Steel sheet piles and their installation methods
The angled nozzle configuration on steel sheet piles addresses nozzle damage and enhances ground strength reduction, improving driving efficiency and accuracy by minimizing collision and pressure loss.
Patent Information
- Application Number
- JP2020178882
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-10-26
- Publication Date
- 2024-10-17
- Estimated Expiration
- 2040-10-26
AI Technical Summary
Conventional water jet construction methods for steel sheet piles face issues with nozzle damage and reduced effectiveness due to water jet loss and pressure attenuation when injecting vertically downward, leading to increased flow rates and difficulty in reducing ground strength.
The steel sheet pile design includes nozzles positioned at an angle to the longitudinal direction, injecting water jets away from the pile body, with specific angle configurations to minimize collision and pressure loss, thereby preventing nozzle damage and enhancing ground strength reduction.
This configuration effectively reduces ground resistance and promotes efficient driving of steel sheet piles by maintaining water jet pressure and preventing nozzle damage, improving driving efficiency and accuracy.
Smart Images

Figure 0007569049000012 
Figure 0007569049000013 
Figure 0007569049000014
Abstract
Description
[Technical field]
[0001] The present invention relates to a steel sheet pile and a method for installing the steel sheet pile. [Background technology]
[0002] There are two main methods for driving steel sheet piles: the vibro hammer method and the press-in method. For each method, there is a guideline for the ground N-value that can be driven for each type of steel sheet pile, and in ground where the N-value exceeds the guideline, it is common to use the water jet method as an auxiliary method. In the water jet method, high-pressure water discharged from a water delivery device is supplied to a nozzle attached to the tip of the steel sheet pile body through a pipe or hose installed along the steel sheet pile body. By spraying a water jet from the nozzle into the ground, the ground strength is locally reduced, and the driving of the steel sheet pile is promoted. Technologies related to such water jet methods are described, for example, in Non-Patent Document 1, Patent Document 1, and Patent Document 2. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] International Publication No. 2010 / 089985 [Patent Document 2] JP 2002-38481 A [Non-patent literature]
[0004] [Non-Patent Document 1] "Guidelines for design and construction of press-in construction method", International Press-in Conference, 2015, p.131 Summary of the Invention [Problem to be solved by the invention]
[0005] In the conventional water jet method, as shown in Fig. 10A, high-pressure water is supplied via a pipe 21 to a nozzle 2P attached near the tip of a steel sheet pile body 1, and the nozzle 2P sprays a water jet WJ vertically downward, that is, in the longitudinal direction of the steel sheet pile body 1. As shown in Fig. 10B, the nozzle 2P is positioned a short distance away from the tip of the steel sheet pile body 1. As shown in Fig. 10C, the sprayed water jet WJ spreads radially from the nozzle 2P in a plan view.
[0006] In this case, as shown in FIG. 11(A), a part of the water jet WJ ejected from the nozzle 2P collides with the steel sheet pile body 1, resulting in loss WJ. loss As shown in Fig. 11(B), the water jet WJ injected into the ground eventually becomes a backflow WJ due to the resistance of the ground. ref However, if the water jet WJ is sprayed vertically downward, the flow path in the area along the steel sheet pile body 1 becomes narrow, and the return flow WJ ref This makes it easier for the pressure of the water jet (WJ) to attenuate due to the resistance of the water jet.
[0007] Thus, in the conventional water jet method, the effect of reducing the ground strength is reduced due to the loss of the water jet WJ and the attenuation of pressure, and the required jet flow rate may increase. Note that, if the nozzle 2P is attached without being separated from the tip of the steel sheet pile body 1 as shown in Fig. 11(C), there is no loss or attenuation of the water jet WJ, but it becomes difficult to prevent damage to the nozzle 2P due to contact with boulders in the ground.
