Precast concrete seismic isolation upper foundation
The seismic isolation upper foundation with a base plate and concrete part efficiently positions and supports the prestressed steel material's lower end, addressing inefficiencies in precast concrete construction and improving work efficiency and quality.
Patent Information
- Application Number
- JP2020182031
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-10-30
- Publication Date
- 2024-09-26
- Estimated Expiration
- 2040-10-30
AI Technical Summary
The challenge in constructing seismic isolation upper foundations using precast concrete with prestressed steel materials is the inefficient positioning and support of the prestressed steel material's lower end, which affects work efficiency during the fixing process.
A seismic isolation upper foundation is designed with a seismic isolation upper base plate and a concrete part, where the prestressed steel material's lower end is positioned and supported by a coupling member on the base plate, and a fixing plate is embedded in the concrete, allowing for rational and efficient fixation of the steel material during precast concrete manufacturing.
This configuration enables proper and efficient fixation of the prestressed steel material to the concrete part, enhancing workability and quality by ensuring the steel material is correctly positioned and supported during the manufacturing process.
Smart Images

Figure 0007556748000006 
Figure 0007556748000005 
Figure 0007556748000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a seismic isolation upper foundation made of precast concrete and equipped with PC steel members. [Background technology]
[0002] A known conventional seismic isolation upper foundation comprises a seismic isolation upper base plate to which a seismic isolation device is fixed on its underside, a concrete section constructed on the upper side of the seismic isolation upper base plate, and prestressing steel members which are embedded in and fixed to the concrete section with an anchoring plate attached to their lower end with their upper end protruding from the top surface of the concrete section, and in which prestress is applied by inserting the prestressing steel members into concrete columns installed above the concrete section (see, for example, Patent Document 1). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent No. 5210337 Summary of the Invention [Problem to be solved by the invention]
[0004] In constructing the seismic isolation upper foundation as described above, in order to improve workability and quality, the seismic isolation upper foundation may be manufactured from precast concrete. However, when manufacturing the seismic isolation upper foundation equipped with the PC steel as described in the above Patent Document 1 from precast concrete, in order to properly fix the PC steel to the concrete part, it is necessary to install the PC steel in a state in which the upper end protrudes from above the concrete part in the concrete part before the concrete is poured, and to position and support the lower end of the PC steel to which the fixing plate is attached. For this purpose, it is conceivable to add a support member or template for positioning and supporting the lower end of the PC steel in the space of the concrete part, but in that case, there is a concern that the work efficiency will decrease.
[0005] In view of this situation, the main objective of the present invention is to provide a technology for a seismic isolation upper foundation having prestressing steel members with anchoring plates attached to their lower ends and whose upper ends protrude above the concrete part, which is capable of rationally and appropriately positioning and supporting the lower ends of the prestressing steel members so that the prestressing steel members are properly anchored to the concrete part when they are manufactured from precast concrete. [Means for solving the problem]
[0006] The first characteristic configuration of the present invention is a seismic isolation upper base plate to which a seismic isolation device is fixed on the underside thereof, A concrete portion constructed on the upper surface side of the seismic isolation upper base plate; and a PC steel member having an anchoring plate attached to a lower end thereof with an upper end thereof protruding from an upper surface of the concrete section, the anchoring plate being embedded and fixed to the concrete section, A precast concrete seismic isolation upper foundation in which prestress is applied in a state in which the PC steel is inserted into a concrete column installed above the concrete part, a connecting member disposed on the seismic isolation upper base plate to which the lower end of the PC steel can be connected; The PC steel member includes a first PC steel member that extends downward from the fixing plate and has a lower end connected to the connecting member. 、 an anchor plate support member supported by an anchor plate attached to the first PC steel member is embedded in the concrete portion; The PC steel member includes a second PC steel member supported by the anchor plate support member. The point is this.
