Liquefaction countermeasure structure to existing structure, and liquefaction countermeasure method

The described structure addresses the challenges of deep foundations by using a gravel layer and drainage system to prevent liquefaction damage and sand spouting, reducing costs and construction time.

JP2024168529APending Publication Date: 2024-12-05SHIMIZU CORP
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2023085283
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-24
Publication Date
2024-12-05

AI Technical Summary

Technical Problem

Conventional liquefaction countermeasures for existing structures face challenges due to difficult construction conditions, especially when foundations are deep or have high groundwater levels, leading to increased excavation and drainage requirements, and are ineffective in preventing sand spouting and tilting during liquefaction.

Method used

A liquefaction countermeasure structure featuring a gravel layer with water permeability and a drainage path, arranged around the foundation's outer periphery with an overhanging portion to collect and drain water, and optionally incorporating vertical drains to reduce water pressure and prevent sand blowing.

Benefits of technology

Reduces liquefaction damage, construction costs, and period by preventing sand spouting and tilting, even with deep foundations, by efficiently draining water and blocking sand flow without extensive excavation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024168529000001_ABST
    Figure 2024168529000001_ABST
Patent Text Reader

Abstract

To reduce liquefaction damage even when a bottom surface of a foundation of an existing structure is deep, and to reduce costs and a construction period required for liquefaction countermeasures.SOLUTION: A liquefaction countermeasure structure 1 for an existing structure 20 whose foundation is built in a liquefied ground G, for reducing sand boiling in the liquefied ground G, comprises: a gravel layer portion 30 disposed on an upper surface 21a of a foundation 21, provided between the foundation 21 and the ground surface Ga, having water permeability and suppressing passage of sand; and a drainage path portion 40 connecting the gravel layer portion 30 and the ground surface Ga to allow water to pass through. The gravel layer portion 30 has a protruding portion 31 disposed continuously around the entire outer periphery edge of the foundation 21 and protruding outward from the foundation 21 so as to cover a side portion 21A of the foundation 21 from above.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a liquefaction countermeasure structure and a liquefaction countermeasure method for an existing structure. [Background technology]

[0002] Traditionally, liquefaction countermeasures for existing small structures such as equipment foundations have been difficult to implement using conventional liquefaction prevention methods, due to strict construction conditions such as the presence of other structures nearby, and the small size of the foundations makes it difficult to implement expensive countermeasures. As a countermeasure, a method is known in which permeable gravel is laid around the periphery of an existing structure to widen the foundation (see, for example, Patent Document 1).In addition, when there is not enough space to widen the foundation, a method is also known in which an excavation is performed directly below the periphery of the existing structure and the area is backfilled with gravel (see Patent Document 1 above) or with gravel packed in sandbags (see, for example, Patent Document 2). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Patent No. 6132144 [Patent Document 2] Patent No. 6544566 Summary of the Invention [Problem to be solved by the invention]

[0004] However, conventional liquefaction countermeasure methods such as those shown in Patent Documents 1 and 2 require excavation below the bottom depth of the foundation of an existing structure, so if the bottom depth of the foundation is deep or is deeper than the groundwater level, the amount of excavation may increase or drainage may be required for the excavation. This may result in larger land area for retaining walls and construction, or drainage work such as pumping may be required to excavate under the foundation, making construction difficult.

[0005] Furthermore, as shown in Fig. 8, when the center of gravity of the existing structure 100 is high and the conditions for overturning are severe, the foundation 101 is often embedded deeper to increase resistance to overturning. In this case, the upper surface 101a of the foundation 101 is often located underground. In such cases, there is a problem that sand boils S are generated from the side portion 101A of the foundation 101 due to the increased water pressure during liquefaction, causing the ground to loosen and causing liquefaction damage such as tilting of the existing structure 100, and there is room for improvement in this regard.

