Method for decomposing annual planned power amount curve of stepped hydraulic power plant group

JP2024163989AActive Publication Date: 2024-11-26CHINA YANGTZE POWER
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2024078526
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-14
Filing Date
2024-05-14
Publication Date
2024-11-26
Estimated Expiration
2044-05-14

Smart Images

  • Figure 2024163989000001_ABST
    Figure 2024163989000001_ABST
Patent Text Reader

Abstract

To provide a method for decomposing an annual planned power amount curve of stepped hydroelectric power plant group that can obtain a reasonable power amount decomposition curve for each month of a year for a plurality of power networks of a stepped hydroelectric power plant, can effectively respond to a different peak adjustment demand in various receiving end power networks, and can improve response capability to a load.SOLUTION: In consideration of differentiated load adjustment demand of a plurality of receiving end power networks, a method constructs a peak adjustment reference model of power amount curve decomposition, determines a typical load curve of each receiving end power network in the peak adjustment reference model, and using a big-M method, introduces 0 to 1 variables bsc,d,k,m, a large number M, and two continuous variables xsc,d,k,m, osc,d,k,m. Then, a mathematical description of positive and negative deviations is abstracted into a general rule of power market contractual issues, and obtained using a mixed integer programming model.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical Field]

[0001] The present invention relates to the field of scheduling of hydroelectric power generation systems, and more particularly to a method for decomposing annual planned power curves of stepped hydroelectric power plants. [Background technology]

[0002] Many of the large hydropower plants in southwest China are responsible for cross-provincial and cross-regional power transmission. Under the current electricity market reform, they typically involve trading and fulfilling energy demands across multiple destination markets and multiple time scales, making scheduling more complex. Due to the large scale of energy demand, the current electricity demands of large hydropower plants are primarily planned, and any increase in power generation requires participation in regular electricity market trading. Under these circumstances, how to decompose and execute planned energy demands has a significant impact on the operation of the entire plant and the destination power grid, making it particularly important to rationally arrange the execution curve for planned energy demands.

[0003] Regarding the annual energy planning curve decomposition problem, it is necessary to determine how to accurately allocate the planned energy among power plants and each month around October each year. It is also necessary to establish decomposition criteria for typical curves for each month for each transmission province and to determine typical energy curves for each power plant and province based on certain criteria. After the market is liberalized, market-regulated energy must be reasonably allocated among provinces and months based on different provincial market conditions. This problem simultaneously takes into account various scheduling and operation constraints of hydropower plants, reservoirs, and the power grid. These include hydropower constraints such as water balance equations, reservoir water level limits, outflow limits, and generation flow limits; output constraints such as output limits, energy balance limits, and power balance limits; and system constraints such as inter-provincial transmission proportionality and different load demands. This is a highly complex optimization problem with high-dimensional, nonlinear, and multi-time coupled constraints. Most current power decomposition and contract fulfillment problems focus on the execution progress of contracted power or power generation revenue, with little consideration given to the peak adjustment demand of the power grid. How to consider the peak adjustment demand of multiple receiving power grids and how to efficiently solve complex models are facing major challenges. Summary of the Invention

[0004] To solve the above technical problems, the present invention provides a method for decomposing the annual planned power curve of a tiered hydropower station group, and determines the power curve decomposition results between multiple power grids and multiple items of the tiered hydropower station group. This method can obtain reasonable monthly power decomposition curves for the tiered hydropower station to multiple power grids in the year, and can effectively respond to different peak regulation demands in various receiving power grids, thereby improving the tiered hydropower system's ability to respond to different loads in the receiving power grids.

