Roof construction method
The roofing method uses lifelines and sectioned work lines to ensure worker safety and efficiency by eliminating the need for scaffolding, thereby reducing time and costs.
Patent Information
- Application Number
- JP2023067947
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-18
- Publication Date
- 2024-10-30
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing roofing methods require scaffolding, which is time-consuming, costly, and poses safety risks for workers due to the need for erection and dismantling, making it impossible to ensure worker safety and reduce construction time.
A roofing method that utilizes lifelines and dividing the roof into sections, allowing workers to perform tasks safely without scaffolding by attaching lifelines to locking means along predetermined work lines, ensuring safety and efficiency.
Enables safe and efficient roofing work without scaffolding, reducing construction time and costs by preventing falls and allowing workers to perform tasks with peace of mind along predetermined lines.
Smart Images

Figure 2024154222000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a roofing work method in which a worker performs predetermined roofing work on a roof. [Background technology]
[0002] A building is disclosed that has a waterproof structure comprising a solar panel adhesively fixed to a first waterproof layer installed on a flat roof of a building, and a second waterproof layer that covers the entire portion of the first waterproof layer where there is no solar panel and overlaps the solar panel around its entire circumference on the opposite side of the first waterproof layer, with the second waterproof layer overlapping the solar panel at a position that avoids the light receiving range of the solar panel when viewed in a planar view (see Patent Document 1). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent No. 7048807 Summary of the Invention [Problem to be solved by the invention]
[0004] In the building disclosed in the above-mentioned Patent Document 1, professionally trained scaffolding workers set up scaffolding around the building through scaffolding work, and roof workers use the scaffolding to stand on the flat roof of the building and perform waterproofing work, solar panel installation work, etc. After various construction work such as waterproofing work and solar panel installation work on the building is completed, the scaffolding workers dismantle the scaffolding through demolition work. In this building, the scaffolding work by the scaffolding workers and the scaffolding dismantling work cannot be omitted, and various works on the roof cannot be performed without scaffolding. In addition, the scaffolding work and the scaffolding dismantling work take time and effort, so the time required for roofing work cannot be shortened and the cost of roofing work cannot be reduced. In addition, when various works are performed on the flat roof without scaffolding, there is always a risk of falling from the roof, and the safety of the workers cannot be ensured, and the workers cannot perform the specified roofing work with peace of mind.
[0005] The object of the present invention is to provide a roof construction method that can ensure the safety of workers without the risk of falling from the roof and allows workers to carry out prescribed roof construction work on the roof with peace of mind. Another object of the present invention is to provide a roof construction method that can perform prescribed roof construction work without scaffolding, without the need to set up scaffolding around the building or dismantle it, thereby shortening the time required for roof construction work and reducing the cost required for roof construction work. [Means for solving the problem]
[0006] The premise of the present invention for solving the above-mentioned problems is a roofing construction method in which a worker stands on the roof of a building that is long in the width direction or the front-to-back direction, and has first and second side edges that extend in the front-to-back direction and are spaced apart opposite each other in the width direction, and first and second end edges that extend in the width direction and are spaced apart opposite each other in the front-to-back direction, and performs specified roofing construction work on the roof.
[0007] The present invention on the above premise is characterized in that the roof construction method includes a first setting step of setting a widthwise centerline extending in the width direction by dividing the front-to-rear dimension of the roof in half, dividing one half of the widthwise centerline extending from a widthwise center point of the widthwise centerline to a first side edge to set division points A1 to An that are aligned from the widthwise center point toward the first side edge, and dividing the other half of the widthwise centerline extending from the widthwise center point of the widthwise centerline to a second side edge to set division points B1 to Bn that are aligned from the widthwise center point toward the second side edge; and and a second setting process for setting B1-Bn work lines extending to the second end edge; a locking means installation process for installing a central locking means at the widthwise center point and the A1-An locking means at the A1-An division points, and installing the B1-Bn locking means at the B1-Bn division points; and a roofing work process in which a worker standing on the roof wearing a first lifeline having a length dimension equal to half the work line length of the work lines or a length dimension slightly shorter than half the work line length of the work lines connects the first lifeline to the locking means in sequence, or connects the first lifeline to the worker standing on the roof and connects the first lifeline to the locking means in sequence, and the worker performs roofing work along the work lines.
[0008] As an example of the roof construction method of the present invention, the roof construction process is composed of a central roof construction process in which a worker wearing a first lifeline and standing on the roof connects the first lifeline to a central locking means, or the worker connects the first lifeline to the central locking means while connecting the first lifeline to the worker on the roof, and performs roof construction along the central work line; an A1 to An roof construction process in which the first lifeline is removed from the central locking means and the first lifeline is connected in sequence from the A1 locking means to the An locking means, while performing roof construction along the A1 work line to the An work line; and a B1 to Bn roof construction process in which the first lifeline is removed from the central locking means and the first lifeline is connected in sequence from the B1 locking means to the Bn locking means, while performing roof construction along the B1 work line to the Bn work line.
[0009] Another example of a roof construction method of the present invention is a method in which workers are composed of a first worker who constructs one half of the roof from the widthwise center point of the widthwise center line to the first side edge, and a second worker who constructs the other half of the roof from the widthwise center point of the widthwise center line to the second side edge, in which the first worker performs roof construction on half of the central work line extending between the widthwise center point and the first edge in the central roof construction process, and performs roof construction along the A1 work line to the An work line in the A1 to An roof construction processes, and the second worker performs roof construction on half of the central work line extending between the widthwise center point and the second edge in the central roof construction process, and performs roof construction along the B1 work line to the Bn work line in the B1 to Bn roof construction processes.
[0010] In another example of the roof construction method of the present invention, the roof construction process includes a worker standing on the roof wearing a second lifeline having a length dimension equal to or slightly shorter than the widthwise centerline length between the B1 division point of the widthwise centerline and the first side edge or the widthwise centerline length between the A1 division point of the widthwise centerline and the second side edge, and then connecting the second lifeline to the B1 fastening means or the A1 fastening means, or connecting the second lifeline to the B1 fastening means or the A1 fastening means while connecting the second lifeline to the worker standing on the roof, and then the worker performs roof construction along those work lines.
[0011] In another example of the roof construction method of the present invention, the first setting step equally divides one half of the widthwise centerline extending from the widthwise center point of the widthwise centerline to the first side edge to set division points A1 to An that are equally spaced apart in the width direction, and equally divides the other half of the widthwise centerline to set division points B1 to Bn that are equally spaced apart in the width direction, so that the A1 to An work lines are arranged at equal intervals in the width direction from the central work line toward the first side edge, and the B1 to Bn work lines are arranged at equal intervals in the width direction from the central work line toward the second side edge.
[0012] In another example of the roof construction method of the present invention, a central work line extends straight in the front-to-rear direction from the widthwise center point toward the first and second end edges, perpendicular to the widthwise center line, work lines A1 to An extend straight in the front-to-rear direction from the A1 to An division points toward the first and second end edges, and work lines B1 to Bn extend straight in the front-to-rear direction from the B1 to Bn division points toward the first and second end edges, perpendicular to the widthwise center line.
[0013] Another example of the roof construction method of the present invention is a wooden modular house in which the building is formed from a wood-based ceiling plate of a specified area that is shaped like a rectangle that is long in the front-to-back or width direction and extends horizontally, a wood-based floor plate of a specified area that is shaped like a rectangle that is long in the front-to-back or width direction and extends horizontally, and a wood-based wall panel of a specified area that is shaped like a rectangle and extends vertically and is located between the wood-based ceiling plate and the wood-based floor plate, the roof is a flat roof, and the specified roof construction is waterproofing construction for the flat roof.
[0014] In another example of the roof construction method of the present invention, the wood floor plates and wood ceiling plates are made from CLT, and the wood wall panels are made from 2x4 lumber. Effect of the Invention
[0015] According to the roof construction method of the present invention, a worker on the roof wearing a first lifeline having a length dimension equal to or slightly shorter than half the length of the work lines connects the first lifeline to the fastening means in sequence, or connects the first lifeline to the worker on the roof while connecting the first lifeline to the fastening means in sequence, and the worker performs roof construction along the work lines, so that when the worker moves on the roof of the building during roof construction, the first lifeline prevents the worker from moving forward in the front-rear direction from the first edge of the roof, and the first lifeline prevents the worker from moving backward in the front-rear direction from the second edge of the roof, preventing the worker from falling from the first and second edges of the roof to the bottom of the roof during roof construction, ensuring the safety of the worker and allowing the worker to perform the required roof construction with peace of mind. The roof construction method does not require the construction of scaffolding around the building or the dismantling of scaffolding, so that the required roof construction can be performed without scaffolding. Compared with the case of erecting scaffolding, this roof construction method can omit the need for scaffold workers to erect and dismantle the scaffolding, significantly shortening the time required for roof construction and reducing the costs involved.
