Substrate processing method, method of manufacturing semiconductor device, substrate processing apparatus and program
By stabilizing gas temperatures through controlled temperature adjustments in multiple cycles, the method addresses temperature-induced variations in substrate processing, ensuring consistent film formation on wafers.
Patent Information
- Application Number
- JP2023082673
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-19
- Publication Date
- 2024-11-29
AI Technical Summary
Existing substrate processing methods experience variations due to temperature fluctuations during multiple cycles of processing gas supply, affecting the consistency of film formation on wafers.
A method involving storing processing gas at a first temperature, then adjusting the storage section temperature to a second temperature lower than the first, followed by setting it to a third temperature different from the second, and repeating this cycle to equalize the third temperature across multiple cycles, thereby stabilizing the gas temperature for consistent processing.
This approach suppresses variations in substrate processing, ensuring consistent film formation by maintaining stable gas temperatures across cycles, improving processing consistency and reducing fluctuations.
Smart Images

Figure 2024166522000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a substrate processing method, a semiconductor device manufacturing method, a substrate processing apparatus, and a program. [Background technology]
[0002] A substrate may be processed by performing a step of storing a process gas in a storage unit and a step of supplying the process gas stored in the storage unit to the substrate a predetermined number of times (see, for example, Patent Document 1). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2020-136301 A Summary of the Invention [Problem to be solved by the invention]
[0004] The present disclosure provides a technique capable of suppressing variations in substrate processing. [Means for solving the problem]
[0005] According to one aspect of the present disclosure, (a) storing a first process gas in a storage portion; (b) after (a), supplying the first process gas from the reservoir at a first temperature to a substrate to bring the temperature of the reservoir to a second temperature lower than the first temperature; (c) after (b), setting the temperature of the storage portion after the first process gas is supplied to a third temperature different from the second temperature; A cycle of performing the steps in this order multiple times, Techniques are provided for equalizing the third temperature between a number of said cycles. Effect of the Invention
[0006] According to the present disclosure, it is possible to suppress variations in substrate processing. [Brief description of the drawings]
[0007] [Figure 1] FIG. 1 is a schematic configuration diagram of a vertical processing furnace of a substrate processing apparatus preferably used in one embodiment of the present disclosure, and is a vertical sectional view of the processing furnace portion. [Diagram 2] FIG. 2 is a schematic configuration diagram of a first process gas supply system of a substrate processing apparatus preferably used in one aspect of the present disclosure. [Diagram 3] FIG. 3 is a schematic configuration diagram of a controller of the substrate processing apparatus shown in FIG. 1, and is a block diagram of an example of a control system of the controller. [Figure 4] FIG. 4 is a flow chart of an example of a substrate processing process using the substrate processing apparatus shown in FIG. [Diagram 5] FIG. 5 is a diagram showing the relationship between the tank temperature and time in a comparative example that does not include the temperature adjustment step of the first process gas supply step shown in FIG. [Figure 6] FIG. 6 is a diagram showing the relationship between the tank temperature and time in the first process gas supplying step shown in FIG. [Figure 7] Fig. 7(a) is a flowchart of a first example of the sub-steps of the storage step shown in Fig. 4. Fig. 7(b) is a flowchart of a second example of the sub-steps of the storage step shown in Fig. 4. Fig. 7(c) is a flowchart of a third example of the sub-steps of the storage step shown in Fig. 4. Fig. 7(d) is a flowchart of a fourth example of the sub-steps of the storage step shown in Fig. 4. [Figure 8] FIG. 8 is a flowchart showing another example of the sub-steps of the first process gas supply step shown in FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0008] Hereinafter, one embodiment of the present disclosure will be described mainly with reference to FIG. 1 to FIG. 4. The drawings used in the following description are all schematic, and the dimensional relationship of each element, the ratio of each element, and the like shown in the drawings do not necessarily match the actual ones. Furthermore, the dimensional relationship of each element, the ratio of each element, and the like do not necessarily match between multiple drawings. Furthermore, between multiple drawings, substantially the same elements are given the same reference numerals, and each element is described in the drawing in which it first appears, and the description is omitted in the subsequent drawings unless otherwise necessary. Unless otherwise specified in the specification, each element is not limited to one, and may be present in multiple numbers.
[0009] (1) Configuration of the substrate processing device
[0010] The substrate processing apparatus of this embodiment includes a vertical processing furnace 202. The processing furnace 202 includes a reaction tube 203 made of a heat-resistant material such as quartz (SiO2) or silicon carbide (SiC). A heater 207 as a heating device is provided concentrically around the reaction tube 203 on the outside of the reaction tube 203. A heating power source 250 is connected to the heater 207. A seal cap 219 as a furnace port cover is provided below the reaction tube 203. An O-ring 220 as an airtight member is disposed between the lower end of the reaction tube 203 and the upper surface of the seal cap 219. The seal cap 219 is made of a metal such as stainless steel (SUS) and is configured to airtightly close the lower end opening of the reaction tube 203. The inside of the reaction tube 203 is configured as a processing chamber 201 that accommodates wafers 200 as substrates.
[0011] On the seal cap 219, a boat support table 218 is provided to support a boat 217 as a substrate holder. The boat 217 has a bottom plate fixed on the boat support table 218 and a top plate disposed above the bottom plate. A plurality of support columns are provided between the bottom plate and the top plate. A plurality of wafers 200 are loaded (loaded) on the support columns in multiple stages in the axial direction of the reaction tube 203 with a predetermined interval between them, in a horizontal position, and with their centers aligned. The boat support table 218, the bottom plate, the top plate, and the support columns are each made of, for example, the heat-resistant material described above. A rotation mechanism 267 is provided on the opposite side of the seal cap 219 to the processing chamber 201. A rotation shaft 265 of the rotation mechanism 267 is connected to the boat support table 218 through the seal cap 219. The rotation mechanism 267 rotates the rotation shaft 265 to rotate the boat 217 and the wafers 200. The seal cap 219 is raised and lowered in the vertical direction by the boat elevator 115. The boat elevator 115 is configured as a transfer mechanism that transfers the boat 217 and the wafers 200 into and out of the processing chamber 201.
[0012] Nozzles 410, 420, and 430 are provided in the processing chamber 201 so as to penetrate the lower sidewall of the reaction tube 203. Gas supply pipes 310, 320, and 330 are connected to the nozzles 410, 420, and 430, respectively.
[0013] The gas supply pipes 310 and 320 are provided with mass flow controllers (MFCs) 312 and 322, valves 314 and 324, tanks 315 and 325, and valves 313 and 323, in that order from the upstream side of the gas flow. In other words, the valves 314 and 324 are provided on the primary side of the tanks 315 and 325, and the valves 313 and 323 are provided on the secondary side of the tanks 315 and 325. The MFCs 312 and 322 are also referred to as flow rate control units. The valves 314 and 324 are on-off valves and are also referred to as first valves. The tanks 315 and 325 are also referred to as storage units. The valves 313 and 323 are on-off valves and are also referred to as second valves. One or both of the first and second valves can be considered as gas control units that control the storage of the first process gas in the storage unit and the supply of the first process gas from the storage unit to the wafer 200 in the process chamber 201. Vaporizers 317 and 327 serving as process gas supply units are connected to the gas supply pipes 310 and 320, respectively. Heat exchangers 318 and 328 serving as preheating units are provided downstream of the MFCs 312 and 322. The heat exchangers 318 and 328 may be provided upstream of the MFCs 312 and 322.
[0014] Vent gas pipes 610, 620 are connected between the MFCs 312, 322 and the valves 314, 324 in the gas supply pipes 310, 320. The vent gas pipes 610, 620 are connected to the downstream side of an APC valve 243 in the exhaust pipe 231, which will be described later. Valves 612, 622 are provided in the vent gas pipes 610, 620, respectively. Gas supply pipes 510, 520 that supply an inert gas are connected to the downstream side of the valves 313, 323 in the gas supply pipes 310, 320, respectively. MFCs 512, 522 and valves 513, 523 are provided in the gas supply pipes 510, 520, in this order from the upstream side of the gas flow, respectively.
