Arithmetic device of raw material amount to be used, arithmetic method of raw material amount to be used, and arithmetic program of raw material amount to be used

The raw material usage amount calculation device optimizes cost and quality constraints to determine the necessary amounts of original and recycled materials, addressing the challenge of using recycled materials in manufacturing while ensuring product quality and sustainability.

JP2024165459AActive Publication Date: 2024-11-28KOBE STEEL LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2023081678
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-17
Publication Date
2024-11-28
Estimated Expiration
2043-05-17

AI Technical Summary

Technical Problem

The challenge lies in determining the amount of raw materials to be used while ensuring product quality when recycled materials, such as scraps and defective products, are incorporated into the manufacturing process, considering factors like quality, management costs, and carbon dioxide emissions.

Method used

A raw material usage amount calculation device and method that optimizes a cost mathematical model with quality and constraint conditions to determine the amounts of original and recycled raw materials needed, incorporating constraint expressions for recycled materials and carbon dioxide generation.

Benefits of technology

Enables the calculation of raw material amounts that satisfy product quality even when using recycled materials, accounting for management costs and carbon dioxide emissions, thereby supporting sustainable manufacturing practices.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024165459000001_ABST
    Figure 2024165459000001_ABST
Patent Text Reader

Abstract

To provide an arithmetic device of raw material amount to be used, an arithmetic method of raw material amount to be used, and an arithmetic program of raw material amount to be used in which, even in the case of using a recycled raw material, each raw material amount to be used of an original raw material and a recycled raw material which satisfy product quality can be obtained.SOLUTION: An arithmetic device 1000 of a raw material amount to be used comprises: an optimization processing part 12 which obtains a raw material amount to be used of a raw material by optimizing an objective function of a cost mathematical model expressing the cost of the raw material, in a predetermined constraint condition; and an output processing part 13 which outputs the raw material amount to be used of the raw material obtained by the optimization processing part 12 to the outside, where the cost of the raw material is expressed by multiplication of a raw material unit price and a raw material amount to be used, the raw material includes an original raw material being originally a raw material and a recycled raw material recycled into a raw material, and the constraint condition includes a constraint equation of a quality mathematical model regarding product quality.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a raw material usage amount calculation device, a raw material usage amount calculation method, and a raw material usage amount calculation program for calculating the amount of each of raw materials used when raw materials that are originally raw materials and recycled raw materials that have been recycled into raw materials are used as raw materials. [Background technology]

[0002] In the manufacturing industry and the like, when a product is manufactured, a production plan is generally made. When making the production plan, for example, as disclosed in Patent Document 1, the production plan is made from the viewpoint of minimizing costs, or, for example, as disclosed in Patent Document 2, the production plan is made from the viewpoint of quality, and the production plan is made from each of these viewpoints. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Patent Publication No. 2022-12613 [Patent Document 2] JP 2012-155702 A Summary of the Invention [Problem to be solved by the invention]

[0004] Incidentally, in recent years, so-called carbon neutrality and SDGs (Sustainable Development Goals) have been gaining momentum, and it is hoped that manufacturing industries and the like will also implement projects from this perspective. For this reason, from this perspective, it is conceivable to reuse so-called scraps and defective products as raw materials. The scraps are pieces or ends of raw materials generated during the production process (manufacturing process), and the defective products are products that could not be shipped as products because they do not meet the specified standards after production. However, compared to producing products from original raw materials that are the raw materials, producing products from recycled raw materials that have been recycled from the scraps or defective products may affect the quality of the products.

[0005] The present invention has been made in consideration of the above-mentioned circumstances, and its object is to provide a raw material usage amount calculation device, a raw material usage amount calculation method, and a raw material usage amount calculation program that can calculate the amounts of original raw materials and recycled raw materials used that satisfy the quality of the product, even when recycled raw materials are used. [Means for solving the problem]

[0006] As a result of various investigations, the inventors have found that the above object can be achieved by the present invention described below. That is, a raw material usage amount calculation device according to one aspect of the present invention includes an optimization processing unit that solves the raw material usage amount of the raw material by optimizing an objective function of a cost mathematical model that represents the cost of the raw material under predetermined constraint conditions, and an output processing unit that outputs the raw material usage amount of the raw material found by the optimization processing unit to an outside, the cost of the raw material is expressed by multiplying the raw material unit price and the raw material usage amount, the raw materials include original raw materials that are raw materials and recycled raw materials that have been recycled into raw materials, and the constraint conditions include a constraint equation of a quality mathematical model related to product quality.

[0007] Such a raw material usage amount calculation device determines the amounts of each of the raw material and recycled raw material to be used by optimizing the objective function of a cost mathematical model that represents the cost of raw materials, including the original raw materials that are raw materials and the recycled raw materials that have been recycled into raw materials, under predetermined constraint conditions including the constraint equations of a quality mathematical model related to product quality.Therefore, even when recycled raw materials are used, it is possible to determine the amounts of each of the raw material and recycled raw materials to be used that satisfy the quality of the product.

[0008] In another aspect, in the above-mentioned raw material usage calculation device, the recycled raw materials include a first recycled raw material made from scraps and a second recycled raw material made from defective products, and the constraint conditions further include a constraint equation of a first recycled raw material mathematical model related to the first recycled raw material and a constraint equation of a second recycled raw material mathematical model related to the second recycled raw material.

[0009] Such a raw material usage amount calculation device can calculate the amount of each of the original raw materials and recycled raw materials used that satisfies the quality of the product, even when using recycled raw materials that include a first recycled raw material made from scraps and a second recycled raw material recycled from defective products. The use of the first recycled raw material requires the generation of scraps, and the use of the second recycled raw material requires the generation of defective products as well as the man-hours (processing, steps) required to recycle the defective products into raw materials. However, since the above-mentioned raw material usage amount calculation device includes the constraint equations for the first and second recycled raw materials in the constraint conditions, such necessary items can be taken into consideration in the calculation of the amount of each of the original raw materials and recycled raw materials used.

[0010] In another aspect, in the above-mentioned raw material usage amount calculation device, the first recycled raw material includes a 1A recycled raw material made from a first scrap generated internally, and a 1B recycled raw material made from a second scrap purchased from outside, and the constraint equation of the first recycled raw material mathematical model is a constraint equation of a mathematical model related to the 1A recycled raw material.

