Tunnel boring machine and method for advancing a tunnel using a tunnel boring machine
Patent Information
- Application Number
- JP2024508448
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2021-10-08
- Filing Date
- 2022-09-22
- Publication Date
- 2024-11-06
- Estimated Expiration
- 2042-09-22
AI Technical Summary
Existing tunnel excavation machines face challenges in applying digging forces with precision and reliability, often relying on potentiometers for control which can be complex and unreliable.
A tunnel excavation machine that visualizes the actual position of the total pressure center of gravity in a coordinate system, allowing operators to control digging forces through a touch-sensitive screen, enabling simple and reliable operation by presetting the target total digging force.
Enables precise and efficient tunnel excavation by aligning the actual pressure center of gravity with the target, simplifying control and enhancing operational reliability.
Smart Images

Figure 2023057217000001
Abstract
Description
[Technical field]
[0001] The present invention relates to a tunnel boring machine having the features of the preamble of claim 1.
[0002] The invention further relates to a method for excavating a tunnel using a tunnel boring machine. [Background technology]
[0003] An apparatus of this type and a method of this type are known from DE 10 2018 102 330 A1. The known tunnel boring machine has cutting wheels and a number of driving press means, which are movable in the direction of excavation. Furthermore, a driving press means control unit is provided, which drives and controls the driving press means, and the driving press means control unit is provided with means for visualizing the total pressure center of gravity resulting from the pressure action of the driving press means. When excavating a tunnel with this tunnel boring machine, the position of the total pressure center of gravity is visually displayed, in particular when attaching segments (tabbings) with a corresponding load change on the driving press means during subsequent excavation.
[0004] Nos. CN 111 810 171 A, CN 111 810 172 A and JP 2013-007226 A disclose tunnel boring machines and methods for tunnel boring, in which the pressure action exerted by the tunnel boring press means is based on a group formation in the tunnel boring press means, with JP 2013-007226 A providing a visualization of the resultant force exerted. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] German Patent Application Publication No. 102018102330 [Patent Document 2] China Patent Application Publication No. 111810171 [Patent Document 3] China Patent Application Publication No. 111810172 [Patent Document 4] Patent Publication No. 2013-007226 Summary of the Invention [Problem to be solved by the invention]
[0006] Usually in practice in tunnel boring machines the setting of the drilling forces to be applied by the individual drilling press means or groups of drilling press means is effected via potentiometers acting on drive control modules connected to the drilling press means.
[0007] The object of the present invention is to provide a tunnel boring machine of the type described at the outset and a method for boring a tunnel with the aid of a tunnel boring machine of the type described at the outset, which is distinguished by a relatively simple and operationally reliable operation. [Means for solving the problem]
[0008] This object is achieved according to the invention in a tunnel boring machine of the type mentioned in the introduction by a tunnel boring machine having the features of claim 1.
[0009] This problem is solved according to the invention in an apparatus for tunnel boring by an apparatus having the features of claim 8. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] Hereinafter, a mode for carrying out the invention will be described.
[0011] In the tunnel boring machine and in the method according to the invention, the actual position of the actual total pressure center of gravity is influenced by the coordinate values of the display of the desired target total pressure center of gravity, visualized in a coordinate system associated with the tunnel boring machine, based on the preset target total excavation force, and this is preferably done via a touch-sensitive screen, so that the tunnel boring machine can be controlled relatively simply via this one central operating parameter.
[0012] Further configurations which meet the objectives of the invention are the subject of the dependent claims.
