Blast furnace operation method
Patent Information
- Application Number
- JP2023080566
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-16
- Publication Date
- 2024-11-28
AI Technical Summary
【0009】 本発明の上記観点によれば、高炉の出銑量を長期にわたって高位安定化させることが可能となる。例えば、後述する実施例に示される通り、顕著な出銑量の低下(1日当たりの出銑量が平均値の3%以上少ない)を1カ月で1度も発生させず、出銑量を安定化させることができる。
Smart Images

Figure 2024164880000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a method for operating a blast furnace. [Background technology]
[0002] In the steel industry, the blast furnace process is the mainstream of pig iron manufacturing processes. In the blast furnace process, ferrous raw materials for the blast furnace (raw materials containing iron oxide, mainly sintered ore, lump ore, and pellets, hereinafter also simply referred to as "ferrous raw materials") and main reducing materials (lump coke) are charged alternately and in layers into the blast furnace from the top of the blast furnace, while hot air is blown into the blast furnace from the tuyeres at the bottom of the blast furnace. The hot air reacts with the auxiliary reducing material (typically pulverized coal, but flammable gases such as LNG and COG, and recycled materials such as waste plastics may also be used as auxiliary reducing materials) blown in together with the hot air, and with the main reducing material in the blast furnace, generating high-temperature reducing gas (mainly CO gas in this case). That is, the hot air gasifies the main reducing material and the auxiliary reducing material. The reducing gas rises in the blast furnace, reducing the ferrous raw materials while heating them. The ferrous raw materials descend in the blast furnace, while being heated and reduced by the reducing gas. The ferrous raw materials then soften and melt in the cohesive zone, dripping down inside the blast furnace while being further reduced by the coke. The ferrous raw materials are ultimately stored at the bottom of the furnace as molten pig iron (pig iron) containing just under 5% carbon by mass. The molten pig iron at the bottom of the furnace is removed from the tap hole and sent to the next steelmaking process. It is believed that by stabilizing the reduction reaction of the ferrous raw materials as described above, the blast furnace can maintain a high and stable (with little variation) pig iron output over the long term. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2000-129319 A [Patent Document 2] Japanese Patent Application Publication No. 62-010203 Summary of the Invention [Problem to be solved by the invention]
[0004] Therefore, stabilizing the productivity of a blast furnace over the long term is one of the important issues in blast furnace operation. Conventionally, in order to stabilize the reduction reaction of iron-based raw materials, the furnace heat in the blast furnace and the supply amounts of iron-based raw materials and main reducing materials supplied from the top of the blast furnace have been controlled.
[0005] For example, Patent Documents 1 and 2 disclose techniques aimed at stabilizing the amount of iron produced from a blast furnace for a long period of time. Specifically, Patent Document 1 discloses a technique for controlling furnace heat in a blast furnace related to a reduction reaction. In the technique disclosed in Patent Document 1, the molten iron temperature or the Si concentration in the molten iron is used as an index of the furnace heat level, and the blast temperature is changed to control the furnace heat to a target value. Patent Document 2 discloses a technique for controlling the supply amount (downloading speed) of iron-based raw materials and main reducing material from the furnace top related to a reduction reaction. In the technique disclosed in Patent Document 2, the amount of CO2 generated as a result of the reduction reaction is used to change the blast conditions to control the supply amount to a target value.
[0006] According to the techniques disclosed in Patent Documents 1 and 2, a reasonable effect is expected, but there is room for improvement in terms of long-term stabilization of the iron production rate of a blast furnace.
[0007] The present invention has been made in consideration of the above problems, and an object of the present invention is to provide a new and improved method for operating a blast furnace, which makes it possible to stabilize the iron production rate of the blast furnace at a high level for a long period of time. [Means for solving the problem]
[0008] The gist of the present invention is as follows. (1) a furnace heat operation for changing at least one set value selected from the group consisting of an auxiliary reducing agent ratio, a blast humidity, and a blast temperature by a change amount of 0.1% or more of the set value up to a change time; A method for operating a blast furnace, comprising: a lowering speed operation for changing at least one set value selected from a blast flow rate and an oxygen enrichment amount by an amount of change of 0.1% or more of the set value up to the change time; and A method for operating a blast furnace, comprising the steps of: carrying out simultaneous operations in which the time difference between the change time of the furnace heat operation and the change time of the lowering speed operation is X minutes; and carrying out frequent operations in which the time difference between the end time of one simultaneous operation and the end time of the next simultaneous operation after the one simultaneous operation is within Y minutes, said operations being carried out continuously for 20 hours or more per day, wherein X and Y satisfy 0≦X≦24, X×Y≦600, Y≦60, X≦Y, and further wherein the difference between the maximum and minimum actual values of the main reducing agent rate (kg / t-pig) during any 20-hour period is 50 (kg / t-pig) or less. (2) When the auxiliary reducing agent ratio is changed as the furnace heat operation, the change amount is set to 3 to 45 Mcal / t-pig per furnace heat operation, When the blast moisture is changed as the furnace heat operation, the change amount is 1 to 12 g / Nm3 per furnace heat operation. 3 year, When the blowing air temperature is changed as the furnace heating operation, the change amount is set to 5 to 60° C. per furnace heating operation, When the air flow rate is changed as the lowering speed operation, the change amount is set to 5 to 100 Nm per lowering speed operation. 3 / min, When the oxygen enrichment amount is changed as the lowering speed operation, the change amount is set to 60 to 1300 Nm3 per lowering speed operation. 3 / Hr. Effect of the Invention
[0009] According to the above-mentioned aspects of the present invention, it is possible to stabilize the pig iron production rate of a blast furnace at a high level for a long period of time. For example, as shown in the examples described later, it is possible to stabilize the pig iron production rate without a significant decrease in the pig iron production rate (a daily pig iron production rate that is 3% or more lower than the average) occurring even once in a month. [Brief description of the drawings]
[0010] [Figure 1] FIG. 1 is an explanatory diagram illustrating a schematic view of a change in ventilation route due to a change in the height of the cohesive zone. [Diagram 2] FIG. 2 is an explanatory diagram illustrating a state of fluctuation in the height of the cohesive zone and suppression of the fluctuation. [Diagram 3] FIG. 10 is an explanatory diagram illustrating a change in ventilation conditions due to an operation for suppressing fluctuations in the height of the cohesive zone. [Figure 4] FIG. 10 is an explanatory diagram showing a schematic diagram of changes in ventilation conditions when furnace heat operation and lowering speed operation are performed simultaneously. [Diagram 5] FIG. 11 is an explanatory diagram illustrating a change in the ventilation state when the difference between the maximum and minimum actual values of the main reducing agent rate is changed beyond 50 kg / t-pig. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] A preferred embodiment of the present invention will be described in detail below with reference to the accompanying drawings. In this embodiment, a numerical range expressed using "to" means a range including the numerical values before and after "to" as the lower and upper limits. In addition, the definitions of each term in this embodiment are as follows.
[0012] The blast flow rate is the flow rate per unit time of the blast air blown into the blast furnace from the tuyere (unit: Nm 3 The oxygen enrichment rate is the flow rate per unit time (unit: Nm3) of the blast oxygen (excluding oxygen in the air) blown into the blast furnace from the tuyere. 3 / hr). Auxiliary reducing agents refer to pulverized coal, fine coke, waste plastics, blast furnace gas, coke oven gas, natural gas, hydrogen gas, or modified substances of these, either alone or mixed, which are injected into the blast furnace from the tuyere, and the auxiliary reducing agent ratio refers to the calorific value (unit: Mcal / t-pig) of the auxiliary reducing agent injected per ton of molten iron produced. The reducing agent ratio refers to the main reducing agent ratio plus the auxiliary reducing agent ratio (unit: Mcal / t-pig). Main reducing agents refer to lump coke and small coke, which are mainly charged from the top of the blast furnace, and the main reducing agent ratio refers to the amount of main reducing agent charged per ton of molten iron produced (unit: kg / t-pig) or the calorific value (unit: Mcal / t-pig) of the main reducing agent charged per ton of molten iron produced. The blast moisture is 1 Nm of hot air (a mixture of blast air and blast oxygen) blown into the blast furnace from the tuyere. 3 The amount of steam contained per unit (unit: g / Nm 3 The blowing air temperature refers to the temperature of the hot air (unit: °C).
