Architecture reform presenting method and reform presenting system
The method addresses the challenge of accurately predicting power consumption reduction in insulation renovation by using air condition data and power consumption to calculate and present renovation plans, ensuring user acceptance.
Patent Information
- Application Number
- JP2023083810
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-22
- Publication Date
- 2024-12-04
AI Technical Summary
Existing methods struggle to accurately predict the power consumption reduction effect of insulation renovation in buildings due to variations in users' lifestyle patterns, air conditioner settings, and sunlight exposure, making it difficult to propose renovations that are highly acceptable to users.
A method that includes acquiring outside air conditions and power consumption data, calculating heat amounts before and after insulation renovation, determining insulation renovation plans, and providing users with information on power consumption reduction effects based on these calculations.
Accurately predicts and presents the power consumption reduction effect of insulation renovation, enabling proposals that are highly acceptable to users by considering individual conditions and actual living patterns.
Smart Images

Figure 2024167612000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a method and system for proposing renovations for a building. [Background technology]
[0002] Conventionally, various methods for proposing renovation of buildings have been proposed (for example, see Patent Document 1 below). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2020-166483 A Summary of the Invention [Problem to be solved by the invention]
[0004] One example of renovation is a thermal insulation renovation for improving the thermal insulation performance of a building. The purpose of this thermal insulation renovation includes, for example, reducing the amount of power consumed by an air conditioner installed in the building. Therefore, in order to propose a thermal insulation renovation that is convincing to building users, it is important to accurately predict and present the effect of reducing power consumption due to the thermal insulation renovation.
[0005] The reduction effect mentioned above can be predicted to some extent by, for example, simulating standard lifestyle patterns and weather conditions assumed in advance. However, because users' lifestyle patterns, air conditioner temperature settings, heat generation inside buildings, and solar radiation levels vary, it is difficult to accurately predict the reduction effect in power consumption taking into account these individual conditions.
[0006] The present invention was devised in consideration of the above-mentioned situation, and its main object is to provide a method that can accurately predict the effect of reducing power consumption of electrical equipment after insulation renovation and propose insulation renovation. [Means for solving the problem]
[0007] The present invention is a method for proposing renovation of a building in which electrical equipment including air conditioners or water heaters are installed to a user of the building, the method including: an acquisition step of acquiring outdoor air conditions including the outdoor air temperature for a predetermined period in an area in which the building is located, and the amount of power consumption of the electrical equipment for each predetermined unit time within the period; a first calculation step of calculating a first amount of heat, which is the amount of heat processed by the electrical equipment for each unit time, based on the acquired outdoor air conditions and the amount of power consumption; a determination step of determining a plan for insulation renovation of the building; a second calculation step of calculating a first heat loss amount, which is the amount of heat loss of the building before the insulation renovation, and a second heat loss amount, which is the amount of heat loss of the building after the insulation renovation; a third calculation step of calculating a second amount of heat, which is the amount of heat processed by the electrical equipment after the insulation renovation, based on the first heat amount, the first heat loss amount, and the second heat loss amount; and a provision step of providing the user with information regarding the reduction effect of the amount of power consumption of the electrical equipment after the insulation renovation based on the first heat amount and the second heat amount. Effect of the Invention
[0008] By adopting the above-mentioned steps, the building renovation proposal method of the present invention makes it possible to accurately predict the effect of reducing power consumption of electrical equipment after insulation renovation and propose insulation renovation. [Brief description of the drawings]
[0009] [Figure 1] FIG. 1 is a cross-sectional view conceptually illustrating an example of a building in which electrical equipment is installed. [Diagram 2] FIG. 1 is a block diagram showing an example of the configuration of a building renovation proposal system. [Diagram 3] FIG. 4 is a diagram showing an example of information regarding specifications of electrical devices. [Figure 4] FIG. 11 is a diagram showing an example of information regarding building specifications. [Diagram 5] FIG. 13 is a diagram showing an example of candidate insulation specifications for a plurality of building materials. [Figure 6] 11 is a flowchart showing the processing steps of a building renovation proposal method. [Figure 7] FIG. 2 is a diagram showing outdoor air conditions in an area where a building is located and some of the amounts of power consumed by electrical appliances. [Figure 8] 11 is a flowchart showing a processing procedure of a first calculation step. [Figure 9] 1 is a graph showing the relationship between energy consumption efficiency and load factor during heating. [Figure 10] 1 is a graph showing the relationship between energy consumption efficiency and load factor during cooling. [Figure 11] FIG. 8 is a diagram showing the outdoor air conditions and power consumption amounts shown in FIG. 7, and a corrected coefficient of performance during heating. [Figure 12] 12 is a diagram showing the outdoor air conditions, the power consumption, and the corrected coefficient of performance during heating shown in FIG. 11, and the first heat quantity. FIG. [Figure 13] FIG. 13 is a diagram showing a display device on which a screen for deciding a plan for insulating a building is displayed. [Figure 14] FIG. 4 is a diagram illustrating a first heat loss amount and a second heat loss amount. [Figure 15] 13 is a diagram showing the outdoor air conditions, the power consumption, the corrected coefficient of performance during heating, and the first and second heat quantities shown in FIG. 12. FIG. [Figure 16] 13 is a diagram showing a display device on which information regarding the effect of reducing the amount of power consumption of electrical equipment after insulation renovation is output. FIG. [Figure 17] 13 is a flowchart showing the processing steps of a building renovation proposal method according to another embodiment of the present invention. [Figure 18] 16 is a diagram showing the outdoor air conditions, the power consumption before the insulation renovation, the corrected coefficient of performance during heating, the first heat quantity, and the second heat quantity shown in FIG. 15, and the power consumption after the insulation renovation. FIG. [Figure 19] FIG. 13 is a diagram showing a display device on which information regarding the reduction effect of power consumption of electrical equipment after insulation renovation according to another embodiment of the present invention is output. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. It should be understood that the drawings include exaggerated expressions and expressions different from the dimensional ratio of the actual structure in order to help understand the contents of the invention. Furthermore, the same or common elements are given the same reference numerals throughout the embodiments, and duplicated explanations are omitted. Furthermore, the specific configurations shown in the embodiments and drawings are for understanding the contents of the present invention, and the present invention is not limited to the specific configurations shown in the drawings.
[0011] In the building renovation proposal method (hereinafter, sometimes referred to as the "proposal method") of this embodiment, renovation of a building in which electrical equipment is installed is proposed to a user of the building. In this embodiment, insulation renovation is proposed as the building renovation.
[0012] In the present embodiment, the electric equipment is of a heat pump type, but is not particularly limited and may be, for example, an equipment other than a heat pump type. The electric equipment includes, for example, an air conditioner or a water heater. In addition, the user to whom the remodeling is proposed includes, for example, the owner, the landlord, and the management company of the building B.
[0013] [building] 1 is a cross-sectional view conceptually illustrating an example of a building B in which an electric device 1 is installed. The building B may be, for example, a house or a building. The building B in this embodiment is configured as an industrialized house. However, the building B is not limited to an industrialized house as in this embodiment.
[0014] A plurality of rooms 2 are provided inside the building B. These rooms 2 include, for example, a living room 2A and a bedroom 2B. These rooms 2 are configured (divided) by a plurality of building materials 3. The building materials (parts) 3 include, for example, a ceiling 4, an exterior wall 5, a floor (first floor floor) 6, and an opening 7. These building materials 3 are configured as an exterior skin 8 that becomes the thermal boundary of the building B.
[0015] When building B is constructed as an industrialized house as in this embodiment, the insulation specifications (initial insulation specifications) of each building material 3 (in this example, the ceiling 4, exterior wall 5, floor 6, and opening 7, etc.) are determined in advance for each specification (product) of building B. The insulation specifications are specified, for example, by the heat transfer coefficient (W / (m2·K)) and the amount of heat loss (W / K). The smaller the values of the heat transfer coefficient and heat loss of a building material 3, the better its insulation performance. In the insulation renovation of this embodiment, at least one building material 3 out of multiple building materials 3 is changed to a building material that can exhibit higher insulation performance than the current insulation specifications (initial insulation specifications).
[0016] [Air conditioning equipment (electrical equipment)] A heat pump type air conditioner is used as the air conditioner 9 in this embodiment. An example of the air conditioner 9 is an air conditioner 10. The air conditioner 10 is, for example, a typical household split-type air conditioner. The air conditioner 10 includes, as a set, an indoor unit 10A and an outdoor unit (not shown) installed outside the building B.
[0017] [Water heater (electrical equipment)] A heat pump type water heater is used as the water heater 20. One example of the water heater 20 is a hot water heating device (for example, a floor heating device, a hot water room heater, a panel heater, etc.). This type of water heater 20 includes a hot water storage unit 20A and a heat pump unit (not shown) as a set, as in the conventional water heater.