[0013] Further objectives and advantages of the invention will become apparent from the following description of an embodiment with reference to the figures of the drawing, as well as from the supplementary description. [Brief description of the drawings]
[0014] [Figure 1] FIG. 1 shows an embodiment of a tunnel boring machine with cutting wheels, equipped with an operating unit, in a schematic diagram. [Diagram 2] FIG. 2 shows an embodiment of the tunnel boring machine of FIG. 1 in a side view with exemplary force progression lines for linear travel, applied by the tunneling press means in a distributed manner in the horizontal direction (X direction) and constant over the entire diameter of the cutting wheel. [Diagram 3] FIG. 2 shows an embodiment of the tunnel boring machine of FIG. 1 in a side view with exemplary force progression lines for curve progression, which are applied by the tunneling press means in a distributed manner in the horizontal direction (X direction) and vary constantly over the entire diameter of the cutting wheel. [Figure 4] FIG. 2 shows an embodiment of the tunnel boring machine of FIG. 1 in a side view with exemplary force progression lines for curve progression, applied by the tunneling press means in a distributed manner in the horizontal direction (X direction) and varying continuously over a portion of the diameter of the cutting wheel. [Diagram 5]FIG. 2 shows an embodiment of the tunnel boring machine of FIG. 1 in a side view with exemplary force progression lines for horizontal progression to compensate for the reaction forces applied by the tunneling press means distributed in the vertical direction (Y direction) that vary constantly over the entire diameter of the cutting wheel and that vary in the vertical direction. [Figure 6] FIG. 2 shows an embodiment of the tunnel boring machine of FIG. 1 in a side view with an exemplary force progression line for a downward diving advancement, applied by the tunneling press means in a distributed manner in the vertical direction (Y direction) and constant over the entire diameter of the cutting wheel. [Figure 7] FIG. 4 is a flow chart showing one embodiment of a processing procedure in the operation of a tunnel boring machine for excavating a tunnel using the embodiment of the tunnel boring machine according to the present invention described based on FIGS. 1 to 3. EXAMPLES
[0015] 1 shows a schematic diagram of an embodiment of a tunnel boring machine 103 according to the invention, which is equipped with a cutting wheel 106 placed in front in the excavation direction. The tunnel boring machine 103 also has a number of pushing press means 109 on the rear side of the cutting wheel 106 in the excavation direction, and by using these pushing press means 109, the cutting wheel 106 can be moved in the excavation direction and can be pressed against a face (excavation face) 112 located in front of the cutting wheel 106 in the excavation direction during excavation operation, particularly with a pushing force.
[0016] The drilling press means 109 are individually or grouped together and integrally connected to a drilling press means control unit 115, by means of which the drilling press means 109 can be driven and controlled to achieve a pressure action (thrust action).
[0017] In addition, the tunneling press means control unit 115 is connected to the operation unit 118, and via the operation unit 118, the tunneling press means control unit 115 can be provided with the control values necessary to drive and control the tunneling press means 109 after converting (converting) the coordinate values, which will be described in detail in the following paragraphs, into control values corresponding to pressure values.
[0018] The operating unit 118 has, on the one hand, a touch-sensitive screen with a first input area 121, via which the target total drilling force F 109 to be applied overall by the drilling press means 109 or a group of drilling press means 109 to the cutting wheel 106 can be input as a preset value directly by the machine operator in an input field 130 as input means. ges A value for can be entered.
[0019] Target total digging force F ges In a variant to the direct input, the first input area 121 is provided with, for example, a touch-sensitive area or an electromechanical push button or an element that acts electromechanically by rotation or sliding, such as a potentiometer or slide adjuster.
[0020] In another embodiment not shown, the target total excavation force F ges An excavation speed regulation circuit is provided as an input means for presetting the total target excavation force F, to which a desired target excavation speed can be provided by the machine operator at a first input and the current excavation speed of the tunnel boring machine 103 at a second input. The output of the excavation speed regulation circuit is provided as a preset target total excavation force F for further processing to maintain the desired target excavation speed, as will be described in detail in the following paragraphs. ges to provide.
[0021] The operating unit 118 further comprises a second input area 133 which is configured to have a predetermined number, in this case four, of touch fields 136, 139, 142, 145 as operating elements which, in the embodiment described here, are used by their horizontal or vertical pairwise arrangement to lower or raise the coordinate value of the desired target total pressure center of gravity (also called "Center of Thrust", abbreviated "CoT") resulting from the pressure action of all the driving press means 109 in a coordinate system related to the tunnel boring machine 103 and in this case in a coordinate system related in particular to the longitudinal central axis of a shield element 146 of the tunnel boring machine 103 which is configured substantially cylindrically and to which the driving press means 109 are arranged and fixedly attached.
[0022] In one embodiment, the touch fields 136, 139, 142, 145 are configured to be touch-sensitive as part of a region of a touch-sensitive screen (display).
[0023] In another embodiment, the touch fields 136, 139, 142, 145 are configured as pressure sensitive electromechanical push buttons.
[0024] In yet another embodiment, the means for acting on the target total pressure center of gravity comprises an electromechanically acting element, such as a potentiometer or slide adjuster.
[0025] Furthermore, in this embodiment, the screen of the operating unit 118 further has as visualization means a two-dimensional touch-sensitive area 148 on which a symbolic visualization of the target total pressure center of gravity 151 to be taken is displayed in a coordinate system related to the tunnel boring machine 103, fixed by an X-axis 154 for the horizontal direction and a Y-axis 157 for the vertical direction, which intersect at right angles at the zero point 163 as the origin of the coordinate system.