[0013] <1. Findings by the Inventor> (1-1-1. Blast furnace operation modes) First, the findings of the present inventors that form the basis of this embodiment will be described. In the blast furnace method, iron-based raw materials for the blast furnace (raw materials containing iron oxide, mainly sintered ore, lump ore, and pellets, hereinafter also simply referred to as "iron-based raw materials") and a main reducing material (mainly lump coke, hereinafter also simply referred to as "coke") are charged alternately and in layers into the blast furnace from the top of the blast furnace, while hot air is blown into the blast furnace from a tuyere at the bottom of the blast furnace.
[0014] The temperature of the coke and iron-based raw materials (hereinafter collectively referred to as "blast furnace charge") charged into a blast furnace is lowest at the top layer of the charge, rises toward the bottom of the blast furnace, and is highest at the hearth, which is the lowest height. The temperature of the blast furnace charge at the hearth is generally about 1550°C. Note that near the tuyere that supplies hot air into the blast furnace, the temperature of the blast furnace charge is slightly higher than the temperature at the hearth.
[0015] Here, the blast furnace charge is consumed as pig iron is produced in the lower part of the blast furnace, so the blast furnace charge charged from the top of the furnace descends to the lower part of the blast furnace as it is consumed (this descent of the blast furnace charge is also called "loading down"). As the blast furnace charge descends, its temperature rises.
[0016] The iron-based raw materials start to soften at a certain height in the blast furnace and complete melting. The temperature range of the blast furnace charge at this time is, for example, 1100 to 1400 ° C, and such a temperature range is generally called the cohesive zone. Above the cohesive zone, unmelted coke particles and unmelted iron-based raw material particles are alternately stacked. On the other hand, below the cohesive zone, unmelted coke particles and molten iron-based raw materials exist, and it is thought that the molten iron-based raw materials drip toward the lower part of the blast furnace while being reduced through the gaps in the packed layer of coke particles (i.e., the coke layer).
[0017] Fig. 1 is an explanatory diagram showing the variation of the ventilation route due to the variation of the cohesive zone height. Fig. 1(a) shows the distribution of the ventilation route and the cohesive zone when neither the furnace heat operation nor the downloading speed operation described later is performed, and Fig. 1(b) shows the distribution of the ventilation route and the cohesive zone when the downloading speed operation to raise the cohesive zone is performed.
[0018] In Figure 1, the iron-based raw material portion of the blast furnace charge that constitutes the cohesive zone, from the beginning of softening to the completion of melting, is shown in black (the black portion is also called the cohesive layer). The coke layer is not colored. The cohesive zone has an inverted V-shape in a cross section parallel to the height direction of the blast furnace. Figures 1(a) and (b) also show that the distribution of the cohesive zone changes depending on the lowering speed control, and the ventilation route changes accordingly.
[0019] Hot air is blown into the blast furnace from tuyere located below the cohesive zone. In the area below the cohesive zone, the hot air flows through the gaps in the coke layer (gaps between coke particles). In the cohesive zone, the iron-based raw materials form a cohesive layer, so most of the hot air flows only through the coke layer between the coke layers. In the area above the cohesive zone, the hot air flows through the gaps between the coke particles and the iron ore particles.
[0020] If the location where the hot air flows (ventilation route) is stable and without bias within the blast furnace, the reduction reaction of the iron ore will occur steadily and continuously, and it is thought that the amount of pig iron produced (pig iron production) will remain stable at a high level over the long term (stable at a high value).
[0021] However, if the ventilation route becomes unstable, such as being biased to a certain part of the blast furnace, when focusing on a certain part of the blast furnace, the reduction reaction of the iron-based raw materials at that part will proceed intermittently. For example, it may happen that at a certain time, the reduction reaction proceeds because hot air flows through that part, but at other times, the reduction reaction does not proceed because hot air does not flow through that part. Furthermore, the location where the reduction reaction occurs will also be biased. This is thought to lead to a problem in which the amount of pig iron produced decreases suddenly.
[0022] Here, the cohesive zone, which is the region where the ferrous raw materials start to soften and complete melting, is constantly supplied with ferrous raw material particles and coke particles from above the cohesive zone, and the coke particles and molten ferrous raw materials are discharged below the cohesive zone. For this reason, the cohesive zone rises or falls in the blast furnace height direction, for example, depending on the amount of heat in the region below the cohesive zone. In other words, the cohesive zone always has a tendency to rise or fall.
[0023] It is known that such a cohesive zone is one of the main sites of reduction reaction of ferrous materials. Therefore, it is important to maintain a stable reduction reaction between ferrous materials and hot blast in the cohesive zone for the long-term high stabilization of pig iron production.
[0024] However, as mentioned above, the cohesive zone has a tendency to move up and down due to factors such as the amount of heat in the area below it. Due to this movement, the cohesive zone is prone to instability, such as a bias in the ventilation route that is concentrated in the coke layer part of the cohesive zone. Therefore, if the vertical movement of the cohesive zone cannot be suppressed, the amount of hot metal produced may decrease rapidly.
[0025] (1-1-2. Height of the cohesive zone) Regarding the shape of the cohesive zone (the shape in the cross section parallel to the height direction of the blast furnace), various prior arts have been proposed, such as an inverted V shape, a W shape, etc. Regardless of the shape of the cohesive zone, depending on the fluctuation of the height position of the cohesive zone (although it is considered that the shaped characteristics of an inverted V shape and a W shape will not change), it may cause a large fluctuation in the ventilation route, which may lead to a malfunction of the reduction reaction.
[0026] The height position of the cohesive zone is determined by the balance between the heat supply to the cohesive zone from below the cohesive zone, e.g., furnace heat, and the heat removal from the cohesive zone to the upper part of the blast furnace, e.g., the lowering speed, which is an index for the supply of heat removal material (i.e., blast furnace charge material) to the cohesive zone, so the height position of the cohesive zone can be controlled by controlling the furnace heat or the lowering speed. In the above-mentioned Patent Document 1, the furnace heat is controlled, and in Patent Document 2, the lowering speed is controlled.
[0027] Here, the cohesive zone can be raised or lowered by either controlling the furnace heat, i.e., furnace heat operation, or controlling the downloading speed, i.e., downloading speed operation. For example, when an operation to increase the auxiliary reducing agent ratio is performed as the furnace heat operation, the cohesive zone rises. Also, when the blast flow rate is increased as the downloading speed operation, the cohesive zone falls. Therefore, in the following description, of the furnace heat operation and the downloading speed operation, the operation to raise the cohesive zone is also referred to as a cohesive zone raising operation, and the operation to lower the cohesive zone is also referred to as a cohesive zone lowering operation. Also, the furnace heat operation and the downloading speed operation are collectively referred to as a cohesive zone moving operation.
[0028] As mentioned above, the height of the cohesive zone always tends to rise or fall. Therefore, by performing regular cohesive zone movement operations to return the cohesive zone to its original position (moving it to its original position) as shown in Figure 2, fluctuations in the height of the cohesive zone can be suppressed and the reduction reaction can be carried out stably. As a result, it becomes possible to stabilize the high level of iron production over the long term.
[0029] FIG. 2 is an explanatory diagram showing the fluctuation of the cohesive zone height and the suppression of the fluctuation. Assume that the height position of the cohesive zone shown in FIG. 2(a) drops to the height position shown in FIG. 2(b) after N hours (for example, 1 hour). In this case, the coke layer portion of the cohesive zone that is permeable decreases from 6 stages to 5 stages. With this decrease, the amount of hot air passing through the coke layer portion in the cohesive zone fluctuates. If the cohesive zone is raised at this point, the cohesive zone height position at (b) returns to the position at (a). If another N hours have passed without the cohesive zone raising operation at the point at (b), the cohesive zone height position further drops to, for example, the position at (c). In this case, the coke layer portion of the cohesive zone that is permeable has two stages.