[0018] [Electrical equipment other than heat pump type] Electric appliances other than heat pumps include, for example, electric stoves and electric floor heating devices. These electrical appliances always have a coefficient of performance (COP) of "1," as described below.
[0019] Incidentally, the purpose of the thermal insulation renovation of building B includes, for example, reducing the amount of power consumed by electrical equipment 1 (such as air conditioner 10). Therefore, in order to propose a thermal insulation renovation that is convincing to the users of building B, it is important to accurately predict and present the effect of reducing power consumption due to the thermal insulation renovation.
[0020] The effect of reducing power consumption can be predicted to some extent by, for example, a simulation based on previously assumed standard lifestyle patterns and weather conditions. However, because the lifestyle patterns of users of building B, the temperature settings of the air conditioner 10, heat generation within the building, and the way in which solar radiation enters vary, it is difficult to accurately predict the effect of reducing power consumption taking into account these individual conditions.
[0021] [Building renovation proposal method (first embodiment)] In the proposed method of this embodiment, the reduction effect of power consumption of the electrical appliance 1 after insulation renovation is accurately predicted. Then, based on the predicted reduction effect, a proposal for insulation renovation is made. In this embodiment, the case where an air conditioner 10, which is a heat pump type electrical appliance 1, is used as an example of the electrical appliance 1 for which the reduction effect of power consumption is predicted.
[0022] In the case where multiple rooms 2 are provided in building B as in this embodiment, insulation renovation may be proposed for at least one of these rooms 2. When insulation renovation is proposed for each room 2, the effect of reducing power consumption of each of the air conditioners 10 provided in those rooms 2 is predicted. Note that in the case of building B provided with a central air conditioning system that uses one air conditioner (not shown) to condition multiple rooms 2, the effect of reducing power consumption of that air conditioner is predicted.
[0023] [Building renovation proposal system] In the proposal method of this embodiment, a building remodeling proposal system (hereinafter, sometimes referred to as a "proposal system") is used. Fig. 2 is a block diagram showing an example of the configuration of the building remodeling proposal system 11.
[0024] The proposed system 11 of this embodiment has an input device 12, a display device 13, and an arithmetic processing device 14 (computer 15). Furthermore, a power acquisition device 16 is connected to the proposed system 11 of this embodiment. A collection of these devices can configure the proposed system 11 that can perform the function of proposing renovation of the building B in which the electrical device 1 shown in FIG. 1 is installed.
[0025] The arithmetic processing device 14 (computer 15) in this embodiment is configured as a server (cloud server), but is not particularly limited thereto and may be configured as, for example, a personal computer or a mobile information terminal (tablet type, etc.).
[0026] [Power acquisition device] The power acquisition device 16 is for acquiring the amount of power consumed by the electric appliance 1 (the air conditioner 10) shown in Fig. 1. This amount of power consumption is used to calculate the amount of heat processed by the electric appliance 1.
[0027] The power acquisition device 16 is not particularly limited as long as it can acquire the power consumption of the electric device 1. For example, a HEMS (Home Energy Management Service) controller, a power meter, or the like is adopted as the power acquisition device 16. In the HEMS, the power consumption can be acquired by communication with the electric device 1. On the other hand, in the power meter, the power consumption of the electric device 1 can be measured by being connected between the power plug of the electric device 1 and an outlet. The power consumption of the electric device 1 can be easily acquired by connecting the arithmetic processing device 14 to the HEMS, the power meter, or the like. When the arithmetic processing device 14 is configured as a cloud server as in the present embodiment, the power acquisition device 16 and the arithmetic processing device 14 can be connected via a communication network N such as a WAN.
[0028] In the power acquisition device 16 of the present embodiment, the amount of power consumption of the electric device 1 can be acquired at predetermined unit time intervals. The unit time is set according to the frequency of calculation of the amount of heat processed by the electric device 1, and is set to, for example, 10 to 60 minutes (60 minutes in this example).
[0029] [Input / display device] 2, for example, a keyboard, a mouse, or a touch panel is used as the input device 12. For example, a display device or a printer is used as the display device 13.
[0030] [Processing unit] The arithmetic processing device 14 includes a calculation unit (CPU) 17 that performs various calculations, a storage unit 18 that stores data, programs, etc., and a working memory 19.
[0031] [Storage] The storage unit 18 is a non-volatile information storage device formed of, for example, a magnetic disk, an optical disk, an SSD, etc. The storage unit 18 includes a data unit 21 and a program unit 22.
[0032] The data section 21 is for storing information necessary for proposing the renovation of the building B. The data section 21 of this embodiment includes an outdoor air condition input section 21a, a power consumption input section 21b, an electric device input section 21c, a building specification input section 21d, a candidate insulation specification input section 21e, and a determined plan input section 21f. Furthermore, the data section 21 includes a corrected coefficient of performance input section 21g, a heat quantity input section 21h, a heat loss amount input section 21i, and a reduction effect input section 21j. Note that the data section 21 is not limited to such an embodiment, and for example, some of these may be omitted, or an input section (not shown) for storing other data may be further included.
[0033] The electric device input unit 21c stores in advance, as a database (table), information relating to the specifications of the electric device 1 shown in Fig. 1. Fig. 3 is a diagram showing an example of information 31 relating to the specifications of the electric device 1.
[0034] The information 31 on the specifications of the electric device 1 includes a rated heating capacity 31a, a rated cooling capacity 31b, a maximum heating capacity 31c, a maximum cooling capacity 31d, a coefficient of performance during heating 31e, and a coefficient of performance during cooling 31f.
[0035] The coefficient of performance (COP) indicates the energy consumption efficiency when the electrical equipment 1 is operated at rated capacity under the outdoor temperature conditions defined in JIS C9612 (hereinafter, sometimes referred to as "JIS measurement conditions"). The JIS measurement conditions are 7°C for heating and 35°C for cooling. Specifications including such a coefficient of performance are determined in advance by, for example, the manufacturer of the electrical equipment 1.
[0036] Information relating to the specifications of building B shown in Fig. 1 is stored in advance as a database (table) in the building specification input unit 21d shown in Fig. 2. Fig. 4 is a diagram showing an example of information 32 relating to the specifications of building B. Fig. 4 shows the specifications of one room 2 (e.g., living room 2A) to be renovated as a representative of the multiple rooms 2 included in building B.
[0037] 4, the information 32 on the building specifications specifies the specifications of each of the multiple building materials 3 (in this example, the ceiling 4, the exterior wall 5, the floor 6, and the opening 7) that make up one room 2 to be remodeled. The specifications of each building material 3 include, for example, an adjacent space 32a, an area 32b, a heat transfer coefficient 32c, and a temperature difference coefficient 32d. Note that some of these specifications may be omitted, or other specifications may be included.
[0038] The adjacent space 32a is a space adjacent to the room 2 to be renovated via the building material 3 for each of the multiple building materials 3. For example, the adjacent space 32a of the ceiling 4 is an attic. The adjacent space 32a of the exterior wall 5 is the outside air. The temperature difference coefficient 32d of each building material 3 can be specified according to these adjacent spaces 32a.
[0039] The temperature difference coefficient 32d is a parameter used to calculate the amount of heat loss. For building materials 3 whose adjacent spaces 32a are open to the outside air (e.g., ceiling 4, exterior wall 5, and opening 7), a temperature difference coefficient of 1.0 may be set. On the other hand, for building materials 3 whose adjacent spaces 32a are under the floor (e.g., floor 6) and building materials that are not open to the outside air (not shown), a temperature difference coefficient of 0.7 may be set. The heat transmission coefficient 32c is specified as the initial insulation specification (heat transmission coefficient), which is the current insulation specification of each building material 3.
[0040] In the candidate insulation specification input unit 21e shown in Fig. 2, candidate insulation specifications that are candidates for a plan of insulation renovation for multiple building materials 3 constituting the building B (room 2 to be renovated) shown in Fig. 1 are stored in advance as a database (table). Fig. 5 is a diagram showing an example of candidate insulation specifications 33 for multiple building materials 3.
[0041] The candidate insulation specifications 33 include a first candidate insulation specification 33a, a second candidate insulation specification 33b, and a third candidate insulation specification 33c. The candidate insulation specifications 33 are not limited to such an embodiment, and some of these may be omitted, or other candidate insulation specifications (not shown) may be further included. In this embodiment, one candidate insulation specification 33 among the first candidate insulation specification 33a to the third candidate insulation specification 33c is determined as the plan for the insulation renovation.
[0042] The first candidate insulation specification 33a to the third candidate insulation specification 33c each have a heat transmission coefficient 34a set for each building material 3 (in this example, the ceiling 4, the exterior wall 5, the floor 6, and the opening 7). The first candidate insulation specification 33a to the third candidate insulation specification 33c each have a different heat transmission coefficient 34a for at least one building material 3. Therefore, the first candidate insulation specification 33a to the third candidate insulation specification 33c each have a different amount of heat loss in the building B (the room 2 to be remodeled). In this embodiment, the cost 34b required for the insulation reform is set for each of the first candidate insulation specification 33a to the third candidate insulation specification 33c.