[0026] The visualization portion shown by the black circle in FIG. 1 relates to a target total pressure center of gravity 151, and the coordinate value of the target total pressure center of gravity 151 in a coordinate system formed by an X-axis line 154 and a Y-axis line 157 represents a target total excavation force F to be applied, which can be input, for example, via an input field 130. ges Together with the values for , they form input values for the tunneling press means control unit 115 for driving and controlling the tunneling press means 109.
[0027] In a further expedient configuration, on the touch-sensitive area 148, the current total pressure center of gravity 166 is also displayed as another visualization part indicated by a white circle, which represents the current actual position of the current total pressure center of gravity 166 fed back from the drilling press means 109 by the drilling press means control unit 115 to the operating unit 118. In the representation according to Fig. 1, the current total pressure center of gravity 166 still deviates significantly from the target total pressure center of gravity 151, for example based on an adjustment process which is not yet completed and which will be described in detail in the following paragraphs, during which it will move further in the direction of the adjustment direction arrow 167 which in the representation according to Fig. 1 extends from the current total pressure center of gravity 166 towards the target total pressure center of gravity 151.
[0028] To change the position of the current total pressure center of gravity 166, by touching and moving the visualisation parts of the target total pressure center of gravity 151 in addition to the touch fields 136, 139, 142, 145, the target total pressure center of gravity 151 is moved in two dimensions within the touch-sensitive area 148, for example with the operator's finger or with an interactive pen, with a corresponding change in the control values provided to the excavation press means control unit 115 with the assigned pressure value changes, but only if the operating conditions of the tunnel boring machine 103 basically allow for the new current total pressure center of gravity 166 to be located within a purely exemplary permissible value area 169 shown by dashed lines in the drawing according to FIG. 1.
[0029] Figure 2 shows an embodiment of the tunnel boring machine 103 of Figure 1 in a side view with an exemplary force progression 200 for linear advancement, which is applied by the tunneling press means 109 in a horizontal distributed manner along the X-axis 154 and is constant over the entire diameter of the cutting wheel 106. In the view according to Figure 2, the Z-axis 203, which lies in the coordinate system associated with the tunnel boring machine 103 and whose negative value range is illustrated in Figure 2, indicates the direction of the central longitudinal axis of the shielding element 146 to which said coordinate system is referenced in this embodiment and similarly otherwise.
[0030] FIG. 2 further shows a target total drilling force F, which can be input via an input field 130, to be applied by the entire drilling press means 109. ges The resultant force vector arrow 206 and the dashed line 209 represent the average force F m Values for and are shown.
[0031] In the embodiment shown in FIG. 2, for a straight advance in the horizontal direction, in the sense of an advance along a straight line lying in the horizontal direction without curves, each of the pressing means 109 or each group of pressing means 109 applies an average force F m and illustrated by the partial force vector arrow 212. i , so that the force progression line 200, which lies on the dashed line 209, is constant across the diameter of the cutting wheel 106, and the target total penetration force F ges is exactly located on the Z-axis 203 and passes through the zero point 163 of the X-axis 154. As a result, the target total excavation force F from the Z-axis 203 in the X direction (on the X-axis) is ges , and therefore the X-displacement position CoT as the coordinate value of the target total pressure center of gravity 151 from the Z-axis 203 in the X-direction. x is equivalent to zero.
[0032] FIG. 3 shows an embodiment of the tunnel boring machine 103 of FIG. 1 in a side view corresponding to FIG. 2, with an exemplary force progression line 300 for curve progression, which is applied by the tunneling press means 109 in a horizontal direction distributed along the X-axis 154 and which varies constantly over the entire diameter of the cutting wheel 106.
[0033] In FIG. 3, the total target drilling force F to be applied by the entire drilling press means 109 can be input via an input field 130. ges The resultant force vector arrow 306 for and the dashed first line 309 indicate the average force F to be applied. m and the dashed second line 312 indicates the minimum force F that should be applied. min and the third dashed line 315 indicates the maximum force F that should be applied. max Values for and are shown.