[0015] The downstream ends of the gas supply pipes 310, 320 are connected to the upstream ends of the nozzles 410, 420, respectively. The nozzles 410, 420 are provided in an annular space between the inner wall of the reaction tube 203 and the wafers 200, along the inner wall of the reaction tube 203 from the lower part to the upper part, i.e., rising along the direction in which the wafers 200 are loaded. A plurality of gas supply ports 411, 421 are provided on the side (side surface) of the nozzles 410, 420, respectively. The gas supply ports 411, 421 are provided at positions corresponding to the plurality of wafers 200, respectively.
[0016] The tanks 315, 325 are configured as gas tanks with a larger gas capacity than normal piping, or as spiral piping, etc. By opening and closing the valves 314, 324 on the upstream side of the tanks 315, 325 and the valves 313, 323 on the downstream side, the gas supplied from the gas supply pipes 310, 320 can be temporarily filled (stored) in the tanks 315, 325, respectively, and the gas temporarily stored in the tanks 315, 325, respectively, can be supplied into the processing chamber 201. The conductance between the tanks 315, 325 and the processing chamber 201 is, for example, 1.5×10 -3 m 3 When the volume of the reaction tube 203 is 100 L (liters), the volume of the tank 315 is preferably set to a predetermined size within a range of, for example, 100 cc to 300 cc.
[0017] As shown in Fig. 2, the tanks 315, 325 are provided with tank heaters 316, 326 as temperature adjustment units (heating units) and thermocouples 319, 329 as temperature measurement units. Based on temperature information detected by the thermocouples 319, 329, the power supplied to the tank heaters 316, 326 from a power source (not shown) is adjusted. This controls the temperature of the tanks 315, 325 to a desired temperature. In other words, the output of the tank heaters 316, 326 is feedback-controlled with respect to the temperature of the tanks 315, 325.
[0018] When the valves 313, 323, 612, and 622 are closed and the valves 314 and 324 are opened, the gas whose flow rate is adjusted by the MFCs 312 and 322 is temporarily stored in the tanks 315 and 325. After a predetermined amount of gas is stored in the tanks 315 and 325 and the pressure in the tanks 315 and 325 reaches a predetermined pressure, the valves 314 and 324 are closed and the valves 313 and 323 are opened. Then, the high-pressure gas stored in each of the tanks 315 and 325 is supplied into the processing chamber 201 at once (in a short time) through the gas supply pipes 310 and 320 and the nozzles 410 and 420. At this time, when the valves 513 and 523 are opened, the inert gas whose flow rate is adjusted by the MFCs 512 and 522 is supplied into the processing chamber 201 through the gas supply pipes 310 and 320 and the nozzles 410 and 420.
[0019] Furthermore, when the valves 314, 324 are closed and the valves 612, 622 are opened, the gas whose flow rate is adjusted by the MFCs 312, 322 is bypassed without being supplied into the processing chamber 201, and is exhausted to the exhaust pipe 231 via the vent gas pipes 610, 620. Furthermore, when the valves 313, 323 are closed and the valves 513, 523 are opened, the inert gas whose flow rate is adjusted by the MFCs 512, 522 is supplied into the processing chamber 201 via the gas supply pipes 310, 320 and the nozzles 410, 420, respectively, and the processing chamber 201 is purged.
[0020] A first process gas is supplied from gas supply pipes 310 and 320 into the process chamber 201 via MFCs 312 and 322, valves 314 and 324, tanks 315 and 325, valves 313 and 323, and nozzles 410 and 420, respectively.
[0021] An inert gas is supplied from gas supply pipes 510 and 520 into the processing chamber 201 via MFCs 512 and 522, valves 513 and 523, gas supply pipes 310 and 320, and nozzles 410 and 420, respectively.
[0022] The first process gas supply systems 301, 302 are mainly constituted by the gas supply pipes 310, 320, the MFCs 312, 322, the heat exchangers 318, 328, the valves 314, 324, the tanks 315, 325, and the valves 313, 323. The first process gas supply systems 301, 302 may also include the vaporizers 317, 327 and the nozzles 410, 420. The first inert gas supply systems 501, 502 are mainly constituted by the gas supply pipes 510, 520, the MFCs 512, 522, and the valves 513, 523. Although two first process gas supply systems, the first process gas supply systems 301, 302, are provided as the first process gas supply systems, only one of them may be provided.
[0023] The gas supply pipe 330 is provided with an MFC 332 and a valve 333 in this order from the upstream side of the gas flow. A vent gas pipe 630 is connected between the MFC 332 and the valve 333 of the gas supply pipe 330. The vent gas pipe 630 is connected to the downstream side of an APC valve 243 of the exhaust pipe 231, which will be described later. A valve 632 is provided in the vent gas pipe 630. A gas supply pipe 530 that supplies an inert gas is connected to the downstream side of the valve 333 of the gas supply pipe 330. The gas supply pipe 530 is provided with an MFC 532 and a valve 533 in this order from the upstream side.
[0024] The gas supply pipe 330 is connected to a nozzle 430. The nozzle 430 is provided in a buffer chamber 433 which is a gas dispersion space.
[0025] The buffer chamber 433 is formed by the inner wall of the reaction tube 203 and a buffer chamber wall 434. The buffer chamber wall 434 is provided in a circular space between the inner wall of the reaction tube 203 and the wafer 200, from the lower part to the upper part of the inner wall of the reaction tube 203, along the loading direction of the wafer 200. A gas supply port 435 for supplying gas is provided in the wall of the buffer chamber wall 434 adjacent to the wafer 200. The gas supply port 435 opens to face the center of the reaction tube 203. A plurality of gas supply ports 435 are provided from the lower part to the upper part of the reaction tube 203. A pair of rod-shaped electrodes to which high-frequency power is applied from the high-frequency power source 270 via a matching device 271 is provided in the buffer chamber 433.
[0026] The nozzle 430 is provided at one end of the buffer chamber 433, rising upward in the loading direction of the wafers 200 along the inner wall of the reaction tube 203 from the lower part to the upper part. A gas supply port 431 for supplying gas is provided on the side of the nozzle 430. The gas supply port 431 opens toward the center of the buffer chamber 433. Similar to the gas supply port 435 of the buffer chamber 433, a plurality of gas supply ports 431 are provided from the lower part to the upper part of the reaction tube 203.
[0027] When the valve 333 is opened, the gas whose flow rate is adjusted by the MFC 332 is supplied into the processing chamber 201 through the gas supply pipe 330, the nozzle 430, and the buffer chamber 433. At this time, when the valve 533 is opened, the inert gas whose flow rate is adjusted by the MFC 532 is supplied into the processing chamber 201 through the gas supply pipe 330, the nozzle 430, and the buffer chamber 433. When the valve 333 is closed and the valve 632 is opened, the gas whose flow rate is adjusted by the MFC 332 is bypassed without being supplied into the processing chamber 201, and is exhausted to the exhaust pipe 231 through the vent gas pipe 630. When the valve 333 is closed and the valve 533 is opened, the inert gas whose flow rate is adjusted by the MFC 532 is supplied into the processing chamber 201 through the gas supply pipe 330, the nozzle 430, and the buffer chamber 433, and the processing chamber 201 is purged.
[0028] A second process gas having a different chemical structure (molecular structure) from the first process gas is supplied from the gas supply pipe 330 into the process chamber 201 via the MFC 332, the valve 333, the nozzle 430 and the buffer chamber 433.
[0029] An inert gas is supplied from the gas supply pipe 530 through the MFC 532 , the valve 533 , the gas supply pipe 330 , the nozzle 430 , and the buffer chamber 433 into the processing chamber 201 .
[0030] The second process gas supply system 303 is mainly constituted by the gas supply pipe 330, the MFC 332, and the valve 333. The second process gas supply system 303 may also include a nozzle 430 and a buffer chamber 433. The second inert gas supply system 503 is mainly constituted by the gas supply pipe 530, the MFC 532, and the valve 533.
