Base station, communication method and integrated circuit
By adjusting the reference point for time resource allocation based on specific conditions, the terminal and communication method improve signal allocation efficiency and reduce complexity in URLLC scenarios, enhancing flexibility and reliability in wireless communication systems.
Patent Information
- Application Number
- JP2024144236
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2019-10-11
- Filing Date
- 2024-08-26
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2040-07-22
AI Technical Summary
Current wireless communication systems face challenges in efficiently allocating signals, particularly in high-reliability and low-latency scenarios like URLLC, leading to inefficiencies in time resource allocation and increased complexity in signal identification.
A terminal and communication method that adjusts the reference point for time resource allocation based on specific conditions, such as repetition application or data type, to simplify the process and improve efficiency.
Enhances signal allocation efficiency by reducing complexity and improving flexibility in time resource management, particularly in URLLC scenarios, while maintaining reliability and reducing overhead in control information.
Smart Images

Figure 2024167294000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a terminal and a communication method. [Background technology]
[0002] In recent years, the Internet of Things (IoT) is expected to develop rapidly against the backdrop of the expansion and diversification of wireless services, and the use of mobile communications is expanding to all fields, such as cars, homes, home appliances, and industrial equipment, in addition to information terminals such as smartphones. In order to support the diversification of services, a significant improvement in the performance and functions of mobile communication systems is required to meet various requirements, such as an increase in the number of connected devices and low latency, in addition to an increase in system capacity. In response to this background, the 5th Generation mobile communication systems (5G), which are being researched, developed, and standardized, can provide flexible wireless communication according to a wide variety of needs by enhancing mobile broadband (eMBB: enhanced Mobile Broadband), connecting multiple devices (mMTC: massive Machine Type Communication), and ultra-reliable and low latency communication (URLLC: ultra-reliable and low latency communication).
[0003] The 3rd Generation Partnership Project (3GPP), an international standardization organization, is considering New Radio (NR) as one of the 5G wireless interfaces, and has completed the formulation of the Release 15 specifications that will realize eMBB and basic URLLC (see, for example, Non-Patent Documents 1-4).
[0004] In URLLC in Release 15, for example, the requirements are to achieve a wireless section delay of 1 ms or less and a reliability of 99.999% when transmitting a 32-byte packet. On the other hand, in Release 16, in order to extend URLLC to various use cases such as remote operation and industrial IoT, the expansion of functions to achieve higher requirements compared to Release 15, such as an increase in packet size, further reduction in delay, and improvement in reliability, is being considered (for example, see Non-Patent Documents 5 and 6). [Prior art documents] [Non-patent literature]
[0005] [Non-Patent Document 1] 3GPP TS 38.211 V15.7.0, "NR; Physical channels and modulation (Release 15)," September 2019. [Non-Patent Document 2] 3GPP TS 38.212 V15.7.0, "NR; Multiplexing and channel coding (Release 15)," September 2019. [Non-Patent Document 3] 3GPP TS 38.213 V15.7.0, "NR; Physical layer procedure for control (Release 15)," September 2019. [Non-Patent Document 4] 3GPP TS 38.214 V15.7.0, "NR; Physical layer procedures for data (Release 15)," September 2019. [Non-Patent Document 5] RP-191584, “Revised WID: Physical layer enhancements for NR ultra-reliable and low latency communication (URLLC),” Huawei, HiSilicon, June 2019. [Non-Patent Document 6] RP-191561, “Revised WID: Support of NR industrial Internet of Things (IoT),” Nokia, Nokia Shanghai Bell, June 2019. [Non-Patent Document 7] R1-1908798, “PDCCH enhancements for NR URLLC,” Panasonic, August 2019. Summary of the Invention [Problem to be solved by the invention]
[0006] However, there is room for further study regarding the method of allocating signals in wireless communication.
[0007] Non-limiting embodiments of the present disclosure contribute to providing a terminal and a communication method capable of improving the efficiency of signal allocation in wireless communication. [Means for solving the problem]
[0008] A terminal according to one embodiment of the present disclosure includes a receiving circuit for receiving downlink control information, and a control circuit for controlling a criterion for a position at which data is placed in a time resource based on the control information, based on certain conditions.
[0009] These comprehensive or specific aspects may be realized as a system, an apparatus, a method, an integrated circuit, a computer program, or a recording medium, or may be realized as any combination of a system, an apparatus, a method, an integrated circuit, a computer program, and a recording medium. Effect of the Invention
[0010] According to an embodiment of the present disclosure, it is possible to improve frequency utilization efficiency in wireless communication.
[0011] Further advantages and benefits of an embodiment of the present disclosure will become apparent from the specification and drawings. Such advantages and / or benefits may be provided by some of the embodiments and features described in the specification and drawings, respectively, but not necessarily all of them may be provided to obtain one or more identical features. [Brief description of the drawings]
[0012] [Figure 1] FIG. 1 is an example architecture diagram of a 3GPP NR system. [Diagram 2] Schematic showing the functional separation between NG-RAN and 5GC [Diagram 3] Sequence diagram of RRC connection setup / reconfiguration procedure [Figure 4] A schematic diagram showing the usage scenarios of enhanced Mobile BroadBand (eMBB), massive Machine Type Communications (mMTC), and Ultra Reliable and Low Latency Communications (URLLC). [Diagram 5] Block diagram illustrating an example 5G system architecture for a non-roaming scenario [Figure 6] FIG. 1 shows an example of time resource allocation for downlink data. [Figure 7] FIG. 1 is a diagram showing an example of time resource allocation for uplink data. [Figure 8] FIG. 1 shows an example of time resource allocation for downlink data. [Figure 9] FIG. 1 is a diagram showing an example of time resource allocation for uplink data. [Figure 10]FIG. 1 shows an example of time resource allocation for downlink data. [Figure 11] FIG. 1 is a diagram showing an example of time resource allocation for uplink data. [Figure 12] FIG. 1 shows an example of time resource allocation for downlink data to which repetition is applied. [Figure 13] FIG. 1 shows an example of time resource allocation for uplink data to which repetition is applied. [Figure 14] Block diagram showing an example of a partial configuration of a terminal [Figure 15] Block diagram showing an example of the configuration of a base station [Figure 16] Block diagram showing an example of a terminal configuration [Figure 17] Flowchart showing an example of the operation of a terminal [Figure 18] FIG. 13 is a diagram showing an example of time resource allocation according to operation example 1-1. [Figure 19] FIG. 13 is a diagram showing an example of time resource allocation according to operation example 1-2. [Figure 20] FIG. 13 is a diagram showing an example of time resource allocation according to a modification of the first embodiment. [Figure 21] A diagram showing an example of time resource allocation [Figure 22] FIG. 13 is a diagram showing an example of time resource allocation according to the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0013] Hereinafter, embodiments of the present disclosure will be described in detail with reference to the drawings.
[0014] <5G NR system architecture and protocol stack> 3GPP continues to work on the next release of the fifth generation of mobile phone technology (also known simply as "5G"), which includes the development of a new radio access technology (NR) that will operate in the frequency range up to 100 GHz. The first version of the 5G standard was completed at the end of 2017, which will allow for the prototyping and commercial deployment of 5G NR compliant devices (e.g. smartphones).
[0015] For example, the system architecture generally assumes a Next Generation - Radio Access Network (NG-RAN) with gNBs. The gNBs provide the UE-side termination of the NG radio access user plane (SDAP / PDCP / RLC / MAC / PHY) and control plane (RRC) protocols. The gNBs are connected to each other by an Xn interface. The gNBs are also connected to a Next Generation Core (NGC) by a Next Generation (NG) interface, more specifically to an Access and Mobility Management Function (AMF) (e.g., a specific core entity performing AMF) by an NG-C interface, and to a User Plane Function (UPF) (e.g., a specific core entity performing UPF) by an NG-U interface. The NG-RAN architecture is shown in Figure 1 (see, e.g., 3GPP TS 38.300 v15.6.0, section 4).
[0016] The NR user plane protocol stack (see, for example, 3GPP TS 38.300, section 4.4.1) includes the Packet Data Convergence Protocol (PDCP) (see section 6.4 of TS 38.300), Radio Link Control (RLC) (see section 6.3 of TS 38.300), and Medium Access Control (MAC) (see section 6.2 of TS 38.300) sublayers, which are terminated on the network side at the gNB. A new Access Stratum (AS) sublayer (Service Data Adaptation Protocol (SDAP)) is also introduced on top of PDCP (see, for example, 3GPP TS 38.300, section 6.5). A control plane protocol stack is also defined for NR (see, for example, TS 38.300, section 4.4.2). An overview of Layer 2 functions is given in section 6 of TS 38.300. The functions of the PDCP, RLC and MAC sublayers are listed in clauses 6.4, 6.3 and 6.2 of TS 38.300, respectively. The functions of the RRC layer are listed in clause 7 of TS 38.300.
[0017] For example, the Medium-Access-Control layer handles logical channel multiplexing and scheduling and scheduling-related functions, including handling various numerologies.
[0018] For example, the physical layer (PHY) is responsible for coding, PHY HARQ processing, modulation, multi-antenna processing, and mapping of signals to appropriate physical time-frequency resources. The physical layer also handles mapping of transport channels to physical channels. The physical layer provides services to the MAC layer in the form of transport channels. A physical channel corresponds to a set of time-frequency resources used for the transmission of a particular transport channel, and each transport channel is mapped to a corresponding physical channel. For example, the physical channels include the PRACH (Physical Random Access Channel), PUSCH (Physical Uplink Shared Channel), and PUCCH (Physical Uplink Control Channel) as uplink physical channels, and the PDSCH (Physical Downlink Shared Channel), PDCCH (Physical Downlink Control Channel), and PBCH (Physical Broadcast Channel) as downlink physical channels.
[0019] NR use cases / deployment scenarios may include enhanced mobile broadband (eMBB), ultra-reliable low-latency communications (URLLC), and massive machine type communication (mMTC), which have diverse requirements in terms of data rates, latency, and coverage. For example, eMBB is expected to support peak data rates (20 Gbps in downlink and 10 Gbps in uplink) and effective (user-experienced) data rates that are about three times higher than those offered by IMT-Advanced. On the other hand, for URLLC, more stringent requirements are imposed on ultra-low latency (0.5 ms for user plane latency in UL and DL, respectively) and high reliability (1-10-5 within 1 ms). Finally, mMTC may require preferably high connection density (1,000,000 devices / km2 in urban environments), wide coverage in adverse environments, and extremely long battery life (15 years) for low-cost devices.
[0020] Therefore, OFDM numerology (e.g., subcarrier spacing, OFDM symbol length, cyclic prefix (CP) length, number of symbols per scheduling interval) suitable for one use case may not be valid for other use cases. For example, low latency services may preferably require a shorter symbol length (and therefore a larger subcarrier spacing) and / or fewer symbols per scheduling interval (also called TTI) than mMTC services. Furthermore, deployment scenarios with large channel delay spreads may preferably require a longer CP length than scenarios with small delay spreads. Subcarrier spacing may be optimized accordingly to maintain similar CP overhead. NR may support one or more subcarrier spacing values. Correspondingly, subcarrier spacings of 15 kHz, 30 kHz, 60 kHz... are currently considered. The symbol length Tu and subcarrier spacing Δf are directly related by the formula Δf=1 / Tu. Similar to LTE systems, the term "resource element" can be used to mean the smallest resource unit consisting of one subcarrier for the length of one OFDM / SC-FDMA symbol.
[0021] In the new radio system 5G-NR, for each numerology and each carrier, a resource grid of subcarriers and OFDM symbols is defined for the uplink and downlink, respectively. Each element of the resource grid is called a resource element and is specified based on a frequency index in the frequency domain and a symbol position in the time domain (see 3GPP TS 38.211 v15.6.0).