[0034] Furthermore, in FIG. 3 , a partial force vector arrow 318 indicates, by way of example, the partial drilling force F to be applied by one drilling press means 109 or one group of drilling press means 109, here one drilling press means 109 arranged relatively laterally and on the edge side in the horizontal direction. i is shown, and the average force F to be applied by the entire drilling press means 109 is indicated by an average force vector arrow 321. m is shown. The differential force vector arrow 324 is used to calculate the partial excavation force F i and the mean force F m Differential force ΔF as the difference in the X direction from x,i Finally, a double (bidirectional) arrow 327 is used to indicate the total target excavation force F from the Z-axis 203 in the X-direction. ges , and therefore, as a coordinate value, the X-displacement position CoT of the target total pressure center of gravity 151 from the Z-axis line 203 in the X-direction x is shown, and the X-separation position CoT x is taken for the visualization portion of each total pressure center of gravity 151, 166 within the coordinate system depicted in region 148 (FIG. 1).
[0035] To achieve the curve progression, the minimum force Fmin and maximum force F max The force progression line 300 in the X direction between has a continuously changing force over the entire diameter of the cutting wheel 106 and a differential force ΔF x,i The value of the minimum force F min Starting from the Z axis 203, it is negative at first, then becomes positive, resulting in a maximum force F max It consists of a gradual increase up to
[0036] FIG. 4 shows an embodiment of the tunnel boring machine 103 of FIG. 1 in a side view corresponding to FIGS. 2 and 3, with an exemplary force progression line 400 for curve progression, which is applied by the tunneling press means 109 in a horizontal direction distributed along the X-axis 154 and varies continuously over a portion of the diameter of the cutting wheel 106, whereby, to avoid repetition, the same reference numbers used in FIGS. 3 and 4 indicate corresponding elements.
[0037] From FIG. 4, the partial drilling force F applied by the drilling press means 109 or by a group of drilling press means 109 is i are the same over a given edge area, respectively, and the minimum force F min or maximum force F max between these edge regions, the partial penetration force F i changes continuously, which also means that the X-direction distance CoT x and therefore a curve progression in the horizontal direction.
[0038] FIG. 5 shows an embodiment of the tunnel boring machine 103 of FIG. 1 in a side view rotated 90 degrees with respect to the side views of FIGS. 2-4, with an exemplary force progression line 500 for horizontal progression applied by the tunneling press means 109 in a vertical direction distributed along the Y-axis 157, varying constantly (uniformly) over the entire diameter of the cutting wheel 106, to compensate for corresponding oppositely varying vertical reaction forces such as earth pressure, water pressure, friction, etc.
[0039] In FIG. 5, the total target drilling force F to be applied by the entire drilling press means 109 can be input via an input field 130. ges The resultant force vector arrow 506 for and the dashed first line 509 represent the average force F m and the dashed second line 512 indicates the minimum force F that can be applied at min and the third dashed line 515 indicates the maximum force F that should be applied. max Values for and are shown.
[0040] Further in FIG. 5 , the partial force vector arrow 518 indicates, by way of example, the partial excavation force F applied by one excavation press means 109 or by one group of excavation press means 109, here one excavation press means 109 arranged relatively close to the tunnel bottom in the vertical direction. i is shown, and the average force F exerted by the entire drilling press means 109 is indicated by an average force vector arrow 521. m The differential force vector arrow 524 is used to calculate the partial excavation force F i and the mean force F m Differential force ΔF as the difference in the Y direction from y,i Finally, a double arrow 527 is used to indicate the total target excavation force F from the Z axis 203 in the Y direction. ges , and therefore, as a coordinate value, the Y distance position CoT of the target total pressure center of gravity 151 from the Z axis 203 in the Y direction. y is shown, and the Y separation position CoT y is taken for visualization of the respective total pressure centroids 151, 166 in the coordinate system depicted in region 148 (FIG. 1).
[0041] In the force progression line 500 shown in FIG. 5, the reaction force of the face 112, which normally increases uniformly with depth, is compensated by the tunneling press means 109 in order to perform horizontal advancement in the sense of tunnel excavation in the horizontal direction without deviations (deflection) in the vertical direction.
[0042] FIG. 6 shows an embodiment of the tunnel boring machine 103 of FIG. 1 in a side view corresponding to FIG. 5, with an exemplary force profile 600 for performing a downward diving movement during tunnel boring, which is applied by the boring press means 109 in a vertical direction distributed along the Y-axis 157 and is constant over the entire diameter of the cutting wheel 106, whereby, to avoid repetition, the same reference numbers used in FIGS. 5 and 6 refer to corresponding elements.