[0043] The outdoor air condition input section 21a, the power consumption input section 21b, the decision plan input section 21f, the corrected coefficient of performance input section 21g, the heat quantity input section 21h, the heat loss amount input section 21i, and the reduction effect input section 21j shown in Fig. 2 store data (calculation results) acquired by executing the proposed method. Details of these data will be described later.
[0044] [Program section] The program unit 22 is a program (computer program) necessary for executing the proposed method. The program unit (program) 22 is executed by the calculation unit 17, so that the computer 15 can function as a specific means for proposing a renovation of the building B shown in FIG. 1.
[0045] The program unit 22 of this embodiment includes an acquisition unit 22a, a first calculation unit 22b, a determination unit 22c, a second calculation unit 22d, a third calculation unit 22e, a fourth calculation unit 22f, and a provision unit 22g. Note that the program unit 22 is not limited to such an embodiment, and for example, some of these may be omitted, or a program unit (not shown) having other functions may be further included. The functions of these program units 22 will be described in detail later.
[0046] [Acquire outdoor air conditions and power consumption (acquisition process)] Fig. 6 is a flowchart showing the processing procedure of the building renovation proposal method. In the proposal method of this embodiment, first, the outdoor air condition and the power consumption of the electrical appliance 1 shown in Fig. 1 are acquired (acquisition step S1). In the acquisition step S1, the power consumption of the electrical appliance 1 before the insulation renovation is acquired.
[0047] In the acquisition step S1 of this embodiment, first, an acquisition unit 22a included in the program unit 22 shown in Fig. 2 is loaded into the working memory 19. The acquisition unit 22a is a program for acquiring the outside air conditions and the power consumption of the electric device 1. The acquisition unit 22a is executed by the calculation unit 17, whereby the computer 15 can function as a means for acquiring the outside conditions and the power consumption.
[0048] The outdoor air conditions include the outdoor air temperature in the area where the building B shown in Fig. 1 is located (for example, Osaka Prefecture). This outdoor air temperature is acquired during a predetermined period. In addition to the outdoor air temperature, the outdoor air conditions may further include the outdoor air humidity (relative humidity).
[0049] The weather conditions can be appropriately acquired if the outside air temperature and humidity in the area where building B is located are specified. In this embodiment, for example, the weather conditions may be acquired from weather data provided by the Japan Meteorological Agency or may be acquired by actual measurement in the area where building B is located. The weather conditions in this embodiment are acquired from the weather data.
[0050] The period during which the outdoor air conditions are acquired is set appropriately according to, for example, the period from the date on which a request for remodeling of building B is made to the scheduled date on which the remodeling of building B is proposed. In this embodiment, the period is set, for example, to 1 to 60 days (30 days in this example). From the perspective of acquiring the amount of power consumed by the electric appliance 1 (air conditioner 10), it is preferable that the period includes days on which the electric appliance 1 is actually operating (heating operation and cooling operation). In this embodiment, the outdoor air conditions are acquired every unit time (for example, 60 minutes) within the above-mentioned period, similar to the amount of power consumed by the electric appliance 1.
[0051] 7 is a diagram showing part of the outdoor air conditions 41 in an area where the building B is located and the power consumption 42 of the electrical appliance 1. FIG. 7 shows the outdoor air conditions 41 and the power consumption 42 for one day representatively out of the above-mentioned period (30 days in this example). The outdoor air conditions 41 include a temperature 41A and a relative humidity 41B. The outdoor air conditions 41 are acquired for each unit time and stored in the outdoor air condition input unit 21a shown in FIG. 2.
[0052] The power consumption (power consumption before insulation renovation) 42 of the electric device 1 is acquired within the period (30 days in this example) during which the outdoor air condition 41 is acquired. As described above, the power consumption 42 is acquired in advance for each unit time (60 minutes in this example) by the power acquisition device 16 shown in Figs. 1 and 2. For this reason, in the acquisition step S1 of this embodiment, the power consumption 42 acquired within the above-mentioned period among these power consumption amounts 42 is transmitted to the arithmetic processing device 14. As a result, the arithmetic processing device 14 acquires the power consumption 42 of the electric device 1 for each unit time during the above-mentioned period. The power consumption is stored in the power consumption input unit 21b shown in Fig. 2.
[0053] [Calculate the first heat quantity (first calculation step)] Next, in the method proposed in this embodiment, a first heat amount, which is the amount of heat processed by the electric appliance 1, is calculated for each unit time (first calculation step S2). In the first calculation step S2 in this embodiment, the first heat amount is calculated for each unit time of the above-mentioned period based on the outside air condition 41 and the power consumption amount 42 of the electric appliance 1 shown in FIG.
[0054] In the first calculation step S2 of the present embodiment, first, the outdoor air conditions 41 (shown in FIG. 7) stored in the outdoor air condition input unit 21a shown in FIG. 2 and the power consumption 42 (shown in FIG. 7) stored in the power consumption input unit 21b are loaded into the work memory 19. Next, the first calculation unit 22b included in the program unit 22 is loaded into the work memory 19. This first calculation unit 22b is a program for calculating a first amount of heat processed by the electric device 1 per unit time based on the outdoor air conditions 41 and the power consumption 42. The first calculation unit 22b is executed by the arithmetic unit 17, thereby allowing the computer 15 to function as a means for calculating the first amount of heat.
[0055] 7, the outdoor air condition 41 and the power consumption 42 of the electric device 1 are acquired for each unit time (60 minutes in this example) within the above-mentioned period (30 days in this example). Therefore, the first heat quantity calculated based on the outdoor air condition 41 and the power consumption 42 can also be calculated for each unit time within the above-mentioned period.
[0056] The first amount of heat can be calculated as appropriate so long as it is the amount of heat actually processed by the electric appliance 1 shown in Fig. 1 (hereinafter, sometimes referred to as the "processed amount of heat"). In general, the processed amount of heat (processing capacity) can be calculated by multiplying the power consumption 42 (shown in Fig. 7) of the electric appliance 1 by the coefficient of performance (coefficient of performance 31e during heating or coefficient of performance 31f during cooling shown in Fig. 3) of the electric appliance 1.
[0057] As described above, the coefficient of performance 31e during heating and the coefficient of performance 31f during cooling shown in Fig. 3 indicate the energy consumption efficiency when the electrical appliance 1 operates at the rated capacity under predetermined outdoor conditions (JIS measurement conditions). The coefficient of performance 31e during heating is calculated by dividing the rated heating capacity 31a by the rated power consumption during heating (not shown). On the other hand, the coefficient of performance 31f during cooling is calculated by dividing the rated cooling capacity 31b by the rated power consumption during cooling (not shown).
[0058] The actual heating capacity, cooling capacity, and power consumption of the electrical appliance 1 tend to be influenced by ever-changing outdoor conditions 41 (shown in FIG. 7). For this reason, the actual coefficient of performance (not shown) may deviate from the coefficient of performance under JIS measurement conditions (coefficient of performance 31e during heating and coefficient of performance 31f during cooling shown in FIG. 3).
[0059] 7 (conditions in which outdoor air temperature 41A is low and outdoor air relative humidity 41B is high), frost may form on the outdoor unit (not shown) of the electrical appliance 1. When a defrosting operation is performed to remove such frost, the heating operation is temporarily stopped and the actual coefficient of performance (not shown) decreases and deviates from the coefficient of performance 31e (shown in FIG. 3) during heating under JIS measurement conditions.
[0060] In this way, the actual coefficient of performance (not shown) may deviate from the coefficient of performance under the JIS measurement conditions (coefficient of performance 31e during heating and coefficient of performance 31f during cooling shown in FIG. 3). Therefore, it may not be appropriate to calculate the amount of heat processed by the electric device 1 based on these coefficients of performance 31e and 31f.
[0061] In the first calculation step S2 of the present embodiment, a corrected coefficient of performance (not shown) is calculated by correcting the coefficient of performance of the electric appliance 1 (coefficient of performance 31e during heating or coefficient of performance 31f during cooling shown in FIG. 3) based on the ever-changing outside air conditions 41 (shown in FIG. 7). Then, a first heat quantity is calculated based on the corrected coefficient of performance and the amount of power consumption 42 (shown in FIG. 7) actually processed by the electric appliance 1. FIG. 8 is a flowchart showing the processing procedure of the first calculation step S2.
[0062] [Get Coefficient of Performance] In the first calculation step S2 of this embodiment, first, the coefficient of performance of the electric appliance 1 (coefficient of performance 31e during heating and coefficient of performance 31f during cooling shown in FIG. 3) is acquired (step S21). In step S21 of this embodiment, the coefficients of performance 31e, 31f of the electric appliance 1 stored in the electric appliance input unit 21c shown in FIG. 2 are read into the working memory 19, thereby acquiring the coefficients of performance 31e, 31f of the electric appliance 1. Note that, when the coefficients of performance 31e, 31f of the electric appliance 1 are not stored in advance in the electric appliance input unit 21c, for example, a screen for inputting the coefficients of performance 31e, 31f may be displayed on the display device 13, and an operator or the like may directly input the coefficients of performance 31e, 31f.
