Machine learning device, prediction device, number control parameter output device, and control device
A machine learning-based prediction model in boiler systems adjusts boiler operations to match anticipated steam load patterns, improving efficiency and stability by predicting maximum and average steam usage, thus optimizing boiler performance.
Patent Information
- Application Number
- JP2020199588
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-12-01
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2040-12-01
AI Technical Summary
Existing boiler systems struggle to adjust steam output settings effectively in response to varying steam load patterns due to changes in months, seasons, days of the week, or holidays, leading to inefficiencies and difficulties in maintaining high boiler efficiency.
A machine learning device is employed to create a prediction model based on historical steam output data, allowing for the prediction of maximum and average steam usage, which is then used to adjust the number of boilers and their combustion settings in real-time to match anticipated load demands.
The system enhances the stability and efficiency of steam output by accurately predicting and adjusting to varying load patterns, ensuring high boiler efficiency and responsiveness to changing demands.
Smart Images

Figure 0007563140000001 
Figure 0007563140000002 
Figure 0007563140000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a machine learning device, a prediction device, a number control parameter output device, and a control device for a boiler system including a boiler group having a plurality of boilers. [Background technology]
[0002] Conventionally, a boiler system has been proposed that includes a boiler group having a plurality of boilers, a steam header that collects steam generated in the boiler group, and controls the combustion state of the boiler group based on a header pressure value, which is the steam pressure inside the steam header. 2. Description of the Related Art Conventionally, as boilers, there are known step value control boilers that can increase or decrease the combustion amount in steps according to a selected combustion position, and continuous control boilers that can increase or decrease the combustion amount continuously. Here, a step value control boiler refers to a multi-position control boiler that burns at multiple (three or more) stages of combustion positions by selectively turning combustion on / off or adjusting the size of the flame. In such a step value control boiler, the combustion rate is changed in stages. Note that multi-position control means that the combustion amount of a step value control boiler can be controlled in stages to multiple positions, including the combustion stop position. As described in Patent Document 1, in the combustion control of a boiler system having a boiler group with multiple step value control boilers, it is known to control each boiler to burn at an "eco driving point" as much as possible, aiming for a high-efficiency operating point (hereinafter also referred to as an "eco driving point") that indicates the combustion position where the boiler efficiency is high.
[0003] For example, the combustion control described in Patent Document 1 is premised on the presetting of the maximum evaporation amount as the maximum amount of steam used, the first evaporation amount as the average amount of steam used, the second evaporation amount as the fluctuating amount of steam, the number of boilers to be operated, and the combustion priority order. In addition, when it is desired to secure a long period of time for combustion at the "eco driving point" throughout the day, for example, the number of boilers to be operated and the combustion priority order are set in advance, taking into account the operating conditions for the day, so that the first steam amount as the average amount of steam used is burned at the medium combustion position, which is the high-efficiency combustion position.
[0004] On the other hand, in a boiler system consisting of a boiler group of one or more continuously controlled boilers, when controlling the combustion state of each continuously controlled boiler, a number control method is known in which a target steam pressure value is set in advance, and a control amount corresponding to the deviation between the header pressure value and the target steam pressure value is calculated so as to maintain the header pressure value at the target steam pressure value, thereby controlling the combustion amount of the boiler to be controlled. As described in Patent Document 2, the continuous control boiler can continuously change the combustion rate in the range from the minimum combustion state S1 to the maximum combustion state S2, but the boiler efficiency (thermal efficiency of the continuous control boiler) varies depending on the combustion rate. Therefore, for example, the combustion rate at which the boiler efficiency is highest (e.g., 98%) is set as the eco-operation point, and the range of combustion rates at which the boiler efficiency is higher than a predetermined value (e.g., 97%) is set as the eco-operation zone. For example, if the boiler efficiency is highest when the combustion rate of the continuous control boiler is 50%, the eco-operation point is a combustion rate of 50%, and if the combustion rate at which the boiler efficiency is higher than a predetermined value is reached when the combustion rate of the continuous control boiler is in the range of 30% to 70%, the eco-operation zone is the range of combustion rates of 30% to 70%. Furthermore, in the combustion control of a boiler system having a boiler group with multiple continuously controlled boilers, it is desirable to control each continuously controlled boiler to burn within the eco-operation zone as much as possible by setting a predetermined steam amount so that the combustion rate of each continuously controlled boiler is within the eco-operation zone, even if the combustion rate of the continuously controlled boiler decreases. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2012-017940 A [Patent Document 2] JP 2016-176679 A Summary of the Invention [Problem to be solved by the invention]
[0006] However, it is difficult to actually grasp the daily average steam volume, and when the steam load pattern changes depending on the day of the week, holidays, etc., of the month, season, or quarter, it is difficult to adjust the number of boilers to be operated and the combustion priority order each time.Currently, most users first set the daily average steam volume, fluctuating steam volume, and maximum steam usage volume, and then operate the system so that the number of boilers is controlled based on these parameters. In order to increase the stability of the amount of steam output while maintaining high boiler efficiency, a boiler system is desired that can predict the average steam consumption, fluctuating steam consumption, and maximum steam consumption from immediately after a time period (multiple hours) to a specified time ahead (e.g., one hour ahead), even if the steam load pattern differs depending on the day of the week, holiday, etc., of the month, season, or quarter.
[0007] The present invention aims to provide a machine learning device that can create a predictive model for predicting maximum steam consumption and average steam consumption a specified time ahead based on, for example, the history of total output steam volume from a boiler group in the immediately preceding time period (multiple hours) in a boiler system equipped with a boiler group having multiple boilers, even when the steam load pattern differs depending on the day of the week, holiday, etc., of the month, season, or quarter. [Means for solving the problem]
[0008] The present invention provides a method for extracting first time zone time series data, which is a subset of the time series data of the unit time steam volume included in a preset first time zone, from a set of time series data of unit time steam volume including at least maximum steam consumption and average steam consumption of the boiler group per predetermined unit time, the time series data being calculated based on time series data in sampling order for each operating day including a sampling time and measurement data including at least a total output steam volume of the boiler group at the sampling time, which is output at each preset sampling period from a boiler system having a boiler group having a plurality of boilers and a control device for controlling the combustion state of the boiler group; the unit time series data of the unit time steam volume included in the first time period on any operating day, based on the teacher data created by the teacher data creation unit, and a prediction model that predicts a unit time steam volume including at least a maximum steam consumption volume and an average steam consumption volume of the boiler group from the unit time immediately after the first time period to the unit time two hours ahead, based on the teacher data created by the teacher data creation unit.
[0009] Furthermore, a preset steam load pattern may be associated with the operating date, and the learning unit may generate the prediction model in response to the steam load pattern.
[0010] The learning unit may also perform supervised learning based on teacher data that uses the first time zone time series data as input data and the steam volume per unit time from immediately after the first time zone to the second time ahead as label data, thereby generating a trained model as the prediction model.
[0011] The machine learning device may be configured to include one or more servers communicatively connected to the control device via a network.
[0012] The present invention also relates to a prediction device including: a prediction model generated by the machine learning device; and a prediction unit that acquires, for each unit time, first time zone time series data immediately before an arbitrary time on an operation day of the boiler system, and acquires, for each unit time, a steam volume prediction value for a unit time two hours ahead from the arbitrary time using the prediction model, and predicts at least a maximum steam consumption and an average steam consumption of the boiler group in a time zone from a predetermined time to the second hour ahead on an operation day of the boiler system based on a set of steam volume prediction values for the unit time the second hour ahead acquired for each unit time.
[0013] The boiler group included in the boiler system is a boiler group having a plurality of step value control boilers capable of controlling combustion at a plurality of stepwise combustion positions, and relates to a number control parameter output device that calculates two or more values of the maximum steam usage, average steam usage, and fluctuating steam usage of the boiler system during a time period from the specified time to the second hour ahead based on the maximum steam usage and average steam usage during the time period predicted by the prediction device, and outputs the values to the control device of the boiler system.
[0014] The present invention also relates to a boiler system control device that sets appropriate number control parameters for a time period from the specified time to a second hour ahead based on two or more values of maximum steam usage, average steam volume, and fluctuating steam volume obtained from the number control parameter output device, and controls combustion of the boiler group based on the set number control parameters.
[0015] The present invention also relates to a number-of-units control parameter output device, wherein the boiler group included in the boiler system has a plurality of step value control boilers capable of controlling combustion at a plurality of stepwise combustion positions, and the device is equipped with a number-of-units control parameter output unit that selects a number-of-units control parameter group ID that is most suitable for a time period from the specified time to the second hour ahead based on the maximum steam consumption and average steam consumption predicted by the prediction device, and outputs the number-of-units control parameter group ID to the control device of the boiler system.