[0043] From Figure 6, the average force F m The corresponding partial excavation force F i and therefore the Y distance CoT of the total pressure center of gravity 151 from the Z axis 203 in the Y direction. y In this force transition line 600, which is constant along the Y-axis 157 in the vertical direction with the disappearance of ges can be seen to lie on the Z axis 203 and intersect with the Y axis 157 at the zero point 163 of the coordinate system. This causes the reaction forces at the face 112 to be over-compensated in the upper, near-ceiling region and under-compensated in the region of the tunnel bottom, causing the tunnel trajectory to tilt downwards and the tunnel boring machine 103 to perform a downward submerged advance compared to horizontal advancement.
[0044] FIG. 7 shows, as a flow chart, the basic steps in a method for excavating a tunnel using a tunnel boring machine 103 according to the invention.
[0045] First, in an evaluation step 703, the current position of the tunnel boring machine 103 is evaluated taking into account other operating parameters of the tunnel boring machine 103.
[0046] The evaluation step 703 is followed by a setting step 706, which first involves selecting a target total pressure center of gravity 151 (also called the "Center of Thrust", or "CoT" for short) or, if necessary, changing the target total pressure center of gravity 151 during drilling, by setting the coordinates of the target total pressure center of gravity 151 in the coordinate system using the touch fields 136, 139, 142, 145 or by moving its visualization part in the touch-sensitive area 148.
[0047] In this case, the target total excavation force F ges is preset directly via the input field 130 as an input means.
[0048] In another embodiment (not shown) in which a drilling speed adjustment circuit is used as the input means, the drilling speed adjustment circuit determines a target total drilling force F for maintaining a desired drilling speed. ges is preset.
[0049] The setting step 706 is followed by a first calculation step 709, which is carried out by the drilling press control unit 115, in which the aforementioned value CoT x , CoT y , F ges Using the pre-specified values, the force F to be applied for the horizontal or vertical control of the tunnel boring machine 103 is i The calculation of the force components is done by dividing the variable components ΔF x,i and ΔF y,i This is carried out regarding:
[0050] The first calculation step 709 is followed in a second calculation step 712, also using the tunneling press means control unit 115, by which the desired respective force components ΔF to be applied by each i-th tunneling press means 109 or each i-th group of tunneling press means 109 are calculated. x,i , ΔF y,i Force F to generate i The calculation of the total drilling force F to be applied is ges This will be done taking into consideration the following:
[0051] The second calculation step 712 is followed by a conversion step 715, in which the force F i In order to actually apply the force F i The hydraulic pressures to be applied to the respective drilling press means 109 are then converted.
[0052] In the adjustment step 718 following the conversion step 715, the hydraulic pressure that actually energizes the excavation press means 109 is adjusted to bring the current total pressure center of gravity 166 closer to the target total pressure center of gravity 151 and ultimately make the two substantially coincident.
[0053] The adjustment step 718 is followed by an operation step 721 in which the tunnel boring machine 103 is operated for a predefined, somewhat selectable, time unit corresponding to the last operational data used, until the next evaluation step 703 is performed. [Explanation of symbols]
[0054] 103 Tunnel Boring Machine 106 Cutting Wheel 109 Excavation Press Means 112 Excavation face 115 Excavation press means control unit 118 Operation Unit 121 First input area 130 Input Field 133 Second input area 136 Touch Field 139 Touch Field 142 Touch Field 145 Touch Field 146 Shielding Elements 148 Touch-sensitive Area 151 Target total pressure center of gravity 154 X axis (horizontal direction) 157 Y axis (vertical direction) 163 Zero point (origin of coordinate system) 166 Current total pressure center of gravity 167 Adjustment Direction Arrow 169 Acceptable Value Range 200 Force transition line 203 Z axis 206 Resultant Force Vector Arrow 209 Dashed line (average force F m value for 212 Partial force vector arrow (partial excavation force F i ) 300 Force transition line 306 Resultant Force Vector Arrow 309 The first dashed line (mean force F m value for 312 The second dashed line (minimum force F min value for 315 The third dashed line (minimum force F max value for 318 Partial force vector arrow (partial excavation force F i ) 321 Mean force vector arrow (mean force F m ) 324 Differential Force Vector Arrow (Differential Force ΔF x,i ) 327 Double Arrow (X Separation Position CoT x ) 400 Force transition line 500 Force transition line 506 Resultant Force Vector Arrow 509 The first dashed line (mean force F m value for 512 The second dashed line (minimum force F min value for 515 The third dashed line (minimum force F max value for 518 Partial force vector arrow (partial excavation force F i ) 521 Mean force vector arrow (mean force F m ) 524 Differential Force Vector Arrow (Differential Force ΔF y,i ) 527 Double Arrow (Y Separation Position CoT y ) 600 Force transition line 703 Evaluation Step 706 Setting Steps 709 First calculation step 712 Second calculation step 715 Conversion Steps 718 Adjustment Steps 721 Operation Steps F ges Target total digging power
