Pile construction method, pipe pile and pile structure
The described pile construction method improves ground bearing capacity by expanding the pipe pile's diameter with crushed stone, addressing the limitations of existing methods with enhanced friction and reduced machinery needs.
Patent Information
- Application Number
- JP2024012797
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2024-01-31
- Publication Date
- 2024-10-23
- Estimated Expiration
- 2044-01-31
AI Technical Summary
Existing pile construction methods using small-diameter steel pipe piles face challenges in achieving sufficient ground bearing capacity, especially in soft grounds or with obstacles, and require expensive machinery or complex diameter expansion techniques.
A method involving a pipe pile with slits in the circumferential wall that is press-fitted and expanded radially by filling with crushed stone, using a settling prevention device and pressure to enhance peripheral friction force.
This method reduces construction costs and complexity by using simple machinery, enhances ground holding capacity through increased friction, and prevents soil intrusion, offering improved workability and cost-effectiveness.
Smart Images

Figure 0007571904000001_ABST
Abstract
Description
[Technical field]
[0001] The invention disclosed in this application relates to a pile construction method for burying pipe piles made of steel pipes or other hollow straight pipes in the ground to obtain bearing capacity, a pipe pile used in said method, and a pile structure constructed by said method. [Background technology]
[0002] In the construction of houses and other small to medium-sized buildings, small-diameter (approximately φ100mm to 200mm) steel pipe piles are often used to ensure sufficient ground bearing capacity. The following are some of the methods for constructing small-diameter steel pipe piles: (1) A pile construction method in which a steel pipe pile with a spiral impeller attached to the tip is rotated to excavate the ground while penetrating it, and the tip of the pile is brought to a hard layer to obtain bearing capacity. (2) A pile construction method in which a straight pipe without stirring blades is pressed into the ground without or while rotating, and bearing capacity is obtained by the frictional resistance of its periphery. are typical examples.
[0003] The pile construction method (1) requires a large construction machine to rotate and drive the steel pipe pile, and depending on the ground, the tip of the pile needs to reach a hard layer deep inside, so the pile length becomes large and the construction cost is often high. Also, the rotation of the mixing blades disturbs the soil in the ground, so the peripheral friction force cannot be obtained.
[0004] On the other hand, the pile construction method (2) is easier and cheaper to construct than the pile construction method (1) above. However, if the ground is soft, sufficient surface friction cannot be obtained, and construction may be difficult if there are obstacles such as rocks in the shallow part of the ground.
[0005] Therefore, a construction method has been proposed in which a straight steel pipe pile is driven into the ground, and then the peripheral surface of the steel pipe pile is expanded radially outward from the inside to increase peripheral friction. For example, Patent Documents 1 to 4 disclose a technique in which a steel pipe pile with a slit formed in the peripheral wall at the tip or middle part is driven into the ground, and then a mechanical diameter expansion device is inserted into the steel pipe pile or an expansive material is filled in to expand the diameter of the part where the slit is formed. [Prior art documents] [Patent documents]
[0006] [Patent Document 1] Japanese Patent Application Publication No. 55-009953 [Patent Document 2] Japanese Patent Application Publication No. 57-108314 [Patent Document 3] Japanese Patent Application Publication No. 63-233117 [Patent Document 4] JP 2014-070478 A Summary of the Invention [Problem to be solved by the invention]
[0007] The invention disclosed in this application relates to a pile construction method in which a steel pipe pile or the like with a slit formed in the surrounding wall is pressed into the ground and expanded from the inside, as described above, and aims to provide a pile construction method that employs an expansion means that can be constructed more easily and at lower cost than conventional methods, a pipe pile that can be suitably used for said method, and a pile structure constructed by said method. [Means for solving the problem]
[0008] The pile construction method adopted in the present application to achieve the above-mentioned object is characterized as including the following [Step 1] to [Step 6]. [Step 1] By forming multiple slits in the peripheral wall of a hollow straight pipe, extending in the longitudinal direction of the straight pipe and penetrating the peripheral wall in an inward and outward direction, the peripheral wall in that portion is made into an easily expandable section, and a pipe pile is prepared with the tip of the straight pipe blocked. [Step 2] The pipe pile is buried in the ground to a specified depth by pressing or driving it in. [Step 3] Attach a subsidence prevention device to the head of the pipe pile and abut the subsidence prevention device against the ground surface. [Step 4] Pour crushed stone into the inside of the pipe pile, filling it at least up to the height of the easy-to-expand section. [Step 5] Pressurization is applied to the crushed stone from above the pipe pile using a pressure device, thereby causing the easy-to-expand portion to bulge and deform in the radial outward direction. [Step 6] Stop applying pressure to the crushed stone, remove the pressure device, and detach the anti-settling device.