[0011] Such a raw material usage amount calculation device can determine the amounts of the original raw materials and recycled raw materials used that satisfy the quality of the product, even when using recycled raw materials that include a 1A recycled raw material made from a first scrap generated internally and a 1B recycled raw material made from a second scrap purchased from outside.

[0012] In another aspect, in the above-mentioned raw material usage amount calculation device, the objective function of the cost mathematical model further includes a management cost for managing the recycled raw materials, and the management cost is expressed by multiplying a management unit price and a management amount of the recycled raw materials. Preferably, in the above-mentioned raw material usage amount calculation device, the recycled raw materials include a first recycled raw material obtained by using scraps as the raw material and a second recycled raw material obtained by using defective products as the raw material, and the management cost is expressed by the sum of a first multiplication result of a first management unit price of the first recycled raw material and a first management amount of the first recycled raw material, and a second multiplication result of a second management unit price of the second recycled raw material and a second management amount of the second recycled raw material. Preferably, the first management amount is calculated based on a first lead time from the generation of the scraps to the time when the scraps can be used as the first recycled raw material. Preferably, the second management amount is calculated based on a second lead time from the generation of the defective products to the time when the scraps can be used as the second recycled raw material.

[0013] Such a raw material usage amount calculation device can further take into account the management costs of managing the recycled raw materials and determine the amounts of the original raw materials and recycled raw materials used that satisfy the quality of the product.

[0014] In another aspect, in the above-mentioned raw material usage amount calculation device, the constraint conditions further include a constraint equation of a CO2 mathematical model regarding the amount of carbon dioxide generated associated with the raw material.

[0015] Such a raw material usage amount calculation device includes a constraint equation of a CO2 mathematical model related to the amount of carbon dioxide generated from the raw materials in the constraint conditions, so that the amount of carbon dioxide generated from such raw materials can be taken into consideration when calculating the amount of each raw material used, that is, the original raw materials and the recycled raw materials.

[0016] In another aspect, in the above-mentioned raw material usage amount calculation device, the raw materials include a plurality of types of raw materials having different amounts of carbon dioxide generated in relation to the production of the raw materials. Preferably, in the above-mentioned raw material usage amount calculation device, the raw materials include bullion and green bullion that generates an amount of carbon dioxide less than the amount of carbon dioxide generated in relation to the bullion.

[0017] Such a raw material usage amount calculation device can determine the amount of each of the raw materials and recycled raw materials used that satisfies the quality of the product, even when multiple types of raw materials with different carbon dioxide emissions are used.

[0018] A method for calculating the amount of raw material used according to another aspect of the present invention includes an optimization processing step of finding the amount of raw material used by optimizing an objective function of a cost mathematical model representing the cost of the raw material under predetermined constraint conditions, and an output processing step of outputting the amount of raw material used of the raw material found in the optimization processing step to the outside, wherein the cost of the raw material is represented by multiplying the unit price of the raw material and the amount of raw material used, the raw materials include original raw materials that are raw materials and recycled raw materials that have been recycled into raw materials, and the constraint conditions include a constraint equation of a quality mathematical model related to product quality.

[0019] This method of calculating the amount of raw materials used determines the amount of each of the raw materials and recycled raw materials used by optimizing the objective function of a cost mathematical model that represents the cost of raw materials, including the original raw materials that are raw materials and the recycled raw materials that have been recycled into raw materials, under predetermined constraint conditions including the constraint equations of a quality mathematical model related to product quality.Therefore, even when recycled raw materials are used, it is possible to determine the amount of each of the raw materials and recycled raw materials used that satisfies the quality of the product.

[0020] A raw material usage amount calculation program according to another aspect of the present invention is a program for causing a computer to function as any one of the raw material usage amount calculation devices described above.

[0021] According to this, a raw material usage amount calculation program can be provided, and this raw material usage amount calculation program has the same effects as those of the above-mentioned raw material usage amount calculation device. Effect of the Invention

[0022] The raw material usage amount calculation device and raw material usage amount calculation method according to the present invention can calculate the amounts of original raw materials and recycled raw materials used that satisfy the quality of the product, even when recycled raw materials are used. According to the present invention, a raw material usage amount calculation program can be provided. [Brief description of the drawings]

[0023] [Figure 1] FIG. 2 is a block diagram showing a configuration of a raw material usage amount calculation device in the embodiment. [Diagram 2] FIG. 1 is a diagram for explaining, as an example, the flow of each item in a plant that is the subject of calculation by the raw material usage amount calculation device. [Diagram 3] FIG. 13 is a diagram showing, as an example, a schedule information table inputted, stored and used in the raw material usage amount calculation device. [Figure 4] FIG. 13 is a diagram showing, as an example, a charge information table inputted, stored and utilized in the raw material usage amount calculation device. [Diagram 5] FIG. 13 is a diagram showing, as an example, a lead time information table inputted, stored and utilized in the raw material usage amount calculation device. [Figure 6] FIG. 11 is a diagram illustrating dust information as an example. [Figure 7] FIG. 11 is a diagram for explaining defective product information as an example. [Figure 8] FIG. 13 is a diagram for explaining purchase waste as an example. [Figure 9] FIG. 13 is a diagram for explaining green bullion information as an example. [Figure 10] FIG. 13 is a diagram for explaining bullion information as an example. [Figure 11] 4 is a flowchart showing the operation of the raw material usage amount calculation device. [Figure 12] FIG. 13 is a diagram for explaining the results of an example as an example. [Figure 13]13 is a diagram for explaining constraint values ​​of the constraint equations used in FIG. 12 and their calculation results. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0024] Hereinafter, one or more embodiments of the present invention will be described with reference to the drawings. However, the scope of the invention is not limited to the disclosed embodiments. In addition, configurations with the same reference numerals in each drawing indicate that they are the same configurations, and their description will be omitted as appropriate. In this specification, when referring to a general term, a reference numeral without a subscript is used, and when referring to an individual configuration, a reference numeral with a subscript is used.