Claims
1. A tunnel boring machine comprising a cutting wheel (106), a number of tunnel pressing means (109), a tunnel pressing means control unit (115) and a visualization means (148), using said drilling press means (109), said cutting wheel (106) is movable in a drilling direction, using said drilling press means control unit (115), said drilling press means (109) or a group of said drilling press means (109) is driveable and said visualization means (148) is configured to visualize a current total pressure center of gravity (166) resulting from the pressure action of said drilling press means (109) or a group of said drilling press means (109), An input means (130) is provided, and the input means (130) inputs a target total drilling force (F ges ) configured to pre-set said visualization means (148) being configured to display a target total pressure centre of gravity (151) and said current total pressure centre of gravity (166); An operating unit (118) is provided which is connected to the tunnel boring machine control unit (115), and the operating unit (118) calculates a coordinate value (CoT) of the target total pressure center of gravity (151) in a coordinate system (154, 157) related to the tunnel boring machine (103) in order to bring the current total pressure center of gravity (166) at least close to the target total pressure center of gravity (151). x , CoT y means (133, 136, 139, 142, 145, 148) for acting on said current total pressure centre of gravity (166) by modifying the The drilling press means control unit (115) determines the coordinate value (CoT x , CoT y ) into a pressure value change in the drive control of the tunneling press means (109) or a group of the tunneling press means (109) for adjustment; A tunnel boring machine characterized by:
2. The means for acting on the target total pressure center of gravity (151) is x , CoT y ) and / or the coordinate value (CoT x , CoT y 1. Having operating elements (136, 139, 142, 145) for raising or lowering the 2. A tunnel boring machine as claimed in claim 1 , characterized in that
3. The coordinate value (CoT x , CoT y ) for raising or lowering the screen, the given screen having a touch-sensitive area (133) with touch-sensitive touch fields (136, 139, 142, 145); 3. A tunnel boring machine as claimed in claim 2.
4. The coordinate value (CoT x , CoT y a region (133) having pressure-sensitive touch fields (136, 139, 142, 145) for raising or lowering the 3. A tunnel boring machine as claimed in claim 2.
5. The coordinate value (CoT x , CoT y 1. An electromechanically actuated element is provided for raising or lowering the 3. A tunnel boring machine as claimed in claim 2.
6. A screen is provided with a touch-sensitive area (148) in which the visualized target total pressure center of gravity (151) can move from a start position to an end position upon contact with a touch object and movement of the touch object, and the coordinate value (CoT) of the end position relative to the start position is calculated. x , CoT y ) constitutes an input value for the tunneling press means control unit (115) for adapting the pressing force applied by the tunneling press means (109) or by a group of the tunneling press means (109), 2. A tunnel boring machine as claimed in claim 1 , characterized in that
7. the coordinate system being a two-axis Cartesian coordinate system (154, 157) having a zero point (163) on the longitudinal central axis of a shield element (146) of the tunnel boring machine (103) on which the tunnel pressing means (109) or the group of tunnel pressing means (109) is arranged, 2. A tunnel boring machine as claimed in claim 1 , characterized in that
8. the visualization means (148) being configured to display an allowed value range (169) for the target total pressure center of gravity (151), and the drilling press means control unit (115) being configured to process only values for the target total pressure center of gravity (151) that lie within said allowed value range (169); 2. A tunnel boring machine as claimed in claim 1 , characterized in that
9. The input means includes an excavation speed adjustment circuit, which adjusts the target total excavation force (F) by maintaining the target excavation speed via a target excavation speed that can be provided as a first input and via a current excavation speed that can be provided as a second input. ges ) configured to preset 2. A tunnel boring machine as claimed in claim 1 ,
10. A method for excavating a tunnel using a tunnel boring machine (103), comprising the steps of: The method includes the steps of: - providing a tunnel boring machine (103) according to any one of claims 1 to 9, - determining a predetermined target trajectory; - determining an initial drilling force of the drilling press means (109) or of a group of drilling press means (109), and the coordinate value (CoT) of the target total pressure centre of gravity (151) in the coordinate system (154, 157) related to said tunnel boring machine (103); x , CoT y Repeatedly setting the excavation force during excavation through changing the target total pressure center of gravity (151) in the containing, The method comprising: