Concrete force-feed device and concrete force-feed method
The integration of a pump and vibrator control system in concrete pumping devices addresses clogging and fluidity loss by coordinating their operations to maintain concrete flow, enhancing delivery efficiency.
Patent Information
- Application Number
- JP2024052359
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-04-12
- Filing Date
- 2024-03-27
- Publication Date
- 2024-10-25
AI Technical Summary
Existing concrete pumping devices face issues with a decrease in fluidity of fresh concrete due to clogging within the pipes, which conventional methods fail to adequately address.
A concrete pumping device and method that integrates a pump, piping, a pump control device, a vibrator, and a vibrator control device, where the pump and vibrator operations are coordinated to prevent clogging and maintain fluidity by applying vibration to the concrete within the pipe.
The coordinated operation of the pump and vibrator effectively prevents clogging and maintains the fluidity of fresh concrete, ensuring reliable delivery to the pouring position while minimizing fluidity loss.
Smart Images

Figure 2024152642000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a concrete pumping device that pumps ready-mixed concrete to a pouring position, and a concrete pumping method using the concrete pumping device. [Background technology]
[0002] A concrete pump that pumps ready-mixed concrete into a concrete pipe has been proposed (see Patent Document 1). It has also been proposed to attach a vibrator to the concrete pipe and vibrate the concrete pipe to smoothly circulate the ready-mixed concrete in the concrete pipe (see Patent Document 2). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent No. 6008524 [Patent Document 2] Japanese Patent Application Publication No. 59-228657 Summary of the Invention [Problem to be solved by the invention]
[0004] An object of the present invention is to provide a concrete pumping device and a concrete pumping method capable of suppressing a decrease in the fluidity of ready-mixed concrete in a pipe. [Means for solving the problem]
[0005] The inventors have come up with the present invention by focusing on the fact that a concrete pumping device is constructed to include a pump, piping, a pump control device, a vibrator, and a vibrator control device, and that by operating the pump using the pump control device and operating the vibrator in conjunction with the operation of the pump, it is possible to obtain fresh concrete with a predetermined fluidity at the tip of the pipe without clogging the fresh concrete in the pipe. A concrete pumping device of a first invention is a concrete pumping device (e.g., concrete pumping device 1, 1B described below) that pumps ready-mixed concrete to a pouring position (e.g., pouring position P described below), and includes a pump (e.g., pump 10 described below) that pumps the ready-mixed concrete, a pipe (e.g., pipe 20 described below) that extends from the pump to the pouring position and through which the ready-mixed concrete pumped by the pump flows, a pump control device (e.g., pump control device 30 described below) that controls the pump, a vibrator (e.g., vibrator 40 described below) that is attached to a predetermined location of the pipe and vibrates the pipe, and a vibrator control device (e.g., vibrator control device 50 described below) that controls the vibrator, wherein the pump control device operates the pump and transmits an operation signal to the vibrator control device in conjunction with the operation of the pump, and the vibrator control device operates the vibrator based on the operation signal received from the pump control device.
[0006] According to this invention, the pump control device operates the pump and the vibrator attached to the pipe in conjunction with each other. In other words, the pump pressure-feeds the ready-mixed concrete into the pipe, and the vibrator vibrates the ready-mixed concrete in the pipe. This prevents the ready-mixed concrete from clogging the pipe, and suppresses a decrease in the fluidity (slump value, flow value) of the ready-mixed concrete flowing through the pipe.
[0007] A second aspect of the present invention provides a concrete pumping device, wherein the pump control device is capable of transmitting an operation signal to the vibrator control device without operating the pump.
[0008] According to this invention, the pump control device can send an activation signal to the vibrator control device without operating the pump. Therefore, regardless of the pumping status of the ready-mixed concrete, an operator can activate the vibrator at any time to provide sufficient vibration to the ready-mixed concrete in the pipe. This makes it possible to suppress a decrease in the fluidity of the ready-mixed concrete in the pipe.
[0009] The concrete pumping device of the third invention is a concrete pumping device (e.g., concrete pumping devices 1A and 1C described below) that pumps fresh concrete to a pouring position (e.g., pumping position P described below), and comprises a pump (e.g., pump 10 described below) that pumps the fresh concrete, a pipe (e.g., pipe 20 described below) that extends from the pump to the pouring position and through which the fresh concrete pumped by the pump flows, a vibrator (e.g., vibrator 40 described below) that is attached to a predetermined location of the pipe and vibrates the pipe, and a vibrator control device (e.g., vibrator control device 50 described below) that controls the vibrator, and is characterized in that the vibrator control device is capable of operating the vibrator regardless of the operating state of the pump.