[0063] [Calculate the adjusted coefficient of performance] Next, in a first calculation step S2 of this embodiment, a corrected coefficient of performance is calculated by correcting the coefficient of performance of the electric device 1 (coefficient of performance 31e during heating or coefficient of performance 31f during cooling shown in FIG. 3) based on the outdoor air condition 41 (shown in FIG. 7) (step S22). In step S22 of this embodiment, a corrected coefficient of performance is calculated for each of heating and cooling.
[0064] FIG. 9 is a graph showing the relationship between the energy consumption efficiency during heating and the load factor. The solid curve 51 shows the relationship between the energy consumption efficiency and the load factor under the JIS measurement conditions (7° C.). Such a solid curve 51 can be appropriately specified based on, for example, the information 31 (rated heating capacity 31a, maximum heating capacity 31c, coefficient of performance during heating 31e, and rated heating power consumption (not shown), etc.) related to the specifications of the electrical appliance 1 shown in FIG. 3. In this embodiment, for example, the energy consumption efficiency is calculated based on the information 31 (rated heating capacity 31a, maximum heating capacity 31c, coefficient of performance during heating 31e, and rated heating power consumption (not shown)) related to the specifications of the electrical appliance 1 shown in FIG. 3.<URL: https: / / www.kenken.go.jp / becc / documents / house / 4-3_210401_v07.pdf> ) in equation (5), information on the specifications of electrical equipment 1, the JIS measurement temperature (7°C), and the changed correction processing heating load Q' T,H,d,t By substituting and, the corrected heating load Q' T,H,d,t and power consumption E E,H,d,t The solid curve 51 is obtained from the above. The JIS measurement temperature (7°C) is calculated by the reference input / output function f H,θ In the equations (6) and (7) that specify the outside air temperature θ ex Then, the energy consumption efficiency C1 at which the rated capacity is achieved on the solid curve 51 is identified as the coefficient of performance during heating under the JIS measurement conditions (i.e., the coefficient of performance during heating of the electrical device 1 shown in FIG. 3) 31e.
[0065] In FIG. 9, the dashed-dotted curve 52 shows the relationship between the energy consumption efficiency and the load factor at an outside air temperature 41A (for example, 2°C) that is lower than the JIS measurement condition (7°C). This dashed-dotted curve 52 can be specified as appropriate. In this embodiment, for example, the reference input / output function f H,θ In the equations (6) and (7) that specify the outside air temperature θ exBy substituting the outside air temperature (in this example, "2° C.") into the above, the dashed dotted curve 52 can be obtained.
[0066] In addition, in the dashed-dotted curve 52, the energy consumption efficiency C2 at the rated capacity is specified as the corrected coefficient of performance 37 during heating obtained by correcting the coefficient of performance 31e (C1) during heating under the JIS measurement conditions by the outdoor air condition 41 (outdoor air temperature 41A: 2°C). Thus, under conditions where the outdoor air temperature 41A is lower than the JIS measurement conditions (7°C), the corrected coefficient of performance 37 (C2) during heating is smaller than the coefficient of performance 31e (C1) during heating under the JIS measurement conditions, and the energy consumption efficiency deteriorates.
[0067] In FIG. 9, dashed curve 53 shows the relationship between the energy consumption efficiency and the load factor at an outside air temperature 41A (for example, 12°C) higher than the JIS measurement condition (7°C). This dashed curve 53 can be specified as appropriate. In this embodiment, for example, the reference input / output function f H,θ In the equations (6) and (7) that specify the outside air temperature θ ex By substituting the outside air temperature 41A (in this example, "12° C.") into the above, the dashed curve 53 can be obtained.
[0068] In addition, in dashed curve 53, energy consumption efficiency C3 at rated capacity is specified as corrected coefficient of performance 37 during heating obtained by correcting coefficient of performance 31e (C1) during heating under JIS measurement conditions by outdoor air conditions 41 (outdoor air temperature 41A: 12°C). Thus, under conditions where outdoor air temperature 41A is higher than JIS measurement conditions (7°C), corrected coefficient of performance 37 (C3) during heating is larger than coefficient of performance 31e (C1) during heating under JIS measurement conditions, and energy consumption efficiency is good.
[0069] FIG. 10 is a graph showing the relationship between energy consumption efficiency and load factor during cooling. A solid curve 54 shows the relationship between energy consumption efficiency and load factor under JIS measurement conditions (35°C). Such solid curve 54 can be determined, for example, based on information on the specifications of the electrical appliance 1 shown in FIG. 3 (rated cooling capacity 31b, maximum cooling capacity 31d, coefficient of performance during cooling 31f, and rated cooling power consumption (not shown), etc.). In this embodiment, for example, equation (20) in the above document is used to calculate the relationship between the energy consumption efficiency and load factor under JIS measurement conditions (35°C), and the corrected heating load Q' T,C,d,t By substituting and, the corrected heating load Q' T,C,d,t and power consumption E E,C,d,t The solid curve 54 is obtained from the above. The JIS measurement temperature (35°C) is calculated by the reference input / output function f C,θ In the equations (21) and (22) that specify the outside air temperature θ ex Then, the energy consumption efficiency C4 at which the rated capacity is achieved on the solid curve 54 is identified as the coefficient of performance during cooling under the JIS measurement conditions (i.e., the coefficient of performance during cooling of the electrical equipment 1 shown in FIG. 3) 31f.
[0070] The relationship between the outdoor air condition 41 and the energy consumption efficiency is reversed for the dashed line curve 55 and the dashed line curve 56 during cooling shown in FIG. 10 compared to the dashed line curve 52 and the dashed line curve 53 during heating shown in FIG.
[0071] The dashed-dotted curve 52 during heating shown in Fig. 9 shows the relationship between energy consumption efficiency and load factor at an outdoor air temperature 41A (2°C) that is lower than the JIS measurement conditions (7°C). On the other hand, the dashed-dotted curve 55 during cooling shown in Fig. 10 shows the relationship between energy consumption efficiency and load factor at an outdoor air temperature 41A (e.g., 40°C) that is higher than the JIS measurement conditions (35°C). Although the dashed-dotted curves 52 and 55 have different relationships between the outdoor air conditions 41 and the JIS measurement conditions, they show that energy consumption efficiency deteriorates during both heating and cooling.
[0072] The dashed-dotted curve 55 during cooling can be obtained as appropriate. In this embodiment, for example, the reference input / output function f C,θ In the equations (21) and (22) that specify the outside air temperature θ ex By substituting the outdoor air temperature (in this example, "40°C") into, it is possible to obtain the dashed-dotted curve 55 during cooling. In such dashed-dotted curve 55, the energy consumption efficiency C5 at the rated capacity is specified as the corrected coefficient of performance 38 during cooling obtained by correcting the coefficient of performance 31f (C4) during cooling under the JIS measurement conditions by the outdoor air condition 41 (outdoor air temperature 41A: 40°C).
[0073] Moreover, dashed curve 53 during heating shown in Fig. 9 shows the relationship between energy consumption efficiency and load factor at an outdoor air temperature (12°C) that is higher than the JIS measurement conditions (7°C). Meanwhile, dashed curve 56 during cooling shown in Fig. 10 shows the relationship between energy consumption efficiency and load factor at an outdoor air temperature (e.g., 30°C) that is lower than the JIS measurement conditions (35°C). Although dashed curves 53 and 56 differ in the relationship between the high and low outdoor air conditions 41 relative to the JIS measurement conditions, they show that the energy consumption efficiency is good during both heating and cooling.
[0074] The dashed curve 56 during cooling can be obtained as appropriate. In this embodiment, for example, the reference input / output function f C,θ In the equations (21) and (22) that specify the outside air temperature θ ex By substituting the outdoor air temperature (in this example, "30°C") into, a dashed curve 56 during cooling can be obtained. In such dashed curve 56, the energy consumption efficiency C6 at the rated capacity is specified as the corrected coefficient of performance 38 during cooling obtained by correcting the coefficient of performance 31f (C4) during cooling under JIS measurement conditions by the outdoor air condition 41 (outdoor air temperature 41A: 30°C).
[0075] In this manner, in step S22 of the present embodiment, a corrected coefficient of performance (corrected coefficient of performance 37 during heating shown in FIG. 9 or corrected coefficient of performance 38 during cooling shown in FIG. 10) obtained by correcting the coefficient of performance shown in FIG. 3 (coefficient of performance 31e during heating or coefficient of performance 31f during cooling) based on an outside air temperature 41A (shown in FIG. 7) different from the JIS measurement conditions (heating: 7° C., cooling: 35° C.) can be easily obtained. This makes it possible to obtain the coefficient of performance (i.e., corrected coefficient of performance 37, 38) of the existing electrical equipment 1 under actual outside air conditions.