[0006] The present invention has been made in consideration of the above-mentioned problems, and aims to provide a liquefaction prevention structure and liquefaction prevention method for existing structures that can reduce liquefaction damage even when the bottom surface of the foundation of the existing structure is deep, and that can reduce the costs and construction time required for liquefaction countermeasures. [Means for solving the problem]

[0007] In order to achieve the above-mentioned objective, the liquefaction prevention structure for an existing structure of the present invention is a liquefaction prevention structure for an existing structure for reducing sand boiling in liquefied ground, for an existing structure whose foundation is built in liquefied ground, and comprises: a gravel layer portion that is placed on the upper surface of the foundation and provided between the foundation and the ground surface, which is permeable and suppresses the passage of sand; and a drainage path portion that connects the gravel layer portion and the ground surface to allow water to pass through, wherein the gravel layer portion is arranged continuously around the entire outer periphery of the foundation and has a protrusion portion that protrudes outward from the foundation so as to cover the side portion of the foundation from above.

[0008] In the liquefaction countermeasure structure for an existing structure according to the present invention, even if the bottom surface of the foundation of the existing structure is deep, the liquefied ground can be excavated to the top surface of the foundation, and then a gravel layer is provided only around the entire outer edge of the foundation between the top surface of the foundation and the ground surface, and the gravel layer and the ground surface are connected by a drainage path. In other words, the gravel layer is constructed only near the ground surface, and there is no need to lay gravel under the foundation as in the past, so a liquefaction countermeasure structure that can reduce liquefaction damage can be formed. Therefore, even if the foundation is deep or the groundwater level is shallower than the bottom surface of the foundation, the cost and construction period required for liquefaction countermeasures can be reduced.

[0009] In addition, in the present invention, the gravel layer has a protruding portion that protrudes outward from the foundation so as to cover the side portion of the foundation from above, so that the water that has risen up the side portion passes through the gravel layer. Furthermore, since the protruding portion is provided around the entire outer periphery of the foundation, the rising water is always configured to enter the gravel layer. Therefore, the passage of sand that flows with the water is prevented, and only the water is collected in the gravel layer, and the collected water is drained to the ground surface through the drainage path portion, thereby suppressing sand boiling and preventing liquefaction damage caused by loosening of the ground due to sand boiling. That is, in the present invention, at least around the foundation, it is possible to prevent sand flow and sand boiling when liquefaction occurs in the liquefied ground directly below the protruding portion of the gravel layer. This makes it possible to suppress the inclination or settlement of existing structures and the occurrence of large unevenness between the existing structures and the surrounding ground, and effectively reduce liquefaction damage.

[0010] In addition, in the liquefaction countermeasure structure for an existing structure according to the present invention, the grain size of the gravel constituting the gravel layer is preferably 2 to 5 mm.

[0011] In this case, the gravel layer can be given high water permeability, and since the gaps between the gravel are smaller, it can function as a filter that more reliably prevents the passage of sand that flows along with the water.

[0012] In addition, in the liquefaction prevention structure for an existing structure according to the present invention, it is preferable that the gravel layer has a thickness of 15 cm or more.

[0013] In this case, the force of the rising water can be reduced by the gravel layer, and the rising water can be reliably absorbed into the gravel layer. This increases the water collection capacity of the gravel layer, and the collected water is drained to the ground surface by the drainage path, reliably preventing sand boiling.

[0014] In addition, in the liquefaction prevention structure for an existing structure according to the present invention, it is preferable that the overlap width of the layered portion on the foundation in the gravel layer and the projection length of the projection portion are each 30 cm or more.

[0015] In this case, by making the thickness of the gravel layer 15cm or more, and further making the overlap width of the laminated parts and the overhang length of the overhanging parts 30cm or more, the force of the rising water can be further reduced in the gravel layer, and the rising water can be more reliably infiltrated into the gravel layer. This increases the water collection capacity of the gravel layer, and the collected water is drained to the ground surface by the drainage path, more reliably preventing sand boiling.

[0016] In addition, it is preferable that the liquefaction prevention structure for an existing structure of the present invention is provided with a permeable vertical drain that is arranged on the side of the foundation, communicates with the gravel layer, and extends vertically downward from the gravel layer.