[0016] a central roof construction process in which a worker wearing a first lifeline and standing on the roof connects the first lifeline to the central fastening means, or a worker connects the first lifeline to the central fastening means while connecting the first lifeline to a worker standing on the roof, and the worker performs roof construction along a central work line; an A1-An roof construction process in which the first lifeline is removed from the central fastening means and the first lifeline is connected in sequence from the A1 fastening means to the An fastening means, and roof construction is performed in sequence from the A1 work line to the An work line; and a A1-An roof construction process in which the first lifeline is removed from the central fastening means and the first lifeline is connected in sequence from the B1 fastening means to the Bn fastening means, and roof construction is performed along a central work line. The roof construction method, which is formed of B1 to Bn roof construction steps in which roof construction work is performed in sequence along the Bn work line, performs roof construction work along the central work line, then performs roof construction work in sequence from the widthwise center point of the roof's widthwise center line to the first side edge of the roof along the A1 work line to the An work line, and further performs roof construction work in sequence from the widthwise center point of the roof's widthwise center line to the second side edge of the roof along the B1 work line to the Bn work line, so that roof construction work can be performed regularly based on a predetermined rule, the work efficiency of roof construction work can be improved, and the worker can perform roof construction work in a short time. The roof construction method performs roof construction work by connecting the first lifeline to the central locking means, the A1 to An locking means, and the B1 to Bn locking means, so that the worker can be prevented from falling from the first and second edges of the roof to the bottom of the roof during roof construction work, and the worker can perform the specified roof construction work with peace of mind while ensuring the safety of the worker.
[0017] A roof construction method in which workers are composed of a first worker who works on one half of the roof and a second worker who works on the other half of the roof, in which the first worker performs roof work on half of the central work line extending between the widthwise center point and the first edge, and also performs roof work sequentially along the A1 work line to the An work line, and the second worker performs roof work on half of the central work line extending between the widthwise center point and the second edge, and also performs roof work sequentially along the B1 work line to the Bn work line, in which the first and second workers each perform roof work on half of the central work line, the first worker performs roof work sequentially along the A1 work line to the An work line, and the second worker performs roof work sequentially along the B1 work line to the Bn work line, allows the first and second workers to perform roof work in an orderly manner based on predetermined rules, improves the work efficiency of the roof construction, and enables the first and second workers to complete the roof construction in a short time.
[0018] In a roof construction method in which a worker standing on a roof wearing a second lifeline having a length dimension equal to or slightly shorter than the widthwise centerline length between the B1 division point of the widthwise centerline and the first side edge or the widthwise centerline length between the A1 division point of the widthwise centerline and the second side edge connects the second lifeline to the B1 fastening means or the A1 fastening means, or connects the second lifeline to the B1 fastening means or the A1 fastening means while connecting the second lifeline to the worker standing on the roof, and then the worker performs roof construction along those work lines, when the worker moves on the roof of a building during roof construction, the second lifeline prevents the worker from moving outward in the width direction from the first side edge of the roof, and the second lifeline prevents the worker from moving outward in the width direction from the second side edge of the roof, preventing the worker from falling from the first and second side edges of the roof under construction, and the worker can perform the specified roof construction work with peace of mind while ensuring the safety of the worker.
[0019] In a first setting step, one half of a widthwise centerline extending from a widthwise center point of the widthwise centerline to a first side edge is equally divided in the width direction to set division points A1 to An that are equally spaced apart in the width direction, and the other half of the widthwise centerline is equally divided in the width direction to set division points B1 to Bn that are equally spaced apart in the width direction, so that the A1 to An work lines are arranged at equal intervals in the width direction from the central work line toward the first side edge, and the B1 to Bn work lines are arranged at equal intervals in the width direction from the central work line toward the second side edge. The construction method divides the roof equally in the width direction, and workers perform the specified roof work along work lines A1 to An that are lined up at equal intervals in the width direction from the central work line toward the first side edge, and also along work lines B1 to Bn that are lined up at equal intervals in the width direction from the central work line toward the second side edge, so that workers can perform the roof work regularly based on specified rules, which improves the work efficiency of the roof work and enables workers to complete the roof work in a short time.
[0020] A roof construction method in which a central work line extends linearly in the front-to-rear direction from the widthwise center point toward the first and second edges, the A1-An work lines extend linearly in the front-to-rear direction from the A1-An division points toward the first and second edges, and the B1-Bn work lines extend linearly in the front-to-rear direction from the B1-Bn division points toward the first and second edges, perpendicular to the widthwise center line, allows workers to perform roof construction in a linear manner from the widthwise center line toward the first and second edges along the central work line, the A1-An work lines, and the B1-Bn work lines, enabling workers to perform roof construction in an orderly manner, improving work efficiency in roof construction and enabling workers to complete roof construction in a short time.
[0021] The building is a wooden modular house formed of a wooden ceiling plate of a predetermined area that is shaped like a rectangle long in the front-rear or width direction and extends horizontally, a wooden floor plate of a predetermined area that is shaped like a rectangle long in the front-rear or width direction and extends horizontally, and a wooden wall panel of a predetermined area that is shaped like a rectangle and extends vertically and is located between the wooden ceiling plate and the wooden floor plate, the roof is a flat roof, and the predetermined roofing work is waterproofing work for the flat roof, and the roofing work method includes connecting a first lifeline to a worker standing on the flat roof made of the wooden ceiling plate. While connecting the first lifeline to the fastening means in sequence, the worker performs waterproofing work on the flat roof along the work lines, so that when the worker moves across the flat roof during construction, the first lifeline prevents the worker from moving forward in the front-to-rear direction from the first edge of the flat roof, and the first lifeline prevents the worker from moving backward in the front-to-rear direction from the second edge of the flat roof, preventing the worker from falling from the first and second edges of the flat roof to the bottom of the roof during construction, and the worker can perform the specified waterproofing work with confidence while ensuring the worker's safety. The roof construction method is such that, when the worker moves across a flat roof made of wood-based ceiling plates during construction, the second lifeline prevents the worker from moving outward in the width direction from the first side edge of the flat roof, and the second lifeline prevents the worker from moving outward in the width direction from the second side edge of the flat roof, preventing the worker from falling from the first and second side edges of the flat roof to the bottom of the roof during construction. The roof construction method does not require the construction of scaffolding around the building or the dismantling of scaffolding, so waterproofing work on flat roofs can be done without scaffolding. The roof construction method can omit the scaffolding work of scaffolding workers and the dismantling of scaffolding, significantly shortening the time required for waterproofing work on flat roofs and reducing the cost of waterproofing work.