[0030] As described above, it can be seen that the ventilation state in the cohesive zone (the number of stages of coke layers that can be ventilated) fluctuates depending on the fluctuation of the height position of the cohesive zone. If it is desired to return the height position from that of Figure 2(b) to that of Figure 2(a), it is sufficient to perform the cohesive zone raising operation one stage, but if it is desired to return the height position from that of Figure 2(c) to that of Figure 2(a), it is necessary to perform the cohesive zone raising operation four stages. As will be described in detail later, if the cohesive zone raising operation (operation to suppress fluctuations in the height position of the cohesive zone) is performed at the stage of Figure 2(b), the height position of the cohesive zone can be returned in a short time and the ventilation route is stabilized. As a result, it becomes possible to stabilize the high level of the iron production rate over a long period of time.
[0031] The method of estimating the height position of the cohesive zone is described, for example, in Japanese Patent Publication No. 63-61367 and in Tajima et al., Tetsu-to-Haganen, 68 (1982), p. 2287.
[0032] (1-2. Problems with the prior art and overview of the present invention) (1-2-1. Regarding the prior art) The techniques disclosed in Patent Documents 1 and 2 are techniques for controlling the furnace heat or raw material supply amount required to realize a stable reduction reaction, and are considered to be quite effective in preventing a sudden drop in pig iron production rate by suppressing fluctuations in the height position of the cohesive zone and, in turn, suppressing fluctuations in the ventilation route in the cohesive zone. However, it is not possible to stabilize the pig iron production rate at a high level for a long period of time. Before examining the reason for this, the techniques disclosed in Patent Documents 1 and 2 will be outlined.
[0033] In the technology disclosed in Patent Document 1, the hot air blast temperature is changed in order to set the furnace heat (molten iron temperature) to a target value. When the blast temperature is changed to a higher temperature, the cohesive zone moves further upward from the position where the cohesive zone was before the change as the blast temperature increases.
[0034] In the technology disclosed in Patent Document 2, the hot air blast flow rate, which is one of the hot air blast conditions, is changed in order to set the lowering speed to a target value. When the blast flow rate is reduced, the consumption rate of the main reducing material below the cohesive zone decreases, and the lowering speed decreases (i.e., the amount of heat removed upward from the cohesive zone decreases). For this reason, as the blast flow rate is reduced, the cohesive zone moves further upward than the position where the cohesive zone was before the change.
[0035] As described above, the height position of the cohesive zone can be corrected by changing only one of the furnace heat and the downloading speed, as in the techniques disclosed in Patent Documents 1 and 2. By correcting the height position of the cohesive zone, fluctuations in the height position of the cohesive zone can be suppressed, and fluctuations in the ventilation route due to fluctuations in the height position of the cohesive zone can be suppressed. Note that the furnace heat manipulation referred to here includes changes in the auxiliary reducing agent ratio, blast temperature, blast moisture, etc., and the downloading speed manipulation includes changes in the blast flow rate, oxygen enrichment amount, etc.
[0036] However, as in the techniques disclosed in Patent Documents 1 and 2, simply changing either the furnace heat or the lowering speed caused the reduction reaction to malfunction with a certain probability, although the frequency was low, and it was not possible to stabilize the iron production rate at a high level over the long term.
[0037] Although the details will be described later, when only one of the furnace heat and the downgoing speed is changed as in the techniques disclosed in Patent Documents 1 and 2, the operation amount of the furnace heat operation and the downgoing speed operation becomes excessive. On the other hand, the furnace heat operation (changing the blast temperature, etc.) and the downgoing speed operation (changing the blast flow rate, etc.) for suppressing the fluctuation of the height position of the cohesive zone are themselves factors that cause the ventilation route to fluctuate. For this reason, the present inventor presumed that the operation amount of the furnace heat operation and the downgoing speed operation becomes excessive in the techniques disclosed in Patent Documents 1 and 2, and these operations cause the ventilation route to fluctuate. The present inventor then considered that such fluctuation of the ventilation route made it impossible to achieve high stabilization of the pig iron production rate over a long period of time.
[0038] (1-2-2. Issues with the conventional technology) As described above, even if an attempt was made to suppress fluctuations in the height position of the cohesive zone and to suppress fluctuations in the ventilation route in the cohesive zone by changing only one of the furnace heat and the lowering speed, it was not possible to stabilize the iron production rate at a high level over the long term.
[0039] Here, the operation of suppressing the fluctuation of the height position of the cohesive zone means the operation (control) of moving the cohesive zone, whose height position has been moved, back to its original position. However, in the techniques disclosed in Patent Documents 1 and 2, it is considered that a significant fluctuation occurs in the ventilation route in the coke layer when the cohesive zone is moved to its original position.
[0040] When the furnace heat is controlled by increasing the blast temperature or when the lowering speed is controlled by decreasing the blast flow rate, the cohesive zone moves upward. In this case, when the blast temperature is increased, the particle size of the coke particles decreases, and when the blast flow rate is decreased, the bulk density of the coke particles increases.
[0041] Fig. 3 is an explanatory diagram showing a schematic diagram of the change in the ventilation condition due to the operation of suppressing the fluctuation of the cohesive zone height. When the particle size or bulk density of the coke particles changes significantly, the ventilation route of the gas flowing through the coke layer changes (for example, from (1) to (2) in Fig. 3, or from (1) to (3)). As a result, the amount of hot air flowing through the boundary between the iron-based raw material layer and the coke layer in the cohesive zone fluctuates, making the reduction reaction unstable.
[0042] As disclosed in Patent Documents 1 and 2, the inventors considered that when attempting to suppress fluctuations in the height position of the cohesive zone by changing only one of the furnace heat and the lowering speed, the amount of operation of the furnace heat and the lowering speed would increase, resulting in a large change in the particle size or bulk density of the coke particles, and causing fluctuations in the ventilation route.
[0043] In the techniques disclosed in Patent Documents 1 and 2, the reason why the furnace heat operation and the lowering speed operation tend to become large is as follows: When the furnace heat or the lowering speed fluctuates in a blast furnace, the reduction reaction state fluctuates, which induces further fluctuations in the lowering speed or furnace heat.
[0044] Specifically, if the furnace heat decreases, it is considered that the proportion of direct reduction (the proportion of direct reduction in the reduction reaction of iron-based raw materials) has increased. This is because the direct reduction reaction is an endothermic reaction. In the direct reduction reaction, as shown in the following chemical formula, the amount of pig iron produced per unit mole of reducing material is large. FeO+C→Fe+CO -37880kcal / mol Therefore, an increase in the proportion of direct reduction leads to an increase in the subsequent lowering speed. Furthermore, when the lowering speed increases, the iron-based raw materials are lowered to the bottom of the furnace without being sufficiently reduced, leading to an increase in direct reduction. This is likely to result in a decrease in furnace heat afterwards. On the other hand, when the furnace heat increases, it is believed that the proportion of indirect reduction has increased. This is because the indirect reduction reaction is an exothermic reaction. As shown in the following chemical formula, in the indirect reduction reaction, the amount of pig iron produced per unit mole of reducing material is lower than in the direct reduction reaction. FeO+4CO→Fe+3CO+CO2+3340kcal / mol Therefore, the increase in the proportion of indirect reduction leads to a decrease in the lowering speed. If the lowering speed decreases, the iron-based raw materials are lowered to the bottom of the furnace after being sufficiently reduced by indirect reduction. In other words, the proportion of indirect reduction increases and the proportion of direct reduction decreases. This can easily lead to an increase in furnace heat.