[0017] In this case, the vertical drains installed on the sides of the foundation allow the water under the foundation to seep into the gravel layer first, reducing the water pressure under the foundation. This reduces the amount of water that flows around under the foundation, and by reducing the amount of water in the liquefied ground that rises up the sides of the foundation, sand boiling is suppressed, and the effectiveness of liquefaction countermeasures is improved.

[0018] In addition, in the liquefaction prevention structure for an existing structure according to the present invention, it is preferable that the vertical drain is provided to a depth up to the bottom surface of the foundation.

[0019] In this case, since the lower end of the vertical drain is extended to the depth of the bottom surface of the foundation, water beneath the foundation can be reliably permeated into the gravel layer through the vertical drain.

[0020] In addition, the liquefaction countermeasure method of the present invention is a liquefaction countermeasure method for constructing a liquefaction countermeasure structure for the existing structure described above, and is characterized by having the steps of: arranging the gravel layer section having the protrusion section continuously around the entire outer edge of the foundation on the upper surface of the foundation between the foundation and the ground surface; and providing a drainage path section connecting the gravel layer section and the ground surface to allow water to pass through.

[0021] In the present invention, after excavating the liquefied ground up to the top surface of the foundation, a gravel layer is provided only around the entire outer edge of the foundation between the top surface of the foundation and the ground surface, and the gravel layer is connected to the ground surface by a drainage path, making it possible to efficiently construct a liquefaction prevention structure having the above-mentioned effects, even if the bottom surface of the foundation of an existing structure is deep. Effect of the Invention

[0022] According to the liquefaction countermeasure structure and liquefaction countermeasure method for existing structures of the present invention, liquefaction damage can be reduced even when the bottom surface of the foundation of the existing structure is located deep, and the costs and construction time required for liquefaction countermeasures can be reduced. [Brief description of the drawings]

[0023] [Figure 1] 1 is a vertical cross-sectional view showing a liquefaction countermeasure structure according to a first embodiment of the present invention. [Diagram 2] FIG. 2 is a view taken along line II in FIG. 1, and is a plan view of the liquefaction countermeasure structure. [Diagram 3] FIG. 2 is a vertical cross-sectional view showing the flow of water in the liquefaction countermeasure structure shown in FIG. [Figure 4] FIG. 4 is a vertical cross-sectional view showing a liquefaction countermeasure structure according to a second embodiment of the present invention. [Diagram 5] FIG. 5 is a view taken along line II-II in FIG. 4, and is a plan view of the liquefaction countermeasure structure. [Figure 6] FIG. 11 is a vertical cross-sectional view showing a liquefaction countermeasure structure according to a third embodiment of the present invention. [Figure 7] 7 is a view taken along line III-III in FIG. 6, and is a plan view of the liquefaction countermeasure structure. [Figure 8] FIG. 1 is a vertical cross-sectional view showing the state of liquefaction damage in a conventional existing structure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0024] Hereinafter, a liquefaction countermeasure structure and a liquefaction countermeasure method for an existing structure according to an embodiment of the present invention will be described with reference to the drawings.

[0025] (First embodiment) As shown in Figures 1 and 2, the liquefaction prevention structure 1 for an existing structure of this embodiment is applied to an existing structure 20 whose foundation 21 is constructed in liquefied ground G, in the case where sand boiling in the liquefied ground G is reduced.

[0026] The foundation 21 supports the structure main body 23 from below via the columnar bodies 22. The foundation 21 has a rectangular shape in a plan view. In this embodiment, the foundation bottom surface 21c of the foundation 21 is constructed at a position deeper than the groundwater level Wa.

[0027] The liquefaction prevention structure 1 is arranged on the upper surface 21a of the foundation 21, and is provided between the foundation 21 and the ground surface Ga. The liquefaction prevention structure 1 comprises a gravel layer section 30 which is permeable and suppresses the passage of sand, and a drainage path section 40 which connects the gravel layer section 30 and the ground surface Ga to allow water to pass through.