[0010] According to this invention, the vibrator control device can be operated regardless of the operating state of the pump. Therefore, even when the pump is not running, such as during a break in pouring the ready-mixed concrete, the person pouring the concrete can activate the vibrator at any time, preventing blockage of the ready-mixed concrete in the pipes and suppressing a decrease in the fluidity (slump value, flow value) of the ready-mixed concrete flowing through the pipes. In addition, even if the pump control device that controls the pump cannot be modified to operate the vibrator independently of the operation of the pump, or if the pump control device and the vibrator control device are disconnected, the vibrator can be easily operated regardless of the operation of the pump.
[0011] A fourth invention is a method for pumping concrete using the above-mentioned concrete pumping device, characterized in that the pump control device operates the pump to discharge fresh concrete from the end of the pipe, and sends an operation signal to the vibrator control device in conjunction with the operation of the pump, and the vibrator control device operates the vibrator attached to the pipe based on the operation signal received from the pump control device.
[0012] According to this invention, the pump control device operates the pump and the vibrator attached to the pipe in conjunction with each other. In other words, the pump pressure-feeds the ready-mixed concrete into the pipe, and the vibrator vibrates the ready-mixed concrete in the pipe. This prevents the ready-mixed concrete from clogging the pipe, and suppresses a decrease in the fluidity (slump value, flow value) of the ready-mixed concrete flowing through the pipe.
[0013] The concrete pumping method of the fifth invention is a method for pumping concrete using the above-mentioned concrete pumping device, characterized in that the pump discharges fresh concrete from the end of the pipe, and the vibrator control device operates the vibrator attached to the pipe regardless of the operating state of the pump.
[0014] According to this invention, the vibrator control device activates the vibrator attached to the pipe regardless of the operating state of the pump. Therefore, even when the pump is not operating, such as during a break in the concrete pouring work, the concrete pourer can use the vibrator to vibrate the fresh concrete in the pipe at any time. This prevents the fresh concrete from clogging the pipe and suppresses a decrease in the fluidity (slump value, flow value) of the fresh concrete flowing through the pipe. Effect of the Invention
[0015] According to the present invention, it is possible to provide a concrete pumping device and a concrete pumping method capable of suppressing a decrease in the fluidity of ready-mixed concrete in a pipe. [Brief description of the drawings]
[0016] [Figure 1] FIG. 1 is a schematic diagram showing a configuration of a concrete pumping device according to a first embodiment of the present invention. [Diagram 2] FIG. 2 is a diagram showing a piping configuration of the concrete pumping device according to the first embodiment. [Diagram 3]FIG. 2 is a diagram showing an operation panel of a remote control device constituting the concrete pumping device according to the first embodiment. [Figure 4] FIG. 2 is a diagram showing a vibrator constituting the concrete pumping device according to the first embodiment. [Diagram 5] 2 is a cross-sectional view taken along line AA of the vibrator according to the first embodiment. FIG. [Figure 6] This is a diagram (part 1) showing the test method for the concrete pumping test. [Figure 7] FIG. 2 is a diagram showing the test conditions for the concrete pumping test. [Figure 8] FIG. 1 is a diagram for explaining an evaluation method for a concrete pumping test. [Figure 9] These are the test results for tests No. 1-1 to 3 on test day 2 of the concrete pumping test. [Figure 10] These are the test results for tests No. 1-4 to 6 on test day 1 of the concrete pumping test. [Figure 11] These are the test results for the No. 2 concrete pumping test. [Figure 12] These are the test results for Test No. 3-1 on Test Day 1 of the concrete pumping test. [Figure 13] These are the test results for the No. 3-2 concrete pumping test. [Figure 14] These are the test results for Test No. 4 of the concrete pumping test. [Figure 15] These are the test results for Test No. 5 of the concrete pumping test. [Figure 16] FIG. 5 is a schematic diagram showing a configuration of a concrete pumping device according to a second embodiment of the present invention. [Figure 17] FIG. 2 is a schematic diagram showing a configuration of a concrete pumping device according to a first modified example of the present invention. [Figure 18] FIG. 11 is a schematic diagram showing a configuration of a concrete pumping device according to a second modified example of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0017] The present invention relates to a concrete pumping device including a pump, piping, a pump control device, a vibrator, and a vibrator control device, and a concrete pumping method using the concrete pumping device. Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In the following description of the embodiments, the same components are denoted by the same reference numerals, and the description thereof will be omitted or simplified. [First embodiment] Fig. 1 is a schematic diagram showing the configuration of a concrete-feeding apparatus 1 according to a first embodiment of the present invention. Fig. 2 is a diagram showing the configuration of a piping 20 of the concrete-feeding apparatus 1. The concrete pumping device 1 pumps ready-mixed concrete from a pump 10 to a pouring position P. The concrete pumping device 1 includes a pump 10 that is mounted on a pump vehicle 2 and pumps ready-mixed concrete charged into a hopper 11, a pipe 20 that extends from the pump 10 to the pouring position P and through which the ready-mixed concrete pumped by the pump 10 flows, a pump control device 30 that controls the pump 10, a plurality of vibrators 40 that are attached to predetermined locations of the pipe 20 and vibrate the pipe 20, and one vibrator control device 50 that controls the plurality of vibrators 40.