[0007] According to this configuration, when a seismic isolation upper foundation equipped with PC steel members is manufactured from precast concrete, a rational and highly workable configuration is adopted in which the first PC steel member as the PC steel member is extended below the anchoring plate and its lower end is joined to a joining member arranged on the seismic isolation upper base plate in the concrete part before the concrete is poured, so that the lower end of the first PC steel member can be appropriately positioned and supported. And, for the first PC steel member installed in this way, the anchoring plate is attached above the lower end joined to the joining member on the seismic isolation upper base plate at the lower end, so that the anchoring plate can be appropriately fixed in the state of being embedded in the concrete part. Therefore, the present invention can provide a technology that enables a seismic isolation upper foundation having PC steel members with anchoring plates attached to their lower ends and whose upper ends protrude above the concrete part to be fabricated from precast concrete, whereby the lower ends of the PC steel members can be rationally and appropriately positioned and supported so that the PC steel members are properly anchored to the concrete part. Furthermore, according to this configuration, in the concrete portion before concrete is poured, the anchor plate support member is supported on the lower end of the first PC steel member, which is positioned by connecting its lower end to the connecting member arranged on the upper base plate of the seismic isolation structure, so that the anchor plate support member can be positioned rationally and appropriately. Furthermore, the anchor plate attached to the lower end of the second PC steel member is supported on the anchor plate support member, so that the lower end of the second PC steel member can be positioned rationally and appropriately.
[0008] The second characteristic configuration of the present invention is as follows: The inner PC tendon located in the space directly above the seismic isolation upper base plate is the first PC tendon, The outer PC tendon located outside the space directly above the seismic isolation upper base plate is the second PC tendon. It is at the point. [Brief description of the drawings]
[0010] [Figure 1] Elevation cross-sectional view of the seismic isolation upper foundation of the first embodiment [Diagram 2] FIG. 1 is a diagram showing a state of a first step in the manufacturing method of the seismic isolation upper foundation of the first embodiment. [Diagram 3]FIG. 13 is a diagram showing a state of a second step in the manufacturing method of the seismic isolation upper foundation of the first embodiment. [Figure 4] FIG. 13 is a diagram showing a state of a third step in the manufacturing method of the seismic isolation upper foundation of the first embodiment. [Diagram 5] FIG. 13 is a diagram showing a fourth step in the method for manufacturing the seismic isolation upper foundation according to the first embodiment. [Figure 6] Elevation cross-sectional view of the seismic isolation upper foundation of the second embodiment DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] [First embodiment] A first embodiment of the present invention will be described with reference to FIG. The seismic isolation upper foundation 50 of this embodiment (hereinafter referred to as "this seismic isolation upper foundation 50") is made of precast concrete that is manufactured in advance at a location different from the installation site, and after manufacturing, it is transported to the site and installed as the upper foundation of the seismic isolation device 5. The seismic isolation upper foundation 50 comprises a seismic isolation upper base plate 12 , a concrete section 20 and PC steel members 25 .
[0012] The seismic isolation upper base plate 12 is provided as a part made of steel plate to which the seismic isolation device 5 is fixed on the underside. Furthermore, a plurality of anchor members 16 are arranged on the upper surface of the seismic isolation upper base plate 12 for fixing the seismic isolation upper base plate 12 to the concrete part 20 and for fixing the seismic isolation device 5. The anchor members 16 are composed of long nuts 14 to which the fixing bolts 5a of the seismic isolation device 5 are fastened, and anchor bolts 15 which are screwed into the upper ends of the long nuts 14. The anchor members 16 can be modified as appropriate.
[0013] The concrete section 20 is provided as a section constructed by pouring concrete on the upper surface side of the seismic isolation upper base plate 12. Although not shown in the figure, the concrete section 20 is appropriately provided with main reinforcement bars, hoop reinforcement bars, connecting bars for connecting to the foundation beams 2, and the like. In this embodiment, the size of the bottom surface of the concrete portion 20 in a plan view matches the size of the seismic isolation upper base plate 12 in a plan view. That is, the concrete portion 20 formed above the seismic isolation upper base plate 12 does not have a portion that protrudes outward from the seismic isolation upper base plate 12. The shapes of the seismic isolation upper base plate 12 and the concrete portion 20 can be changed as appropriate.