[0022] In a roof construction method in which wood floor plates and wood ceiling plates are made from CLT and wood wall panels are made from 2x4 lumber, a first lifeline is connected to a worker standing on a flat roof consisting of wood ceiling plates made from CLT, while the first lifeline is connected to those locking means in turn, and the worker performs waterproofing work on the flat roof along those work lines. Therefore, when the worker moves across the flat roof during construction, the first lifeline prevents the worker from moving forward in the fore-and-aft direction from the first edge of the flat roof, and the first lifeline prevents the worker from moving backward in the fore-and-aft direction from the second edge of the flat roof, preventing the worker from falling from the first and second edges of the flat roof to below the roof during construction, ensuring the safety of the worker and allowing the worker to perform the required waterproofing work with peace of mind. In the roof construction method, when a worker moves across a flat roof consisting of a wood-based ceiling plate made from CLT during roof construction, the second lifeline prevents the worker from moving outward in the width direction from the first side edge of the flat roof, and the second lifeline prevents the worker from moving outward in the width direction from the second side edge of the flat roof, thereby preventing the worker from falling from the first and second side edges of the flat roof onto the ground during flat roof construction. [Brief description of the drawings]
[0023] [Figure 1] FIG. 1 is a perspective view seen from the front side showing an example of a wooden modular house on which waterproofing work is performed using a roof construction method. [Diagram 2] FIG. 2 is a perspective view of the wooden modular house of FIG. 1 as seen from the rear side. [Diagram 3] Front view of the wooden modular house in Figure 1. [Figure 4] Side view of the wooden modular house in Figure 1. [Diagram 5] FIG. 2 is a perspective view showing an example of a worker wearing a safety belt to which first and second lifelines are connected. [Figure 6] FIG. 2 is a top view of a wooden modular house, illustrating an example of the first and second setting steps and the fastening means installation step of the roof construction method. [Figure 7] FIG. 1 is a top view of a wooden modular house illustrating an example of a central roof construction step of a roof construction method. [Figure 8] FIG. 2 is a top view of a wooden modular house illustrating an example of the A1 roof construction step of the roof construction method. [Figure 9] FIG. 13 is a top view of a wooden modular house illustrating an example of the A2 roof construction step of the roof construction method. [Figure 10] FIG. 2 is a top view of a wooden modular house illustrating an example of the B1 roof construction step of the roof construction method. [Figure 11] FIG. 13 is a top view of a wooden modular house illustrating an example of the B2 roof construction step of the roof construction method. [Figure 12] FIG. 11 is a top view of a wooden modular house illustrating another example of the central roof construction process of the roof construction method. [Figure 13] FIG. 13 is a top view of a wooden modular house, illustrating another example of the A1 roof construction step and the B1 roof construction step of the roof construction method. [Figure 14] FIG. 13 is a top view of a wooden modular house, illustrating another example of the A2 roof construction step and the B2 roof construction step of the roof construction method. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0024] The roof construction method according to the present invention will be described in detail below with reference to the attached drawings. Fig. 1 is a front perspective view showing an example of a wooden unitary house 10 on which waterproofing is performed in the roof construction method, and Fig. 2 is a rear perspective view of the wooden unitary house 10 in Fig. 1. Fig. 3 is a front view of the wooden unitary house 10 in Fig. 1, and Fig. 4 is a rear view of the wooden unitary house 10 in Fig. 1. In Figs. 1 and 2, the up-down direction is indicated by arrow X, the width direction is indicated by arrow Y, and the front-rear direction is indicated by arrow Z.
[0025] The wooden module house 10 in FIG. 1, which is to undergo the roof construction method, is assembled in an assembly factory and then transported to a predetermined installation site by a transport vehicle. The wooden module house 10 transported to the installation site is lifted by a crane from the transport vehicle and placed on a foundation laid on the foundation rise of the foundation (slab foundation, strip foundation) at the installation site created by foundation construction. The wooden module house 10 placed on the foundation is finely adjusted in the front-rear and width directions relative to the foundation, and then the wooden floor plate 12 (CLT) of the wooden module house 10 is connected and fixed to the foundation. The wooden floor plate 12 of the wooden module house 10 and the foundation are fixed with vertical long screws (vertical screws) and diagonal long screws (diagonal screws). Although not shown in the figure, two or more wooden module houses are assembled and erected at the installation site to create wooden module houses with various floor plans.
[0026] The wooden modular house 10 shown in Fig. 1 is composed of a wooden ceiling plate 11 of a predetermined area that extends horizontally, a wooden floor plate 12 of a predetermined area that extends horizontally, and a wooden wall panel 13 of a predetermined area that extends vertically. The wooden ceiling plate 11 is made of CLT (Cross Laminated Timber) which is made by arranging planks (lamina) and then laminating and bonding them with an adhesive (aqueous polymer isocyanate resin adhesive (non-formaldehyde adhesive)) so that the fiber directions are perpendicular to each other.
[0027] CLT can be made up of three layers with three plies, three layers with four plies, five layers with five plies, five layers with seven plies, seven layers with seven plies, or nine layers with nine plies. CLT can be made up of cedar CLT panels made from Japanese cedar, cypress CLT panels made from Japanese cypress, larch CLT panels made from Japanese larch, or todomatsu CLT panels made from Japanese pine. CLT has excellent insulation properties and high energy-saving effects, has excellent earthquake resistance, and is lighter than reinforced concrete construction. Any type of CLT that will be developed in the future can be used.
[0028] The wooden ceiling plate 11 is formed in a generally rectangular shape elongated in the width direction, and has a first end edge 14 extending in the width direction, a second end edge 15 extending in the width direction from the first end edge 14 and spaced apart in the front-rear direction, a first side edge 16 extending in the front-rear direction, and a second side edge 17 extending in the front-rear direction from the first side edge 16 and spaced apart in the width direction. The wooden ceiling plate 11 forms a flat roof 18 of the wooden modular house 10. On the upper surface of the wooden ceiling plate 11, a plurality of rafters 19 extending in the width direction at equal intervals in the front-rear direction are arranged. The rafters 19 are attached with sheathing plywood 20. The rafters 19 and sheathing plywood 20 are fixed to the wooden ceiling plate 11 (CLT) with long screws. Furthermore, when four wooden unit houses 10 are connected, the widthwise dimension (length) of the flat roof 18 is approximately 11.0 m, and the front-to-back dimension (length) is approximately 9.1 m, but there are no particular limitations on the widthwise dimension (length) or front-to-back dimension (length) of the flat roof 18.
[0029] The wooden floor plate 12 has the same shape and size as the wooden ceiling plate 11, and is made of CLT like the wooden ceiling plate 11. The wooden floor plate 12 is formed into a generally rectangular shape that is long in the width direction, and has a first end edge 14 extending in the width direction, a second end edge 15 extending in the width direction from the first end edge 14 and facing each other in the front-rear direction, a first side edge 16 extending in the front-rear direction, and a second side edge 17 extending in the front-rear direction from the first side edge 16 and facing each other in the width direction. A flooring 21 is applied to the upper surface of the wooden floor plate 12 (CLT). The flooring 21 (a sound-insulating wooden floor material with a special cushioning material that enhances sound-insulating performance) is bonded to the upper surface of the wooden floor plate 12 (CLT) with an adhesive.
[0030] The wood-based wall panel 13 is formed of a first wood-based wall panel 13a of a predetermined area extending in the width direction, a second wood-based wall panel 13b of a predetermined area extending in the width direction, and a third wood-based wall panel 13c of a predetermined area extending in the front-rear direction. The first to third wood-based wall panels 13a to 13c are made by the two-by-four construction method using two-by-four lumber (2×4 lumber) and are formed into a substantially rectangular shape.
[0031] The first to third wood-based wall panels 13a to 13c are formed from a head joint (square timber) and an upper frame (square timber) extending in the front-to-back or width direction, a lower frame (square timber) located vertically below the upper frame and extending in the front-to-back or width direction, a first vertical frame (square timber) located between the upper and lower frames and extending in the vertical direction, a second vertical frame (square timber) extending in the vertical direction opposite the first vertical frame and spaced apart in the front-to-back or width direction, and a number of studs (square timbers) located between the first and second vertical frames, extending in the vertical direction, and lined up at a distance in the front-to-back or width direction.
[0032] The head joint, upper frame, lower frame, first vertical frame, second vertical frame, and studs are connected with standardized nails. The first to third wooden wall panels 13a to 13c are made by assembling 2x4 lumber (head joint, upper frame, lower frame, first vertical frame, second vertical frame, and studs) to create a "framework" that forms a highly rigid diaphragm.
[0033] The wood-based first wall panel 13a has an upper end 22 (head joint and upper frame) extending in the front-to-rear direction, a lower end 23 (lower frame) located vertically below the upper end 22 and extending in the front-to-rear direction, and both side edges 24, 25 (first vertical frame, second vertical frame) located between the upper end 22 and the lower end 23 and extending in the vertical direction. Window frames (sashes) and door frames of various shapes are made in the wood-based first wall panel 13a.
[0034] The second wood-based wall panel 13b faces the first wood-based wall panel 13a at a distance in the width direction. The second wood-based wall panel 13b has an upper end 22 (head joint and upper frame) extending in the front-rear direction, a lower end 23 (lower frame) located vertically below the upper end 22 and extending in the front-rear direction, and both side edges 24, 25 (first vertical frame, second vertical frame) located between the upper end 22 and the lower end 23 and extending in the vertical direction. Window frames (sashes) and door frames of various shapes are made in the second wood-based panel 13b.