[0028] The gravel layer portion 30 is disposed continuously around the entire outer periphery of the foundation 21. The gravel layer portion 30 has a protruding portion 31 that protrudes outward from the foundation 21 so as to cover the side portion 21A of the foundation 21 from above. The height (thickness H) of the gravel layer 30 is 15 cm or more. The overlap width L1 of the laminated portion 32 on the foundation 21 in the gravel layer 30 and the overhang length L2 of the overhanging portion 31 are each 30 cm or more, preferably 50 cm or more.

[0029] The thickness and rigidity of the protruding portion 31 are not necessarily limited to those of the laminated portion 32 . The overhanging portion 31 is not limited to having the same overhang length L2 around the entire circumference of the foundation 21 in a plan view, and may be formed so that the overhanging length L2 is partially shorter. In this case, it is possible to reduce the construction area of ​​the overhanging portion 31, thereby reducing the construction cost.

[0030] The gravel layer 30 is formed by laying gravel, and functions as a filter that restricts the passage of sand. The gravel constituting the gravel layer 30 is made of crushed stone (such as No. 7 crushed stone) with a particle size of, for example, 2 to 5 mm in order to reduce the gaps between the gravel in order to provide the above-mentioned filter function. To prevent clogging of the gravel layer 30, small gravel may be laid in an area from the bottom to about 5 cm above.

[0031] The gravel layer 30 is formed in a rectangular shape along the outer circumferential upper edge 21b of the foundation 21 when viewed from above. The gravel layer 30 is constructed by, for example, spreading crushed stone in an area where the liquefied ground G has been excavated to a predetermined depth where the upper surface 21a of the foundation 21 is exposed, and then backfilling with soil and sand from the excavated liquefied ground. At this time, the gravel material is not spread all the way down to the ground surface Ga, and a distance is provided between the upper surface 30a of the gravel layer 30 and the ground surface Ga. The depth of the gravel layer 30 is approximately 1 m. In addition, crushed stone and various artificial permeable materials can also be used as the gravel material as long as they provide equivalent water permeability and filtering performance.

[0032] The gravel layer 30 has a drainage function with a higher hydraulic conductivity than the liquefied ground G. The gravel layer 30 is provided in the surface layer, and is intended to efficiently drain excess pore water to the ground surface Ga through the drainage path 40 when liquefaction occurs in the liquefied ground G, thereby preventing sand boiling at the ground surface Ga. For this reason, the hydraulic conductivity of the gravel layer 30 needs to be higher than that of the liquefied ground G, which is the original ground, and is preferably greater than that of the liquefied ground G by, for example, about two orders of magnitude (100 times) or more.

[0033] It is preferable that the gravel layer 30 is formed in an unconsolidated state so that it has flexibility that allows it to deform during an earthquake without breaking. In other words, if the gravel layer 30 is formed in a solidified, rigid state, it will break during an earthquake, and gaps will form at the breakage, or the entire gravel layer 30 will be displaced relative to the foundation 21, leaving room for gaps to form between them, in which case sand will boil through the gaps. In contrast, by forming the gravel layer 30 in an unconsolidated state so that it has flexibility to the extent that it can absorb deformation during an earthquake, it is possible to prevent the gravel layer 30 from breaking or the formation of gaps, and to effectively prevent sand from boiling through the gaps.

[0034] The drainage path 40 connects the gravel layer 30 and the ground surface Ga to ensure a drainage path to the ground surface Ga. The drainage path 40 is a drain or catch basin that extends vertically from the overhang 31 of the gravel layer 30 to the ground surface Ga in a plan view and has water permeability. As a result, as shown in FIG. 3, water W (groundwater) that has risen up the side portion 21A of the foundation 21 is taken into the gravel layer 30, and only the water W is passed through the drainage path 40 and discharged to the ground surface Ga. For this reason, the gravel layer 30 is formed around the entire outer periphery of the foundation 21 so that the rising water always enters the gravel layer 30. The number of drainage path portions 40 to be installed is set to a predetermined number depending on the size of the foundation 21, but if the foundation 21 is of the same size as a normal equipment foundation, one will suffice.

[0035] When the drainage path portion 40 is a drain, a permeable material such as gravel or sandy gravel similar to that of the gravel layer portion 30 is used, but it may be made of a material with even higher permeability.