[0025] The raw material usage amount calculation device in the embodiment is a device that calculates the amount of raw material usage of each of the raw material and the recycled raw material when raw materials are used as raw materials. This raw material usage amount calculation device includes an optimization processing unit that solves the raw material usage amount of the raw material by optimizing the objective function of a cost mathematical model that represents the cost of the raw material under a predetermined constraint condition, and an output processing unit that outputs the raw material usage amount of the raw material calculated by the optimization processing unit to the outside. The cost of the raw material is expressed by multiplying the raw material unit price and the raw material usage amount, the raw materials include the raw material that is originally the raw material and the recycled raw material that has been recycled into the raw material, and the constraint condition includes a constraint equation of a quality mathematical model related to the quality of the product. Below, such a raw material usage amount calculation device, as well as a raw material usage amount calculation method and a raw material usage amount calculation program implemented therein will be described in more detail.

[0026] FIG. 1 is a block diagram showing the configuration of a raw material usage amount calculation device in an embodiment. FIG. 2 is a diagram for explaining, as an example, the flow of each item in a plant that is the subject of calculation by the raw material usage amount calculation device. FIG. 3 is a diagram showing, as an example, a schedule information table inputted, stored and used by the raw material usage amount calculation device. FIG. 4 is a diagram showing, as an example, a charge information table inputted, stored and used by the raw material usage amount calculation device. FIG. 5 is a diagram showing, as an example, a lead time information table inputted, stored and used by the raw material usage amount calculation device. FIG. 6 is a diagram for explaining scrap information as an example. FIG. 7 is a diagram for explaining defective product information as an example. FIG. 8 is a diagram for explaining purchased scrap as an example. FIG. 9 is a diagram for explaining green bullion information as an example. FIG. 10 is a diagram for explaining bullion information as an example.

[0027] The raw material usage amount calculation device 1000 in the embodiment includes a control processing unit 1, a storage unit 2, an input unit 3, an output unit 4, and an interface unit (IF unit) 5, as shown in FIG.

[0028] As described above, the raw material usage amount calculation device 1000 in the embodiment is a device that calculates the amount of raw material usage of each of the raw material (original raw material generated from resources collected from nature) and the recycled raw material recycled into raw material when raw materials are used. The raw material usage amount calculation device 1000 in the embodiment can be used in any business that uses these raw materials and recycled raw materials. Here, as an example, the raw material usage amount calculation device 1000 in the embodiment is applied to the manufacturing industry, more specifically, to a metal plant shown in FIG. 2. In this metal plant, semi-finished products are manufactured from raw materials in an upstream process, and products are manufactured from the manufactured semi-finished products in other processes. The raw materials include the raw materials and the recycled raw materials. The recycled raw materials include a first recycled raw material made from scraps and a second recycled raw material made from defective products. As described above, the scraps are pieces or ends of raw materials generated during the production process (manufacturing process), and the defective products are products that could not be shipped as products after production because they do not meet a predetermined standard. The first recycled raw materials include the 1A recycled raw materials made from the first scraps (internal scraps, in-house scraps) generated internally, and the 1B recycled raw materials made from the second scraps (purchased scraps) purchased from outside. In the example shown in FIG. 2, the 1A recycled raw materials are made from the first scraps generated in the metal plant shown in FIG. 2, and the 1B recycled raw materials are made from the first scraps generated outside the metal plant shown in FIG. 2, which are purchased as raw materials. The raw materials include a plurality of types that have different amounts of carbon dioxide generated in relation to the generation of the raw materials, and in the example shown in FIG. 2, the raw materials include bullion and green bullion (G bullion) that generates less carbon dioxide than the amount of carbon dioxide generated in relation to the bullion.

[0029] Returning to Fig. 1, the input unit 3 is connected to the control processing unit 1 and is a device for inputting various data required for operating the raw material usage amount calculation device 1000, such as various commands such as a command to start calculation, and various data described below such as schedule information, to the raw material usage amount calculation device 1000, and is, for example, a keyboard, a mouse, and a plurality of input switches to which predetermined functions are assigned. The output unit 4 is connected to the control processing unit 1 and is a device for outputting commands and data input from the input unit 3 and the amounts of raw materials usage resulting from the calculation under the control of the control processing unit 1, and is, for example, a display device such as a CRT display, an LCD (liquid crystal display device), or an organic EL display, or a printing device such as a printer.

[0030] The input unit 3 and the output unit 4 may be configured with a touch panel. In the case of configuring this touch panel, the input unit 3 is a position input device that detects and inputs an operation position, such as a resistive film type or a capacitive type, and the output unit 4 is a display device. In this touch panel, a position input device is provided on the display surface of the display device, and one or more input contents that can be input to the display device are displayed. When a user touches the display position that displays the input content that the user wants to input, the position is detected by the position input device, and the display content displayed at the detected position is input to the raw material usage amount calculation device 1000 as the user's operation input content. In such a touch panel, the user can easily intuitively understand the input operation, so that the raw material usage amount calculation device 1000 that is easy for the user to handle is provided.

[0031] The IF unit 5 is connected to the control processing unit 1 and is a circuit that inputs and outputs data to and from, for example, an external device under the control of the control processing unit 1, and is, for example, an interface circuit of RS-232C, which is a serial communication method, an interface circuit using the Bluetooth (registered trademark) standard, an interface circuit using the USB standard, etc. The IF unit 5 may also be, for example, a communication interface circuit that transmits and receives communication signals to and from an external device, such as a data communication card or a communication interface circuit conforming to the IEEE802.11 standard, etc.

[0032] The storage unit 2 is connected to the control processing unit 1 and is a circuit that stores various predetermined programs and various predetermined data according to the control of the control processing unit 1. The various predetermined programs include, for example, a control processing program, and the control processing program includes, for example, a control program, an optimization processing program, and an output processing program. The control program is a program that controls each of the units 2 to 5 of the raw material usage amount calculation device 1000 according to the function of each unit. The optimization processing program is a program that solves the raw material usage amount of the raw material by optimizing the objective function of a cost mathematical model that represents the cost of the raw material under a predetermined constraint condition. The output processing program is a program that outputs the raw material usage amount of the raw material calculated by the optimization processing program to the outside. The various predetermined data include, for example, data required to execute each of these programs, such as schedule information, charge information, lead time information (LT information), and raw material information.

[0033] Such a storage unit 2 includes, for example, a ROM (Read Only Memory) which is a nonvolatile storage element, an EEPROM (Electrically Erasable Programmable Read Only Memory) which is a rewritable nonvolatile storage element, etc. The storage unit 2 also includes a RAM (Random Access Memory) which serves as a so-called working memory of the control processing unit 1 for storing data generated during execution of the predetermined program, etc. The storage unit 2 may also be configured to include a hard disk device with a relatively large storage capacity.