[0018] The pump control device 30 includes a control panel 31 mounted on the pump vehicle 2, and a remote control device 32 capable of operating the control panel 31 via wireless communication. 3 is a diagram showing an operation panel 33 of the remote control device 32. When an operator presses a vibration interlocking switch 34 on the operation panel 33, the remote control device 32 transmits a first operation signal to the control panel 31. When an operator presses a vibration manual switch 35 on the operation panel 33, the remote control device 32 transmits a second operation signal. When the control panel 31 receives a first operation signal from the remote control device 32 and the following conditions are met: the amount of ready mixed concrete poured into the hopper 11 is equal to or greater than a predetermined amount, the emergency stop switch has not been pressed, the hydraulic oil temperature has not exceeded a predetermined temperature, and the control panel 31 is connected to the remote control device 32, the control panel 31 operates the pump 10 and transmits an operation signal to each vibrator control device 50 in conjunction with the operation of the pump 10. Furthermore, when the control panel 31 receives a second operation signal from the remote control device 32, it transmits an operation signal to each vibrator control device 50 without operating the pump 10.
[0019] Fig. 4 is a diagram showing the vibrator 40 attached to the pipe 20. Fig. 5 is a cross-sectional view of the vibrator 40 taken along line AA. The vibrator 40 includes a fixing ring 41 that can be opened and closed by a hinge 42 and that sandwiches the pipe 20, a bolt 43 and a nut 44 that connect the ends of the fixing ring 41, a base 45 provided on the fixing ring 41, and a vibration device 46 attached to the base 45. A power cord 47 of the vibration device 46 is connected to a vibrator control device 50.
[0020] The vibrator control device 50 is connected to the control panel 31 of the pump control device 30 by wire or wirelessly, and power cords 47 of the multiple vibrators 40 are connected to the vibrator control device 50. The vibrator control device 50 activates the vibrator 40 based on an activation signal received from the control panel 31 of the pump control device 30. Specifically, the vibrator control device 50 turns the power of the vibrator 40 ON / OFF based on the activation signal received from the control panel 31 of the pump control device 30. In FIG. 1, one vibrator control device 50 is connected to the control panel 31, and power cords 47 of three vibrators 40 are connected to this vibrator control device 50, but this is not limited to the above, and multiple vibrator control devices 50 may be connected to the control panel 31, and power cords 47 of four or more vibrators 40 may be connected to each vibrator control device 50.
[0021] As shown in FIG. 2, the pump vehicle 2 is arranged on the first floor, and the pump vehicle 2 is equipped with a pump 10 and a control panel 31. The piping 20 comprises a horizontal pipe 21 extending horizontally on the first floor from the pump 10 on the pump truck 2, a vent pipe 22 bending vertically from the horizontal pipe 21, a vertical pipe 23 extending vertically from the vent pipe 22, a vent pipe 24 bending horizontally from the vertical pipe 23, a horizontal pipe 25 extending horizontally from the vent pipe 24 on the floor of the pouring floor, a tapered pipe 26 which becomes thinner as it approaches the tip of the horizontal pipe 25, and a tip hose 27 connected to the tapered pipe 26.