[0045] As a result, if the furnace heat decreases, the subsequent increase in the lowering speed will cause a further decrease in the furnace heat, and if the lowering speed increases, the subsequent decrease in the furnace heat will cause a further increase in the lowering speed. Similarly, if the furnace heat increases, the subsequent decrease in the lowering speed will cause a further increase in the furnace heat, and if the lowering speed decreases, the subsequent increase in the furnace heat will cause a further decrease in the lowering speed (these are collectively called secondary effects). In addition, because this secondary effect is a chain reaction, the fluctuation of the cohesive zone due to the secondary effect, for example the decrease, may increase over time.
[0046] For this reason, for example, when the furnace heat is decreased as in Patent Document 1, only furnace heat operation (e.g., increasing the blast temperature) is performed, or when the lowering speed is increased as in Patent Document 2, only lowering speed operation (e.g., decreasing the blast flow rate) is performed to suppress fluctuations in the height position of the cohesive zone. In the former case, a large amount of furnace heat operation is required to take into account the subsequent decrease in furnace heat, while in the latter case, a large amount of lowering speed operation is required to take into account the subsequent increase in the lowering speed.
[0047] Such a large amount of operation can cause a large change in the particle size or bulk density of the coke particles, resulting in a change in the ventilation route. Such a change in the ventilation route causes a change in the amount of hot blast air flowing through the boundary between the iron-based raw material layer and the coke layer in the cohesive zone, destabilizing the reduction reaction. As a result, it is considered that the techniques disclosed in Patent Documents 1 and 2 cannot achieve a high and stable long-term iron production rate.
[0048] Therefore, the inventors thought that the problems of the conventional technology could be solved by performing an operation capable of reducing the above-mentioned secondary effects and suppressing the fluctuation of the ventilation route, i.e., a cohesive zone movement operation that minimizes the changes in both the particle size and bulk density of the coke. Based on this knowledge, the inventors arrived at the present invention.
[0049] <2. Configuration of the present invention> The method of operating a blast furnace according to the present invention is as follows. That is, the method of operating a blast furnace according to the present invention is a method of operating a blast furnace that performs both a furnace heat operation in which at least one set value selected from the group consisting of an auxiliary reducing agent ratio, blast moisture, and blast temperature is changed by an amount of change of 0.1% or more of the set value until the change time, and a downloading speed operation in which at least one set value selected from the blast flow rate and the oxygen enrichment amount is changed by an amount of change of 0.1% or more of the set value until the change time. The method of operating a blast furnace according to the present invention further performs simultaneous operations in which the time difference between the change time of the furnace heat operation and the change time of the downloading speed operation is X minutes, and performs frequent operations in which the time difference between the end time of one simultaneous operation and the end time of the next simultaneous operation after the one simultaneous operation is within Y minutes, for 20 hours or more per day. X and Y satisfy 0≦X≦24, X×Y≦600, Y≦60, X≦Y, and further the difference between the maximum and minimum actual values of the main reducing agent rate (kg / t-pig) during any 20-hour period is 50 (kg / t-pig) or less. This makes it possible for the present invention to achieve high and stable iron production over a long period of time. The reason why the present invention adopts such a configuration will be explained below.
[0050] When the blast flow rate or oxygen enrichment rate is reduced as a load lowering speed control, the consumption of the blast furnace charge is suppressed, so the supply of the blast furnace charge (heat extraction material) to the cohesive zone decreases, and the cohesive zone rises. Furthermore, the amount of hot air passing between the coke particles decreases, so the bulk density of the coke particles stacked in the blast furnace (particle stacking state) increases.
[0051] When the blast flow rate or oxygen enrichment rate is increased as a load lowering speed control, the consumption of the blast furnace charge is promoted, so the supply of the blast furnace charge (heat extraction material) to the cohesive zone increases, and the cohesive zone descends. Furthermore, the amount of hot air passing between the coke particles increases, so the bulk density of the coke particles stacked in the blast furnace (particle stacking state) decreases.
[0052] On the other hand, when furnace heat operations are performed, the particle size of the coke particles changes. Specifically, when the auxiliary reducing agent ratio is increased, the cohesive zone rises and the coke particle size increases. When the blast temperature is increased, the cohesive zone rises and the coke particle size decreases. When the blast moisture is increased, the cohesive zone falls and the coke particle size increases (the rate of decrease slows). When the auxiliary reducing agent ratio, blast temperature, or blast moisture is decreased, the opposite phenomenon to the above occurs.
[0053] In the present invention, both the furnace heat operation and the downloading speed operation are performed simultaneously (hereinafter, referred to as "two-way operation"). For example, when the furnace heat decreases (the cohesive zone decreases), in addition to the furnace heat operation to increase the furnace heat (e.g., increase the auxiliary reducing agent ratio), an operation to decrease the downloading speed (e.g., decrease the blast flow rate) is performed. Note that both of these operations are cohesive zone raising operations. This makes it possible to raise the cohesive zone while suppressing the above-mentioned secondary effect (further decrease in furnace heat due to an increase in the downloading speed after the decrease in furnace heat) by the downloading speed operation (i.e., the operation to decrease the downloading speed). In other words, it is possible to suppress the fluctuation of the height position of the cohesive zone. Note that the fluctuation of the furnace heat can be detected, for example, by the temperature and / or composition of the molten pig iron and slag (molten pig iron and molten slag) tapped from the blast furnace.
[0054] Similarly, when the downloading speed increases (the cohesive zone is lowering), a downloading speed operation (e.g., a decrease in the blast flow rate) is performed to decrease the downloading speed, and a furnace heat operation (e.g., an increase in the auxiliary reducing agent ratio) is performed to increase the furnace heat. Note that both of these operations are cohesive zone raising operations. This makes it possible to raise the cohesive zone while suppressing the above-mentioned secondary effect (a further increase in the downloading speed due to a decrease in furnace heat after the increase in the downloading speed) by the furnace heat operation (i.e., an operation to increase the furnace heat). In other words, it is possible to suppress fluctuations in the height position of the cohesive zone. Note that the fluctuations in the downloading speed can be detected, for example, from the change over time in the height of the pile surface of the blast furnace charge in the upper part of the blast furnace.
[0055] Fig. 4 is an explanatory diagram showing the change in ventilation conditions when the furnace heat operation and the lowering speed operation are performed simultaneously. For comparison, Fig. 4 also shows the change in ventilation conditions when only one of the furnace heat operation and the lowering speed operation is performed (a diagram similar to Fig. 3).
[0056] In the present invention, as shown by the change from (1) to (4) in FIG. 4, the furnace heat operation and the downloading speed operation are performed simultaneously to suppress the fluctuation of the height position of the cohesive zone. This makes it possible to reduce the above-mentioned secondary effects compared to the case where only one of the furnace heat operation and the downloading speed operation is performed as in the techniques disclosed in Patent Documents 1 and 2. For example, when the downloading speed increases, a further increase in the downloading speed due to a decrease in furnace heat after the increase in the downloading speed is assumed as a secondary effect. However, in the present invention, in addition to the downloading speed operation to decrease the downloading speed, a furnace heat operation to increase the furnace heat is performed. This makes it possible to suppress the decrease in furnace heat after the increase in the downloading speed, so that a further increase in the downloading speed due to a decrease in furnace heat after the increase in the downloading speed can be suppressed. Therefore, the amount of each operation can be reduced, and thus a large change in the coke particle size and bulk density can be prevented. As a result, a significant fluctuation in the ventilation route due to the operation of suppressing the fluctuation of the height position of the cohesive zone (cohesive zone movement operation) can be suppressed, and thus the reduction reaction can be stabilized. That is, it is possible to stabilize the high level of the pig iron production rate over a long period of time. In this embodiment, "simultaneous operation" refers to a short time difference X between the change time of the furnace heat operation and the change time of the lowering speed operation, and X, which is the degree of shortness, is about 0 to 24 minutes. In addition, as long as the furnace heat operation and the lowering speed operation are performed "simultaneously," the order of the operations is not particularly limited. According to the knowledge of the inventors of the present application, if the time difference X between the change time of the furnace heat operation and the change time of the lowering speed operation is 10 minutes or less, the secondary effects are negligible and small, and if it is greater than that, the larger the value of X, the greater the secondary effects will be. As will be described later, if X is longer than 10 minutes, the time difference Y of the frequent operation is shortened to reduce the secondary effects.
