the work expenses and work labor). Therefore, there is room for improvement from the viewpoint of reducing the work costs.
[0005] The present invention has been made in consideration of the above, and aims to provide a concrete pouring structure and a concrete pouring method that make it possible to reduce working costs. [Means for solving the problem]
[0006] In order to solve the above-mentioned problems and achieve the object, the concrete pouring structure described in claim 1 is a concrete pouring structure for pouring concrete into a pouring space located between a pair of standing bodies, comprising at least one inlet provided in at least one of the pair of standing bodies, which makes it possible to fill the pouring space with the concrete from the outside through the inlet, and at least one dead-end pipe provided in the pouring space, which is capable of being dead-end in the concrete and makes it possible to fill the pouring space from the outside through the inlet and the dead-end pipe, and the dead-end pipe is configured so that when the concrete is poured into the pouring space, it is possible to fill the concrete into a remaining space in the pouring space, which is a space in which voids are likely to remain when the concrete is poured.
[0007] The concrete pouring structure of claim 2 is the concrete pouring structure of claim 1, which is provided with a connecting pipe for freely detachably connecting to the inlet and the inlet side end of the dead-end pipe, and which enables the concrete to be poured into the pouring space via the connecting pipe, the inlet, and the dead-end pipe.
[0008] The concrete pouring structure described in claim 3 is the concrete pouring structure described in claim 1 or 2, in which the buried pipe is arranged at an angle so that the end of the buried pipe opposite the inlet side is positioned lower than the end of the buried pipe on the inlet side.
[0009] A concrete pouring structure according to claim 4 is the concrete pouring structure according to claim 1 or 2, in which the buried pipe is a spiral pipe.
[0010] The concrete pouring structure described in claim 5 is the concrete pouring structure described in claim 1 or 2, which is equipped with a water-stopping member provided in the buried pipe, and prevents water from entering the buried pipe.
[0011] The concrete pouring structure according to claim 6 is the concrete pouring structure according to claim 1 or 2, further comprising a lid portion which allows the inflow port to be freely opened and closed.
[0012] The concrete pouring method described in claim 7 is a concrete pouring method for pouring concrete into a pouring space located between a pair of standing bodies, and includes a remaining space filling process of filling a remaining space in the pouring space, which is a space in which voids are likely to remain when the concrete is poured, with the concrete via an inlet provided in at least one of the pair of standing bodies and a dead-end pipe provided in the pouring space and capable of being dead-end-in the concrete, and a non-remaining space filling process of filling a non-remaining space in the pouring space, which is a space other than the remaining space, with the concrete via the inlet and / or the dead-end pipe, and the remaining space filling process is completed before the non-remaining space filling process. Effect of the Invention
[0013] According to the concrete pouring structure of claim 1, at least one of the pair of erected bodies is provided with at least one inlet and at least one dead-end pipe provided in the pouring space, and the dead-end pipe is configured so that the remaining space can be filled with concrete when the concrete is poured into the pouring space, so that the remaining space can be filled with concrete reliably and voids can be prevented from remaining in the concrete poured into the pouring space. Therefore, compared to the conventional technology (technology in which concrete fills the pouring space only through the inlet), it is possible to avoid taking measures to remove voids remaining in the concrete after the concrete is poured into the pouring space, and it is possible to reduce the operation cost.
[0014] According to the concrete pouring structure described in claim 2, a connecting pipe is provided for freely attaching and detaching to the inlet and the inlet side end of the buried pipe, which enables concrete to be poured into the pouring space via the connecting pipe, the inlet, and the buried pipe.Therefore, while the concrete is being poured into the pouring space (or after the pouring), the connecting pipe can be removed from the inlet and the inlet side end of the buried pipe, and the buried pipe can be buried so that it is not exposed to the outside, thereby ensuring the design of the concrete structure formed by the pouring.
[0015] According to the concrete pouring structure described in claim 3, the buried pipe is arranged at an angle so that the end opposite the inlet side of the buried pipe is positioned lower than the end on the inlet side of the buried pipe. This makes it possible to prevent water from remaining in the buried pipe after the concrete is poured into the pouring space, making it easier to ensure the quality of the concrete structure formed by pouring the concrete.
[0016] According to the concrete pouring structure described in claim 4, the buried pipe is a spiral pipe, so that it is possible to prevent water from entering the buried pipe, making it easier to ensure the quality of the concrete structure formed by pouring concrete.
[0017] According to the concrete pouring structure described in claim 5, a water-stopping member is provided in the buried pipe, and the water-stopping member is provided for preventing water from entering the buried pipe. Therefore, it is possible to suppress water from entering the buried pipe, and it becomes easier to ensure the quality of the concrete structure formed by pouring concrete.
[0018] According to the concrete pouring structure described in claim 6, a lid portion is provided that allows the inlet to be opened and closed freely, thereby preventing concrete from leaking out of the inlet and allowing concrete to be poured accurately into the pouring space.
[0019] According to the concrete pouring method of claim 7, the method includes a remaining space filling step of filling the remaining space with concrete through an inlet provided in at least one of the pair of erected bodies and a dead-end pipe provided in the pouring space, and a non-remaining space filling step of filling the non-remaining space with concrete through the inlet and / or the dead-end pipe, and the remaining space filling step is completed before the non-remaining space filling step, so that the remaining space can be filled with concrete reliably and voids can be prevented from remaining in the concrete poured in the pouring space. Therefore, compared to the conventional technology (technology in which concrete fills the pouring space only through the inlet), it is possible to avoid taking measures to remove voids remaining in the concrete after the concrete is poured into the pouring space, and it is possible to reduce the operation cost. [Brief description of the drawings]
[0020] [Figure 1] FIG. 2 is a conceptual diagram of a concrete pouring structure according to the first embodiment of the present invention, and is a cross-sectional view showing a remaining void filling step of the concrete pouring method according to the first embodiment. [Diagram 2] FIG. 2 is a front view of FIG. [Diagram 3] FIG. 2 is a diagram showing a preparation step of the concrete pouring method according to the first embodiment, showing an area corresponding to FIG. 1. [Figure 4]FIG. 2 is a diagram showing a first non-remaining space filling step of the concrete pouring method according to the first embodiment, showing an area corresponding to FIG. 1. [Diagram 5] FIG. 2 is a diagram showing a second non-remaining space filling step of the concrete pouring method according to embodiment 1, showing the area corresponding to FIG. 1. [Figure 6] FIG. 2 is a diagram showing the state after concrete has been poured into the pouring space, and shows the area corresponding to FIG. 1. [Figure 7] FIG. 13 is a conceptual diagram of a concrete pouring structure according to embodiment 2, and is a cross-sectional view showing the remaining void filling step of the concrete pouring method according to embodiment 2. [Figure 8] FIG. 8 is a diagram showing a preparation step of a concrete pouring method according to embodiment 2, showing the area corresponding to FIG. 7. [Figure 9] FIG. 8 is a diagram showing a first non-remaining space filling step of the concrete pouring method according to the second embodiment, showing the area corresponding to FIG. 7. [Figure 10] FIG. 8 is a diagram showing a second non-remaining space filling step of the concrete pouring method according to the second embodiment, showing the area corresponding to FIG. 7. [Figure 11] FIG. 8 is a diagram showing the state after concrete has been poured into the pouring space, and shows the area corresponding to FIG. 7. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0021] Hereinafter, with reference to the accompanying drawings, a concrete pouring structure and a concrete pouring method according to the present invention will be described in detail. First, [I] the basic concept of the embodiment will be described, then [II] the specific content of the embodiment will be described, and finally, [III] modified examples of the embodiment will be described. However, the present invention is not limited to the embodiment.