[0022] <Functional separation between NG-RAN and 5GC in 5G NR> Figure 2 shows the functional separation between NG-RAN and 5GC. The logical node of NG-RAN is gNB or ng-eNB. 5GC has logical nodes AMF, UPF, and SMF.
[0023] For example, the gNB and ng-eNB host the following main functions: - Radio Resource Management functions such as Radio Bearer Control, Radio Admission Control, Connection Mobility Control, dynamic allocation (scheduling) of resources to UEs in both uplink and downlink; - IP header compression, encryption, and integrity protection of data; - Selection of the AMF at UE attach time if routing to the AMF cannot be determined from information provided by the UE; - Routing of user plane data towards the UPF; - Routing of control plane information towards AMF; - Setting up and tearing down connections; - Scheduling and sending paging messages; - Scheduling and transmission of system broadcast information (AMF or Operation, Admission, Maintenance (OAM) origin); - Configuration of measurements and measurement reporting for mobility and scheduling; - Transport level packet marking in the uplink; - Session management; - Support for network slicing; - Management of QoS flows and their mapping to data radio bearers; - Support for UEs in RRC_INACTIVE state; - NAS message delivery function; - Sharing of radio access networks; - Dual connectivity; - Close cooperation between NR and E-UTRA.
[0024] The Access and Mobility Management Function (AMF) hosts the following main functions: - Ability to terminate Non-Access Stratum (NAS) signalling; - NAS signaling security; - Access Stratum (AS) security control; - 3GPP Core Network (CN) inter-node signalling for mobility between access networks; - Reachability to idle mode UEs (including control and execution of paging retransmissions); - Managing the registration area; - Support for intra-system and inter-system mobility; - Access authentication; - Access authorization including roaming privilege checks; - Mobility management control (subscription and policies); - Support for network slicing; - Select the Session Management Function (SMF).
[0025] Additionally, the User Plane Function (UPF) hosts the following main functions: - anchor points for intra-RAT mobility / inter-RAT mobility (if applicable); - External PDU (Protocol Data Unit) Session Points for interconnection with data networks; - Packet routing and forwarding; - Packet inspection and policy rule enforcement for the user plane part; - Traffic usage reporting; - uplink classifier to support routing of traffic flows to the data network; - Branching Point for supporting multi-homed PDU session; - QoS processing for the user plane (e.g., packet filtering, gating, UL / DL rate enforcement); - Verification of uplink traffic (mapping to the QoS flow of the SDF); - Downlink packet buffering and trigger function for downlink data notification.
[0026] Finally, the Session Management Function (SMF) hosts the following main functions: - Session management; - IP address allocation and management for the UE; - Selection and control of the UPF; - Traffic steering setting function in the User Plane Function (UPF) for routing traffic to the appropriate destination; - Enforcement of control part policies and QoS; - Notification of downlink data.
[0027] <Procedures for RRC connection setup and reconfiguration> Figure 3 shows some of the interactions between the UE, gNB, and AMF (5GC entity) when the UE transitions from RRC_IDLE to RRC_CONNECTED in the NAS part (see TS 38.300 v15.6.0).
[0028] RRC is a higher layer signaling (protocol) used for UE and gNB configuration. With this transition, the AMF prepares UE context data (which includes, for example, PDU session context, security keys, UE Radio Capability, UE Security Capabilities, etc.) and sends it to the gNB with an INITIAL CONTEXT SETUP REQUEST. The gNB then activates AS security together with the UE. This is done by the gNB sending a SecurityModeCommand message to the UE, and the UE responding with a SecurityModeComplete message to the gNB. The gNB then reconfigures to set up Signaling Radio Bearer 2 (SRB2) and Data Radio Bearer (DRB) by sending an RRCReconfiguration message to the UE and receiving an RRCReconfigurationComplete from the UE. For signaling-only connections, the steps related to RRCReconfiguration are omitted since SRB2 and DRB are not set up. Finally, the gNB informs the AMF that the setup procedure is complete with an INITIAL CONTEXT SETUP RESPONSE.
[0029] Therefore, the present disclosure provides an entity (e.g., AMF, SMF, etc.) of a 5th Generation Core (5GC), comprising: a control circuit that operatively establishes a Next Generation (NG) connection with a gNodeB; and a transmitter that operatively transmits an initial context setup message to the gNodeB via the NG connection so that a signaling radio bearer between the gNodeB and a User Equipment (UE) is set up. Specifically, the gNodeB transmits Radio Resource Control (RRC) signaling including a resource allocation configuration information element (IE) to the UE via the signaling radio bearer. Then, the UE transmits in uplink or receives in downlink based on the resource allocation configuration.
[0030] <IMT usage scenarios after 2020> Figure 4 shows some of the use cases for 5G NR. The 3rd generation partnership project new radio (3GPP NR) considers three use cases that were envisioned by IMT-2020 to support a wide variety of services and applications. The first phase of specifications for enhanced mobile-broadband (eMBB) has been completed. Current and future work includes standardization for ultra-reliable and low-latency communications (URLLC) and massive machine-type communications (mMTC), in addition to expanding support for eMBB. Figure 4 shows some examples of envisioned usage scenarios for IMT beyond 2020 (see e.g. ITU-R M.2083 Figure 2).
[0031] URLLC use cases have stringent requirements for performance such as throughput, latency, and availability. URLLC use cases are envisioned as one of the enabling technologies for future applications such as wireless control of industrial production or manufacturing processes, remote medical surgery, automation of power transmission and distribution in smart grids, and road safety. URLLC's ultra-high reliability is supported by identifying technologies that meet the requirements set by TR 38.913. Key requirements for NR URLLC in Release 15 include a target user plane latency of 0.5 ms on the UL (uplink) and 0.5 ms on the DL (downlink). The overall URLLC requirement for a single packet transmission is a block error rate (BLER) of 1E-5 for a packet size of 32 bytes with a user plane latency of 1 ms.
[0032] From a physical layer perspective, reliability can be improved in many possible ways. Current room for reliability improvement includes defining a separate CQI table for URLLC, more compact DCI formats, PDCCH repetition, etc. However, this room can be expanded to achieve ultra-high reliability as NR (with respect to the key requirements of NR URLLC) becomes more stable and more developed. Specific use cases for NR URLLC in Release 15 include augmented reality / virtual reality (AR / VR), e-health, e-safety, and mission-critical applications.
[0033] Also, technology enhancements targeted by NR URLLC aim at improving latency and improving reliability. Technology enhancements for improving latency include configurable numerology, non-slot-based scheduling with flexible mapping, grant-free (configured grant) uplink, slot-level repetition in data channel, and pre-emption in downlink. Pre-emption means that a transmission with already allocated resources is stopped and the already allocated resources are used for other transmissions with lower latency / higher priority requirements that are requested later. Thus, a transmission that was already allowed is preempted by a later transmission. Pre-emption is applicable regardless of the specific service type. For example, a transmission of service type A (URLLC) may be preempted by a transmission of service type B (eMBB, etc.). Technology enhancements for improving reliability include dedicated CQI / MCS tables for a target BLER of 1E-5.
[0034] The use case of mMTC (massive machine type communication) is characterized by a very large number of connected devices transmitting relatively small amounts of data that are typically not sensitive to delays. The devices are required to be low-cost and have a very long battery life. From an NR perspective, the use of very narrow bandwidth portions is one solution that allows UEs to save power and extend battery life.
[0035] As mentioned above, the scope of reliability improvement in NR is expected to be broader. One of the key requirements for all cases, e.g. for URLLC and mMTC, is high or ultra-high reliability. Several mechanisms can improve reliability from a radio perspective and a network perspective. In general, there are two to three key areas that can help improve reliability. These areas include compact control channel information, data channel / control channel repetition, and diversity with respect to frequency, time, and / or spatial domains. These areas are generally applicable to reliability improvement regardless of the specific communication scenario.
[0036] Further use cases with more stringent requirements are envisaged for NR URLLC, such as factory automation, transportation and power distribution, such as high reliability (up to 10-6 level of reliability), high availability, packet size up to 256 bytes, time synchronization up to a few μs (depending on the use case, the value can be 1 μs or a few μs depending on the frequency range and low latency in the order of 0.5 ms to 1 ms (e.g. 0.5 ms latency in the targeted user plane)).
[0037] Furthermore, for NR URLLC, several technical enhancements are possible from the perspective of the physical layer. These technical enhancements include enhancements to the Physical Downlink Control Channel (PDCCH) related to compact DCI, repetition of the PDCCH, and increased monitoring of the PDCCH. Also, the enhancement of Uplink Control Information (UCI) is related to the enhancement of enhanced Hybrid Automatic Repeat Request (HARQ) and CSI feedback. In addition, enhancements to the Physical Uplink Shared Channel (PUSCH) related to mini-slot level hopping, and enhancements to retransmission / repetition are possible. The term "mini-slot" refers to a Transmission Time Interval (TTI) that contains fewer symbols than a slot (a slot has 14 symbols).
[0038] <QoS Control> The 5G Quality of Service (QoS) model is based on QoS flows and supports both QoS flows that require a guaranteed flow bit rate (GBR: Guaranteed Bit Rate QoS flow) and QoS flows that do not require a guaranteed flow bit rate (non-GBR QoS flow). Therefore, at the NAS level, a QoS flow is the finest-grained QoS differentiation in a PDU session. A QoS flow is identified within a PDU session by a QoS Flow ID (QFI) that is carried in an encapsulation header via the NG-U interface.
[0039] For each UE, the 5GC establishes one or more PDU sessions. For each UE, the NG-RAN establishes at least one Data Radio Bearer (DRB) for the PDU session, e.g. as shown above with reference to Fig. 3. Additional DRBs for the QoS flows of that PDU session can be configured later (when it is up to the NG-RAN). The NG-RAN maps packets belonging to different PDU sessions to different DRBs. The NAS level packet filters in the UE and 5GC associate UL and DL packets with QoS flows, whereas the AS level mapping rules in the UE and NG-RAN associate UL and DL QoS flows with DRBs.
[0040] Figure 5 shows the non-roaming reference architecture for 5G NR (see TS 23.501 v16.1.0, section 4.23). An Application Function (AF) (e.g., an external application server hosting 5G services as illustrated in Figure 4) interacts with the 3GPP core network to provide services, for example by accessing a Network Exposure Function (NEF) to support applications that affect traffic routing, or by interacting with a policy framework for policy control (e.g., QoS control) (see Policy Control Function (PCF)). Based on the operator's deployment, Application Functions that are considered trusted by the operator can interact directly with the relevant Network Functions. Application Functions that are not allowed by the operator to directly access the Network Functions interact with the relevant Network Functions using an exposure framework for external use via the NEF.
[0041] Figure 5 further illustrates further functional units of the 5G architecture: Network Slice Selection Function (NSSF), Network Repository Function (NRF), Unified Data Management (UDM), Authentication Server Function (AUSF), Access and Mobility Management Function (AMF), Session Management Function (SMF), and Data Network (DN, e.g., operator-provided services, Internet access, or third-party services). All or part of the core network functions and application services may be deployed and run in a cloud computing environment.
[0042] Therefore, the present disclosure provides an application server (e.g., an AF in a 5G architecture) comprising: a transmitter that, when operated, sends a request including QoS requirements for at least one of a URLLC service, an eMMB service, and an mMTC service to at least one of the 5GC functions (e.g., NEF, AMF, SMF, PCF, UPF, etc.) to establish a PDU session including a radio bearer between a gNodeB and a UE according to the QoS requirements; and a control circuit that, when operated, performs a service using the established PDU session.