[0008] Therefore, the present invention aims to provide a steel sheet pile and a steel sheet pile construction method that can effectively reduce ground strength while preventing damage to the nozzle when driving steel sheet piles using the water jet method as an auxiliary construction method. [Means for solving the problem]
[0009] [1] A steel sheet pile comprising: a long steel sheet pile body including a first plate-shaped portion; and a nozzle arranged at one longitudinal end of the steel sheet pile body on a plate surface of the first plate-shaped portion away from the tip of the steel sheet pile body, the nozzle being inclined with respect to the longitudinal direction and configured to spray a water jet in a direction away from the plate surface of the first plate-shaped portion. [2] The steel sheet pile according to [1], wherein the steel sheet pile body further includes a second plate-shaped portion that is angularly continuous with the first plate-shaped portion in cross section, and the nozzle includes a first nozzle that is arranged on the minor angle side near the boundary between the first plate-shaped portion and the second plate-shaped portion. [3] The steel sheet pile according to [2], wherein the first nozzle is configured to spray a water jet in a direction parallel to a plate surface of the second plate-shaped portion. [4] The steel sheet pile described in [3], wherein in the cross section of the steel sheet pile body, the difference between the angle that the second plate-shaped portion makes with respect to the first plate-shaped portion and the angle that the water jet spray direction makes with respect to the first plate-shaped portion is within ±10°. [5] The steel sheet pile according to [3] or [4], wherein, in a cross section of the steel sheet pile body, the first plate-shaped portion is a portion extending in the extension direction of a wall formed by the steel sheet pile body, and the second plate-shaped portion is a portion inclined with respect to the extension direction, and the first nozzle is configured so that the following formula (i) is satisfied when the cross-sectional height of the steel sheet pile body is H, the angle that the second plate-shaped portion makes with respect to the first plate-shaped portion is θf, the excavation distance of the water jet is D, the angle that the water jet spray direction makes with respect to the longitudinal direction in a cross section that includes the longitudinal direction and is perpendicular to the first plate-shaped portion is θa, and the angle that the water jet spray direction makes with respect to the first plate-shaped portion in a cross section perpendicular to the longitudinal direction is substantially equal to angle θf. TIFF0007569049000001.tif12143 [6] The steel sheet pile according to [3] or [4], wherein, in a cross section of the steel sheet pile body, the first plate-shaped portion is a portion extending in the extension direction of a wall formed by the steel sheet pile body, and the second plate-shaped portion is a portion inclined with respect to the extension direction, and the first nozzle is configured so that the following formula (ii) is satisfied when the cross-sectional height of the steel sheet pile body is H, the angle that the second plate-shaped portion makes with respect to the first plate-shaped portion is θf, the excavation distance of the water jet is D, the angle that the water jet spray direction makes with respect to the longitudinal direction in a cross section that includes the longitudinal direction and is perpendicular to the first plate-shaped portion is θa, and the angle that the water jet spray direction makes with respect to the first plate-shaped portion in a cross section perpendicular to the longitudinal direction is substantially equal to angle θf. TIFF0007569049000002.tif12143 [7] The steel sheet pile according to [1] or [2], wherein the nozzle includes a second nozzle configured to spray a water jet in a direction parallel to the plate surface of the first plate-shaped portion. [8] The steel sheet pile according to [7], wherein in the cross section of the steel sheet pile body, the angle between the first plate-shaped portion and the spray direction of the water jet is greater than 0 and less than 10°. [9] The steel sheet pile according to any one of [1] to [8], wherein the nozzle includes a third nozzle configured to spray water jets in multiple directions.
[10] A steel sheet pile according to any one of [1] to [9], further comprising another nozzle arranged at one longitudinal end of the steel sheet pile body and configured to spray a water jet in the longitudinal direction.
[11] A steel sheet pile according to any one of [1] to
[10] , wherein the steel sheet pile body is a hat-shaped steel sheet pile including a web, first and second flanges, first and second arms, and first and second joints, the first plate-shaped portion is the web, and the nozzles include a pair of fourth nozzles arranged on the minor angle side near each boundary between the web and the first and second flanges.
[12] A steel sheet pile according to any one of [1] to
[10] , wherein the steel sheet pile body includes a joint formed at an end of the first plate-shaped portion in cross section, and the nozzle includes a fifth nozzle configured to spray a water jet in a direction toward the joint.
[13] The steel sheet pile according to
[12] , wherein the steel sheet pile body is a hat-shaped steel sheet pile including a web, first and second flanges, first and second arms and first and second joints, the first plate-shaped portion is a first arm, and the fifth nozzle is configured to spray a water jet in a direction toward the first joint formed at the end of the first arm in cross section.
[14] A method for constructing a steel sheet pile, comprising the step of driving the steel sheet pile described in any one of [1] to
[13] by a vibro hammer method.
[15] A method for constructing a steel sheet pile, comprising the step of driving the steel sheet pile described in any one of [1] to
[13] by a pressing method. Effect of the Invention
[0010] According to the above configuration, the nozzle attached to the end of the steel sheet pile body is separated from the tip of the steel sheet pile body to prevent damage to the nozzle, while the water jet is sprayed in a direction inclined to the longitudinal direction of the steel sheet pile body and away from the steel sheet pile body, thereby effectively reducing the ground strength and promoting the driving of the steel sheet pile. [Brief description of the drawings]
[0011] [Figure 1A] FIG. 1 is a diagram showing a steel sheet pile according to a first embodiment of the present invention. [Figure 1B] FIG. 1 is a diagram showing a steel sheet pile according to a first embodiment of the present invention. [Figure 1C] FIG. 1 is a diagram showing a steel sheet pile according to a first embodiment of the present invention. [Diagram 2] 11A and 11B are diagrams for explaining the effect of the jet direction being inclined in a vertical cross section. [Diagram 3] 11A and 11B are diagrams for explaining the effect of the jet direction being inclined in a horizontal cross section. [Figure 4A]FIG. 6 is a diagram showing a steel sheet pile according to a second embodiment of the present invention. [Figure 4B] FIG. 6 is a diagram showing a steel sheet pile according to a second embodiment of the present invention. [Figure 4C] FIG. 6 is a diagram showing a steel sheet pile according to a second embodiment of the present invention. [Figure 5A] FIG. 11 is a diagram showing a steel sheet pile according to a third embodiment of the present invention. [Figure 5B] FIG. 11 is a diagram showing a steel sheet pile according to a third embodiment of the present invention. [Figure 5C] FIG. 11 is a diagram showing a steel sheet pile according to a third embodiment of the present invention. [Figure 6A] FIG. 11 is a view showing a steel sheet pile according to a fourth embodiment of the present invention. [Figure 6B] FIG. 11 is a view showing a steel sheet pile according to a fourth embodiment of the present invention. [Figure 6C] FIG. 11 is a view showing a steel sheet pile according to a fourth embodiment of the present invention. [Figure 7A] FIG. 13 is a view showing a steel sheet pile according to a fifth embodiment of the present invention. [Figure 7B] FIG. 13 is a view showing a steel sheet pile according to a fifth embodiment of the present invention. [Figure 7C] FIG. 13 is a view showing a steel sheet pile according to a fifth embodiment of the present invention. [Figure 8] 5A to 5C are diagrams for explaining the angle of the ejection direction of a water jet in an embodiment of the present invention. [Figure 9A] 5A to 5C are diagrams for explaining the angle of the ejection direction of a water jet in an embodiment of the present invention. [Figure 9B] 5A to 5C are diagrams for explaining the angle of the ejection direction of a water jet in an embodiment of the present invention. [Figure 10A] FIG. 1 is a diagram showing a steel sheet pile to which a conventional water jet construction method is applied. [Figure 10B] FIG. 1 is a diagram showing a steel sheet pile to which a conventional water jet construction method is applied. [Figure 10C] FIG. 1 is a diagram showing a steel sheet pile to which a conventional water jet construction method is applied. [Figure 11]FIG. 1 is a diagram showing a steel sheet pile to which a conventional water jet construction method is applied. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. In this specification and the drawings, components having substantially the same functional configurations are designated by the same reference numerals, and redundant description will be omitted.