[0031] An exhaust port 230 is provided at the bottom of the reaction tube 203. An exhaust pipe 231 that exhausts the atmosphere in the processing chamber 201 is connected to the exhaust port 230. The exhaust pipe 231 is provided with a pressure sensor 245, an APC (Auto Pressure Controller) valve 243, and a vacuum pump 246 in this order from the upstream side. The pressure sensor 245 detects the pressure in the processing chamber 201 and is also called a pressure detection unit. The APC valve 243 is also called a pressure adjustment unit. The vacuum pump 246 is also called a vacuum exhaust device. The APC valve 243 is configured to be able to perform evacuation and stop evacuation in the processing chamber 201 by opening and closing the valve while the vacuum pump 246 is in operation. Furthermore, the APC valve 243 is configured to be able to adjust the pressure in the processing chamber 201 by adjusting the valve opening while the vacuum pump 246 is in operation. An exhaust system is mainly configured by the exhaust pipe 231, the APC valve 243, and the pressure sensor 245. A vacuum pump 246 may be included in the exhaust system.
[0032] A temperature sensor 263 serving as a temperature detector is installed in the reaction tube 203. Based on temperature information detected by the temperature sensor 263, the power supplied from the heating power source 250 to the heater 207 is adjusted. This allows the temperature in the processing chamber 201 to be controlled to have a desired temperature distribution.
[0033] 3, the controller 280 as a control unit is configured as a computer including a CPU (Central Processing Unit) 280a, a RAM (Random Access Memory) 280b, a storage device 280c, and an I / O port 280d. The RAM 280b, the storage device 280c, and the I / O port 280d are configured to be able to exchange data with the CPU 280a via an internal bus 280e. An input / output device 282 configured as, for example, a touch panel is connected to the controller 280.
[0034] The storage device 280c is composed of a flash memory, a HDD (Hard Disk Drive), and the like. In the storage device 280c, a control program for controlling the operation of the substrate processing apparatus, a process recipe in which procedures and conditions of the substrate processing described later are described, and the like are readably stored. The process recipe is a combination of procedures in the substrate processing described later that are executed by the controller 280 to obtain a predetermined result, and functions as a program. Hereinafter, the process recipe, the control program, and the like are collectively referred to simply as a program. In addition, the process recipe is also simply referred to as a recipe. In this specification, when the word program is used, it may include only a recipe, only a control program, or both. The RAM 280b is configured as a memory area (work area) in which the programs and data read by the CPU 280a are temporarily stored.
[0035] The I / O port 280d is connected to the MFCs 312, 322, 332, 512, 522, 532, valves 313, 314, 323, 324, 333, 513, 523, 533, 612, 622, 632, pressure sensor 245, APC valve 243, vacuum pump 246, heater 207, heating power supply 250, temperature sensor 263, high frequency power supply 270, matching box 271, rotation mechanism 267, boat elevator 115, tank heaters 316, 326, thermocouples 319, 329, etc.
[0036] The CPU 280a is configured to read and execute a control program from the storage device 280c, and to read a recipe from the storage device 280c in response to an input of an operation command from the input / output device 282. The CPU 280a is configured to control the flow rate adjustment of various gases by the MFCs 312, 322, 332, 512, 522, and 532, and the opening and closing of the valves 313, 314, 323, 324, 333, 513, 523, 533, 612, 622, and 632, in accordance with the contents of the read recipe. Furthermore, the CPU 280a is configured to control the opening and closing of the APC valve 243, the pressure adjustment operation by the APC valve 243 based on the pressure sensor 245, and the start and stop of the vacuum pump 246. Furthermore, the CPU 280a is configured to control the temperature adjustment operation (output adjustment of the heating power supply 250) of the heater 207 based on the temperature sensor 263, the power supply of the high frequency power supply 270, and the impedance adjustment operation by the matching device 271. Furthermore, the CPU 280a is configured to control the rotation and rotation speed adjustment operation of the boat 217 by the rotation mechanism 267, the raising and lowering operation of the boat 217 by the boat elevator 115, the tank heaters 316, 326 based on the thermocouples 319, 329, etc.
[0037] The controller 280 can be configured by installing the above-mentioned program stored in the external storage device 281 in a computer. The external storage device 281 includes, for example, a magnetic disk such as an HDD, an optical disk such as a CD, a magneto-optical disk such as an MO, a semiconductor memory such as a USB memory, and the like. The storage device 280c and the external storage device 281 are configured as computer-readable recording media. Hereinafter, these are collectively referred to simply as recording media. When the term recording media is used in this specification, it may include only the storage device 280c alone, only the external storage device 281 alone, or both of them. The program may be provided to the computer using a communication means such as the Internet or a dedicated line, without using the external storage device 281.
[0038] (2) Substrate processing An example of a process for forming a film on a wafer 200 as one step of a manufacturing process of a semiconductor device using the above-mentioned substrate processing apparatus, i.e., an example of a sequence of a film forming process, will be described with reference to Fig. 4. In the following description, the operation of each part constituting the substrate processing apparatus is controlled by a controller 280.
[0039] The term "wafer" used in this specification may mean the wafer itself or a laminate of the wafer and a predetermined layer or film formed on its surface. The term "surface of a wafer" used in this specification may mean the surface of the wafer itself or the surface of a predetermined layer or the like formed on the wafer. When it is stated in this specification that "a predetermined layer is formed on a wafer", it may mean that a predetermined layer is formed directly on the surface of the wafer itself or that a predetermined layer is formed on a layer or the like formed on the wafer. When the term "substrate" is used in this specification, it is synonymous with the term "wafer".
[0040] (Substrate loading process S1) A plurality of wafers 200 are loaded into the boat 217 (wafer charge), and the bottom opening of the reaction tube 203 is opened. Then, the boat 217 supporting the wafers 200 is lifted by the boat elevator 115 and carried into the processing chamber 201 (boat load). As shown in FIG. 1, the bottom end of the reaction tube 203 is sealed by a seal cap 219 via an O-ring 220.
[0041] (Pressure / temperature adjustment process S2) The inside of the processing chamber 201 is evacuated by the vacuum pump 246 so as to reach a desired pressure (pressure adjustment). The inside of the processing chamber 201 is heated by the heater 207 so as to reach a desired temperature (temperature adjustment). The rotation mechanism 267 starts to rotate the wafer 200 (rotation). These various operations are continued at least until the processing of the wafer 200 is completed.
[0042] (Film forming process S3) Thereafter, a first process gas supply step S31, a purge gas supply step S32, a second process gas supply step S33, and a purge gas supply step S34 are sequentially performed to perform a film forming process.
[0043] [First process gas supply step S31] <Storage process S311> With the valves 313, 323, 612, and 622 closed, the valves 314 and 324 are opened, and the first process gas, the flow rate of which is adjusted by the MFCs 312 and 322, is filled (stored) in the tanks 315 and 325, respectively. The first process gas is filled in the tanks 315 and 325 so that the pressure in the tanks 315 and 325 is, for example, 20,000 Pa or more. The amount of the first process gas filled in the tanks 315 and 325 is, for example, 100 to 250 cc. In this specification, the expression of a numerical range such as "100 to 250 cc" means that the lower limit and the upper limit are included in the range. Thus, for example, "100 to 250 cc" means "100 cc or more and 250 cc or less". The same applies to other numerical ranges. When the tanks 315 and 325 are filled with a predetermined amount of the first process gas at a predetermined pressure, the valves 314 and 324 are closed.
[0044] <Supply process S312> While the tanks 315 and 325 are being filled with the first process gas, the process chamber 201 is evacuated so that the pressure in the process chamber 201 becomes a predetermined pressure, for example, 20 Pa or less. After the tanks 315 and 325 are filled with the first process gas and the process chamber 201 is evacuated, the APC valve 243 is closed to block the exhaust system, and the valves 313 and 323 are opened. This allows the high-pressure first process gas stored in the tanks 315 and 325 to be supplied into the process chamber 201 at once. The pressure in the process chamber 201 rises rapidly and reaches a pressure in the range of, for example, 800 to 1200 Pa. Thereafter, the state in which the first process gas is sealed in the process chamber 201 is maintained, and the wafer 200 is exposed to the atmosphere of the first process gas for a predetermined time (first process gas supply). At this time, the valves 513, 523, and 533 are opened to allow the inert gas to flow into the processing chamber 201, thereby preventing the first processing gas from entering the nozzles 410, 420, and 430. When a predetermined time has elapsed since the valves 313 and 323 were opened, the valves 313 and 323 are closed.