[0035] The wood-based third wall panel 13c is formed into a rectangular shape long in the width direction, and is located between the side edge 24 of the wood-based first wall panel 13a and the side edge 24 of the wood-based second wall panel 13b. The wood-based third wall panel 13c has an upper end 22 (head joint and upper frame) extending in the width direction, a lower end 23 (lower frame) located vertically below the upper end 22 and extending in the width direction, and both side edges 24, 25 (first vertical frame, second vertical frame) located between the upper end 22 and the lower end 23 and extending in the vertical direction. Window frames (sashes) of various shapes are made in the wood-based third panel 13c. Although not shown, the first to third wood-based wall panels 13a to 13c are fitted with electrical appliances such as wiring cables, outlet boxes, and outlet plates, plumbing equipment such as water supply and drainage pipes, and air conditioning equipment such as pipes and ducts, and holes for ventilation openings and air conditioner refrigerant pipes and drain hoses are drilled therein.
[0036] In the wooden modular house 10, the first to third wooden wall panels 13a to 13c are connected to the wooden ceiling plate 11 and the wooden floor plate 12, the first wooden wall panel 13a is connected to the wooden third wall panel 13c, and the second wooden wall panel 13b is connected to the wooden third wall panel 13c. By connecting the first to third wooden wall panels 13a to 13c and the first to third wooden wall panels 13a to 13c to the wooden ceiling plate 11 and the wooden floor plate 12, an internal living space of a predetermined volume that is long in the front-rear direction (or width direction) is defined, surrounded by the wooden ceiling plate 11, the wooden floor plate 12, and the first to third wooden wall panels 13a to 13c.
[0037] The wooden ceiling plate 11 and the first to third wooden wall panels 13a to 13c are connected by hold-down hardware and at least one of vertical long screws and oblique long screws. The wooden floor plate 12 and the first to third wooden wall panels 13a to 13c are connected by hold-down hardware and at least one of vertical long screws and oblique long screws. The first to third wooden wall panels 13a to 13c are connected by long screws.
[0038] Fig. 5 is a perspective view showing an example of a worker 26 wearing a safety belt 27 to which first and second lifelines 31, 32 are connected, and Fig. 6 is a top view of a wooden modular house 10 illustrating an example of the first and second setting steps and the fastening means installation step of a roof construction method. In Fig. 5, the width direction is indicated by arrow Y, and the front-rear direction is indicated by arrow Z. Figs. 6 to 14 show a flat roof 18 of a wooden modular house formed by connecting four wooden modular houses 10.
[0039] In the roof construction method, a worker 26 (or first and second workers 26a, 26b) wearing a safety belt 27 stands on the flat roof 18 of the wooden modular house 10, and the worker 26 (or first and second workers 26a, 26b) performs waterproofing work (roof construction) on the flat roof 18. The roof construction method can be used for roof construction on flat roofs of not only wooden modular houses 10, but also any type of building such as W construction, S construction, RC construction, SRC construction, RS construction, WRC construction, etc., and can be used for roof construction on flat roofs of one-story buildings or buildings with two or more stories.
[0040] Waterproofing work includes FRP waterproofing, urethane waterproofing, sheet waterproofing, and asphalt waterproofing. In addition to waterproofing, roofing work includes roof cover work, roof painting work, rain gutters work, skylight work, antenna installation work, solar panel installation work, etc. The roofing work method includes the first setting process, the second setting process, the fastening means installation process, and the roofing work process (the central roofing work process, the A1 to An roofing work processes, and the B1 to Bn roofing work processes).
[0041] The safety belt 27 worn by the worker 26 (or the first and second workers 26a, 26b) is composed of a shoulder belt 28a, a chest belt 28b, a waist belt 28c, a thigh belt 28d, and a pelvic belt 28e, as shown in Fig. 5. A shock absorber 30 is attached to a D-ring 29 of the safety belt 27, and a first lifeline 31 (first lanyard) and a second lifeline 32 (second lanyard) are connected to the shock absorber 30.
[0042] In the roof construction method, as shown in Fig. 6, a widthwise centerline 34 is set (imaginary) by dividing (halving) the front-to-rear dimension of a long flat roof 18 (wood-based ceiling plate 11) in the width direction of a wooden modular house 10. Next, a widthwise center point 35 is set (imaginary) that divides (halves) the widthwise dimension of the widthwise centerline 34 in half, and the widthwise centerline 34 is divided (equally) into one half 36 extending from the widthwise center point 35 to the first side edge 16a and the other half 37 extending from the widthwise center point 35 to the second side edge 17a.
[0043] One half 36 of the widthwise centerline 34 is equally divided (segmented) in the width direction, and A1 division points 38 and A2 division points 39 (A1 to An division points) aligned from the widthwise center point 35 toward the first side edge 16a are set (imaginary), while the other half 37 of the widthwise centerline 34 is equally divided (segmented) in the width direction, and B1 division points 40 and B2 division points 41 (B1 to Bn division points) aligned from the widthwise center point 35 toward the second side edge 17a are set (imaginary) (first setting step). The A1 division points 38 and A2 division points 39 are aligned at equal intervals in the width direction from the widthwise center point 35 toward the first side edge 16a. The B1 division points 40 and B2 division points 41 are aligned at equal intervals in the width direction from the widthwise center point 35 toward the second side edge 17a.
[0044] In the first setting step, one half 36 of the widthwise centerline 34 may be divided unequally in the width direction, so that A1 division points 38 and A2 division points 39 (A1 to An division points) are arranged unequally at a predetermined interval in the width direction from the widthwise center point 35 toward the first side edge 16a. The other half 37 of the widthwise centerline 34 may be divided unequally in the width direction, so that B1 division points 40 and B2 division points 41 (B1 to Bn division points) are arranged unequally at a predetermined interval in the width direction from the widthwise center point 35 toward the second side edge 17a.
[0045] After setting these division points 38, 39, 40, 41, a central work line 42 extending in the front-to-rear direction from the widthwise center point 35 toward the first edge 14a and the second edge 15a is set (virtual), an A1 work line 43 extending in the front-to-rear direction from the A1 division point 38 arranged at equal intervals in the width direction toward the first edge 14a and the second edge 15a is set (virtual), and an A2 work line 44 (Anth work line) extending in the front-to-rear direction from the A2 division point 39 (Anth division point) arranged at equal intervals in the width direction toward the first edge 14a and the second edge 15a is set (virtual) (second setting process).
[0046] Furthermore, a B1 work line 45 is set (virtual) extending in the front-to-rear direction from the B1 division point 40, which is arranged at equal intervals in the width direction, toward the first edge 14a and the second edge 15a, and a B2 work line 46 (Bn work line) is set (virtual) extending in the front-to-rear direction from the B2 division point 41 (Bn division point), which is arranged at equal intervals in the width direction, toward the first edge 14a and the second edge 15a (second setting process).
[0047] The (imaginary) central work line 42 set on the flat roof 18 extends straight (in a straight line) in the front-rear direction from the widthwise center point 35 toward the first and second edges 14a, 15a, perpendicular to the widthwise center line 34. The (imaginary) A1 work line 43 and A2 work line 44 (A1 to An work lines) set on the flat roof 18 extend straight in the front-rear direction from the A1 division point 43 and A2 division point 44 (A1 to An division point) toward the first and second edges 14a, 15a, perpendicular to the widthwise center line 34. The A1 work line and A2 work line 43, 44 are arranged at equal intervals in the width direction from the central work line 42 toward the first side edge 16a.
[0048] The (imaginary) B1 work line 45 and B2 work line 46 (B1 to Bn work lines) set on the flat roof 18 extend straight in the front-rear direction from the B1 division point 40 and the B2 division point 41 (B1 to Bn division points) toward the first and second edges 14a, 15a, perpendicular to the widthwise center line 34. The B1 work line 45 and the B2 work line 46 are aligned at equal intervals in the widthwise direction from the central work line 42 toward the second side edge 17a.
