Shield excavation passage structure for subway entrances and exits

The shield excavation passage structure with circular tunnels and temporary supports addresses environmental and traffic disruption, ensuring safe and efficient subway entrance construction despite rock protrusions.

JP3248656UActive Publication Date: 2024-10-07CHINA RAILWAY LIUYUAN GRP CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
JP2024002681U
Authority / Receiving Office
JP · JP
Patent Type
Utility models
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-10-07
Estimated Expiration
2034-08-09

AI Technical Summary

Technical Problem

Conventional subway entrance construction methods cause significant environmental impact and traffic disruption, and the use of rectangular top pipe methods is challenging in areas with rock protrusions, leading to increased construction difficulty and cost.

Method used

A shield excavation passage structure with circular cross-section tunnels, temporary support structures, and precast reinforced concrete pipes, allowing underground construction to minimize surface excavation and adapt to hard rock formations, while ensuring safety and stability.

Benefits of technology

Reduces environmental and traffic disruption, enhances construction safety, and improves adaptability to rock protrusions, with efficient assembly and reduced construction site requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0003248656000001_ABST
    Figure 0003248656000001_ABST
Patent Text Reader

Abstract

To provide a shield excavation passage structure for subway entrances and exits, which solves the problem of difficulty in construction and increased costs due to the difficulty of construction using the rectangular top pipe method for above-ground parts where rock mass protrusions exist. [Solution] The shield structure includes a first shield structure passage 1 and a second shield structure passage 2, the cross sections of the first shield structure passage and the second shield structure passage are both circular, the diameters of the first shield structure passage and the second shield structure passage are the same, the first shield structure passage and the second shield structure passage are arranged in parallel, a temporary support structure is provided inside each of the first shield structure passages, and the clearance between the first shield structure passage and the second shield structure passage is 0.25 times or less the diameter of the shield structure passage.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to the field of railway transportation technology, and in particular to a shield excavation passage structure for subway entrances and exits. [Background technology]

[0002] Conventional subway entrance and exit construction methods usually adopt the open excavation method, which forms a construction area by excavating at the ground surface, then performs structural construction, and finally performs backfilling and ground restoration. However, the excavation method has a significant impact on the surrounding environment and traffic during construction. In order to reduce the impact of the open excavation method on the surrounding environment, currently, subway entrance and exit passages that penetrate roads are generally constructed using the rectangular top pipe method. However, since the buried depth of the subway entrance and exit is generally shallow, and the problems of floating resistance and environmental impact are significant, it is not appropriate to adopt a single round large diameter shield or jacking pipe. In addition, the construction of the rectangular top pipe method in the related technology is difficult for floor parts with rock protrusions, so the protruding hard rock needs to be pre-treated in advance. However, in such a processing process, a series of problems such as traffic loosening and pipeline relocation arise, which further increases the difficulty and cost of construction. Summary of the Invention [Problem to be solved by the invention]

[0003] In view of this, the present invention aims to solve at least one of the problems in the related art to some extent. [Means for solving the problem]

[0004] In order to achieve the above objectives, the technical solution of the present invention is realized as follows: A shield excavation passage structure for a subway entrance / exit, comprising a first shield structure passage and a second shield structure passage; The cross sections of the first shielding structure passage and the second shielding structure passage are both circular, the diameters of the first shielding structure passage and the second shielding structure passage are the same, the first shielding structure passage and the second shielding structure passage are installed in parallel, and a temporary support structure is provided inside each of the first shielding structure passages. The clearance between the first shield structural passage and the second shield structural passage is less than or equal to 0.25 times the diameter of the shield structural passage.

[0005] One end of the shield structure passage is connected to a subway station platform, and the other end of the shield structure passage is connected to a subway entrance / exit excavation.

[0006] Furthermore, one end of the shield structure passage is connected to a subway station platform via one rear injection hole door ring, and the other end of the shield structure passage is connected to a subway entrance / exit excavation section via one rear injection hole door ring.

[0007] Furthermore, precast reinforced concrete pipe sheets are laid inside both the first and second shield structure passages.

[0008] Furthermore, the subway station platform is a shield initiation well, and the subway entrance excavation is a shield receiving well.

[0009] Furthermore, a ground reinforcement structure is provided at each of the connection positions between the subway station platform and the subway entrance / exit excavation and the shield structure passage.

[0010] Furthermore, air conditioning pipes and smoke exhaust ducts are provided at the upper parts of both the first shield structure passage and the second shield structure passage, a completed renovation surface is provided inside the first shield structure passage and the second shield structure passage, and pipeline spaces for placing pipelines are provided on both the left and right sides of the completed renovation surface.

[0011] Furthermore, the bottoms of the first shield structure passage and the second shield structure passage are made of a raw concrete layer, and a dam and a drainage groove are provided on the upper end surface of the raw concrete layer.