[0013] (First embodiment) 1A to 1C are diagrams showing a steel sheet pile according to a first embodiment of the present invention. In the illustrated example, the steel sheet pile includes a long steel sheet pile body 1 and nozzles 2A and 2B arranged at one end in the longitudinal direction of the steel sheet pile body 1 and configured to spray a water jet WJ. Here, the long shape means that a cross section of substantially the same shape is formed extending in the longitudinal direction. In this embodiment, the steel sheet pile body 1 is a hat-shaped steel sheet pile and includes a web 11, flanges 12A and 12B, and arms 13A and 13B. The web 11, the flanges 12A and 12B, and the arms 13A and 13B are plate-shaped parts extending in the longitudinal direction of the steel sheet pile body 1. In relation to the nozzles 2A and 2B, the web 11 constitutes a first plate-shaped part, and the flanges 12A and 12B constitute a second plate-shaped part. In the cross section of the steel sheet pile body 1, the flanges 12A, 12B are continuous with both ends of the web 11 at an angle, the arms 13A, 13B are continuous with the ends of the flanges 12A, 12B opposite the web 11 at an angle, and joints 14A, 14B are formed at the ends of the arms 13A, 13B opposite the flanges 12A, 12B.
[0014] The nozzles 2A and 2B are arranged on the plate surface of the web 11 at the end of the side (lower end side) that will be the tip when the steel sheet pile body 1 is driven into the ground. Here, the plate surface means a surface other than the end face of the plate-shaped part. In addition, the nozzles are arranged on the plate surface, for example, the nozzle body or its support member is attached to the plate surface. Therefore, there may be a gap between the main body of the nozzles 2A and 2B and the web 11. Note that the nozzles 2A and 2B are arranged at the end of the steel sheet pile body 1 in the longitudinal direction, but are arranged away from the tip of the steel sheet pile body to prevent damage. High-pressure water is supplied to the nozzles 2A and 2B of the steel sheet pile during driving from a water delivery device (not shown) through pipes 21A and 21B. In this embodiment, the nozzles 2A and 2B are arranged on the minor angle side near the boundary between the web 11 and the flanges 12A and 12B, that is, on the side where the angle between the web 11 and the flanges 12A and 12B is smaller than 180°. The minor angle sides in the vicinity of the boundaries between the web 11 and each of the flanges 12A and 12B are areas that are prone to clogging with soil and sand during pouring, so it is effective to arrange the nozzles 2A and 2B in these areas.
[0015] Furthermore, in this embodiment, the nozzles 2A and 2B are configured to spray the water jet WJ in the longitudinal direction of the steel sheet pile body 1 (z-axis direction in the figure), that is, in a direction inclined to the driving direction of the steel sheet pile and away from the plate surface of the web 11. The water jet WJ sprayed from the nozzles 2A and 2B diffuses, but the spraying direction can be specified as a straight line passing through the center of the diffusion range of the water jet WJ from the nozzle 2A or nozzle 2B. For example, when a water jet sprayed in a direction parallel to the driving direction of the steel sheet pile diffuses, some of the diffused water jets may be sprayed in a direction away from the plate surface of the web when viewed individually, but the straight line passing through the diffusion range is parallel to the plate surface of the web, and the spraying direction of the water jet does not move away from the plate surface of the web as a whole. When the spray direction of the water jet WJ is inclined with respect to the longitudinal direction of the steel sheet pile body 1, the spray direction of the water jet WJ can be defined in a cross section perpendicular to the longitudinal direction of the steel sheet pile body 1 (xy cross section in the figure), but the spray direction of the water jet WJ sprayed from the nozzles 2A and 2B is a direction not toward the web 11 in this cross section. Specifically, for the nozzles 2A and 2B, the range of about 180° on the opposite side to the plate surface of the web 11 becomes the "direction away from the web 11."