[0049] In the first and second setting steps, one half 36 of the widthwise centerline 34 is equally divided in the width direction to set A1 and A2 division points 38, 39, the other half 37 of the widthwise centerline 34 is equally divided in the width direction to set B1 and B2 division points 40, 41, A1 and A2 work lines 43, 44 extending in the front-rear direction from the A1 and A2 division points 38, 39 toward the first and second end edges 14a, 15a are set, and A1 and A2 work lines 44 extending in the front-rear direction from the B1 and B2 division points 40, 41 toward the first and second end edges 14a, 15a are set. According to the area (size) of the flat roof 18, the A1 to An division points are set in one half 36 of the widthwise center line 34, and the B1 to Bn division points are set in one half 36 of the widthwise center line 34, and the A1 to An work lines are set extending in the front-to-rear direction from the A1 to An division points toward the first and second end edges 14a, 15a, and the B1 to Bn work lines are set extending in the front-to-rear direction from the B1 to Bn division points toward the first and second end edges 14a, 15a.
[0050] In addition, in the second setting process, A1 work lines 43 and A2 work lines 44 (A1 to An work lines) are set (virtual) extending in the front-to-rear direction from the A1 division points 38 and A2 division points 39 (A1 to An division points) that are unevenly spaced a predetermined distance apart toward the first and second end edges 14a, 15a, and B1 work lines 45 and B2 work lines 46 (B1 to Bn work lines) are set (virtual) extending in the front-to-rear direction from the B1 division points 40 and B2 division points 41 (B1 to Bn division points) that are unevenly spaced a predetermined distance apart in the width direction toward the first and second end edges 14a, 15a. In this case, the A1 work line 43 and the A2 work line 44 are arranged unevenly at a predetermined distance in the width direction from the central work line 42 toward the first side edge 16a, and the B1 work line 45 and the B2 work line 46 are arranged unevenly at a predetermined distance in the width direction from the central work line 42 toward the second side edge 17a.
[0051] In the roof construction method, as shown in Figure 6, a central fastener 47 (central locking means) is installed and fixed at a widthwise center point 35 set (virtual) on the widthwise center line 34, an A1 fastener 48 (A1 locking means) is installed and fixed at an A1 division point 38 set (virtual) on the widthwise center line 34, and an A2 fastener 49 (Anth locking means) is installed and fixed at an A2 division point 39 (Anth division point) set (virtual) on the widthwise center line 34 (locking means installation process).
[0052] Furthermore, a B1 fastener 50 (B1 locking means) is installed and fixed to a B1 division point 40 (imaginary) set on the widthwise center line 34, and a B2 fastener 51 (Bn locking means) is installed and fixed to a B2 division point 41 (Bn division point) (imaginary) set on the widthwise center line 34 (locking means installation process). A hook 33a (described later) of the first lifeline 31 (first lanyard) and a hook 33b of the second lifeline 32 (second lanyard) are detachably hooked (locked) to the central fastener 47, the A1 fastener 48, the A2 fastener 49, the B1 fastener 50 and the B2 fastener 51.
[0053] The A1 fasteners 48 and A2 fasteners 49 (A1 to An fasteners) are aligned at equal intervals in the width direction from the central fastener 47 toward the first side edge 16a. The B1 fasteners 50 and B2 fasteners 51 (B1 to Bn fasteners) are aligned at equal intervals in the width direction from the central fastener 47 toward the second side edge 17a. There may be cases where the A1 fasteners 48 and A2 fasteners 49 are aligned unequally at a predetermined interval in the width direction from the central fastener 47 toward the first side edge 16a, and the B1 fasteners 50 and B2 fasteners 51 are aligned unequally at a predetermined interval in the width direction from the central fastener 47 toward the second side edge 17a.
[0054] The first lifeline 31 (first lanyard) has a length dimension equal to or slightly shorter than half the work line length L1 (see FIG. 6) of those work lines 42 to 46 (central work line 42, A1 work line 43, A2 work line 44, B1 work line 45, B2 work line 46). Note that a slightly shorter length dimension is a length dimension 10 cm to 30 cm shorter than half the work line length L1.
[0055] The second lifeline 32 (second lanyard) has a length dimension equal to or slightly shorter than the widthwise centerline length L2 (see FIG. 6) between the B1 division point 40 of the widthwise centerline 34 and the first side edge 16a. Alternatively, the second lifeline 32 (second lanyard) has a length dimension equal to or slightly shorter than the widthwise centerline length L2 (see FIG. 6) between the A1 division point 38 of the widthwise centerline 34 and the second side edge 17a. The slightly shorter length dimension is 10 cm to 30 cm shorter than the widthwise centerline length L2.
[0056] Fig. 7 is a top view of the wooden unitary house 10 for explaining an example of the central roof construction step of the roof construction method, and Fig. 8 is a top view of the wooden unitary house 10 for explaining an example of the A1 roof construction step of the roof construction method. Fig. 9 is a top view of the wooden unitary house 10 for explaining an example of the A2 roof construction step of the roof construction method, and Fig. 10 is a top view of the wooden unitary house 10 for explaining an example of the B1 roof construction step of the roof construction method. Fig. 11 is a top view of the wooden unitary house 10 for explaining an example of the B2 roof construction step of the roof construction method. In Fig. 7, the width direction is indicated by arrow Y, and the front-rear direction is indicated by arrow Z.
[0057] In the roof construction process of the roof construction method, a worker 26 on the ground puts on a safety belt 27 to which a first lifeline 31 and a second lifeline 32 are connected to a shock absorber 30, and the worker 26 wearing the safety belt 27 climbs onto the flat roof 18 of the wooden module house 10 using a ladder, stepladder, aerial work vehicle, etc., and in the center of the flat roof 18, the worker 26 hooks (engages) the hook 33b of the second lifeline 32 onto (engages) the B1 fastener 50 (B1 engaging means) to connect the second lifeline 32 to the B1 fastener 50.
[0058] After connecting the second lifeline 32 to the B1 fastener 50, the worker 26 hooks (locks) the hook 33a of the first lifeline 31 onto (connects) the central fastener 47 (central locking means) to connect the first lifeline 31 to the central fastener 47. After connecting the first lifeline 31 to the central fastener 47, as shown in Fig. 7, the worker 26 moves back and forth along the central work line 42 from the widthwise center point 35 toward the first edge 14a and the second edge 15a while performing waterproofing work (roofing work) (central roofing work process (roofing work process)).
[0059] Alternatively, the worker 26 puts on the safety belt 27 on the ground, and using a ladder, stepladder, or aerial work vehicle, the worker 26 wearing the safety belt 27 climbs onto the flat roof 18 of the wooden modular house 10, and at the center of the flat roof 18, the worker 26 connects the first lifeline 31 and the second lifeline 32 to the shock absorber 30 of the safety belt 27, and hooks (locks) the hook 33b of the second lifeline 32 to (B1 fastening means) to connect the second lifeline 32 to (B1 fastening means). After connecting the second lifeline 32 to (B1 fastening means), the worker 26 hooks (locks) the hook 33a of the first lifeline 31 to (B1 fastening means) to connect the first lifeline 31 to (B1 fastening means). After connecting the first lifeline 31 to the central fastener 47, as shown in FIG. 7, the worker 26 performs waterproofing work (roofing work) while moving back and forth along the central work line 42 from the widthwise center point 35 (widthwise center line) toward the first edge 14a and the second edge 15a (central roofing work process (roofing work process)).
[0060] 7, the working range (movable range) of the worker 26 due to the first lifeline 31 is indicated by a circle C1, and the working range (movable range) of the worker 26 due to the second lifeline 32 is indicated by a circle C2. As shown in the circle C1, the first lifeline 31 restricts (prevents) the worker 26 from moving forward or backward from the first edge 14a and the second edge 15a on the central working line 42, and the second lifeline 32 restricts (prevents) the worker 26 from moving widthwise outward from the first side edge 16a at the widthwise centerline 34.
[0061] After carrying out waterproofing work (roof work) along the central work line 42, worker 26 removes hook 33a of first lifeline 31 from central fastener 47 (central locking means) and releases the connection between first lifeline 31 and central fastener 47, then moves widthwise along or on widthwise centerline 34 from widthwise center point 35 of flat roof 18 toward first side edge 16a, and moves to A1 division point 38. Note that second lifeline 32 remains connected to B1 fastener 50.
[0062] After moving to the A1 division point 38, the worker 26 hooks (engages) the hook 33a of the first lifeline 31 onto (into) the A1 fastener 48 (A1 fastening means) to connect the first lifeline 31 to the A1 fastener 48. After connecting the first lifeline 31 to the A1 fastener 48, as shown in Fig. 8, the worker 26 performs waterproofing work (roofing work) while moving in the front-to-rear direction along the A1 work line 43 from the A1 division point 38 (widthwise centerline 34) toward the first edge 14a and the second edge 15a (A1 roofing work process (roofing work process)).