[0043] [Time resource allocation] In NR, for example, a base station (also referred to as, for example, gNB) schedules a downlink data channel (e.g., PDSCH: Physical Downlink Shared Channel) or an uplink data channel (e.g., PUSCH: Physical Uplink Shared Channel) for a terminal (e.g., UE: User Equipment) based on downlink control information (e.g., DCI: Downlink Control Information).
[0044] The DCI is transmitted from a base station to a terminal on a downlink control channel (e.g., a Physical Downlink Control Channel (PDCCH)). For example, time-domain radio resources (hereinafter referred to as "time resources") allocated to a data channel are controlled by the DCI.
[0045] In addition, in NR, time resources can be allocated more flexibly, for example, to achieve low latency. For example, in NR, in addition to allocation (in other words, basic allocation) in units of one slot (e.g., 14 symbols per slot), allocation in units shorter than a slot (e.g., one to several symbols), also called "minislots," is possible.
[0046] For example, the time resources assigned to the data channel may be controlled by a time resource assignment (eg, a Time Domain Resource Assignment (TDRA)) field of the DCI.
[0047] For example, multiple time resource allocation patterns (hereinafter referred to as "allocation patterns") are set to a terminal by signaling of a higher layer (e.g., radio resource control (RRC)). The base station indicates one of the multiple allocation patterns set to the terminal in the DCI (e.g., TDRA field) and allocates time resources to the terminal (e.g., see Non-Patent Documents 2-4).
[0048] Here, the allocation pattern of time resources set in the terminal may include parameters such as a "slot offset" indicating the position of the slot based on the slot in which the terminal received the DCI, the first symbol position at which data transmission or reception begins within the slot (e.g., "Start symbol"), and the number of symbols (e.g., "symbol length").
[0049] For example, the first symbol position at which data transmission or reception in a slot begins is set to a symbol position based on the first symbol of the slot (in other words, the slot boundary). Figures 6 and 7 show examples of time resource allocation by the TRDA field of DCI. Figure 6 shows an example of time resource allocation for downlink data (e.g., PDSCH), and Figure 7 shows an example of time resource allocation for uplink data (e.g., PUSCH).
[0050] In the following description, the first symbol in a slot is referred to as symbol 0. In other words, in Figures 6 and 7, one slot includes 14 symbols, from symbol 0 to symbol 13.
[0051] In URLLC, for example, low latency can be achieved by enabling multiple allocations of data channels (e.g., PDSCH or PUSCH) with fewer allocated symbols to a slot. Also, in URLLC, the frequency with which a terminal receives DCI is, for example, not at one-slot intervals (e.g., receiving PDCCH in the first few symbols of each slot) as in eMBB, but multiple times within one slot, thereby shortening the time from packet generation to scheduling.
[0052] 8 and 9 show examples of time resource allocation when a terminal can receive a PDCCH (including, for example, DCI) multiple times within one slot. Fig. 8 shows an example of time resource allocation for a PDSCH, and Fig. 9 shows an example of time resource allocation for a PUSCH.
[0053] In Release 15, for example, when the first symbol position at which data transmission or reception in a slot starts is different, multiple different allocation patterns (for example, multiple allocation patterns with different start symbols and the same length) are set even for time resource allocation with the same number of symbols (for example, length). For example, in FIG. 8 and FIG. 9, when a data channel with a length of 4 symbols (length=4) can be assigned, three allocation patterns with different first symbol positions at which data transmission or reception in a slot starts are set. In this way, the number of allocation patterns can increase as the number of candidates for the first symbol position at which data transmission or reception in a slot starts increases. An increase in the number of allocation patterns leads to an increase in the number of bits in the TDRA field in DCI. Setting multiple different allocation patterns for data assignment with the same symbol length is inefficient.
[0054] Therefore, in Release 16, among the parameters included in the time resource allocation pattern, consideration is being given to setting the standard (e.g., also called the reference point) for the symbol position allocated to data in a slot (e.g., the first symbol position at which data transmission or reception begins) to the symbol position in the slot at which the terminal receives a PDCCH including DCI, instead of the first symbol of the slot in Release 15 (see, for example, Non-Patent Document 7).
[0055] Figures 10 and 11 show examples of time resource allocation based on the symbol position of PDCCH reception. Figure 10 shows an example of time resource allocation for PDSCH, and Figure 11 shows an example of time resource allocation for PUSCH.
[0056] For example, in the example shown in Fig. 10 (when Index = 0 is notified), the terminal determines a symbol position in the same slot (e.g., Slot offset = 0) as the slot in which the PDCCH (including DCI) is received, which corresponds to the symbol position (e.g., the 0th symbol, the 4th symbol, or the 8th symbol) in which the PDCCH (including DCI) is received in a certain slot, as a reference. Then, the terminal sets the symbol position (e.g., the 2nd symbol, the 6th symbol, or the 10th symbol) that is the second symbol from the reference (e.g., Start symbol = 2) as the starting symbol position of the PDSCH.
[0057] Also, for example, in the example shown in Fig. 11 (when Index = 0 is notified), the terminal determines the symbol position in the next slot (e.g., Slot offset = 1) of the slot in which the PDCCH (including DCI) is received, which corresponds to the symbol position (e.g., the 0th symbol, the 4th symbol, or the 8th symbol) in which the PDCCH (including DCI) is received in a certain slot, as a reference. Then, the terminal sets the symbol position (e.g., the 2nd symbol, the 6th symbol, or the 10th symbol) of the second symbol from the reference (e.g., Start symbol = 2) as the first symbol position of the PUSCH.
[0058] As shown in FIGS. 10 and 11, even when one allocation pattern is notified, the time resources (for example, symbol positions) allocated to the PDSCH or PUSCH differ depending on the symbol positions in the slot in which the terminal receives the PDCCH.
[0059] For example, when a terminal can receive DCI multiple times within one slot, the allocation of the same symbol length (for example, 4 symbols in Figs. 10 and 11) can be set by one allocation pattern by setting time resource allocation for PDSCH or PUSCH according to a criterion based on the symbol position of PDCCH reception within the slot. By setting this allocation pattern, the number of bits of the TDRA field in DCI can be reduced. Also, for example, when the number of TDRA field bits is fixed, a different time resource allocation pattern can be set, improving the flexibility of time resource allocation.
[0060] In Release 16 URLLC, a technology that enables flexible configuration of processing for PUSCH, such as repeated transmission in minislot units (also called Repetition) or resource allocation across multiple slots, "for example, called PUSCH transmission enhancement" is being considered (see, for example, Non-Patent Document 5). Enhanced PUSCH transmission can realize, for example, low-latency and highly reliable transmission of uplink data (for example, PUSCH).
[0061] In the enhancement of PUSCH transmission, for example, control of the number of repeated transmissions (also called the number of repetitions) or time resource allocation for each repeated transmission (for example, at least one of the leading symbol position and the symbol length) by DCI is being considered. However, time resource allocation based on the symbol position of PDCCH reception in the enhancement of PUSCH transmission has not been fully considered.
[0062] For example, in the enhancement of PUSCH transmission, the commonization of DCI that controls the allocation of time resources for each repeated transmission is being considered. For example, a method is being considered in which the base station notifies the terminal of the allocation pattern of time resources for each repeated transmission in a common TDRA field. This method can reduce the overhead of control information.
[0063] Fig. 12 shows an example of time resource allocation for repetitive transmission. In Fig. 12, as an example, the number of repetitive transmissions is set to two (first PUSCH transmission (1st repetition) and second PUSCH transmission (2nd repetition). Note that the number of repetitive transmissions is not limited to two, and may be three or more.
[0064] For example, a plurality of time resource allocation patterns for each repeated transmission shown in FIG. 12 may be set from the base station to the terminal by signaling of a higher layer (for example, RRC). The base station, for example, in the TDRA field of DCI, instructs the terminal to select one of the allocation patterns set for the terminal, and allocates time resources to the terminal. At this time, as shown in FIG. 12, the leading symbol position of the time resource allocation for each repeated transmission may be determined according to a criterion based on the symbol position of PDCCH reception, for example, as described above. By setting this criterion, for example, when the terminal can receive DCI multiple times within one slot, the allocation of time resources having the same number of repetitions and the same symbol length for each repeated transmission can be set by one allocation pattern.
[0065] However, for example, when repeat transmission is set across multiple slots as shown in FIG. 13, it may not be possible to set the allocation of time resources with the same number of repetitions and the same symbol length for each repeat transmission using a single allocation pattern.
[0066] The time resource allocation examples shown in Figures 13(a), (b) and (c) are allocations in which the number of repetitions and the symbol length of each repeated transmission are the same (number of repetitions: 2, symbol length: 4 symbols). For example, in the examples shown in Figures 13(a) and (b), data that is repeatedly transmitted is allocated within one slot. Therefore, each of the time resource allocations shown in Figures 13(a) and (b) can be set by one allocation pattern (e.g., Index=0).
[0067] In contrast, for example, in the example shown in Fig. 13(c), the data to be repeatedly transmitted is allocated across two slots. Therefore, the time resource allocation shown in Fig. 13(c) can be set by an allocation pattern (e.g., Index=1) different from the allocation pattern (e.g., Index=0) for Fig. 13(a) and (b). In other words, the examples shown in Fig. 13(a), (b), and (c) can be set by multiple allocation patterns, although the number of repetitions and the symbol length of each repeated transmission are the same.
[0068] Furthermore, when following the criteria based on the PDCCH reception symbol position, if repeatedly transmitted data is allocated across multiple slots (for example, in the case of FIG. 13(c)), a symbol position earlier than the criteria is also set in the multiple slots, so the setting range of the first symbol position at which data transmission or reception starts is, for example, -13 to 13. For example, when following the criteria based on the slot start in Release 15, the setting range of the first symbol position at which data transmission or reception starts is, for example, 0 to 13, so when following the criteria based on the PDCCH reception symbol position (in the range of -13 to 13), the overhead of higher layer signals increases.
[0069] Furthermore, for example, when the setting range (e.g., the range of Start symbol) of the first symbol position at which data transmission or reception in a slot starts is set to 0 to 13, the terminal performs a process of determining whether or not the first symbol position of data identified according to a criterion based on the PDCCH reception symbol position is the same as the slot indicated by the slot offset of the time resource pattern, which may complicate the process of identifying the time resource in the terminal. For example, the terminal determines whether or not a value indicated by the PDCCH reception symbol position (e.g., any of the 0th to 13th symbols) and the first symbol position of the time resource pattern (e.g., any of the 0th to 13th symbols) exceeds the number of symbols in a slot (e.g., 14).
[0070] Furthermore, in the enhancement of PUSCH transmission, a terminal cannot transmit a signal with a symbol set as a downlink (DL) symbol (or a flexible symbol). Therefore, for example, when a symbol set as a DL symbol (or a flexible symbol) is included in a time resource (or a time resource pattern) of a PUSCH assigned by DCI, dropping (in other words, not transmitting) the PUSCH transmission assigned to the symbol, or postponing the transmission until the next transmission opportunity (for example, an uplink symbol) is under consideration. Note that a terminal can identify the position of a DL symbol in a slot, for example, by notification of control information (for example, SFI: Slot Format Indicator).
[0071] In this case, for example, if the first symbol position (e.g., Start symbol) of the time resource allocation for each repeated transmission is based on the above-mentioned criteria based on the symbol position of PDCCH reception, the terminal performs a process of determining whether the notified time resource matches the DL symbol (or Flexible symbol), which may complicate the process of identifying the time resource in the terminal.
[0072] Therefore, in one embodiment of the present disclosure, for example, a method for improving efficiency of time resource allocation in URLLC will be described. According to one embodiment of the present disclosure, for example, it is possible to improve efficiency of time resource allocation in URLLC and suppress complication of time resource specification processing in a terminal.