[0022] The procedure for pumping ready-mixed concrete to the pouring position P using the above-described concrete pumping device 1 is as follows. A worker is positioned near the pouring position P, and the worker operates the remote control device 32 to transmit a first operation signal to the control panel 31. Upon receiving the first operation signal from the remote control device 32, the control panel 31 operates the pump 10 to pump the ready-mixed concrete into the pipe 20, and at the same time transmits an operation signal to the vibrator control device 50 in conjunction with the operation of the pump 10. The vibrator control device 50 operates the vibrator 40 attached to the piping 20 based on the operation signal received from the control panel 31.
[0023] It should be noted that in the concrete pumping device 1, the vibrator can be operated regardless of the pumping status of the ready-mixed concrete. That is, the worker operates the remote control device 32 to transmit a second operation signal to the control panel 31. Upon receiving the second operation signal from the remote control device 32, the control panel 31 transmits an operation signal to each vibrator control device 50 without operating the pump 10. The vibrator control device 50 operates the vibrator 40 attached to the piping 20 based on the operation signal received from the control panel 31.
[0024] [Concrete pumping test] Using the concrete pumping device 1 of the present invention, a test was conducted to pump fresh concrete from the first floor to the casting floor. The test conditions for this concrete pumping test are shown in Figures 6 and 7. Specifically, as shown in Figure 6, the above-mentioned concrete pumping device was constructed, and a test was conducted using the vibrator installation position, the vibrating direction of the vibrator, and the supply voltage of the vibrator as parameters. In each test, the slump of the unloaded ready-mixed concrete was measured. In addition, with the vibrator not in operation, the ready-mixed concrete was pumped with the pump and the slump of the ready-mixed concrete discharged from the end hose was measured ("without vibration"). In addition, with the vibrator in operation, the ready-mixed concrete was pumped with the pump and the slump of the ready-mixed concrete discharged from the end hose was measured ("with vibration"). In the test, the horizontal pipe on the first floor was 23.5m long, the vertical pipe length was 71.0m to 97.1m (2 vent pipes), the horizontal piping on the pouring floor was 3.3m to 64.9m (0 to 2 vent pipes, 1 tapered pipe), and the flexible hose was 14.0m to 20.0m. In addition, as shown in FIG. 7, the tests were carried out twice on different days for Nos. 1-1, 1-4, 1-5, 1-6, and 3-1.
[0025] This time, the improvement rate was used as an evaluation index for each test result. The improvement rate is calculated using the following procedure. As shown in Fig. 8, the difference between the slump of the unloaded fresh concrete and the slump of the fresh concrete at the end of the tube without vibration is taken as the loss amount. Also, the difference between the slump of the fresh concrete at the end of the tube without vibration and the slump of the fresh concrete at the end of the tube with vibration is taken as the improvement amount. Using these loss amounts and improvement amounts, the improvement rate is calculated according to the following formula (B). Improvement rate (%) = improvement (cm) / loss (cm) × 100 (B) If the improvement rate is less than 75 percent, the effect is judged to be small, and if the improvement rate is 75 percent or more, the effect is judged to be large.
[0026] FIG. 9 shows the test results of Test No. 1-1 to 3 on Test Day 2, and FIG. 10 shows the test results of Test No. 1-4 to 6 on Test Day 1. As shown in Fig. 9, the improvement rate was 138.5% in tests No. 1-1 to 3 on test day 2. Also, as shown in Fig. 10, the improvement rate was 100.0% in tests No. 1-4 to 6 on test day 1. From the test results of No.1-1 to 6, it is found that there is no difference in effectiveness depending on the installation angle of the vibrator. Also, it is found that when the vibrators are installed at equal intervals on the vertical pipe, it is very effective in improving the slump of fresh concrete.
[0027] Figure 11 shows the test results for Test No. 2. As shown in Figure 11, in Test No. 2, the improvement rate was 114.3%. This shows that placing vibrators before and after the vent pipes and before and after the tapered pipes on the casting floor is highly effective in improving the slump of fresh concrete. Figure 12 shows the test results for Test No. 3-1 on Test Day 1, and Figure 13 shows the test results for Test No. 3-2. As shown in Figure 12, the improvement rate for Test No. 3-1 was 50.0%. Also, as shown in Figure 13, the improvement rate for Test No. 3-2 was 42.9%. This shows that arranging vibrators at equal intervals on the piping on the pouring floor has little effect on improving the slump of fresh concrete.
