Member conveyance device and member conveyance method
The member transporting device and method address slipping issues by using a cart with a rotating and lifting mechanism, enhancing transportation efficiency and reducing the burden on workers.
Patent Information
- Application Number
- JP2023071839
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-25
- Publication Date
- 2024-11-07
- Estimated Expiration
- 2043-04-25
AI Technical Summary
Conventional member carrying jigs for elevator rails risk the rear end slipping and falling from the base plate during transportation, necessitating adjustments and increasing the burden of carrying long members.
A member transporting device and method that uses a cart with a pedestal and connecting shaft, allowing the elevator rail to be rotated and lifted while connected to the pedestal, preventing slipping and facilitating easy transportation.
Reduces the burden of transporting long members by preventing slipping, reducing working time, and minimizing the need for adjustments, while allowing single-worker operation and efficient space utilization.
Smart Images

Figure 2024157455000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a member transport device for transporting a long member and a member transport method. [Background technology]
[0002] Patent Document 1 discloses a member delivery tool in which a roller conveyor body on which the rear end of the elevator rail is placed is installed at the landing, and a winch for lifting the front end of the elevator rail is provided in the hoistway in order to deliver the elevator rail from the landing to the hoistway. The roller conveyor body is provided with a base plate on which the roller conveyor body can slide. The rear end of the elevator rail is placed on the roller conveyor body via the base plate. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Japanese Utility Model Application Publication No. 3-56501 Summary of the Invention [Problem to be solved by the invention]
[0004] In the conventional component delivery jig disclosed in Patent Document 1, the front end of the elevator rail is pulled up by a winch, and the rear end of the elevator rail is pulled toward the hoistway together with the base plate. Therefore, in the conventional component delivery jig, when the rear end of the elevator rail is pulled toward the hoistway, there is a risk that the rear end of the elevator rail may slip on the base plate and fall off the base plate. As a result, if the position of the rear end of the elevator rail is misaligned with respect to the base plate, it is necessary to adjust the position of the rear end of the elevator rail back to its original position. This increases the burden of the elevator rail delivery work.
[0005] The present disclosure is devised to solve the above-mentioned problems, and aims to provide a component transporting device and a component transporting method that can reduce the burden of transporting long components. [Means for solving the problem]
[0006] The material transport device disclosed herein comprises a cart, the cart having a base with a loading surface on which a long material is placed, and an attachment portion provided on the base, the attachment portion having a connecting shaft that connects the long material to the base, and when the long material is connected to the base by the connecting shaft, the connecting shaft is passed through a connecting hole provided in the long material, and the long material is freely rotatable around the connecting shaft in a direction that changes the angle of the long material relative to the loading surface. In addition, the member transporting method disclosed herein includes a loading process in which a long member is placed on a loading surface formed on the base of the trolley, a connecting process in which, after the loading process, the long member is connected to the base by passing the connecting shaft through a connecting hole provided in the long member, and a delivery process in which, after the loading and connecting processes, the long member is delivered to a space to be transported while standing up the long member from a state in which the long member is lying on the loading surface, and in the delivery process, the long member is stood up while rotating around the connecting shaft in a direction in which the angle of the long member relative to the loading surface increases. Effect of the Invention
[0007] According to the present disclosure, it is possible to provide a component transporting device and a component transporting method that can reduce the burden of transporting long components. [Brief description of the drawings]
[0008] [Figure 1] 1 is a configuration diagram showing a state in which a long member is being transported using a member transporting device according to embodiment 1. FIG. [Diagram 2] FIG. 2 is a perspective view showing the carriage of FIG. 1. [Diagram 3] FIG. 3 is a perspective view showing the carriage in FIG. 2 when the base is retracted. [Figure 4] 3 is an enlarged view showing a main part of the base in FIG. 2. [Diagram 5] 5 is an enlarged view showing a state in which the elevator rail is connected to the base by the connecting shaft of FIG. 4. [Figure 6] 6 is an enlarged view showing the mounting portion when the elevator rail in FIG. 5 is inclined with respect to the loading surface. [Figure 7] 4 is a flowchart showing a member transport method according to the first embodiment. [Figure 8] 8 is a configuration diagram showing a state of the member transporting device after each of the loading step, the coupling step, and the connection step in FIG. 7 has been performed. FIG. [Figure 9] 9 is a configuration diagram showing a state of the member transporting device when a second end of the elevator rail in FIG. 8 is being pulled up by a lifting machine. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] The embodiments for carrying out the subject of the present disclosure will be described with reference to the attached drawings. In each drawing, the same or corresponding parts are given the same reference numerals, and duplicated descriptions are appropriately simplified or omitted. Note that the subject of the present disclosure is not limited to the following embodiments, and any component of the embodiment may be modified or omitted within the scope of the gist of the present disclosure.