[0009] In addition, in this pile construction method, the following [Step 7] and [Step 8] may be carried out following the above [Step 1] to [Step 6]. [Step 7] Adjust the head of the pipe pile to the specified height. [Step 8] The foundation of the building is constructed on top of the adjusted pipe piles.
[0010] Furthermore, the pile construction method adopted in the present application is characterized in that in the above-mentioned [Step 2], the pipe pile is embedded while being rotated and pressed in a fixed direction.
[0011] In this pile construction method, the pipe pile prepared in [Step 1] is formed so that the penetration direction of the slit appearing in a cross section perpendicular to the material axis of the easy-to-expand section is inclined at a predetermined angle relative to the radial direction of the pipe pile, and in [Step 2], it is preferable to construct the pipe pile so that the inside of the penetration direction of the slit leads in the rotation direction of the pipe pile.
[0012] Furthermore, the pipe pile invention disclosed in this application can be characterized as a pipe pile consisting of a hollow straight pipe, wherein the peripheral wall of the straight pipe, which has a closed tip, is provided with an easily expandable portion having a plurality of slits extending in the material length direction of the straight pipe and penetrating the peripheral wall in an inward and outward direction, and the easily expandable portion is formed so that the penetrating direction of the slits as seen in a cross section perpendicular to the material axis is inclined at a predetermined angle with respect to the radial direction of the straight pipe.
[0013] Furthermore, the pipe pile may be one in which the easily expandable diameter portions are provided at a plurality of locations at predetermined intervals in the material axial direction.
[0014] Furthermore, the pile structure invention disclosed in this application can be characterized as comprising a pipe pile consisting of a hollow straight pipe with a closed tip, the peripheral wall of which is provided with an easily expandable portion having a plurality of slits extending in the longitudinal direction of the pipe pile and penetrating the peripheral wall in an inward and outward direction, the pipe pile being buried in the ground, crushed stone being filled inside the pipe pile, and the crushed stone being pressurized, whereby the easily expandable portion is deformed and bulges radially outward within the ground.
[0015] Furthermore, the easily expandable diameter portion is characterized in that the penetrating direction of the slit, as seen in a cross section perpendicular to the material axis, is inclined at a predetermined angle with respect to the radial direction of the straight pipe. Effect of the Invention
[0016] According to the pile construction method configured as described above, the impact of obstacles in the ground can be reduced by embedding the pipe pile in the ground by pressing or driving it in. Then, the crushed stone filled inside the pipe pile is compressed from the head side of the pipe pile, and the easily expandable portion formed in the pipe pile is deformed in the radially outward direction by the simple process, which increases the peripheral frictional force of the pipe pile against the ground, thereby obtaining excellent bearing capacity.
[0017] Furthermore, by using a pipe pile configured as described above, it is possible to prevent surrounding soil and sand from entering the inside of the pipe pile through the slits formed in the peripheral wall when the pipe pile is rotary pressed into the ground.