[0034] The storage unit 2 functionally comprises a schedule information storage unit 21, a charge information storage unit 22, a lead time information storage unit (LT information storage unit) 23, and a raw material information storage unit 24 in order to store schedule information, charge information, LT information, and raw material information, respectively.

[0035] The schedule information storage unit 21 stores schedule information. The schedule information is information that indicates the distribution status of recycled raw materials in the metal plant to which the raw material usage amount calculation device 1000 is applied. In the metal plant shown in FIG. 2, the recycled raw materials include the first recycled raw materials made from scraps and the second recycled raw materials made from defective products, as described above, so the schedule information is the date (time of generation) of scrap generation and the amount of generated scraps, the date (time of generation) of defective products generation and the amount of generated defective products, and the free time (usable time) and processing capacity of the shared equipment that recycles the defective products into raw materials.

[0036] In this embodiment, this schedule information is stored in table format in the schedule information storage unit 21. The schedule information table TB1 for registering this schedule information includes, for example, a date field 101 for registering a date d, and an available time F of the shared equipment of the shared equipment number i (i=1 in this example) on the day d registered in the date field 101, as shown in FIG. 1d The shared equipment availability field 102 registers [Hr], and the processing capacity A of the shared equipment of the shared equipment number i (in this example, i=1) for the defective product of the defective product number k (in this example, k=1) on the day d registered in the date field 101 11d A defective product processing capacity field 103 for registering [Hr / Ton] and a scrap (first scrap) generation amount SQ for the scrap with scrap number j (j=1 in this example) on the day d registered in the date field 101 1d The waste generation amount field 104 registers [Ton], and the amount of defective products dQ for the defective product with the defective product number k (k=1 in this example) on the date d registered in the date field 101. 1d It has a defective product generation amount field 105 for registering [Ton], and has daily records. The shared equipment number is an example of an identifier (ID) for specifying and identifying shared equipment. The defective product number is an example of an identifier (ID) for specifying and identifying defective products. The scrap number is an example of an identifier (ID) for specifying and identifying scrap (first scrap).

[0037] The charge information storage unit 22 stores charge information. A charge is the minimum production unit in a metal manufacturing process in a metal plant, and the charge information is information that represents a production plan for a semi-finished product to be manufactured in the upstream process in a metal plant to which the raw material usage amount calculation device 1000 is applied, and in this embodiment, further includes constraint values ​​of constraint conditions when manufacturing the semi-finished product. In the metal plant shown in FIG. 2, the charge information includes a charge number, a melting date (treatment date) on which the charge of the charge number is melted (processed) and the melting amount (processing amount), as well as an upper limit value CCO m and the upper limit of the quality cost, CS m The CO2 cost of an item is the amount of carbon dioxide generated related to the item, and the CO2 cost CCO m is the upper limit of the total CO2 cost of the goods in the charge with charge number m. The charge number is an example of an identifier (ID) for specifying and identifying the charge.

[0038] In this embodiment, this charge information is stored in table format in the charge information storage unit 22. The charge information table TB2 in which this charge information is registered includes, for example, a charge number field 111 in which a charge number m is registered, and a dissolution date CD for dissolving the charge of the charge number m registered in the charge number field 111, as shown in FIG. m The dissolution date field 112 registers the amount of dissolution CQ of the charge with charge number m registered in the charge number field 111. m The dissolution amount field 113 registers [Ton] and the upper limit of the CO2 cost CCO m [kg] in the CO2 cost upper limit field 114 and the upper limit CS of the quality cost for the charge with charge number m registered in the charge number field 111 m and a quality cost upper limit field 115 for registering the quality cost upper limit, and has a record for each charge (charge number).

[0039] The LT information storage unit 23 stores LT information. Since recycled raw materials require time before they can be used, the LT information is stored in the LT information storage unit 23 as information indicating this time. That is, in this embodiment, the LT information is information indicating the lead time related to recycled raw materials, and a lead time is provided for each piece of equipment used from generation to becoming recycled raw materials. In the metal plant shown in FIG. 2, the LT information TB3 stores the lead time (scrap melting lead time) LT1 from the generation of scrap (first scrap) to when it can be melted, as shown in FIG. S [Days], Lead time from when a defective product is generated until it can be processed using shared equipment (defective product processing lead time) LT1 D1 [Days], and the lead time from when the product is processed in the shared facility until it can be dissolved (lead time for dissolving defective products) LT1 D2 [Sun].

[0040] The raw material information storage unit 24 stores raw material information. The raw material information is predetermined information related to raw materials. In the metal plant shown in FIG. 2, the raw materials are the 1A recycled raw material made from scrap (first scrap, internally generated scrap), the second recycled raw material made by recycling defective products into raw materials, the 1B recycled raw material made from the second scrap (purchased scrap), G bullion, and bullion, so the raw material information includes information on each of the 1A recycled raw material, the second recycled raw material, the 1B recycled raw material, the G bullion, and the bullion.

[0041] The raw material information of the 1A recycled raw material (1A recycled raw material information) is the type of scrap (first scrap, internally generated scrap), monetary cost information indicating its monetary cost SC, management cost information indicating its management cost DSCS, CO2 cost information indicating its CO2 cost SCO, and quality cost information indicating its quality cost SS. In this embodiment, this 1A recycled raw material information is stored in the raw material information storage unit 24 in table format. The 1A recycled raw material information table TB4 in which this 1A recycled raw material information is registered includes, for example, an in-house generated scrap type number field 131 in which an in-house generated scrap type number j, which is an example of an identifier for specifying and identifying the type of the first scrap, and monetary cost SC for the first scrap of the in-house generated scrap type number j registered in the in-house generated scrap type number field 131, as shown in FIG. j The monetary cost information field 132 registers [yen / ton], and the management cost DSCS for the first scrap of the in-house generated scrap type number j registered in the in-house generated scrap type number field 131 j The management cost information field 133 registers [yen / Ton·day] and the CO2 cost SCO for the first scrap of the on-site generated scrap type number j registered in the on-site generated scrap type number field 131. j The CO2 cost information field 134 registers [kg / Ton] and the quality cost SS for the first scrap of the in-house generated scrap type number j registered in the in-house generated scrap type number field 131 j and has a record for each type of first scrap (in-house generated scrap type number j).