[0036] As a liquefaction countermeasure method for constructing the liquefaction countermeasure structure 1 for the existing structure 20 described above, first, in the liquefied ground G, excavation is performed from the ground surface Ga to the upper surface 21a of the foundation 21 of the existing structure 20, as shown in Fig. 1. At this time, excavation is performed so that a space is formed above the side portion 21A of the foundation 21.

[0037] Next, gravel is spread along the entire outer periphery of the foundation 21 on the upper surface 21a of the foundation 21 between the foundation 21 and the ground surface Ga to form a circumferentially continuous gravel layer 30. At this time, a protruding portion 31 of the gravel layer 30 is formed in the above-mentioned space. Next, a drainage path portion 40 is formed to connect the gravel layer portion 30 and the ground surface Ga so that water can flow therethrough. Thereafter, the formed gravel layer 30 and drainage path 40 are backfilled with excavated soil or the like, and the construction of the liquefaction prevention structure 1 is completed.

[0038] Next, the operation of the liquefaction countermeasure structure 1 and the liquefaction countermeasure method for the above-mentioned existing structure 20 will be described in detail with reference to the drawings. In the liquefaction countermeasure structure 1 for the existing structure 20 according to this embodiment, even if the foundation bottom surface 21c of the existing structure 20 is located deep, the liquefied ground G is excavated to the upper surface 21a of the foundation 21, and then the gravel layer 30 is provided only around the entire outer periphery of the foundation 21 between the upper surface 21a of the foundation 21 and the ground surface Ga, and the gravel layer 30 and the ground surface Ga are connected by the drainage path 40. In other words, the gravel layer 30 is constructed only near the ground surface Ga, and gravel is not laid under the foundation as in the conventional method, and the liquefaction countermeasure structure 1 that can reduce liquefaction damage can be formed. Therefore, even if the foundation 21 is deep or the groundwater level Wa is shallower than the foundation bottom surface 21c, the cost and construction period required for liquefaction countermeasures can be reduced.

[0039] In this embodiment, the gravel layer 30 has the projection 31 that projects outward from the foundation 21 so as to cover the side portion 21A of the foundation 21 from above, so that the water W that has risen up the side portion 21A passes through the gravel layer 30. Furthermore, the projection 31 is provided around the entire outer periphery of the foundation 21, so that the rising water W always enters the gravel layer 30. Therefore, the passage of sand flowing together with the water W is prevented, and only the water W is collected in the gravel layer 30, and the collected water W is drained to the ground surface Ga through the drainage path 40, suppressing sand boiling and preventing liquefaction damage caused by loosening of the ground due to sand boiling. That is, in this embodiment, when liquefaction occurs in the liquefied ground G directly below the overhanging portion 31 of the gravel layer 30, it is possible to prevent sand flow and sand boiling from occurring at least around the foundation 21. This makes it possible to prevent the existing structure 20 from tilting or sinking and to prevent large unevenness from occurring between the existing structure 20 and the surrounding ground, thereby making it possible to effectively reduce liquefaction damage.

[0040] In this embodiment, the grain size of the gravel constituting the gravel layer 30 is 2 to 5 mm. This configuration can provide the gravel layer 30 with high water permeability, and further, because the gaps between the gravels are small, the layer 30 can function as a filter that more reliably blocks the passage of sand that flows together with the water W.

[0041] In addition, in this embodiment, since the thickness H of the gravel layer 30 is 15 cm or more, the momentum of the rising water W can be reduced by the gravel layer 30, and the rising water W can be reliably infiltrated into the gravel layer 30. This can increase the water W collection capacity of the gravel layer 30, and the collected water W is drained to the ground surface Ga by the drainage path 40, thereby reliably preventing sand boiling.

[0042] In this embodiment, the thickness of the gravel layer 30 is set to 15 cm or more, and the overlap width L1 of the laminated portion 32 and the overhang length L2 of the overhang portion 31 are set to 30 cm or more, so that the momentum of the rising water can be further reduced by the gravel layer 30, and the rising water W can be more reliably infiltrated into the gravel layer 30. This improves the water collection capacity of the gravel layer 30, and the collected water W is drained to the ground surface Ga by the drainage path 40, so that sand boiling can be more reliably prevented.