[0076] In step S22 of this embodiment, according to the above-mentioned procedure, a corrected coefficient of performance 37 during heating is obtained by correcting the coefficient of performance 31e during heating (shown in FIG. 3) based on the outdoor air conditions 41 (outdoor air temperature 41A) for each unit time (hour) shown in FIG. 7. FIG. 11 is a diagram showing the outdoor air conditions 41 and power consumption 42 shown in FIG. 7, and the corrected coefficient of performance 37 during heating.
[0077] As described above, when a defrosting operation is performed, the heating operation is temporarily stopped, and the energy consumption efficiency decreases. For this reason, it is preferable to obtain a corrected coefficient of performance 37 for heating when a defrosting operation is performed in the unit time (hour) when the defrosting operation is performed. In this embodiment, for example, the corrected heating load Q' in the formula (5) in the above document used to obtain the solid curve 51 shown in FIG. 9 is T,H,d,t In equation (10) for determining the heating output correction coefficient C af,H The curve for defrosting operation is obtained by substituting "0.77" into . Then, on the curve for defrosting operation, the energy consumption efficiency at the rated capacity is specified as the corrected coefficient of performance 37 for heating during defrosting operation. Note that the heating output correction coefficient C af,H The "0.77" substituted into is, for example, a constant when the outside air temperature is less than 5°C and the relative humidity is 80% or more. Therefore, the heating output correction coefficient C af,H The constants substituted into can be appropriately set according to the outside air temperature and relative humidity. The corrected coefficient of performance 37 during heating and the corrected coefficient of performance 38 during cooling are stored in the corrected coefficient of performance input section 21g shown in FIG.
[0078] [Calculate the first heat quantity] Next, in a first calculation step S2 of this embodiment, the first heat quantity is calculated (step S23) by multiplying the power consumption 42 of the electric appliance 1 shown in Fig. 11 by the corrected coefficient of performance (the corrected coefficient of performance 37 during heating or the corrected coefficient of performance 38 during cooling). Fig. 12 is a diagram showing the outdoor air condition 41, the power consumption 42, the corrected coefficient of performance 37 during heating, and the first heat quantity H1 shown in Fig. 11.
[0079] In step S23 of this embodiment, the power consumption 42 is multiplied by the corrected coefficient of performance (the corrected coefficient of performance for heating 37) for each unit time (60 minutes) within the above-mentioned period (30 days in this example). This calculates a first heat amount H1, which is the amount of heat processed by the electric appliance 1 for each unit time. The first heat amount H1 is stored in the heat amount input section 21h shown in FIG. 2.
[0080] In the first calculation step S2 of this embodiment, a first amount of heat H1 processed by the electric appliance 1 is obtained per unit time from the power consumption 42 of the electric appliance 1 based on the coefficient of performance of the electric appliance 1 (corrected coefficient of performance 37 during heating) that changes from moment to moment depending on the outdoor air condition 41. Such a first amount of heat H1 can be obtained as the amount of heat actually processed by the electric appliance 1 in consideration of individual conditions including the actual lifestyle patterns of users of the building B shown in Fig. 1 before the insulation renovation.
[0081] [Decide on the insulation renovation plan (decision process)] Next, in the method proposed in this embodiment, a plan for thermal insulation renovation of building B is decided (decision step S3). In the decision step S3 in this embodiment, one or more candidate thermal insulation specifications (thermal insulation renovation plans) 33 are selected from a plurality of candidate thermal insulation specifications 33 (shown in FIG. 5) set in advance.
[0082] In the decision step S3 of this embodiment, first, a plurality of candidate insulation specifications 33 (shown in FIG. 5) stored in the candidate insulation specification input unit 21e shown in FIG. 2 are loaded into the working memory 19. Next, a decision unit 22c included in the program unit 22 is loaded into the working memory 19. This decision unit 22c is a program for deciding a plan for insulation renovation of the building B. By executing this decision unit 22c by the calculation unit 17, the computer 15 can function as a means for deciding a plan for insulation renovation.
[0083] The decision step S3 can be performed as appropriate as long as it is possible to decide on a plan for insulation renovation of building B. In this embodiment, a screen for deciding on a plan for insulation renovation is output to a display device 13 (shown in FIG. 2). The screen is not limited to being displayed on the display device 13, and may be displayed, for example, on a display device (not shown) of a mobile terminal owned by the user via the communication network N shown in FIG. 1.
[0084] FIG. 13 is a diagram showing the display device 13 on which a screen 45 for deciding a plan for thermal insulation renovation of the building B is output. The screen 45 shows a plurality of candidate thermal insulation specifications 33 shown in FIG. 5 (in this example, the first candidate thermal insulation specification 33a, the second candidate thermal insulation specification 33b, and the third candidate thermal insulation specification 33c). Check boxes 46 are shown which allow one or more of the candidate thermal insulation specifications 33 to be selected. The candidate thermal insulation specifications 33 can be selected by checking at least one of the check boxes 46. In this embodiment, the first candidate thermal insulation specification 33a is selected (checked), but the present invention is not limited to such an embodiment.
[0085] In the determination step S3 of this embodiment, for example, from among a plurality of candidate insulation specifications, a candidate insulation specification 33 within the budget of the user of building B or a candidate insulation specification 33 recommended by a salesperson of renovation, etc. may be selected. In this case, the screen 45 displays the heat transmission coefficient 34a of each building material 3 and the cost 34b required for the insulation renovation for the plurality of candidate insulation specifications 33, which can serve as a reference for selecting the candidate insulation specification 33. The selected candidate insulation specification 33 (first candidate insulation specification 33a in FIG. 13) is stored in the determined plan input unit 21f shown in FIG. 2 as a plan for the insulation renovation of building B.
[0086] [Calculate the first heat loss amount and the second heat loss amount (second calculation step)] Next, in the method proposed in this embodiment, a first heat loss amount, which is the amount of heat loss from building B before the insulation reform, and a second heat loss amount, which is the amount of heat loss from building B after the insulation reform, are calculated (second calculation step S4). The heat loss amount is a parameter that indicates how difficult it is for heat to escape from building B (room 2 that is the target of the insulation reform), and the smaller the value, the higher the insulation performance (energy saving performance).
[0087] In the second calculation step S4 of this embodiment, first, information 32 (shown in FIG. 4) on the specifications of building B stored in the building specification input unit 21d shown in FIG. 2 is read into the working memory 19. Furthermore, the insulation renovation plan (in this example, the first candidate insulation specification 33a) stored in the determined plan input unit 21f and a plurality of candidate insulation specifications 33 (shown in FIG. 5) stored in the candidate insulation specification input unit 21e are read into the working memory 19.
[0088] Next, in the second calculation step S4 of this embodiment, a second calculation unit 22d included in the program unit 22 is loaded into the working memory 19. The second calculation unit 22d is a program for calculating the first heat loss amount and the second heat loss amount. The second calculation unit 22d is executed by the arithmetic unit 17, thereby allowing the computer 15 to function as a means for calculating the first heat loss amount and the second heat loss amount.
[0089] Fig. 14 is a diagram for explaining the first heat loss amount L1 and the second heat loss amount L2. Fig. 14 shows information 32 (adjacent space 32a, area 32b, heat transmission coefficient (initial insulation specification) 32c, and temperature difference coefficient 32d) related to the specifications of the building B shown in Fig. 4.
[0090] [Calculate the first heat loss amount] In the second calculation step S4 of this embodiment, first, a first heat loss amount L1, which is the amount of heat loss of the building B (room 2 to be remodeled) before the insulation reform, is calculated. The first heat loss amount L1 is calculated appropriately based on a conventional procedure. In this embodiment, the heat loss amount (transparent heat loss) 53 before the insulation reform for each of the multiple building materials 3 (in this example, the ceiling 4, the exterior wall 5, the floor 6, and the opening 7) and the ventilation 47 is added up to calculate the first heat loss amount L1.
[0091] For multiple building materials 3 (in this example, the ceiling 4, the exterior wall 5, the floor 6, and the opening 7), the heat loss amount (transmission heat loss) 53 before the insulation reform can be calculated by multiplying the area 32b, the temperature difference coefficient 32d, and the heat transmission coefficient before the insulation reform (initial insulation specification) 32c. On the other hand, the heat loss amount 53 of the ventilation 47 is calculated by multiplying the volume of the room 2 to be reformed, the ventilation rate, and the ventilation heat transmission coefficient 32c. The ventilation rate is set to, for example, 0.5 times / h. Then, in this embodiment, the first heat loss amount L1 is calculated by adding up the heat loss amounts 53 before the insulation reform for each of the building materials 3 (the ceiling 4, the exterior wall 5, the floor 6, and the opening 7) and the ventilation 47 of the building B. The first heat loss amount L1 is stored in the heat loss amount input unit 21i shown in FIG. 2.