[0012] Furthermore, a grout hole capable of being fitted with a grout pipe is provided in the side wall of the first shield structure passage.

[0013] Furthermore, the temporary support structure is made up of four steel backing plates and a plurality of steel support rods, and the four steel backing plates form a steel plate structure having a cross section shaped like an "I", and one steel support rod is provided on each of the upper and lower sides of the intersection position of the two steel backing plates in the steel plate structure.

[0014] Furthermore, the front and rear ends of the shield structure passage are each provided with an internal steel plate for connection to the rim of the rear injection hole.

[0015] Compared with the prior art, the shield excavation passage structure for subway entrance and exit described in the present invention has the following advantages:

[0016] 1. The shield structure passage adopts a circular cross-section design, has good load-bearing performance, can evenly distribute the pressure of the stratum, and reduce the risk of tunnel deformation and structural damage. It uses precast reinforced concrete tube sheets, which are quick to assemble and have tight joints, improving the stability and durability of the entire tunnel structure. The shield construction is carried out underground, avoiding the impact of large-area surface excavation on surrounding buildings and roads, reducing ground subsidence and environmental damage during the construction process, solving the problems of on-site disassembly of open excavation work, traffic sparseness, and difficult pipeline changes. Compared with the rectangular top pipe method passage, it can effectively solve the problem of the adaptability of hard rock protrusion stratum. Compared with a single larger diameter shield tunnel, the construction site required for this passage structure is smaller, the buried depth of the tunnel is shallower, and the space utilization rate is higher.

[0017] 2. During the construction process, proper clearance can be maintained to reduce the construction interference between the two tunnels, reduce the construction risks caused by mutual influence, and ensure construction safety. With a clearance of less than 0.25 times the diameter of the shield tunnel and protective measures such as grouted passages and temporary support structures, the safety of the structure can be guaranteed, land use can be reduced, and functionality can be improved. [Brief description of the drawings]

[0018] The drawings constituting a part of the present invention are intended to provide a further understanding of the present invention, and the schematic embodiments of the present invention and the description thereof are intended to interpret the present invention and are not intended to unduly limit the present invention. [Figure 1] 1 is a schematic diagram of the structure of a shield excavation passage for a subway entrance / exit according to an embodiment of the present invention; [Diagram 2] 1 is a cross-sectional view of a shield excavation passage for a subway entrance / exit according to an embodiment of the present invention. [Diagram 3] 1 is a longitudinal cross-sectional view of a shield excavation passage structure for a subway entrance / exit according to an embodiment of the present invention. [Figure 4] 1 is a cross-sectional view of a subway entrance excavation according to an embodiment of the present invention; [Diagram 5] FIG. 2 is a structural schematic diagram of a grout pipe according to an embodiment of the present invention. [Figure 6] FIG. 2 is a schematic diagram of the structure of a grout hole according to an embodiment of the present invention; [Figure 7] 1 is a schematic diagram of a temporary support structure according to an embodiment of the present invention; [Figure 8] 2 is a schematic diagram of a combination structure of a shield structure passage and a rear runner gate ring according to an embodiment of the present invention; FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0019] Furthermore, unless contradictory, the embodiments of the present invention and the features of the embodiments can be combined with each other. In the description of the present invention, the orientation or positional relationship indicated by the terms "center", "longitudinal", "lateral", "up", "down", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., is based on the orientation or positional relationship shown in the drawings, and is merely for convenience and simplification of the description of the present invention, and does not indicate or imply that a specified device or element must have a specific orientation, be constructed and operated in a specific orientation, and should not be understood as a limitation on the utility model. In addition, the terms "first", "second", etc., are merely for descriptive purposes and should not be understood as indicating or implying a relative importance or implying the number of technical features indicated. Thus, a feature limited to "first", "second", etc., may explicitly or implicitly include one or more of the feature. In the description of the present invention, unless otherwise specified, "plurality" means two or more.

[0020] In the description of the present invention, unless otherwise clearly specified and limited, the terms "attached", "connected" and "connection" should be understood in a broad sense, for example, may be fixedly connected, detachably connected, integrally connected, mechanically connected, electrically connected, directly connected, indirectly connected via an intermediate medium, or internal communication between two elements. Those skilled in the art can understand the specific meaning of the above terms in the present invention according to specific situations.

[0021] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings.

[0022] As shown in Fig. 1, the shield excavation passage structure for subway entrance and exit includes a first shield structure passage 1 and a second shield structure passage 2, the cross section of the first shield structure passage 1 and the second shield structure passage 2 are both circular, the diameter of the first shield structure passage 1 and the second shield structure passage 2 are the same, the first shield structure passage 1 and the second shield structure passage 2 are installed in parallel, the inside of the first shield structure passage 1 is provided with a temporary support structure, and the clearance between the first shield structure passage 1 and the second shield structure passage 2 is less than 0.25 times the diameter of the shield structure passage, during the construction process, the construction interference between the two tunnels can be reduced, the construction risk caused by mutual influence can be reduced, and the construction safety can be ensured. The clearance is less than 0.25 times the diameter of the shield tunnel, and protective measures such as a passage with a grout structure and a temporary support structure can be adopted, thereby ensuring the safety of the structure, reducing the use of land, and improving the use function.