[0043] In addition, this embodiment includes a step of arranging a gravel layer portion 30 having a protruding portion 31 continuously around the entire outer periphery of the foundation 21 on the upper surface 21a of the foundation 21 between the foundation 21 and the ground surface Ga, and a step of providing a drainage path portion 40 that connects the gravel layer portion 30 and the ground surface Ga so that water can pass through. That is, after the liquefied ground G is excavated up to the upper surface 21a of the foundation 21, the gravel layer portion 30 is provided only around the entire outer periphery of the foundation 21 between the upper surface 21a of the foundation 21 and the ground surface Ga, and the gravel layer portion 30 and the ground surface Ga are connected by the drainage path portion 40, so that the liquefaction countermeasure structure 1 having the above-mentioned effect can be efficiently constructed even when the foundation bottom surface 21c of the existing structure 20 is located deep.

[0044] As described above, the liquefaction countermeasure structure 1 and liquefaction countermeasure method for an existing structure 20 according to this embodiment can reduce liquefaction damage even when the foundation bottom surface 21c of the existing structure 20 is located deep, and can reduce the costs and construction time required for liquefaction countermeasures.

[0045] Next, other embodiments of the liquefaction countermeasure structure and liquefaction countermeasure method for existing structures of the present invention will be described with reference to the attached drawings. Components and parts that are the same or similar to those of the first embodiment described above will be designated by the same reference numerals and their descriptions will be omitted, and only configurations that differ from the first embodiment will be described.

[0046] Second embodiment As shown in Figures 4 and 5, the liquefaction countermeasure structure 1A for an existing structure 20 according to the second embodiment is an example of a case where another existing structure (second existing structure 20A) is adjacent to the existing structure 20. In the liquefaction countermeasure structure 1A, a slight protrusion 31A is provided on one side of the foundation 21 facing the second existing structure 20A. This protrusion 31A does not have a sufficient protrusion length L2 compared to the protrusions 31B on the other three sides. The protrusion 31A on the second existing structure 20A side is provided at a position adjacent to the second existing structure 20A.

[0047] In this way, the countermeasure range of the gravel layer portion 30 in the direction of the adjacent structure can be set to the adjacent structure (the second existing structure 20A in this embodiment). That is, the liquefaction countermeasure structure 1A provides the gravel layer portion 30 having the protruding portion 31 around the entire outer periphery of the existing structure 20, but the protruding length of the protruding portion 31A on the side of the adjacent second existing structure 20A can be set according to the distance between the existing structures 20, 20A.

[0048] Third embodiment As shown in Figures 6 and 7, the liquefaction countermeasure structure 1B for an existing structure 20 according to the third embodiment is configured such that a permeable vertical drain 50 is provided in the side portion 21A of the foundation 21 in the liquefaction countermeasure structure 1 of the first embodiment described above (see Figure 1).

[0049] The vertical drain 50 communicates with the overhanging portion 31 of the gravel layer portion 30 and extends vertically downward from the overhanging portion 31. The lower end 50a of the vertical drain 50 is provided to the depth of the foundation bottom surface 21c of the foundation 21. The vertical drain 50 preferably has a diameter of, for example, 300 mm or more. The vertical drain 50 is made of a permeable material such as gravel or sand similar to that of the gravel layer portion 30 and the drainage path portion 40 consisting of a drain, but may be made of a material with even higher permeability.

[0050] The vertical drains 50 are provided at the outer positions of a pair of diagonally opposite corners 21d of the foundation 21. The number of vertical drains 50 is set to a predetermined number according to the size of the foundation 21, and is not limited to two as in the third embodiment. Furthermore, the installation positions are not limited to the outer positions of the corners 20d of the foundation 21.