[0016] In order to enable the spraying of the water jet WJ as described above, for example, the nozzles 2A and 2B are arranged with the axes of their heads inclined with respect to the longitudinal direction of the steel sheet pile body 1. Alternatively, the axes of the heads of the nozzles 2A and 2B may coincide with the longitudinal direction of the steel sheet pile body 1, and the piping route inside the nozzles may be inclined.
[0017] Here, as shown in FIG. 1B, the angle θa is defined as the angle that the spraying direction of the water jet WJ makes with the longitudinal direction (z-axis direction) of the steel sheet pile body 1 in a vertical cross section (yz cross section in the figure) that includes the longitudinal direction of the steel sheet pile body 1 and is perpendicular to the web 11. By making the angle θa equal to or larger than a predetermined value, the overlap between the area where the water jet WJ is diffused and the steel sheet pile body 1 is eliminated or reduced, as shown in FIG. 2. This makes it possible to reduce the amount of water lost due to the collision of the water jet WJ with the steel sheet pile body 1. In addition, since the flow path in the area along the steel sheet pile body 1 is not narrowed, the return flow WJ ref Therefore, in this embodiment, even if the nozzles 2A and 2B are arranged away from the tip of the steel sheet pile body 1 to prevent damage, the effect of reducing the ground strength by the water jets WJ is enhanced.
[0018] On the other hand, as shown in FIG. 1C, the angle that the spray direction of the water jet WJ makes with respect to the web 11 of the steel sheet pile body 1 in a horizontal cross section (xy cross section) perpendicular to the longitudinal direction of the steel sheet pile body 1 is defined as θb. In this embodiment, the angle θb is substantially equal to the flange angle θf of the steel sheet pile body 1, that is, the angle that the flanges 12A, 12B make with respect to the web 11. Specifically, the difference between the flange angle θf and the angle θb is within ±10°. The angle θb is finally adjusted in the installation work of the nozzles 2A, 2B to the steel sheet pile body 1 performed at the construction site, but it is not easy to strictly match the angle θb with the flange angle θf in such work, and in fact, the same effect can be obtained even if there is a slight difference between the angle θb and the angle θf due to the diffusion of the water jet WJ, so that the range of the substantially effective angle θb is exemplified as within θf±10°. By setting the angle θb as described above, the direction of the water jet WJ from the nozzles 2A and 2B is away from the plate surface of the web 11 and parallel to the flanges 12A and 12B. As a result, as shown in FIG. 3, the strength of the ground is reduced by the water jet WJ not only in the web 11 but also in the area along the flanges 12A and 12B. Therefore, the variation of the ground resistance R in the cross-sectional height direction (y-axis direction in the figure) of the steel sheet pile body 1 during driving is reduced, and it is possible to prevent a decrease in vertical accuracy that occurs when driving by applying a vertical load to the head of the steel sheet pile body 1 and an increase in joint friction associated therewith. Depending on the type of the steel sheet pile body 1, the plate thickness of the flanges 12A and 12B may be relatively thin compared to the plate thickness of the web 11 and the arms 13A and 13B, and the above configuration is also effective in preventing deformation of the flanges in such a case.
[0019] Here, for example, when the nozzles 2A and 2B are disposed close to the boundary between the web 11 and the flanges 12A and 12B, the diverging water jet WJ can be prevented from colliding with the flanges 12A and 12B by making the angle θb slightly larger than the flange angle θf. In this case, the spray direction of the water jet WJ from the nozzles 2A and 2B moves away from the plate surface of the web 11 and also moves away from the plate surfaces of the flanges 12A and 12B, and is parallel to the plate surfaces of the flanges 12A and 12B. In this specification, parallel does not necessarily mean geometrically parallel, so there is no contradiction between the spray direction of the water jet WJ moving away from the plate surface of the plate-shaped portion and being parallel to the plate surface of the plate-shaped portion. In another example, the angle θb may be the same as or slightly smaller than the flange angle θf. For example, in a case where the water jet WJ sprayed by the nozzles 2A, 2B arranged on the web 11 has already passed the tip of the steel sheet pile body 1 in the vicinity of the flanges 12A, 12B, the spraying direction of the water jet WJ does not necessarily have to move away from the flanges 12A, 12B.
[0020] The steel sheet pile according to the present embodiment as described above can be driven by either the vibro hammer method or the press-in method. Specifically, while fitting one of the joints (joint 14A in the example of FIG. 1A) to the steel sheet piles (steel sheet pile body 3 shown in FIG. 1A) driven in advance except for the first one to be driven, high-pressure water is supplied to the nozzles 2A, 2B through the pipes 21A, 21B from a water delivery device such as a water jet pump, and while spraying water jets WJ into the ground from the nozzles 2A, 2B, a vertical load is applied to the steel sheet pile body 1 by a vibro hammer or a press-in machine, and the steel sheet pile is driven into the ground. After the driving of the steel sheet pile is completed, the pipes 21A, 21B are removed while leaving the nozzles 2A, 2B in the ground, and the pipes may be reused for driving another steel sheet pile (nozzles 4A, 4B shown in FIG. 1A). Alternatively, at least a portion of the pipes 21A, 21B may be left in the ground together with the nozzles 2A, 2B, or the nozzles 2A, 2B may be retrieved together with the pipes 21A, 21B and not left in the ground.