[0042] The raw material information of the second recycled raw material (second recycled raw material information) is the type of defective product, monetary cost information indicating its monetary cost DC, management cost information indicating its management cost DSCD, CO2 cost information indicating its CO2 cost DCO, and quality cost information indicating its quality cost DS. In this embodiment, this second recycled raw material information is stored in the raw material information storage unit 24 in table format. The second recycled raw material information table TB5 in which this second recycled raw material information is registered includes, for example, a defective product type number field 141 in which a defective product type number k, which is an example of an identifier for specifying and identifying the type of defective product, is registered, and a monetary cost DC for the defective product with the defective product type number k registered in the defective product type number field 141, as shown in FIG. k The monetary cost information field 142 registers [yen / ton], and the management cost DSCD for the defective product of the defective product type number k registered in the defective product type number field 141 k The management cost information field 143 registers [yen / Ton·day], and the CO2 cost DCO for the defective product with the defective product type number k registered in the defective product type number field 141 k The CO2 cost information field 144 registers [kg / Ton] and the quality cost DS for the defective product of the defective product type number k registered in the defective product type number field 141 k and has a record for each type of defective product (defective product type number k).

[0043] The raw material information of the 1B recycled raw material (1B recycled raw material information) includes the type of second scrap (purchased scrap), monetary cost information indicating its monetary cost PSC, CO2 cost information indicating its CO2 cost PSCO, and quality cost information indicating its quality cost PSS. Since purchased scrap is basically purchased whenever necessary, its management cost is omitted, but the management cost DSCP may be included in the 1B recycled raw material information to take into account the case where purchased scrap is purchased in advance before the date of use and kept in stock. In this embodiment, this 1B recycled raw material information is stored in the raw material information storage unit 24 in table format. For example, as shown in FIG. 8, the 1B recycled raw material information table TB6 in which this 1B recycled raw material information is registered includes a purchased scrap type number field 151 in which a purchased scrap type number p, which is an example of an identifier for specifying and identifying the type of second scrap, and a monetary cost PSC of the second scrap of the purchased scrap type number p registered in the purchased scrap type number field 151. p The monetary cost information field 152 registers [yen / ton], and the CO2 cost PSCO for the second waste of the purchased waste type number p registered in the purchased waste type number field 151 p The CO2 cost information field 154 registers [kg / Ton], and the quality cost PSS for the second scrap of the purchased scrap type number p registered in the purchased scrap type number field 151 p and has a quality cost information field 155 for registering the quality cost information, and has a record for each type of second scrap (purchased scrap type number p).

[0044] The raw material information of green bullion (G bullion raw material information) includes the type of G bullion, monetary cost information indicating its monetary cost GC, and CO2 cost information indicating its CO2 cost GCO. Since G bullion is basically purchased whenever it is needed, its management cost is omitted, but its management cost DSCG may be included in the G bullion raw material information to take into consideration the case where G bullion is purchased in advance before the date of use and kept in stock. Since G bullion according to the required quality is purchased, its quality cost is omitted as 0. In this embodiment, this G bullion raw material information is stored in the raw material information storage unit 24 in table format. The G bullion raw material information table TB7 in which this G bullion raw material information is registered includes, for example, a G bullion type number field 161 in which a G bullion type number g, which is an example of an identifier for specifying and identifying the type of G bullion, and CO2 cost information indicating the monetary cost GC of the G bullion of the G bullion type number g registered in the G bullion type number field 161, as shown in FIG. 9. g The monetary cost information field 162 registers [yen / ton] and the CO2 cost GCO g It has a CO2 cost information field 164 for registering [kg / Ton], and has a record for each type of G bullion (G bullion type number g).

[0045] As shown in FIG. 10, the bullion raw material information (bullion raw material information) TB8 is monetary cost information showing the bullion's monetary cost AC [yen / Ton] and CO2 cost information showing its CO2 cost ACO [kg / Ton]. Since bullion is basically purchased whenever it is needed, its management cost is omitted, but the bullion raw material information may include its management cost DSCA in order to take into account the case where bullion is purchased in advance before the date of use and stored in stock. Furthermore, since bullion according to the required quality is purchased, its quality cost is omitted as 0. Furthermore, here, the type of bullion is one, but if there are multiple types of bullion, for example, depending on the manufacturer, the bullion type a may be included in the bullion raw material information, and the bullion raw material information may be stored in the raw material information storage unit 24 in table format, similar to the G bullion information.

[0046] In the examples shown in Figs. 6 to 9, there is one of each type, but of course there may be more than one of each type.

[0047] Returning to Fig. 1, the control processing unit 1 is a circuit for controlling each of the units 2-5 of the raw material usage amount calculation device 1000 according to the function of each unit, and for determining the raw material usage amount of each of the original raw materials and the recycled raw materials. The control processing unit 1 is configured, for example, with a CPU (Central Processing Unit) and its peripheral circuits. In the control processing unit 1, a control unit 11, an optimization processing unit 12, and an output processing unit 13 are functionally configured by executing the control processing program.

[0048] The control unit 11 controls each of the units 2 to 5 of the raw material usage amount calculation device 1000 in accordance with the function of each unit, and is responsible for the overall control of the raw material usage amount calculation device 1000.