[0092] [Calculate the second heat loss] Next, in the second calculation step S4 of this embodiment, a second heat loss amount L2, which is the amount of heat loss of the building B after the insulation reform, is calculated. The second heat loss amount L2 is calculated appropriately based on a conventional procedure. In this embodiment, the second heat loss amount L2 is calculated by adding up the heat loss amount (transparent heat loss) 54 after the insulation reform for each of the multiple building materials 3 (in this example, the ceiling 4, the exterior wall 5, the floor 6, and the opening 7) and the ventilation 47.
[0093] For multiple building materials 3 (in this example, the ceiling 4, the exterior wall 5, the floor 6, and the opening 7), the heat loss (transmission heat loss) 54 after the insulation reform can be calculated by multiplying the area 32b, the temperature difference coefficient 32d, and the heat transmission coefficient 55 after the insulation reform. The heat transmission coefficient 55 after the insulation reform is specified by the heat transmission coefficient 34a of the candidate insulation specification 33 corresponding to the insulation reform plan (in this example, the first candidate insulation specification 33a) determined in the determination step S3 among the multiple candidate insulation specifications 33 shown in FIG. 5. On the other hand, the heat loss amount 54 of the ventilation 47 does not change before and after the insulation reform. Therefore, the heat loss amount 54 of the ventilation can be calculated based on the above-mentioned procedure.
[0094] In this embodiment, the second heat loss amount L2 is calculated by adding up the heat loss amount 54 after the insulation reform for each of the building materials 3 (in this example, the ceiling 4, the exterior wall 5, the floor 6, and the opening 7) and the ventilation 47 of the building B. The second heat loss amount L2 is stored in the heat loss amount input unit 21i shown in FIG.
[0095] [Calculate the second amount of heat processed by electrical equipment after insulation renovation (third calculation step)] Next, in the proposed method of this embodiment, the second heat quantity, which is the heat quantity treated by the electrical equipment after the insulation reform, is calculated (third calculation step S5). In the third calculation step S5 of this embodiment, the second heat quantity is calculated based on the first heat quantity H1 shown in Fig. 2 and the first heat loss quantity L1 and the second heat loss quantity L2 shown in Fig. 14.
[0096] In the third calculation step S5 of this embodiment, first, the first heat amount H1 (shown in FIG. 12) stored in the heat amount input section 21h shown in FIG. 2 is read into the working memory 19. Furthermore, the first heat loss amount L1 (shown in FIG. 14) and the second heat loss amount L2 (shown in FIG. 14) stored in the heat loss amount input section 21i are read into the working memory 19.
[0097] Next, in a third calculation step S5 of the present embodiment, a third calculation unit 22e included in the program unit 22 is loaded into the working memory 19. The third calculation unit 22e is a program for calculating a second amount of heat, which is the amount of heat processed by the electric device 1 after the insulation reform. The third calculation unit 22e is executed by the arithmetic unit 17, so that the computer 15 can function as a means for calculating the second amount of heat.
[0098] The second heat amount H2 can be calculated appropriately based on the first heat amount H1 shown in Fig. 12 and the first heat loss amount L1 and the second heat loss amount L2 shown in Fig. 14. The heat amount of the electric device 1 increases in proportion to the heat loss amount of the building B. From this perspective, in this embodiment, the second heat amount is calculated based on the following formula. H2 = H1 × (L2 / L1) Where: H1: 1st heat amount H2: 2nd heat amount L1: 1st heat loss amount L2: 2nd heat loss amount
[0099] In the above formula, L2 / L1 indicates the ratio (proportion) of the second heat loss amount L2 reduced after the insulation renovation to the first heat loss amount L1 before the insulation renovation. This ratio L2 / L1 is multiplied by the first heat amount H1 of the electrical device 1 before the insulation renovation to obtain the second heat amount H2 of the electrical device 1 reduced after the insulation renovation.
[0100] In this way, in the third calculation step S5 of this embodiment, the second amount of heat H2 of the electrical appliance 1 after the insulation renovation is calculated based on the first amount of heat H1 of the electrical appliance 1 before the insulation renovation and the ratio L2 / L1 of the amount of heat loss before and after the insulation renovation. As described above, the first amount of heat H1 is the amount of heat actually treated by the electrical appliance 1 before the insulation renovation in accordance with the actual lifestyle patterns of the users of the building B shown in Fig. 1. By using such a first amount of heat H1, the second amount of heat H2 predicted to be treated by the electrical appliance 1 after the insulation renovation can be obtained in consideration of individual conditions including the actual lifestyle patterns of the users of the building B.
[0101] Fig. 15 is a diagram showing the outdoor air condition 41, the power consumption 42, the corrected coefficient of performance 37 during heating, and the first heat amount H1 and the second heat amount H2 shown in Fig. 12. In this embodiment, the first heat amount H1 calculated for each unit time (60 minutes) within the above-mentioned period (30 days in this example) is multiplied by the ratio L2 / L1 of the heat loss amount before and after the insulation renovation. As a result, the second heat amount H2 predicted to be processed by the electric device 1 after the insulation renovation is calculated for each unit time. The second heat amount H2 is stored in the heat amount input unit 21h shown in Fig. 2.
[0102] [Providing the effect of reducing power consumption after insulation renovation (Providing process)] Next, in the method proposed in this embodiment, information on the effect of reducing the amount of power consumption of the electric appliance 1 after the insulation renovation is provided to the user (provision step S6). The information on the effect of reducing the amount of power consumption is provided based on the first amount of heat H1 (shown in FIG. 15) processed by the electric appliance before the insulation renovation and the second amount of heat H2 (shown in FIG. 15) processed by the electric appliance 1 after the insulation renovation.
[0103] In the providing step S6 of this embodiment, first, the first heat quantity H1 and the second heat quantity H2 (shown in FIG. 15) stored in the heat quantity input unit 21h shown in FIG. 2 are read into the working memory 19. Furthermore, the providing unit 22g included in the program unit 22 is read into the working memory 19. The providing unit 22g is a program for providing information on the reduction effect of the power consumption of the electric appliance 1 after the insulation renovation (hereinafter, sometimes referred to as the "power consumption reduction effect") to the user of the building B. The providing unit 22g is executed by the calculation unit 17, so that the computer 15 can function as a means for providing information on the reduction effect.
[0104] The providing step S6 can be carried out as appropriate as long as information on the effect of reducing power consumption can be provided to the user of building B. The information on the effect of reducing power consumption is output to a display device 13 (shown in FIG. 2). Note that the information on the effect of reducing power consumption is not limited to being output to the display device 13, and may be displayed on a display device (not shown) of a mobile terminal owned by the user via the communication network N shown in FIG. 1, for example.
[0105] 16 is a diagram showing a display device 13 on which information 56 on the reduction effect of the amount of power consumption of the electric appliance 1 after the insulation renovation is output. In the providing step S6 of this embodiment, at least one (in this example, all) of the first amount of heat H1, the second amount of heat H2, and the difference D1 between the first amount of heat and the second amount of heat is provided as the information 56 on the reduction effect of the amount of power consumption. The first amount of heat H1, the second amount of heat H2, and the difference D1 between the first amount of heat and the second amount of heat may be provided for each unit time of the above-mentioned period, or the total value thereof may be provided. In this embodiment, the total value for one day is provided, but the total value for the period may be provided.
[0106] In the providing step S6 of this embodiment, the first heat amount H1 is provided, so that the user can know the heat amount actually treated by the electric appliance 1 before the insulation reform. Furthermore, the second heat amount H2 is provided, so that the user can know the heat amount predicted to be treated by the electric appliance 1 after the insulation reform based on the insulation reform plan determined in the determining step S3 (in this example, the first candidate insulation specification 33a shown in FIG. 13). Then, the difference D1 between the first heat amount and the second heat amount is provided, so that the user can know the heat amount of the electric appliance 1 that can be reduced after the insulation reform. These first heat amount H1 and second heat amount H2 are divided by the coefficient of performance 31e during heating as shown in FIG. 3, for example, to obtain the power consumption of the electric appliance 1, so that the difference D1 between the first heat amount and the second heat amount (the reducible heat amount) is directly related to the reduction effect of the power consumption.
[0107] As described above, the first heat amount H1 is the heat amount actually processed by the electric appliance 1 before the insulation renovation, taking into account individual conditions including the actual life patterns of the users of the building B shown in FIG. 1. The second heat amount H2 is the heat amount predicted to be processed by the electric appliance 1 after the insulation renovation, taking into account the individual conditions. By obtaining the difference D1 between the first heat amount and the second heat amount, the reduction effect of the power consumption of the electric appliance 1 after the insulation renovation can be accurately predicted. By providing such a reduction effect of the power consumption together with the determined insulation renovation plan (in this example, the first candidate insulation specification 33a), it is possible to propose an insulation renovation that is convincing to the users of the building B. The difference D1 between the first heat amount and the second heat amount is stored in the reduction effect input unit 21j shown in FIG. 1.