[0010] Embodiment 1 When an elevator is installed in a building, a plurality of elevator components constituting the elevator are transported into the hoistway of the building. The plurality of elevator components include long components such as elevator rails, elevator machine platform beams, etc. The component transport device of the present disclosure transports the long components.
[0011] Fig. 1 is a configuration diagram showing a state in which a long member is being transported using a member transporting device according to embodiment 1. In this embodiment, the long member transported by member transporting device 1 is an elevator rail 2. Also, in this embodiment, the space to which the long member is transported is an elevator hoistway 3. The elevator rail 2 is transported from a hall 4 of a building through a hall entrance / exit 5 into the hoistway 3.
[0012] The member transport device 1 has a dolly 6 and a lifting machine 7. When the elevator rail 2 is transported from the landing 4 into the hoistway 3, the elevator rail 2 is lifted up by the lifting machine 7 while the elevator rail 2 is placed on the dolly 6. The elevator rail 2 has a first end 2a and a second end 2b. The lifting machine 7 lifts up the second end 2b of the elevator rail 2.
[0013] The lifting machine 7 has a hanging body 71, a lifting machine main body 72, and an operation unit 73.
[0014] The hanging body 71 is a chain that suspends the elevator rail 2. A wire rope may be used as the hanging body 71. The hanging body 71 is connectable to the second end 2b of the elevator rail 2. The second end 2b of the elevator rail 2 is provided with a connection hole that is a through hole. The hanging body 71 is connected to the second end 2b by passing a hook provided at the end of the hanging body 71 through the connection hole.
[0015] The lifting machine main body 72 can be installed in the hoistway 3. When the lifting machine main body 72 is installed in the hoistway 3, the position of the lifting machine main body 72 is higher than the landing 4. The lifting machine main body 72 moves the hanging body 71 upward by winding up the hanging body 71, and moves the hanging body 71 downward by letting out the hanging body 71. That is, the lifting machine main body 72 moves the hanging body 71 in the up and down direction.
[0016] The lifting machine main body 72 has a motor. The lifting machine main body 72 operates by the driving force of the motor. As a result, the lifting machine main body 72 moves the hanging body 71 in the up and down direction by the driving force of the motor.
[0017] The operation unit 73 is a portable device that can be operated at a position away from the lifting machine main body 72. In this embodiment, the operation unit 73 communicates wirelessly with the lifting machine main body 72. This allows a worker 8 who transports the elevator rail 2 using the member transporting device 1 to operate the operation unit 73 at the landing 4 located outside the hoistway 3.
[0018] The lifting machine main body 72 operates in response to the operation of the operating unit 73. The operation of the operating unit 73 is performed by selecting either an ascent operation or a descent operation. The lifting machine main body 72 moves the hanging body 71 upward by the ascent operation of the operating unit 73, and moves the hanging body 71 downward by the descent operation of the operating unit 73.
[0019] The cart 6 has a base 61 , a handle portion 62 , a mounting portion 63 , a pair of front wheels 64 , and a pair of rear wheels 65 .
[0020] Fig. 2 is a perspective view showing the dolly 6 of Fig. 1. A loading surface 611 is formed on the base 61. The base 61 is arranged with the loading surface 611 facing upward. The elevator rail 2 is placed on the loading surface 611. The base 61 is extendable and contractable in a direction that changes the distance between the front end and the rear end of the base 61. This allows the base 61 to extend and contract in a direction along the loading surface 611.
[0021] Fig. 3 is a perspective view showing the dolly 6 when the pedestal 61 of Fig. 2 is retracted. Fig. 4 is an enlarged view showing a main part of the pedestal 61 of Fig. 2. The pedestal 61 has a plurality of slide members 612. The slide members 612 are sequentially connected to each other so as to be slidable relative to each other in the direction in which the pedestal 61 extends and retracts. The pedestal 61 extends and retracts as the slide members 612 slide relative to each other.