[0073] For example, in one embodiment of the present disclosure, a terminal switches between determining the first symbol position at which to start transmitting or receiving data notified by DCI based on a criterion based on the first symbol position of a slot or a criterion based on the PDCCH received symbol position, based on certain conditions (an example of which will be described later).
[0074] [Communication system overview] The communication system according to each embodiment of the present disclosure includes a base station 100 and a terminal 200.
[0075] Fig. 14 is a block diagram showing a configuration example of a part of terminal 200 according to an embodiment of the present disclosure. In terminal 200 shown in Fig. 14, receiver 201 (e.g., corresponding to a receiver circuit) receives downlink control information (e.g., DCI). Controller 205 (e.g., corresponding to a control circuit) controls a criterion for a position (e.g., symbol position) at which data is arranged in a time resource based on a certain condition in controlling the arrangement of data (e.g., PDSCH or PUSCH) in a time resource based on the control information.
[0076] [Base station configuration] Fig. 15 is a block diagram showing an example of the configuration of a base station 100 according to embodiment 1. In Fig. 15, the base station 100 includes a control unit 101, a higher control signal generation unit 102, a downlink control information generation unit 103, an encoding unit 104, a modulation unit 105, a signal allocation unit 106, a transmission unit 107, a reception unit 108, an extraction unit 109, a demodulation unit 110, and a decoding unit 111.
[0077] Control section 101 determines, for example, information related to DCI reception in terminal 200, and outputs the determined information to higher control signal generating section 102. The information related to DCI reception may include, for example, information such as a control resource set (CORESET) setting, a search space setting, or a symbol setting within one slot in which the terminal receives a PDCCH.
[0078] Furthermore, control section 101 determines, for example, setting information including higher layer parameters for terminal 200 (for example, referred to as Radio Resource Control (RRC) setting information), and outputs the determined RRC setting information to higher control signal generating section 102. The RRC setting information may include, for example, information regarding an allocation pattern of time resources notified in the TDRA field of DCI.
[0079] Furthermore, the control unit 101 determines information on a downlink signal for transmitting a downlink data signal (e.g., PDSCH), an upper control signal, or downlink control information (e.g., DCI). The information on the downlink signal may include, for example, information on a modulation and coding scheme (MCS) and radio resource allocation. The information on the downlink signal may include, for example, information on TDRA or information on repeated transmission (e.g., Repetition). The control unit 101 outputs the determined information to, for example, the encoding unit 104, the modulation unit 105, and the signal allocation unit 106. The control unit 101 also outputs the information on the downlink signal to the downlink control information generation unit 103.
[0080] Furthermore, the control unit 101 determines information for terminal 200 to transmit an uplink data signal (for example, PUSCH), and outputs the determined information to the downlink control information generating unit 103, the extracting unit 109, the demodulating unit 110, and the decoding unit 111. The information for transmitting the uplink data signal may include, for example, a coding and modulation scheme and radio resource allocation. Furthermore, the information for transmitting the uplink data signal may include, for example, information on TDRA or information on repeated transmission (for example, Repetition).
[0081] The higher layer control signal generating unit 102 generates a higher layer control signal bit sequence based on information input from the control unit 101 (e.g., information regarding DCI reception or RRC setting information), and outputs the higher layer control signal bit sequence to the encoding unit 104.
[0082] The downlink control information generating unit 103 generates a downlink control information (for example, DCI) bit string based on information input from the control unit 101, and outputs the generated DCI bit string to the encoding unit 104. Note that control information may be transmitted to multiple terminals. For this reason, the downlink control information generating unit 103 may scramble the PDCCH that transmits the DCI using terminal-specific identification information. The terminal-specific identification information may be, for example, any of information such as a C-RNTI (Cell Radio Network Temporary Identifier) and an MCS-C-RNTI (Modulation and Coding Scheme C-RNTI), or may be other information (for example, another RNTI). The other RNTI may be, for example, an RNTI introduced for URLLC.
[0083] The encoding unit 104 encodes the downlink data, the bit sequence input from the higher control signal generating unit 102, or the DCI bit sequence input from the downlink control information generating unit 103, based on, for example, information input from the control unit 101 (for example, information related to the coding rate). The encoding unit 104 outputs the encoded bit sequence to the modulation unit 105.
[0084] The modulation unit 105 modulates the coded bit sequence input from the coding unit 104, for example, based on information input from the control unit 101 (for example, information regarding a modulation method), and outputs the modulated signal (for example, a symbol sequence) to the signal allocation unit 106.
[0085] The signal allocation unit 106 maps the symbol sequence (including, for example, downlink data or a control signal) input from the modulation unit 105 to the radio resource based on the information indicating the radio resource input from the control unit 101. The signal allocation unit 106 outputs the downlink signal onto which the signal has been mapped to the transmission unit 107.
[0086] The transmitting unit 107 performs a transmission waveform generation process such as Orthogonal Frequency Division Multiplexing (OFDM) on the signal input from the signal allocation unit 106. In addition, in the case of OFDM transmission that adds a cyclic prefix (CP), the transmitting unit 107 performs an Inverse Fast Fourier Transform (IFFT) process on the signal and adds a CP to the signal after IFFT. In addition, the transmitting unit 107 performs RF processes such as D / A conversion and up-conversion on the signal, and transmits the radio signal to the terminal 200 via an antenna.
[0087] The receiving unit 108 performs RF processing such as down-converting or A / D conversion on the uplink signal received from the terminal 200 via the antenna. In addition, in the case of OFDM transmission, the receiving unit 108 performs Fast Fourier Transform (FFT) processing on the received signal and outputs the obtained frequency domain signal to the extracting unit 109.
[0088] The extraction unit 109 extracts a radio resource portion from which the uplink signal transmitted by the terminal 200 is transmitted based on the information input from the control unit 101 , and outputs the extracted radio resource portion to the demodulation unit 110 .
[0089] The demodulation unit 110 demodulates the signal (for example, uplink data) input from the extraction unit 109 based on the information input from the control unit 101. The demodulation unit 110 outputs the demodulation result to the decoding unit 111, for example.
[0090] The decoder 111 performs error correction decoding on the uplink data based on the information input from the controller 101 and the demodulation result input from the demodulator 110, and obtains a decoded received bit sequence.
[0091] [Device configuration] 16 is a block diagram showing a configuration example of a terminal 200 according to an embodiment of the present disclosure. For example, in FIG. 16, the terminal 200 includes a receiving unit 201, an extracting unit 202, a demodulating unit 203, a decoding unit 204, a control unit 205, an encoding unit 206, a modulating unit 207, a signal allocating unit 208, and a transmitting unit 209.
[0092] The receiver 201 receives a downlink signal (e.g., downlink data or downlink control information) from the base station 100 via an antenna, and performs RF processing such as downconvert or A / D conversion on the wireless received signal to obtain a received signal (baseband signal). When receiving an OFDM signal, the receiver 201 performs FFT processing on the received signal to convert the received signal into the frequency domain. The receiver 201 outputs the received signal to the extractor 202.
[0093] Based on information relating to the radio resource of the downlink control information input from the control unit 205, the extraction unit 202 extracts a radio resource portion including the downlink control information from the received signal input from the receiving unit 201, and outputs the extracted radio resource portion to the demodulation unit 203. Also, based on information relating to the radio resource of the data signal input from the control unit 205, the extraction unit 202 extracts a radio resource portion including the downlink data, and outputs the extracted radio resource portion to the demodulation unit 203.
[0094] Demodulation section 203 demodulates the signal inputted from extraction section 202 and outputs the demodulated result to decoding section 204 .
[0095] The decoding unit 204 performs error correction decoding on the demodulation result input from the demodulation unit 203, and obtains, for example, downlink reception data, a higher layer control signal, or downlink control information. The decoding unit 204 outputs the higher layer control signal and the downlink control information to the control unit 205, and outputs the downlink reception data. The decoding unit 204 may also generate a response signal (for example, also called ACK / NACK or HARQ-ACK) based on the decoding result of the downlink reception data.
[0096] The control unit 205 determines at least one radio resource of the downlink data signal and the uplink data signal, for example, based on information on DCI reception included in the upper layer control signal information input from the decoding unit 204, RRC setting information, and information on radio resource allocation included in the downlink control information. The control unit 205, for example, outputs information indicating the determined radio resource of the downlink data signal to the extraction unit 202, and outputs information indicating the determined radio resource of the uplink data signal to the signal allocation unit 208. Furthermore, the control unit 205 may determine information on the transmission of the uplink signal, for example, based on the downlink control information, and output the determined information to the encoding unit 206.
[0097] The encoding unit 206 encodes the uplink data signal based on the information input from the control unit 205 , and outputs the encoded bit sequence to the modulation unit 207 .
[0098] The modulation unit 207 modulates the coded bit sequence inputted from the coding unit 206 and outputs the modulated signal (symbol sequence) to the signal allocation unit 208 .
[0099] The signal allocation unit 208 maps the signal input from the modulation unit 207 to radio resources based on the information input from the control unit 205, and outputs the uplink signal onto which the signal has been mapped to the transmission unit 209.
[0100] The transmitting unit 209 generates a transmission signal waveform, such as OFDM, for the signal input from the signal allocating unit 208. In addition, in the case of OFDM transmission using a CP, the transmitting unit 209 performs IFFT processing on the signal and adds a CP to the signal after IFFT. Alternatively, in the case of generating a single carrier waveform, the transmitting unit 209 may add a DFT (Discrete Fourier Transform) unit after the modulating unit 207 or before the signal allocating unit 208 (not shown). In addition, the transmitting unit 209 performs RF processing, such as D / A conversion and up-conversion, on the transmission signal, and transmits the radio signal to the base station 100 via an antenna.
[0101] [Example of Operation of Base Station 100 and Terminal 200] An example of the operation of base station 100 and terminal 200 having the above configuration will be described.
[0102] FIG. 17 is a flowchart showing an example of the operation of terminal 200 according to the present embodiment.
[0103] 17, terminal 200 acquires, for example, information on an allocation pattern of time resources (ST101). The information on the allocation pattern of time resources may be set (in other words, notified or instructed) to terminal 200 from base station 100 by a control signal such as an upper layer parameter (for example, an RRC parameter) or DCI, or may be set in advance in terminal 200 according to a standard.
[0104] Terminal 200 receives, for example, a PDCCH including DCI (ST102). Terminal 200 acquires, for example, time resource allocation information (for example, an index indicating one of the allocation patterns) included in the DCI (for example, a TDRA field) (ST103).
[0105] Terminal 200 determines whether or not a condition for identifying a symbol position at which to start transmitting or receiving data is satisfied (ST104). For example, terminal 200 may determine whether "condition A" or "condition B" is satisfied. Examples of condition A and condition B will be described later.
[0106] If condition A is satisfied, terminal 200 identifies the symbol position at which to start transmitting or receiving data, in accordance with a criterion based on the symbol position at which the PDCCH was received (ST105).
[0107] If condition B is met, terminal 200 identifies the symbol position at which to start transmitting or receiving data, according to a criterion based on the leading symbol position of the slot (ST106).
[0108] Terminal 200 transmits or receives data based on the identified symbol position (ST107).
[0109] [Example of time resource allocation] Next, an example of time resource allocation will be described.
[0110] In this embodiment, for example, terminal 200 supports Repetition. For example, terminal 200 supports at least one of repeated transmission of a PUSCH and reception of a PDSCH repeatedly transmitted from base station 100.
[0111] Furthermore, the time resource of the PUSCH transmitted by terminal 200 (also referred to as a "PUSCH resource," for example) or the time resource of the PDSCH received by terminal 200 (also referred to as a "PDSCH resource," for example) may be controlled by a TDRA field included in DCI.