[0016] The present invention also relates to a boiler system control device that sets appropriate number control parameters for a time period from the specified time to a second hour ahead based on a number control parameter group ID acquired from the number control parameter output device, and controls combustion of the boiler group based on the set number control parameters. Effect of the Invention
[0017] According to the present invention, in a boiler system having a boiler group having multiple boilers, the machine learning device can create a prediction model for predicting maximum steam consumption and average steam consumption a specified time ahead, for example, based on the history of total output steam volume from the boiler group in the immediately preceding time period (multiple hours), even if the steam load pattern differs depending on the day of the week, holiday, etc., of the month, season, or quarter. [Brief description of the drawings]
[0018] [Figure 1] 1 is a diagram showing an outline of a boiler system with a prediction function according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a functional block diagram showing a configuration of the number-of-units control device according to the embodiment. [Diagram 3] FIG. 2 is a functional block diagram showing the configuration of a time-series data storage device according to the embodiment. [Figure 4] FIG. 2 is a diagram showing an overview of first time zone time series data extracted by the time series data storage device of the embodiment. [Diagram 5] FIG. 2 is a functional block diagram showing a configuration of the machine learning device according to the embodiment. [Figure 6] FIG. 2 is a diagram showing an overview of teacher data in the machine learning device of the embodiment. [Figure 7] FIG. 1 is a diagram illustrating an example of a prediction model (trained model) provided to a prediction device. [Figure 8] 11 is a diagram illustrating an example of an input / output processing status in the prediction device of the embodiment. [Figure 9]FIG. 2 is a functional block diagram showing a configuration of a prediction device according to the embodiment. [Figure 10] FIG. 2 is a functional block diagram showing a configuration of a number-of-units control parameter output device according to the embodiment. [Figure 11] FIG. 13 is a diagram showing an example of the operation of the prediction device and the number control parameter output device in the operation phase of the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0019] Hereinafter, a preferred embodiment of the boiler system with a prediction function of the present invention will be described with reference to the drawings. Fig. 1 is a diagram showing an outline of a boiler system 100 with a prediction function according to this embodiment. As shown in Fig. 1, the boiler system 100 with a prediction function includes a boiler system 1, a time-series data storage device 6, a machine learning device 7, a prediction device 8, and a number-of-units control parameter output device 9. In addition, the time series data storage device 6, the machine learning device 7, the prediction device 8, and the number control parameter output device 9 each include a processor such as a central processing unit (CPU) to realize the operation of a predetermined function, as well as an auxiliary storage device (not shown) such as a read only memory (ROM) or a hard disk drive (HDD) that stores various control programs, and a main storage device (not shown) such as a RAM for storing data temporarily required for the processor to execute the program. The processor then reads the OS and application software from the auxiliary storage device, and performs calculations based on the OS and application software while expanding the read OS and application software in the main storage device. Based on the calculation results, each device controls each piece of hardware. As a result, the functions of each device can be realized by the cooperation of hardware and software. In the following description, a step value control boiler is exemplified as a boiler. However, the number of units control device 3 is replaced with a number of units control device 3A that controls a continuous control boiler, and the time series data storage device 6, the machine learning device 7, and the prediction device 8 are directly applied to the continuous control boiler, so that the boiler system 100 with prediction function can also be applied to the boiler system 1 having a boiler group having a plurality of continuously controlled boilers. Next, the boiler system 1 will be described.
[0020] As shown in FIG. 1, the boiler system 1 includes a boiler group 2 including a plurality of step value control boilers 20, a steam header 4 that collects steam generated in the plurality of step value control boilers 20, a steam pressure sensor 5 that measures the internal pressure of the steam header 4 (hereinafter also referred to as "header pressure"), and a number-of-unit control device 3 having a control unit 30 that controls the combustion state of the boiler group 2. The boiler group 2 generates steam to be supplied to steam-using equipment 18 serving as load equipment.
[0021] The number of units control device 3 may be directly connected to the time series data storage device 6 and the number of units control parameter output device 9 via a connection interface (not shown). The number of units control device 3 may be connected to the time series data storage device 6 and the number of units control parameter output device 9 via a network (not shown) such as a LAN (Local Area Network) or the Internet. In this case, the number of units control device 3, the time series data storage device 6, and the number of units control parameter output device 9 are provided with a communication unit (not shown) for communicating with each other through such connection. The machine learning device 7 is also connected to the time series data storage device 6 and the number of units control parameter output device 9 so as to be able to communicate with each other. As will be described later, the number of units control device 3 may include any of the time series data storage device 6, the machine learning device 7, and the number of units control parameter output device 9. Next, the boiler system 1 will be briefly described.
[0022] Each of the plurality of step value control boilers 20 includes a boiler body 21 in which combustion takes place, and a local control unit 22 that controls the combustion position of the step value control boiler 20 . In this embodiment, the step value control boiler 20 is 1) Combustion stop position (first combustion position: 0%) 2) low combustion position L (second combustion position: set at, for example, 5 to 35% of the maximum combustion amount, 20% in this embodiment); 3) Middle combustion position M (third combustion position: for example, set at 40 to 60% of the maximum combustion amount, 40% in this embodiment); 4) A step value control boiler having stepwise combustion positions of high combustion position H (fourth combustion position: 100% (maximum combustion amount)) (hereinafter also referred to as a "four-position control boiler") is exemplified. The step value control boiler 20 of this embodiment is a boiler having a characteristic that the medium combustion position is highly efficient in operation. That is, each step value control boiler 20 has the medium combustion position as a highly efficient combustion position.
[0023] A priority order is set for each of the multiple step value control boilers 20. The priority order is used to select the step value control boiler 20 to which a combustion command or a combustion stop command is to be issued. The priority order can be set, for example, using an integer value, so that the smaller the value, the higher the priority order. Note that this priority order may be changed at a predetermined time interval (for example, every 24 hours) under the control of the control unit 30 described later. The step value control boiler 20 is not limited to a four-position boiler, but may be any multi-position boiler.
[0024] The boiler body 21 includes water tubes and a burner, and heats boiler water supplied from a water source (water supply tank) (not shown) in the water tubes to generate steam.
[0025] The local control unit 22 changes the combustion position of the step value control boiler 20 in accordance with the steam consumption. Specifically, the local control unit 22 controls the combustion position of the step value control boiler 20 based on a number of units control signal transmitted from the number of units control device 3 via the signal line 16. The local control unit 22 also transmits a signal used by the number of units control device 3 to the number of units control device 3 via the signal line 16. Examples of the signal used by the number of units control device 3 include the actual combustion position of the step value control boiler 20, the output steam amount, and other data.
[0026] The steam header 4 is connected via a steam pipe 11 to a plurality of step value control boilers 20 constituting the boiler group 2. The downstream side of the steam header 4 is connected via a steam pipe 12 to a steam using facility 18.
[0027] The steam header 4 collects and stores the steam generated in the boiler group 2. The steam header 4 adjusts the pressure difference and pressure fluctuation between one or more step value control boilers 20 that are being combusted, and supplies steam whose steam pressure value has been adjusted to a constant value to the steam-using equipment 18.
[0028] The steam pressure sensor 5 is electrically connected to the number of units control device 3 via a signal line 13. The steam pressure sensor 5 measures a steam pressure value of the steam header 4 (hereinafter also referred to as a “header pressure value”), and transmits a steam pressure signal corresponding to the steam pressure value to the number of units control device 3 via the signal line 13.
[0029] Next, the number of units control device 3 will be described. 1, the number of units control device 3 is electrically connected to a plurality of step value control boilers 20 via signal lines 16. The number of units control device 3 calculates the required steam amount of the boiler group 2 according to the required load based on the steam pressure value of the steam header 4 measured by the steam pressure sensor 5, and controls the combustion position (combustion amount) of the step value control boiler 20 to be controlled (hereinafter also referred to as the "controlled boiler") among the boiler group 2 based on the calculated required steam amount. In the boiler system 1, a step value control boiler 20 (hereinafter also referred to as a "spare boiler") that is not a control target may be provided in the boiler group 2. Then, the number control device 3 ("controller 30" described later) can add the spare boiler 20 to the control targets and change it to a control target boiler 20, or remove the control target boiler 20 from the control targets and change it to a spare boiler 20, depending on the combustion state of the control target boiler 20.
[0030] Fig. 2 is a functional block diagram showing the configuration of the unit count control device 3. As shown in Fig. 2, the device includes a control unit 30 as a control means, and a storage unit 32. Before describing the configuration of the control unit 30, the storage unit 32 will first be described.