[0022] In this embodiment, each slide member 612 has a cylindrical shape and a rectangular cross-sectional shape. In this embodiment, the cross-sectional areas of the slide members 612 gradually decrease from the front end and rear end of the base 61 toward the center of the base 61. As a result, in this embodiment, the slide members 612 can be inserted sequentially inside the slide members 612 located at the front end and rear end of the base 61 while sliding against each other.
[0023] The base 61 contracts by sequentially inserting a plurality of slide members 612 inside the slide members 612 located at the front end and the rear end of the base 61. When the base 61 is in a contracted state, the two slide members 612 located at the front end and the rear end of the base 61 are lined up adjacent to each other, as shown in FIG.
[0024] The base 61 extends as the multiple slide members 612 are successively pulled out from the slide members 612 located at the front end and rear end of the base 61. When the base 61 is extended, as shown in Fig. 2, the multiple slide members 612 are continuously lined up between the two slide members 612 located at the front end and rear end of the base 61. The distance from the rear end to the front end of the base 61 increases as the base 61 extends from a contracted state.
[0025] The pair of front wheels 64 and the pair of rear wheels 65 are attached to the back surface of the base 61. The back surface of the base 61 is the surface opposite to the loading surface 611 of the base 61. The base 61 is supported by the pair of front wheels 64 and the pair of rear wheels 65. The cart 6 moves on the floor surface of the landing 4 while rotating each of the pair of front wheels 64 and the pair of rear wheels 65.
[0026] The pair of front wheels 64 are attached to a slide member 612 located at the front end of the base 61. The pair of rear wheels 65 are attached to a slide member 612 located at the rear end of the base 61. As a result, the distance from the pair of rear wheels 65 to the pair of front wheels 64 changes as the base 61 expands and contracts. Therefore, when the base 61 is expanded, the distance from the pair of rear wheels 65 to the pair of front wheels 64 is greater than when the base 61 is contracted.
[0027] The handle portion 62 is a frame fixed to the rear end portion of the base 61. The handle portion 62 is fixed to the base 61 in a state in which it stands up from the loading surface 611. The worker 8 moves the dolly 6 while holding the handle portion 62.
[0028] The mounting portion 63 is provided at the rear end portion of the base 61. In this embodiment, the mounting portion 63 is disposed inside the handle portion 62. The mounting portion 63 has a pair of support pillars 631 and a connecting shaft 632.
[0029] The pair of support pillars 631 are fixed to the base 61. Each of the pair of support pillars 631 is connected to the handle portion 62. The pair of support pillars 631 are disposed apart from each other in the width direction of the base 61. The width direction of the base 61 is a direction perpendicular to the direction in which the base 61 extends and contracts, and is a direction along the loading surface 611.
[0030] The connecting shaft 632 is a pin that connects the first end 2a of the elevator rail 2 to the base 61. The connecting shaft 632 is detachably attached to each of the pair of support columns 631. This makes the connecting shaft 632 detachable from the base 61 via the pair of support columns 631.
[0031] The connecting shaft 632 is disposed between the pair of support pillars 631. Moreover, the connecting shaft 632 is disposed at a position away from the base 61. When the dolly 6 is disposed with the loading surface 611 facing upward, the connecting shaft 632 is disposed at a position higher than the loading surface 611. Moreover, the connecting shaft 632 is disposed at a position outside the rear end portion of the base 61 in the direction in which the base 61 extends and retracts.
[0032] The connecting shaft 632 intersects with the direction in which the base 61 extends and retracts, and is disposed along the loading surface 611. In other words, the base 61 is extendable in a direction intersecting the connecting shaft 632 and in a direction along the loading surface 611. In this embodiment, the connecting shaft 632 is disposed along the width direction of the base 61.
[0033] In this embodiment, an insertion hole is provided in each of the pair of support columns 631. In this embodiment, the connecting shaft 632 is attached to the pair of support columns 631 with both ends of the connecting shaft 632 inserted into the respective insertion holes. The connecting shaft 632 comes off from the pair of support columns 631 by coming out of the respective insertion holes.
[0034] Fig. 5 is an enlarged view showing the elevator rail 2 connected to the base 61 by the connecting shaft 632 in Fig. 4. A connecting hole 21, which is a through hole, is provided at a first end 2a of the elevator rail 2. When the elevator rail 2 is laid down on the loading surface 611, the position of the connecting hole 21 is at the same height as the position of the connecting shaft 632.