[0112] For example, multiple time resource allocation patterns may be set from base station 100 to terminal 200 by signaling of a higher layer (for example, RRC). For example, information (for example, an index) identifying each time resource allocation pattern may be associated with the time resource allocation pattern. Base station 100 indicates one allocation pattern (for example, an index) of the multiple allocation patterns set for terminal 200 to terminal 200 in the TDRA field of DCI, and allocates time resources to terminal 200.
[0113] The allocation pattern of time resources set in terminal 200 may include parameters such as a slot offset (e.g., slot offset), a first symbol position in a slot at which data transmission or reception starts (e.g., start symbol), and the number of symbols (e.g., length). The parameters included in the allocation pattern are not limited to these, and may be other parameters related to time resources. For example, in the case of repeated transmission of PUSCH or repeated reception of PDSCH, the allocation pattern may include a parameter related to the number of repeated transmissions or the allocation of time resources for each repeated transmission.
[0114] In this embodiment, terminal 200 may identify time resources (eg, symbol positions within a slot) to be allocated to data, based on, for example, operation example 1-1, operation example 1-2, or operation example 1-3 described below.
[0115] <Example 1-1> In operation example 1-1, terminal 200 controls a criterion (for example, a reference point) for the position at which PUSCH or PDSCH is arranged in time resources based on whether or not repetition is applied in PUSCH transmission or PDSCH reception in the arrangement control of PUSCH or PDSCH in time resources based on DCI. In other words, terminal 200 switches the criterion for the position at which PUSCH or PDSCH is arranged in time resources based on whether or not repetition is applied to data.
[0116] For example, when terminal 200 does not repeatedly transmit a PUSCH or does not repeatedly receive a PDSCH, it identifies the first symbol position at which to start transmitting or receiving data within a slot according to a criterion based on the symbol position within the slot at which a PDCCH including DCI is received.
[0117] On the other hand, for example, when terminal 200 repeatedly transmits a PUSCH or repeatedly receives a PDSCH, it identifies the leading symbol position at which to start transmitting or receiving data within a slot, according to a criterion based on the leading symbol of the slot.
[0118] In other words, in the operational example 1-1, the condition A in FIG. 17 is that Repetition is not applied to the terminal 200, and the condition B is that Repetition is applied to the terminal 200.
[0119] Base station 100 may notify terminal 200 of different allocation patterns depending on whether Repetition is not applied or applied.
[0120] Fig. 18 shows an example of allocation of time resources for PUSCH according to operation example 1-1. For example, the upper part of Fig. 18 shows an example of allocation of time resources (e.g., a TDRA table) and a corresponding time resource allocation pattern when Repetition is not applied to terminal 200. Moreover, the lower part of Fig. 18 shows an example of allocation of time resources (e.g., a TDRA table) and a corresponding time resource allocation pattern when Repetition is applied to terminal 200.
[0121] As shown in FIG. 18, the parameters (for example, the value or number of parameters) included in the same allocation pattern (for example, Index=0) may be different between the case where Repetition is not applied to terminal 200 and the case where Repetition is applied.
[0122] For example, as shown in the upper part of FIG. 18, when Repetition is not applied to terminal 200, terminal 200 identifies the symbol position in which to place data within a slot included in an allocation pattern for PUSCH resources, in accordance with a criterion based on received symbols of a PDCCH including DCI.
[0123] For example, in the upper part of FIG. 18, terminal 200 receives a PDCCH at the eighth symbol in a certain slot. Also, in the upper part of FIG. 18, terminal 200 is instructed that index=0 in the TDRA field of DCI included in the received PDCCH. Therefore, in the upper part of FIG. 18, terminal 200 determines the eighth symbol (in other words, the symbol position corresponding to the symbol position where PDCCH is received in another slot) in the slot next to the slot where PDCCH is received (for example, Slot offset=1) as the reference for the position where PUSCH is placed. Then, terminal 200 specifies, for example, the tenth symbol, which is the symbol position of the second symbol from the reference (for example, Start symbol=2) in the slot next to the slot where PDCCH is received, as the leading symbol position where PUSCH transmission is started. For example, in the upper part of FIG. 18, the symbol length is four symbols (Length=4), so terminal 200 transmits PUSCH in four symbols from the tenth symbol to the thirteenth symbol in the slot.
[0124] Also, for example, as shown in the lower part of FIG. 18, when Repetition is applied to terminal 200, terminal 200 identifies the symbol position at which to place data in a slot included in an allocation pattern for PUSCH resources, in accordance with a criterion based on the first symbol of the slot.
[0125] For example, in the lower part of FIG. 18, terminal 200 receives a PDCCH at the eighth symbol in a certain slot. Also, in the lower part of FIG. 18, terminal 200 is instructed that index=0 in the TDRA field of DCI included in the received PDCCH. Therefore, in the lower part of FIG. 18, terminal 200 determines the 0th symbol (leading symbol) in the slot (e.g., Slot offset=1) next to the slot in which the PDCCH is received as the reference for the position in which the PUSCH is arranged. Then, terminal 200 specifies, for example, the 10th symbol, which is the symbol position 10th symbol (e.g., Start symbol=10) from the reference in the slot next to the slot in which the PDCCH is received, as the leading symbol position at which the transmission of the PUSCH in the first repeated transmission is started. Similarly, in the lower part of FIG. 18, terminal 200 determines the 0th symbol (leading symbol) in the slot two slots after the slot in which the PDCCH is received (e.g., Slot offset=2) as the reference for the position in which the PUSCH is arranged. Then, terminal 200 specifies, for example, the 0th symbol, which is the 0th symbol position from the reference (for example, Start symbol=0) in the slot two slots after the slot in which the PDCCH is received, as the leading symbol position at which to start transmitting the PUSCH in the second repeated transmission. For example, in the lower part of FIG. 18, the symbol length in each repeated transmission is 4 symbols (Length=4), so terminal 200 transmits the PUSCH in the four symbols from the 10th symbol to the 13th symbol in the slot one slot after the slot in which the PDCCH is received, and in the four symbols from the 0th symbol to the 3rd symbol in the slot two slots after.
[0126] Although an example of allocation of PUSCH resources has been described with reference to FIG. 18, the allocation of PDSCH resources may be performed in a similar manner depending on whether or not Repetition is applied.
[0127] According to the operation example 1-1, when the repetition is applied, the time resource is determined based on the first symbol of the slot, so that the terminal 200 does not need to determine, for example, whether the first symbol position of the identified data is the same as the slot specified by the slot offset of the time resource pattern. Therefore, even if the repetition applied to the PUSCH is set across multiple slots (for example, the lower part of FIG. 18), the terminal 200 can easily identify the time resource available for transmitting the PUSCH.
[0128] Also, for example, the symbol set as the DL symbol (or Flexible symbol) in a slot is notified from base station 100 to terminal 200 by, for example, SFI, which is slot-based information. Therefore, when Repetition is applied to the PUSCH, terminal 200 can compare the slot-based DL symbol (or Flexible symbol) setting with the slot-based PUSCH resource setting to determine whether each symbol included in the PUSCH resource is usable or not. By this determination, terminal 200 can easily identify the time resource usable for transmitting the PUSCH, for example, even when the time resource pattern of the PUSCH assigned by DCI includes a symbol set as the DL symbol (or Flexible symbol) (not shown).
[0129] Therefore, according to the operation example 1-1, the complication of the process related to identifying the time resource in the terminal 200 can be suppressed.
[0130] Furthermore, when Repetition is applied, time resources are determined based on the first symbol of a slot. For example, the setting range of the first symbol position of data is 0 to 13, which makes it possible to suppress an increase in overhead of higher layer signals, such as the example shown in FIG. 13.
[0131] Also, according to operation example 1-1, when Repetition is not applied, terminal 200 determines the time resource of PDSCH or PUSCH according to a criterion based on the symbol position of PDCCH reception. This allocation makes it possible to set, for example, allocation of the same symbol length by one allocation pattern. Therefore, according to operation example 1-1, for example, the number of bits of the TDRA field in DCI can be reduced. Or, according to operation example 1-1, for example, when the number of TDRA field bits is fixed, it is possible to set a different time resource allocation pattern, thereby improving the flexibility of time resource allocation.
[0132] <Example 1-2> In operation example 1-2, terminal 200 controls a criterion (for example, a reference point) for the position at which PUSCH or PDSCH is arranged in time resources based on whether a repeatedly transmitted PUSCH or a repeatedly received PDSCH is allocated to one slot in the allocation control of PUSCH or PDSCH for time resources based on DCI. In other words, terminal 200 switches the criterion for the position at which PUSCH or PDSCH is arranged in time resources based on the number of slots to which repetition data is allocated.
[0133] For example, when the time resource of a PUSCH that is repeatedly transmitted or the time resource of a PDSCH that is repeatedly received is included in one slot, terminal 200 identifies the first symbol position at which to start transmitting or receiving data within the slot in accordance with a criterion based on the symbol position within the slot at which a PDCCH containing DCI is received.
[0134] On the other hand, for example, when the time resource of the PUSCH that is repeatedly transmitted or the time resource of the PDSCH that is repeatedly received is set across multiple slots, terminal 200 identifies the first symbol position at which to start transmitting or receiving data within the slot in accordance with a criterion based on the first symbol of the slot.
[0135] In other words, in the operational example 1-2, condition A in FIG. 17 is that the repeated data is assigned to one slot, and condition B is that the repeated data is assigned to multiple slots.
[0136] Base station 100 may notify different allocation patterns for the case where repetition data is allocated to one slot and the case where repetition data is allocated to multiple slots.
[0137] Fig. 19 shows an example of PUSCH resource allocation according to operation example 1-2. For example, the upper part of Fig. 19 shows a time resource allocation pattern (e.g., TDRA table) and an example of time resource allocation corresponding to a case where the time resource of the PUSCH to be repeated is included in one slot. Also, the lower part of Fig. 19 shows a time resource allocation pattern (e.g., TDRA table) and an example of time resource allocation corresponding to a case where the time resource of the PUSCH to be repeated is set across multiple slots.
[0138] As shown in FIG. 19, the parameters (e.g., parameter values) included in the same allocation pattern (e.g., Index=0) may be different between when the time resource of the repeated PUSCH is included in one slot and when the time resource of the repeated PUSCH is set across multiple slots.
[0139] For example, in the upper part of FIG. 19, terminal 200 identifies symbol positions in which to place data within slots included in an allocation pattern for PUSCH resources, according to criteria based on received symbols of a PDCCH including DCI.
[0140] For example, in the upper part of FIG. 19, terminal 200 receives a PDCCH at the fourth symbol in a certain slot. Also, in the upper part of FIG. 19, terminal 200 is instructed that index=0 in the TDRA field of DCI included in the received PDCCH. Therefore, in the upper part of FIG. 19, terminal 200 determines the fourth symbol (in other words, the symbol position corresponding to the symbol position where PDCCH is received in another slot) in the slot next to the slot where PDCCH is received (for example, Slot offset=1) as the reference for the position where PUSCH is arranged. Then, terminal 200 specifies, for example, the sixth symbol, which is the symbol position of the second symbol from the reference (for example, Start symbol=2) in the slot next to the slot where PDCCH is received, as the leading symbol position where PUSCH transmission in the first repeated transmission starts. Similarly, in the upper part of Fig. 19, terminal 200 specifies the 10th symbol, which is the sixth symbol (e.g., Start symbol = 6) from the reference in the slot (e.g., Slot offset = 1) next to the slot in which the PDCCH is received, as the first symbol position at which to start transmitting the PUSCH in the second repeated transmission. For example, in the upper part of Fig. 19, the symbol length in each repeated transmission is four symbols (length = 4), so terminal 200 transmits the PUSCH in the eight symbols from the sixth symbol to the thirteenth symbol in the slot one slot after the slot in which the PDCCH is received.