[0031] The memory unit 32 is, for example, a ROM, RAM, HDD, etc., and includes, together with various control programs, a maximum steam usage memory unit 321, an average steam volume memory unit 322, a fluctuating steam volume memory unit 323, a number of unit control parameter group ID memory unit 324, and a number of unit control parameter group memory unit 325, as shown in Figure 2. The maximum steam usage memory unit 321 stores the maximum steam usage, which is the maximum value of the total output steam amount supplied by the boiler group 2 (i.e., the maximum steam usage amount of the steam amount consumed in the steam-using equipment 18 (required load)). The average steam amount storage unit 322 stores an average steam consumption amount (also referred to as “average steam amount”) which is an average value of the total output steam amount supplied by the boiler group 2. The fluctuation steam amount storage unit 323 stores the fluctuation steam amount corresponding to the fluctuation of the steam supply amount in the boiler group 2. Usually, the fluctuation steam amount=the maximum used steam amount−the average steam amount. The number of units control parameter group ID storage unit 324 stores a number of units control parameter group ID selected in advance from a plurality of parameter groups. Here, the number of units control parameter group ID may be any number, letter, or combination of numbers and letters that can identify the number of units control parameter group. The number-of-units control parameter group storage unit 325 stores a plurality of parameter groups preset by a user. Here, each parameter group is a set including each parameter value (e.g., parameter values such as proportional distribution set pressure, proportional distribution control width, maximum steam usage amount, average steam amount, fluctuating steam amount, and combustion priority control mode) that sets the number-of-units control pattern. The user can select the parameter group most appropriate for controlling the number of boiler systems 1 from among a plurality of parameter groups, and can reflect the selected parameter group in the control of the number of boiler systems 1.
[0032] In addition, the memory unit 32 stores the contents of instructions given to each stage value control boiler 20 under the control of the number control device 3 (control unit 30) as described above, information such as the combustion position received from each stage value control boiler 20, priority setting information, and setting information regarding changes to priority (rotation).
[0033] Next, a description will be given of the control unit 30. As shown in Fig. 2, the control unit 30 includes a number-of-vehicles control function unit 301, a time-series data output unit 302, and a number-of-vehicles control parameter setting unit 303. Includes.
[0034] The number control function unit 301 is a function unit known to those skilled in the art, which calculates the required steam volume of the boiler group 2 according to the required load based on the steam pressure value of the steam header 4 measured by the steam pressure sensor 5, and controls the combustion position (combustion volume) of the step value control boiler 20 (hereinafter also referred to as the "controlled boiler") that is to be controlled among the boiler group 2 based on the calculated required steam volume. For example, the number control function unit 301 calculates the amount of steam required for the boiler group 2 according to the required load based on the steam pressure value of the steam header 4 measured by the steam pressure sensor 5, and controls the combustion position (combustion amount) of the step value control boiler 20 (hereinafter also referred to as the "controlled boiler") that is the control target among the boiler group 2 based on the calculated amount of steam required. For example, the control unit 30 may control the number of boilers by a proportional distribution control method. Specifically, the control unit 30 divides a control pressure band, which is determined by two preset values, the proportional distribution control pressure and the proportional distribution control width, into a plurality of pressure bands based on the number of boilers to be controlled and the type of boiler, and assigns the number of boiler combustion units and the combustion state to each divided pressure band in advance so that the boiler combustion amount increases as the header pressure decreases. In this way, the control unit 30 can control the number of boilers so that the number of boiler combustion units and the combustion state change according to the divided pressure band that includes the header pressure value in response to fluctuations in the header pressure.
[0035] The number of units control function unit 301 can control the number of units based on a preset parameter group from among a plurality of number of unit control parameter groups. For example, when the efficiency priority mode is set as the combustion priority control mode value included in the selected parameter group for controlling the number of units, the number control function unit 301 determines the boilers to be controlled and the number of boilers so that the output steam volume of the average steam volume can be secured in the most efficient combustion state (e.g., medium combustion state), and controls the boilers to be in the most efficient combustion state while sequentially increasing the number of combustion boilers so that the steam reserve capacity of the fluctuating steam volume can be secured. In other words, since starting a boiler that is not functioning for a load that exceeds the average steam volume will cause a loss, the number control function unit 301 controls the boiler that is burning efficiently to be temporarily in a higher combustion state without starting a new boiler. Furthermore, when the response priority mode is set as the combustion priority control mode value included in the selected parameter group for controlling the number of units, the number of units control function unit 301 determines the boilers to be controlled and the number of units so as to ensure an output steam volume equal to the sum of the average steam volume and the fluctuating steam volume, and controls the boilers to be in standby mode as much as possible to enhance responsiveness. That is, the number of units control function unit 301 controls the boilers to be in medium combustion mode in sequence when the load increases, and prioritizes the low combustion boiler when the load decreases, thereby enhancing responsiveness by controlling the boilers to be in standby mode as much as possible. The combustion priority control mode includes a basic priority mode suitable for a three-position control type boiler. In this case, the number control function unit 301 determines the boilers to be controlled and the number of boilers to ensure the maximum amount of steam used, and controls the boilers to be in a high combustion state while gradually increasing the number of combustion boilers so that the amount of steam reserve for the fluctuating steam amount can be ensured. The functions of the number of units control function unit 301 have been described above.
[0036] The time series data output unit 302 calculates the output steam amount output by the boiler group 2 for each preset sampling period (or each preset time interval) based on the combustion state of each of the step value control boilers 20 to be controlled, which is transmitted from the local control unit 22. The time series data output unit 302 then generates time series data including a time stamp (hereinafter also referred to as "sampling time") indicating the time in the period and at least the total output steam amount of the boiler group 2 at the time, and outputs the data to the time series data storage device 6 described later. Here, the sampling period (preset time interval) may be, for example, 1 second. The sampling period may also be the control period. Hereinafter, unless otherwise specified, the sampling period will be exemplified and described as 1 second. The sampling period is not limited to 1 second. Any value may be used.
[0037] As described later, the number of units control parameter setting unit 303 acquires the maximum steam usage amount, average steam usage amount, and fluctuation steam amount, as well as the parameter group ID, calculated based on the predicted values of the average steam usage amount, the maximum steam usage amount, and the fluctuation steam amount from just after the time until the predetermined time ahead (for example, one hour ahead), which are output from the number of units control parameter output device 9, and stores them in a maximum steam usage amount storage unit 321, an average steam usage amount storage unit 322, a fluctuation steam usage amount storage unit 323, and a number of units control parameter group ID storage unit 324. In this way, the number of units control device 3 can automatically perform unit number control appropriate for the user, based on various steam amounts predicted in real time and a parameter group selected from a plurality of parameter groups. For example, if the user selects a mode (efficiency priority mode) in which the user wants to ensure a long combustion time at the "eco driving point," the number control device 3 can adjust parameters to set the number of boilers to be operated and set the combustion priority order while the boiler system 1 is in operation, so that, for example, the average steam usage predicted for each hour up to the next hour is burned at the medium combustion position, which is a high-efficiency combustion position. In addition, when the user selects the response priority mode, the number control device 3 controls the number of boilers while the boiler system 1 is in operation, for example, to the minimum number of boilers that can secure the maximum steam usage predicted for the next hour, and when the load increases, the boilers are sequentially switched to medium combustion, and when the load decreases, the low combustion boiler is prioritized, and the parameters are adjusted to control the boiler system so that the boilers are not put into standby mode as much as possible, thereby improving responsiveness. The number of units control device 3 has been described above.
[0038] Next, we will explain the time series data storage device 6. A functional block diagram showing the configuration of the time series data storage device 6 is shown in FIG. As described above, the time series data storage device 6 is a device that is directly connected to the number control device 3, the machine learning device 7, and the number control parameter output device 9 via respective connection interfaces, or is connected to each other via a network not shown, such as a LAN (Local Area Network) or the Internet. The time-series data storage device 6 may be, for example, an edge device installed at the site, or may be a data server connected in a communicable manner, or a virtual storage device or a virtual data server located on the cloud. 3, the time-series data storage device 6 includes a control unit 60 and a storage unit 62. Before describing the configuration of the control unit 60, the storage unit 62 will first be described.
[0039] The memory unit 62 is, for example, a ROM, a RAM, a HDD, etc., and includes, together with various control programs, a total output steam volume time series information memory unit 621, a unit time steam volume time series information memory unit 622, and a steam load pattern information memory unit 623, as shown in FIG. 3.
[0040] The total output steam amount time series information storage unit 621 stores time series information of the total output steam amount of the boiler group 2 (also referred to as "total output steam amount time series information") for each operating day of the boiler system 1, as described later. In this embodiment, the sampling period is exemplified as 1 second. In this case, the total output steam amount time series information for one day includes up to 86400 sets (=24hh×60mm×60ss) of information, each set including the value of the total output steam amount of the boiler group 2 and time information (sampling time) indicating the time when the total output steam amount was measured, and date information when the total output steam amount was measured. The time information may be, for example, hhmmss (hours, minutes, seconds). In the following, unless otherwise specified, the sampling period is exemplified as 1 second and described, but the sampling period is not limited to 1 second. Any value may be set.