[0022] [I] Basic Concept of the Embodiment First, a basic concept of the embodiment will be described. The embodiment generally relates to a concrete pouring structure for pouring concrete into a pouring space located between a pair of standing bodies.
[0023] Here, the term "erectile" refers to a structural body that is erected on an installation surface (e.g., a foundation surface, a floor surface, etc.), and is a concept that includes, for example, components that constitute a structure (e.g., wall materials (e.g., retaining wall materials, exterior wall materials, interior wall materials, etc.), pillar materials, etc.) and components used when constructing a structure (e.g., formwork materials, etc.).
[0024] Furthermore, the specific structure and type of the "structure" are arbitrary, and the concept includes, for example, architectural structures (examples include detached houses, apartment complexes such as apartments and condominiums, office buildings, commercial facilities, etc.) and civil engineering structures (examples include bridges, tunnels, dams, etc.), but in the embodiment, it will be described as an office building under construction.
[0025] In addition, the term "casting space" refers to the space into which concrete is cast in order to construct a concrete structure that constitutes a structure.
[0026] Furthermore, the term "concrete structure" is a concept that includes, for example, wall materials, pillar materials, etc., but in the embodiment, it will be described as a seismic isolation retaining wall material.
[0027] Furthermore, the specific type of "concrete" is arbitrary, and the concept includes, for example, ordinary concrete, lightweight concrete, high-strength concrete, flowable concrete, mass concrete, and / or watertight concrete.
[0028] [II] Specific Contents of the Embodiments Next, the specific contents of the embodiment will be described.
[0029] [First embodiment] First, there will be described a concrete pouring structure and a concrete pouring method according to embodiment 1. In this embodiment 1, concrete is poured from only one of a pair of standing bodies.
[0030] (composition) First, the configuration of the concrete pouring structure 1 according to the first embodiment and the configurations of the first standing body 10 and the second standing body 20 to which the concrete pouring structure 1 is applied will be described.
[0031] (Structure: First erection body) First, the configuration of the first upright body 10 will be described.
[0032] In the following explanation, the X direction in Figure 2 is referred to as the left-right direction of the concrete pouring structure 1 (the -X direction is the left direction of the concrete pouring structure 1, and the +X direction is the right direction of the concrete pouring structure 1), the Y direction in Figure 1 is referred to as the front-to-back direction of the concrete pouring structure 1 (the +Y direction is the front direction of the concrete pouring structure 1, and the -Y direction is the rear direction of the concrete pouring structure 1), and the Z direction in Figure 1 is referred to as the up-down direction of the concrete pouring structure 1 (the +Z direction is the upward direction of the concrete pouring structure 1, and the -Z direction is the downward direction of the concrete pouring structure 1).
[0033] The first erected body 10 is a structure erected on an installation surface S (specifically, a foundation surface). This first erected body 10 is constructed, for example, using a known formwork material for pouring concrete, and specifically, as shown in Fig. 1, includes a sheathing 11 erected on the installation surface S between the preceding structure PB and the installation surface S, a support 12 supporting the sheathing 11, and a fastener 13 connecting the sheathing 11 and the support 12.
[0034] Here, the "preceding structure PB" refers to a structure that was installed in a building prior to the first standing structure 10 and / or the second standing structure 20, and is a concept that includes, for example, concrete (or steel) beams, floor materials, wall materials, pillar materials, or combinations of these.
[0035] As shown in FIG. 1, the first standing body 10 is erected on an installation surface S inside a structure (specifically, an office building under construction) not shown, and is fixed to the installation surface S by a fastener or the like so as to be freely attached and detached.
[0036] (Structure - Second erected body) Next, the configuration of the second standing body 20 will be described.
[0037] The second erected body 20 is a structure erected on the installation surface S. This second erected body 20 is constructed, for example, using a known earth retaining wall (one example is an earth retaining wall made of a ground improvement body, etc.), and is erected on the installation surface S between the preceding structure PB and the installation surface S, at a position outside the structure relative to the first erected body 10, separated from the first erected body 10 by a casting space PS, as shown in FIG.
[0038] The above-mentioned "first upright body 10" and "second upright body 20" correspond to "a pair of upright bodies" in the claims.
[0039] (Configuration - Casting space) Here, the pouring space PS is a space into which concrete C is poured in order to construct a concrete structure (specifically, a seismic isolation retaining wall material) that constitutes the structure, and is provided so as to be located between the first standing body 10 and the second standing body 20, as shown in Figure 1.
[0040] Furthermore, the specific size of the casting space PS is arbitrary, but in embodiment 1 it is set as follows.
[0041] That is, the left-right length of the pouring space PS is set to be approximately the same as the left-right length of the concrete structure, and as an example, is set to about 30 m.
[0042] In addition, the length of the pouring space PS in the front-to-rear direction is set to be approximately the same as the length of the concrete structure in the front-to-rear direction, and as an example, is set to be approximately 1.8 m to 2 m.
[0043] In addition, the vertical length of the casting space PS is set to be approximately the same as the front-to-rear length of the concrete structure, and as an example, is set to about 4 m.
[0044] In the first embodiment, the pouring space PS includes a remaining space RS, a first non-remaining space NR1, and a second non-remaining space NR2, as shown in FIG.
[0045] Of these, the remaining space RS is the space within the pouring space PS in which voids are likely to remain when the concrete C is poured, and specifically, as shown in Figure 1, it is the space within the pouring space PS that is located on the upper side and on the side of the second standing body 20.
[0046] The first non-remaining space NR1 is a space (non-remaining space) other than the remaining space RS in the pouring space PS, and specifically, as shown in FIG. 1, is a space located below the remaining space RS.
[0047] In addition, the second non-remaining space NR2 is a space (non-remaining space) within the pouring space PS other than the remaining space RS, and is a space different from the second non-remaining space NR2, and specifically, as shown in Figure 1, it is a space located on the first standing body 10 side relative to the remaining space RS.
[0048] Here, the reason why residual space RS may occur in the pouring space PS is as follows.
[0049] That is, while the first standing body 10 is provided with air holes and inlets 30 (not shown), the second standing body 20 is not provided with air holes and inlets 30. As a result, when the concrete C is being poured into the pouring space PS, the air in the pouring space PS is less likely to escape to the outside through the second standing body 20, and air tends to accumulate in the remaining space RS.
