The construction management system uses a detection unit with a tilt sensor to evaluate construction impacts on ground and buildings by recording and correcting sensor variations, enabling precise analysis and timely intervention.

JP2024169028AInactive Publication Date: 2024-12-05NIPPON SEIKI CO LTD

Patent Information

Application Number
JP2023086198
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-25
Publication Date
2024-12-05
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing technologies fail to effectively evaluate the impact of construction on surrounding ground and buildings, despite efforts to prevent such impacts.

Method used

A construction management system comprising a detection unit with a tilt sensor and a management terminal that acquires and stores tilt values as time-series data, allowing for the evaluation of construction impacts through wireless communication and correction for individual sensor variations.

Benefits of technology

Enables precise evaluation of construction impacts on surrounding ground and buildings by recording and analyzing slope changes over time, facilitating timely intervention and appropriate measures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024169028000001_ABST
    Figure 2024169028000001_ABST
Patent Text Reader

Abstract

To enable evaluation of influence of construction on the ground and buildings in an area surrounding a construction site.SOLUTION: A construction management system S is provided, comprising a detection unit 2 installed at a construction site 1 or in a neighboring area of the construction site 1, and a management terminal 3 for acquiring detection values transmitted from the detection unit 2. The detection unit 2 has an inclination sensor 24 and is configured to transmit inclination values detected by the inclination sensor 24 as detection values. The management terminal 3 is configured to receive the inclination values transmitted by the detection unit 2 and store the received inclination values as time-series data.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a construction management system and a construction management method. [Background technology]

[0002] 2. Description of the Related Art When carrying out civil engineering or construction work, a technique for preventing adverse effects of the work on the surrounding ground and buildings is known, such as the installation of sheet piles between a construction site and the surrounding area, as disclosed in Patent Document 1. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] International Publication No. 2015 / 029426 Summary of the Invention [Problem to be solved by the invention]

[0004] The technology disclosed in Patent Document 1 is intended to prevent adverse effects of construction on the surrounding ground and buildings, but there is also a demand for detecting the effects of construction on the surrounding ground and buildings.

[0005] Therefore, an object of the present disclosure is to provide a construction management system and a construction management method that can evaluate the impact of construction on the surrounding ground and surrounding buildings. [Means for solving the problem]

[0006] In one aspect, the following solution is provided. A detection unit installed at a construction site or adjacent to the construction site; A construction management system including a management terminal that acquires the detection value transmitted from the detection unit, the detection unit has a tilt sensor and transmits a tilt value detected by the tilt sensor as the detection value; The management terminal stores the tilt value as time-series data. Effect of the Invention

[0007] According to the present disclosure, it is possible to evaluate the impact of construction on the surrounding ground and surrounding buildings. [Brief description of the drawings]

[0008] [Figure 1] FIG. 1 is a diagram showing a configuration of a construction management system. [Diagram 2] FIG. 1 is a diagram showing an example of use of a construction management system. [Diagram 3] FIG. 2 is a diagram showing a process flow of a construction management system. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Hereinafter, the embodiments will be described in detail with reference to the accompanying drawings.

[0010] <Overview of the construction management system> FIG. 1 is a diagram showing the configuration of a construction management system S. As shown in FIG. 1, the construction management system S includes a detection unit 2, a management terminal 3, and another terminal 4.

[0011] The detection unit 2 is installed at a construction site or the like, and transmits the detected value to the management terminal 3 wirelessly. The management terminal 3 is a communication terminal such as a smartphone, and stores the detection values ​​transmitted from the detection units 2 as time-series data in association with the reception dates and times. The other terminal 4 is a communication terminal such as a smartphone that receives information transmitted from the management terminal 3 to the other terminal 4 . In the following description and drawings, the process of storing detected values ​​as time-series data may be referred to as logging.

[0012] <Examples of using construction management systems> FIG. 2 is a diagram showing an example of use of the construction management system S. As shown in FIG. 2, the construction management system S is used, for example, at a construction site 1 where a worker P2 is operating a construction machine M to carry out excavation work under the supervision of a site supervisor P1.

[0013] In this usage example, two detection units 2A and 2B capable of detecting inclination are used. Detection unit 2A is installed on a sheet pile 11 that separates the construction site 1 from the adjacent land, and detection unit 2B is installed on a building 12 adjacent to the construction site 1. Detection units 2A and 2B in operation detect the inclination at predetermined intervals or at predetermined times, and wirelessly transmit the inclination value to the management terminal 3 as the detected value.