[0021] As described above, in the steel sheet pile of this embodiment, the nozzles 2A, 2B attached to the ends of the steel sheet pile body 1 are separated from the tip of the steel sheet pile body 1 to prevent damage to the nozzles 2A, 2B, while the water jet WJ is sprayed at an angle to the longitudinal direction of the steel sheet pile body 1 and away from the steel sheet pile body, thereby effectively reducing the ground strength and promoting the driving of the steel sheet pile.
[0022] Second Embodiment 4A to 4C are diagrams showing a steel sheet pile according to a second embodiment of the present invention. The steel sheet pile according to this embodiment includes a nozzle 2C instead of the nozzle 2A in the first embodiment. The nozzle 2C is arranged on the plate surface of the arm 13A. High-pressure water is supplied to the nozzle 2C by a pipe 21C. In addition, in relation to the nozzle 2C, the arm 13A constitutes a first plate-shaped part. The other configurations are the same as those in the first embodiment, so duplicated explanations will be omitted. As shown in FIG. 4C, the nozzle 2C is configured to spray a water jet WJ in a direction toward the joint 14A along the arm 13A in a horizontal cross section (xy cross section) perpendicular to the longitudinal direction of the steel sheet pile body 1. In the illustrated example, nozzles 4B and 4C similar to the nozzles 2B and 2C remain in the steel sheet pile body 3 that has already been driven. In this embodiment, by positioning the nozzle 2C, the ground strength in the area close to the joint 14A that receives resistance due to fitting into the joint of the previously cast steel sheet pile body 3 can be reduced, thereby facilitating the casting of the steel sheet pile.
[0023] (Third embodiment) 5A to 5C are diagrams showing a steel sheet pile according to a third embodiment of the present invention. The steel sheet pile according to this embodiment includes a nozzle 2D instead of the nozzles 2A and 2B in the first embodiment. The nozzle 2D is disposed near the center of the width of the web 11 and is configured to spray two water jets WJ from a single nozzle. High-pressure water is supplied to the nozzle 2D by a pipe 21D. In addition, in relation to the nozzle 2D, the web 11 constitutes a first plate-shaped portion. Since the other configurations are the same as those in the first embodiment, repeated explanations will be omitted. As shown in FIG. 5B, the spraying directions of the two water jets WJ sprayed from the nozzle 2D are both inclined with respect to the longitudinal direction of the steel sheet pile body 1. In addition, as shown in FIG. 5C, the spraying directions of the two water jets WJ sprayed from the nozzle 2D are both away from the plate surface of the web 11 and parallel to the plate surfaces of the flanges 12A and 12B. In this embodiment, the single nozzle 2D can be used to reduce the ground strength in the regions along both flanges 12A, 12B of the steel sheet pile body 1, thereby facilitating the driving of the steel sheet pile.
[0024] (Fourth embodiment) 6A to 6C are diagrams showing a steel sheet pile according to a fourth embodiment of the present invention. The steel sheet pile according to this embodiment includes nozzles 2E to 2H instead of the nozzles 2A and 2B in the first embodiment. The nozzles 2E and 2H are arranged on the plate surfaces of the flanges 12A and 12B. Therefore, in relation to the nozzles 2E and 2H, the flanges 12A and 12B constitute the first plate-shaped portion. On the other hand, the nozzles 2F and 2G are arranged on the plate surface of the web 11. As shown in FIG. 6B, the spraying directions of the water jets WJ sprayed from the nozzles 2E and 2H are both inclined with respect to the longitudinal direction of the steel sheet pile body 1. On the other hand, the nozzles 2F and 2G are configured to spray the water jets WJ in the longitudinal direction of the steel sheet pile body 1, similar to the nozzle 2P used in the conventional water jet construction method described above. As shown in Fig. 6C, the jetting direction of the water jet WJ jetted from each of the nozzles 2E and 2H is away from the plate surface of the flanges 12A and 12B and is parallel to the plate surface of the flanges 12A and 12B. In this manner, when the jetting direction of the water jet WJ is away from and parallel to the plate surface of the same plate-shaped part, it is preferable that the angle between the plate-shaped part and the jetting direction is greater than 0 and less than or equal to 10°. In this embodiment, the nozzles 2F and 2G are used to prevent soil clogging in the minor angle side area between the web 11 and the flanges 12A and 12B where soil clogging is likely to occur during concrete pouring, and the nozzles 2E and 2H are also used in the area along the flanges 12A and 12B to reduce the ground strength, thereby reducing the variation in ground resistance R during concrete pouring in the cross-sectional height direction of the steel sheet pile body 1 (y-axis direction in the figure). This embodiment can also be used, for example, in a case where a steel sheet pile already has nozzles (nozzles 2F, 2G) for conventional water jet construction methods arranged on the web 11, and new nozzles (nozzles 2E, 2H) are arranged in addition to the flanges 12A, 12B.