[0028] Figure 14 shows the test results for Test No. 4. As shown in Figure 14, in Test No. 4, the improvement rate was 37.5%. This shows that when vibrators are placed at equal intervals over the entire pipe, the effect on improving the slump of fresh concrete is small. Figure 15 shows the test results for Test No. 5. As shown in Figure 15, in Test No. 5, the improvement rate was 83.3%. This shows that placing vibrators before and after the vent pipe of the vertical pipe is highly effective in improving the slump of fresh concrete. From the above test results, it was found that by arranging the vibrator in the vertical pipe, before and after the vent pipe of the vertical pipe, and before and after the vent pipe and tapered pipe of the casting floor, the decrease in the fluidity of the fresh concrete in the piping can be suppressed. Therefore, in the concrete pumping method of the present invention, the installation positions of the vibrator along the piping are preferably in the vertical pipe, before and after the vent pipe of the vertical pipe, before and after the vent pipe of the casting floor, and before and after the tapered pipe of the casting floor.
[0029] According to this embodiment, the following effects are obtained. (1) The pump control device 30 operated the pump 10 in conjunction with the vibrator 40 attached to the pipe 20. That is, the pump 10 pumped the ready-mixed concrete into the pipe 20, while the vibrator 40 applied vibrations to the ready-mixed concrete in the pipe 20. This prevents the ready-mixed concrete from clogging the pipe 20, and also suppresses a decrease in the fluidity (slump value, flow value) of the ready-mixed concrete flowing through the pipe 20. As a result, by using the concrete pumping device 1 of the present invention, the ready-mixed concrete can be reliably pumped to the tip of the tip hose 27 while suppressing a decrease in fluidity.
[0030] (2) The pump control device 30 can send an activation signal to the vibrator control device 50 without operating the pump 10. Therefore, regardless of the pumping status of the ready-mixed concrete, an operator can activate the vibrator 40 at any timing to provide sufficient vibration to the ready-mixed concrete in the pipe 20.
[0031] Second Embodiment FIG. 16 is a schematic diagram showing the configuration of a concrete pumping device 1A according to the second embodiment of the present invention. The concrete pumping device 1A comprises a pump 10 mounted on a pump truck 2 for pumping ready-mixed concrete poured into a hopper 11, a pipe 20 extending from the pump 10 to a pouring position P through which the ready-mixed concrete pumped by the pump 10 circulates, a pump control device 30 for controlling the pump 10, a plurality of vibrators 40 attached to predetermined locations of the pipe 20 for vibrating the pipe 20, and a vibrator control device 50 for controlling the plurality of vibrators 40.
[0032] The vibrator control device 50 includes a system control module 51 as a system control device, and a power supply control device 52 connected to the system control module 51 wirelessly or via a wire. The system control module 51 receives an activation signal from the control panel 31 and transmits the activation signal to the power supply control device 52. Also, by manually operating the system control module 51, it is possible to transmit an activation signal to the power supply control device 52. Also, the system control module 51 is capable of setting the power supply control device 52 (vibrator 40) to be controlled.
[0033] Power cords 47 of the multiple vibrators 40 are connected to the power supply control device 52. The power supply control device 52 turns on / off the power supply of the vibrators 40 in accordance with an operation signal from the system control module 51, thereby activating / stopping these vibrators 40. The control panel 31 and the system control module 51 are connected by wire via a cord 53, and this cord 53 is provided with a switch 54. The switch 54 turns the connection between the control panel 31 and the system control module 51 ON / OFF.
[0034] The procedure for pumping ready-mixed concrete to the pouring position P using the above-described concrete pumping device 1A is as follows. A worker is positioned near pouring position P, and the worker operates remote control device 32 to transmit a first operation signal to control panel 31. Upon receiving the first operation signal from remote control device 32, control panel 31 operates pump 10 to pump ready-mixed concrete into pipe 20, and at the same time transmits an operation signal to system control module 51 in conjunction with the operation of pump 10. Based on the operation signal received from control panel 31, system control module 51 operates vibrator 40 attached to pipe 20.
[0035] In addition, in the concrete pumping device 1A, it is possible to operate the vibrator regardless of the pumping condition of the ready-mixed concrete. That is, a concrete pourer or worker operates the system control module 51 to send an activation signal to each power supply control device 52 without operating the pump 10. The power supply control device 52 activates the vibrator 40 attached to the piping 20 based on the activation signal received from the system control module 51.