[0014] The management terminal 3 in this example of use is a smartphone carried by the site supervisor P1, and stores the detection values ​​wirelessly transmitted from the detection units 2A and 2B as time-series data, linking them to the date and time of reception.

[0015] At a fixed time, the management terminal 3 sends the time series data for the past few days (for example, two days) and events detected based on the time series data by email to the other terminal 4. Events detected based on the time series data suggest the impact of construction on the surrounding ground and buildings, such as the inclination value of the sheet piles 11 changing in a manner different from the cyclical fluctuation of the previous day.

[0016] In this example, two other terminals 4A and 4B are used to receive, via the Internet, emails sent by the management terminal 3. The other terminal 4A is a smartphone carried by a worker P2 at the construction site 1, and the other terminal 4B is a laptop PC carried by a client P3 located in a remote location away from the construction site 1.

[0017] According to the construction management system S used in this manner, the change in the slope value at the construction site and its surroundings is recorded as time-series data, so that the impact of construction on the surrounding ground and buildings can be evaluated based on the time-series data.

[0018] Hereinafter, a specific configuration of the detection unit 2 and the management terminal 3 of this embodiment will be described with reference to FIG.

[0019] <Detection unit configuration> The detection unit 2 includes a control unit 21, a wireless communication unit 22, a notification unit 23, a tilt sensor 24, a temperature sensor 25, a calibration parameter storage unit 26, an ID storage unit 27, and a data transmission unit .

[0020] The control unit 21 is an integrated arithmetic circuit including a CPU, a RAM, a ROM, etc., and operates according to a program written in the ROM to control each part of the detection unit 2.

[0021] The wireless communication unit 22 performs wireless communication with the management terminal 3. The wireless communication standard used is, for example, Bluetooth (registered trademark) long-distance communication mode (Bluetooth ver. 5.0 Long Range), which enables wireless communication up to a maximum distance of approximately 1 km.

[0022] The notification unit 23 issues a warning notification when an abnormality occurs. For example, the notification unit 23 of this embodiment notifies the operator P2 or the like around the detection unit 2 of the occurrence of the abnormality by turning on (for example, blinking red) a warning lamp (for example, an LED lamp) when an abnormality occurs.

[0023] The tilt sensor 24 detects at least two-axial tilt (roll angle and pitch angle). For example, the tilt sensor 24 of this embodiment is configured using an IMU sensor that detects three-axial acceleration and angular velocity.

[0024] The temperature sensor 25 is disposed in the vicinity of the tilt sensor 24 and detects the temperature in the vicinity of the tilt sensor 24 .

[0025] The calibration parameter storage unit 26 stores calibration parameters for temperature-compensating (calibrating) the tilt value detected by the tilt sensor 24. For example, the calibration parameter storage unit 26 in this embodiment stores the calibration parameters in a ROM built into the control unit 21.

[0026] In other words, since there are not a few individual differences in the tilt sensors 24, the degree of temperature correction must also be adjusted individually. For this reason, at the time of shipment from the factory, calibration parameters based on the individual differences of the tilt sensors 24 incorporated in the detection unit 2 are stored in advance in the detection unit 2, and these calibration parameters are sent to the management terminal 3 at a predetermined timing.

[0027] This makes it possible to accurately correct the detection value of the tilt sensor 24 in the management terminal 3 for temperature and obtain an accurate tilt value, regardless of individual differences in the tilt sensor 24. The timing for transmitting the calibration parameters may be at the time of pairing for wireless communication, or may be transmitted each time the tilt value and temperature value are transmitted, by including them in the transmission data.

[0028] The ID holding unit 27 holds an individual identifier (ID) of the detection unit 2. For example, the ID holding unit 27 in this embodiment holds the individual identifier in a ROM built into the control unit 21.

[0029] That is, when there are multiple detection units 2, the management terminal 3 needs to identify which detection unit 2 sent the received detection values ​​(tilt value and temperature value). For this reason, the detection unit 2 sends an individual identifier to the management terminal 3 at a predetermined timing. The timing for sending the individual identifier may be at the time of pairing for wireless communication, or the individual identifier may be sent each time the tilt value and temperature value are sent by including it in the transmission data.