[0050] (Structure: Cast concrete structure) Next, the configuration of the concrete pouring structure 1 will be described.
[0051] The concrete pouring structure 1 is a structure for pouring concrete C into the pouring space PS, and as shown in Figures 1 and 2, it is equipped with an inlet 30, a buried pipe 40, a connecting pipe 50, a water-stopping member (not shown), and a lid 60.
[0052] (Configuration - Concrete pouring structure - Inlet) The inflow port 30 is an opening that allows concrete C to be filled into the casting space PS from the outside through the inflow port 30, and at least one of them is provided in the sheathing 11 of the first standing body 10.
[0053] Specifically, as shown in FIG. 2, a plurality of inlets 30 are arranged side by side at predetermined intervals substantially along the left-right and up-down directions.
[0054] More specifically, the inlets 30 are arranged in two rows in the vertical direction. The inlets 30 in the lower row are arranged approximately 2 m above the installation surface S, and the inlets 30 in the upper row are arranged approximately 1 m above the lower row. The inlets 30 in the lower row are arranged side by side at intervals of approximately 12 m in the left-right direction (two inlets are arranged side by side in FIG. 2). The inlets 30 in the upper row are arranged side by side at intervals of approximately 6 m in the left-right direction (five inlets are arranged side by side in FIG. 2).
[0055] In the following, as necessary, of the multiple inlets 30, the inlets 31, 32 in the lower row will be referred to as the "lower first inlet 31" and the "lower second inlet 32" from the left side of Figure 2, and the inlets 33 to 37 in the upper row will be referred to as the "upper first inlet 33," "upper second inlet 34," "upper third inlet 35," "upper fourth inlet 36," and "upper fifth inlet 37" from the left side of Figure 2.
[0056] Furthermore, the specific shape and size of the inlet 30 may be any shape and size as long as the concrete C can be filled from the outside into the casting space PS through the inlet 30, but in the first embodiment, they are set as follows.
[0057] That is, the shape of the inlet 30 is set to be substantially circular, but is not limited thereto, and may be set to be a polygonal shape such as a substantially rectangular shape, or a substantially elliptical shape.
[0058] The diameter of the inlet 30 is set to a size that allows the connection pipe 50 to be inserted therethrough, for example, about 100 mm to 200 mm.
[0059] (Configuration - Concrete pouring structure - Buried dead pipe) Returning to Fig. 1, the dead-end pipe 40 is a pipe that can be dead-end in the concrete C and enables the concrete C to be filled into the casting space PS from the outside through the inlet 30 and the dead-end pipe 40. This dead-end pipe 40 is a long tubular body, and at least one dead-end pipe 40 is provided in the casting space PS such that the longitudinal direction of the dead-end pipe 40 is approximately directed from the first standing body 10 to the second standing body 20.
[0060] Specifically, as shown in FIG. 1, a plurality of buried pipes 40 are provided spaced apart from each other at a height position approximately the same as the height position of the inlets 30 in the upper row, and are each connected to the first upright body 10 and / or the second upright body 20 by connecting members (e.g., reinforcing bars, etc.) not shown.
[0061] More specifically, as shown in Figure 2, each buried pipe 40 is positioned so that the left-right position of the end of each buried pipe 40 on the inlet 30 side is approximately the same as the left-right position of a specific inlet 30 (specifically, the upper first inlet 33, the upper third inlet 35, or the upper fifth inlet 37) among the inlets 30 in the upper row.
[0062] In addition, the specific configuration of the buried pipe 40 is arbitrary, but in embodiment 1, it is configured so that it can be buried in the concrete C and can also be filled into the remaining space RS when the concrete C is poured into the pouring space PS.
[0063] Specifically, first, the cross-sectional shape of the buried pipe 40 along the XZ plane is set to be substantially circular. However, without being limited thereto, it may be set to, for example, a substantially rectangular or elliptical ring shape.
[0064] The length of the dead-end pipe 40 in the front-rear direction is set shorter than the length of the casting space PS in the front-rear direction as shown in Fig. 1, and the end of the dead-end pipe 40 opposite the inlet 30 (the rear end of the dead-end pipe 40 in Fig. 1) is set so that it can be placed in the remaining space RS or / and in its vicinity. As an example, it may be set to about 1500 mm to 1800 mm.
[0065] The outer diameter of the buried pipe 40 is set to be approximately the same as the diameter of the inlet 30. However, this is not limited thereto, and the outer diameter may be set to be less than the diameter of the inlet 30 or greater than the diameter of the inlet 30, for example.
[0066] The thickness of the buried pipe 40 is set to a thickness that provides a desired pressure resistance, and may be set to about 2 mm to 3 mm, for example.
[0067] In addition, with regard to the method of installing the buried pipe 40, in order to avoid water remaining in the buried pipe 40 after the concrete C is poured into the pouring space PS, the buried pipe 40 is arranged at an angle so that the end of the buried pipe 40 opposite the inlet 30 is positioned lower than the end of the buried pipe 40 on the inlet 30 side (in Figure 1, the front end of the buried pipe 40).
[0068] Specifically, the buried pipe 40 is arranged so as to be inclined downward from the first upright body 10 side to the second upright body 20 side.
[0069] The method for setting the inclination gradient of the buried dead pipe 40 is arbitrary, but in embodiment 1, the gradient is set to a value that can prevent water from remaining in the buried dead pipe 40 while maintaining the functionality of the buried dead pipe 40, and as an example, may be set to approximately 1:50.
[0070] In addition, the buried pipe 40 is formed of a spiral pipe, specifically, a steel spiral pipe, in order to prevent water from entering the buried pipe 40.
[0071] With this configuration, the concrete C can be reliably filled into the remaining space RS, and voids can be prevented from remaining in the concrete C poured in the pouring space PS.
[0072] Regarding other configurations of the buried pipe 40, in embodiment 1, as shown in FIG. 1, the end face of the buried pipe 40 opposite the inlet 30 (in FIG. 1, the rear end face of the buried pipe 40) is formed as an upwardly facing inclined surface.
[0073] Specifically, the rear end surface of the buried pipe 40 is formed so that the lower end of the rear end surface of the buried pipe 40 is located rearward of the upper end of the rear end surface.
[0074] This makes it easier to fill the remaining space RS with concrete C, further preventing voids from remaining in the concrete C poured in the pouring space PS.
[0075] However, the present invention is not limited to this, and for example, the rear end surface of the dead end pipe 40 may be formed as a vertical surface.
[0076] (Configuration - Concrete pouring structure - Connection pipe) The connecting pipe 50 is a pipe for detachably connecting to the inlet 30 and the end of the dead-end pipe 40 on the inlet 30 side. The connecting pipe 50 is formed, for example, of a long steel tubular body, and as shown in FIG. 1, is provided on the first standing body 10 and is detachably fitted to the inlet 30 and the end of the dead-end pipe 40 on the inlet 30 side.
[0077] Specifically, the connecting pipes 50 are removably fitted to the inlet 30 side ends of the buried pipes 40 corresponding to the upper first inlet 33, the upper third inlet 35, and the upper fifth inlet 37, respectively.