[0036] According to this embodiment, the following effects are obtained. (3) By operating the system control module 51, the vibrator 40 can be manually turned on / off without operating the remote control device 32. Therefore, even when the pump 10 is not operating, such as during a break in the fresh concrete pouring work, the person pouring the concrete can operate the vibrator 40 at any time, thereby preventing blockage of the fresh concrete in the pipe 20 and suppressing a decrease in the fluidity (slump value, flow value) of the fresh concrete flowing through the pipe 20. Furthermore, even if the pump control device 30 cannot be modified to operate the vibrator 40 independently of the operation of the pump 10, or if the connection between the pump control device 30 and the vibrator control device 50 is broken, the vibrator 40 can be easily operated regardless of the operation of the pump. (4) Since the system control module 51 can set the power supply control device 52 (vibrator 40) to be controlled, it is possible to control only the desired vibrator 40, thereby improving the work efficiency of concrete pouring work.
[0037] The present invention is not limited to the above-described embodiment, and modifications and improvements within the scope of the present invention that can achieve the object of the present invention are included in the present invention. In the above-described embodiment, the tip hose 27 is connected to the tip of the tapered pipe 26 at the concrete pouring level, but this is not limited thereto, and the pipe 20 may be further connected to the tip of the tapered pipe 26. In addition, in the above-described first embodiment, one vibrator control device 50 controls multiple vibrators 40, but this is not limited to the above, and each vibrator control device 50 may control one vibrator 40, as shown in FIG. 17.
[0038] In the second embodiment described above, the vibrator control device 50 is configured to include one system control module 51 and one power supply control device 52 to which multiple vibrators 40 are connected, but this is not limiting. As shown in Fig. 18, the vibrator control device 50 may be configured to include one system control module 51 and multiple power supply control devices 52, and one vibrator 40 may be operated for each power supply control device 52. In this way, it becomes possible for the system control module 51 to operate only an arbitrary power supply control device 52 (vibrator 40). [Explanation of symbols]
[0039] 1, 1A, 1B, 1C...Concrete pumping device 2...Pump vehicle 10... Pump 11... Hopper 20... Piping 21... Horizontal pipe 22... Vent pipe 23... Vertical pipe 24... Bent pipe 25... Horizontal pipe 26... Tapered pipe 27…Tip hose 30: Pump control device 31: Control panel 32: Remote control device 33: Operation panel 34…Vibration link switch 35…Vibration manual switch 40...Vibrator 41...Fixing ring 42...Hinge 43...Bolt 44...Nut 45...Base 46...Vibration device 47...Power cord 50...Vibrator control device 51... System control module (system control device) 52... Power supply control device 53…Code 54…Switch
Claims
1. A concrete pumping device that pumps ready-mixed concrete to a pouring position, A pump for pumping ready-mix concrete; A pipe extending from the pump to the pouring position through which the ready-mixed concrete pumped by the pump flows; A pump control device that controls the pump; a vibrator attached to a predetermined portion of the piping to vibrate the piping; a vibrator control device for controlling the vibrator, the pump control device is capable of selectively executing an operation of operating the pump and transmitting an operation signal to the vibrator control device in conjunction with the operation of the pump, and an operation of transmitting an operation signal to the vibrator control device without operating the pump, A concrete pumping device characterized in that the vibrator control device operates the vibrator based on an operation signal received from the pump control device.
2. A concrete pumping device that pumps ready-mixed concrete to a pouring position, A pump for pumping ready-mix concrete; A pipe extending from the pump to the pouring position through which the ready-mixed concrete pumped by the pump flows; a vibrator attached to a predetermined portion of the piping to vibrate the piping; a vibrator control device for controlling the vibrator, A concrete pumping device, characterized in that the vibrator control device is capable of operating the vibrator regardless of the operating state of the pump.
3. A method for pumping concrete using the concrete pumping device according to claim 1, A method for pumping concrete, comprising the steps of: operating the pump using the pump control device to discharge fresh concrete from the end of the pipe; transmitting an operation signal to the vibrator control device in conjunction with the operation of the pump; and operating the vibrator attached to the pipe using the vibrator control device based on the operation signal received from the pump control device.
4. A method for pumping concrete using the concrete pumping device according to claim 2, A method for pumping concrete, comprising the steps of: discharging ready-mixed concrete from the end of the pipe using the pump; and activating the vibrator attached to the pipe using the vibrator control device regardless of the operating state of the pump.
Citation Information
Patent Citations
Developer used for copying machine and the like
JP1984228657A
Dynamic pressure gas bearing
JP1985008524A