[0035] The inner diameter of the connecting hole 21 is larger than the outer diameter of the connecting shaft 632. This allows the connecting shaft 632 to be inserted into the connecting hole 21. When the connecting shaft 632 is inserted into the connecting hole 21, a gap is generated between the inner peripheral surface of the connecting hole 21 and the outer peripheral surface of the connecting shaft 632.
[0036] The connecting shaft 632 is attached to the first end 2a of the elevator rail 2 by passing through the connecting hole 21, and is removed from the first end 2a of the elevator rail 2 by pulling out of the connecting hole 21. Therefore, the connecting shaft 632 is detachable from the first end 2a of the elevator rail 2.
[0037] A first end 2a of the elevator rail 2 is connected to the base 61 by a connecting shaft 632. The first end 2a of the elevator rail 2 is connected to the base 61 by attaching the connecting shaft 632, which is passed through the connecting hole 21, to a pair of support columns 631. Therefore, when the elevator rail 2 is connected to the base 61 by the connecting shaft 632, the connecting shaft 632 is passed through the connecting hole 21.
[0038] When elevator rail 2 is connected to base 61 by connecting shaft 632, elevator rail 2 is freely rotatable about connecting shaft 632 in a direction that changes the angle of elevator rail 2 relative to loading surface 611. When elevator rail 2 rotates about connecting shaft 632 in a direction that increases the angle of elevator rail 2 relative to loading surface 611, elevator rail 2 rises up.
[0039] When the elevator rail 2 is connected to the base 61 by the connecting shaft 632, the elevator rail 2 is pulled up by the lifting machine 7, increasing the angle of the elevator rail 2 with respect to the loading surface 611. When the elevator rail 2 is pulled up by the lifting machine 7, it rotates about the connecting shaft 632 in a direction to rise up from a state in which the elevator rail 2 is lying on the loading surface 611.
[0040] 6 is an enlarged view showing the attachment portion 63 when the elevator rail 2 in FIG. 5 is inclined with respect to the loading surface 611. When the elevator rail 2 rotates about the connecting shaft 632 in the direction in which the elevator rail 2 rises up, a part of the first end 2a of the elevator rail 2 moves to a position lower than the loading surface 611. However, the connecting shaft 632 is disposed at a position outside the base 61 relative to the rear end of the base 61 in the direction in which the base 61 extends and retracts. This allows the elevator rail 2 to rise up without the first end 2a interfering with the base 61.
[0041] Next, a member transporting method for transporting the elevator rail 2 from the landing 4 into the hoistway 3 using the member transporting device 1 will be described. FIG. 7 is a flowchart showing the member transporting method according to the first embodiment. The member transporting method has a loading step S1, a coupling step S2, a connection step S3, and a carrying-in step S4. When transporting the elevator rail 2 from the landing 4 into the hoistway 3, the loading step S1, the coupling step S2, and the connection step S3 are each performed, and then the carrying-in step S4 is performed. In this embodiment, each step is performed in the order of the loading step S1, the coupling step S2, the connection step S3, and the carrying-in step S4. The worker 8 performs the loading step S1, the coupling step S2, the connection step S3, and the carrying-in step S4 at the landing 4.
[0042] <Loading process S1> In the loading step S1, the elevator rail 2 is placed on the loading surface 611 of the base 61. At this time, the base 61 is in an extended state. Also, at this time, the elevator rail 2 is in a state of being laid down on the loading surface 611. Furthermore, at this time, the length of the base 61 is adjusted to correspond to the length of the elevator rail 2. Also, at this time, the longitudinal direction of the elevator rail 2 placed on the loading surface 611 is aligned with the direction in which the base 61 extends and contracts.
[0043] <Connection process S2> In the connecting step S2, the first end 2a of the elevator rail 2 is connected to the base 61 by the connecting shaft 632. That is, in the connecting step S2, the connecting shaft 632 removed from the pair of support pillars 631 is passed through the connecting hole 21 of the first end 2a of the elevator rail 2, and the connecting shaft 632 passed through the connecting hole 21 is attached to the pair of support pillars 631. As a result, the first end 2a of the elevator rail 2 is connected to the base 61 by the connecting shaft 632.