[0078] Furthermore, the specific configuration of the connecting pipe 50 is arbitrary, but in the first embodiment, it is configured so that concrete C can be poured into the pouring space PS via the connecting pipe 50, the inlet 30, and the dead-buried pipe 40.
[0079] Specifically, first, the cross-sectional shape of the connection pipe 50 along the XZ plane is set to be substantially circular. However, without being limited thereto, it may be set to, for example, a substantially rectangular or elliptical ring shape.
[0080] In addition, the length of the connecting pipe 50 in the front-to-rear direction is set to be longer than the length between the inlet 30 and the end of the buried pipe 40 on the inlet 30 side, and may be set to approximately 300 mm to 400 mm, for example.
[0081] The outer diameter of the connecting pipe 50 is set to a size that allows it to fit into the inlet 30 and the end of the dead-end pipe 40 on the inlet 30 side.
[0082] Specifically, as shown in Fig. 1, the outer diameter of the connecting pipe 50 is set to become smaller from the first standing body 10 side to the second standing body 20 side (i.e., the connecting pipe 50 is configured in a tapered shape). Also, the outer diameter of the end of the connecting pipe 50 on the buried pipe 40 side (the rear end of the connecting pipe 50 in Fig. 1) is set to be smaller than the inner diameter of the end of the buried pipe 40 on the inlet 30 side. Also, the outer diameter of the end of the connecting pipe 50 opposite to the buried pipe 40 side (the front end of the connecting pipe 50 in Fig. 1) is set to be larger than the diameter of the inlet 30.
[0083] The thickness of the connecting pipe 50 is set to a value that provides a desired pressure resistance, and may be set to about 1 mm to 2 mm, for example.
[0084] With this configuration, while the concrete C is being poured into the pouring space PS (or after the pouring), the connecting pipe 50 can be removed from the inlet 30 and the end of the buried pipe 40 on the inlet 30 side, and the buried pipe 40 can be buried so that it is not exposed to the outside, thereby ensuring the design of the concrete structure formed by the pouring.
[0085] (Configuration - concrete pouring structure - water-stopping material) The water-stopping member is a member for preventing water from entering the buried pipe 40, and is provided in each buried pipe 40.
[0086] The specific configuration of the water-stopping member is arbitrary, but may be configured using, for example, a known span seal and / or a known water-stopping rubber.
[0087] Here, for example, when the water-stopping member is made of a span seal, it may be provided outside the dead-end pipe 40. Also, when the water-stopping member is made of a water-stopping rubber, it may be provided inside the dead-end pipe 40 near the end on the inlet 30 side and / or near the end on the opposite side to the inlet 30 side.
[0088] Such a water-stopping member can prevent water from entering the dead-end pipe 40, making it easier to ensure the quality of the concrete structure formed by pouring the concrete C.
[0089] (Configuration - Concrete pouring structure - Lid) The lid portion 60 is for freely opening and closing the inlet 30. The lid portion 60 is configured using, for example, a known lid member (one example is a steel lid member), and as shown in Fig. 2, is provided in the first standing body 10 so as to cover each inlet 30, and is detachably (or rotatably) connected to the first standing body 10 by a fixture or the like (partially omitted in Fig. 2).
[0090] Such a lid portion 60 can prevent the concrete C from leaking out from the inlet 30, and allows the concrete C to be accurately poured into the pouring space PS.
[0091] With the above-described concrete pouring structure 1, compared to the conventional technology (technology in which concrete is filled into the pouring space only through the inlet), it is possible to avoid having to take measures to remove any voids remaining in the concrete C after the concrete C has been poured into the pouring space PS, thereby reducing labor costs.
[0092] (Concrete pouring method) Next, a concrete pouring method using the above-mentioned concrete pouring structure 1 will be described.
[0093] The concrete pouring method is a method for pouring concrete C into the pouring space PS, and includes a preparation step, a first non-remaining space filling step, a remaining space filling step, and a second non-remaining space filling step.
[0094] In addition, the above concrete pouring method will be described on the assumption that the first standing body 10 and the second standing body 20 have already been installed on the installation surface S.
[0095] (Concrete pouring method - preparation process) First, the preparation process will be described.
[0096] The preparation process is a process for preparing for pouring concrete C into the pouring space PS.
[0097] Specifically, as shown in Fig. 3, a plurality of inlets 30 are provided in the sheathing 11 of the first upright body 10, and a lid 60 is provided to cover each inlet 30. A plurality of dead-end pipes 40 are provided in the casting space PS. Connection pipes 50 are connected (fitted) to the corresponding inlets 30 and the ends of the corresponding dead-end pipes 40 on the inlet 30 side. Water-stopping members are provided inside and / or outside each dead-end pipe 40. The open / close state of each lid 60 provided on each inlet 30 is set to an open state.
[0098] (Concrete pouring method - 1st non-remaining space filling process) Next, the first non-residual space filling step will be described.
[0099] The first non-remaining space filling process is a non-remaining space filling process in which concrete C is filled into the first non-remaining space NR1 through the inlet 30 and / or the dead-end pipe 40 after the preparation process.
[0100] Specifically, as shown in Fig. 4, concrete C sent from a known concrete pump (not shown) is poured into the first non-remaining space NR1 through each of the lower first inlet 31, the lower second inlet 32, the upper second inlet 34, and / or the upper fourth inlet 36, to fill the first non-remaining space NR1. The concrete C is also poured into the first non-remaining space NR1 through each of the upper first inlet 33, the upper third inlet 35, and / or the upper fifth inlet 37, the corresponding connecting pipe 50, and the corresponding dead-end pipe 40, to fill the first non-remaining space NR1. After or during the filling of the first non-remaining space NR1, the open / close states of the lids 60 corresponding to the lower first inlet 31 and the lower second inlet 32 are closed.
[0101] However, this is not limited to the above, and for example, the concrete C may be filled by pouring it into the first non-remaining space NR1 only through the inlet 30, or the concrete C may be filled into the first non-remaining space NR1 only through the inlet 30, the connecting pipe 50, and the buried pipe 40.
[0102] (Concrete pouring method - remaining space filling process) Returning to FIG. 1, the remaining space filling step will now be described.
[0103] The remaining space filling process is a process of filling concrete C into the remaining space RS through the inlet 30 and the dead-fill pipe 40 after the second non-remaining space filling process, and in embodiment 1, is completed before the second non-remaining space filling process.
[0104] Specifically, as shown in Fig. 1, concrete C sent from a known concrete pump is poured into the remaining space RS through the upper first inlet 33, the upper third inlet 35, and the upper fifth inlet 37, the corresponding connecting pipes 50, and the corresponding dead-end pipes 40, to fill the remaining space RS. Then, all the connecting pipes 50 are removed.
[0105] (Concrete pouring method - 2nd non-remaining space filling process) Next, the second non-residual space filling step will be described.
[0106] The second non-remaining space filling process is a non-remaining space filling process in which concrete C is filled into the second non-remaining space NR2 through the inlet 30 and / or the dead-end pipe 40 after the remaining space filling process.