[0018] Furthermore, according to the pile structure configured as described above, the peripheral frictional force of the pipe pile against the ground is increased, and excellent bearing capacity can be obtained. [Brief description of the drawings]
[0019] [Figure 1]FIG. 2 is an explanatory diagram showing a construction method from [Step 1] to [Step 4] in the pile construction method disclosed in the present application, in which (a) to (c) are external views and (d) is a cross-sectional view. [Diagram 2] Similarly, this is an explanatory diagram showing the construction method from [Step 5] to [Step 7], (E) and (F) are cross-sectional views, and (G) and (H) are half cross-sectional and half external views. [Diagram 3] FIG. 13 is an explanatory diagram showing the construction method of [Step 8], with (K) to (Sa) being half cross-sectional and half external views. [Figure 4] This is a cross-sectional view perpendicular to the material axis of an easily expandable portion of a pipe pile according to one embodiment of the invention disclosed in the present application. [Diagram 5] FIG. 2 is a perspective view showing an example of a head portion of the pipe pile and an attachment attached to the head portion. [Figure 6] FIG. 4 is a perspective view showing an example of a subsidence prevention device attached to the head of the pipe pile. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0020] Hereinafter, embodiments of the invention disclosed in this application will be described.
[0021] [Pipe pile] In this pile construction method, small-diameter steel pipes with hollow circular cross sections are used as pipe piles. The specifications for steel pipes used for supports, scaffolding, piles, etc. in architectural and civil engineering works are stipulated in the Japanese Industrial Standards (JIS) G3444:2015 "General structural carbon steel pipes," and "small-diameter steel pipe piles" usually refer to a pile construction method that uses steel pipe piles with an outer diameter of 101.6mm to 267.4mm, but this pile construction method assumes the use of steel pipes with an outer diameter of approximately 139.8mm and a wall thickness of 4.5mm to an outer diameter of 267.4mm and a wall thickness of 6.0mm.
[0022] However, the invention disclosed in this application does not limit the size of the steel pipe to the above range. Metal pipes other than steel pipes can also be used. Plastic pipes made of fiber reinforced plastic (FRP), carbon fiber reinforced plastic (CFRP), etc. can also be used as long as the pipe material has sufficient rigidity and undergoes moderate plastic deformation. A pipe material that is easily plastically deformed can be used for the easy-to-expand diameter section described below, and a pipe material of the same diameter with high rigidity can be used for the other general sections, and they can be joined together in appropriate places. In this specification and claims, these hollow pipe materials are collectively referred to as "straight pipes."
[0023] 1 to 3 are explanatory diagrams showing the steps of the pile construction method disclosed in the present application. The steps will be explained below with reference to these drawings. Note that these drawings are schematic representations, and the thickness, length, and other details of the pipe pile are appropriately deformed to fit the size of the paper.
[0024] [Process 1]~[Process 2] In this pile construction method, prior to on-site construction, a pipe pile 1 is prepared in which an easily expandable portion 11 is formed in the peripheral wall of the portion near the tip or the middle portion of the straight pipe as described above. The easily expandable portion 11 is a portion in which a plurality of slits 12 extending in the longitudinal direction of the pipe pile 1 and penetrating the peripheral wall of the pipe pile 1 in the inward and outward directions are formed at regular intervals in the circumferential direction of the pipe pile 1. The pipe pile 1 illustrated in FIG. 1(A) has two easily expandable portions 11 provided at an appropriate interval in the middle portion in the longitudinal direction. In each of the easily expandable portions 11, four slits 12 extending parallel to the material axis of the pipe pile 1 are arranged to be the same length and spaced apart by 90 degrees at the central angle in the cross section perpendicular to the material axis of the pipe pile 1 (see FIG. 4). However, the number of slits 12 is not limited to four, and can be selected as a guideline from about 2 to 12 (more preferably about 4 to 8) within a range that allows for balanced expansion in the circumferential direction without impairing the compressive strength of the peripheral wall of the pipe pile 1. Furthermore, the number of easily expandable portions 11 provided in the material length direction of one pipe pile 1 is not limited to two, and may be one or three or more. Furthermore, different numbers of slits 12 may be formed in multiple easily expandable portions 11.
[0025] The dimensions of the slits 12 are appropriately selected depending on the material, pipe diameter, wall thickness, etc. of the straight pipe constituting the pipe pile 1, but the length is generally 2 to 5 times the pipe diameter, and the width is approximately 5 mm to 12 mm. It is preferable that the multiple slits 12 lined up in the circumferential direction in one easy-to-expand diameter portion 11 are all formed to the same length and width. However, if there are a large number of slits, it is also possible to select a form in which long slits 12 and short slits 12 are arranged alternately.