[0041] The unit time steam volume time series information storage unit 622 stores time series information (also referred to as "unit time steam volume time series information") in which the maximum value and average value of the total output steam volume per unit time (also referred to as "unit time steam volume") are associated with time information for each operating day of the boiler system 1 as described later. In this embodiment, one minute is exemplified as the unit time. The start of the unit time (one minute) is set to mm minutes 00 seconds, and the period is set to mm minutes 00 seconds to one minute. In this case, the unit time steam volume time series information for one day includes up to 1440 (=24hh×60mm) pieces of information each including a value of the unit time steam volume of the boiler group 2 for each unit time and time information indicating the time of the unit time, and date information on when the total output steam volume was measured. The time information may be, for example, hhmm (hours and minutes). In other words, the date is yymmdd (year, month, day), and the unit time steam volume including (maximum steam consumption, average steam consumption) at hhmm on that date is x yymmdd(hhmm), the unit time steam volume time series information is the set of unit time steam volumes with date information on when the steam volume was measured {x yymmdd (hhmm)}. In the following description, unless otherwise specified, the unit time is 1 minute, but the unit time is not limited to 1 minute. Any value may be set.
[0042] The steam load pattern information storage unit 623 stores a table (also called a "steam load pattern table") in which a steam load pattern set in advance by a user is associated with a calendar date. For example, the steam load pattern may be a "high load pattern" corresponding to a "high" average operating rate of the manufacturing equipment of the factory, a "medium load and large fluctuation pattern" corresponding to a "medium" average operating rate of the manufacturing equipment of the factory and a "high" number of times that the equipment that consumes a large amount of steam in a short time operates, a "medium load and small fluctuation pattern" corresponding to a "medium" average operating rate of the manufacturing equipment of the factory and a "low" number of times that the equipment that consumes a large amount of steam in a short time operates, a "low load pattern" corresponding to a "low" average operating rate of the manufacturing equipment of the factory, and a "holiday pattern" corresponding to all the manufacturing equipment of the factory being stopped and only air conditioning being used. For example, when a steam load pattern is set for each day of the week, the day of the week may be set to the steam usage pattern, and an arbitrary steam load pattern may be set for irregular times such as holidays. Here, the threshold value for distinguishing between high, medium, and low average operating rates may be set in advance by the user. Similarly, for the number of times that the equipment that consumes a large amount of steam in a short time operates, the threshold value for distinguishing between short-term and large-volume equipment and the threshold value for distinguishing between high and low number of times of operation may be set in advance by the user. In addition, a table for associating the date of the month with the steam load pattern may be set in advance for each month.
[0043] Next, a description will be given of the control unit 60. As shown in Fig. 3, the control unit 60 includes a time series information recording unit 601, a unit time data creating unit 602, a first time zone time series data extracting unit 603, and a steam load pattern acquiring unit 604.
[0044] The time series information recording unit 601 imports time series information (total output steam volume time series information) of the total output steam volume of the boiler group 2 for each sampling period (e.g., 1 second) of the boiler system 1 for each operating day, and records it in the memory unit 62 (total output steam volume time series information memory unit 621).
[0045] For each operating day, based on the total output steam volume time series information recorded in the total output steam volume time series information storage unit 621, the unit time data creation unit 602 calculates the maximum value and average value (unit time steam volume) of the total output steam volume for each unit time of the operating day, and records them as unit time steam volume time series information in the storage unit 62 (unit time steam volume time series information storage unit 622). Note that when calculating the average value, the average value may be calculated based on a moving average.
[0046] The first time zone time series data extraction unit 603 extracts a subset (referred to as "first time zone time series data") of unit time steam volume time series information of a preset first time (for example, the first time is 2 hours = 120 minutes) included in the operating time zone of the boiler system 1 for each unit time from the unit time steam volume time series information. Hereinafter, unless otherwise specified, the first time will be exemplified as 2 hours for explanation. In this case, the start of each first time (2 hours) is every minute at any time, specifically, between hh hours and mm minutes and 2 hours. Here, hh is the time included in the operating time zone, and mm is an integer satisfying 0≦mm≦59. In this way, the first time zone time series data extraction unit 603 can extract the first time zone time series data for each minute from the unit time steam volume time series information. FIG. 4 is a diagram showing an outline of the first time slot time series data extracted by the time series data storage device 6. As shown in FIG. 4, the first time slot time series data extraction unit 603 extracts the first first time slot time series data (1) two hours after the time corresponding to the first unit time steam volume on the operating day of the boiler system 1, and then extracts the first time slot time series data (i) (2≦i) at one-minute intervals. Then, for example, the first time slot time series data extraction unit 603 extracts the final first time slot time series data (N) one hour before the operation end time on the operating day (x minutes after the time corresponding to the first unit time steam volume on the operating day). Here, N indicates the number of first time slot time series data extracted at one-minute intervals on the operating day. As described later, the first time slot time series data extraction unit 603 may provide the first time slot time series data (i) (1≦i≦N) extracted at one-minute intervals to the machine learning device 7 and / or the number control parameter output device 9.
[0047] As described above, the steam load pattern acquisition unit 604 associates a steam load pattern corresponding to the date on which the steam volume was measured with total output steam volume time series information and unit time steam volume time series information for each operating day, based on a steam load pattern previously set by the user corresponding to, for example, a calendar date. In this way, the steam load pattern acquisition unit 604 can incorporate the operation pattern of each operating day into the prediction model, making it possible, for example, to learn a prediction model for each steam load pattern, which is expected to lead to improved prediction accuracy.
[0048] As described above, the time series data storage device 6 can function as a time series database that provides the machine learning device 7 and / or the number control parameter output device 9 with total output steam volume time series information, unit time steam volume time series information, and first time zone time series data, each associated with a steam load pattern. The time-series data storage device 6 has been described above.
[0049] Next, we will explain the machine learning device 7. A functional block diagram showing the configuration of the machine learning device 7 is shown in FIG. 5, the machine learning device 7 includes a control unit 70 and a storage unit 72. Before describing the configuration of the control unit 70, the storage unit 72 will first be described.
[0050] The memory unit 72 is, for example, a ROM, a RAM, a HDD, etc., and stores, together with various control programs, teacher data (training data) generated for each steam load pattern k (1≦k≦M) generated by the teacher data creation unit 701, and a prediction model 75(k) (trained model 75(k)) being constructed or constructed for each steam load pattern k (1≦k≦M) by the learning unit 702. As shown in FIG. 5, the storage unit 72 includes a teacher data storage unit 721 and a prediction model storage unit 722.
[0051] The teacher data storage unit 721 receives as input data each first time zone time series data (i) for each operating day, and stores teacher data (training data) in which the unit time steam volume from immediately after the time zone corresponding to the first time zone time series data (i) two hours later (for example, 1 hour = 60 minutes) is label data, in association with the steam load pattern k (1≦k≦M) for that operating day. FIG. 6 is a diagram showing an outline of teacher data (training data) in the machine learning device 7. The first time zone time series data shown in FIG. 6 corresponds to the first time zone time series data shown in FIG. 4. As shown in FIG. 6, the teacher data (training data) uses 120 consecutive unit time steam volume time series data corresponding to each first time zone time series data (i) as input data, and uses unit time steam volume data immediately after the time zone corresponding to the first time as label data after the second time (1 hour = 60 minutes). In this way, the learning unit 702 described later learns a prediction model (trained model) that predicts the unit time steam volume immediately after the time zone corresponding to the first time from the 120 consecutive unit time steam volume time series data corresponding to the first time zone time series data (i) stored in the teacher data storage unit 721.
[0052] The prediction model storage unit 722 stores a prediction model (trained model) being learned by the learning unit 702. As described later, the prediction model being learned (trained model) is generated for each steam load pattern.
[0053] Next, a description will be given of the control unit 70. As shown in Fig. 5, the control unit 70 includes a teacher data creation unit 701, a learning unit 702, and a prediction model providing unit 703.
[0054] The teacher data creation unit 701 acquires from the time series data storage device 6 each first time slot time series data (i) for each operating day associated with a steam load pattern k (1≦k≦M) based on the operating day, and also acquires unit time steam volume data from immediately after the first hour to a second hour (1 hour=60 minutes) later, and creates teacher data (also called "training data") in which the first time slot time series data (i) is input data and the unit time steam volume data from immediately after the first hour to the second hour (1 hour=60 minutes) later is label data. In this way, the teacher data creation unit 701 can create N pieces of teacher data (training data) for each operating day. The teacher data creation unit 701 may create a set of teacher data (training data) for each steam load pattern k (1≦k≦K) from the teacher data (training data) created for each operating day. It is desirable to prepare a large amount of teacher data (training data) for supervised learning. For example, it is desirable to prepare teacher data (training data) for each steam load pattern k (1≦k≦M) based on the time-series information of the boiler system 1 for the past few years stored in the time-series data storage device 6. In this way, the learning unit 702 described later can create a prediction model for each steam load pattern k (1≦k≦M) by machine learning based on a large amount of teacher data (training data) generated for each steam load pattern k (1≦k≦M).