[0107] Specifically, as shown in Fig. 5, concrete C sent from a known concrete pump is poured into the second non-remaining space NR2 via each of the upper first inlet 33, the upper second inlet 34, the upper third inlet 35, the upper fourth inlet 36, and / or the upper fifth inlet 37, to fill the second non-remaining space NR2. Then, as shown in Fig. 6, when the concrete C is filled into the entire pouring space PS, the open / close states of the lids 60 corresponding to each of the upper first inlet 33, the upper second inlet 34, the upper third inlet 35, the upper fourth inlet 36, and the upper fifth inlet 37 are closed. This completes the concrete pouring method.
[0108] However, this is not limited to the above, and for example, if the connecting pipes 50 are not removed in the remaining space filling process, the second non-remaining space NR2 can be filled by flowing into it through each of the upper first inlet 33, the upper third inlet 35, and the upper fifth inlet 37, the corresponding connecting pipes 50, and the corresponding dead-end pipes 40, and then all of the connecting pipes 50 can be removed.
[0109] The above-described concrete pouring method ensures that the remaining space RS is filled with concrete C, and prevents voids from remaining in the concrete C poured in the pouring space PS. Therefore, compared to the conventional technology (technology in which concrete fills the pouring space only through the inlet), it is possible to avoid taking measures to remove voids remaining in the concrete C after the concrete C is poured in the pouring space PS, and it is possible to reduce work costs.
[0110] (Effects of the First Embodiment) Thus, according to the first embodiment, at least one inlet 30 is provided in either one of the pair of erected bodies, and at least one dead-end pipe 40 is provided in the casting space PS, and the dead-end pipe 40 is configured so that the concrete C can be filled into the remaining space RS when the concrete C is poured into the casting space PS, so that the concrete C can be reliably filled into the remaining space RS and voids can be prevented from remaining in the concrete C poured into the casting space PS. Therefore, compared to the conventional technology (technology in which concrete fills the casting space only through the inlet), it is possible to avoid taking measures to remove voids remaining in the concrete C after the concrete C is poured into the casting space PS, and it is possible to reduce the work cost.
[0111] In addition, the connecting pipe 50 is for freely attaching and detaching to the inlet 30 and the end of the dead-buried pipe 40 on the inlet 30 side, and enables concrete C to be poured into the pouring space PS via the connecting pipe 50, the inlet 30, and the dead-buried pipe 40.Therefore, while the concrete C is being poured into the pouring space PS (or after the pouring), the connecting pipe 50 can be removed from the inlet 30 and the end of the dead-buried pipe 40 on the inlet 30 side, and the dead-buried pipe 40 can be buried so that it is not exposed to the outside, thereby ensuring the design of the concrete structure formed by the pouring.
[0112] In addition, the buried pipe 40 is positioned at an angle so that the end of the buried pipe 40 opposite the inlet 30 is positioned lower than the end of the buried pipe 40 on the inlet 30 side. This makes it possible to prevent water from remaining in the buried pipe 40 after the concrete C is poured into the pouring space PS, making it easier to ensure the quality of the concrete structure formed by pouring the concrete C.
[0113] In addition, since the buried pipe 40 is a spiral pipe, it is possible to prevent water from entering the buried pipe 40, making it easier to ensure the quality of the concrete structure formed by pouring the concrete C.
[0114] In addition, since the water-stopping member is provided in the buried pipe 40 and prevents water from entering the buried pipe 40, it is possible to prevent water from entering the buried pipe 40, making it easier to ensure the quality of the concrete structure formed by pouring the concrete C.
[0115] In addition, since the lid portion 60 is provided so that the inlet 30 can be opened and closed, leakage of the concrete C from the inlet 30 can be prevented, and the concrete C can be accurately poured into the pouring space PS.
[0116] The method also includes a remaining space filling step of filling the remaining space RS with concrete C through the inlet 30 provided in at least one of the pair of erected bodies and the dead-filling pipe 40 provided in the casting space PS, and a non-remaining space filling step of filling the non-remaining space with concrete C through the inlet 30 and / or the dead-filling pipe 40. Since the remaining space filling step is completed before the non-remaining space filling step, the remaining space RS can be reliably filled with concrete C, and voids can be prevented from remaining in the concrete C cast in the casting space PS. Therefore, compared to the conventional technology (technology in which concrete is filled into the casting space only through the inlet), it is possible to avoid taking measures to remove voids remaining in the concrete C after the concrete C is cast in the casting space PS, and it is possible to reduce the work cost.
[0117] [Embodiment 2] Next, a concrete pouring structure and a concrete pouring method according to embodiment 2 will be described. In embodiment 2, concrete is poured from both of a pair of standing bodies. However, the configuration of embodiment 2 is substantially the same as that of embodiment 1, except where otherwise specified, and the configuration substantially the same as that of embodiment 1 will be given the same symbols and / or names as those used in embodiment 1 as necessary, and the description thereof will be omitted.
[0118] (composition) First, the configuration of a concrete pouring structure 100 according to the second embodiment and the configurations of a first standing body 110 and a second standing body 120 to which the concrete pouring structure 100 is applied will be described.
[0119] (Structure: First erection body) First, the configuration of the first upright body 110 will be described.
[0120] The first standing body 110 according to the second embodiment is configured substantially identically to the first standing body 10 according to the first embodiment, and is provided between the preceding body PB and the installation surface S, as shown in FIG.
[0121] (Structure - Second erected body) Next, the configuration of the second standing body 120 will be described.
[0122] The second upright body 120 in embodiment 2 is configured substantially identically to the first upright body 110, and as shown in Figure 7, is erected on the installation surface S, separated from the first upright body 110 by a pouring space PS, at a position outside the structure relative to the first upright body 110, between the preceding structure PB and the installation surface S.
[0123] (Configuration - Casting space) Here, the casting space PS is configured substantially identically to the casting space PS in embodiment 1, and is provided so as to be located between the first upright body 110 and the second upright body 120, as shown in Figure 7.
[0124] However, the length of the pouring space PS in the front-rear direction is set to be longer than the length of the pouring space PS in the front-rear direction according to the first embodiment, as shown in FIG.
[0125] In the second embodiment, the pouring space PS includes a remaining space RS, a first non-remaining space NR1, and a second non-remaining space NR2, as shown in FIG.
[0126] Of these, in the second embodiment, the remaining space RS is a space located on the upper side and in the center in the front-rear direction of the pouring space PS, as shown in FIG.
[0127] In the second embodiment, the first non-remaining space NR1 is a space located below the remaining space RS, as shown in FIG.
[0128] In the second embodiment, the second non-remaining space NR2 is a space located closer to the first standing body 110 side and a space located closer to the second standing body 120 side than the remaining space RS, as shown in FIG.
[0129] (Structure: Cast concrete structure) Next, the configuration of the concrete pouring structure 100 will be described.