[0026] In addition, the slits 12 do not necessarily have to be formed parallel to the material axis of the pipe pile 1, and may be slightly inclined relative to the material axis as long as they extend generally in the longitudinal direction of the pipe pile 1. Even if they are inclined, it is preferable that the multiple slits 12 lined up in the circumferential direction in one easy-to-expand portion 11 are arranged parallel to each other at equal intervals.
[0027] Furthermore, in this invention, since it is assumed that the pipe pile 1 is pressed into the ground while being rotated in the next [Step 2], the slits 12 are formed to penetrate the peripheral wall of the pipe pile 1 at an angle in order to prevent soil from entering the inside through the slits 12 during the rotation. That is, as shown in FIG. 4, all of the penetration directions of the slits 12 appearing in the cross section perpendicular to the material axis of the easy-to-expand diameter portion 11 are formed so as to be inclined at a predetermined angle α (approximately 50 degrees in the illustrated embodiment) with respect to the radial direction, rather than in the radial direction of the pipe pile 1. This inclination angle α can also be set in the range of about 30 degrees to 60 degrees depending on the material, pipe diameter, wall thickness, etc. of the straight pipe constituting the pipe pile 1. Then, in [Step 2], the pipe pile 1 is rotated in a direction in which the inside of the penetration direction of the slits 12 leads in the rotation direction of the pipe pile 1.
[0028] When driving the pipe pile 1 into the ground, a generally cylindrical attachment 2, for example as shown in FIG. 5, is attached to the head of a pile driver (not shown), which is then placed over the head of the pipe pile 1, and the connecting protrusion 13 on the side of the pipe pile 1 is engaged with the engagement groove 21 of the attachment 2 to set it in place. The tip (lower end) of the pipe pile 1 is blocked in advance by attaching a pointed cap 14 to prevent soil and sand from entering inside. Then, the pipe pile 1 is basically driven into the ground while being rotated. The direction of rotation is as described above (FIG. 4). If the soil is soft and the pipe pile 1 can be driven in without being rotated, it may be driven in without being rotated.
[0029] As shown in Figure 1 (A), when the head of the pipe pile 1 reaches near the design ground level GL, pressing in is stopped and the attachment 2 is removed from the head of the pipe pile 1. If a bearing capacity equal to or greater than a predetermined value is achieved before the head of the pipe pile 1 reaches the design ground level GL, pressing in of the pipe pile 1 can be stopped at that point and the excess portion of the pipe pile 1 can be cut off.
[0030] [Process 3]~[Process 4] Next, as shown in FIG. 1(c), a subsidence prevention device 3 is attached to the head of the pipe pile 1. As shown in an enlarged view in FIG. 6, the subsidence prevention device 3 has a hollow tubular part 31 similar to the attachment 2 used in the above-mentioned [Step 2], which covers the head of the pipe pile 1, and an engagement groove 32 that can engage with the connecting protrusion 13 of the pipe pile 1 is formed in the lower part of the tubular part 31. A flange-shaped pressing plate 33 that protrudes radially outward is connected to the middle part of the tubular part 31, and the subsidence prevention device 3 is set on the pipe pile 1 so that the pressing plate 33 abuts against the design ground surface GL. Note that if the excess part of the pipe pile 1 is cut off in the above-mentioned [Step 2], the engagement groove 32 of the subsidence prevention device 3 cannot be engaged with the connecting protrusion 13 of the pipe pile 1, so the subsidence prevention device 3 may be connected to the pipe pile 1 by bolt and nut joints or the like.