[0045] In this specification, the operation of supplying the first process gas stored in the tank 315, 325 to the process chamber 201 (or to the wafer 200 in the process chamber 201) is referred to as "flush supply." In addition, the operation of storing the first process gas in the tank 315, 325 and the operation of supplying the first process gas stored in the tank 315, 325 to the process chamber 201 may be collectively referred to as "flush supply."
[0046] In the flush supply, the pressure of the first process gas stored in the tanks 315 and 325 can be increased to increase the pressure difference between the tank 315 and the process chamber 201, and the pressure difference between the tank 325 and the process chamber 201. In this way, the flow rate of the first process gas supplied into the process chamber 201 through the gas supply ports 411 and 421 can be increased. The flow rate of the first process gas supplied into the process chamber 201 through the gas supply ports 411 and 421 is such that the first process gas does not stagnate in the nozzles 410 and 420, passes through the nozzles 410 and 420 in a very short time, and is diffused onto the wafer 200 at once. As a result, the first process gas can be efficiently diffused throughout the process chamber 201.
[0047] The pressure difference between tank 315 and processing chamber 201, and the pressure difference between tank 325 and processing chamber 201 are set, for example, so that the flow rate of the first processing gas supplied from gas supply port 421 into processing chamber 201 is 0.8 to 1.2 times the flow rate of the first processing gas supplied from gas supply port 411 into processing chamber 201.
[0048] The temperature of the heater 207 is set within a range of, for example, 350 to 650° C. The supply flow rates of the inert gases controlled by the MFCs 512, 522, and 532 are each set within a range of, for example, 300 to 10,000 sccm. The time for which the first process gas is confined within the process chamber 201 is set within a range of, for example, 1 to 30 seconds.
[0049] By supplying the first process gas to the wafer 200 under the above-mentioned conditions, a first layer can be formed on the wafer 200 (the undercoat film on the surface).
[0050] As the inert gas, for example, nitrogen (N2) gas, argon (Ar) gas, helium (He) gas, neon (Ne) gas, xenon (Xe) gas, or other rare gases can be used. As the inert gas, one or more of these can be used. This also applies to each process described later.
[0051] Note that the valves 313 and 323 may be opened in a state where the APC valve 243 is opened and the exhaust system is not blocked. That is, flush supply may be performed while continuing exhausting the interior of the processing chamber 201. In such a case, the flow rate of the first processing gas in the processing chamber 201 is further increased, and the first processing gas is more likely to be efficiently diffused throughout the entire processing chamber 201.
[0052] <Temperature control process S313> After the supply step S312, the temperature of the tanks 315, 325 is adjusted. For example, the temperature adjustment step S313 is started when the valves 313, 323 are closed and the supply of the first process gas from the tanks 315, 325 is completed. Also, for example, the temperature adjustment step S313 is ended when the valves 314, 324 are opened and the filling of the tanks 315, 325 with the first process gas is started. In other words, the temperature adjustment step S313 is started at the same time as the supply step S312 is completed, and is ended at the same time as the supply step S312 is started. In the temperature adjustment step S313, for example, the tanks 315, 325 are heated by the tank heaters 316, 326 as temperature adjustment devices. The temperature adjustment step S313 will be described in detail later.
[0053] [Purge gas supply process S32] After the first layer is formed on the wafer 200, the valves 313 and 323 are closed. Then, the APC valve 243 is opened to open the exhaust system, and the inside of the processing chamber 201 is evacuated to a vacuum (removal of residual gas). At this time, the valves 513, 523, and 533 are opened, and an inert gas is flowed into the gas supply pipes 510, 520, and 530, and the inside of the processing chamber 201 is purged (purging).
[0054] [Second process gas supply step S33] After the purge gas supply step S32 is completed, the valve 333 is opened while the valve 632 is closed, and the second process gas is caused to flow into the gas supply pipe 330. The flow rate of the second process gas is adjusted by the MFC 332, and the second process gas is supplied from the gas supply port 431 into the buffer chamber 433. At this time, the second process gas supplied into the buffer chamber 433 is excited into plasma (excited into a plasma state) by applying high frequency power between the pair of rod-shaped electrodes, and is supplied into the process chamber 201 from the gas supply port 435 and exhausted from the exhaust pipe 231. At this time, the second process gas activated by plasma is supplied to the wafer 200. At this time, at least the valves 513 and 523 are opened, and an inert gas is caused to flow into the process chamber 201, and the intrusion of the second process gas into the nozzles 410 and 420 is prevented.
[0055] The pressure in the processing chamber 201 is set to, for example, within a range of 10 to 100 Pa. By using plasma, the second processing gas can be activated even if the pressure in the processing chamber 201 is set to such a relatively low pressure range. The partial pressure of the second processing gas in the processing chamber 201 is set to, for example, within a range of 6 to 100 Pa. The supply flow rate of the second processing gas is set to, for example, within a range of 10 to 10,000 sccm. The supply time of the second processing gas is set to, for example, within a range of 1 to 120 seconds. The high frequency power applied between the pair of rod-shaped electrodes is set to, for example, within a range of 50 to 1,000 W. Other processing conditions are the same as those in the first processing gas supply step S31.
[0056] By supplying the second process gas to the wafer 200 while being excited into a plasma state under the above-mentioned conditions, a modification process is performed on the first layer formed on the surface of the wafer 200, and the first layer is modified into a second layer.
[0057] Here, in the second process gas supply step S33, the first layer may be modified to the second layer by supplying the second process gas to the wafer 200 without exciting it into a plasma state. In such a case, the matching box 271, the high frequency power source 270, and the rod-shaped electrode may not be provided. Also, the buffer chamber wall 434 may not be provided.
[0058] [Purge gas supply process S34] After the first layer is modified to the second layer, the valve 333 is closed and the supply of the second process gas into the process chamber 201 via the buffer chamber 433 is stopped. In addition, the application of high frequency power between the pair of rod-shaped electrodes is stopped. Then, the APC valve 243 is opened to open the exhaust system, and the process chamber 201 is evacuated to a vacuum (removal of residual gas). At this time, the valves 513, 523, and 533 are opened, and an inert gas is flowed into the gas supply pipes 510, 520, and 530, and the process chamber 201 is purged (purging).
[0059] [Perform the specified number of times] A first process gas supply step S31, a purge gas supply step S32, a second process gas supply step S33, and a purge gas supply step S34 are performed in this order non-simultaneously, i.e., without synchronization, to form one cycle. This cycle is performed a predetermined number of times (n times, n is an integer of 1 or more), i.e., one or more times, to form a film of a desired film thickness and composition on the wafer 200. The above-mentioned cycle is preferably repeated multiple times. That is, it is preferable that the thickness of the second layer formed per cycle is made smaller than the desired film thickness, and the above-mentioned cycle is preferably repeated multiple times until the film formed by stacking the second layers reaches the desired film thickness. A film containing an element derived from the first process gas and an element derived from the second process gas can be formed.
[0060] The storing step S311 and the temperature adjusting step S313 may be performed while any one of the purge gas supplying step S32, the second process gas supplying step S33, and the purge gas supplying step S34 is being performed.
[0061] (Atmospheric pressure recovery process S4) After the film formation on the wafer 200 is completed, an inert gas is supplied into the processing chamber 201 and exhausted from the exhaust pipe 231. The inert gas acts as a purge gas, and thereby the processing chamber 201 is purged with the inert gas, and gas and reaction by-products remaining in the processing chamber 201 are removed from the processing chamber 201 (purging). Thereafter, the atmosphere in the processing chamber 201 is replaced with the inert gas (inert gas replacement), and the pressure in the processing chamber 201 is returned to normal pressure (return to atmospheric pressure).
[0062] (Substrate unloading process S5) The seal cap 219 is lowered by the boat elevator 115 to open the lower end of the reaction tube 203. Then, the processed wafers 200 supported by the boat 217 are transferred to the outside of the reaction tube 203 (boat unloading). After being transferred to the outside of the reaction tube 203, the processed wafers 200 are taken out of the boat 217 (wafer discharging).
[0063] The first process gas supply step S31 will be described in detail with reference to Figures 5 and 6. Although the tank 315 will be described below, the tank 325 is similarly described.