[0044] After the loading step S1 and the coupling step S2 and before the connecting step S3, the cart 6 carrying the elevator rail 2 is placed at the landing 4. The cart 6 is placed with the front end of the base 61 facing the landing entrance 5.
[0045] <Connection process S3> In the connection step S3, the elevator rail 2 is connected to the lifting machine 7. Specifically, in the connection step S3, the hanging body 71 is paid out to the landing 4 from the lifting machine main body 72 installed in the hoistway 3 through the landing entrance 5. At this time, the lifting machine main body 72 is operated by operating the operation unit 73 at the landing 4. Thereafter, the second end 2b of the elevator rail 2 is connected to the hanging body 71 at the landing 4.
[0046] Fig. 8 is a configuration diagram showing the state of the member transporting device 1 after carrying out each of the loading step S1, the coupling step S2, and the connection step S3 in Fig. 7. At the landing 4, the elevator rail 2 is placed on a cart 6 with the second end 2b facing the landing entrance 5. The hanging body 71 of the lifting machine 7 is connected to the second end 2b of the elevator rail 2 from the lifting machine main body 72 in the hoistway 3 through the landing entrance 5. In this state, the carrying-in step S4 is carried out.
[0047] <Delivery process S4> In the carrying-in process S4, the elevator rail 2 is carried into the hoistway 3, which is the space to which it is to be transported, while being raised from a state in which the elevator rail 2 has fallen onto the loading surface 611. In the carrying-in process S4, the elevator rail 2 is raised by lifting the elevator rail 2 with a lifting machine 7.
[0048] The lifting of the elevator rail 2 by the lifting machine 7 is performed by operating the operation unit 73 at the landing 4 to operate the lifting machine main body 72. That is, the operation unit 73 is operated at the landing 4 to move the hanging body 71 upward, thereby lifting the second end 2b of the elevator rail 2. As a result, the elevator rail 2 rotates about the connecting shaft 632 in a direction in which the angle of the elevator rail 2 with respect to the loading surface 611 increases, and the elevator rail 2 rises up.
[0049] Fig. 9 is a configuration diagram showing a state of the member transporting device 1 when the second end 2b of the elevator rail 2 in Fig. 8 is being pulled up by the lifting machine 7. When the elevator rail 2 is raised, the second end 2b of the elevator rail 2 is retracted into the hoistway 3 while the first end 2a of the elevator rail 2 is drawn toward the landing entrance 5. As a result, the connecting shaft 632 of the cart 6 is drawn toward the landing entrance 5 while following the first end 2a of the elevator rail 2. At this time, the worker 8 at the landing 4 retracts the base 61 while maintaining the position of the front end of the base 61, thereby moving the connecting shaft 632 in a direction approaching the landing entrance 5.
[0050] That is, in the carry-in step S4, the elevator rail 2 is raised by operating the operating unit 73 while the base 61 is being retracted.
[0051] In the carrying-in process S4, after the elevator rail 2 has been raised, the elevator rail 2 is removed from the connecting shaft 632 while the elevator rail 2 is suspended by the crane 7. This allows the elevator rail 2 to be carried into the hoistway 3.
[0052] In such a member transport device 1, the elevator rail 2 is connected to the base 61 by the connecting shaft 632. When the elevator rail 2 is connected to the base 61 by the connecting shaft 632, the connecting shaft 632 is passed through the connecting hole 21 provided in the elevator rail 2. This makes it possible to more reliably prevent the elevator rail 2 from slipping on the loading surface 611 and falling off the base 61. Furthermore, when the elevator rail 2 is carried into the hoistway 3, the elevator rail 2 can be easily raised while the dolly 6 follows the elevator rail 2. Furthermore, by passing the connecting shaft 632 through the connecting hole 21 of the elevator rail 2 placed on the loading surface 611, the elevator rail 2 can be easily connected to the base 61 by the connecting shaft 632. This reduces the burden of the elevator rail 2 transport work. In addition, the work time required for transporting the elevator rail 2 can be shortened.