[0130] As shown in FIG. 7, the concrete pouring structure 100 includes an inlet 30, a buried pipe 40, a connecting pipe 50, a water-stopping member (not shown), and a lid (not shown).
[0131] (Configuration - Concrete pouring structure - Inlet) At least one inlet 30 is provided in the sheathing 11 of each of the first upright body 110 and the second upright body 120.
[0132] Specifically, similarly to the inlet 30 according to the first embodiment, a plurality of inlets are arranged substantially parallel to each other at a predetermined interval along the left-right and up-down directions. That is, the backing board 11 of each of the first standing body 110 and the second standing body 120 is provided with a lower first inlet 31, a lower second inlet 32, an upper first inlet 33, an upper second inlet 34, an upper third inlet 35, an upper fourth inlet 36, and an upper fifth inlet 37, respectively.
[0133] (Configuration - Concrete pouring structure - Buried dead pipe) A plurality of the buried pipes 40 are provided in the casting space PS such that the longitudinal direction of the buried pipes 40 extends from each of the first upright body 110 and the second upright body 120 toward the center of the casting space PS.
[0134] Specifically, as shown in Fig. 7, the buried pipes 40 on the first standing body 110 side are provided at intervals from each other at substantially the same height position as the height position of the inlets 30 (specifically, the upper first inlet 33, the upper third inlet 35, and the upper fifth inlet 37) of the upper row provided in the first standing body 110, and are connected to the first standing body 110 by a connecting member not shown. The buried pipes 40 on the second standing body 120 side are provided at intervals from each other at substantially the same height position as the height position of the inlets 30 (specifically, the upper first inlet 33, the upper third inlet 35, and the upper fifth inlet 37) of the upper row provided in the second standing body 120, and are connected to the second standing body 120 by a connecting member not shown.
[0135] In addition, the specific configuration of the buried pipe 40 is arbitrary, but in embodiment 2, it is configured so that it can be buried in the concrete C and can also be filled into the remaining space RS when the concrete C is poured into the pouring space PS.
[0136] Specifically, the cross-sectional shape along the XZ plane of the buried pipe 40, the outer diameter, the thickness, the installation method, and the formation are each set to be approximately the same as those in the first embodiment.
[0137] In addition, the front-to-rear length of the dead-end pipe 40 is set to approximately half the front-to-rear length of the pouring space PS, as shown in Figure 7, and the end of the dead-end pipe 40 opposite the inlet 30 (in Figure 7, the rear end of the dead-end pipe 40) is set so that it can be positioned in the remaining space RS or / and in its vicinity.
[0138] This makes it easier to fill the remaining space RS with concrete C, further preventing voids from remaining in the concrete C poured in the pouring space PS.
[0139] (Configuration - Concrete pouring structure - Connection pipe) The connecting pipe 50 is configured substantially identically to the connecting pipe 50 according to embodiment 1, and as shown in FIG. 7, is provided on each of the first upright body 110 and the second upright body 120, and is removably fitted to the inlet 30 and the end of the buried pipe 40 on the inlet 30 side.
[0140] Specifically, the connection pipe 50 on the first standing body 110 side is detachably fitted to the inlet 30 side end of the buried pipe 40 corresponding to each of the upper first inlet 33, the upper third inlet 35, and the upper fifth inlet 37 provided in the first standing body 110. Also, the connection pipe 50 on the second standing body 120 side is detachably fitted to the inlet 30 side end of the buried pipe 40 corresponding to each of the upper first inlet 33, the upper third inlet 35, and the upper fifth inlet 37 provided in the second standing body 120.
[0141] (Configuration - concrete pouring structure - water-stopping material) The water-stopping member has substantially the same configuration as the water-stopping member according to the first embodiment, and is provided in each of the buried pipes 40.
[0142] (Configuration - Concrete pouring structure - Lid) The lid portion is configured substantially identically to the lid portion 60 of embodiment 1, and is provided so as to cover each inlet 30 in each of the first upright body 110 and the second upright body 120, and is connected to the first upright body 110 or the second upright body 120 by a fixing device or the like so as to be freely rotatable.
[0143] As with the concrete pouring structure 1 of embodiment 1, the concrete pouring structure 100 as described above makes it possible to avoid taking steps to remove voids remaining in the concrete C after the concrete C has been poured into the pouring space PS, thereby reducing labor costs.
[0144] (Concrete pouring method) Next, a concrete pouring method in which the above-mentioned concrete pouring structure 100 is used will be described.
[0145] The concrete pouring method includes a preparation step, a first non-remaining space filling step, a remaining space filling step, and a second non-remaining space filling step.
[0146] In addition, the concrete pouring method will be described on the assumption that the first standing body 110 and the second standing body 120 are provided on the installation surface S.
[0147] (Concrete pouring method - preparation process) First, the preparation process will be described.
[0148] Specifically, in the preparation step, as shown in Fig. 8, a plurality of inlets 30 are provided in the sheathing 11 of the first upright body 110 and the second upright body 120, and a lid is provided to cover each inlet 30. A plurality of dead-end pipes 40 are provided in the casting space PS. A connecting pipe 50 is connected (fitted) to the corresponding inlets 30 and the end of the corresponding dead-end pipe 40 on the inlet 30 side. A water-stopping member is provided inside and / or outside each dead-end pipe 40. The open / close state of each lid 60 provided on each inlet 30 is set to the open state.
[0149] (Concrete pouring method - 1st non-remaining space filling process) Next, the first non-residual space filling step will be described.
[0150] Specifically, in the first non-remaining space filling step, as shown in Fig. 9, concrete C sent from a known concrete pump (not shown) is poured into the first non-remaining space NR1 through the lower first inlet 31, the lower second inlet 32, the upper second inlet 34, and / or the upper fourth inlet 36 provided in each of the first standing body 110 and the second standing body 120, to fill the first non-remaining space NR1. In addition, the concrete C is poured into the first non-remaining space NR1 through the upper first inlet 33, the upper third inlet 35, and / or the upper fifth inlet 37 provided in each of the first standing body 110 and the second standing body 120, the corresponding connecting pipe 50, and the corresponding dead-end pipe 40, to fill the first non-remaining space NR1. In addition, after or during filling into the first non-remaining space NR1, the opening / closing state of the lid portion 60 corresponding to each of the lower first inlet 31 and the lower second inlet 32 provided in each of the first upright body 110 and the second upright body 120 is changed to a closed state.
[0151] (Concrete pouring method - remaining space filling process) Returning to FIG. 7, the remaining space filling step will now be described.
[0152] Specifically, in the remaining space filling step, as shown in Fig. 7, concrete C sent from a known concrete pump is poured into the remaining space RS through the upper first inlet 33, the upper third inlet 35, and the upper fifth inlet 37 provided on each of the first standing body 110 and the second standing body 120, the corresponding connecting pipes 50, and the corresponding dead-end pipes 40, to fill the remaining space RS. Then, all the connecting pipes 50 are removed.
[0153] (Concrete pouring method - 2nd non-remaining space filling process) Next, the second non-residual space filling step will be described.