[0031] Next, as shown in FIG. 1(d), crushed stones 4 are poured into the pipe pile 1 from the top opening of the subsidence prevention device 3. If the inside diameter of the pipe pile 1 is small, a funnel-shaped auxiliary tool 5 may be attached to the top opening of the subsidence prevention device 3. As the crushed stones 4 to be poured, crusher run (C-30) with a maximum particle size of about 30 mm, or recycled crushed stones (RC-30) mixed with concrete waste, etc. can be suitably used. However, the present invention is not limited to these, and in addition to grain-adjusted crushed stones and natural boulders, blast furnace slag, etc. can also be used as long as the material can withstand pressure. In this specification and claims, they are collectively referred to as "crushed stones". The crushed stones 4 are filled up to the vicinity of the head of the pipe pile 1 (the position where the pressure device reaches in the next [step 5]).
[0032] [Step 5] 2(e) to (f), pressure is applied from above the pipe pile 1 to the top surface of the crushed stone 4 filled in the pipe pile 1 using a pressure device. As the pressure device, a hammer 6 with a diameter smaller than the inner diameter of the pipe pile 1, for example, connected to the head of a pile driver, is used. The subsidence prevention device 3 attached to the head of the pipe pile 1 prevents the entire pipe pile 1 from subsiding due to this pressure, and acts to concentrate pressure on the easily expandable portion 11 of the pipe pile 1. This pressure causes the easily expandable portion 11, which has slits 12 formed therein, to bulge outward in the radial direction, increasing the peripheral friction of the pipe pile 1 against the ground.
[0033] Furthermore, for example, if the overall length of the pipe pile 1 is large and multiple easy-to-expand section 11 are provided, it is possible to adopt a construction procedure in which, rather than pouring crushed stone 4 all at once up to near the head of the pipe pile 1, crushed stone is first poured up to the height of the lower easy-to-expand section 11 and pressurized, causing the lower easy-to-expand section 11 to bulge and deform, and then additional crushed stone is poured and pressurized again, causing the upper easy-to-expand section 11 to bulge and deform.
[0034] [Process 6]~[Process 7] When the top surface of the crushed stone 4 has settled to a certain extent due to pressure, it is determined that the easily expandable portion 11 has bulged and deformed, and pressure is stopped, the pressure device is removed, and the settlement prevention device 3 is also removed. Then, as shown in Figure 2(g), excavation is performed around the head of the pipe pile 1 to match the bottom surface level of the foundation, and adjustments are made by cutting off the head of the pipe pile 1, etc. If necessary, the excavated area is backfilled as shown in Figure 2(h).
[0035] [Step 8] After this, the work on the foundation of the building will begin. As shown in Figure 3 (K) to (K), the area around the head of the pipe pile 1 whose height has been adjusted is cut again, and the foundation 7 of the building is constructed on top of it using an appropriate construction method.
[0036] This pile construction method, in which crushed stone 4 is filled inside a pipe pile 1 buried in the ground by rotary pressing or driving, and pressure is applied to the crushed stone 4 from above to cause the easily expandable portion 11 to expand and deform, is far simpler and less expensive than conventional methods that use complex expansion devices and large-scale heavy machinery. Because this is a so-called "dry" construction method that does not use fluid materials such as cement milk or mortar, there are fewer constraints on the construction schedule (arrangements) and the construction site is easy to manage. Thus, the ease of construction in building pile construction can be greatly improved.
[0037] The technical scope of the invention disclosed in this application should not be interpreted as being limited by the exemplified embodiments, but should be interpreted conceptually based on the description of the claims. The names of the components used in the claims and the specification are for convenience in order to make the invention easier to understand specifically, and the names do not limit the concept or properties of the components more than necessary. When implementing the invention disclosed in this application, the detailed shape, dimensions, structure, material, quantity, combination form with other elements, relative positional relationship, etc. of the components not specifically specified in the claims can be appropriately modified within the scope of utilizing an operating principle substantially equivalent to the exemplified form, or within the scope of obtaining an action effect substantially equivalent to or greater than the exemplified form.
[0038] For example, in the above-described embodiment, a process of attaching a cap to the tip of the pipe pile before the pipe pile is pressed into place is exemplified, but the process of blocking the tip of the pipe pile may be carried out in parallel with the processing of the slit, or a slit may be processed in a straight pipe whose tip has already been blocked by an appropriate blocking member.