[0057] As described above, the height position of the cohesive zone always tends to rise or fall. Therefore, if the cohesive zone moving operation is not performed for a long period of time, the amount of movement of the cohesive zone increases, and even if the furnace heat operation and the lowering speed operation are performed simultaneously to reduce the secondary effects, the amount of operation of each may increase. If the amount of operation of each increases, the coke particle size and bulk density in the coke layer will vary greatly. That is, the ventilation route will vary greatly. As a result, there is a possibility that the high level of the pig iron production amount cannot be stabilized for a long period of time. Therefore, in the present invention, the frequency of the operation of the cohesive zone moving operation (the cohesive zone moving operation of the simultaneous operation) is increased to reduce the amount of operation of the cohesive zone moving operation per one time. That is, in the present invention, the "frequent operation" is performed so that the time difference Y between the end time of one simultaneous operation and the end time of the next simultaneous operation after the one simultaneous operation is within 60 minutes. This makes it possible to suppress significant fluctuations in the ventilation route, and thus to stabilize the high level of the pig iron production amount for a long period of time.
[0058] As described above, the amount of movement of the cohesive zone height position required to maintain the cohesive zone height position constant increases as the secondary effects increase or as the time elapses since the end of one cohesive zone shifting operation. Therefore, by performing the cohesive zone shifting operation more frequently (i.e., by reducing the time difference Y between the end time of one simultaneous operation and the end time of the simultaneous operation following the one simultaneous operation), the amount of fluctuation in the cohesive zone height position and the secondary effects can be reduced. According to the findings of the present inventors, even if the time difference X between the time when the furnace heat operation is changed and the time when the lowering speed operation is changed becomes longer than 10 minutes (i.e., even if the time since the end of one cohesive zone moving operation becomes longer than 10 minutes), if the relationship of X×Y≦600 can be maintained and the time difference Y between the end time of one simultaneous operation and the end time of the simultaneous operation following the first simultaneous operation can be reduced, the amount of fluctuation in the cohesive zone height position over time and the secondary effects will be reduced even if the secondary effects become somewhat larger, and as a result, the amount of operation required to keep the cohesive zone height constant can be reduced.
[0059] As is clear from the above, by definition, the time difference X between the time when the furnace heat operation is changed and the time when the lowering speed operation is changed is less than or equal to the time difference Y between the end time of one simultaneous operation and the end time of the simultaneous operation following the one simultaneous operation (i.e., X≦Y). Therefore, since X must satisfy X≦Y and X×Y≦600, the upper limit of X is 24 minutes, which is calculated from the intersection coordinates of X=Y and X×Y=600. Here, if the time difference X between the change time of the furnace heat operation and the change time of the unloading operation in one simultaneous operation is constant, and the time difference Y between the end time of that one simultaneous operation and the end time of the next simultaneous operation is shortened within the above-mentioned range of X×Y≦600, the effect of the present invention will continue until X=Y. However, when X>Y, an exchange situation will occur in which the effect of the simultaneous operation is affected by Y and the effect of the frequent operation is affected by X, so it will be necessary to change the definition to exchange X and Y. Therefore, in this invention, X≦Y is set based on this situation.
[0060] Furthermore, in the present invention, the above operation (i.e., operation in which 0≦X≦24, Y≦60, and X×Y≦600) is continued for a period of time that is longer than the period during which the raw materials in the blast furnace, including the deadman, are significantly replaced. This makes it possible to suppress fluctuations in the height position of the cohesive zone and to stabilize the pig iron production rate at a high level over a long period of time. Although the operation time is preferably 24 hours / day, it is possible to stabilize the pig iron production rate at a high level over a long period of time if the operation time is at least 20 hours / day. Hereinafter, the operation of the above "two-way operation", "simultaneous operation", and "frequent operation" that maintains the relationship of X×Y≦600 for 20 hours / day or more is referred to as "continuous operation".
[0061] In the above, the simultaneous operation of the combination of furnace heat operation and lowering speed operation, which are the operations for raising the cohesive zone, has been described. However, it goes without saying that the significant fluctuation of the ventilation route can also be suppressed when the simultaneous operation of the combination of furnace heat operation and lowering operation, which are the operations for lowering the cohesive zone, is performed.
[0062] The above-described control for suppressing the fluctuation of the height position of the cohesive zone without significant fluctuation of the ventilation route can be realized by a combination of at least one furnace heat operation and at least one downloading rate operation. Therefore, for example, even if a combination of a furnace heat operation for lowering the furnace heat (cohesive zone lowering operation) and a downloading rate operation for reducing the downloading rate (cohesive zone raising operation) is performed simultaneously, that is, a cohesive zone moving operation in which the cohesive zone moves in the opposite directions, a high level of ferrous production can be stabilized for a long period of time. However, it is preferable to perform such a combination of simultaneous operations infrequently.
[0063] Even if such a combination of simultaneous operations is performed, the amount of correction of the height position of the cohesive zone is small, but the particle size and bulk density (layering state of particles) of the coke can be continuously changed. Therefore, only when the above-mentioned secondary effects are small, that is, when the changes in the furnace heat and the lowering speed are minor, the simultaneous operations are considered to contribute to suppressing significant changes in the ventilation route when correcting the height of the cohesive zone in the future.
[0064] As mentioned above, by continuing the continuous operation, it is possible to suppress significant fluctuations in the ventilation route, but this is not the case when the difference between the maximum and minimum actual values of the main reducing agent ratio (coke ratio) during any 20-hour period is greater than 50 kg / t-pig. The main reducing agent ratio (coke ratio) is an index that determines the thickness of the coke layer mentioned above, and when the range of change is large, for example, when it increases beyond 50 kg / t-pig, the thickness of the coke layer, which is the path of most of the reducing gas in the cohesive zone, increases significantly. The pressure loss in the coke layer is significantly reduced, and the ventilation route is inevitably changed. This leads to significant fluctuations in the ventilation route, and the effect of high stabilization of the pig iron production rate over the long term cannot be obtained (see Figure 5). Therefore, the above-mentioned effect of stable operation can be stably obtained only when the difference between the maximum and minimum values of the actual values of the main reducing agent ratio (coke rate) during any 20-hour period is 50 kg / t-pig or less. The lower limit of the difference between the maximum and minimum values of the actual values of the main reducing agent ratio (coke rate) during any 20-hour period is not particularly limited, but may be 2 kg / t-pig.
[0065] Here, the reason why the above-mentioned furnace heat operation and lowering speed operation are operations to change "set values" rather than "actual values" will be explained. Note that the "set value" in the present invention is synonymous with the "target value." In other words, the blast furnace is operated so that each parameter of the blast furnace operation coincides with the "set value."
[0066] Generally, the actual values of the air flow rate and oxygen enrichment amount, etc., usually have a certain error with respect to the set value, and the actual values at each instant fluctuate around the set value. However, the average value of the actual values over a certain period of time is substantially identical to the set value (for example, the deviation between the actual values of the air flow rate and oxygen enrichment amount and the set value is about 0.0 to 1.0% for the 1-minute instantaneous value, but is less than 0.1% for the 10-minute average value, and the actual value and the set value are substantially identical).
[0067] On the other hand, the blast furnace is a process with a long time constant, and the height of the cohesive zone is not corrected by fluctuations in the actual values over a short period of time (for example, 1 minute). The height of the cohesive zone is corrected only when the actual average values of the blast flow rate and auxiliary reducing agent ratio, etc., over a certain period of time (average values over a period of about 10 minutes or more, according to the knowledge of the present inventors) change. Therefore, it is necessary to change the set values in order to correct the height of the cohesive zone. By changing the set values, the actual average values of the blast flow rate and auxiliary reducing agent ratio, etc. over a certain period of time fluctuate, and the height position of the cohesive zone is corrected.