[0055] The learning unit 702 performs supervised learning based on the teacher data (training data) generated by the teacher data creation unit 701 for each steam load pattern k (1≦k≦M), and can thereby construct a prediction model 75(k) (also referred to as a "trained model 75(k)") that predicts the unit time steam volume from immediately after the first hour to the second hour (60 minutes later) from the first time zone time series data corresponding to the steam load pattern k (1≦k≦M).
[0056] As an example of machine learning in this embodiment, deep machine learning using a recurrent neural network, Long Short Term Memory (LSTM), is exemplified. LSTM is a special type of recurrent neural network, RNN (Recurrent Neural Network), known to traders, that can learn long-term dependencies of past data. In order to optimize parameters such as a weight vector in a prediction model 75(k) (trained model 75(k)) configured by an LSTM network for each steam load pattern k (1≦k≦M), the learning unit 702 inputs each first time slot time series data created for each steam load pattern k (1≦k≦M) from the input layer and takes in output information from the LSTM network. The learning unit 702 performs processing by a well-known error backpropagation method or the like using, for example, a preset error function. In this way, the learning unit 702 optimizes parameters such as a weight vector in the LSTM network for each steam load pattern k (1≦k≦M) based on teacher data (training data) created from time series information for a predetermined period or a predetermined number of teacher data (training data), and generates a prediction model 75(k) (trained model 75(k)). Here, the learning unit 702 may end the learning by satisfying a predetermined condition. Examples of the predetermined condition include, but are not limited to, having learned a predetermined number of teacher data and having learned teacher data corresponding to a predetermined operating period. The user may set any conditions. Although LSTM has been given as an example of machine learning, this is not limiting. A known RNN may also be applied. Also, a known feed-forward neural network may also be applied.
[0057] Fig. 7 is a diagram showing an example of a prediction model 75(k) (trained model 75(k)) provided to a prediction device 8 described later. Here, as shown in Fig. 7, prediction model 75(k) (trained model 75(k)) is exemplified as a multi-layer neural network in which the first time zone time series data (120 consecutive pieces of unit time steam volume time series data) of boiler system 1 operating on an operating day corresponding to steam load pattern k is used as an input layer, and the unit time steam volume from immediately after the first hour to the second hour after the unit time (e.g., one minute) is used as an output layer.
[0058] In addition, after constructing prediction model 75(k) (trained model 75(k)), the learning unit 702 may periodically, for example, every month, every three months, every six months, or every year, acquire each first time zone time series data (i) of an operating day corresponding to steam load pattern k of the boiler system 1 that is newly imported into the time series data storage device 6 (memory unit 62), and acquire unit time steam volume data from immediately after the first hour to a second hour (1 hour = 60 minutes) later, and create teacher data (training data), thereby updating prediction model 75(k) (trained model 75(k)). Also, when a deviation exceeding a predetermined threshold between the predicted value and the actual value occurs with a frequency greater than a predetermined frequency, the prediction model 75(k) (trained model 75(k)) may be updated by acquiring the first time slot time series data (i) of each operating day corresponding to the steam load pattern k of the boiler system 1 newly acquired in the time series data storage device 6 (storage unit 62), acquiring unit time steam volume data from immediately after the first time to the second time (1 hour = 60 minutes) after the first time, and creating teacher data (training data). In this case, a new prediction model 75(k) (trained model 75(k)) may be re-created from the newly created teacher data (training data) and time series information of the steam volume acquired in a recent period, such as one year, from that point in time. In this way, the influence of the time series information of the steam volume acquired in the old period can be eliminated, and the prediction model 75(k) (trained model 75(k)) reflecting the recent time series information of the steam volume can be updated.
[0059] The above-mentioned supervised learning may be performed by online learning, batch learning, or mini-batch learning. Online learning is a learning method in which one piece of teacher data (training data) is extracted and weights and biases are updated. Specifically, while the boiler system 1 is in operation, the first time zone time series data (i) and the unit time steam volume data from immediately after the first hour to the second hour (1 hour = 60 minutes) later are acquired from the time series data storage device 6, teacher data (training data) is created each time, and machine learning is performed using the data each time. Moreover, batch learning is a learning method that uses all teacher data (training data) to update the weights and biases. In batch learning, after time series data for a predetermined period, for example, for each month, is stored in the time series data storage device 6, the first time zone time series data for the month and the unit time steam volume data from immediately after the first hour to the second hour (1 hour = 60 minutes) later are acquired, multiple teacher data (training data) are generated, and supervised learning is performed using all the generated teacher data (training data). Furthermore, mini-batch learning is a learning method that divides teacher data (training data) into small chunks (batches) and updates the weights and biases for each chunk. The learning interval is a period intermediate between online learning and batch learning.
[0060] The prediction model providing unit 703 provides the prediction model 75(k) (trained model 75(k)) constructed by the learning unit 702 for each pattern k (1≦k≦M) to the prediction device 8 described below in response to a user instruction. The machine learning device 7 has been described above.
[0061] Next, a description will be given of the prediction device 8. The prediction device 8 is a device used in a prediction model operation phase in which the prediction model 75(k) (trained model 75(k)) constructed by the machine learning device 7 is applied to the boiler system 1. In the prediction model operation phase, the prediction device 8 uses the prediction model 75(k) (trained model 75(k)) constructed by the machine learning device 7 to calculate a unit time steam volume prediction value for the second time ahead (e.g., one hour ahead) from the time point immediately after the first time (e.g., two hours) has elapsed since the start of operation of the boiler system 1, for example, for each unit time (e.g., one minute), and stores the calculated unit time steam volume prediction value as time series data in the storage unit 82. FIG. 8 is a diagram illustrating an example of an input / output processing state in which the unit time steam volume prediction values acquired by the prediction unit 802 are sequentially stored as time series data in the second time zone time series data storage unit 823. In this way, as shown in FIG. 8, when one hour (60 minutes) of time series data (hereinafter referred to as "second time zone time series data") for the unit time steam volume prediction value is stored, the number of units control parameter output device 9 can statistically calculate the maximum steam consumption prediction value and the average steam consumption prediction value for steam supply by the boiler system 1 during that period (e.g., one hour) based on the second time zone time series data. 9 is a functional block diagram showing the configuration of the prediction device 8. The number-of-vehicles control parameter output device 9 includes a control unit 80 and a storage unit 82, as shown in FIG.
[0062] First, a description will be given of the storage unit 82. The storage unit 82 is, for example, a ROM, a RAM, or a HDD, and includes a prediction model storage unit 821, a first time zone time series data storage unit 822, and a second time zone time series data storage unit 823, as shown in FIG.
[0063] The prediction model storage unit 821 stores a prediction model 75(k) (trained model 75(k)) constructed by the machine learning device 7 for each steam load pattern k (1≦k≦M).
[0064] The first time zone time series data storage unit 822 stores the first time zone time series data created by the time series data storage device 6 every minute from the start of the first hour (2 hours) of the operating day of the boiler system 1 to 1 hour before the end time of the operating day. Note that the first time zone time series data storage unit 822 may store, for example, in a round robin format so that at least 120 pieces of unit time steam volume data corresponding to 120 minutes can be acquired every minute.
[0065] The second time zone time series data storage unit 823 stores, as second time zone time series data, unit time steam volume data (predicted value) from immediately after the first hour (2 hours = 120 minutes) to the second hour (1 hour = 60 minutes) after, which is predicted based on each first time zone time series data, as described later. Note that the second time zone time series data storage unit 823 may store, for example, in a round robin format so that at least 60 pieces of unit time steam volume data corresponding to 60 minutes can be acquired every 60 minutes.
[0066] Next, a description will be given of the control unit 80. As shown in FIG.
[0067] The input unit 801, for example in response to a user's instruction, obtains the latest version of the prediction model 75(k) (trained model 75(k)) constructed from the machine learning device 7, and stores the prediction model in the prediction model memory unit 821 together with version information of the prediction model. The input unit 801 acquires operation start information of the acquired prediction model 75(k) (trained model 75(k)), for example, by an input instruction from a user. The operation start information may include, for example, the operation start date of the prediction model 75(k) (trained model 75(k)). In this way, a functional unit related to prediction of the number control parameter output device 9 may be automatically started after the operation start date of the prediction model 75(k) (trained model 75(k)). In addition, the input unit 801 acquires, for example, a steam load pattern k on the day of operation, and, as described above, acquires the first time zone time series data (i) every minute from the time series data storage device 6 from the start of the first hour (2 hours) to one hour before the end time of the operating day.