[0063] 8, the working range (movable range) of the worker 26 due to the first lifeline 31 is indicated by a circle C1, and the working range (movable range) of the worker 26 due to the second lifeline 32 is indicated by a circle C2. As shown in the circle C1, the first lifeline 31 restricts (prevents) the worker 26 from moving forward or backward from the first edge 14a and the second edge 15a on the A1 work line 43, and the second lifeline 32 restricts (prevents) the worker 26 from moving widthwise outward from the first side edge 16a at the widthwise centerline 34.
[0064] After carrying out waterproofing work (roof work) along the A1 work line 43, the worker removes the hook 33a of the first lifeline 31 from the A1 fastener 48 (A1 engaging means) and releases the connection between the first lifeline 31 and the A1 fastener 48, then moves widthwise along or on the widthwise centerline 34 from the widthwise center point 35 of the flat roof 18 towards the first side edge 16a, and moves to the A2 division point 39. The second lifeline 32 remains connected to the B1 fastener 50.
[0065] After moving to the A2 division point 39, the worker 26 hooks (engages) the hook 33a of the first lifeline 31 onto (into) the A2 fastener 49 (A2 fastening means) to connect the first lifeline 31 to the A2 fastener 49. After connecting the first lifeline 31 to the A2 fastener 49, as shown in Fig. 9, the worker 26 performs waterproofing work (roofing work) while moving in the front-to-rear direction along the A2 work line 44 from the A2 division point 39 (widthwise center line 34) toward the first edge 14a and the second edge 15a (A2 roofing work process (roofing work process)).
[0066] 9, the working range (movable range) of the worker 26 due to the first lifeline 31 is indicated by a circle C1, and the working range (movable range) of the worker 26 due to the second lifeline 32 is indicated by a circle C2. As shown in the circle C1, the first lifeline 31 restricts (prevents) the worker 26 from moving forward or backward from the first end edge 14a and the second end edge 15a on the A2 work line 44, and the second lifeline 32 restricts (prevents) the worker 26 from moving widthwise outward from the first side edge 16a at the widthwise centerline 34.
[0067] After carrying out waterproofing work (roofing work) along the A2 work line 44, the worker 26 removes the hook 33a of the first lifeline 31 from the A2 fastener 49 (A2 engaging means), releases the connection between the first lifeline 31 and the A2 fastener 49, and then moves widthwise along or on the widthwise centerline 34 from the A2 division point 39 of the flat roof 18 towards the B1 division point 40, and moves to the B1 division point 40. The second lifeline 32 remains connected to the B1 fastener 50.
[0068] After moving to the B1 division point 40, the worker 26 removes the hook 33b of the second lifeline 32 from the B1 fastener 50 (the B1 fastening means), releases the connection between the second lifeline 32 and the B1 fastener 50, and then moves widthwise along or on the widthwise centerline 34 from the B1 division point 40 of the flat roof 18 toward the A1 division point 38 to the A1 division point 38. Having moved to the A1 division point 38, the worker 26 hooks (fastens) the hook 33b of the second lifeline 32 onto (the A1 fastening means) and connects the second lifeline 32 to the A1 fastener 48.
[0069] The worker 26 who has connected the second lifeline 32 to the A1 fastener 48 moves in the width direction along or on the width centerline 34 from the A1 division point 38 of the flat roof 18 toward the B1 division point 40, and then moves to the B1 division point 40. The worker 26 who has moved to the B1 division point 40 hooks (locks) the hook 33a of the first lifeline 31 onto (the B1 fastener 50) (the B1 locking means) to connect the first lifeline 31 to the B1 fastener 50. After connecting the first lifeline 31 to the B1 fastener 50, as shown in FIG. 10, the worker 26 performs waterproofing work (roofing work) while moving back and forth along the B1 work line 45 from the B1 division point 40 (the width centerline 34) toward the first edge 14a and the second edge 15a (B1 roofing work process (roofing work process)). The first lifeline 31 restricts (prevents) the worker 26 from moving forward or backward from the first edge 14a and the second edge 15a on the B1 work line 45, and the second lifeline 32 restricts (prevents) the worker 26 from moving widthwise outward from the second side edge 17a at the widthwise center line 34.
[0070] After carrying out waterproofing work (roofing work) along the B1 work line 45, the worker 26 removes the hook 33a of the first lifeline 31 from the B1 fastener 50 (B1 engaging means) and releases the connection between the first lifeline 31 and the B1 fastener 50, then moves widthwise from the B1 division point 40 of the flat roof 18 toward the second side edge 17a along or on the widthwise centerline 34, and moves to the B2 division point 41. The second lifeline 32 remains connected to the A1 fastener 48.
[0071] After moving to the B2 division point 41, the worker 26 hooks (engages) the hook 33a of the first lifeline 31 onto (or engages) the B2 fastener 51 (B2 fastening means) to connect the first lifeline 31 to the B2 fastener 51. After connecting the first lifeline 31 to the B2 fastener 51, as shown in Fig. 11, the worker 26 performs waterproofing work (roofing work) while moving in the front-to-rear direction along the B2 work line 46 from the B2 division point 41 (widthwise centerline 34) toward the first edge 14a and the second edge 15a (B2 roofing work process (roofing work process)). The first lifeline 31 restricts (prevents) the worker 26 from moving forward or backward from the first edge 14a and the second edge 15a on the B2 work line 46, and the second lifeline 32 restricts (prevents) the worker 26 from moving widthwise outward from the second side edge 17a at the widthwise centerline 34.
[0072] After the central roof construction process, the A1-A2 roof construction process, and the B1-B2 roof construction process are completed, the worker 26 removes the hook 33a of the first lifeline 31 from the B2 fastener 51 (B2 fastening means) and removes the hook 33b of the second lifeline 32 from the A1 fastener 48 (A1 fastening means), and descends from the flat roof 18 using a ladder, stepladder, aerial work vehicle, etc.
[0073] The roof construction method is as follows: a worker 26 stands on a flat roof 18 (roof of a building) wearing a second lifeline 32 having a length dimension equal to or slightly shorter than the widthwise centerline length L2 between the B1 division point 40 of the widthwise centerline 34 and the first side edge 16a or the widthwise centerline length L2 between the A1 division point 38 of the widthwise centerline 34 and the second side edge 17a, and connects the second lifeline 32 to the B1 fastening means or the A1 fastening means, or after standing on the flat roof of a wooden modular house, While connecting the first lifeline 31 to the worker 26 on the flat roof 18, the worker 26 connects the second lifeline 31 to the B1 fastener 50 (B1 fastening means) or the A1 fastener 48 (A1 fastening means), and the worker 26 on the flat roof 18 connects the first lifeline 31 to the fasteners 48-51 (these fastening means) in order, or connects the first lifeline 31 to the worker 26 on the flat roof 18. While tying the first lifeline 31, the first lifeline 31 is sequentially connected to the fasteners 48-51 (these fastening means), and the worker 26 performs the roof construction along the work lines 42-45. Therefore, when the worker 26 moves across the flat roof 18 during the roof construction, the second lifeline 32 prevents the worker 26 from moving outward in the width direction from the first side edge 16a of the flat roof 18, and the second lifeline 32 prevents the worker 26 from moving outward in the width direction from the second side edge 17a of the flat roof 18. and second side edges 16a, 17a of the flat roof 18, the first lifeline 31 prevents the worker 26 from moving forward in the fore-and-aft direction from the first edge 14a of the flat roof 18, and the first lifeline 31 prevents the worker 26 from moving backward in the fore-and-aft direction from the second edge 15a of the flat roof 18, thereby preventing the worker 26 from falling under the roof from the first and second edges 14a, 15a of the flat roof 18 during roof construction.
[0074] In the roof construction method, the second lifeline 32 prevents the worker 26 from falling from the first and second side edges 16a, 17a of the flat roof 18 to below the roof, and the first lifeline 31 prevents the worker 26 from falling from the first and second end edges 14a, 15a of the flat roof 18 to below the roof, so the worker 26 can perform waterproofing work (prescribed roofing work) on the flat roof 18 with peace of mind while ensuring the safety of the worker 26. Since the roof construction method does not require the construction of scaffolding around the building or the dismantling of scaffolding, the prescribed waterproofing work (roofing work) can be performed without scaffolding, and compared to the case of constructing scaffolding, the scaffolding work of scaffolding workers and the dismantling of scaffolding can be omitted, so the time required for waterproofing work can be significantly shortened and the cost required for waterproofing work can be reduced.