[0049] The optimization processing unit 12 solves the amount of raw material used by optimizing the objective function of a cost mathematical model that represents the cost of the raw material under a predetermined constraint condition. For the optimization, an appropriate conventional method (known solution method) according to each expression format of the cost mathematical model (objective function) and its constraint condition is used. The cost of the raw material is expressed by multiplying the raw material unit price and the amount of raw material used. As described above, the raw materials include original raw materials that are raw materials and recycled raw materials that have been recycled into raw materials, and more specifically, in this embodiment, as described above, the raw materials include original raw materials of bullion and G bullion, and recycled raw materials of 1A and 1B recycled raw materials and 2nd recycled raw materials. The constraint condition includes a constraint equation of a quality mathematical model related to the quality of the product. In this embodiment, since the recycled raw materials include the first and second recycled raw materials, the constraint conditions further include a constraint equation of a first recycled raw material mathematical model related to the first recycled raw material and a constraint equation of a second recycled raw material mathematical model related to the second recycled raw material, and more specifically, the constraint equation of the first recycled raw material mathematical model is a constraint equation of a mathematical model related to the 1A recycled raw material. In this embodiment, from the viewpoint of taking into account the amount of carbon dioxide generated, the constraint conditions further include a constraint equation of a CO2 mathematical model related to the amount of carbon dioxide generated related to the raw material. And, in this embodiment, from the viewpoint of taking into account the management cost, the objective function of the cost mathematical model further includes the management cost of managing the recycled raw materials, and the management cost is expressed by multiplying the management unit price and the management amount of the recycled raw materials. In this embodiment, the recycled raw materials include the first and second recycled raw materials as described above, so the management cost is expressed as the sum of a first multiplication result of a first management unit price of the first recycled raw material and a first management amount of the first recycled raw material, and a second multiplication result of a second management unit price of the second recycled raw material and a second management amount of the second recycled raw material. The first management amount is calculated based on a first lead time from the generation of the scraps to the time the scraps become usable as the first recycled raw material. The second management amount is calculated based on a second lead time from the generation of the defective products to the time the scraps become usable as the second recycled raw material.

[0050] More specifically, the objective function (evaluation formula) OB of the cost mathematical model is expressed by formula 1, the raw material cost MC is expressed by formula 1a, and the management cost DSC is expressed by formula 1b. That is, the raw material cost MC is the sum of the results of multiplication of the monetary cost (unit price) of each raw material and its usage amount, and the management cost SDC is the sum of the results of multiplication of the management cost (unit price) of each recycled raw material and its management amount. The management amount is calculated based on the generation date, usage date, lead time, and dissolution date.

[0051]

number

[0052] Here, S.C. j , S.U. jm , SQ jd , L.T. j S and DSCS j are the monetary cost (unit price) [yen / Ton] of the 1A recycled raw material of the 1st scrap (internal scrap) of the in-house scrap type number j, the usage amount [Ton] of the charge number m, the amount generated on the generation date d, the lead time from generation to when it can be melted, and the management cost (unit price) [yen / Ton·day]. DC k , D.U. km , DQ jd , L.T. k D1 , L.T. k D2 and DSCD j are the monetary cost (unit price) [yen / Ton] of the second recycled raw material of defective product type number k, the usage amount [Ton] of charge number m, the amount generated on the generation date d, the lead time from generation to when it can be processed in the shared equipment, the lead time from when it is processed in the shared equipment to when it can be dissolved, and the management cost (unit price) [yen / Ton·day], respectively. PSC p and PSU pmare the monetary cost (unit price) [yen / Ton] of the second waste (purchased waste) of purchased waste type number p, and the usage amount [Ton] of charge number m, respectively. GC g and G.U. gm are the monetary cost (unit price) [yen / Ton] of G bullion type number g and the usage amount [Ton] of charge number m, respectively. AC and AU m are the monetary cost (unit price) of bullion [yen / Ton] and the usage amount of charge number m [Ton], respectively. CD m is the dissolution date of charge number m. The monetary cost is the cost of acquisition and is expressed as a unit price. The management cost is the cost of management and is expressed as a unit price.

[0053] In the above, the objective function OB of the cost mathematical model is expressed by Equation 1, but is not limited to this. For example, a weight α may be assigned to each of the raw material cost MC and the management cost DSC (OB=α×MC+(1-α)×DSC). The weight α is appropriately set according to the importance of the raw material cost MC relative to the management cost DSC. For example, when the stock of raw materials exceeds a predetermined amount, it becomes necessary to rent a warehouse from an outside source, so that it is desired to reduce the management cost DSC, and therefore, α is appropriately set to α<0.5. Alternatively, for example, the objective function OB of the cost mathematical model may be defined only by the raw material cost MC (OB=MC). Alternatively, for example, although Equation 1b is defined by the remaining amount, it may be defined by the ratio of the usage amount to the generation amount.

[0054] The constraint equation of the quality mathematical model regarding the quality of the product is expressed by the following Inequality 2. This Inequality 2 expresses the need to make the charge product have a certain level of quality or higher, which is expressed by the inequality that the recycled raw materials are used in a certain amount or less.

[0055]

number

[0056] Here, C.S. m is the upper limit of the quality cost for charge number m. j is the quality cost (unit quantity) of the first scrap of the in-house generated scrap type number j. DS k is the quality cost (unit quantity) of defective product of defective product type number k. PSS p is the quality cost (unit quantity) of the second scrap of purchased scrap type number p. M is the number of charges. Σ is an operator for calculating the sum. The quality cost is a numerical representation of the effect on quality of using 1 ton of recycled raw material, and is expressed in unit amount.

[0057] The constraint equation of the mathematical model of the first recycled material for the first recycled material, here, the constraint equation of the mathematical model for the firstA recycled material, is expressed by the following inequality 3. This inequality 3 expresses that the first recycled material, here, the firstA recycled material, can be used in a charge after the scrap melting lead time from the date D of the first scrap generation, and can be used within the amount of the generated amount. D is the number of days in the production planning period. J is the number of types of first scrap.

[0058]

number

[0059] The constraint equations of the second recycled material mathematical model for the second recycled material are expressed by the following inequalities 4-1 to 4-3. Inequality 4-1 indicates that defective products cannot be processed if the shared equipment is not available, in other words, defective products can only be processed when the shared equipment is available. Inequality 4-2 indicates that defective products related to the second recycled material can be processed in the shared equipment after the defective product processing lead time from the date of generation D, and can be processed within the amount of generation. Inequality 4-3 indicates that defective products related to the second recycled material can be processed in the shared equipment after the date of processing n DThis indicates that the charge can be used after the lead time for dissolving the defective products, and that the charge can be used within the processing amount.

[0060]

number

[0061] Here, F id is the available time [Hr] of the shared equipment number i on day d. A ikd is the defect processing capacity [Hr / Ton] of the shared equipment number i on day d for defective products of defective product type number k. DP ikd is the throughput [Ton] of the shared equipment with shared equipment number i on day d for defective products with defective product type number k. kd is the amount of defective products of defective product type number k on day d [Ton]. I is the number of shared facilities. n K is the number of types of defective products.

[0062] The constraint equation of the CO2 mathematical model regarding the amount of carbon dioxide generated from the raw material is expressed by the following inequality 5. This inequality 5 expresses the need to keep the carbon dioxide cost of the charge product below a certain level (the amount of carbon dioxide generated from the charge product needs to be kept below a certain level).