[0005] The technical solutions adopted by the present invention are as follows: A method for decomposing an annual planned power curve of a stepped hydropower plant group, comprising the following steps:

[0006] JPEG2024163989000002.jpg62170JPEG2024163989000003.jpg47170

[0007] JPEG2024163989000004.jpg143170

[0008] Step 3: Solve the peak regulation reference model to obtain the decomposition curve of the annual planned power amount. Using the big-M method, the 0-1 variable b sc,d,k,m , a large number M, and two continuous variables x sc,d,k,m , o sc,d,k,m The mathematical explanation of the positive and negative deviations is then abstracted into the general rules of the electricity market contract performance problem, and is obtained using a mixed integer programming model, as follows: JPEG2024163989000005.jpg32170pcl sc,d,k,m pcl sc,d,k,m This indicates that the planned energy amount for SC scene d power plant k province m month is a negative deviation. sc,d,k,m , o sc,d,k,m represent two continuous variables respectively. sc,d,k,m This shows the SC scene D power plant K province M month plan. PCU sc,d,k,m indicates the planned power amount positive deviation of SC scene D power plant k province m month. d,k,m indicates the planned power distribution amount for power plant d, province k, and month m. M is the number of power plants.

[0009] The method for proportionately distributing load in the AGC control policy of the present invention has the following technical effects: 1) The present invention can obtain a reasonable decomposition curve of the annual and monthly power consumption of a stepped hydropower station to multiple power grids, and can respond to different peak regulation demands in various receiving power grids. 2) Compared with the conventional methods that focus on the power execution progress or power generation profit of a single power grid, the method of the present invention can simultaneously adapt to the actual situation in which a cascaded hydropower station transmits power to multiple power grids, and by establishing peak adjustment standards that adapt to multiple power grids, it can balance the different load adjustment needs of each power grid. 3) The present invention provides a method for extracting typical load curves that are suitable for different power grids, and can quickly generate typical load curve processes for each power grid based on historical load data. 4) This invention combines the big-M method and the variable equivalent transformation policy to convert the original nonlinear model into a mixed integer programming model, thereby realizing efficient solution of the model, thereby obtaining a reasonable monthly power decomposition curve of a stepped hydropower station to multiple power grids in the year, and effectively responding to different peak adjustment demands in various receiving power grids. [Brief explanation of the drawings]

[0010] [Figure 1] FIG. 1 shows the overall solution framework of the method according to the invention. [Figure 2] This figure shows the results of independent peak regulation of the stepped hydropower station on the Guangdong power grid. [Figure 3] 1 is a diagram showing the results of peak adjustment by a stepped hydropower station on the shared information of the Guangdong power grid. DETAILED DESCRIPTION OF THE INVENTION

[0011] This is a method for decomposing the annual planned power curve of a tiered hydropower station group. The present invention mainly addresses the problem of decomposing the annual planned power curve by establishing a peak-adjustment model for multiple receiving power grids and taking into account hydraulic constraints, power constraints, and system operation constraints to obtain a reasonable monthly typical day power generation curve for a tiered hydropower station. The technical solution is as follows: It considers the differentiated load adjustment needs of multiple receiving power grids and establishes multiple power grid peak-adjustment standards. It provides a method for extracting typical load curves that adapt to different power grids, and generates a typical load curve process for each grid based on historical load data. It combines the big-M method with a variable equivalent transformation policy to convert the original nonlinear model into a mixed integer programming model, achieving efficient model solution.

[0012] JPEG2024163989000006.jpg65170In formula, C d,k,m is the peak load adjustment coefficient for power plant d, province k, and month m. d,k,m is the maximum residual load for power plant d, province k, and month m. d,k,m is the minimum residual load value for power plant d, province k, and month m. d is the power plant number. k is the province number. m is the month number. D is the number of power plants. K d is the number of provinces to which power plant d supplies electricity. M is the number of months. JPEG2024163989000007.jpg68170

[0013] JPEG2024163989000008.jpg174170JPEG2024163989000009.jpg36170

[0014] JPEG2024163989000010.jpg89170

[0015] JPEG2024163989000011.jpg64170

[0016] (2): The second part determines the typical load curve of each receiving end power grid in the peak regulation reference model, and includes the following steps: Step (1): Select the daily load data of a certain month of a certain power grid, transmit the data to a computer, extract the daily load characteristic parameters by computer Java language, perform statistical calculations, and obtain the daily load characteristic index vector C t =[C t1 ,C t2 ,C t3 ,C t4 ,C t5 ] where C t1 ,C t2 ,C t3 ,C t4 ,C t5 respectively represent the daily load factor, peak-to-bottom ratio, peak load factor, flat load factor, and bottom load factor on day t. Step (2): Perform density function fitting for each load characteristic index vector using kernel density estimation, transfer the index results in (1) to a computer, and use the gaussian_kde function in the scipy.stats module of the Python language to estimate the probability density function, thereby obtaining a typical day load characteristic index vector CTP = [CTP1,CTP2,CTP3,CTP4,CTP5], where CTP1,CTP2,CTP3,CTP4,CTP5 represent the daily load factor, daily peak-to-bottom ratio, peak load factor, flat load factor, and bottom load factor of a typical day, respectively. JPEG2024163989000012.jpg108170