[0064] When the volume of a gas increases (the gas expands) under conditions where there is no heat exchange with the outside, the temperature of the gas decreases. The same can be said for conditions where heat exchange with the outside can be considered small, that is, for gases that undergo a process similar to adiabatic expansion. In this specification, these processes are also expressed as "adiabatic expansion of a gas" or "adiabatic expansion of a gas." When a gas expands adiabatically, the temperature of the components surrounding the gas may also decrease at the same time. In this specification, when a gas expands adiabatically, the decrease in at least one of the temperature of the gas and the temperature of the components surrounding the gas is expressed as "temperature decrease due to adiabatic expansion."
[0065] In the flush supply, the first process gas stored in the tank 315 expands in a short time, and during this time, the heat exchange between the first process gas and the outside can be considered to be small. That is, in the flush supply, the first process gas stored in the tank 315 is supplied to the process chamber while expanding in a process close to adiabatic expansion. Therefore, after the flush supply, the temperature of the first process gas in the tank 315 and the process chamber 201 and the temperature of the first process gas supply system including the tank 315 decrease.
[0066] Here, when a cycle including flush supply is performed multiple times, the degree of temperature drop due to adiabatic expansion of the first process gas may vary between cycles. Accordingly, the temperature of the tank 315 after flush supply (hereinafter referred to as the second temperature) and the tank temperature at the start of flush supply in each cycle (hereinafter referred to as the first temperature) may vary between cycles. Factors that cause the degree of temperature drop due to adiabatic expansion of the first process gas to vary include, for example, changes in one or more of the following for each cycle. (a) The pressure and / or temperature of the path connecting the tank 315 and the processing chamber 201 (b) the pressure and / or temperature within the process chamber 201 (c) Amount of gas exhausted from the processing chamber 201 per unit time (d) the pressure and / or temperature in the exhaust pipe 231
[0067] Here, regarding the variations in the first temperature and the second temperature between cycles in a comparative example where a film forming process S3 is performed by repeating a plurality of cycles in which a temperature adjustment process S313 is not provided after the supply process S312 and before the storage process S311 of the next cycle, it will be described with reference to FIG. 5. FIG. 5 shows an example in which the first temperature and the second temperature vary in cycles (cycle) X and Y where the first temperatures are equal. The vertical axis of the graph shown in FIG. 5 is the temperature (T) of the tank 315, and the horizontal axis is the time. The tank temperatures of cycle Y and the next cycle Y + 1 are indicated by broken lines. Here, each cycle is composed of a storage process S311 and a supply process S312. The duration of the storage process S311 is the same in each cycle, and the duration of the supply process S312 is the same in each cycle. Also, in each cycle, it is assumed that the output of the tank heater 316 is feedback-controlled with respect to the temperature of the tank 315 so that the temperature of the tank 315 approaches a predetermined temperature T1.
[0068] In the supply process S312 of cycle X, the temperature of the tank 315 decreases due to the temperature drop caused by the adiabatic expansion of the first processing gas. The second temperature, which is the temperature of the tank 315 at the end of the supply process S312, is T2x. Here, T2x < T1.
[0069] In the storage process S311 of cycle X + 1, the temperature of the tank 315 rises from T2x by heating with the tank heaters 316 and 326. The first temperature, which is the temperature of the tank 315 at the end of the storage process S311 (the start of the supply process S312), is T1x + 1.
[0070] In the supply process S312 of cycle Y, the temperature of the tank 315 decreases due to the temperature drop caused by the adiabatic expansion of the first processing gas. The second temperature, which is the temperature of the tank 315 at the end of the supply process S312 of cycle Y, is T2y. Here, T2y < T1 and T2y < T2x. If the variation in the second temperature is ΔT2, then ΔT2 = T2x - T2y.
[0071] In the storage step S311 of cycle Y+1, the temperature of the tank 315 rises from T2y due to heating by the tank heater 316 or the like. The first temperature, which is the temperature of the tank 315 at the end of the storage step S311 (at the start of the supply step S312), is T1y+1. If the variation in the first temperature is ΔT1, then ΔT1=T1x+1-T1y+1.
[0072] When the storage step S311 of cycle X+1 and cycle Y+1 is performed for a sufficiently long time, T1x+1 and T1y+1 approach T1 due to feedback control of the output of the tank heater 316. As a result, the difference between T1x+1 and T1y+1 becomes small, and ΔT1 finally becomes 0.
[0073] However, as the demand for improved step coverage and shorter processing time due to the miniaturization and complication of semiconductor devices becomes stricter, it is expected that the variation of the first temperature and the second temperature will become larger. For example, consider a case where the amount of the first processing gas supplied in the supply process S312 is increased in accordance with the increase in the surface area of the wafer 200 to improve the step coverage. In such a case, the temperature drop of the tank 315 due to the adiabatic expansion in the supply process S312 becomes large, and ΔT2 also increases accordingly, so it is expected that ΔT1 will not be sufficiently eliminated by feedback control of the output of the tank heater 316 in the storage process S311. Also, for example, consider a case where the time required for the storage process S311 is shortened in order to improve productivity. In such a case, it is expected that ΔT1 will not be sufficiently eliminated by feedback control of the output of the tank heater 316.
[0074] Next, the variation of the first temperature and the second temperature between cycles in the film forming process S3 in which the temperature adjustment process S313 is provided after the supply process S312 and before the storage process S311 of the next cycle is performed multiple times as in the embodiment will be described with reference to FIG. 6. FIG. 6 shows an example in which the second temperature varies in cycles P and Q in which the first temperature is equal. The vertical axis of the graph shown in FIG. 6 is the temperature (T) of the tank 315, and the horizontal axis is time. The temperatures of cycle Q and the following cycle Q+1 are shown by dashed lines. Here, each cycle is composed of the storage process S311, the supply process S312, and the temperature adjustment process S313. Here, the temperature adjustment process S313 is performed from the time when the storage process S311 is completed to the time when the supply process S312 is started. The durations of the storage process S311 and the supply process S312 of each cycle are the same.
[0075] In the storage step S311 of cycle P, the temperature of the tank 315 is increased by heating or the like using the tank heater 316. A first temperature, which is the temperature of the tank 315 at the end of the storage step S311 (at the start of the supply step S312), is T1.
[0076] In the supply step S312 of the cycle P, the temperature of the tank 315 is decreased by the temperature decrease caused by the adiabatic expansion of the first process gas. The second temperature, which is the temperature of the tank 315 at the end of the supply step S312, is T2p. Here, T2p <T1である。
[0077] In the temperature adjustment step S313 of the cycle P, for example, the tank 315 is heated by the tank heater 316, so that the temperature of the tank 315 is set to a third temperature (T3) higher than the second temperature (T2p).
[0078] After the temperatures of the tanks 315, 325 reach the third temperature, the storage step S311 of cycle P+1 is started. In the storage step S311, the temperature of the tank 315 is increased from T3 by heating using the tank heater 316 or the like. The first temperature, which is the temperature of the tank 315 at the end of the storage step S311 (at the start of the supply step S312), is T1p+1.
[0079] In the storage step S311 of cycle Q, the temperature of the tank 315 rises due to heating by the tank heater 316 or the like. The first temperature, which is the temperature of the tank 315 at the end of the storage step S311 (start of the supply step S312), is T1.
[0080]
[0080] In the supply step S312 of cycle Q, the temperature of the tank 315 drops due to the temperature drop caused by the adiabatic expansion of the first process gas. The second temperature, which is the temperature at the end of the supply step S312, is T2q. Here, T2q < T1 and T2q < T2p. If the variation in the second temperature is ΔT2, then ΔT2 = T2p - T2q.
[0081] In the temperature control step S313 of cycle Q, the temperature of the tank 315 is raised to a third temperature (T3) higher than the second temperature (T2q) by heating the tank 315 with the tank heater 316. In this example, the third temperatures in cycle Q and cycle P are equal.
[0082] After the temperature of the tank 315 reaches the third temperature, the storage step S311 of cycle Q + 1 is started. In the storage step S311, the temperature of the tank 315 rises from T3 due to heating by the tank heater 316 or the like. The first temperature, which is the temperature of the tank 315 at the end of the storage step S311 (start of the supply step S312), is T1q + 1. Here, the time of the temperature control step S313 of cycle Q + 1 is the same as the time of the temperature control step S313 of cycle P + 1. Also, T1q + 1 < T1p + 1. If the variation in the first temperature is ΔT1, then ΔT1 = T1p + 1 - T1q + 1.
[0083] In the comparative example, the storage step S311 in cycles X+1 and Y+1 is started immediately after the supply step S312 in cycles X and Y is finished. Therefore, the storage step S311 in cycles X+1 and Y+1 is started in a state where there is a difference in temperature of the tank 315. In contrast, the storage step S311 in cycles P+1 and Q+1 is started after the temperature of the tank 315 is set to the third temperature in the temperature adjustment step S313 in cycles P and Q. That is, the temperature of the tank 315 at the start of the storage step S311 in cycles P+1 and Q+1 is set to T3. Therefore, by performing the temperature adjustment step S313, the first temperature variation (ΔT1) can be reduced or eliminated in a short time. Furthermore, by performing the temperature adjustment step S313, even if the second temperature variation (ΔT2) is further increased, the first temperature variation (ΔT1) can be reduced or eliminated. In other words, the supply step S312 can be started after the first temperature between multiple cycles is set within a predetermined temperature range. The predetermined temperature range here is, for example, a temperature range equal to or higher than a predetermined minimum temperature and equal to or lower than a predetermined maximum temperature. For example, the predetermined temperature range is set so that the difference between the predetermined minimum temperature and the predetermined maximum temperature is within 5°C, preferably within 3°C, and more preferably within 1°C.
[0084] In the above description, the storage step S311 of the next cycle is started at the timing when the temperature of the tank 315 becomes equal to the third temperature in a plurality of cycles by performing the temperature adjustment step S313 in each cycle. However, the contents of the present disclosure are not limited to this. In the temperature adjustment step S313, the temperature of the tank 315 does not need to be kept at the third temperature, and it is sufficient that the temperature of the tank 315 becomes the third temperature at least temporarily. In other words, it is preferable that the storage step S311 is started after the temperature of the tank 315 is changed from the second temperature to the third temperature in each cycle. For example, the storage step S311 may be started after the temperature of the tank 315 is changed to a temperature equal to or higher than the third temperature in each cycle. Also, the storage step S311 may be started after the temperature of the tank 315 is changed to a temperature lower than the third temperature in each cycle. Even in such a case, the variation in temperature of the tanks 315, 325 at the start of the storage step S311 between cycles can be reduced compared to the case where the temperature adjustment step S313 is not performed, so that the same effect can be obtained.
[0085] Also, in the temperature adjustment step S313, the third temperature between multiple cycles may be set within a predetermined temperature range. For example, a temperature range that is equal to or higher than a predetermined minimum temperature and equal to or lower than a predetermined maximum temperature may be set as the predetermined temperature range, and the storage step S311 may be started when the temperature of the tank 315 is within the predetermined temperature range. Even in such a case, the variation in temperature of the tanks 315, 325 at the start of the storage step S311 between cycles can be reduced compared to the case where the temperature adjustment step S313 is not performed, so that the same effect can be obtained. Here, the smaller the difference between the predetermined minimum temperature and the predetermined maximum temperature, the closer the temperature of the tanks 315, 325 at the start of the storage step S311 can be between cycles, so that the variation in the first temperature between cycles can be reduced. For example, it is preferable to set the predetermined temperature range so that the difference between the predetermined minimum temperature and the predetermined maximum temperature is within 10°C. It is even more preferable to set the predetermined temperature range so that the difference between the predetermined minimum temperature and the predetermined maximum temperature is within 5°C. It is further preferable to set the predetermined temperature range so that the difference between the predetermined minimum temperature and the predetermined maximum temperature is within 3°C.
[0086] The third temperature may be equal to or higher than the second temperature. Also, a predetermined temperature range may be set so that the predetermined minimum temperature is equal to or higher than the second temperature. In order to supply the first process gas with small temperature variation for each cycle to the wafer 200, the tank 315, which has been cooled by adiabatic expansion, needs to be heated for each cycle. When the third temperature is set to a temperature equal to or higher than the second temperature, the time required for the temperature of the tank 315 to rise to the same temperature as that of the supply step S312 in the previous cycle can be shortened. Therefore, it is easy to supply the first process gas with the same temperature for each cycle to the wafer 200 while suppressing an increase in the processing time.
[0087] The third temperature may be lower than the second temperature. Also, a predetermined temperature range may be set so that a predetermined maximum temperature is lower than the second temperature. The tanks 315, 325 are cooled by lowering the output of the tank heaters 316, 326 or setting it to zero. Thus, the third temperature may be lower than the second temperature. Even in such a case, it is possible to reduce at least the variation in the first temperature.
[0088] The storage step S311 may be started when the temperature of the tank 315 reaches the third temperature in the temperature adjustment step S313. This makes it possible to keep the temperature of the tank 315 constant between cycles when storage of the first process gas starts, thereby further reducing the variation in the first temperature.
[0089] In the temperature adjustment step S313, the storage step S311 may be started after a predetermined time has elapsed since the temperature of the tank 315 was set to the third temperature. This makes it possible to further suppress the variation in temperature of the tank 315 after the supply step S312 in each cycle. Therefore, it is possible to suppress the variation in processing from cycle to cycle.
[0090] For example, when the supply step S312 is started at the timing when the temperature of the tank 315 becomes the third temperature in the temperature adjustment step S313, the supply step S312 may be started at the time when the thermocouple 319 detects that the temperature of the tank 315 has become the third temperature. Also, for example, a time (time t) from the time when the temperature adjustment step S313 starts until the temperature of the tank 315 becomes the third temperature may be obtained in advance by a predetermined method, and the supply step S312 may be started at the time when the temperature adjustment step S313 starts or when the time t has elapsed. Here, the predetermined method includes, for example, at least one of calculating and predicting the time t based on data obtained from components of the substrate processing apparatus or results of evaluation performed using the substrate processing apparatus at least either before or during the substrate processing step. Also, the predetermined method includes, for example, at least one of calculating and predicting the time t based on results of numerical calculations including computer simulations.
[0091] The temperature adjustment step S313 is performed after the supply step S312, i.e., before the storage step S311. The heat capacity of the first process gas in the tank 315 is smaller before the storage step S311 than after the storage step S311, so the amount of heat required for temperature change is small. Therefore, the influence of temperature variations in the tanks 315, 325 can be suppressed in a short time compared to when the temperature of the tank 315 is adjusted after the storage step S311.
[0092] Here, a raw material gas described later may be used as the first process gas, and a reactive gas that reacts with the raw material gas may be used as the second process gas. Alternatively, a reactive gas described later may be used as the first process gas, and a raw material gas may be used as the second process gas. That is, in the first process gas supply step S31, the raw material gas may be flush-supplied, or the reactive gas may be flush-supplied.
[0093] As the source gas, for example, a metal element-containing gas can be used. As the metal element-containing gas, a gas containing elements such as tungsten (W), titanium (Ti), tantalum (Ta), cobalt (Co), yttrium (Y), ruthenium (Ru), aluminum (Al), molybdenum (Mo), niobium (Nb), hafnium (Hf), zirconium (Zr), silicon (Si), etc. can be used. In addition, as the metal element-containing gas, a gas obtained by vaporizing a substance that is liquid or solid at room temperature and normal pressure can be used.
[0094] Examples of the metal element-containing gas include tungsten hexafluoride (WF6), tungsten hexachloride (WCl6), titanium tetrafluoride (TiF4), titanium tetrachloride (TiCl4), tantalum pentafluoride (TaF5), tantalum pentachloride (TaCl5), cobalt difluoride (CoF2), cobalt dichloride (CoCl2), yttrium trifluoride (YF3), yttrium trichloride (YCl3), ruthenium trifluoride (RuF3), ruthenium trichloride (RuF4), and ruthenium trichloride (RuF4). Ruthenium (RuCl2), bisethylcyclopentadienyl ruthenium (Ru(EtCp)2), biscyclopentadienyl ruthenium (Ru(Cp)2) Aluminum trifluoride (AlF3), aluminum trichloride (AlCl3), molybdenum pentafluoride (MoF5), molybdenum pentachloride (MoCl5), molybdenum dioxide dichloride (MoO2Cl2), molybdenum oxide tetrachloride (MoOCl4), niobium trifluoride (NbF3), Niobium chloride (NbCl3), manganese difluoride (MnF2), manganese dichloride (MnCl2), nickel difluoride (NiF2), nickel dichloride (NiCl2), tetrakisethylmethylaminozirconium (Zr[N(Me)Cp]4), tetrakisdiethylaminozirconium (Zr[N(Et)2]4), tetrakisdimethylaminozirconium (Zr[N(Me)2]4), trisdimethylaminocyclopentadiene It is possible to use a gas containing at least one of the following: dihydrogen zirconium ((Cp)Zr[N(Me)2]3), tetrakis ethyl methyl amino hafnium (Hf[N(Me)Et]4), tetrakis diethyl amino hafnium (Hf[N(Et)2]4), tetrakis dimethyl amino hafnium (Hf[N(Me)2]4), tris dimethyl amino cyclopentadienyl hafnium ((Cp)Hf[N(Me)2]3), etc.
[0095] As the Si-containing gas as the metal element-containing gas, for example, a gas containing at least one of dichlorosilane (SiH2Cl2), dichlorodisilane (Si2H4Cl2), tetrachlorodisilane (Si2H2Cl4), hexachlorodisilane (Si2Cl6), etc. as a chlorosilane-based gas can be used. As the Si-containing gas as the metal element-containing gas, for example, a gas containing at least one of silane-based gases such as monosilane (SiH4), disilane (Si2H6), trisilane (Si3H8), tetrasilane (Si4H 10 ) and the like.
[0096] The reactive gas may be, for example, a reducing gas, a nitriding gas, or an oxidizing gas. Here, for example, when one of the first and second processing gases is a metal element-containing gas and the other is a reducing gas, a conductive metal film mainly composed of a single metal element can be formed on the wafer 200. Also, for example, when one of the first and second processing gases is a metal element-containing gas and the other is an oxidizing gas, a metal oxide film can be formed on the wafer 200. Also, for example, when one of the first and second processing gases is a metal element-containing gas and the other is a nitriding gas, a metal nitride film can be formed on the wafer 200.
[0097] The reducing gas may be, for example, a gas containing at least one of H2 gas, deuterium (D2) gas, borane (BH3) gas, diborane (B2H6) gas, carbon monoxide (CO) gas, ammonia (NH3) gas, monosilane (SiH4) gas, disilane (Si2H6) gas, trisilane (Si3H8) gas, monogermane (GeH4) gas, digermane (Ge2H6), etc. The reactive gas may be, for example, an oxidizing gas containing oxygen (O). The oxidizing gas may be, for example, a gas containing at least one of oxygen (O2), ozone (O3), water vapor (H2O), a mixed gas of H2 and O2, hydrogen peroxide (H2O2), nitrous oxide (N2O), etc. As the nitriding gas, for example, ammonia (NH3) gas, diazane (N2H2) gas, hydrazine (N2H4) gas, N3H8 gas, or other hydrogen nitride gas may be used. As the reactive gas, one or more of these may be used.
[0098] As the first process gas, for example, a source gas or a reactive gas that does not cause a self-decomposition reaction in the space (processing chamber 201) in which the wafer 200 exists may be used. For example, a reducing gas such as H2 as a reactive gas can be regarded as a gas that does not cause a self-decomposition reaction in the processing chamber 201. A gas that does not cause a self-decomposition reaction tends to have low reactivity with the surface of the wafer 200. When such a gas is flush-supplied as the first process gas, it is preferable to increase the amount of the first process gas stored in the tanks 315 and 325 (to increase the charge pressure) and increase the partial pressure of the first process gas in the processing chamber 201 in the supply step S312. This makes it possible to sufficiently facilitate the reaction between the wafer surface and the first process gas, thereby improving the film formation rate. However, if the charge pressure is increased, the temperature of the tank 315 is likely to decrease due to the adiabatic expansion of the first process gas, and the first temperature and the second temperature are likely to vary more between cycles. Even when a process gas that does not undergo a self-decomposition reaction is flushed at a relatively high charge pressure, the techniques disclosed herein can be used to reduce cycle-to-cycle process variations.
[0099] For example, when a metal film is formed on the wafer 200 by using a first processing gas as a metal element-containing gas and a second processing gas as a reducing gas, an unintended discharge is likely to occur when the reducing gas is excited into plasma due to the adhesion of a conductive film (metal film) inside the processing chamber 201. Here, for example, a case is considered in which a metal film is formed on the wafer 200 by using a first processing gas as a reducing gas and a second processing gas as a metal element-containing gas. At this time, the partial pressure of the reducing gas in the processing chamber 201 can be increased by flushing the reducing gas, so that the reactivity of the reducing gas with respect to the surface of the wafer 200 can be improved without using plasma excitation.
[0100] The first process gas may be a source gas or a reaction gas that undergoes an autodecomposition reaction in the space (processing chamber 201) in which the wafer 200 exists. For example, SiH2Cl2, Si2H4Cl2, Si2H2Cl4, and Si2Cl6, which are Si-containing gases serving as source gases, can be regarded as gases that undergo an autodecomposition reaction in the processing chamber 201. The likelihood of an autodecomposition reaction occurring in such gases varies depending on the temperature. That is, the variation in the temperature of the tanks 315 and 325 between cycles tends to cause variation in the processing results between cycles. Even in such a case, the variation in the temperature of the tank 315 between cycles is reduced, so that the temperature of the processing gas that undergoes an autodecomposition reaction can be stabilized. Therefore, the variation in processing between cycles can be reduced.
[0101] In the flush supply, the larger the amount of the first process gas stored in the tank and the amount of the first process gas supplied to the wafer 200, the easier it is to supply a sufficient amount of the first process gas to the wafer 200 having a large surface area, and the easier it is to improve the step coverage. Preferably, the amount of the first process gas supplied from the tank 315 to the wafer 200 in the supply step S312 is more than half the amount of the first process gas stored in the tank 315 in the storage step S311. However, the greater the amount of the first process gas supplied from the tank 315 relative to the amount of the first process gas stored in the tank 315, the greater the pressure change in the tank 315 and the variation in the first temperature and the second temperature between cycles. The technology disclosed herein can suppress such influences by the above-mentioned effects, and can form a film with good step coverage while reducing the variation in processing between cycles.
[0102] Another aspect in which the variation in the first temperature is reduced will be described with reference to FIGS. 7(a) to 7(d) and 8. FIG.
[0103] Preferably, the above-mentioned substrate processing step is performed so that the multiple cycles include at least one set of two or more cycles in which the first temperature is equal. This can further reduce the variation in temperature of the first processing gas supplied to the wafer 200 between cycles. Therefore, the variation in processing between cycles can be suppressed. More preferably, in the above-mentioned substrate processing step, the cycles are performed multiple times so that the first temperature between the multiple cycles is equal. This can further suppress the variation in processing between cycles. These will be described using several specific examples.
[0104] (Example 1) 7(a), the storage step S311 may include a storage step S311a for storing the first process gas in the tank 315, and a tank temperature adjustment step S311 for setting the temperature of the tank 315 to a first temperature after the storage step S311a. In other words, in each cycle, the storage step S311 includes a storage step S311a for storing the first process gas in the tank 315, and a tank temperature adjustment step S311b for setting the temperature of the tank 315 to an equal temperature between cycles after the storage step S311a, and then the supply step S312 is started. This can further suppress the variation in processing between cycles due to the variation in temperature of the tank 315 after the supply step S312.
[0105] (Example 2) 7(b), the storage step S311 may include a heat retention step S311c for maintaining the temperature of the tank 315 at a first temperature until a predetermined time has elapsed, in addition to the storage step S311a and the tank temperature adjustment step S311b. This allows the tank 315 and the first process gas stored in the tank 315 to approach a thermal equilibrium state. This further reduces the variation in temperature of the first process gas supplied to the wafers 200 in each cycle.
[0106] (Example 3) As shown in FIG. 7(c), the storage step S311 may include a thermal equilibrium step S311d in which the temperature of the first process gas stored in the tank 315 is set to a first temperature in addition to the storage step S311a and the tank temperature adjustment step S311b. In the thermal equilibrium step S311d, the first process gas stored in the tank 315 and the tank 315 are brought into thermal equilibrium. This can further suppress the variation in process between cycles. Here, when the process of the heat retention step S311c shown in FIG. 7(b) is performed until the temperature of the first process gas stored in the tank 315 reaches the first temperature, the heat retention step S311c and the thermal equilibrium step S311d may be considered to be performed in parallel.
[0107] (Example 4) As shown in Fig. 7(d), instead of the tank temperature adjustment step S311b in which the temperature of the tank 315 is adjusted to the first temperature as shown in Fig. 7(a), a gas temperature adjustment step S311e in which the temperature of the first process gas is adjusted to the first temperature may be performed. For example, an output condition of the tank heater 316 that adjusts the temperature of the first process gas stored in the tank 315 to the first temperature is obtained in advance by a predetermined method. Then, the tank heater 316 may be controlled under the output condition to adjust the temperature of the first process gas stored in the tank 315 to the first temperature without controlling the temperature of the tank 315 to the first temperature. Here, the predetermined method includes, for example, at least one of calculating and predicting the temperature of the first process gas stored in the tank 315 based on data obtained from components of the substrate processing apparatus or a result of an evaluation performed using the substrate processing apparatus before or during the substrate processing process. The predetermined method also includes, for example, calculating and / or predicting the temperature of the first process gas stored in the tank 315 based on the results of a numerical calculation including a computer simulation, thereby further reducing the variation in process between cycles.
[0108] Note that, while the first process gas is stored in the tank 315 in the storage step S311a, the temperature of the first process gas in the tank 315 may be set to the first temperature. In such a case, it can be considered that the tank temperature adjustment step S311b and the gas temperature adjustment step S311e are performed in parallel.
[0109] 8, a preheating step of supplying the first process gas to the heat exchanger 318 may be performed before the storage step S311. By heating the first process gas by the heat exchanger 318 and then storing it in the tank 315, the variation in temperature of the first process gas supplied to the wafer in each cycle can be further reduced. In addition, when a step of uniforming the temperature of the tank 315 or the temperature of the first process gas stored in the tank 315 between cycles is performed, such as the tank temperature adjustment step S311b or the gas temperature adjustment step S311e, the time required for these steps can be shortened.
[0110] Although the embodiments of the present disclosure have been specifically described above, the present disclosure is not limited to the above-described embodiments and can be modified in various ways without departing from the spirit and scope of the present disclosure.
[0111] In the above-mentioned embodiment, an example of forming a film using a batch-type substrate processing apparatus that processes multiple substrates at a time has been described. The present disclosure is not limited to the above-mentioned embodiment, and can be suitably applied to, for example, a case where a film is formed using a single-wafer type substrate processing apparatus that processes one or several substrates at a time. In addition, in the above-mentioned embodiment, an example of forming a film using a substrate processing apparatus having a hot-wall type processing furnace has been described. The present disclosure is not limited to the above-mentioned embodiment, and can be suitably applied to, for example, a case where a film is formed using a substrate processing apparatus having a cold-wall type processing furnace.
[0112] When these substrate processing apparatuses are used, the processes can be performed under the same processing procedures and conditions as in the above embodiment, and the same effects as in the above embodiment can be obtained.
[0113] The above-mentioned aspects may be used in appropriate combination. The processing procedures and processing conditions in this case may be the same as those of the above-mentioned aspects. [Explanation of symbols]
[0114] 201 Processing room 280···Controller (control unit) 313, 323···Valve (second valve) 314, 324···Valve (first valve) 315,325···Tank (storage section) 316,326 Tank heater (heating unit) S311: Storage process S312...Supply process S313...Temperature control process
Claims
1. (a) storing a first process gas in a storage portion; (b) after (a), supplying the first process gas from the reservoir at a first temperature to a substrate to bring the temperature of the reservoir to a second temperature lower than the first temperature; (c) after (b), setting the temperature of the storage portion after the first process gas is supplied to a third temperature; and A cycle of performing the steps in this order multiple times, The method of claim 1, wherein the third temperature is within a predetermined temperature range between a plurality of the cycles.
2. The substrate processing method according to claim 1 , wherein the third temperature is equal to or higher than the second temperature.
3. The method of claim 1 , wherein the third temperature is lower than the second temperature.
4. The substrate processing method according to claim 1 , wherein the step (a) is started when the temperature of the reservoir reaches the third temperature in the step (c).
5. The substrate processing method of claim 1 , wherein the plurality of cycles includes at least one set of two or more cycles in which the first temperature is equal.
6. The substrate processing method according to claim 5 , further comprising performing the cycle a plurality of times such that the first temperature is equal among the plurality of cycles.
7. As the (a), (a1) storing the first process gas in the storage portion; (a2) after (a1), setting the temperature of the storage portion to the first temperature; The method for processing a substrate according to claim 6 , further comprising the steps of:
8. In the above (a), The substrate processing method according to claim 7 , further comprising the step of: (a3) after (a2), maintaining the temperature of the reservoir at the first temperature until a predetermined time has elapsed.
9. In the above (a), (a4) setting the temperature of the first process gas stored in the storage unit to the first temperature; The substrate processing method according to any one of claims 6 to 8, further comprising the steps of:
10. The cycle comprises:
9. The substrate processing method according to claim 1, further comprising: (d) a step of supplying the first process gas to a preheating section before (a).
11. The substrate processing method according to claim 1 , wherein in (c), (a) is started after a predetermined time has elapsed since the temperature of the storage portion is set to the third temperature.
12. 9. The substrate processing method according to claim 1, wherein the first processing gas is a gas that does not cause a self-decomposition reaction in a space in which the substrate exists.
13. 9. The substrate processing method according to claim 1, wherein the first processing gas is a gas that causes a self-decomposition reaction in a space in which the substrate exists.
14. 9. The substrate processing method according to claim 1, wherein the amount of the first process gas supplied from the storage portion to the substrate in the supply step in (b) is equal to or greater than half of the amount of the first process gas stored in the storage portion in the storage step in (a).
15. The cycle comprises: (e) supplying a second process gas to the substrate; The substrate processing method according to any one of claims 1 to 8, further comprising:
16. (a) storing a first process gas in a storage portion; (b) after (a), supplying the first process gas from the reservoir at a first temperature to a substrate to bring the temperature of the reservoir to a second temperature lower than the first temperature; (c) after (b), setting the temperature of the storage portion after the first process gas is supplied to a third temperature; and A cycle of performing the above steps in the order is repeated multiple times, The method of manufacturing a semiconductor device, wherein the third temperature during the cycle is within a predetermined temperature range.
17. a processing chamber for processing a substrate; a storage section in which a first process gas is stored; A temperature adjustment unit that controls the temperature of the storage unit; a gas control unit that controls the storage of the first process gas in the storage unit and the supply of the first process gas from the storage unit to the substrate; a control unit configured to be capable of controlling the temperature adjustment unit and the gas control unit so as to perform a cycle of performing the following in that order a plurality of times, in which the third temperature between the cycles is within a predetermined temperature range: (a) storing a first process gas in the storage unit; (b) after (a), supplying the first process gas to a substrate from the storage unit at a first temperature to set the temperature of the storage unit to a second temperature lower than the first temperature; and (c) after (b), setting the temperature of the storage unit after supplying the first process gas to a third temperature. A substrate processing apparatus comprising:
18. (a) storing a first process gas in a storage portion; (b) after (a), supplying the first process gas from the reservoir at a first temperature to the substrate to bring the temperature of the reservoir to a second temperature lower than the first temperature; (c) after (b), setting the temperature of the storage portion after the first process gas is supplied to a third temperature; and A cycle of performing the above steps in the order is repeated multiple times, maintaining the third temperature within a predetermined temperature range between the cycles; A program that is executed by a computer in a substrate processing apparatus.
Citation Information
Patent Citations
Substrate processing apparatus, manufacturing method of semiconductor device and program
JP2020136301A