[0063]

number

[0064] Here, SCO j is the CO2 cost (unit amount generated) [kg / Ton] for the first waste of the in-house generated waste type number j. k is the CO2 cost (unit amount) [kg / Ton] for defective products of defective product type number k. j is the CO2 cost (unit amount generated) [kg / Ton] for the second waste of purchased waste type number p. gis the CO2 cost (unit amount generated) [kg / Ton] for G bullion of G bullion type number g. ACO is the CO2 cost (unit amount generated) for the bullion [kg / Ton].

[0065] In this embodiment, in addition to the constraints expressed by the above-mentioned inequalities 2 to 5, the constraint expressed by the following inequality 6 is added. This inequality 6 indicates that a predetermined amount of each raw material is input into the product of each charge.

[0066]

number

[0067] The output processing unit 13 outputs to the outside the amount of each of the original raw materials and the recycled raw materials used, which is determined by the optimization processing unit 12. In this embodiment, the output processing unit 13 outputs the amount of each of the raw materials used to the output unit 4. The output processing unit 13 may output the amount of each of the raw materials used to an external device via the IF unit 5 as necessary.

[0068] In Equation 1 and Inequality 2 to Inequality 6, unless otherwise specified within each equation, Σ calculates the sum within the following range for i, j, k, p, g, m, and d: P is the number of types of second scraps, n G is the number of varieties of G bullion. i = 1, 2, . . . , n I , j=1, 2, . . . , n J , k=1, 2, . . . , n K , p=1, 2, . . . , n P , g=1, 2, . . . , n G , m=1, 2, . . . , n M , d=1, 2, . . . , n D .

[0069] The control processing unit 1, storage unit 2, input unit 3, output unit 4 and IF unit 5 can be configured by, for example, a desktop or notebook computer.

[0070] Next, the operation of this embodiment will be described. FIG. 11 is a flow chart showing the operation of the raw material usage amount calculation device. FIG. 12 is a diagram for explaining the results of one embodiment as an example. FIG. 12A shows the raw material usage amount (input amount) of each of the bullion, G bullion, second recycled raw material, first B recycled raw material, and first A recycled raw material for each charge, and FIG. 12B shows the processing status of the shared equipment. FIG. 13 is a diagram for explaining the constraint value of the constraint equation used in FIG. 12 and the calculation result thereof.

[0071] When the power is turned on, the raw material usage amount calculation device 1000 having such a configuration initializes each required part and starts its operation. In the control processing part 1, a control part 11, an optimization processing part 12 and an output processing part 13 are functionally configured by executing the control processing program.

[0072] First, a user (operator) inputs each piece of data into the raw material usage amount calculation device 1000 from the input unit 3 or IF unit 5. For example, each piece of numerical data shown in Fig. 3 to Fig. 10 is input into the raw material usage amount calculation device 1000. In Fig. 11, the raw material usage amount calculation device 1000 receives input of each piece of data at the input unit 3 or IF unit 5 by the control unit 11 of the control processing unit 1, and stores the received data in the schedule information storage unit 21, the charge information storage unit 22, the lead time information storage unit 23 and the raw material information storage unit 24 in the storage unit 2 (S1).

[0073] Next, the raw material usage amount calculation device 1000 substitutes each piece of data received and stored in process S1 into the above-mentioned equation 1 (equation 1a, equation 1b) and inequality 2 to inequality 6 by the optimization processing unit 12 of the control processing unit 1, and converts the objective function and each constraint equation into a mathematical expression using numerical values ​​(S2).

[0074] Next, the raw material usage amount calculation device 1000 optimizes the objective function, which has been numerically formulated in process S2, under each constraint condition of each constraint equation, which has been numerically formulated in process S2, by the optimization processing unit 12, thereby determining the amount of raw material usage for each of the original raw materials (in this embodiment, the bullion and G bullion) and the recycled raw materials (in this embodiment, the 1A recycled raw material, the 2nd recycled raw material, and the 1B recycled raw material) (S3). For example, IBM's "CPLEX Optimizer" (CPLEX is a registered trademark) was used to optimize this objective function.

[0075] Then, the raw material usage amount calculation device 1000 outputs the raw material usage amounts of the original raw materials and the recycled raw materials calculated in step S3 to, for example, the output unit 4 (S4), and this process ends.

[0076] Figures 12 and 13 show the results of calculations using the data shown in Figures 3 to 10. As can be seen from Figure 13, the required input amount is met for each charge of charge numbers 1 and 2, and the quality cost and CO2 cost each reach the upper limit of the constraint condition. Note that fractions are rounding errors in the calculation process.

[0077] In the charge of charge number 1, referring to FIG. 12A, internally generated scrap and defective products are not used. This is because the charge of charge number 1 is melted on the first day of the production plan, and the lead time shown in FIG. 5 is not enough. Therefore, referring to FIG. 12A, among the other raw materials purchased scrap, ingots and G ingots, the purchased scrap with the smallest monetary cost is used up to the upper limit value in the constraint equation of inequality 2, and then the ingot with the smallest monetary cost among the raw materials with a quality cost of 0 is used in accordance with the constraint equation of inequality 5, and the amount of each raw material used of purchased scrap, ingots and G ingots is calculated so that the shortage in the constraint equation of inequality 6 is compensated for by G ingots, which have a lower CO2 cost than ingots, and therefore optimization is achieved.

[0078] In the case of charge number 2, referring to FIG. 12A, the amount of each raw material used is calculated so that the constraints of Inequality 5 and Inequality 2 are at their upper limits and the constraints of Inequality 6 are satisfied, while the internally generated scrap and defective products, which have a low monetary cost, are used to the maximum extent possible, and therefore optimization is achieved. Note that, since charge number 2 is melted on the fifth day, 4.8 [Tons] (=1.2+1.2+1.2+1.2) of defective products generated from the first to fourth days shown in FIG. 3 are processed and usable at 4.8 [Tons] (=0+1.2+0.6+0+3) in the shared equipment, referring to FIG. 12B, and 4.8 [Tons] of defective products are used, and defective products, which have a lower quality cost than the internally generated scrap, are used preferentially compared to the internally generated scrap.