[0053] In addition, the base 61 is extendable in a direction intersecting the connecting shaft 632 and in a direction along the loading surface 611. Therefore, when the elevator rail 2 is carried into the hoistway 3, the base 61 can be retracted while the connecting shaft 632 is moved following the elevator rail 2. This prevents the base 61 from getting in the way during the transportation of the elevator rail 2, and further reduces the burden of the transportation of the elevator rail 2. In addition, the work time required to transport the elevator rail 2 can be further reduced. Furthermore, the cart 6 can be stored with the base 61 retracted. This allows the space required to store the member transporting device 1 to be saved.
[0054] Furthermore, when elevator rail 2 is connected to base 61 by connecting shaft 632, elevator rail 2 is pulled up by lifting machine 7. Therefore, elevator rail 2 can be easily raised from a state in which elevator rail 2 has fallen onto loading surface 611 by the driving force of lifting machine 7. This makes it possible to further reliably reduce the burden of the work of transporting elevator rail 2. Also, it is possible to further reliably shorten the work time required to transport elevator rail 2.
[0055] Moreover, the lifting machine 7 has an operation unit 73 that can be operated at a position away from the lifting machine main body 72. Moreover, the lifting machine main body 72 operates in response to the operation of the operation unit 73. Therefore, a worker 8 at a landing 4 located outside the hoistway 3 can operate the lifting machine main body 72 in the hoistway 3. This allows the operation of the cart 6 and the lifting machine 7 to be performed by a single worker 8. Therefore, the number of workers 8 required when transporting the elevator rail 2 can be reduced.
[0056] Moreover, in such a member transport method, in the connecting step S2, the connecting shaft 632 is passed through the connecting hole 21 to connect the elevator rail 2 to the base 61 by the connecting shaft 632. This makes it possible to more reliably prevent the elevator rail 2 from falling off the base 61. Also, the elevator rail 2 can be easily raised while the dolly 6 follows the elevator rail 2. Furthermore, the elevator rail 2 can be easily connected to the base 61 by the connecting shaft 632. This reduces the burden of the elevator rail 2 transport work. Also, the work time required to transport the elevator rail 2 can be shortened.
[0057] Furthermore, in the loading step S1, the pedestal 61 is extended, and in the carrying-in step S4, the elevator rail 2 is raised while the pedestal 61 is retracted. Therefore, the pedestal 61 can be retracted while the connecting shaft 632 moves following the elevator rail 2. This prevents the pedestal 61 from getting in the way when the elevator rail 2 is being transported, and the burden of the elevator rail 2 transport operation can be further reliably reduced. Also, the work time required to transport the elevator rail 2 can be further reliably shortened.
[0058] In addition, in a connection step S3, the elevator rail 2 is connected to the lifting machine 7. Furthermore, in a carrying-in step S4, the elevator rail 2 is lifted by the lifting machine 7. Therefore, the elevator rail 2 can be easily raised by the driving force of the lifting machine 7. This makes it possible to further reliably reduce the burden of the work of transporting the elevator rail 2. Also, it is possible to further reliably shorten the work time required to transport the elevator rail 2.
[0059] In the carrying-in process S4, the lifting machine main body 72 is operated by operating the operating unit 73 at the landing 4 located outside the hoistway 3 to lift the elevator rail 2. Therefore, the trolley 6 and the lifting machine 7 can be operated by one worker 8. This makes it possible to reduce the number of workers 8 required when transporting the elevator rail 2.
[0060] In the above embodiment, each slide member 612 has a cylindrical shape. However, the shape of each slide member 612 is not limited to this. For example, each slide member 612 may be a panel having a C-shaped cross section. In this case, each slide member 612 is disposed with the open portion of the cross section of the slide member 612 facing the back side of the base 61.
[0061] In the above embodiment, the base 61 is extendable. However, the base 61 does not have to be extendable. Even in this manner, the elevator rail 2 can be connected to the base 61 by the connecting shaft 632. In this case, by making the length of the base 61 shorter than the length of the elevator rail 2, the carriage 6 can be moved while the connecting shaft 632 follows the elevator rail 2. This makes it possible to more reliably prevent the elevator rail 2 from falling off the base 61.
[0062] In the above embodiment, the member transporting device 1 has a lifting machine 7. However, if the long member carried into the hoistway 3 is not heavy and can be lifted by a worker in the hoistway 3, the lifting machine 7 may not be provided.
[0063] In the above embodiment, the connection step S3 is performed after the loading step S1 and the connecting step S2 and before the carrying-in step S4. However, the connection step S3 may be performed after the loading step S1 and before the connecting step S2.