[0108] In the providing step S6 of this embodiment, information 56 on the power consumption reduction effect of one insulation renovation plan (in this example, the first candidate insulation specification 33a) determined in the determining step S3 is provided, but the present invention is not limited to this embodiment. For example, information 56 on the power consumption reduction effect may be provided including other plans (such as the second candidate insulation specification 33b shown in FIG. 5) different from the determined insulation renovation plan. This makes it possible to compare the power consumption reduction effect between the determined plan and other plans.
[0109] The processing load (first heat amount H1) and power consumption (not shown) of the electric appliance 1 during heating tend to be the largest on the coldest day of the year in the area where the building B shown in Fig. 1 is located. In order to provide information 56 on the power consumption reduction effect on such a coldest day, it is preferable that the coldest day is included in the above-mentioned period in which the outdoor air condition 41, the power consumption amount 42, and the first heat amount H1 shown in Fig. 12 are acquired. This provides the power consumption reduction effect on the coldest day, making it possible to propose a heat insulation renovation that is convincing to the user.
[0110] On the other hand, the processing load (first heat quantity H1) and power consumption during cooling of the electrical appliance 1 tend to be the largest on the hottest day of the year in the area where the building B shown in FIG. 1 is located. In order to provide information 56 on the effect of reducing power consumption on such a hottest day, it is preferable that the hottest day is included in the above-mentioned period. This provides the effect of reducing power consumption on the hottest day, making it possible to propose insulation renovations that are convincing to the user.
[0111] [Deciding whether to carry out insulation renovations] Next, in the method proposed in this embodiment, it is determined whether or not to carry out insulation renovation based on the determined plan (step S7). The determination of whether or not to carry out insulation renovation can be made by the user of building B based on, for example, information 56 on the power consumption reduction effect shown in FIG. 16 and the cost 34b required for insulation renovation.
[0112] If it is determined in step S7 that insulation renovation is to be carried out ("Yes" in step S7), insulation renovation of building B (room 2 to be renovated) shown in FIG. 1 is carried out (step S8). This insulation renovation is carried out based on the determined insulation renovation plan (first candidate insulation specification 33a shown in FIG. 13). This type of insulation renovation makes it possible to obtain the desired effect of reducing power consumption. Furthermore, by determining whether or not insulation renovation is to be carried out based on cost 34b shown in FIG. 16, insulation renovation can be carried out within the budget of the user of building B. This makes it possible to carry out insulation renovation that is satisfactory to the user.
[0113] If it is determined in step S7 that insulation renovation is not to be carried out (step S7: No), the insulation renovation plan (first candidate insulation specification 33a shown in FIG. 13) is changed (step S9), and the second calculation steps S4 to S7 are carried out again. This makes it possible to propose insulation renovation that can achieve the desired power consumption reduction effect.
[0114] [Building renovation proposal method (second embodiment)] As shown in Fig. 16, in the above embodiment, the first heat amount H1, the second heat amount H2, and the difference D1 between the first heat amount and the second heat amount are provided as the information 56 regarding the reduction effect of the power consumption of the electric appliance 1 after the insulation renovation, but the present invention is not limited to such an embodiment. For example, at least one of the first power consumption amount which is the power consumption of the electric appliance 1 before the insulation renovation, the second power consumption amount which is the power consumption of the electric appliance 1 after the insulation renovation, and the difference between the first power consumption amount and the second power consumption amount may be provided as the information 56. Fig. 17 is a flowchart showing the processing procedure of a method for proposing renovation of a building according to another embodiment of the present invention.
[0115] [Calculate the power consumption of electrical equipment after insulation renovation (4th calculation step)] Next, in the proposed method of this embodiment, the power consumption of the electric device 1 after the insulation renovation is calculated (fourth calculation step S10). The power consumption of this embodiment is calculated based on the second amount of heat H2 (shown in FIG. 15) that the electric device 1 processes after the insulation renovation.
[0116] In the fourth calculation step S10, first, the information 31 (shown in FIG. 3) on the specifications of the electric appliance 1 stored in the electric appliance input unit 21c shown in FIG. 2 and the second heat amount H2 (shown in FIG. 15) stored in the heat amount input unit 21h are read into the working memory 19. Furthermore, the fourth calculation unit 22f included in the program unit 22 is read into the working memory 19. The fourth calculation unit 22f is a program for calculating the power consumption of the electric appliance 1 after the insulation reform. The fourth calculation unit 22f is executed by the arithmetic unit 17, so that the computer 15 can function as a means for calculating the power consumption of the electric appliance 1 after the insulation reform.
[0117] The power consumption of the electrical appliance 1 after the insulation renovation can be calculated as appropriate using the second amount of heat H2 that the electrical appliance 1 processes after the insulation renovation. In this embodiment, the second amount of heat H2 is the amount of heat during heating operation of the electrical appliance 1 (air conditioner). Therefore, the power consumption of the electrical appliance 1 after the insulation renovation is calculated by dividing the second amount of heat H2 by the coefficient of performance 31e during heating operation included in the information 31 related to the specifications of the electrical appliance 1 shown in FIG. 3. Such power consumption is acquired as the amount of power predicted to be consumed by the electrical appliance 1 after the insulation renovation, taking into account individual conditions including the actual lifestyle patterns of users of the building B shown in FIG. 1.
[0118] 18 is a diagram showing the outdoor air condition 41, the power consumption 42 before the insulation renovation, the corrected coefficient of performance 37 during heating, the first heat amount H1, and the second heat amount H2, and the power consumption 57 after the insulation renovation, all shown in FIG. 15. In this embodiment, the power consumption (second power consumption) 57 after the insulation renovation is acquired every unit time (for example, 60 minutes) within the above-mentioned period, similar to the power consumption (first power consumption) 42 before the insulation renovation. The power consumption (second power consumption) 57 after the insulation renovation is stored in the power consumption input unit 21b shown in FIG. 2.
[0119] [Providing the effect of reducing power consumption after insulation renovation (Providing process)] Next, in the providing step S6 of this embodiment, at least one of the first power consumption 42, which is the power consumption before the insulation renovation, the second power consumption 57, which is the power consumption after the insulation renovation, and the difference 58 between the first power consumption and the second power consumption (in this example, all of them) is provided as information 56 regarding the reduction effect of the power consumption. The first power consumption 42, the second power consumption 57, and the difference 58 between the first power consumption and the second power consumption may be provided for each unit time of the above-mentioned period, or the total value thereof may be provided. In this embodiment, the total value is provided.
[0120] FIG. 19 is a diagram showing a display device 13 on which information 56 on the reduction effect of the power consumption of the electrical appliance 1 after the insulation renovation according to another embodiment of the present invention is output. In the providing step S6 of this embodiment, the first power consumption 42 is provided, so that the user can know the amount of power actually consumed by the electrical appliance 1 before the insulation renovation. In addition, the second power consumption 57 is provided, so that the user can know the amount of power predicted to be consumed by the electrical appliance 1 after the insulation renovation based on the insulation renovation plan (first candidate insulation specification 33a shown in FIG. 13) determined in the determining step S3. As described above, the second power consumption 57 is acquired as the amount of power predicted to be consumed by the electrical appliance 1 after the insulation renovation, taking into account individual conditions including the actual life patterns of the users of the building B shown in FIG. 1. Then, the difference 58 between the first power consumption and the second power consumption is provided, so that the reduction effect of the power consumption of the electrical appliance 1 after the insulation renovation can be accurately predicted. By providing such a reduction effect in power consumption together with the determined insulation renovation plan (candidate insulation specification 33), it becomes possible to propose insulation renovation that is convincing to the users of building B.
[0121] [Building renovation proposal method (third embodiment)] [Floor heating system] In the above embodiments, an air conditioner 10 has been exemplified as the electric device 1 (air conditioner 9) shown in Fig. 1, but the present invention is not limited to this embodiment and may be the above-mentioned floor heating device (not shown). The floor heating device is configured to include, for example, a floor heating unit (not shown) and an outdoor unit (not shown) in the same manner as in the past.
[0122] In this embodiment, when information is provided regarding the effect of reducing the amount of power consumption of a floor heating device (not shown) after insulation renovation, acquisition steps S1 to S9 are carried out in the same manner as the processing procedures shown in Figures 6 and 8.
[0123] In the first calculation step S2 of this embodiment, a corrected coefficient of performance is calculated by correcting the coefficient of performance of the floor heating device based on the same processing procedure as that of the heating of the air conditioner 10 described above, and the first heat amount H1 can be calculated by multiplying this corrected coefficient of performance by the power consumption. In addition, in the second calculation step S4, the first heat loss amount L1 before the insulation reform and the second heat loss amount L2 after the insulation reform are calculated. Furthermore, in the third calculation step S5, the second heat amount H2 to be processed by the floor heating device after the insulation reform is calculated based on the first heat amount H1, the first heat loss amount L1, and the second heat loss amount L2. Then, in the providing step S6, information 56 (for example, shown in FIG. 16) on the reduction effect of the power consumption of the floor heating device after the insulation reform is provided based on the first heat amount H1 and the second heat amount H2. As a result, in this embodiment, the reduction effect of the power consumption of the floor heating device after the insulation reform is accurately provided, and it is possible to propose an insulation reform that is highly convincing to the user of the building B.