[0075] The roof construction method involves carrying out roof construction along the central work line 42, followed by carrying out waterproofing work (roof construction) sequentially from the widthwise center point 35 of the widthwise center line 34 of the flat roof 18 toward the first side edge 16a of the flat roof 18 along the A1 work line 43 to the A2 work line 44 (An work line), and then carrying out waterproofing work (roof construction) sequentially from the widthwise center point 35 of the widthwise center line 34 of the flat roof 18 toward the second side edge 17a of the flat roof 18 along the B1 work line 45 to the B2 work line 46 (Bn work line).This means that waterproofing work can be carried out regularly based on specified rules, which improves the work efficiency of the waterproofing work and enables workers to complete the waterproofing work in a short time.
[0076] Fig. 12 is a top view of the wooden unitary house 10 for explaining another example of the central roof construction step of the roof construction method, and Fig. 13 is a top view of the wooden unitary house 10 for explaining another example of the A1 roof construction step and the B1 roof construction step of the roof construction method. Fig. 14 is a top view of the wooden unitary house 10 for explaining another example of the A2 roof construction step and the B2 roof construction step of the roof construction method. In Fig. 12, the width direction is indicated by arrow Y, and the front-rear direction is indicated by arrow Z.
[0077] In the roof construction method shown in Figures 12 to 14, the roof construction process is carried out by two workers 26a, 26b, a first worker 26a who constructs one half of the flat roof 18 from the widthwise center point 35 of the widthwise center line 34 to the first side edge 16a, and a second worker 26b who constructs the other half of the flat roof 18 from the widthwise center point 35 of the widthwise center line 34 to the second side edge 17a. The first setting process, the second setting process, and the locking means installation process are as described above.
[0078] In the roof construction process of the roof construction method, the first and second workers 26a, 26b wear the safety belt 27, to which the first lifeline 31 and the second lifeline 32 are connected, on the ground, and the first and second workers 26a, 26b wearing the safety belt 27 use a ladder, a stepladder, a high-altitude work vehicle, or the like to get onto the flat roof 18 of the wooden modular house 10. The first worker 26a hooks (engages) the hook 33b of the second lifeline 32 to the B1 fastener 50 (B1 fastening means) at the center of the flat roof 18 to connect the second lifeline 32 to the B1 fastener 50, and the second worker 26b hooks (engages) the hook 33b of the second lifeline 32 to the A1 fastener 48 (A1 fastening means) at the center of the flat roof 18 to connect the second lifeline 32 to the A1 fastener 48.
[0079] Alternatively, the first and second workers 26a, 26b put on the safety belt 27 on the ground, and then the first and second workers 26a, 26b wearing the safety belt 27 use a ladder, stepladder, aerial work vehicle, or the like to get onto the flat roof 18 of the wooden modular house 10. The first worker 26a connects the first lifeline 31 and the second lifeline 32 to the shock absorber 30 of the safety belt 27 at the center of the flat roof 18, and hooks (engages) the hook 33b of the second lifeline 32 into (connects) the B1 fastener 50 (B1 fastening means) to connect the second lifeline 32 to the B1 fastener 50. The second worker 26b connects the first lifeline 31 and the second lifeline 32 to the shock absorber 30 of the safety belt 27 at the center of the flat roof 18, and hooks (engages) the hook 33b of the second lifeline 32 into the A1 fastener 48 (A1 fastening means) to connect the second lifeline 32 to the A1 fastener 48.
[0080] After connecting the second lifeline 32 to the B1 fastener 50, the first worker 26a hooks (engages) the hook 33a of the first lifeline 31 onto (connects) the central fastener 47 (central locking means) to connect the first lifeline 31 to the central fastener 47, and, as shown in Figure 12, moves in the front-to-back direction along the central work line 42 from the widthwise center point 35 toward the first edge 14a, performing waterproofing work (roofing work) on one half of the central work line 42 extending between the widthwise center point 35 and the first edge 14a (central roofing work process (roofing work process)).
[0081] The second worker 26b connects the second lifeline 32 to the A1 fastener 48, then hooks (engages) the hook 33a of the first lifeline 31 onto (connects) the central fastener 47 (central locking means) to connect the first lifeline 31 to the central fastener 47, and, as shown in Figure 12, moves in the front-to-back direction along the central work line 42 from the widthwise center point 35 toward the second edge 15a, performing waterproofing work (roofing work) on the other half of the central work line 42 extending between the widthwise center point 35 and the second edge 15a (central roofing work process (roofing work process)).
[0082] After the first worker 26a has completed waterproofing work (roofing work) on one half of the central work line 42 along the central work line 42, he removes the hook 33a of the first lifeline 31 from the central fastener 47 (central locking means) and releases the connection between the first lifeline 31 and the central fastener 47, then moves widthwise along or on the widthwise centerline 34 from the widthwise center point 35 of the flat roof 18 towards the first side edge 16a, and moves to the A1 division point 38. The second lifeline 32 remains connected to the B1 fastener 50.
[0083] After moving to the A1 division point 38, the first worker 26a hooks (engages) the hook 33a of the first lifeline 31 onto (connects) the A1 fastener 47 (A1 locking means) to connect the first lifeline 31 to the A1 fastener 47, and performs waterproofing work (roofing work) while moving back and forth along the A1 work line 43 from the A1 division point 38 (widthwise center line 34) toward the first edge 14a and the second edge 15a, as shown in Figure 13 (A1 roofing work process (roofing work process)).
[0084] After carrying out waterproofing work (roof work) along the A1 work line 43, the first worker 26a removes the hook 33a of the first lifeline 31 from the A1 fastener 48 (A1 engaging means) and releases the connection between the first lifeline 31 and the A1 fastener 48, then moves widthwise along or on the widthwise centerline 34 from the A1 division point 38 of the flat roof 18 towards the first side edge 16a, and moves to the A2 division point 39. The second lifeline 32 remains connected to the B1 fastener 50.
[0085] After moving to the A2 division point 39, the first worker 26a hooks (engages) the hook 33a of the first lifeline 31 onto (connects) the A2 fastener 49 (A2 fastening means) to connect the first lifeline 31 to the A2 fastener 49, and then, as shown in FIG. 14, moves back and forth along the A2 work line 44 from the A2 division point 39 (widthwise center line 34) toward the first edge 14a and the second edge 15a while performing waterproofing work (roofing work) (A2 roofing work process (roofing work process)).
[0086] After the second worker 26b has completed waterproofing work (roofing work) on the other half of the central work line 42 along the central work line 42, he removes the hook 33a of the first lifeline 31 from the central fastener 47 (central locking means) and releases the connection between the first lifeline 31 and the central fastener 47, then moves widthwise along or on the widthwise centerline 34 from the widthwise center point 35 of the flat roof 18 towards the second side edge 17a to the B1 division point 40. The second lifeline 32 remains connected to the A1 fastener 48.
[0087] After moving to the B1 division point 40, the second worker 26b hooks (engages) the hook 33a of the first lifeline 31 onto (or engages) the B1 fastener 50 (B1 engaging means) to connect the first lifeline 31 to the B1 fastener 50, and performs waterproofing work (roofing work) while moving back and forth along the B1 work line 45 from the B1 division point 40 (widthwise center line 34) toward the first edge 14a and the second edge 15a, as shown in FIG. 13 (B1 roofing work process (roofing work process)).
[0088] After performing waterproofing work (roof work) along the B1 work line 45, the second worker 26b removes the hook 33a of the first lifeline 31 from the B1 fastener 50 (B1 engaging means) and releases the connection between the first lifeline 31 and the B1 fastener 50, then moves widthwise along or on the widthwise centerline 34 from the B1 division point 40 of the flat roof 18 towards the second side edge 17a, and moves to the B2 division point 41. The second lifeline 32 remains connected to the A1 fastener 48.
[0089] After moving to the B2 division point 41, the second worker 26b hooks (engages) the hook 33a of the first lifeline 31 onto (or engages) the B2 fastener 51 (B2 engaging means) to connect the first lifeline 31 to the B2 fastener 51, and performs waterproofing work (roofing work) while moving back and forth along the B2 work line 46 from the B2 division point 41 (widthwise center line 34) toward the first edge 14a and the second edge 15a, as shown in Figure 14 (B2 roofing work process (roofing work process)).