[0023] The inside of the first shield structure passage 1 and the second shield structure passage 2 are both laid with precast reinforced concrete pipe sheets. The first shield structure passage 1 is a preceding construction passage, the second shield structure passage 2 is a following construction passage, and the first shield structure passage 1 and the second shield structure passage 2 are both shield construction. Under the premise of meeting the passenger flow, in order to save investment, the diameter of the first shield structure passage 1 and the second shield structure passage 2 can be adopted as 5m. The shield structure passage adopts a circular cross-sectional design, has good load-bearing performance, can evenly distribute the ground pressure, and can reduce the risk of tunnel deformation and structural damage. The use of precast reinforced concrete pipe sheets makes it possible to quickly assemble and have tight joints, improving the stability and durability of the entire tunnel structure. Shield construction is carried out underground, which avoids the impact on surrounding buildings and roads caused by large-area surface excavation, reduces ground subsidence and environmental damage during the construction process, and solves the problems of on-site disassembly of open excavation work, traffic congestion and the difficulty of changing municipal pipelines. Compared with the rectangular-topped pipe method passage, it can effectively solve the adaptability problem of hard rock protrusion stratum. Compared with a single larger diameter shield tunnel, the construction site required by this passage structure is smaller, the tunnel burial depth is shallower, and the space utilization rate is higher.

[0024] One end of the shield structure passage is connected to the subway station platform 6, and the other end of the shield structure passage is connected to the subway entrance / exit excavation 5. In this embodiment, one end of the shield structure passage is connected to the subway station platform 6 via one rear injection hole door ring 3, and the other end of the shield structure passage is connected to the subway entrance / exit excavation 5 via one rear injection hole door ring 3.

[0025] The subway station platform 6 is the shield starting well, and the subway entrance excavation section 5 is the shield receiving well. A stratum reinforcement structure 4 is provided at the connection points between the subway station platform 6 and the subway entrance excavation section 5 and the shield structure passage. The stratum reinforcement structure can adopt reinforcement processes such as rotary injection piles, mixing piles, and grouting depending on the stratum where the shield structure passage is located. The range of ground reinforcement covers the soft ground layer within a range of 3m around the shield tunnel.

[0026] As shown in Figure 2, an air conditioning pipe 7 and a smoke exhaust pipe 8 are provided at the top of both the first shield structure passage 1 and the second shield structure passage 2, a completed renovation surface 9 is provided inside the first shield structure passage 1 and the second shield structure passage 2, and a pipeline space 13 for placing a pipeline 14 is provided on both the left and right sides of the completed renovation surface 9.

[0027] The bottoms of the first shield structure passage 1 and the second shield structure passage 2 are made of a raw concrete layer 10, and a blocking threshold 11 and a drainage ditch 12 are provided on the upper end surface of the raw concrete layer 10.

[0028] As shown in Fig. 5, a grout hole 15 that can be fitted with a grout pipe 16 is provided on the side wall of the first shield structure passage 1. After the construction of the first shield structure passage 1 is completed, a grout pipe 16 is installed in the reserved grout hole 15 to perform grout reinforcement on the outside of the second shield structure passage 2, safely protecting the structure of the first shield structure passage 1, and grouting is performed on the soil layer outside the first shield structure passage 1 through the grout pipe 16.

[0029] As shown in Fig. 7, the temporary support structure is four steel backing plates 17 and a number of steel support rods 18, the four steel backing plates 17 form a steel plate structure with a cross section in the shape of a well, and one steel support rod 18 is installed on both the upper and lower sides of the intersection of the two steel backing plates 17 in the steel plate structure, and after the construction of the first shield structure passage 1 is completed and before the construction of the second shield structure passage 2, the temporary support structure is attached to the inner wall of the first shield structure passage 1 to safely protect the structure of the first shield structure passage 1 during the construction of the second shield structure passage 2. The front and rear ends of the shield structure passage are both provided with built-in steel plates 19 for connection to the rear injection hole door ring 3.

[0030] Operational mode of this embodiment Step 1: First, construct the subway station platform 6 and the subway entrance / exit excavation section 5, and reserve temporary holes above the subway station platform 6 and the subway entrance / exit excavation section 5 for sending out and receiving the shield material.

[0031] Step 2: Construction of the ground reinforcement structure 4 for shield start and shield reach is carried out outside the subway station platform 6 and the subway entrance / exit excavation 5.