[0064] In the above embodiment, the member transporting method includes a connecting step S3 for connecting the elevator rail 2 to the lifting machine 7. However, if the long member to be brought into the hoistway 3 is not heavy, the long member can be lifted by a worker in the hoistway 3, and therefore the connecting step S3 does not need to be performed.
[0065] In the above embodiment, the mounting portion 63 is provided at the rear end of the base 61. However, the position of the mounting portion 63 relative to the base 61 is not limited thereto. For example, the mounting portion 63 may be provided at the center of the base 61. Even in this case, the base 61 can be extended and retracted to change the distance from the connecting shaft 632 to the front end of the base 61. This prevents the base 61 from getting in the way during the transportation of the elevator rail 2, and reduces the burden of the transportation of the elevator rail 2. In addition, the cart 6 can be stored with the base 61 retracted, and the space required for storing the member transporting device 1 can be saved.
[0066] In the above embodiment, the operation unit 73 is configured to perform wireless communication with the lifting machine body 72. However, this is not limited to this. For example, the operation unit 73 may be connected to the lifting machine body 72 via a cable so that the operation unit 73 performs wired communication with the lifting machine body 72.
[0067] The configurations shown in the above embodiments are examples of the contents of the present disclosure. The embodiments can be combined with other known technologies. A part of the configuration of the embodiments can be omitted or modified without departing from the gist of the present disclosure. [Explanation of symbols]
[0068] 1 component transport device, 2 elevator rail (long component), 6 trolley, 7 lifting machine, 61 base, 63 mounting part, 71 hanging body, 72 lifting machine main body, 73 operation part, 611 loading surface, 631 connecting shaft.
Claims
1. Trolley Equipped with The cart has a base having a loading surface on which a long member is placed, and a mounting portion provided on the base, the mounting portion has a connecting shaft that connects the elongated member to the base, When the long member is connected to the base by the connecting shaft, the connecting shaft is passed through a connecting hole provided in the long member, and the long member is freely rotatable around the connecting shaft in a direction that changes the angle of the long member relative to the loading surface.
2. 2. The member transporting device according to claim 1, wherein the base is extendable and contractable in a direction intersecting the connecting shaft and in a direction along the loading surface.
3. A lifting machine for lifting the long member Equipped with A component transport device as described in claim 1 or claim 2, wherein when the long component is connected to the base by the connecting shaft, the long component rotates around the connecting shaft in the direction in which the long component is raised when the long component is lifted by the lifting machine.
4. The lifting machine includes a suspending body for suspending the long member, a lifting machine main body for moving the suspending body in the vertical direction, and an operating unit that can be operated at a position away from the lifting machine main body, The member transporting device according to claim 3 , wherein the lifting machine body operates in response to operation of the operating unit.
5. A loading process of placing the long member on a loading surface formed on a base of the dolly; a connecting step of connecting the elongated member to the base by passing a connecting shaft through a connecting hole provided in the elongated member after the loading step; a carrying-in process of carrying the long member into a space at a transport destination while standing up the long member from a state where the long member is lying on the loading surface after the loading process and the connecting process; Equipped with In the carrying-in step, the long member is raised while rotating the long member about the connecting shaft in a direction in which the angle of the long member with respect to the loading surface increases.
6. The base is extendable and retractable in a direction intersecting the connecting shaft and in a direction along the loading surface, In the loading step, the base is extended, The member transport method according to claim 5 , wherein in the carrying-in step, the elongated member is raised while the base is being contracted.
7. A connecting step of connecting the long member to a lifting machine Equipped with The connecting step is performed before the carrying-in step, 7. The member transporting method according to claim 5, wherein in the carrying-in step, the elongated member is raised by lifting the elongated member with the lifting machine.
8. The lifting machine includes a hanging body that hangs the long member, a lifting machine main body that moves the hanging body in the vertical direction, and an operating unit that operates the lifting machine main body, In the connecting step, the elongated member is connected to the hanging body, The member transporting method according to claim 7 , wherein in the carrying-in step, the lifting machine body is operated to lift the long member by operating the operating part outside the space to which the member is transported.
Citation Information
Patent Citations
A lumber cart align the
JP1983196246U
Carrier
JP1984131368U
Conveying carriage
JP1996216890A
Lifting device for elevator guide rail
JP2004010175A
JP1991056501U