[0068] Furthermore, in the above-mentioned furnace heat operation and lowering speed operation, the set values must be changed by an amount of change of 0.1% or more of the set values up to the change time. According to the knowledge of the present inventor, even if the blast flow rate and reducing agent ratio (main reducing agent ratio plus auxiliary reducing agent ratio) are changed by an amount of change of less than 0.1%, it is impossible to correct the height of the cohesive zone. Therefore, in the above-mentioned furnace heat operation and lowering speed operation, the set values must be changed by an amount of change of 0.1% or more of the set values up to the change time.
[0069] Furthermore, in the above-mentioned furnace heat operation and lowering speed operation, it is preferable to change the average value of the set value for 10 minutes after the change time by an amount of change of 0.1% or more compared to the average value of the set value for 10 minutes up to the change time. As described above, since the blast furnace is a process with a long time constant, the set value can be changed more meaningfully by focusing on the average value of the set value over a certain period of time (here, 10 minutes).
[0070] <3. Examples of specific ranges for each parameter> As described above, in order to correct the height position of the cohesive zone, the change amount of the set value needs to be 0.1% or more of the set value before the change. The operation of changing the reducing agent ratio for the purpose of correcting the height of the cohesive zone is generally performed with the auxiliary reducing agent ratio. This is because it takes about 8 hours for coke to reach the tuyere tip after being charged. In other words, the set value of the auxiliary reducing agent ratio is sometimes expressed as a reducing agent ratio including the main reducing agent ratio, rather than the auxiliary reducing agent ratio itself. The reducing agent ratio differs for each blast furnace depending on various conditions related to coke, but is generally 3000 to 4000 Mcal / t-pig. Therefore, it is preferable that the change amount of the auxiliary reducing agent ratio is 3 Mcal / t-pig (0.1% of 3000 Mcal / t-pig) or more per furnace heat operation. When the operation amount of the auxiliary reducing agent ratio per operation, 3 Mcal / t-pig, is converted into a heat equivalent, it is 1 g / Nm3 in terms of blast moisture. 3 , and the supply air temperature is 5°C.
[0071] On the other hand, changes in the auxiliary reducing agent ratio, etc., affect the particle size of the coke that forms the layers. Therefore, if the amount of change in one go is excessive, the particle size of the coke will change rapidly and significantly, causing fluctuations in the ventilation route, and the effect of stabilizing the high level of pig iron production may become insufficient. According to the inventor's findings, if the amount of operation of the auxiliary reducing agent ratio per go is within 45 Mcal / t-pig, the change in the state of the layers of the coke particles is small and it is possible to suppress fluctuations in the ventilation route. When this amount of operation of the auxiliary reducing agent ratio per go, 45 Mcal / t-pig, is converted into a heat equivalent, it is equivalent to 12 g / Nm3 in terms of blast moisture. 3 , the blowing air temperature is 60°C.
[0072] Therefore, when the auxiliary reducing agent ratio is changed as a furnace heat operation, it is preferable that the change amount of the auxiliary reducing agent ratio is 3 to 45 Mcal / t-pig per furnace heat operation. When the blast moisture is changed as a furnace heat operation, it is preferable that the change amount of the blast moisture is 1 to 12 g / Nm 3 When the air blowing temperature is changed as the furnace heating operation, it is preferable that the change amount of the air blowing temperature is 5 to 60° C. per furnace heating operation.
[0073] The same can be said about the change in the lowering speed operation. The blast flow rate varies from furnace to furnace depending on the furnace volume and production level, but is generally 2000 to 8000 Nm 3 / min. Therefore, the change in the air flow rate is 5 Nm per furnace heating operation. 3 / min(5000Nm 3 It is preferable that the operation amount per blowing flow rate is 5 Nm 3 / min is converted to oxygen enrichment equivalent to 60Nm 3 / hr.
[0074] On the other hand, changes in the blast flow rate and oxygen enrichment amount affect the stacking state of the coke particles inside the blast furnace. Therefore, if the amount of change in one go is excessive, the stacking state of the coke may change rapidly and significantly, leading to fluctuations in the ventilation route and the effect of stabilizing the high level of the pig iron production may become insufficient. According to the inventor's knowledge, when the amount of change in the blast flow rate in one go is 100 Nm 3 If the flow rate was within 100 Nm / min, the change in the layered state of the coke particles would be small and it would be possible to suppress the fluctuation of the ventilation route. 3 / min is converted to oxygen enrichment equivalent to 1300Nm 3 / hr.
[0075] Therefore, when changing the air flow rate as a lowering speed operation, the change in the air flow rate should be 5 to 100 Nm per lowering speed operation. 3When the amount of oxygen enrichment is changed as the lowering speed control, the amount of change in the amount of oxygen enrichment is preferably 60 to 1300 Nm per lowering speed control. 3 / Hr is preferable.
[0076] Thereafter, the auxiliary reducing agent ratio setting change amount per time is set to 3 to 45 Mcal / t-pig, and the air flow rate setting change amount per time is set to 5 to 100 Nm 3 / min is called small step operation.
[0077] Note that each parameter may be set to a value below the lower limit of the above range during operation, but such a period must be excluded from the continuous period of 20 hours / day or more. In other words, the period in which the parameter is set to a value below the above lower limit must be within 4 hours / day in total. Each parameter may exceed the upper limit of the range described above during the operation, but the period during which such a value is exceeded may be included in the continuous period of 20 hours / day or more, but is preferably excluded. In other words, the period during which the value is exceeded is preferably within 4 hours / day in total. EXAMPLES
[0078] Next, a verification test carried out to verify the effect of the present invention will be described. In this verification test, a blast furnace with a furnace volume of 4250 m 3 , target iron production rate is 10,000t / day, target hot metal temperature is 1530℃, average blast flow rate is 5000Nm 3 The blast furnace was operated under the operating conditions of a sintering speed of 1000 kcal / min, an average reducing agent rate (main reducing agent rate + auxiliary reducing agent rate) of 3000 Mcal / t-pig, and a main reducing agent rate of 200 to 450 kg / t-pig, with an average main reducing agent rate of about 340 kg / t-pig. The set values shown in the following invention examples 1 to 6 and comparative examples 1 to 6 were changed, and the results were verified. The verification results are shown in Tables 1 and 2.
[0079] Here, in order to explain the embodiment, the operations that have appeared in the explanation so far will be summarized. "Two-way operation" refers to an operation in which both furnace heat operation and lowering speed operation are performed. "Simultaneous operation" refers to an operation in which the time difference X minutes between the time when the furnace heat operation is changed and the time when the lowering speed operation is changed is 0 to 24 minutes. "Frequent operation" refers to an operation in which the time difference Y minutes between the end time of one simultaneous operation and the end time of the next simultaneous operation after the one simultaneous operation is X to 60 minutes. "Continuous operation" refers to an operation in which all of the above-mentioned "two-way operation", "simultaneous operation", and "frequent operation", which maintain the relationship of X×Y≦600, are continued for 20 hours / day or more. "Small-range operation" refers to an operation in which the amount of change in the set value of the auxiliary reducing agent ratio per time is 3 to 45 Mcal / t-pig, and the amount of change in the set value of the blast flow rate per time is 5 to 100 Nm 3 / min.
[0080] Invention Example 1: The auxiliary reducing agent ratio setting value was changed as the furnace heat operation, and the blast flow rate setting value was changed as the lowering speed operation. Simultaneous operation was performed in the range of X from 0 to 10 minutes, frequent operation was performed, and operation in which the difference between the maximum and minimum values of the actual values of the main reducing agent ratio in any 20-hour period was 2 (kg / t-pig) to 50 (kg / t-pig) was performed continuously for 24 hours / day (it is self-evident that operation was performed while maintaining the relationship of X×Y≦600 based on the conditions of the simultaneous operation and frequent operation). In addition, narrow-range operation was performed in the furnace heat operation and lowering speed operation. The above blast furnace operation was performed for one month. The results are shown in Table 1.