[0014] A plurality of prestressing steel members 25 are provided as steel bar sections that are embedded and fixed in the concrete section 20, with anchoring plates 26 attached to the lower ends with their upper ends protruding from the upper surface of the concrete section 20. The anchoring plates 26 are attached to the lower ends of the prestressing steel members 25 in a form that the anchoring plates 26 are placed on nuts 27 screwed into the prestressing steel members 25. In addition, spiral reinforcement 28 is provided on the anchoring plates 26, wound in a spiral shape around the prestressing steel members 25.
[0015] Then, when this seismic isolation upper foundation 50 is installed as the upper foundation of the seismic isolation device 5, prestress is applied to each PC steel 25 by inserting it into a concrete column 1 installed above the concrete section 20. Furthermore, a sheath pipe 29 is provided around each PC steel member 25, and when prestress is applied to the PC steel member 25 as described above, grout is injected into the sheath pipe 29 through a grout hose 30 to fix the PC steel member 25 in place.
[0016] The above is the basic configuration of the seismic isolation upper foundation 50, but when the seismic isolation upper foundation 50 is manufactured using precast concrete, it is configured so that the lower end of the PC steel 25 can be rationally and appropriately positioned and supported so that the PC steel 25 can be properly fixed to the concrete portion 20. The detailed configuration will be explained below.
[0017] A plurality of connecting members 17 to which the lower ends of the respective PC steel members 25 can be connected are arranged on the seismic isolation upper base plate 12 of the seismic isolation upper foundation 50. Specifically, a threaded portion is formed at the lower end of the PC steel member 25, and a nut into which the threaded portion can be screwed is welded and fixed as the connecting member 17 to a predetermined position on the seismic isolation upper base plate 12 corresponding to the position where the PC steel members 25 are arranged in a plan view. The PC steel member 25 is a first PC steel member 25A that extends downward beyond the fixing plate 26 and has its lower end connected to the connecting member 17.
[0018] That is, when the seismic isolation upper foundation 50 having the PC steel 25 is manufactured from precast concrete, in the concrete section 20 before the concrete is poured, the first PC steel 25A as the PC steel 25 extends downward beyond the anchoring plate 26, and its lower end is connected to the connecting member 17 arranged on the seismic isolation upper base plate 12, so that it is properly positioned and supported.
[0019] Furthermore, for the first PC steel 25A installed in this manner, the anchoring plate 26 is attached above the lower end of the first PC steel 25A whose lower end is connected to the connecting member 17 on the seismic isolation upper base plate 12, so that the anchoring plate 26 is properly fixed while embedded in the concrete section 20.
[0020] Hereinafter, a method for manufacturing the seismic isolation upper foundation 50 of this embodiment will be described with reference to Figs. First, as shown in FIG. 2, the seismic isolation upper base plate 12 is installed in the manufacturing space S, and a plurality of anchor members 16 and a plurality of connecting members 17 are welded and fixed to predetermined positions on the upper surface of the plate.
[0021] Next, as shown in Fig. 3, each of the multiple first PC steel members 25A to which the fixing plates 26 are attached by nuts 27 is attached such that its lower end is connected to the connecting members 17 arranged on the upper seismic isolation base plate 12. Furthermore, sheath pipes 29, spiral reinforcement 28, and grout hoses 30 are attached to each of the first PC steel members 25A. At this time, although not shown, main reinforcement, hoop reinforcement, connecting reinforcement for connecting to the foundation beams 2 (see Fig. 1), and the like are appropriately arranged.
[0022] Next, as shown in Fig. 4, a temporary formwork 40 is installed to surround the area of the concrete section 20 (see Fig. 1) where concrete will be poured later, and a temporary upper end stand template 41 is installed to position the upper ends of the first PC steel members 25A. Then, in this state, concrete is poured into the space within the formwork 40.
[0023] Next, as shown in Figure 5, after the concrete poured into the space within the formwork 40 has hardened, the formwork 40 and the upper end frame template 41, etc. (see Figure 4) are removed, thereby completing the seismic isolation upper foundation 50.