[0030] The data transmission unit 28 acquires the detection values ​​of the tilt sensor 24 and the temperature sensor 25 at predetermined intervals or at a predetermined time, and transmits the acquired detection values ​​to the management terminal 3 via the wireless communication unit 22 .

[0031] <Administrative terminal configuration> The management terminal 3 includes a control unit 31 , a wireless communication unit 32 , a notification unit 33 , a transmission unit 34 , a correction unit 35 , a data log unit 36 ​​, and a notification determination unit 37 .

[0032] The control unit 31 is an integrated arithmetic circuit including a CPU, RAM, ROM, etc., and operates according to a program written in the ROM to control each part of the management terminal 3.

[0033] The wireless communication unit 32 performs wireless communication with the detection unit 2. The wireless communication standard used is the same as that used by the wireless communication unit 22 of the detection unit 2.

[0034] The notification unit 33 issues a warning to the site supervisor P1 when an abnormality occurs. For example, in this embodiment, the notification unit 33 issues various warning notifications when the time-series data of the tilt value received from the detection unit 2 includes an event corresponding to a warning. Specifically, the notification unit 33 displays the contents of the warning and the time-series data that is the basis for the warning on the display of the management terminal 3, and issues a sound warning or a vibration warning using the speaker or vibrator of the management terminal 3.

[0035] The transmission unit 34 transmits the impact of the construction on the surrounding ground and surrounding buildings to the other terminals 4. For example, when the notification determination unit 37 determines that the construction has caused an adverse impact on the surrounding ground or surrounding buildings, the transmission unit 34 in this embodiment transmits an email including the warning content and the time series data on which the warning content is based to the other terminals 4 via the Internet. This makes it possible to transmit the impact of the construction on the surrounding ground and surrounding buildings not only to the site supervisor P1 who possesses the management terminal 3, but also to related parties within the construction site 1 (e.g., worker P2) and related parties in locations away from the construction site 1 (e.g., owner P3).

[0036] The correction unit 35 corrects the tilt value based on the temperature value received from the detection unit 2. The correction unit 35 of the present embodiment takes into account individual differences in the tilt sensor 24 and adjusts the degree of correction of the tilt value due to the temperature value based on calibration parameters held by the detection unit 2.

[0037] The data log unit 36 ​​stores the inclination value corrected by the correction unit 35 as time-series data in association with the reception date and time. This allows accurate transition of the inclination value to be recorded in time series regardless of changes in the weather (temperature), making it possible to more precisely evaluate the impact of construction on the surrounding ground and buildings.

[0038] The notification determination unit 37 determines whether or not the construction has caused adverse effects on the surrounding ground or buildings based on the time series data stored in the data log unit 36. For example, it determines that an adverse effect has occurred when there is a large change in the time series data on the day of construction. Alternatively, it compares the time series data on the day of construction with the time series data from the day before, and determines that an adverse effect has occurred when the difference is large.

[0039] The process flow (construction management method) of the construction management system S will be described below with reference to FIG.

[0040] <Processing procedure for construction management system> FIG. 3 is a diagram showing the process flow of the construction management system S. 3, when using the construction management system S, first, pairing is performed for wireless communication between the detection unit 2 and the management terminal 3. This pairing is performed, for example, by transmitting an individual identifier and calibration parameters from the detection unit 2 to the management terminal 3, and the management terminal 3 receiving the parameters recognizes the detection unit 2 and performs pairing processing.

[0041] The construction management system S transitions to periodic processing when pairing is established between the detection unit 2 and the management terminal 3. During periodic processing, the detection unit 2 acquires detection values ​​(inclination value and temperature value) of the tilt sensor 24 and the temperature sensor 25 at predetermined intervals or at a predetermined time, and wirelessly transmits the acquired detection values ​​to the management terminal 3.

[0042] During regular processing, the management terminal 3 waits to receive detection values ​​transmitted from the detection unit 2 (S1). When the management terminal 3 during regular processing receives the detection values ​​transmitted from the detection unit 2, it corrects the inclination value based on the temperature value and the calibration parameters (S2), and stores the corrected inclination value as time-series data in association with the reception date and time (S3). Furthermore, during regular processing, the management terminal 3 determines whether or not the notification condition is met based on the time-series data (S4), and if the determination result is NO, it returns to the reception standby state of step S1 and repeats the regular processing.