[0068] Next, the function of the prediction unit 802 will be described. 7, the prediction unit 802 inputs the first time slot time series data (i) input every minute by the input unit 801 to a prediction model 75(k) (trained model 75(k)) to obtain a unit time steam volume predicted value for the unit time (1 minute) from just after the first hour to the second hour (1 hour). As shown in Fig. 8, the prediction unit 802 sequentially stores the obtained unit time steam volume predicted values in the second time slot time series data storage unit 823 as time series data. 8, when one hour (60 minutes) of time series data (second time zone time series data) is stored, the prediction unit 802 statistically calculates a predicted maximum steam consumption amount and a predicted average steam consumption amount for steam supply by the boiler system 1 during the second hour based on the second time zone time series data. In this way, the prediction unit 802 can statistically calculate, for each hour (60 minutes), a predicted maximum steam consumption amount and a predicted average steam consumption amount for steam supply by the boiler system 1 during the time zone up to the second hour (1 hour) ahead. Here, the maximum steam usage defines the upper limit of the number of boilers to be burned. Even if a load exceeding the maximum steam usage occurs, the control is such that no more boilers are burned. Therefore, in calculating the maximum steam usage, the prediction unit 802 may, for example, set a correction value α in advance and calculate the maximum steam usage as the maximum steam usage (predicted value)+α. In addition, as described above, the average steam usage is for determining the number of boilers to be burned in the most efficient combustion state (eco-driving point). If a small value is set, the eco-driving point is likely to be missed. Therefore, in calculating the average steam usage, the prediction unit 802 may, for example, set a correction value β in advance and calculate the average steam usage as the average steam usage (predicted value)+β. The fluctuating steam usage is calculated by subtracting the average steam usage from the maximum steam usage. The prediction device 8 has been described above.
[0069] Next, a description will be given of the unit count control parameter output device 9. Fig. 10 shows a functional block diagram showing the configuration of the unit count control parameter output device 9. As shown in Fig. 10, the unit count control parameter output device 9 includes a control unit 90 and a storage unit 92.
[0070] The storage unit 92 is, for example, a ROM, a RAM, a HDD, etc., and includes, together with various control programs, a unit count control parameter group storage unit 921 as shown in Fig. 10. The unit count control parameter group storage unit 921 stores a plurality of parameter groups stored in the storage unit 32 (unit count control parameter group storage unit 325) of the unit count control device 3.
[0071] As shown in FIG. 10, the control unit 90 includes a unit count control parameter output unit 901 . The number control parameter output unit 901 may calculate two or more values of the maximum steam usage, the average steam usage, and the fluctuating steam usage based on the maximum steam usage predicted value and the average steam usage predicted value in the second time period predicted by the prediction device 8, and set the calculated values as the number control parameter. The number of units control parameter output unit 901 may output two or more values of the maximum steam usage amount, the average steam amount, and the fluctuating steam amount to the number of units control device 3 (number of units control parameter setting unit 303), and may select a number of units control parameter group based on these values, and output the selected number of units control parameter group ID to the number of units control device 3 (number of units control parameter setting unit 303). The number of units control parameter output unit 901 may select, for example, a number of units control parameter group having the calculated maximum steam amount and average steam amount values (or the closest values). In this way, the number of units control device 3 can automatically control the number of units using a parameter group appropriate for the user, selected from the predicted various steam amounts and a plurality of parameter groups previously set by the user. Specifically, for example, appropriate values of the maximum amount of steam usage and the average amount of steam usage are defined in advance for each unit number control parameter group ID. For example, the optimum values for pattern number 1 are previously defined as the maximum steam consumption of 12,000 to 15,000 kg / h and the average steam consumption of 6,000 to 8,000 kg / h. The optimum values for pattern number 2 are defined as maximum steam consumption of 12,000 to 15,000 kg / h and average steam consumption of 4,000 to 6,000 kg / h. The optimum values for pattern number 3 are defined as maximum steam consumption of 12,000 to 15,000 kg / h and average steam consumption of 2,000 to 4,000 kg / h. The optimum values for pattern number 4 are defined as maximum steam consumption of 6,000 to 9,000 kg / h and average steam consumption of 2,000 to 3,000 kg / h. Assume that the optimum values for pattern number 5 are defined as maximum steam consumption of 3,000 to 6,000 kg / h and average steam consumption of 1,000 to 2,000 kg / h. In this case, the number control parameter output unit 901 may compare the calculated maximum steam volume and average steam volume values with the optimum values of maximum steam consumption and average steam consumption defined for each pattern number, and select the most appropriate pattern number (e.g., the pattern number with the closest values) among the pattern numbers whose calculated maximum steam volume and average steam consumption values are within the range of the maximum steam consumption and average steam consumption defined for each pattern number. The number control parameter output device 9 has been described above.
[0072] Next, we will explain the operation of the prediction device 8 in this embodiment, which predicts the maximum steam consumption and average steam consumption for the time period up to the second hour (1 hour) ahead every hour (60 minutes), and the operation of the number control parameter output device 9 setting the number control parameters to the number control device 3. 11 is a flowchart explaining the processing of the prediction device 8 and the number of units control parameter output device 9 in the operation phase. Note that the prediction device 8 has acquired a prediction model 75(k) (trained model 75(k)) in advance from the machine learning device 7. It is assumed that a steam load pattern k on the day of operation has been acquired. It is also assumed that the number N of first time slot time series data extracted at one-minute intervals on an operating day has been set in advance.
[0073] In step S11, the prediction device 8 (input unit 801) initializes i and j (i=1, j=1).
[0074] In step S12, the prediction device 8 (the input unit 801) acquires the first time zone time series data (i) from the time series data storage device 6 while the boiler system 1 is in operation.
[0075] In step S13, the prediction device 8 (prediction unit 802) inputs the first time zone time series data (i) collected every minute to the prediction model 75, obtains the unit time steam volume prediction value (j) for the unit time (1 minute) from just after the first hour to the second hour (1 hour), and stores it in chronological order (in the order of j) in the second time zone time series data storage unit 823.
[0076] In step S14, the prediction device 8 (prediction unit 802) sets i = i + 1 and j = j + 1.
[0077] In step S15, it is determined whether j = 60. If j < 60, the process proceeds to step S12. If j = 60, the process proceeds to step S16.
[0078] In step S16, the prediction device 8 (prediction unit 802) statistically calculates the predicted maximum steam usage amount and the predicted average steam usage amount of the boiler system 1 in the time period from the current time to 2 hours (1 hour = 60 minutes) ahead based on the second time period time series data stored in the second time period time series data storage unit 823.
[0079] In step S17, the unit number control parameter output device 9 (unit number control parameter output unit 901) calculates the maximum steam usage amount, the average steam amount, and the fluctuating steam amount based on the predicted maximum steam usage amount and the predicted average steam usage amount, or selects the optimal unit number control parameter group ID from the above-described unit number control parameter groups.
[0080] In step S18, the unit number control parameter output device 9 (unit number control parameter output unit 901) outputs the maximum steam usage amount, the average steam amount, the fluctuating steam amount calculated in step S17, and the unit number control parameter group ID to the unit number control device 3 (unit number control parameter setting unit 303). Thereby, the unit number control device 3 stores the unit number control parameters input from the unit number control parameter output device 9 in the storage unit 32, automatically determines the boilers 20 to be controlled and the number of units based on the set unit number control parameters, and can perform unit number control in the combustion priority control mode.
[0081] In step S19, the unit number control device 3 (unit number control parameter setting unit 303) determines whether i = N. If i < N, the process proceeds to step S1A. If i = N, the process ends. In step S1A, the number of units control device 3 (number of units control parameter setting unit 303) sets j=1 and proceeds to step S12.
[0082] As described above, by replacing the number of units control device 3 with the number of units control device 3A that controls the continuously controlled boiler, the time series data storage device 6, the machine learning device 7, and the prediction device 8 can be directly applied to the continuously controlled boiler. Therefore, the prediction device 8 according to one embodiment can predict the maximum steam usage, the average steam usage, and the fluctuating steam usage in the second hour from immediately after the first hour to a predetermined future, in the boiler system 1 and the boiler system 1A that include the boiler group 2 having a plurality of boilers 20, based on the steam load pattern set corresponding to the calendar date (e.g., season or month, day of the week, holiday, etc.) and the history of the total output steam amount by the boiler group 2 in the first hour. Furthermore, in a boiler system 1 equipped with a boiler group 2 having a plurality of step value control boilers 20 capable of combustion at a plurality of stepwise combustion positions, the number control parameter output device 9 calculates the maximum steam usage amount, average steam amount, fluctuating steam amount, and number control parameters for the time period from just after the first hour to the second hour ahead based on the maximum steam usage amount and average steam usage amount predicted as described above for the time period from just after the first hour to the second hour ahead, and outputs these to the number control device 3, so that the number control device 3 can automatically perform unit number control appropriate for the user based on the various steam amounts predicted in real time.
[0083] While one embodiment has been described above, the time series data storage device 6, the machine learning device 7, and the prediction device 8 are not limited to the above-described embodiment, and include modifications, improvements, etc. within the scope that can achieve the objective.