[0024] Second Embodiment A second embodiment of the present invention will be described with reference to FIG. This embodiment differs from the above-described first embodiment only in the relationship between the width of the seismic isolation upper base plate 12 and the concrete portion 20, and in the detailed configuration of the PC steel 25 and the positioning form of its lower end side. In the following description, the same components as those in the above-described first embodiment are given the same reference numerals in the drawings, and detailed description may be omitted.
[0025] In the seismic isolation upper foundation 60 of this embodiment (hereinafter referred to as "this seismic isolation upper foundation 60"), the size of the bottom surface of the concrete portion 20 in a plan view is larger than the size of the seismic isolation upper base plate 12 in a plan view. In other words, the concrete portion 20 formed above the seismic isolation upper base plate 12 has a portion that protrudes outward from the seismic isolation upper base plate 12.
[0026] Of the multiple PC steel members 25 with which the anchoring plate 26 is embedded and fixed in the concrete section 20, the inner PC steel member 25 located in the space directly above the seismic isolation upper base plate 12 is designated as the first PC steel member 25A described in the first embodiment above, extends downwardly beyond the anchoring plate 26, and has its lower end connected to a connecting member 17 arranged on the seismic isolation upper base plate 12 for positioning.
[0027] On the other hand, the outer PC steel 25 located outboard of the space directly above the seismic isolation upper base plate 12 has an extension of its lower end that extends outward from above the seismic isolation upper base plate 12, and is therefore regarded as a second PC steel 25B different from the first PC steel 25A, and its lower end is positioned in a manner different from that of the first PC steel 25A. Specifically, the anchor plate support member 32 is made of angle steel or the like having insertion holes through which the PC steel members 25 (first PC steel member 25A and second PC steel member 2B) are inserted at predetermined positions corresponding to the positions of the respective PC steel members 25 (first PC steel member 25A and second PC steel member 2B) in a plan view. The anchor plate support member 32 is supported by the first PC steel member 25A, with the first PC steel member 25A on the inside inserted into the insertion hole and sandwiched between the anchor plate 26 of the first PC steel member 25A and the nut 27 supporting it. The anchor plate support member 32 supported by the first PC steel member 25A extends outward. The second PC steel member 25B on the outside is inserted into an insertion hole formed in the extension of the anchor plate support member 32, with the second PC steel member 25B sandwiched between the anchor plate 26 of the second steel member 25B and the nut 27 supporting it, and supported by the anchor plate support member 32, resulting in rational and appropriate positioning. [Explanation of symbols]
[0028] 1 Concrete pillar 5 Seismic isolation device 12 Seismic isolation upper base plate 17 Connecting members 20 Concrete Section 25 PC steel material 25A 1st PC steel material 25B 2nd PC steel material 26 Fixing plate 32 Fixing plate support member 50,60 Seismic isolation upper foundation
Claims
1. a seismic isolation upper base plate to which the seismic isolation device is fixed on the underside; A concrete portion constructed on the upper surface side of the seismic isolation upper base plate; and a PC steel member having an anchoring plate attached to a lower end thereof with an upper end thereof protruding from an upper surface of the concrete portion, the anchoring plate being embedded and fixed to the concrete portion, A precast concrete seismic isolation upper foundation in which prestress is applied in a state in which the PC steel is inserted into a concrete column installed above the concrete portion, A connecting member is provided on the seismic isolation upper base plate to which the lower end of the PC steel can be connected, The PC steel member includes a first PC steel member that extends downward beyond the fixing plate and has a lower end connected to the connecting member, an anchor plate support member supported by an anchor plate attached to the first PC steel member is embedded in the concrete portion; The PC steel member is a second PC steel member supported by the anchor plate support member, and the second PC steel member is made of precast concrete.
2. The inner PC steel member located in the space directly above the seismic isolation upper base plate is the first PC steel member, A precast concrete seismic isolation upper foundation as described in claim 1, wherein the outer PC steel member located outside the space directly above the seismic isolation upper base plate is the second PC steel member.
Citation Information
Patent Citations
Process for forming a coating film
JP1977010337A
Mounting-section structure of laminated rubber
JP1999141179A
Base isolation building structure
JP2000220210A
Exposed steel type pedestal structure
JP2005220712A
Hollow precast column
JP2007224581A