[0025] Fifth embodiment 7A to 7C are diagrams showing a steel sheet pile according to a fifth embodiment of the present invention. The steel sheet pile according to this embodiment includes nozzles 2I and 2J instead of the nozzles 2A and 2B in the first embodiment. The nozzles 2I and 2J are arranged on the plate surfaces of the flanges 12A and 12B, respectively. Therefore, in relation to the nozzles 2I and 2J, the flanges 12A and 12B form a first plate-like portion. The nozzles 2E and 2H in the fourth embodiment are attached to the portions of the flanges 12A and 12B near the web 11 and spray the water jets WJ toward the arms 13A and 13B, whereas the nozzles 2I and 2J in this embodiment are attached to the portions of the flanges 12A and 12B near the arms 13A and 13B and spray the water jets WJ toward the web 11, away from the plate surfaces of the flanges 12A and 12B, and in a direction parallel to the plate surfaces of the flanges 12A and 12B. In this case, as in the above example, nozzles 2I, 2J are used in the minor angle area between the web 11 and the flanges 12A, 12B where clogging with soil is likely to occur during pouring, to prevent clogging with soil, and the ground strength is reduced in the area along the flanges 12A, 12B to facilitate the pouring of the steel sheet pile.
[0026] (Study on the angle of the injection direction) FIG. 8 is a diagram for explaining the angle of the injection direction of the water jet in an embodiment of the present invention. For example, in the case of the example shown in FIG. 1A to FIG. 1C, the angle θ of the injection direction of the water jet WJ from the nozzles 2A and 2B with respect to the longitudinal direction (z-axis direction) of the steel sheet pile body 1 is decomposed into an angle θa in a vertical section (yz section) including the longitudinal direction of the steel sheet pile body 1 and perpendicular to the web 11, and an angle θb in a horizontal section (xy section) perpendicular to the longitudinal direction of the steel sheet pile body 1. The x-axis, y-axis, and z-axis shown in FIG. 8 are the same as the axes shown in the figures of each of the above embodiments. Specifically, the x-axis direction is the extension direction of the wall formed by the steel sheet pile body 1, is perpendicular to the longitudinal direction of the steel sheet pile body 1, and is along the plate surface of the web 11. In the cross section of the steel sheet pile body 1, the web 11 is a portion extending in the x-axis direction, and the flanges 12A and 12B are portions inclined with respect to the x-axis direction. The y-axis direction is the cross-sectional height direction of the steel sheet pile body 1, is perpendicular to the longitudinal direction of the steel sheet pile body 1, and is perpendicular to the plate surface of the web 11. The z-axis direction is the longitudinal direction of the steel sheet pile body 1. Along these axes, the excavation distance D of the ground by the water jet WJ is decomposed into Dsinθcosθb in the x-axis direction, Dsinθsinθa in the y-axis direction, and Dcosθ in the z-axis direction. Therefore, the relationship of the following formula (1) holds between angle θa, angle θ, and angle θb.
[0027]
number
[0028] Furthermore, if the angle θb is considered to be substantially equal to the flange angle θf, the angle θa can be expressed using the flange angle θf and the coverage rate n of the flange length Lf by the excavation range of the water jet. Figures 9A and 9B show examples in which n = 0.25 and n = 0.5, respectively. Note that H is the cross-sectional height of the steel sheet pile body. As shown in the figure, since Dsinθ = nLf = n (H / sinθf), the angle θ is expressed as the following formula (2). By substituting formula (2) into formula (1), formula (3) is obtained, which shows the relationship between the angle θa, the flange angle θf, and the excavation distance D.
[0029]
number
[0030] The excavation distance D can be calculated based on knowledge of conventional water jet construction methods. For example, in the case of sandy soil, it can be calculated using the following formula (4), as described on pages 5 to 7 of the Port and Airport Research Institute document "Evaluation of the performance of excavating and mixing the ground using multiple high-pressure jet nozzles (December 2014)." In formula (4), d 0 is the nozzle hole diameter, A is a constant (A=14 from p. 25 of the above reference), Λ is a flow coefficient that depends on the nozzle shape, P is the injection pressure, σ Z is the initial overburden pressure (ground depth), and φ' is the effective friction angle of the ground.
[0031]
number
[0032] Based on the results of the above studies, the angle θa was calculated for various types of steel sheet pile bodies using formula (3). As a premise, the angle θb is substantially equal to the flange angle θf, and the ground depth σ Z The N value is the application guideline value set for each type and construction method (Table 1-2 of "Standard Estimation Data for Press-in and Extraction of SMP Method Steel Sheet Pile (2019 Edition)" by the Steel Pipe Pile and Steel Sheet Pile Association, and Table 5-3 of "Hat-type Steel Sheet Pile Estimation Standard (Draft) Ver. 10" by the Vibro Hammer Construction Method Technology Research Association). 0 and injection pressure P are values within the practical range, and excavation distance D is calculated using formula (4). Table 1 shows the prerequisites for each type, Table 2 shows the calculation results when the coverage rate n of the flange length Lf by the water jet excavation range is 0.25, and Table 3 shows the calculation results when the coverage rate n is 0.5. The calculation results showed that when n = 0.25, θa was 5.5° or more and 21.4° or less, and when n = 0.5, θa was 11.1° or more and 48.8° or less.
[0033] [Table 1]
[0034] [Table 2]
[0035] [Table 3]
[0036] The angle θa calculated above is the minimum value under the condition that the ground strength is reduced in a predetermined range (represented by the coverage rate n) of the flanges 12A and 12B by the injection of the water jet. Therefore, in the actual design of the steel sheet pile, the angle θa can be determined by the following formula (5) or formula (6), which is an inequality in which n = 0.25 or n = 0.5 in the above formula (3).