[0154] Specifically, in the second non-remaining space filling step, as shown in FIG. 10, concrete C sent from a known concrete pump is poured into the second non-remaining space NR2 through the upper first inlet 33, the upper second inlet 34, the upper third inlet 35, the upper fourth inlet 36, and / or the upper fifth inlet 37 provided in each of the first standing body 110 and the second standing body 120, to fill the second non-remaining space NR2. Then, as shown in FIG. 11, when the concrete C is filled in the entire pouring space PS, the open / closed states of the lids corresponding to the upper first inlet 33, the upper second inlet 34, the upper third inlet 35, the upper fourth inlet 36, and the upper fifth inlet 37 provided in each of the first standing body 110 and the second standing body 120 are closed. This completes the concrete pouring method.
[0155] As with the concrete pouring method of embodiment 1, the concrete pouring method described above makes it possible to avoid taking steps to remove any voids remaining in the concrete C after the concrete C has been poured into the pouring space PS, thereby reducing labor costs.
[0156] (Effects of the second embodiment) Thus, according to the second embodiment, each of the pair of erected bodies is provided with at least one inlet 30 and at least one dead-end pipe 40 in the casting space PS, and the dead-end pipe 40 is configured so that the concrete C can be filled into the remaining space RS when the concrete C is poured into the casting space PS, so that the concrete C can be reliably filled into the remaining space RS and voids can be prevented from remaining in the concrete C poured into the casting space PS. Thus, as with the concrete pouring structure 1 according to the first embodiment, it is possible to avoid taking measures to remove voids remaining in the concrete C after the concrete C is poured into the casting space PS, and it is possible to reduce the work cost.
[0157] [III] Modifications to the embodiment Although the embodiments of the present invention have been described above, the specific configurations and means of the present invention can be modified and improved as desired within the scope of the technical ideas of the inventions described in the claims. Such modifications will be described below.
[0158] (About the problem to be solved and the effects of the invention) First, the problems that the invention aims to solve and the effects of the invention are not limited to those described above, and the present invention may solve problems that are not described above or achieve effects that are not described above, or may solve only some of the problems that are described or achieve only some of the effects that are described.
[0159] (shape, number, structure, time series) The components illustrated in the embodiments and drawings may be modified and improved as desired within the scope of the technical concept of the present invention with respect to the shape, numerical values, or structure or chronological relationships of multiple components.
[0160] (Regarding the first and second erection bodies) In the above-mentioned first and second embodiments, the first standing body 110 and the second standing body 120 are described as being provided between the preceding body PB and the installation surface S, but this is not limited thereto. For example, the first standing body 110 and the second standing body 120 may be provided on the installation surface S at a location where the preceding body PB is not located above the installation surface S.
[0161] (Regarding concrete pouring structures) In the above-mentioned first and second embodiments, the concrete pouring structure is described as including the connecting pipe 50, but is not limited thereto. For example, in a case where the distance between the upper first inlet 33 and the corresponding dead-end pipe 40 is very short, and the concrete C can be filled into the pouring space PS through the upper first inlet 33 and the corresponding dead-end pipe 40 without using the connecting pipe 50, the connecting pipe 50 may be omitted.
[0162] Further, in the above first and second embodiments, the concrete pouring structure is described as including a water-stopping member, but this is not limiting, and for example, the water-stopping member may be omitted.
[0163] In the above-mentioned first and second embodiments, the concrete pouring structure is described as having a lid, but this is not limited thereto. For example, if the concrete C poured in the pouring space PS does not leak out from the inlet 30, the lid may be omitted.
[0164] (About the inlet) In the above embodiment 1, it has been described that the number of inlets 30 installed is seven, but this is not limited thereto, and for example, it may be less than seven, or may be eight or more (note that the same applies to the inlets 30 in embodiment 2).
[0165] (About buried pipes) In the above-mentioned first and second embodiments, the buried pipe 40 is described as being inclined, but this is not limited thereto. For example, the buried pipe 40 may be horizontally disposed, and as one example, the longitudinal direction of the buried pipe 40 may be disposed so as to be substantially parallel to the front-rear direction.
[0166] In the above-mentioned first embodiment, the dead-end pipe 40 is described as being provided at a height position substantially equal to that of the inlets 30 in the upper row, but this is not limited thereto. For example, the dead-end pipe 40 may be provided at a height position substantially equal to that of the inlets 30 in the lower row. Alternatively, the dead-end pipe 40 may be provided at a height position substantially equal to that of the inlets 30 in the upper row and the lower row (note that the same applies to the dead-end pipe 40 according to the second embodiment).
[0167] In addition, in the above embodiment 1, it has been described that the number of installed buried pipes 40 is three, but this is not limited thereto, and for example, the number may be four or more, or two or more (note that the same applies to the buried pipes 40 in embodiment 2).
[0168] In addition, in the above-mentioned first and second embodiments, the buried pipe 40 has been described as a spiral pipe, but the present invention is not limited to this and may be, for example, a pipe other than a spiral pipe (as an example, a seamless pipe) or the like.
[0169] (About concrete pouring method) In the above-mentioned first embodiment, the concrete pouring method is described as including the preparation step, but this is not limited thereto. For example, if the inlet 30, the dead-end pipe 40, the connecting pipe 50, the water-stopping member, and the lid 60 are already provided in the predetermined positions before the concrete pouring method is carried out, the preparation step may be omitted (note that the same applies to the concrete pouring method according to the second embodiment).
[0170] In the above-mentioned first and second embodiments, the concrete pouring method is described as including the first non-remaining space filling step, but is not limited thereto. For example, when the vertical length of the pouring space PS is relatively short, the first non-remaining space filling step may be omitted. In this case, in the remaining space filling step or / and the second non-remaining space filling step, the concrete C sent from a known concrete pump may be poured into the first non-remaining space NR1 through the inlet 30, the connecting pipe 50, and / or the dead-end pipe 40 to fill the space.
[0171] (Additional Note) The concrete pouring structure of Appendix 1 is a concrete pouring structure for pouring concrete into a pouring space located between a pair of standing bodies, comprising at least one inlet provided in at least one of the pair of standing bodies, which makes it possible to fill the pouring space with the concrete from the outside through the inlet, and at least one dead-end pipe provided in the pouring space, which is capable of being dead-end in the concrete and makes it possible to fill the pouring space with the concrete from the outside through the inlet and the dead-end pipe, and the dead-end pipe is configured so that when the concrete is poured into the pouring space, the concrete can be filled into a remaining space in the pouring space, which is a space in which voids are likely to remain when the concrete is poured.
[0172] The concrete pouring structure of Appendix 2 is the concrete pouring structure described in Appendix 1, and is provided with a connecting pipe for freely detachably connecting to the inlet and the inlet side end of the dead-end pipe, enabling the concrete to be poured into the pouring space via the connecting pipe, the inlet, and the dead-end pipe.
[0173] The concrete pouring structure of Appendix 3 is the concrete pouring structure described in Appendix 1 or 2, in which the buried pipe is arranged at an angle so that the end of the buried pipe opposite the inlet is positioned lower than the end of the buried pipe on the inlet side.