[0079] As described above, the raw material usage amount calculation device 1000 in this embodiment and the raw material usage amount calculation method and raw material usage amount calculation program implemented therein optimize the objective function of a cost mathematical model that represents the cost of raw materials including original raw materials and recycled raw materials under predetermined constraint conditions including the constraint equation of a quality mathematical model related to product quality, thereby determining the amounts of the original raw materials and recycled raw materials used, so that even when recycled raw materials are used, the amounts of the original raw materials and recycled raw materials used that satisfy the quality of the product can be determined. Therefore, the raw material usage amount calculation device 1000, the raw material usage amount calculation method, and the raw material usage amount calculation program can manufacture a product that satisfies a predetermined quality even when recycled raw materials are used.

[0080] The raw material usage amount calculation device 1000, raw material usage amount calculation method, and raw material usage amount calculation program can calculate the amount of each of the original raw material and the recycled raw material that satisfies the quality of the product, even when using recycled raw materials including a first recycled raw material made from scraps and a second recycled raw material made from defective products. The use of the first recycled raw material requires the generation of scraps, and the use of the second recycled raw material requires the generation of defective products as well as the man-hours (processing, steps) required to recycle the defective products into raw materials. However, the raw material usage amount calculation device 1000, raw material usage amount calculation method, and raw material usage amount calculation program include the constraint equations for the first and second recycled raw materials in the constraint conditions, so these necessary items can be taken into consideration in the calculation of the amount of each of the original raw material and the recycled raw material.

[0081] The raw material usage amount calculation device 1000, the raw material usage amount calculation method, and the raw material usage amount calculation program can calculate the amounts of the original raw materials and the recycled raw materials used that satisfy the quality of the product, even when recycled raw materials including a 1A recycled raw material made from a first scrap generated inside and a 1B recycled raw material made from a second scrap purchased from outside are used.

[0082] The raw material usage amount calculation device 1000, raw material usage amount calculation method, and raw material usage amount calculation program can further take into account the management costs of managing the recycled raw materials and determine the amounts of original raw materials and recycled raw materials used that satisfy the quality of the product.

[0083] The raw material usage amount calculation device 1000, the raw material usage amount calculation method, and the raw material usage amount calculation program include a constraint equation of a CO2 mathematical model related to the amount of carbon dioxide generated from the raw materials in the constraint conditions, so that the amount of carbon dioxide generated from such raw materials can be taken into consideration in the calculation of the amount of raw material used, both the original raw materials and the recycled raw materials. Therefore, a business can be carried out while working on carbon neutrality.

[0084] The raw material usage amount calculation device 1000, the raw material usage amount calculation method, and the raw material usage amount calculation program can calculate the amount of each raw material and recycled raw material used that satisfies the quality of the product, even when using multiple types of raw materials with different carbon dioxide emissions. Therefore, it is possible to carry out a business that is committed to carbon neutrality.

[0085] In order to express the present invention, the present invention has been described adequately and sufficiently through the embodiments with reference to the drawings in the above description, but it should be recognized that those skilled in the art can easily change and / or improve the above-mentioned embodiments. Therefore, unless the changes or improvements made by those skilled in the art are at a level that departs from the scope of the claims described in the claims, the changes or improvements are interpreted as being included in the scope of the claims. [Explanation of symbols]

[0086] 1000 Raw material amount calculation device 1 Control processing section 2 Storage section 3. Input section 4 Output section 5 Interface section (IF section) 11 Control section 12 Optimization Processing Section 13 Output Processing Section 21 Schedule information storage section 22 Charge information storage unit 23 Lead time information storage section 24 Raw material information storage section

Claims

1. an optimization processing unit that optimizes an objective function of a cost mathematical model that represents a cost of a raw material under a predetermined constraint condition to obtain a raw material usage amount of the raw material; an output processing unit that outputs the amount of the raw material used determined by the optimization processing unit to an outside; The cost of the raw material is expressed by multiplying the unit price of the raw material by the amount of the raw material used, The raw materials include original raw materials that are raw materials and recycled raw materials that have been recycled into raw materials, The constraint condition includes a constraint equation of a quality mathematical model regarding the quality of the product. A calculation device for calculating the amount of raw materials used.

2. The recycled raw materials include a first recycled raw material obtained by recycling scraps into the raw material, and a second recycled raw material obtained by recycling defective products into the raw material, The constraint conditions further include a constraint equation of a first recycled raw material mathematical model regarding the first recycled raw material and a constraint equation of a second recycled raw material mathematical model regarding the second recycled raw material; The raw material usage amount calculation device according to claim 1.

3. The first recycled raw material includes a first A recycled raw material made from a first scrap generated inside the company and a first B recycled raw material made from a second scrap purchased from outside the company; The constraint equation of the first recycled raw material mathematical model is a constraint equation of the mathematical model related to the first A recycled raw material; The raw material usage amount calculation device according to claim 2.

4. The objective function of the cost mathematical model further includes a management cost of managing the recycled raw materials, The management cost is represented by multiplying the management unit price by the management amount of the recycled raw material. The raw material usage amount calculation device according to claim 1.

5. The constraint further includes a CO 2 Including constraints of mathematical models, The raw material usage amount calculation device according to claim 1.

6. The raw material includes a plurality of types having different amounts of carbon dioxide generated in relation to the production of the raw material, The raw material usage amount calculation device according to claim 1.

7. an optimization process step of optimizing an objective function of a cost mathematical model that represents the cost of the raw material under a predetermined constraint condition to obtain a raw material usage amount of the raw material; an output processing step of outputting the amount of the raw material used determined in the optimization processing step to an outside; The cost of the raw material is expressed by multiplying the unit price of the raw material by the amount of the raw material used, The raw materials include original raw materials that are raw materials and recycled raw materials that have been recycled into raw materials, The constraint condition includes a constraint equation of a quality mathematical model regarding the quality of the product. How to calculate the amount of raw materials used.

8. A raw material usage amount calculation program for causing a computer to function as the raw material usage amount calculation device according to any one of claims 1 to 6.

Citation Information

Patent Citations

  • Process system controlling method

    JP1999259144A

  • Method for evaluating scrap value and system for determing ratio of scrap used by using this method

    JP1999264013A

  • Composition plan making-out device, method, and program

    JP2009175804A

  • Raw material purchase and use plan creation device, method, and program

    JP2016081195A

  • Capability predictor

    US7110956B1