[0037]
number
[0038] (Example) Next, an example of a driving test carried out on the original ground using a steel sheet pile according to an embodiment of the present invention will be described. In this example, a test hat-shaped steel sheet pile with a cross-sectional height H = 240 mm and a flange angle θf = 41° was driven into sandy soil with a ground N value of 2 to 50. In the example, as shown in FIG. 1A, nozzles were arranged at both ends of the web of the steel sheet pile body in the width direction (at the minor angle side near the boundary with the flange), and water jets were sprayed in a direction inclined to the longitudinal direction of the steel sheet pile body and along each flange. In a vertical cross section including the longitudinal direction of the steel sheet pile body and perpendicular to the web, the angle θa of the water jet spray direction to the longitudinal direction of the steel sheet pile body was 18°, and in a horizontal cross section perpendicular to the longitudinal direction of the steel sheet pile body, the angle θb of the water jet spray direction to the web was 41°, which is the same as the flange angle θf. As a result, the coverage rate n of the flange length Lf by the excavation range of the water jet was 0.41. On the other hand, in the comparative example, as in the example shown in FIG. 10A above, nozzles were arranged at both ends in the width direction of the web of the steel sheet pile body, and water jets were sprayed in the longitudinal direction of the steel sheet pile body.
[0039] In both the examples and the comparative examples, a press-in machine (Silent Piler (registered trademark)) was used for driving. The nozzle was placed about 100 mm away from the tip of the steel sheet pile, and a piping hose was connected via a connector. The piping hose was extended to the head of the steel sheet pile and connected to a water jet pump. The nozzle hole diameter was 6.5 mm, and the supply flow rate of the water jet pump was adjusted according to the ground resistance (press-in input displayed on the press-in machine). The total length of the steel sheet pile body was 16 m, and the embedment depth into the ground was 15.5 m. At a depth of 13 m to 15 m, the ground N value was 30 to 50, and in this section, the supply flow rate was 325 L / min, the upper limit of the pump capacity, in both the examples and the comparative examples. In order to compare the ground resistance excluding the effect of the joint resistance, the joints of the steel sheet pile body were not engaged with the joints of other steel sheet piles.
[0040] As a result of the experiment, a significant difference was observed in the drive-in force between the Example and the Comparative Example in the section of 13 m to 15 m deep where the ground N value was 30 to 50, and the drive-in force of the Example was 10% or more smaller than that of the Comparative Example. This result shows that the steel sheet pile according to the embodiment of the present invention can be advantageously driven in hard ground, particularly in ground with a large N value.
[0041] Although the above embodiments and examples have been described as examples in which the steel sheet pile body is hat-shaped, the embodiments of the present invention are not limited to these examples and can also be applied, for example, to cases in which the steel sheet pile body is U-shaped or Z-shaped.
[0042] Although the preferred embodiments of the present invention have been described in detail above with reference to the accompanying drawings, the present invention is not limited to these examples. It is clear that a person skilled in the art in the technical field to which the present invention pertains can come up with various modified or altered examples within the scope of the technical ideas described in the claims, and it is understood that these also naturally fall within the technical scope of the present invention. [Explanation of symbols]
[0043] 1...steel sheet pile body, 11...web, 12A, 12B...flanges, 13A, 13B...arm, 14A, 14B...joints, 2A, 2B, 2C, 2D, 2E, 2F, 2G, 2H, 2I, 2J...nozzles, 21A, 21B, 21C, 21D...piping, 3...steel sheet pile body, 4A, 4B...nozzle, WJ...water jet.
Claims
1. A long steel sheet pile body including a first plate-shaped portion; a nozzle disposed on a plate surface of the first plate-shaped portion at one end of the steel sheet pile body in a longitudinal direction and spaced from a tip of the steel sheet pile body; The nozzle is configured so that the axis of the head portion of the nozzle is inclined relative to the longitudinal direction, or the piping path inside the nozzle is inclined relative to the longitudinal direction, thereby spraying a water jet in a direction inclined relative to the longitudinal direction and away from the plate surface of the first plate-shaped portion.
2. The steel sheet pile body further includes a second plate-shaped portion that is angularly continuous with the first plate-shaped portion in a cross section, The steel sheet pile according to claim 1 , wherein the nozzles include a first nozzle arranged on a minor angle side in the vicinity of a boundary between the first plate-shaped portion and the second plate-shaped portion.
3. The steel sheet pile according to claim 2 , wherein the first nozzle is configured to spray a water jet in a direction parallel to a plate surface of the second plate-shaped portion.
4. The steel sheet pile according to claim 3, wherein in a cross section of the steel sheet pile body, a difference between an angle that the second plate-shaped portion makes with respect to the first plate-shaped portion and an angle that the spray direction of the water jet makes with respect to the first plate-shaped portion is within ±10°.