[0081] Invention Example 2: The auxiliary reducing agent ratio setting value was changed as the furnace heat operation, and the blast flow rate setting value was changed as the lowering speed operation. Simultaneous operation was performed in the range of X from 0 to 10 minutes, frequent operation was performed, and operation in which the difference between the maximum and minimum values of the main reducing agent ratio actual value during any 20-hour period was 2 (kg / t-pig) to 50 (kg / t-pig) was performed continuously for 20 hours / day (it is self-evident that operation was performed while maintaining the relationship of X×Y≦600 based on the conditions of the simultaneous operation and frequent operation). In addition, narrow-range operation was performed for the furnace heat operation and the lowering speed operation. The above blast furnace operation was performed for one month. The results are shown in Table 1.
[0082] Invention Example 3: The auxiliary reducing agent ratio setting value was changed as the furnace heat operation, and the blast flow rate setting value was changed as the lowering speed operation. Simultaneous operation was performed in the range of X from 11 to 24 minutes, frequent operation was performed, and operation was performed while maintaining the relationship of X×Y≦600. Operation was continued for 20 hours / day in which the difference between the maximum and minimum values of the actual values of the main reducing agent ratio during any 20-hour period was 2 (kg / t-pig) or more and 50 (kg / t-pig) or less. In addition, narrow-range operation was performed in the furnace heat operation and the lowering speed operation. A test was performed twice to carry out the above blast furnace operation for one month. The results are shown in Table 1.
[0083] Invention Example 4: The auxiliary reducing agent ratio setting value was changed as the furnace heat operation, and the blast flow rate setting value was changed as the lowering speed operation. Simultaneous operation was performed in the range of X from 11 to 24 minutes, frequent operation was performed, and operation was performed while maintaining the relationship of X×Y≦600. Operation was performed continuously for 20 hours / day in which the difference between the maximum and minimum values of the actual values of the main reducing agent ratio during any 20-hour period was 2 (kg / t-pig) to 50 (kg / t-pig). In the furnace heat operation, small-range operation was not performed, the amount of change in the auxiliary reducing agent ratio per time was 50 to 70 Mcal / t-pig, and small-range operation was performed in the lowering speed operation. The above blast furnace operation was performed for one month. The results are shown in Table 1.
[0084] Invention Example 5: The auxiliary reducing agent ratio setting value was changed as the furnace heat operation, and the blast flow rate setting value was changed as the lowering speed operation. Simultaneous operations were performed with X in the range of 11 to 24 minutes, frequent operations were performed, and operation was performed while maintaining the relationship of X×Y≦600. Operation was continued for 20 hours / day in which the difference between the maximum and minimum actual values of the main reducing agent ratio during any 20-hour period was 2 (kg / t-pig) to 50 (kg / t-pig). Small-range operations were performed in the furnace heat operation, and small-range operations were not performed in the lowering speed operation, and the amount of change in the blast flow rate per time was 120 to 160 Nm 3 The blast furnace operation was carried out for one month. The results are shown in Table 1.
[0085] Invention Example 6: The auxiliary reducing agent ratio setting value was changed as the furnace heat operation, and the blast flow rate setting value was changed as the lowering speed operation. Simultaneous operation was performed in the range of X from 11 to 24 minutes, frequent operation was performed, and operation was performed while maintaining the relationship of X×Y≦600. Operation was continued for 20 hours / day in which the difference between the maximum and minimum values of the actual values of the main reducing agent ratio during any 20-hour period was 2 (kg / t-pig) or more and 50 (kg / t-pig) or less. In addition, narrow-range operation was not performed in the furnace heat operation and the lowering speed operation. The above blast furnace operation was carried out for one month. The results are shown in Table 1.
[0086] Comparative Example 1: No furnace heat operation was performed, and the set value of the blast flow rate was changed as the lowering speed operation. The lowering speed operation was performed once at intervals of 60 minutes or less, and an operation in which the difference between the maximum and minimum actual values of the main reducing agent ratio during any 20-hour period was 2 (kg / t-pig) or more and 50 (kg / t-pig) or less was continuously performed for 20 hours / day. A narrow range operation was performed in the lowering speed operation. The above blast furnace operation was performed for one month. The results are shown in Table 2.
[0087] Comparative Example 2: As furnace heat operation, the auxiliary reducing agent rate setting value was changed, and no lowering speed operation was performed. Furnace heat operation was performed once at intervals of 60 minutes or less, and operation was continued for 20 hours / day in which the difference between the maximum and minimum actual values of the main reducing agent rate during any 20-hour period was 2 (kg / t-pig) or more and 50 (kg / t-pig) or less. Small-range operation was performed in the furnace heat operation. The above blast furnace operation was carried out for one month. The results are shown in Table 2.
[0088] Comparative Example 3: An operation of changing the set value of the auxiliary reducing agent ratio was performed as the furnace heat operation, and an operation of changing the set value of the blast flow rate was performed as the charging rate operation. The time difference X between the change times of both operations was 8 to 30 minutes (when not corresponding to simultaneous operation), the difference Y between the end time of one set of both operations and the end time of the next set of both operations was 24 to 80 minutes (when not corresponding to frequent operation), X ≤ Y, X × Y > 600, and an operation in which the difference between the maximum value and the minimum value of the actual value of the main reducing agent ratio within any 20-hour period was 2 (kg / t-pig) or more and 50 (kg / t-pig) or less was continuously performed for 20 hours per day. Also, in the furnace heat operation and the charging rate operation, minor operations were carried out. The above blast furnace operation was carried out for 1 month. The results are shown in Table 2.
[0089] Comparative Example 4: An operation of changing the set value of the auxiliary reducing agent ratio was performed as the furnace heat operation, and an operation of changing the set value of the blast flow rate was performed as the charging rate operation. Simultaneous operation was carried out in the range where X was 0 to 10 minutes, and the difference Y between the end time of one simultaneous operation and the end time of the next simultaneous operation was 60 < Y ≤ 80 minutes (not corresponding to frequent operation), and an operation maintaining the relationship of X × Y ≤ 600 was carried out. An operation in which the difference between the maximum value and the minimum value of the actual value of the main reducing agent ratio within any 20-hour period was 2 (kg / t-pig) or more and 50 (kg / t-pig) or less was continuously performed for 20 hours per day. Also, in the furnace heat operation and the charging rate operation, minor operations were carried out. The above blast furnace operation was carried out for 1 month. The results are shown in Table 2.
[0090] Comparative Example 5: An operation of changing the set value of the auxiliary reducing agent ratio was performed as the furnace heat operation, and an operation of changing the set value of the blast flow rate was performed as the charging rate operation. Simultaneous operation was carried out in the range where X was 0 to 10 minutes, and frequent operation was carried out. An operation in which the difference between the maximum value and the minimum value of the actual value of the main reducing agent ratio was 2 (kg / t-pig) or more and 50 (kg / t-pig) or less was continuously performed for 12 hours per day (it is obvious that an operation maintaining the relationship of X × Y ≤ 600 was carried out according to the conditions of the above simultaneous operation and frequent operation). Also, in the furnace heat operation and the charging rate operation, minor operations were carried out. The above blast furnace operation was carried out for 1 month. The results are shown in Table 2.
[0091] Comparative Example 6: The auxiliary reducing agent ratio setting value was changed as the furnace heat operation, and the blast flow rate setting value was changed as the lowering speed operation. Simultaneous operation was performed with X in the range of 0 to 10 minutes, frequent operation was performed, and the operation was continued for 20 hours / day with the difference between the maximum and minimum values of the main reducing agent ratio actual value in any 20-hour period being 60 to 70 (kg / t-pig), which is greater than 50 (kg / t-pig) (from the conditions of the simultaneous operation and frequent operation, it is self-evident that the operation was performed while maintaining the relationship of X×Y≦600). In addition, narrow-range operation was performed in the furnace heat operation and lowering speed operation. The above blast furnace operation was performed for one month. The results are shown in Table 2.