[0043] If the result of the determination in step S4 is YES, the construction management system S proceeds to a process of notifying or transmitting. For example, if there is a large change in the inclination value in the time series data on the day of construction, or if there is a large difference between the time series data on the day of construction and the time series data from the day before, the construction management system S proceeds to a process of notifying or transmitting.

[0044] If the determination result in step S4 is YES, the management terminal 3 executes a communication process to the detection unit 2 and other terminals 4 (S5). For example, the management terminal 3 transmits a warning notification request to the detection unit 2, and transmits a warning email to the other terminals 4. When the detection unit 2 receives the warning notification request from the management terminal 3, it turns on a warning lamp to notify the operator P2 or the like around the detection unit 2 that an abnormality has occurred (S6).

[0045] The warning email sent by the management terminal 3 to the other terminal 4 includes the contents of the warning, time series data for the period during which the warning occurred, comparison data between the time series data at the time of the warning and the time series data before construction, etc. This allows the user of the other terminal 4 (worker P2, owner P3, etc.) who receives the warning email to quickly recognize that the construction has caused a negative impact on the ground and buildings surrounding the construction site 1, and to take appropriate measures.

[0046] After executing step S5, the management terminal 3 executes a notification process in the management terminal 3 (S7). This notification process includes, for example, a process of displaying information equivalent to the warning email or more detailed information on the display of the management terminal 3, and a process of outputting a sound warning or a vibration warning by operating the speaker or vibrator of the management terminal 3. This enables the user of the management terminal 3 (such as the site supervisor P1) to quickly recognize that the construction has caused an adverse effect on the ground or buildings surrounding the construction site 1, and to take appropriate measures.

[0047] Although the embodiments have been described in detail above, the present invention is not limited to the specific embodiments, and various modifications and changes are possible within the scope of the claims. In addition, it is also possible to combine all or a plurality of the components of the above-described embodiments.

[0048] For example, the detection unit in the above-described embodiment is equipped with a tilt sensor and a temperature sensor, but may further be equipped with sensors other than the tilt sensor and temperature sensor (e.g., a humidity sensor, a vibration sensor, a noise sensor, etc.), and the detected values ​​of these may be transmitted to the management terminal.

[0049] In addition, the management terminal of the above-mentioned embodiment stores the detection values ​​received from the detection unit as time-series data, but the time-series data may include not only the detection values ​​received from the detection unit but also information acquired from sources other than the detection unit. For example, information such as the construction schedule of the construction site, meteorological information (temperature, humidity, wind speed, rainfall, etc.) of the area including the construction site, and disaster information (typhoons, earthquakes, tsunamis, eruptions, etc.) can be linked to the time-series data. In this way, it becomes easier to determine whether the cause of the change in the inclination value is construction, weather, or disaster. [Explanation of symbols]

[0050] 1 Construction site 11 Yaita 12 Buildings adjacent to the construction site 2(2A, 2B) Detection unit 21 Control section 22 Wireless Communication Section 23 Notification Department 24 Tilt Sensor 25 Temperature Sensor 26 Calibration parameter storage unit 27 ID holding part 28 Data transmission unit 3. Management terminal 31 Control Unit 32 Wireless Communication Section 33 Notification Department 34 Transmission section 35 Correction section 36 Data log section 37 Notification determination unit 4. Other devices 4A Worker-owned devices 4B Owner-owned terminal S Construction Management System M Construction machinery P1 Site supervisor P2 worker P3 Client

Claims

1. A detection unit installed at a construction site or adjacent to the construction site; A construction management system including a management terminal that acquires the detection value transmitted from the detection unit, the detection unit has a tilt sensor and transmits a tilt value detected by the tilt sensor as the detection value; The management terminal stores the inclination value as time-series data.

2. the detection unit further includes a temperature sensor, and transmits a temperature value detected by the temperature sensor and the tilt value as the detection value; The construction management system according to claim 1 , wherein the management terminal corrects the inclination value based on the temperature value, and stores the corrected inclination value as time-series data.

3. The detection unit transmits the detection value to the management terminal by wireless communication; 3. The construction management system according to claim 1, wherein the management terminal transmits the time series data or an event detected based on the time series data to another terminal via the Internet.

4. A detection unit installed at a construction site or adjacent to the construction site; A construction management method using a management terminal that acquires a detection value transmitted from the detection unit, The detection unit transmits a tilt value detected by a tilt sensor as the detection value, The management terminal stores the inclination value as time-series data.