[0017] (3): The third part solves the peak regulation reference model to obtain the decomposition curve of the annual planned power amount. Using the big-M method, the 0-1 variable b sc,d,k,m , a large number M, and two continuous variables x sc,d,k,m , o sc,d,k,m The mathematical explanation of the positive and negative deviations is then abstracted into the general rules of the electricity market contract performance problem, and a mixed integer programming model is used to model it. The model is modeled using the computer language Python, the Pyomo modeling tool, and solved using Gurobi. The specifics are as follows: JPEG2024163989000013.jpg31170pcl sc,d,k,m pcl sc,d,k,m This indicates that the planned energy amount for SC scene d power plant k province m month is a negative deviation. sc,d,k,m , o sc,d,k,m represent two continuous variables, respectively. sc,d,k,m This shows the SC scene D power plant K province M month plan. PCU sc,d,k,m indicates the planned power amount positive deviation of SC scene D power plant K province M month. d,k,m indicates the planned power distribution amount for power plant d, province k, and month m. M is the number of power plants. [Example]

[0018] The study focused on the Wudongde, Baihetan, Xiluodu, and Xiangjiayan hydropower stations downstream of the Jinsha River. Their installed capacities are 10,200 MW, 16,000 MW, 12,600 MW, and 6,000 MW, respectively. They are the "mainstay" of China's "West-to-East Power Transmission" initiative, covering seven provinces (cities) including Guangdong, Guangxi, Yunnan, Jiangsu, Zhejiang, Sichuan, and Shanghai. Among these, the Xiluodu hydropower station features two reservoirs, two factories, and two power grid system scheduling. The transmission ratios differ during flood and dry periods, resulting in a highly complex scheduling relationship. The planned power allocation ratios among multiple provincial-level power grids are shown in Table 1.

[0019] [Table 1]

[0020] The method of the present invention is used to decompose the annual planned power curve of the stepped hydropower station group in the downstream of the Jinsha River, and first determine the typical load. Step 2 of the present invention can be used to extract 84 typical loads for each receiving province and each month of the stepped hydropower station in the downstream of the Jinsha River, thereby constructing a peak adjustment model targeting the peak standard in step 1.

[0021] Table 2, Figures 2, and 3 provide some calculation results. The peak-to-peak load ratios for Guangdong and Sichuan in January were 25.6% and 23.7%, respectively. After calculating the peak load ratios by sharing the peak load information target, the peak load ratios for Guangdong and Sichuan were 12.3% and 15.6%. After each power plant's independent peak load calculation, the peak load ratios for Guangdong and Sichuan were 16.3% and 21.9%. In a situation where different cascaded hydropower plants supply power to the same province (Wudongde and Xiluodu Right Bank both supply power to Guangdong, while Baihetan, Xiluodu Left Bank, and Xiangjiayan all supply power to Sichuan), the peak load ratio achieved by using shared peak load information is significantly better than the peak load ratio achieved by each power plant independently. Based on the calculation results, the method proposed in this invention effectively accounts for the different peak load ratio demands of different provinces, such as Guangdong and Sichuan.

[0022] [Table 2-1]

[0023] [Table 2-2]

[0024] [Table 2-3]

Claims

【Request 1】 【Request 2】 【Request 3】

Citation Information

Patent Citations

  • Potential output calculating apparatus, method and computer program

    JP2006260004A

  • Power generation pattern generation device and power generation pattern generation program

    JP2020014262A

  • A practical short-term scheduling method for large-scale hydroelectric power plants

    JP2020517227A