[0084] <Variation 1> In the above embodiment, the machine learning device 7 is configured to acquire the first time data (i) at unit time (1 minute) intervals for each operating day based on the history information from the time series data storage device 6, and acquire unit time steam volume data from immediately after the time slot corresponding to the first time to the second time (1 hour = 60 minutes) after the first time. However, for example, the machine learning device 7 (teacher data creation unit 701) may directly calculate the maximum value and average value (unit time steam volume) of the total output steam volume for each unit time of each operating day based on the time series data (history information) stored in the storage unit 62 (total output steam volume time series information storage unit 621) of the time series data storage device 6 in the machine learning phase, and record the calculated unit time steam volume time series information in the storage unit 72. In this way, the machine learning device 7 (teacher data creation unit 701) may create teacher data (training data) by extracting the first time slot time series data and the second time slot time series data based on the unit time steam volume time series information of each operating day stored in the storage unit 72.
[0085] <Variation 2> In the above embodiment, on an operating day of the prediction model operation phase, the prediction device 8 is configured to obtain the first hour data (i) for each unit time (1 minute) from the time series data storage device 6, predict unit time steam volume data from immediately after the time zone corresponding to the first hour to the second hour (for example, 1 hour = 60 minutes) later, and sequentially set the unit time steam volume predicted value in the unit time (1 minute) from immediately after the first hour to the second hour (1 hour later) as the second time zone time series data. However, for example, the time series data storage device 6 instead of the prediction device 8 may be configured to extract the first hour data (i) based on the unit time steam volume time series information stored in the unit time steam volume time series information storage unit 622, predict the unit time steam volume data from immediately after the time zone corresponding to the first hour to the second hour (1 hour = 60 minutes) later, and sequentially store the unit time steam volume predicted value in the unit time (1 minute) from immediately after the first hour to the second hour (1 hour later) in the storage unit 62. In this case, the time series data storage device 6 may store the prediction model in the storage unit 62. Alternatively, the prediction may be requested from the prediction model stored in the machine learning device 7. In this way, the prediction device 8 may acquire the first time data (i) and the second time zone time series data from the time series data storage device 6, and statistically calculate a maximum steam consumption predicted value and an average steam consumption predicted value for steam supply of the boiler system 1 in the second time period.
[0086] <Variation 3> In the above-described embodiment, the prediction model is constructed according to a steam load pattern set corresponding to a calendar date (e.g., a season or month, a day of the week, a holiday, etc.), but this is not limited thereto. For example, the steam load pattern may be set corresponding to a predetermined operating time period of the calendar date. In this way, even if the steam load pattern differs depending on the time period, it is possible to provide a machine learning device that creates a prediction model for predicting the maximum steam usage and the average steam usage up to a predetermined time (e.g., 1 hour) ahead based on the history of the total output steam amount by the boiler group in, for example, the immediately preceding time period (e.g., 2 hours) in the time period.
[0087] <Modification 4> In the above-described embodiment, the machine learning device 7 (learning unit 702) uses the first time zone time series data as input data and the unit time steam volume data after the second hour (1 hour = 60 minutes) as label data as teacher data (training data) to perform supervised learning using a multi-layer neural network, but is not limited to this learning method. For example, the learning unit 702 may perform a time series analysis based on the first time zone time series data and the unit time steam volume data after the second hour (1 hour = 60 minutes) to generate a prediction model 75.
[0088] <Variation 5> In the above-described embodiment, the machine learning device 7 has been exemplified as a device different from the unit count control device 3, the time-series data storage device 6, the prediction device 8, and the unit count control parameter output device 9, but some or all of the functions of the machine learning device 7 may be provided by the unit count control device 3, the edge device serving as the time-series data storage device 6, the prediction device 8, or the unit count control parameter output device 9. Alternatively, some or all of the functions of the machine learning device 7 may be realized by using a virtual server function or the like on the cloud. Similarly, a part or all of the functions of the prediction device 8 may be provided in an edge device as the number control device 3 or the time-series data storage device 6. In addition, the functions of the number control parameter output device 9 may be provided in an edge device as the number control device 3 or the time-series data storage device 6.
[0089] <Variation 6> In this embodiment, the number control device 3 performs combustion control of each stage value control boiler 20 of the boiler group 2 so that the steam pressure inside the steam header 4 falls within a preset set pressure range, but is not limited to this proportional distribution control method. For example, the number of units control device 3 may control the combustion state of the step value control boiler 20 that is the combustion target of the boiler group 2 so as to maintain the steam pressure inside the steam header at a preset target steam pressure value.
[0090] <Variation 7> As mentioned above, the boiler is not limited to a step value controlled boiler, but may be a group of boilers that are continuously controlled. Specifically, for example, as described above, the number control device 3 may be replaced with a number control device 3A that controls the number of continuously controlled boilers, which is known to those skilled in the art, and in place of the number control parameter output device 9, a control parameter may be set, for example, so that the combustion rate of the combustion boiler is set within the range of the eco-operation zone when outputting the average steam volume.
[0091] According to the machine learning device 7 or the unit number control parameter output device 9 included in the boiler system with prediction function 100 of the present embodiment described above, the following effects are achieved.
[0092] (1) The machine learning device 7 of the present embodiment calculates a first time slot, which is a subset of the time series data of the unit time steam volume included in a preset first time slot, from a set of time series data of the unit time steam volume including at least the maximum steam consumption and the average steam consumption of the boiler group 2 for a predetermined unit time, the time series data being calculated based on time series data in sampling order for each operating day including a sampling time and measurement data including at least the total output steam volume of the boiler group 2 at the sampling time, outputted at each preset sampling period from a boiler system 1 including a boiler group 2 having a plurality of boilers 20 and a unit count control device 3 that controls the combustion state of the boiler group 2. The system includes a teacher data creation unit 701 that extracts time series data and extracts the steam volume for a unit time period from immediately after the first time period to a preset second time ahead from a collection of time series data of unit time steam volume, thereby creating teacher data including the first time period time series data and the steam volume for the unit time period second ahead, and a learning unit 702 that generates a prediction model 75 that predicts the unit time steam volume including at least the maximum steam consumption and average steam consumption of the boiler group 2 from the time series data of the unit time steam volume included in the first time period on any operating day, based on the teacher data created by the teacher data creation unit 701, from the time series data of the unit time steam volume included in the first time period on any operating day. In this way, in a boiler system 1 having a boiler group 2 having multiple boilers 20, even if the steam load pattern differs depending on the day of the week, holidays, etc., of the month, season, or quarter, a prediction model 75 can be created for predicting the maximum steam consumption and average steam consumption a specified time ahead, for example, based on the history of the total output steam volume from the boiler group 2 in the immediately preceding time period (multiple hours).
[0093] (2) In this embodiment, the operating days may be associated with a preset steam load pattern, and the learning unit 702 may generate the prediction model 75 in accordance with the steam load pattern. In this way, the machine learning device 7 of this embodiment can create a prediction model 75 for predicting maximum steam consumption and average steam consumption a specified time ahead, for example, based on the history of the total output steam volume from the boiler group 2 in the immediately preceding time period (multiple hours), even if the steam load pattern differs depending on the day of the week, holiday, etc., of the month, season, or quarter.
[0094] (3) The learning unit 702 of the machine learning device 7 of this embodiment may use the first time zone time series data as input data, perform supervised learning based on teacher data in which the steam volume per unit time from immediately after the first time zone to the second hour ahead is used as label data, and generate a learned model as a prediction model 75. In this way, the learning unit 702 of the machine learning device 7 of this embodiment can achieve the same effect as (1) or (2).
[0095] (4) The learning unit 702 of the machine learning device 7 of this embodiment may perform time series analysis based on the time series data for each unit time in the first time zone and the steam volume for the unit time from immediately after the first time zone to the second hour ahead, to generate a prediction model 75. In this way, the learning unit 702 of the machine learning device 7 of this embodiment can achieve the same effect as (1) or (2).
[0096] (5) The machine learning device 7 of this embodiment may be configured to be composed of one or more servers communicably connected to the number of units control device 3 via a network. In this way, the machine learning device 7 of this embodiment can be a device independent of the boiler system 1.
[0097] (6) The prediction device 8 of this embodiment includes a prediction model 75 generated by the machine learning device 7 described in any one of (1) to (5), and a prediction unit 802 that acquires, for each unit time, first time zone time series data immediately before an arbitrary time on an operating day of the boiler system 1, and acquires, for each unit time, a steam volume prediction value for a unit time two hours ahead from that time using the prediction model 75, and predicts at least the maximum steam consumption and average steam consumption of at least the boiler group 2 in the time zone from a predetermined time to the second hour ahead on an operating day of the boiler system 1 based on the set of steam volume prediction values for the unit time two hours ahead acquired for each unit time. In this way, in a boiler system 1 including a boiler group 2 having a plurality of step value control boilers 20 capable of combustion at a plurality of stepwise combustion positions, the prediction device 8 of this embodiment can predict the maximum steam usage and average steam usage in a second time period from immediately after the first hour to the second hour ahead, based on the history of the total output steam volume from the boiler group 2 in the immediately preceding first time period, even if the steam load pattern differs depending on the day of the week, holiday, etc., of the month, season, or quarter.