[0174] The concrete pouring structure of Appendix 4 is the concrete pouring structure of Appendix 1 or 2, in which the buried pipe is a spiral pipe.
[0175] The concrete pouring structure of Appendix 5 is the concrete pouring structure described in Appendix 1 or 2, which is provided with a water-stopping member in the buried pipe, and is equipped with a water-stopping member for preventing water from entering the buried pipe.
[0176] The concrete pouring structure of Appendix 6 is the concrete pouring structure of Appendix 1 or 2, further comprising a lid portion that allows the inlet to be opened and closed freely.
[0177] The concrete pouring method of Appendix 7 is a concrete pouring method for pouring concrete into a pouring space located between a pair of standing bodies, and includes a remaining space filling step of filling a remaining space, which is a space in the pouring space where voids are likely to remain when the concrete is poured, with the concrete via an inlet provided in at least one of the pair of standing bodies and a dead-end pipe provided in the pouring space and capable of being dead-end-in the concrete, and a non-remaining space filling step of filling a non-remaining space, which is a space in the pouring space other than the remaining space, with the concrete via the inlet and / or the dead-end pipe, and the remaining space filling step is completed before the non-remaining space filling step.
[0178] (Effect of supplementary notes) According to the concrete pouring structure described in Supplementary Note 1, at least one of the pair of erected bodies is provided with at least one inlet and at least one dead-end pipe provided in the pouring space, and the dead-end pipe is configured so that the remaining space can be filled with concrete when the concrete is poured into the pouring space, so that the remaining space can be filled with concrete reliably and voids can be prevented from remaining in the concrete poured into the pouring space. Therefore, compared to the conventional technology (technology in which concrete fills the pouring space only through the inlet), it is possible to avoid taking measures to remove voids remaining in the concrete after the concrete is poured into the pouring space, and it is possible to reduce the work cost.
[0179] According to the concrete pouring structure described in Appendix 2, a connecting pipe is provided for freely attaching and detaching to the inlet and the inlet side end of the dead-buried pipe, which enables concrete to be poured into the pouring space via the connecting pipe, the inlet, and the dead-buried pipe.Therefore, while the concrete is being poured into the pouring space (or after the pouring), the connecting pipe can be removed from the inlet and the inlet side end of the dead-buried pipe, and the dead-buried pipe can be buried so that it is not exposed to the outside, thereby ensuring the design of the concrete structure formed by the pouring.
[0180] According to the concrete pouring structure described in Appendix 3, the buried pipe is arranged at an angle so that the end opposite the inlet side of the buried pipe is positioned lower than the end on the inlet side of the buried pipe. This makes it possible to prevent water from remaining in the buried pipe after the concrete is poured into the pouring space, making it easier to ensure the quality of the concrete structure formed by pouring the concrete.
[0181] According to the concrete pouring structure described in Appendix 4, the buried pipe is a spiral pipe, which makes it possible to prevent water from entering the buried pipe, making it easier to ensure the quality of the concrete structure formed by pouring concrete.
[0182] According to the concrete pouring structure described in Appendix 5, a water-stopping member is provided in the buried pipe, and the water-stopping member is provided to prevent water from entering the buried pipe. This makes it possible to prevent water from entering the buried pipe, making it easier to ensure the quality of the concrete structure formed by pouring concrete.
[0183] According to the concrete pouring structure described in Appendix 6, a lid portion is provided that allows the inlet to be opened and closed freely, thereby preventing concrete from leaking out of the inlet and allowing concrete to be poured accurately into the pouring space.
[0184] According to the concrete pouring method described in Appendix 7, the method includes a remaining space filling step of filling the remaining space with concrete through an inlet provided in at least one of the pair of erected bodies and a dead-end pipe provided in the pouring space, and a non-remaining space filling step of filling the non-remaining space with concrete through the inlet and / or the dead-end pipe, and the remaining space filling step is completed before the non-remaining space filling step, so that the remaining space can be filled with concrete reliably and voids can be prevented from remaining in the concrete poured in the pouring space. Therefore, compared to the conventional technology (technology in which concrete fills the pouring space only through the inlet), it is possible to avoid taking measures to remove voids remaining in the concrete after the concrete is poured into the pouring space, and it is possible to reduce the operation cost. [Explanation of symbols]
[0185] 1. Concrete pouring structure 10 First erection 11. Sheathing 12 Shoring 13 Fasteners 20 Second erection 30 Inlet 31 Lower 1st inlet 32 Lower 2nd inlet 33 Upper first inlet 34 Upper 2nd inlet 35 Upper third inlet 36 Upper 4th inlet 37 Upper 5th inlet 40 Buried Killing Pipe 50 Connecting pipe 60 Lid 100 Cast concrete structure 110 First erection 120 Second Standing Body C. Concrete NR1 1st non-residual space NR2 2nd non-residual space PB Preceding frame PS casting space RS residual space S Installation surface
Claims
1. A concrete pouring structure for pouring concrete into a pouring space located between a pair of erected bodies, At least one inlet is provided in at least one of the pair of erected bodies, and the inlet enables the concrete to be filled into the casting space from the outside through the inlet; At least one or more mortise pipes are provided in the casting space, and the mortise pipes can be mortised in the concrete and can be used to fill the concrete from the outside into the casting space through the inlet and the mortise pipes. The buried pipe is configured so that when the concrete is poured into the pouring space, the concrete can be filled into the remaining space in the pouring space, which is a space in which voids are likely to remain when the concrete is poured. Concrete poured structure.
2. A connecting pipe for detachably connecting to the inlet and the end of the dead-end pipe on the inlet side, the connecting pipe enabling the concrete to be poured into the pouring space through the connecting pipe, the inlet, and the dead-end pipe. The concrete pouring structure according to claim 1.
3. The buried pipe is inclined so that the end of the buried pipe opposite the inlet side is located lower than the end of the buried pipe on the inlet side. A concrete pouring structure according to claim 1 or 2.
4. The buried pipe is a spiral pipe. A concrete pouring structure according to claim 1 or 2.
5. A water-stopping member is provided in the buried pipe, and the water-stopping member is configured to prevent water from entering the buried pipe. A concrete pouring structure according to claim 1 or 2.
6. A lid portion is provided to freely open and close the inlet. A concrete pouring structure according to claim 1 or 2.
7. A concrete pouring method for pouring concrete into a pouring space located between a pair of erected bodies, comprising: A remaining space filling process in which the concrete is filled into a remaining space in the casting space, which is a space in which voids are likely to remain when the concrete is cast, through an inlet provided in at least one of the pair of erected bodies and a dead-end pipe provided in the casting space and capable of being dead-end in the concrete, and the concrete is poured into the remaining space through the dead-end pipe; A non-remaining space filling process of filling the concrete into a non-remaining space, which is a space other than the remaining space, of the casting space through the inlet and / or the dead-end pipe, completing the remaining space filling step prior to the non-remaining space filling step; How to pour concrete.