[0032] Step 3: The shield is started at the railway station 6, creating the first shield structural passage 1 and suspending the shield in the subway entrance excavation 5.

[0033] Step 4: A grout pipe 16 is installed in the first shield structure passage 1 to perform layer grout reinforcement, and a temporary support structure is erected.

[0034] In step 5, the shield machine departs to re-shield at the subway station platform 6, creates a second shield structure passage 2, suspends the shield in the subway entrance excavation 5, and temporarily seals the hole.

[0035] Step 6: Remove the temporary support structure and inject the injection hole door ring 3 after installation.

[0036] Step 7: Complete backfilling of the raw concrete layer 10, construct the blocking sill 11 and drainage ditch 12, and install the air conditioning pipe 7, smoke exhaust pipe 8, and pipeline 14.

[0037] Step 8: Complete the interior renovation of the hallway.

[0038] The above are only preferred embodiments of the present invention, and do not limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included within the protection scope of the present invention. [Explanation of symbols]

[0039] 1, the first shield structure passage; 2, the second shield structure passage; 3, rear injection hole door ring; 4. Strata reinforcement structure; 5. Subway entrance and exit excavation section; 6. Subway station platform; 7, air conditioning pipe; 8, smoke exhaust pipe; 9. Renovation completion surface; 10, raw concrete layer; 11, cut-off threshold; 12, drainage ditch; 13, Pipeline space; 14, Pipeline; 15, grout hole; 16, grout pipe; 17, steel backing plate; 18, steel support rod; 19. Built-in steel plate

Claims

1. A shield excavation passage structure for a subway entrance / exit, comprising a first shield structure passage (1) and a second shield structure passage (2), The cross sections of the first shielding structural passage (1) and the second shielding structural passage (2) are both circular, The diameters of the first shielding structural passage (1) and the second shielding structural passage (2) are the same; The first shielding structural passage (1) and the second shielding structural passage (2) are installed in parallel, and a temporary support structure is provided inside each of the first shielding structural passages (1); A clearance between the first shield structural passage (1) and the second shield structural passage (2) is 0.25 times or less of a diameter of the shield structural passage; One end of the shield structure passage is connected to a subway station platform (6), and the other end of the shield structure passage is connected to a subway entrance / exit excavation (5). This shield excavation passage structure for subway entrances and exits is characterized by the above.

2. One end of the shield structure passage is connected to a subway station platform (6) through one rear injection hole door ring (3), and the other end of the shield structure passage is connected to a subway entrance / exit excavation (5) through one rear injection hole door ring (3).

2. The shield excavation passage structure for a subway entrance / exit according to claim 1.

3. A precast reinforced concrete pipe sheet is laid inside each of the first shield structure passage (1) and the second shield structure passage (2).

2. The shield excavation passage structure for a subway entrance / exit according to claim 1.

4. The subway station platform (6) is a shield starting well, and the subway entrance excavation (5) is a shield receiving well; 2. The shield excavation passage structure for a subway entrance / exit according to claim 1.

5. A ground reinforcement structure (4) is provided at each of the connection positions between the subway station platform (6) and the subway entrance excavation (5) and the shield structure passage. The shield excavation passage structure for a subway entrance / exit according to claim 4.

6. An air conditioning pipe (7) and a smoke exhaust pipe (8) are installed on the upper part of each of the first shield structure passage (1) and the second shield structure passage (2). A completed repair surface (9) is installed inside the first shield structural passage (1) and the second shield structural passage (2); A pipeline space (13) for accommodating a pipeline (14) is provided on both the left and right sides of the completed repair surface (9). A shield excavation passage structure for a subway entrance / exit according to any one of claims 1 to 5.

7. The bottom of the first shield structure passage (1) and the second shield structure passage (2) is a concrete layer (10), A blocking threshold (11) and a drainage ditch (12) are provided on the upper end surface of the raw concrete layer (10). The shield excavation passage structure for a subway entrance / exit according to claim 6.

8. A grout hole (15) capable of engaging with a grout pipe (16) is provided on the side wall of the first shield structure passage (1). The shield excavation passage structure for a subway entrance / exit according to claim 6.

9. The temporary support structure is made up of four steel backing plates (17) and a plurality of steel support rods (18), and the four steel backing plates (17) form a steel plate structure having a cross section shaped like a square. A single steel support rod (18) is installed on each of the upper and lower sides of the intersection of the two steel backing plates (17) in the steel plate structure. The shield excavation passage structure for a subway entrance / exit according to claim 6.

10. The front and rear ends of the shield structure passage are provided with built-in steel plates (19) for connecting the rear injection hole door ring (3). The shield excavation passage structure for a subway entrance / exit according to claim 6.

Citation Information

Cited By

  • Receiving construction method of rectangular jacking pipe in station main body enclosure stage

    CN119914298A