[0141] Also, for example, in the lower part of FIG. 19, terminal 200 specifies the symbol position in which to place data within a slot included in an allocation pattern for PUSCH resources, according to a criterion based on the first symbol of the slot.
[0142] For example, in the lower part of FIG. 19, terminal 200 receives a PDCCH at the eighth symbol in a certain slot. Also, in the lower part of FIG. 19, terminal 200 is instructed to set index=0 in the TDRA field of DCI. Therefore, in the lower part of FIG. 19, terminal 200 determines the 0th symbol (first symbol) in the slot (e.g., Slot offset=1) next to the slot in which the PDCCH is received as the reference for the position in which the PUSCH is arranged. Then, terminal 200 specifies, for example, the 10th symbol, which is the symbol position 10th symbol (e.g., Start symbol=10) from the reference in the slot next to the slot in which the PDCCH is received, as the first symbol position at which the transmission of the PUSCH in the first repeated transmission is started. Similarly, in the lower part of FIG. 19, terminal 200 determines the 0th symbol (first symbol) in the slot two slots after the slot in which the PDCCH is received (e.g., Slot offset=2) as the reference for the position in which the PUSCH is arranged. Then, terminal 200 specifies the 0th symbol, which is the 0th symbol from the reference (e.g., start symbol=0) in the slot two slots after the slot in which the PDCCH was received, as the leading symbol position at which to start transmitting the PUSCH in the second repeated transmission. For example, in the lower part of FIG. 19, the symbol length in each repeated transmission is 4 symbols (length=4), so terminal 200 transmits the PUSCH in the four symbols from the 10th symbol to the 13th symbol in the slot one slot after the slot in which the PDCCH was received, and in the four symbols from the 0th symbol to the 3rd symbol in the slot two slots after.
[0143] Although an example of allocation of PUSCH resources has been described with reference to FIG. 19, allocation of PDSCH resources may be performed in a similar manner according to the slot to which the repetition data is allocated.
[0144] According to the operation example 1-2, when the repetition data is allocated over a plurality of slots, the time resource is determined based on the first symbol of the slot, so that the terminal 200 does not need to determine, for example, whether the first symbol position of the identified data is the same as the slot indicated by the slot offset of the time resource pattern. Therefore, even when the repetition applied to the PUSCH is set over a plurality of slots (for example, the lower part of FIG. 19), the terminal 200 can easily identify the time resource available for transmitting the PUSCH.
[0145] Also, for example, the symbol set as the DL symbol (or Flexible symbol) in a slot is notified from base station 100 to terminal 200 by, for example, SFI, which is slot-based information. Therefore, when a PUSCH to be repeated is allocated to a plurality of slots, terminal 200 can compare the slot-based DL symbol (or Flexible symbol) setting with the slot-based PUSCH resource setting to determine whether each symbol included in the PUSCH resource is usable or not. By this determination, terminal 200 can easily identify the time resource usable for transmitting the PUSCH, for example, even when the time resource pattern of the PUSCH allocated by DCI includes a symbol set as the DL symbol (or Flexible symbol) (not shown).
[0146] Therefore, according to the operation example 1-2, the complication of the process related to identifying the time resource in the terminal 200 can be suppressed.
[0147] Furthermore, when the data to be repeated is allocated across multiple slots, the time resource is determined based on the first symbol of the slot. For example, the setting range of the first symbol position of the data is 0 to 13, and this makes it possible to suppress an increase in overhead of the upper layer signal, for example, as shown in the example of FIG. 13.
[0148] Also, according to operation example 1-2, when the repetition data is allocated to one slot, terminal 200 determines the time resource of PDSCH or PUSCH according to a criterion based on the symbol position of PDCCH reception. This allocation makes it possible to set, for example, allocation of the same symbol length by one allocation pattern. Therefore, according to operation example 1-2, for example, the number of bits of the TDRA field in DCI can be reduced. Or, according to operation example 1-2, for example, when the number of TDRA field bits is fixed, it is possible to set a different time resource allocation pattern, thereby improving the flexibility of time resource allocation.
[0149] <Example 1-3> In operation example 1-3, terminal 200 identifies the leading symbol position within a slot in parameters included in the allocation pattern of time resources, according to a criterion based on the symbol position within a slot in which a PDCCH including DCI is received.
[0150] Furthermore, in operation example 1-3, terminal 200 applies Repetition (for example, repeated transmission of PUSCH or repeated reception of PDSCH) when receiving PDCCH at a specific symbol in a slot.
[0151] For example, when terminal 200 meets the condition for receiving a PDCCH (e.g., DCI) at a specific symbol in a slot, it determines the symbol position in the slot allocated to a PUSCH or PDSCH, which corresponds to the position of the symbol at which DCI is received in the slot, as the reference for the PUSCH or PDSCH to be repeated.
[0152] On the other hand, when terminal 200 receives the PDCCH at a symbol other than the specific symbol in the slot, it does not apply Repetition.
[0153] The "specific symbol" may be, for example, at least one symbol including the first symbol of each slot, or at least one symbol near the first symbol of each slot.
[0154] According to the operation example 1-3, when the terminal 200 receives the PDCCH at a specific symbol, the repetition is applied. For example, when the specific symbol is a symbol including the first symbol of each slot, the received symbol of the PDCCH may include the first symbol of the slot. Therefore, in this case, the criterion based on the symbol position in the slot where the PDCCH is received is equal to the criterion based on the first symbol of the slot, so that during the repetition, for example, the same effect as that of the operation example 1-1 can be obtained.
[0155] In addition, in the operation example 1-3, when the PDCCH is received at a specific symbol, the terminal 200 may apply the repeated transmission of the PUSCH or the repeated reception of the PDSCH set over a plurality of slots. For example, when the condition for receiving the PDCCH (e.g., DCI) at a specific symbol in a slot is satisfied, the terminal 200 determines the symbol position in the slot allocated to the PUSCH or PDSCH, which corresponds to the position of the symbol at which the DCI is received in the slot, as the reference for the PUSCH or PDSCH repeated over a plurality of slots. This operation can obtain, for example, the same effect as the operation example 1-2 when data is repeated over a plurality of slots.
[0156] Operation examples 1 to 3 have been described above.
[0157] As described above, in this embodiment, terminal 200 controls the criterion for the position where data is arranged in time resources based on a certain condition, for example, in the data arrangement control for time resources based on the received DCI. With this control, terminal 200 can, for example, suppress the complication of the process related to the identification of time resources in terminal 200 by switching the criterion for the position where data is arranged depending on the time resource to which data is assigned or the application of Repetition. Therefore, according to this embodiment, it is possible to improve the efficiency of signal allocation in wireless communication such as URLLC.
[0158] [Modification of the first embodiment] In the first embodiment, for example, when Repetition is applied, terminal 200 specifies the first symbol position at which to start transmitting or receiving data within a slot, based on the first symbol of the slot.
[0159] In this case, when terminal 200 can receive DCI multiple times within one slot, depending on the timing of receiving the PDCCH, one or more of the allocation patterns of time resources set in terminal 200 may not be valid patterns for allocating PUSCH or PDSCH.
[0160] As an example, assume that a PDSCH resource allocation pattern as shown in Fig. 8 is set, and terminal 200 can receive a PDCCH at any of the 0th, 4th, and 8th symbols in a slot. In this case, in DCI included in a PDCCH received at the 4th symbol in a slot, PDSCH allocation with Index = 1 (e.g., Start symbol = 6) or Index = 2 (e.g., Start symbol = 10) corresponding to a reception timing after the reception timing of the PDCCH is valid. On the other hand, PDSCH allocation with Index = 0 (e.g., Start symbol = 2) corresponding to a reception timing before the reception timing of the PDCCH is not valid.
[0161] Also, in PUSCH transmission, a period (for example, "N2 symbols") equivalent to a processing time from when terminal 200 receives DCI to when it generates PUSCH may be set. As an example, assume that N2=16 symbols, a PUSCH resource allocation pattern as shown in FIG. 9 is set, and terminal 200 can receive PDCCH at any of the 0th symbol, 4th symbol, and 8th symbol in a slot. In this case, for DCI included in PDCCH received at the 4th symbol in a slot, PUSCH allocation with Index=1 (for example, Start symbol=6) or Index=2 (for example, Start symbol=10) corresponding to the PUSCH transmission timing N2 (=16) symbols or later from the PDCCH reception timing is valid. On the other hand, PUSCH allocation with Index=0 (for example, Start symbol=2) corresponding to the PUSCH transmission timing N2 (=16) symbols earlier from the PDCCH reception timing is not valid.
[0162] Incidentally, in PUSCH repetition, as described above, terminal 200 cannot transmit PUSCH in a symbol set as a DL symbol (or a Flexible symbol). Therefore, when a symbol set as a DL symbol (or a Flexible symbol) is included in a time resource pattern of a PUSCH assigned by DCI, terminal 200 can, for example, decide to drop (in other words, not transmit) the transmission of a PUSCH assigned to that symbol, or postpone the transmission until the next transmission opportunity (for example, an uplink symbol).
[0163] These symbols for which PUSCH transmission is not possible are sometimes called "invalid symbols", for example.
[0164] In a modification of the first embodiment, for example, when PUSCH repetition is applied, terminal 200 is permitted to allocate a PUSCH resource that is N2 symbols (for example, N2=16) before the reception of the PDCCH. Furthermore, terminal 200 may determine, for example, a symbol corresponding to a PUSCH resource that is N2 symbols before the reception of the PDCCH by terminal 200 (or a unit of PUSCH resources including that symbol) as an invalid symbol.
[0165] For example, terminal 200 may drop the transmission of the PUSCH assigned to the symbol determined to be an invalid symbol, or may postpone the transmission of the PUSCH until the next transmission opportunity (eg, an uplink symbol).
[0166] Fig. 20 shows an example of time resource allocation in a modification of the first embodiment. In Fig. 20, N2=16 symbols, and terminal 200 can transmit PUSCH N2=16 symbols after receiving PDCCH. Also, as an example, Index=0 is reported in all of DCIs in Fig. 20(a), (b), and (c). Note that N2 is not limited to 16 symbols and may be another number of symbols.
[0167] Also, in Fig. 20, for example, in PUSCH repetition, the allocation of time resources for the first PUSCH repetition is notified in the TDRA field, and the allocation of time resources for the second and subsequent repetitions is allocated to transmit consecutive symbols of PUSCH with the same number of symbols as the first PUSCH repetition. Note that, in the example shown in Fig. 20, the number of repetitions is two, but the number of repetitions may be three or more.
[0168] For example, as shown in Fig. 20(a), when terminal 200 receives a PDCCH at the 0th symbol of a certain slot, the second symbol (e.g., Start symbol = 2) of the next slot (e.g., Slot offset = 1) is N2 = 16 symbols after the reception of the PDCCH. Therefore, in Fig. 20(a), terminal 200 starts PUSCH transmission using the time resource of the PUSCH notified by the TDRA field.
[0169] On the other hand, for example, as shown in FIG. 20(b), when terminal 200 receives a PDCCH in the fourth symbol of a certain slot, the second symbol (e.g., Start symbol=2) of the next slot (e.g., Slot offset=1) is an invalid symbol, occurring before N2=16 symbols after the reception of the PDCCH. Thus, in FIG. 20(b), terminal 200 may, for example, determine to postpone the transmission of the PUSCH, and transmit the PUSCH in a valid symbol (e.g., the sixth symbol or later) after N2=16 symbols. Note that in FIG. 20(b), terminal 200 may determine to drop the PUSCH in the invalid symbol.
[0170] Similarly, for example, as shown in FIG. 20(c), when terminal 200 receives a PDCCH in the eighth symbol of a certain slot, the second symbol (e.g., Start symbol=2) of the next slot (e.g., Slot offset=1) is an invalid symbol, occurring before N2=16 symbols after the reception of the PDCCH. Thus, in FIG. 20(c), terminal 200 may, for example, determine to postpone the transmission of the PUSCH, and transmit the PUSCH in a valid symbol (e.g., the 10th symbol or later) after N2=16 symbols. Note that in FIG. 20(c), terminal 200 may determine to drop the PUSCH in the invalid symbol.
[0171] In a modification of the first embodiment, the invalid symbol may be, for example, a symbol that precedes N2 symbols after terminal 200 receives the PDCCH.
[0172] Furthermore, the invalid symbol may be, for example, an allocation unit of PUSCH resources including symbols preceding N2 symbols after terminal 200 receives the PDCCH (for example, a unit of PUSCH resources notified in a TDRA field).
[0173] Alternatively, the invalid symbol may be, for example, a pair of a DMRS and a PUSCH including a symbol that is more than N2 (=16) symbols after terminal 200 receives a PDCCH. In other words, if a DMRS is not included in symbols excluding the symbols more than N2 symbols after terminal 200 receives a PDCCH, among the allocation units of PUSCH resources, the entire allocation unit of PUSCH resources may be set to invalid symbols.
[0174] According to a modification of the first embodiment, terminal 200 decides to drop data or postpone transmission of data when a symbol to which data is allocated in time resources is included within a period (for example, N2) corresponding to the data processing time in terminal 200. This process enables terminal 200 to use a time resource allocation pattern configured for terminal 200, for example, regardless of the timing at which terminal 200 receives a PDCCH. This makes it possible to reduce the number of bits in the TDRA field in DCI. Alternatively, time resources can be allocated more flexibly.
[0175] Note that the modification of the first embodiment may be applied not only to PUSCH repetition but also to PDSCH repetition. In the case of PDSCH repetition, for example, time resources before PDCCH reception may be set as invalid symbols.
[0176] (Embodiment 2) In the enhancement of PUSCH transmission, as described above, the terminal cannot transmit PUSCH in a symbol set as a DL symbol (or a Flexible symbol). Therefore, when a symbol set as a DL symbol (or a Flexible symbol) is included in a time resource pattern of PUSCH allocated by DCI, the terminal may decide to drop the PUSCH transmission of the symbol or postpone the PUSCH transmission until the next transmission opportunity (e.g., an uplink symbol). In addition, the terminal may specify the position of the DL symbol in the slot, for example, by notification of the SFI.
[0177] Also, in uplink (UL) symbols, a terminal cannot transmit a PUSCH in a symbol in which the terminal or another terminal transmits an uplink control channel (e.g., a Physical Uplink Control Channel (PUCCH)) or a reference signal (e.g., a Sounding Reference Signal (SRS)).
[0178] However, the terminal cannot identify the position of a symbol where PUSCH cannot be transmitted (in other words, a symbol where uplink data transmission is not permitted; hereinafter, referred to as an "invalid UL symbol") by, for example, the SFI.
[0179] Therefore, in this embodiment, a method in which a terminal specifies an invalid UL symbol position will be described.
[0180] The configurations of a base station and a terminal according to the present embodiment may be common to the configurations of base station 100 and terminal 200 according to the first embodiment.
[0181] In this embodiment, for example, terminal 200 supports repeated transmission of the PUSCH (in other words, Repetition).
[0182] Furthermore, time resources (e.g., PUSCH resources) of PUSCH transmitted by terminal 200 are controlled by, for example, the TDRA field of DCI. For example, multiple time resource allocation patterns are set in terminal 200 by higher layer signaling. Furthermore, one of the multiple allocation patterns set in terminal 200 is indicated to terminal 200 by base station 100 via the TDRA field of DCI, whereby PUSCH resources are allocated to terminal 200.
[0183] The allocation pattern of time resources set in terminal 200 may include parameters such as a slot offset, a start symbol position at which data transmission or reception starts in a slot, and the number of symbols (Length). In addition, when repeated transmission of a PUSCH or repeated reception of a PDSCH is applied, the allocation pattern may include the number of repeated transmissions or time resource allocation for each repeated transmission.
[0184] Furthermore, in this embodiment, base station 100 notifies terminal 200 of, for example, information on invalid UL symbol positions. The information on invalid UL symbol positions may be indicated to terminal 200 by, for example, DCI (for example, DCI including one allocation pattern). Furthermore, the information on invalid UL symbol positions may be notified in a field different from the TDRA field, and may be included in the allocation pattern of time resources notified in the TDRA field.
[0185] Furthermore, in this embodiment, the criteria for identifying the symbol position of the first symbol at which data transmission starts in a slot and the invalid UL symbol position in a slot are different.
[0186] For example, terminal 200 identifies the first symbol position in a slot in parameters included in the time resource allocation pattern according to a criterion based on the symbol position in the slot where a PDCCH including DCI is received. On the other hand, terminal 200 identifies an invalid UL symbol position according to a criterion based on the first symbol of a slot.
[0187] FIG. 21 shows an example of time resource allocation in the case where terminal 200 identifies invalid UL symbol positions according to a criterion based on the symbol position in a slot in which the PDCCH is received.
[0188] On the other hand, Fig. 22 shows an example of time resource allocation according to this embodiment. In other words, Fig. 22 shows an example of time resource allocation when an invalid UL symbol position is specified based on the first symbol of a slot.
[0189] 21 and 22, for example, a criterion for the position where the PUSCH is arranged is determined for the PUSCH resource based on the symbol position in a slot where the PDCCH is received. For example, when terminal 200 identifies a time resource for the PUSCH based on DCI, it determines a symbol position in a slot to which the PUSCH is allocated (e.g., the next slot corresponding to Slot offset=1) that corresponds to a symbol position (e.g., the 0th symbol or the 4th symbol) where DCI is received in a certain slot, as a criterion for the position where the PUSCH is arranged.
[0190] 21 and 22 also show an example in which a PUSCH transmission of an invalid UL symbol (eg, an invalid UL symbol) is dropped.
[0191] For example, as shown in Fig. 21, when the reference for the invalid UL symbol position is based on the symbol position where the PDCCH is received, for example, when the Start symbol included in the allocation pattern is the same, if the reception timing of the PDCCH (the 0th symbol and the 4th symbol in Fig. 21) is different, the specified invalid UL symbol position is different. Therefore, as shown in Fig. 21, an allocation pattern for notifying one invalid UL symbol position (for example, the 6th symbol in Fig. 21) can be set for each reception timing of the PDCCH. In other words, in Fig. 21, multiple allocation patterns are set for the invalid UL symbol position at the same position, so the overhead of the higher layer signal for setting the allocation pattern can increase.
[0192] In contrast, in Fig. 22, when terminal 200 specifies an invalid UL symbol position, it determines the first symbol position of a slot to which PUSCH is allocated as a reference for the position where the invalid UL symbol is arranged. For example, as shown in Fig. 22, even if the reception timing of the PDCCH (the 0th symbol and the 4th symbol in Fig. 22) is different, terminal 200 can specify an invalid UL symbol position (for example, the 6th symbol) by one allocation pattern (for example, Index = 0 in Fig. 22). In other words, in Fig. 22, one allocation pattern is set to notify one invalid UL symbol position regardless of the reception timing of the PDCCH.
[0193] As described above, in this embodiment, when the determination is based on information regarding the position where the PUSCH is placed among the PDCCH (e.g., DCI) notified from base station 100 (e.g., first condition), terminal 200 identifies a PUSCH resource according to a criterion based on the PDCCH reception symbol position, and when the determination is based on information regarding the invalid UL symbol position (e.g., second condition), terminal 200 identifies an invalid UL symbol position according to a criterion based on the first symbol position of the slot.
[0194] By this process, according to the present embodiment, base station 100 can notify terminal 200 of invalid UL symbol positions regardless of the PDCCH reception timing, so that patterns for notifying invalid UL symbol positions can be reduced.
[0195] (Embodiment 3) In URLLC of Release 16, for example, the enhancement of PUSCH transmission that can flexibly set the resource allocation between slots or repeat transmission in minislot units is considered, while the application of Release 15 operation to the downlink is considered.
[0196] For this reason, there is a possibility that the method of repeating transmission in minislot units or flexibly setting resource allocation between slots may not be applied to the downlink.
[0197] Therefore, in this embodiment, a method of allocating time resources for each of the downlink and the uplink will be described.
[0198] The configurations of a base station and a terminal according to the present embodiment may be common to the configurations of base station 100 and terminal 200 according to the first embodiment.
[0199] For example, in controlling the placement of PUSCH or PDSCH in time resources based on DCI, terminal 200 controls the criterion for the position at which PUSCH or PDSCH is placed in time resources based on whether data to be allocated is PUSCH or PDSCH. In other words, terminal 200 switches the criterion for the position at which PUSCH or PDSCH is placed in time resources based on whether data is PUSCH or PDSCH.
[0200] For example, when a time resource for a PDSCH is allocated, terminal 200 identifies the leading symbol position at which to start receiving the PDSCH within a slot, according to a criterion based on the symbol position within the slot at which a PDCCH including DCI was received.
[0201] On the other hand, for example, when a time resource for a PUSCH is allocated, terminal 200 identifies the leading symbol position at which to start transmitting the PUSCH within a slot, according to a criterion based on the leading symbol of the slot.
[0202] In other words, in this embodiment, condition A in FIG. 17 is that a time resource for a PDSCH is allocated (for example, in the case of a downlink), and condition B is that a time resource for a PUSCH is allocated (for example, in the case of an uplink).
[0203] Base station 100 may report different allocation patterns for PDSCH time resource allocation and PUSCH time resource allocation.
[0204] According to the present embodiment, in the case of PUSCH transmission, time resources are determined based on the first symbol of a slot, so terminal 200 does not need to determine, for example, whether the position of the first symbol of identified data is the same as the slot specified by the slot offset of the time resource pattern. Thus, even if Repetition applied to PUSCH is set across multiple slots, terminal 200 can easily identify time resources available for PUSCH transmission.
[0205] Also, for example, the symbol set as the DL symbol (or Flexible symbol) in a slot is notified from base station 100 to terminal 200 by, for example, SFI, which is slot-based information. Thus, in the case of PUSCH transmission to which Repetition may be applied, terminal 200 can compare the slot-based DL symbol (or Flexible symbol) setting with the slot-based PUSCH resource setting to determine whether each symbol included in the PUSCH resource is usable or not. By this determination, terminal 200 can easily identify the time resource usable for PUSCH transmission, for example, even when a time resource pattern of the PUSCH assigned by DCI includes a symbol set as the DL symbol (or Flexible symbol) (not shown).
[0206] Therefore, according to this embodiment, it is possible to prevent the process relating to identifying time resources in terminal 200 from becoming complicated.
[0207] In addition, when transmitting a PUSCH to which Repetition may be applied, time resources are determined based on the first symbol of a slot. For example, the setting range of the first symbol position of data is 0 to 13, and this makes it possible to suppress an increase in overhead of higher layer signals, such as the example shown in FIG. 13.
[0208] Also, according to the present embodiment, in the case of PDSCH transmission in which Repetition cannot be applied, terminal 200 determines the time resource of the PDSCH according to a criterion based on the symbol position of the PDCCH reception. This allocation makes it possible to set, for example, allocation of the same symbol length by one allocation pattern. Therefore, according to the present embodiment, for example, the number of bits of the TDRA field in the DCI can be reduced. Alternatively, according to the present embodiment, for example, when the number of TDRA field bits is fixed, a different time resource allocation pattern can be set, thereby improving the flexibility of time resource allocation.
[0209] The above describes each embodiment according to one embodiment of the present disclosure.