[0090] After the central roof construction process, the A1-A2 roof construction process, and the B1-B2 roof construction process are completed, the first and second workers 26a, 26b remove the hook 33a of the first lifeline 31 from the A2 fastener 49 (A2 fastening means) and the B2 fastener 51 (B2 fastening means), and remove the hook 33b of the second lifeline 32 from the B1 fastener 50 (B1 fastening means) and the A1 fastener 48 (A1 fastening means), and use a ladder, stepladder, aerial work vehicle, etc. to descend from the flat roof 18 of the wooden unit house 10.
[0091] The roof construction method shown in Figures 12 to 14 has the following effects in addition to the effects of the roof construction method shown in Figures 7 to 11. In the roof construction method of Figures 12 to 14, the first worker 26a and the second worker 26b each perform half of the roof construction on the central work line 42, the first worker 26a performs the roof construction in sequence from the A1 work line 43 to the A2 work line 44, and the second worker 26b performs the roof construction in sequence from the B1 work line 45 to the B2 work line 46. Therefore, the first and second workers 26a, 26b can perform the waterproofing work (roof construction) regularly based on a predetermined rule, the work efficiency of the waterproofing work can be improved, and the first and second workers 26a, 26b can complete the waterproofing work in a short time. [Explanation of symbols]
[0092] 10 Wooden modular house 11 Wood ceiling plate 12 Wood-based floor plate 13 Wood-based wall panels 13a Wood-based first wall panel 13b Wood-based second wall panel 13c Wood-based third wall panel 14 First edge 14a First edge 15 Second edge 15a 2nd edge 16 First side edge 16a 1st side edge 17 Second side edge 17a 2nd side edge 18 Flat Roof 19 Rafters 20. Plywood 21 Flooring 22 Upper end 23 Lower end 24 Side edge 25 Side edge 26 Workers 26a 1st worker 26b Second Worker 27 Safety Belt 28a Shoulder belt 28b Chest belt 28c waist belt 28d Thigh belt 28e Pelvic Belt 29 D ring 30 Shock absorber 31 First Lifeline 32 The Second Lifeline 33a,b hook 34 Width direction center line 35 Center point in width direction 36 One Half 37 The other half 38 A1 division point 39 A2th division point (Anth division point) 40 B1 division point 41 B2 division point (Bn division point) 42 Central Work Line 43 A1 Work Line 44 A2 Work Line (An Work Line) 45 B1 Work Line 46 B2 Work Line (Bn Work Line) 47 Center fastener (center locking means) 48 No. A1 fastener (A1 locking means) 49 No. A2 fastener (No. An locking means) 50 No. B1 fastener (No. B1 locking means) 51 No. B2 fastener (No. Bn locking means)
Claims
1. A roof construction method in which a worker stands on a roof of a building that is long in a width direction or a front-to-rear direction and has first and second side edges that are spaced apart and opposed to each other in the width direction and extend in a front-to-rear direction, and the worker performs a predetermined roof construction on the roof, The roof construction method includes a first setting step of setting a widthwise centerline that halves the front-to-rear dimension of the roof and extends in the width direction, dividing one half of the widthwise centerline that extends from a widthwise center point of the widthwise centerline to the first side edge, setting A1 to An division points that are aligned from the widthwise center point to the first side edge, and dividing the other half of the widthwise centerline that extends from the widthwise center point of the widthwise centerline to the second side edge, setting B1 to Bn division points that are aligned from the widthwise center point to the second side edge; a second setting step of setting a central work line extending from the width direction center point to the first and second edges, setting A1 to An work lines extending from the A1 to An division points to the first and second edges, and setting B1 to Bn work lines extending from the B1 to Bn division points to the first and second edges; a locking means installation step of installing a central locking means at the width direction center point, installing A1 to An locking means at the A1 to An division points, and installing B1 to Bn locking means at the B1 to Bn division points; A roof construction method characterized by comprising a roof construction process in which the worker, who is on the roof wearing a first lifeline having a length dimension equal to half the length of the work lines or slightly shorter than half the length of the work lines, sequentially connects the first lifeline to the fastening means, or the worker connects the first lifeline to the worker on the roof while sequentially connecting the first lifeline to the fastening means, and the worker performs the roof construction along the work lines.
2. The roof construction method described in claim 1, wherein the roof construction process is composed of a central roof construction process in which the worker wearing the first lifeline and standing on the roof connects the first lifeline to the central locking means, or the worker connects the first lifeline to the central locking means while connecting the first lifeline to the worker standing on the roof, and the worker performs the roof construction along a central work line; an A1 to An roof construction process in which the first lifeline is removed from the central locking means and the first lifeline is connected in sequence from the A1 locking means to the An locking means, while performing the roof construction in sequence from the A1 work line to the An work line; and a B1 to Bn roof construction process in which the first lifeline is removed from the central locking means and the first lifeline is connected in sequence from the B1 locking means to the Bn locking means, while performing the roof construction in sequence from the B1 work line to the Bn work line.
3. The roof construction method described in claim 2, wherein the workers are composed of a first worker who constructs one half of the roof from the widthwise center point of the widthwise center line to the first side edge, and a second worker who constructs the other half of the roof from the widthwise center point of the widthwise center line to the second side edge, and the first worker performs roof construction on half of the central work line extending between the widthwise center point and the first edge in the central roof construction process, and performs roof construction work in sequence from the A1 work line to the An work line in the A1 to An roof construction processes, and the second worker performs roof construction work on half of the central work line extending between the widthwise center point and the second edge in the central roof construction process, and performs roof construction work in sequence from the B1 work line to the Bn work line in the B1 to Bn roof construction processes.
4. A roof construction method as described in any one of claims 1 to 3, wherein the roof construction process includes a worker standing on the roof wearing a second lifeline having a length dimension equal to or slightly shorter than the widthwise centerline length between the B1 division point of the widthwise centerline and the first side edge or the widthwise centerline length between the A1 division point of the widthwise centerline and the second side edge, and then connecting the second lifeline to the B1 fastening means or the A1 fastening means, or after the worker connects the second lifeline to the B1 fastening means or the A1 fastening means while connecting the second lifeline to the worker standing on the roof, the worker performs the roof construction along those work lines.
5. A roof construction method as described in any one of claims 1 to 4, wherein the first setting step equally divides one half of the widthwise centerline extending from the widthwise center point of the widthwise centerline to the first side edge in the width direction to set the A1 to An division points that are equally spaced apart in the width direction, and equally divides the other half of the widthwise centerline in the width direction to set the B1 to Bn division points that are equally spaced apart in the width direction, wherein the A1 to An work lines are arranged at equal intervals in the width direction from the central work line toward the first side edge, and the B1 to Bn work lines are arranged at equal intervals in the width direction from the central work line toward the second side edge.
6. A roof construction method as described in any one of claims 1 to 5, wherein the central work line extends in a straight line in the front-to-rear direction from the widthwise center point toward the first and second edges, perpendicular to the widthwise center line, the A1 to An work lines extend in a straight line in the front-to-rear direction from the A1 to An division points toward the first and second edges, and the B1 to Bn work lines extend in a straight line in the front-to-rear direction from the B1 to Bn division points toward the first and second edges, perpendicular to the widthwise center line.
7. 7. A roof construction method as described in any one of claims 1 to 6, wherein the building is a wooden modular house formed from a wood-based ceiling plate of a specified area shaped as a rectangle that is long in the front-to-back or width direction and extends horizontally, a wood-based floor plate of a specified area shaped as a rectangle that is long in the front-to-back or width direction and extends horizontally, and a wood-based wall panel of a specified area shaped as a rectangle that is long in the front-to-back or width direction and extends horizontally, located between the wood-based ceiling plate and the wood-based floor plate, and extending vertically, the roof is a flat roof, and the specified roof construction is waterproofing work for the flat roof.
8. 8. The roof construction method according to claim 7, wherein the wood-based floor plate and the wood-based ceiling plate are made from CLT, and the wood-based wall panel is made from 2x4 lumber.
Citation Information
Patent Citations
Waterproofing structure for flat roofs and waterproofing construction method for flat roofs
JP7048807B1