5. A long steel sheet pile body including a first plate-shaped portion, a nozzle disposed on a plate surface of the first plate-shaped portion at one end of the steel sheet pile body in a longitudinal direction and spaced from a tip of the steel sheet pile body, the nozzle being configured to spray a water jet in a direction inclined with respect to the longitudinal direction and away from the plate surface of the first plate-shaped portion; Equipped with The steel sheet pile body further includes a second plate-shaped portion that is angularly continuous with the first plate-shaped portion in a cross section, the nozzles include a first nozzle disposed on a minor angle side near a boundary between the first plate-shaped portion and the second plate-shaped portion, The first nozzle is configured to spray a water jet in a direction parallel to a plate surface of the second plate-shaped portion, In a cross section of the steel sheet pile body, the first plate-shaped portion is a portion extending in an extension direction of a wall body formed by the steel sheet pile body, and the second plate-shaped portion is a portion inclined with respect to the extension direction, The first nozzle is a steel sheet pile configured such that the following formula (i) is satisfied when the cross-sectional height of the steel sheet pile body is H, the angle that the second plate-shaped portion makes with respect to the first plate-shaped portion is θf, the excavation distance of the water jet is D, the angle that the spray direction of the water jet makes with respect to the longitudinal direction in a cross section that includes the longitudinal direction and is perpendicular to the first plate-shaped portion is θa, and the angle that the spray direction of the water jet makes with respect to the first plate-shaped portion in a cross section perpendicular to the longitudinal direction is substantially equal to angle θf.
6. A long steel sheet pile body including a first plate-shaped portion, a nozzle disposed on a plate surface of the first plate-shaped portion at one end of the steel sheet pile body in a longitudinal direction and spaced from a tip of the steel sheet pile body, the nozzle being configured to spray a water jet in a direction inclined with respect to the longitudinal direction and away from the plate surface of the first plate-shaped portion; Equipped with The steel sheet pile body further includes a second plate-shaped portion that is angularly continuous with the first plate-shaped portion in a cross section, the nozzles include a first nozzle disposed on a minor angle side near a boundary between the first plate-shaped portion and the second plate-shaped portion, The first nozzle is configured to spray a water jet in a direction parallel to a plate surface of the second plate-shaped portion, In a cross section of the steel sheet pile body, the first plate-shaped portion is a portion extending in an extension direction of a wall body formed by the steel sheet pile body, and the second plate-shaped portion is a portion inclined with respect to the extension direction, The first nozzle is a steel sheet pile configured such that the following formula (ii) is satisfied when the cross-sectional height of the steel sheet pile body is H, the angle that the second plate-shaped portion makes with respect to the first plate-shaped portion is θf, the excavation distance of the water jet is D, the angle that the spray direction of the water jet makes with respect to the longitudinal direction in a cross section that includes the longitudinal direction and is perpendicular to the first plate-shaped portion is θa, and the angle that the spray direction of the water jet makes with respect to the first plate-shaped portion in a cross section perpendicular to the longitudinal direction is substantially equal to angle θf.
7. The steel sheet pile according to claim 1 or 2, wherein the nozzle includes a second nozzle configured to spray a water jet in a direction parallel to a plate surface of the first plate-shaped portion.
8. The steel sheet pile according to claim 7 , wherein an angle between the first plate-shaped portion and a spraying direction of the water jet in a cross section of the steel sheet pile body is greater than 0 and is equal to or smaller than 10°.
9. The steel sheet pile according to claim 1 , wherein the nozzles include a third nozzle configured to spray water jets in a plurality of directions.
10. The steel sheet pile according to any one of claims 1 to 9, further comprising another nozzle arranged at one end in a longitudinal direction of the steel sheet pile body and configured to spray a water jet in the longitudinal direction.
11. The steel sheet pile body is a hat-shaped steel sheet pile including a web, first and second flanges, first and second arms, and first and second joints, the first plate-like portion is the web, The steel sheet pile according to claim 1 , wherein the nozzles include a pair of fourth nozzles arranged on minor angle sides near boundaries between the web and the first and second flanges, respectively.
12. A long steel sheet pile body including a first plate-shaped portion, a nozzle disposed on a plate surface of the first plate-shaped portion at one end of the steel sheet pile body in a longitudinal direction and spaced from a tip of the steel sheet pile body, the nozzle being configured to spray a water jet in a direction inclined with respect to the longitudinal direction and away from the plate surface of the first plate-shaped portion; Equipped with The steel sheet pile body includes a joint formed at an end of the first plate-shaped portion in a cross section, the nozzles including a fifth nozzle configured to eject a water jet in a direction toward the fitting; The steel sheet pile body is a hat-shaped steel sheet pile including a web, first and second flanges, first and second arms, and first and second joints; the first plate-like portion is the first arm, The fifth nozzle is configured to spray a water jet in a direction toward the first joint formed at an end of the first arm in a cross-sectional view.
13. A method for installing a steel sheet pile, comprising the step of driving the steel sheet pile according to any one of claims 1 to 12 by a vibro hammer method.
14. A method for installing a steel sheet pile, comprising the step of driving the steel sheet pile according to any one of claims 1 to 12 by a press-in method.
Citation Information
Patent Citations
JP1973060405A
Jet casing device for h beam pile drawing
JP1993025823A
High-pressure fluid injection nozzle used in pile driving methods, etc.
JP1993094334U
Joint structure and driving method for steel pipe sheet pile
JP1993331854A
Device and method for pressing-in pile
JP2001152453A