[0051] In the liquefaction countermeasure structure 1B according to the third embodiment, the vertical drain 50 provided on the side portion 21A of the foundation 21 allows the water W under the foundation 21 to infiltrate into the gravel layer 30 in advance, thereby reducing the water pressure under the foundation 21. This reduces the amount of water that flows around under the foundation 21, and by reducing the amount of water in the liquefied ground G rising up the side portion 21A of the foundation 21, sand boiling is suppressed, and the effectiveness of the liquefaction countermeasure can be improved.

[0052] In addition, in the third embodiment, the lower end 50a of the vertical drain 50 extends to the depth of the foundation bottom surface 21c, so that water W below the foundation 21 can reliably seep into the gravel layer 30 through the vertical drain 50.

[0053] The above describes embodiments of the liquefaction countermeasure structure and liquefaction countermeasure method for existing structures according to the present invention, but the present invention is not limited to the above embodiments and can be modified as appropriate without departing from the spirit of the present invention.

[0054] For example, in this embodiment, the thickness H of the gravel layer 30, the projection length L2 of the projection portion 31, the overlap width L1 of the stacked portion 32, the diameter, cross-sectional shape, and depth length of the drainage path portion 40 and the vertical drain 50, the shape of the foundation 21 of the existing structure 20, and the depth positions of the upper surface 21a and the foundation bottom surface 21c are appropriately set taking into account the size, weight, and ground conditions of the existing structure 20. Therefore, for example, the grain size of the gravel constituting the gravel layer 30 is not limited to 2 to 5 mm. Also, the thickness H of the gravel layer 30 is not limited to 15 cm or more.

[0055] In addition, the components in the above-described embodiments can be replaced with well-known components as appropriate without departing from the spirit of the present invention.

[0056] In addition, the components in the above-described embodiments can be replaced with well-known components as appropriate without departing from the spirit of the present invention. [Explanation of symbols]

[0057] 1, 1A, 1B Liquefaction prevention structure 20 Existing Structures 20A Second Existing Structure 21 Basics 21A Lateral section 21a Top side 21b Upper outer edge 21c Foundation bottom 30 Gravel layer 31 Overhang 32 Laminated section 40 Drainage path section 50 Vertical Drain G Liquefied ground Ga Surface W water

Claims

1. A liquefaction countermeasure structure for an existing structure having a foundation built in liquefied ground, for reducing sand boiling in the liquefied ground, A gravel layer portion is disposed on the upper surface of the foundation, provided between the foundation and the ground surface, has water permeability, and suppresses the passage of sand; A drainage path portion that connects the gravel layer portion and the ground surface in a water-permeable manner, The gravel layer is arranged continuously around the entire outer edge of the foundation, and has a protrusion that protrudes outward from the foundation to cover the side portions of the foundation from above, forming a liquefaction prevention structure for an existing structure.

2. 2. A liquefaction prevention structure for an existing structure as described in claim 1, wherein the grain size of the gravel constituting the gravel layer is 2 to 5 mm.

3. The liquefaction prevention structure for an existing structure according to claim 1, wherein the gravel layer has a thickness of 15 cm or more.

4. 4. A liquefaction prevention structure for an existing structure as described in claim 3, wherein the overlap width of the layered portion on the foundation in the gravel layer and the overhang length of the overhanging portion are each 30 cm or more.

5. A liquefaction prevention structure for an existing structure as described in claim 1, comprising a permeable vertical drain arranged on the side of the foundation, connected to the gravel layer, and extending vertically downward from the gravel layer.

6. The liquefaction prevention structure for an existing structure according to claim 5, wherein the vertical drain is provided to a depth up to the bottom surface of the foundation.

7. A liquefaction countermeasure method for constructing a liquefaction countermeasure structure for an existing structure according to any one of claims 1 to 6, A step of arranging the gravel layer having the protruding portion continuously around the entire outer periphery of the foundation on the upper surface of the foundation between the foundation and the ground surface; A liquefaction countermeasure method comprising the steps of: providing a drainage path section that connects the gravel layer and the ground surface to allow water to pass through.

Citation Information

Patent Citations

  • Exclusive data processing system by microprogram control

    JP1986032144A

  • Liquefaction countermeasures for existing structures

    JP6544566B2