[0210] (Other embodiments) In the above embodiment, when time resources are controlled by DCI, a method has been described for reducing the complexity of processing related to identifying time resources in terminal 200 by switching, depending on conditions, whether to identify the position at which data transmission or reception within a slot is to be based on the slot start or based on the symbol position of PDCCH reception. However, the conditions for switching the criteria for the position at which data is to be arranged are not limited to the conditions described in the above-mentioned embodiments, and other conditions may be used.
[0211] For example, for time resource allocation of PDSCH, the difference in the transmission method (in other words, HARQ codebook) of the response signal (e.g., also called ACK / NACK or HARQ-ACK) may be set as a condition. For example, in the Type-1 (semi-static) codebook, the slot head may be used as a reference, and in the Type-2 (dynamic) codebook, the symbol position of the PDCCH reception may be used as a reference.
[0212] Also, for example, differences in scheduling methods may be set as conditions for time resource allocation of PDSCH. For example, in Semi-Persistent Scheduling (SPS), the start of a slot may be used as a reference, and in Dynamic scheduling, the symbol position of PDCCH reception may be used as a reference.
[0213] Furthermore, the conditions for switching the criteria for the position where data is arranged are not limited to these, and other conditions may be used.
[0214] Furthermore, in one embodiment of the present disclosure, when terminal 200 receives a PDCCH at the nth symbol in a slot, the symbol position in the slot at which PUSCH transmission or PDSCH reception starts may be expressed as n+S. Here, S corresponds to a value (e.g., start symbol) notified in the TDRA field of the above-mentioned DCI. For example, when the slot start is used as a reference, n=0 is set regardless of the timing of receiving the PDCCH.
[0215] In addition, in the above embodiment, a method of allocating time resources to data (e.g., downlink data or uplink data) has been described, but the allocation target of time resources is not limited to data. For example, an embodiment of the present disclosure may be applied to allocation of time resources to reference signals (e.g., demodulation reference signals (DMRS: Demodulation Reference Signals), channel state estimation reference signals (CSI-RS: Channel State Information RSs), and SRSs).
[0216] In addition, in the above embodiment, the terminal receives the PDCCH including DCI at one symbol, but the present invention is not limited to this, and the terminal may receive the PDCCH including DCI at multiple symbols. When the terminal receives the PDCCH including DCI at multiple symbols, terminal 200 may determine a criterion for arranging data based on the position of any one of the multiple symbols (for example, the first (or start) symbol).
[0217] In addition, in the above embodiment, uplink communication in which a signal is transmitted from a terminal to a base station, or downlink communication in which a signal is transmitted from a base station to a terminal is assumed. However, an embodiment of the present disclosure is not limited to this, and may be applied to communication between terminals (for example, sidelink communication).
[0218] Furthermore, the downlink control channel, the downlink data channel, the uplink control channel, and the uplink data channel are not limited to the PDCCH, the PDSCH, the PUCCH, and the PUSCH, respectively, and may be control channels with other names.
[0219] Furthermore, the unit of time resource is not limited to the time resource (for example, slot or subslot) described in each of the above embodiments, but may be another time resource unit (for example, subframe or frame, etc.).
[0220] In the above-mentioned embodiments, the number of symbols constituting a slot (in other words, a unit time interval) is 14 symbols, but the number of symbols constituting a slot is not limited to 14 symbols and may be other numbers of symbols (for example, 12 symbols). Also, the arrangement positions of signals (for example, PDCCH, PDSCH, or PUSCH) or invalid symbols (or invalid UL symbols) shown in the above-mentioned embodiments are merely examples, and they may be arranged in other positions.
[0221] In addition, at least two of the embodiment 1 (for example, operation example 1-1, operation example 1-2, operation example 1-3, and modified example), embodiment 2, and embodiment 3 described in one embodiment of the present disclosure may be combined.
[0222] The present disclosure can be realized by software, hardware, or software in cooperation with hardware. Each functional block used in the description of the above embodiment may be realized partially or entirely as an LSI, which is an integrated circuit, and each process described in the above embodiment may be controlled partially or entirely by one LSI or a combination of LSIs. The LSI may be composed of individual chips, or may be composed of one chip so as to include some or all of the functional blocks. The LSI may have input and output of data. Depending on the degree of integration, the LSI may be called an IC, a system LSI, a super LSI, or an ultra LSI.
[0223] The method of integration is not limited to LSI, and may be realized by a dedicated circuit, a general-purpose processor, or a dedicated processor. Also, after LSI manufacturing, a programmable FPGA (Field Programmable Gate Array) or a reconfigurable processor that can reconfigure the connections and settings of circuit cells inside the LSI may be used. The present disclosure may be realized as digital processing or analog processing.
[0224] Furthermore, if a new integrated circuit technology that can replace LSI appears due to the progress of semiconductor technology or a derivative technology, it is possible to integrate the functional blocks using that technology. The application of biotechnology is also a possibility.
[0225] The present disclosure may be implemented in any type of apparatus, device, or system having a communication function (collectively referred to as a communication apparatus). The communication apparatus may include a radio transceiver and processing / control circuitry. The radio transceiver may include a receiver and a transmitter, or both as functions. The radio transceiver (transmitter and receiver) may include a radio frequency (RF) module and one or more antennas. The RF module may include an amplifier, an RF modulator / demodulator, or the like. Non-limiting examples of communication devices include telephones (e.g., cell phones, smartphones, etc.), tablets, personal computers (PCs) (e.g., laptops, desktops, notebooks, etc.), cameras (e.g., digital still / video cameras), digital players (e.g., digital audio / video players), wearable devices (e.g., wearable cameras, smart watches, tracking devices, etc.), game consoles, digital book readers, telehealth and telemedicine devices, communication-enabled vehicles or mobile conveyances (e.g., cars, airplanes, boats, etc.), and combinations of the above devices.
[0226] Communications Equipment includes, but is not limited to portable or mobile equipment, non-portable or fixed equipment, devices and systems of any kind, such as smart home devices (appliances, lighting equipment, smart meters or metering devices, control panels, etc.), vending machines and any other "Things" that may exist on an Internet of Things (IoT) network.
[0227] Communications include data communications via cellular systems, wireless LAN systems, communications satellite systems, etc., as well as data communications via combinations of these.
[0228] A communications apparatus also includes devices, such as controllers and sensors, connected or coupled to a communications device that performs the communications functions described in this disclosure, such as controllers and sensors that generate control and data signals used by the communications device to perform the communications functions of the communications apparatus.
[0229] The communication apparatus also includes infrastructure facilities, such as base stations, access points, and any other apparatus, device, or system that communicates with or controls the various apparatuses listed above, but are not limited to these.
[0230] A terminal according to one embodiment of the present disclosure includes a receiving circuit for receiving downlink control information, and a control circuit for controlling a criterion for a position at which data is placed in a time resource based on the control information, based on certain conditions.
[0231] In one embodiment of the present disclosure, when a first condition is satisfied, the control circuit determines, as the criterion, a symbol position in a second unit interval that corresponds to the position of the symbol at which the control information is received within a first unit interval of the time resource, and when a second condition is satisfied, determines, as the criterion, the position of the first symbol of the second unit interval.
[0232] In one embodiment of the present disclosure, the first condition is that repetition is not applied to the data, and the second condition is that repetition is applied to the data.
[0233] In one embodiment of the present disclosure, the first condition is that the data to be repeated is allocated to one of the second unit intervals, and the second condition is that the data to be repeated is allocated across the second unit interval and a third unit interval following the second unit interval.
[0234] In one embodiment of the present disclosure, the first condition is that the data is downlink data, and the second condition is that the data is uplink data.
[0235] In one embodiment of the present disclosure, the condition is that the control information is received at a certain symbol within a first unit interval in the time resource, and when the condition is satisfied, the control circuit determines a symbol position within a second unit interval in the time resource corresponding to the position of the symbol at which the control information was received within the first unit interval as the reference for the data to be repeated within the second unit interval.
[0236] In one embodiment of the present disclosure, the condition is that the control information is received at a certain symbol within a first unit interval in the time resource, and when the condition is satisfied, the control circuit determines a symbol position within a second unit interval in the time resource corresponding to the position of the symbol at which the control information was received within the first unit interval as the reference for the data to be repeated across the second unit interval and a third unit interval following the second unit interval.
[0237] In one embodiment of the present disclosure, the control circuit determines not to transmit the data or to postpone transmission of the data when a symbol to which the data is assigned is included in the time resource within a period corresponding to the processing time of the data.
[0238] In one embodiment of the present disclosure, the control information includes first information regarding a first position where the data is placed in the time resource and second information regarding a second position where transmission of the data is not permitted, the condition includes a first condition based on the first information and a second condition based on the second information, and when the first condition is satisfied, the control circuit determines a symbol position in a second unit interval in the time resource corresponding to a symbol position at which the control information is received in a first unit interval in the time resource as the reference for the first position, and when the second condition is satisfied, determines a first symbol position of the second unit interval as the reference for the second position.
[0239] In a communication method relating to one embodiment of the present disclosure, a terminal receives downlink control information, and in controlling data placement in a time resource based on the control information, controls a criterion for a position at which the data is placed in the time resource based on certain conditions.
[0240] The disclosures of the specification, drawings and abstract contained in Japanese Patent Application No. 2019-187624, filed on October 11, 2019, are incorporated herein by reference in their entirety. [Industrial Applicability]
[0241] One embodiment of the present disclosure is useful in wireless communication systems. [Explanation of symbols]
[0242] 100 base stations 101,205 Control section 102 Upper control signal generation unit 103 Downlink control information generator 104,206 Encoding section 105,207 Modulation section 106,208 Signal allocation section 107,209 Transmitter 108,201 Receiver 109,202 Extraction part 110,203 Demodulation section 111,204 Decoding section 200 terminals
Claims
1. a control circuit for controlling a criterion for a position at which the data is arranged in a time resource based on downlink control information, the control circuit controlling the criterion for a position at which the data is arranged in the time resource based on a certain condition; A transmission circuit for transmitting the control information; Equipped with When the control information indicates transmission of a Physical Uplink Shared Channel (PUSCH), the reference is a symbol position corresponding to the first symbol of a slot, When the control information indicates reception of a PDSCH (Physical Downlink Shared Channel), the reference is a symbol position corresponding to the symbol in the slot in which the control information is received. Base station.
2. the specified one symbol is different for each transmission of the control information; The base station according to claim 1 .
3. the control information includes time resource allocation information; a location for placing the data is identified using the time resource allocation information and the criteria; The base station according to claim 1 .
4. The base station is In a data allocation control for a time resource based on downlink control information, a criterion for a position at which the data is allocated to the time resource is controlled based on a certain condition; Transmitting the control information; When the control information indicates transmission of a Physical Uplink Shared Channel (PUSCH), the reference is a symbol position corresponding to the first symbol of a slot, When the control information indicates reception of a PDSCH (Physical Downlink Shared Channel), the reference is a symbol position corresponding to the symbol in the slot in which the control information is received. Communication methods.
5. the specified one symbol is different for each transmission of the control information; The communication method according to claim 4.
6. the control information includes time resource allocation information; a location for placing the data is identified using the time resource allocation information and the criteria; The communication method according to claim 4.
7. A process of controlling a criterion for a position at which the data is arranged in the time resource based on a certain condition in a data arrangement control for the time resource based on a downlink control information; receiving the control information; When the control information indicates transmission of a Physical Uplink Shared Channel (PUSCH), the reference is a symbol position corresponding to the first symbol of a slot, When the control information indicates reception of a PDSCH (Physical Downlink Shared Channel), the reference is a symbol position corresponding to the symbol in the slot in which the control information is received. Integrated circuits.
Citation Information
Patent Citations
Terminal, communication method and integrated circuit
JP7546583B2
User terminal and wireless communication method
WO2019159235A1
Transmission device and reception device
WO2019193732A1