[0098] (7) The boiler group 2 included in the boiler system 1 of this embodiment is a boiler group 2 having a plurality of step value control boilers 20 capable of controlling combustion at a plurality of stepwise combustion positions, and the number control parameter output device 9 is equipped with a number control parameter output unit 901 that calculates two or more values of the maximum steam usage, average steam usage, and fluctuating steam usage of the boiler system in a time period from a specified time to the second hour ahead based on the maximum steam usage and average steam usage in the time period predicted by the prediction device 8, and outputs the values to the number control device 3 of the boiler system 1. In this way, the boiler system 1 of this embodiment can automatically set appropriate maximum steam usage, average steam volume, and fluctuating steam volume for the time period from a specified time to the second hour ahead based on the predicted values of various steam volumes predicted in real time.
[0099] (8) The number of units control device 3 of this embodiment may set appropriate number of units control parameters for a time period from a specified time to the second hour ahead based on two or more values of the maximum steam usage, the average steam volume, and the fluctuating steam volume obtained from the number of units control parameter output device 9, and may perform combustion control of the boiler group 2 based on the set number of units control parameters. In this way, the boiler system 1 of this embodiment can optimally control the number of boilers in a time period from a predetermined time to the second hour ahead, based on the predicted values of various steam volumes predicted in real time.
[0100] (9) The boiler group 2 included in the boiler system 1 of this embodiment is a boiler group 2 having a plurality of step value control boilers 20 capable of controlling combustion at a plurality of stepwise combustion positions, and the number control parameter output device 9 is equipped with a number control parameter output unit 901 that selects the most appropriate number control parameter group ID for a time period from a specified time to the second hour ahead based on the maximum steam consumption and average steam consumption predicted by the prediction device 8 for that time period, and outputs the number control parameter group ID to the control device of the boiler system. In this way, the boiler system 1 of this embodiment can automatically set appropriate maximum steam usage, average steam volume, and fluctuating steam volume for the time period from a specified time to the second hour ahead based on the predicted values of various steam volumes predicted in real time.
[0101] (10) The number of units control device 3 of this embodiment may set appropriate number of units control parameters for a time period from the specified time to the second hour ahead based on a number of units control parameter group ID acquired from the number of units control parameter output device 9, and perform combustion control of the boiler group based on the set number of units control parameters. In this way, the boiler system 1 of this embodiment can optimally control the number of boilers in a time period from a predetermined time to the second hour ahead, based on the predicted values of various steam volumes predicted in real time. [Explanation of symbols]
[0102] 100 Boiler system with predictive function 1. Boiler system 2 Boiler Group 20 Step value control boiler 3. Number of units control device 30 Control section 301 Number control function unit 302 Time series data output section 303 Number control parameter setting section 32 Storage section 321 Maximum steam usage memory unit 322 Average steam volume memory unit 323 Variable steam volume memory unit 324 Number control parameter group ID storage section 325 Number control parameter group storage unit 4 Steam Header 5 Vapor pressure sensor 6 Time series data storage device 60 Control section 601 Time Series Information Recording Unit 602 Unit Time Data Creation Unit 603 First Time Zone Time Series Data Extraction Unit 604 Steam Load Pattern Acquisition Unit 62 Storage section 621 Total output steam amount time series information storage unit 622 Unit time steam volume time series information storage unit 623 Steam load pattern information storage unit 7 Machine Learning Device 70 Control section 701 Teacher Data Creation Department 702 Learning Department 703 Prediction Model Provider 72 Memory section 721 Teacher Data Storage Unit 722 Prediction model memory unit 75 Predictive models (trained models) 8 Prediction Device 80 Control section 801 Input section 802 Prediction Department 82 Memory section 821 Prediction model memory unit 822 1st Time Zone Time Series Data Storage Unit 823 Second Time Zone Time Series Data Storage Unit 9. Number control parameter output device 90 Control section 901 Number control parameter output section 92 Memory section 921 Number control parameter group memory unit
Claims
1. A boiler system includes a boiler group having a plurality of boilers, and a control device for controlling the combustion state of the boiler group. The ... control device outputs, at each preset sampling period, time series data in a sampling order for each operating day, the time series data including a sampling time and measurement data including at least a total output steam volume of the boiler group at the sampling time. The time series data is calculated based on the time series data of unit time steam volume including at least a maximum steam consumption volume and an average steam consumption volume of the boiler group for each predetermined unit time. The time series data is extracted from the time series data of unit time steam volume including at least a maximum steam consumption volume and an average steam consumption volume of the boiler group for each predetermined unit time. The first time series data is a subset of the time series data of the unit time steam volume included in a preset first time period. a teacher data creation unit that creates teacher data including the first time zone time series data and the steam volume for the unit time of the second time ahead by extracting the steam volume for the unit time of the second time ahead from immediately after the first time zone from a set of time series data of the unit time steam volume; a learning unit that generates a prediction model for predicting a unit time steam volume including at least a maximum steam consumption volume and an average steam consumption volume of the boiler group from time series data of the unit time steam volume included in a first time slot on an arbitrary operating day based on the teacher data created by the teacher data creation unit, the unit time steam volume including at least a maximum steam consumption volume and an average steam consumption volume of the boiler group from immediately after the first time slot to a unit time two hours ahead, the unit time being determined based on the teacher data created by the teacher data creation unit; A machine learning device comprising:
2. The operating days are associated with a preset steam load pattern, The machine learning device according to claim 1 , wherein the learning unit generates the predictive model in response to the steam load pattern.
3. 3. The machine learning device according to claim 1, wherein the learning unit uses the first time zone time series data as input data, performs supervised learning based on teacher data in which the steam volume per unit time from immediately after the first time zone to the second time ahead is used as label data, and generates a trained model as the prediction model.
4. The machine learning device according to claim 1 or claim 2, wherein the learning unit performs a time series analysis based on time series data for each unit time in the first time zone and the steam volume for the unit time from immediately after the first time zone to the second time ahead, to generate the prediction model.
5. The machine learning device according to claim 1 , wherein the machine learning device is configured with one or more servers communicatively connected to the control device via a network.
6. A prediction model generated by the machine learning device according to any one of claims 1 to 5; A first time zone time series data immediately before an arbitrary time on an operation day of the boiler system is acquired for each unit time, and a steam volume prediction value for a unit time a second time ahead from the arbitrary time is acquired for each unit time using the prediction model; a prediction unit that predicts at least a maximum steam consumption and an average steam consumption of the boiler group during a time period from a predetermined time on an operating day of the boiler system to a second time ahead, based on a set of steam volume prediction values for the second time ahead unit time acquired for each unit time; A prediction device comprising:
7. The boiler group included in the boiler system is a boiler group having a plurality of step value control boilers capable of controlling combustion at a plurality of stepwise combustion positions, 7. A number-of-units control parameter output device comprising: a number-of-units control parameter output unit that calculates two or more values of a maximum steam usage amount, an average steam usage amount, and a fluctuating steam usage amount of the boiler system during a time period from the specified time to a second time ahead based on a maximum steam usage amount and an average steam usage amount during the time period predicted by the prediction device described in claim 6, and outputs the values to the control device of the boiler system.
8. setting an appropriate number of control units parameter for a time period from the predetermined time to a second time ahead based on two or more values of a maximum steam usage amount, an average steam amount, and a fluctuating steam amount obtained from the number of control units parameter output device according to claim 7; A control device that controls combustion of the boiler group based on the set unit number control parameter.
9. The boiler group included in the boiler system is a boiler group having a plurality of step value control boilers capable of controlling combustion at a plurality of stepwise combustion positions, 7. A number-of-units control parameter output device comprising: a number-of-units control parameter output unit that selects a number-of-units control parameter group ID that is most appropriate for a time period from the specified time to a second time ahead, based on a maximum steam consumption and an average steam consumption during the time period predicted by the prediction device according to claim 6, and outputs the selected number-of-units control parameter group ID to the control device of the boiler system.
10. setting an appropriate number of units control parameter for a time period from the predetermined time to a second time ahead based on a number of units control parameter group ID acquired from the number of units control parameter output device according to claim 9; A control device that controls combustion of the boiler group based on the set unit number control parameter.
Citation Information
Patent Citations
Operation controlling method for heat supplying plant
JP1996136174A
Multi-can installed boiler
JP2010236719A
Program, controller, and boiler system
JP2012017940A
Boiler system
JP2016176679A
Machine learning device, machine learning method, and machine learning program
JP2017129896A