[0092] The test results were evaluated in terms of the frequency of significant and minor declines in productivity per month. Specifically, a significant decline in productivity was defined as a daily productivity that was 3% or more lower than the average (monthly average), and a minor decline in productivity was defined as a daily productivity that was 1.5% to 3% lower than the average, and the frequency (number of occurrences) of these declines per month was compared. A significant decline in productivity that occurred four or more times in a month was rated × (bad), 1-3 times was rated △ (insufficient), 0 significant declines and 2 or more minor declines were rated ◯ (good), 0 significant declines and 1 minor decline were rated ◎ (excellent), and 0 significant and 0 minor declines were rated ◎+ (excellent). Here, × and △ are not suitable for practical use because a significant decrease in pig iron production occurs more frequently than a certain level.
[0093] [Table 1]
[0094] [Table 2]
[0095] From Tables 1 and 2, the following can be seen. In Comparative Examples 1 to 5, in which one of the following operations was not performed: dual operation, simultaneous operation, frequent operation, operation maintaining the relationship of X×Y≦600, or continuous operation, and the other operation was performed, a significant decrease in pig iron productivity occurred at least once per month, and it was not possible to stabilize the pig iron productivity at a high level over the long term. In Comparative Example 6, in which operation maintaining the relationship of dual operation, simultaneous operation, frequent operation, and X×Y≦600, and continuous operation were performed, but the difference between the maximum and minimum actual values of the main reducing agent ratio over any 20-hour period was greater than 50 (kg / t-pig), a significant decrease in pig iron productivity occurred at least once per month, and it was not possible to stabilize the pig iron productivity at a high level over the long term. On the other hand, in Examples 1 to 3 in which the difference between the maximum and minimum actual values of the main reducing agent ratio over any 20-hour period was 50 (kg / t-pig) or less and operation maintaining the relationship of bidirectional operation, simultaneous operation, frequent operation, X×Y≦600, continuous operation, and narrow-range operation was performed, and in Examples 4 and 5 in which operation maintaining the relationship of bidirectional operation, simultaneous operation, frequent operation, X×Y≦600 other than narrow-range operation, and continuous operation were all performed, no significant decrease in pig iron productivity occurred even once during the one-month period, and pig iron productivity was stabilized at a high level over the long term.
[0096] In addition, as in Example 3, when the difference between the maximum and minimum actual values of the main reducing agent rate during any 20-hour period was 50 (kg / t-pig) or less, and operation and continuous operation were performed while maintaining the relationship of bilateral operation, simultaneous operation, frequent operation, and X×Y≦600, and simultaneous operation was performed within the range of X from 11 to 24 minutes, there were no significant decreases in pig iron productivity and one or two slight decreases in pig iron productivity in two tests. As in Examples 4 and 5, when the difference between the maximum and minimum actual values of the main reducing agent rate over any 20-hour period was 50 (kg / t-pig) or less, operation and continuous operation were performed while maintaining the relationship of bilateral operation, simultaneous operation, frequent operation, and X×Y≦600, and small-scale operation of either the furnace heat operation or the lowering rate operation was not performed, a significant decrease in pig iron productivity did not occur, but a minor decrease in pig iron productivity occurred more than twice in a month, and the effect on stabilizing pig iron productivity was smaller than in Examples 1 and 2 (where a minor decrease in pig iron productivity occurred once or less per month). As in Example 6, when the difference between the maximum and minimum actual values of the main reducing agent rate over any 20-hour period was 50 (kg / t-pig) or less, operation and continuous operation were performed while maintaining the relationship of bilateral operation, simultaneous operation, frequent operation, and X×Y≦600, and small adjustments of both furnace heat operation and lowering rate operation were not performed, no significant decrease in pig iron productivity occurred, but slight decreases in pig iron productivity occurred significantly more than twice in a month, and the effect of stabilizing pig iron productivity was smaller than in Examples 4 and 5.
[0097] Furthermore, comparing Example 1 and Example 2, in which the continuous operation times were 24 hours / day and 20 hours / day, respectively, but the other conditions were the same, Example 1, in which the continuous operation time was longer, did not experience even one minor decrease in productivity in one month, whereas Example 2, in which the continuous operation time was shorter, experienced one minor decrease in productivity in one month. In other words, the longer the continuous operation time, the greater the effect on stabilizing the productivity.
[0098] From the above, in order to achieve high stabilization of pig iron production over a long period of time (no significant pig iron production occurring even once in a month), all of the following are essential: bilateral operation, simultaneous operation, frequent operation, operation with X×Y≦600, continuous operation, and a difference between the maximum and minimum actual values of the main reducing agent ratio during any 20-hour period of 50 (kg / t-pig) or less. In addition to these, in order to further increase the stabilization effect of pig iron production, it is effective to perform simultaneous operation with X in the range of 0-10 minutes and to perform narrow operation. In addition, while a certain effect can be obtained if the continuous operation continues for 20 hours / day or more, the stabilization effect of pig iron production increases the longer the operation is. Note that although an example of one month has been described here, it goes without saying that if it is continued for three days, it will be possible to achieve stabilization of pig iron production for three days, and if it is continued for one year, it will be possible to achieve stabilization of pig iron production for one year. In addition, in Example 2 of the present invention, the auxiliary reducing agent ratio is kept constant, and the blast moisture is set to 1-12 g / Nm 3 Alternatively, the same effect of stabilizing the iron production rate was obtained even when the blast temperature was adjusted in the range of 5 to 60°C. Similarly, in Example 2, the blast flow rate was kept constant, and the oxygen enrichment amount was adjusted to 60 to 1300 Nm 3 Even when the flow rate was adjusted within the range of / hr, a similar effect on stabilizing the iron production rate was obtained.
[0099] Although the preferred embodiment of the present invention has been described in detail above, the present invention is not limited to such an example. It is clear that a person having ordinary knowledge in the technical field to which the present invention pertains can conceive of various modified or amended examples within the scope of the technical ideas described in the claims, and it is understood that these also naturally fall within the technical scope of the present invention.
Claims
1. a furnace heat operation for changing at least one set value selected from the group consisting of an auxiliary reducing agent ratio, a blast humidity, and a blast temperature by a change amount of 0.1% or more of the set value up to a change time; A method for operating a blast furnace, comprising: a lowering speed operation for changing at least one set value selected from a blast flow rate and an oxygen enrichment amount by an amount of change of 0.1% or more of the set value up to the change time; and A method for operating a blast furnace, comprising the steps of: carrying out simultaneous operations in which the time difference between the change time of the furnace heat operation and the change time of the lowering speed operation is X minutes; and carrying out frequent operations in which the time difference between the end time of one simultaneous operation and the end time of the next simultaneous operation after the one simultaneous operation is within Y minutes; said X and Y satisfy 0≦X≦24, X×Y≦600, Y≦60, X≦Y; and further, a difference between a maximum value and a minimum value of an actual value of a main reducing agent rate (kg / t-pig) during any 20-hour period is 50 (kg / t-pig) or less.
2. When the auxiliary reducing agent ratio is changed as the furnace heat operation, the change amount is 3 to 45 Mcal / t-pig per furnace heat operation, When the blast moisture is changed as the furnace heat operation, the change amount is 1 to 12 g / Nm3 per furnace heat operation. 3 year, When the blowing air temperature is changed as the furnace heating operation, the change amount is set to 5 to 60° C. per furnace heating operation, When the air flow rate is changed as the lowering speed operation, the change amount is set to 5 to 100 Nm per lowering speed operation. 3 / min, When the oxygen enrichment amount is changed as the lowering speed operation, the change amount is set to 60 to 1300 Nm per lowering speed operation. 3 2. The method for operating a blast furnace according to claim 1, wherein the heating time is set to 1 / Hr.