[0124] [Building renovation proposal method (fourth embodiment)] [Water heater] In the above embodiments, the air conditioner 9 has been exemplified as the electric appliance 1, but the electric appliance 1 is not limited to this embodiment and may be, for example, the water heater 20 described above.
[0125] In this embodiment, when information regarding the reduction effect of power consumption of water heater 20 after insulation renovation is provided, acquisition steps S1 to S9 are performed similarly to the processing procedures shown in Figures 6 and 8. As a result, in this embodiment, the reduction effect of power consumption of water heater 20 after insulation renovation is accurately provided, and it is possible to propose insulation renovation that is highly convincing to the user of building B.
[0126] [Building renovation proposal method (fifth embodiment)] In the embodiments described above, a heat pump type has been exemplified as the electrical device 1, but this is not limited to this embodiment and may be, for example, an electrical device other than the above-mentioned heat pump type (e.g., an electric stove, an electric floor heating device, etc.).
[0127] In this embodiment, when information on the reduction effect of the power consumption of the electric appliance (electric stove, etc.) 1 after the insulation renovation is provided, the acquisition steps S1 to S9 are performed in the same manner as the processing procedure shown in FIG. 6. The coefficient of performance of the electric appliance 1 other than the heat pump type is always "1", unlike the heat pump type electric appliance 1 (air conditioner 9). Therefore, in this embodiment, it is not necessary to calculate a corrected coefficient of performance in which the coefficient of performance of the electric appliance 1 is corrected based on the ever-changing outdoor air condition 41 (shown in FIG. 7) as in the previous embodiments. Therefore, in this embodiment, the first heat amount H1 (shown in FIG. 12) is acquired from the power consumption amount 42 (shown in FIG. 7) of the electric appliance 1 without performing the processing procedure shown in FIG. 8.
[0128] In this embodiment, similarly to the previous embodiments, the second amount of heat H2 to be processed by the electric appliance (electric stove, etc.) 1 after the insulation renovation is calculated based on the first amount of heat H1, the first amount of heat loss L1, and the second amount of heat loss L2. This allows the reduction effect of the power consumption of the electric appliance 1 after the insulation renovation to be accurately provided, and makes it possible to propose an insulation renovation that is convincing to the users of the building B.
[0129] Although a particularly preferred embodiment of the present invention has been described in detail above, the present invention is not limited to the illustrated embodiment and can be modified in various ways.
[0130] [Note] The present invention includes the following aspects.
[0131] [Invention 1] A method for proposing renovation of a building in which an electrical appliance including an air conditioner or a water heater is installed to a user of the building, the method comprising: an acquisition step of acquiring outdoor air conditions including an outdoor air temperature for a predetermined period in an area where the building is located, and an amount of power consumption of the electrical device for each predetermined unit time within the period; a first calculation step of calculating a first amount of heat, which is an amount of heat processed by the electrical device per unit time, based on the acquired outside air condition and the amount of power consumption; A decision step of deciding a plan for thermal insulation renovation of the building; A second calculation step of calculating a first heat loss amount, which is a heat loss amount of the building before the insulation reform, and a second heat loss amount, which is a heat loss amount of the building after the insulation reform; A third calculation step of calculating a second heat quantity, which is the heat quantity treated by the electrical equipment after the insulation reform, based on the first heat quantity, the first heat loss quantity, and the second heat loss quantity; and providing the user with information regarding the reduction effect of the power consumption of the electrical equipment after the insulation reform based on the first heat amount and the second heat amount. How to propose renovation of a building. [Invention 2] The building renovation proposal method described in present invention 1, wherein the providing step provides at least one of the first heat amount, the second heat amount, and the difference between the first heat amount and the second heat amount as the information. [Invention 3] Further comprising a fourth calculation step of calculating the power consumption of the electrical equipment after the insulation reform based on the second heat quantity; In the providing process, at least one of the information is provided: a first power consumption amount, which is the power consumption amount before the insulation renovation; a second power consumption amount, which is the power consumption amount after the insulation renovation; and a difference between the first power consumption amount and the second power consumption amount.This is a building renovation proposal method as described in Invention 1 or 2. [Invention 4] The method for proposing renovation of a building described in any one of claims 1 to 3, wherein the period includes the coldest day or the hottest day of the region. [Invention 5] A system for proposing renovation of a building in which an electrical appliance including an air conditioner or a water heater is installed to a user of the building, an acquisition unit that acquires outdoor air conditions including an outdoor air temperature for a predetermined period in an area where the building is located and an amount of power consumption of the electrical device for each predetermined unit time within the period; a first calculation unit that calculates a first amount of heat, which is an amount of heat processed by the electrical device per unit time, based on the acquired outside air condition and the amount of power consumption; A decision unit that decides a plan for thermal insulation renovation of the building; A second calculation unit that calculates a first heat loss amount, which is a heat loss amount of the building before the insulation reform, and a second heat loss amount, which is a heat loss amount of the building after the insulation reform; A third calculation unit that calculates a second heat amount, which is the amount of heat treated by the electrical equipment after the insulation reform, based on the first heat amount, the first heat loss amount, and the second heat loss amount; A provision unit that provides the user with information regarding the reduction effect of the power consumption of the electrical equipment after the insulation reform based on the first heat amount and the second heat amount. Building renovation proposal system. [Explanation of symbols]
[0132] B Building 1. Electrical Equipment
Claims
1. A method for proposing renovation of a building in which an electrical appliance including an air conditioner or a water heater is installed to a user of the building, the method comprising: an acquisition step of acquiring outdoor air conditions including an outdoor air temperature for a predetermined period in an area where the building is located, and an amount of power consumption of the electrical appliance for each predetermined unit time within the period; a first calculation step of calculating a first amount of heat, which is an amount of heat processed by the electrical device per unit time, based on the acquired outside air condition and the amount of power consumption; A decision step of deciding a plan for thermal insulation renovation of the building; A second calculation step of calculating a first heat loss amount, which is a heat loss amount of the building before the insulation reform, and a second heat loss amount, which is a heat loss amount of the building after the insulation reform; A third calculation step of calculating a second heat quantity, which is the heat quantity treated by the electrical equipment after the insulation reform, based on the first heat quantity, the first heat loss quantity, and the second heat loss quantity; and providing the user with information regarding the reduction effect of the power consumption of the electrical equipment after the insulation reform based on the first heat amount and the second heat amount. How to propose renovation of a building.
2. The building renovation proposal method according to claim 1 , wherein the providing step provides at least one of the first heat amount, the second heat amount, and the difference between the first heat amount and the second heat amount as the information.
3. Further comprising a fourth calculation step of calculating the power consumption of the electrical equipment after the insulation reform based on the second heat amount; The building renovation proposal method of claim 1, wherein the providing process provides as the information at least one of a first power consumption amount which is the power consumption amount before the insulation renovation, a second power consumption amount which is the power consumption amount after the insulation renovation, and a difference between the first power consumption amount and the second power consumption amount.
4. The method for proposing renovation of a building according to claim 1 , wherein the period includes the coldest day or the hottest day of the region.
5. A system for proposing renovation of a building in which an electrical appliance including an air conditioner or a water heater is installed to a user of the building, an acquisition unit that acquires outdoor air conditions including an outdoor air temperature for a predetermined period in an area where the building is located and an amount of power consumption of the electrical device for each predetermined unit time within the period; a first calculation unit that calculates a first amount of heat, which is an amount of heat processed by the electrical device per unit time, based on the acquired outside air condition and the amount of power consumption; A decision unit that decides a plan for thermal insulation renovation of the building; A second calculation unit that calculates a first heat loss amount, which is a heat loss amount of the building before the insulation reform, and a second heat loss amount, which is a heat loss amount of the building after the insulation reform; A third calculation unit calculates a second heat amount, which is a heat amount to be processed by the electrical equipment after the insulation reform based on the first heat amount, the first heat loss amount, and the second heat loss amount; A provision unit that provides the user with information regarding a reduction effect of the power consumption of the electrical equipment after the insulation reform based on the first heat amount and the second heat amount. Building renovation proposal system.
Citation Information
Patent Citations
Thermal-insulation-performance measuring system
JP2010242487A
Computer for outputting heat insulation effect, program for outputting heat insulation effect by computer, and method for outputting heat insulation effect by computer
JP2013217039A
Estimation device and program for thermal insulation performance
JP2016094715A
Building facility evaluation device and program
JP2022011295A
Building renovation proposal method and building renovation proposal system
JP2020166483A