[0039] In the above embodiment, the method of embedding the pipe pile in [Step 2] is exemplified by rotary pressing, but the method of embedding the pipe pile is not limited to this, and the pipe pile may be embedded by other pressing or driving methods. For example, the pipe pile may be embedded by a method of inserting the pipe pile into a borehole that has been created after the ground has been excavated to a predetermined depth.
[0040] Furthermore, the embodiments and other matters disclosed in this specification can also be understood as the technical ideas described in the following supplementary notes.
[0041] (Appendix 1) A pile construction method including the following [Step 1] to [Step 6]. [Step 1] By forming multiple slits in the peripheral wall of a hollow straight pipe, extending in the longitudinal direction of the straight pipe and penetrating the peripheral wall in an inward and outward direction, the peripheral wall in that portion is made into an easily expandable section, and a pipe pile is prepared with the tip of the straight pipe blocked. [Step 2] The pipe pile is buried in the ground to a specified depth by pressing or driving it in. [Step 3] Attach a subsidence prevention device to the head of the pipe pile and abut the subsidence prevention device against the ground surface. [Step 4] Pour crushed stone into the inside of the pipe pile, filling it at least up to the height of the easy-to-expand section. [Step 5] Pressurization is applied to the crushed stone from above the pipe pile using a pressure device, thereby causing the easy-to-expand portion to bulge and deform in the radial outward direction. [Step 6] Stop applying pressure to the crushed stone, remove the pressure device, and detach the anti-settling device.
[0042] (Appendix 2) In step 2 of the pile construction method described in Appendix 1, The pipe pile is buried while being rotated and pressed in a certain direction. A pile construction method characterized by the above.
[0043] (Appendix 3) In the pile construction method described in Appendix 2, The pipe pile prepared in [Step 1] is formed so that the penetration direction of the slit appearing in the cross section perpendicular to the material axis of the easy-to-expand portion is inclined at a predetermined angle with respect to the radial direction of the pipe pile, In step 2, the pipe pile is rotated so that the inner side in the penetration direction of the slit leads in the rotation direction of the pipe pile. A pile construction method characterized by the above.
[0044] (Appendix 4) A pipe pile consisting of a hollow straight pipe, The straight pipe has a peripheral wall formed with a plurality of slits extending in a material length direction of the straight pipe and penetrating the peripheral wall in an inward and outward direction, The easily expandable portion is formed such that the penetration direction of the slits, which appears in a cross section perpendicular to the material axis, is inclined at a predetermined angle with respect to the radial direction of the straight pipe. A pipe pile characterized by:
[0045] (Appendix 5) In the pipe piles described in Appendix 4, The easily expandable diameter portion is provided at a plurality of locations at predetermined intervals in the material axial direction. A pipe pile characterized by:
[0046] (Appendix 6) A peripheral wall of a pipe pile made of a hollow straight pipe with a closed tip is provided with an easily expandable diameter portion having a plurality of slits extending in the material length direction of the pipe pile and penetrating the peripheral wall in an inward and outward direction; The pipe pile is buried in the ground, The inside of the pipe pile is filled with crushed stone, When the crushed stone is pressurized, the easily expandable portion is deformed by expanding in the radially outward direction within the ground. A pile structure characterized by:
[0047] (Appendix 7) In the pile structure described in Appendix 6, The easily expandable portion is formed such that the penetration direction of the slits, which appears in a cross section perpendicular to the material axis, is inclined at a predetermined angle with respect to the radial direction of the straight pipe. A pile structure characterized by: [Industrial Applicability]
[0048] The invention disclosed in this application can be widely used as a technique for obtaining ground bearing capacity in construction work for small to medium-sized buildings and the like. [Explanation of symbols]
[0049] 1 pile pipe 11 Easy-to-expand diameter section 12 Slit 13 Connecting protrusion 14 Cap 2 Attachment 21 Engagement groove 3. Anti-sinking device 31 Cylinder part 32 Engagement groove 33 Presser plate 4. Crushed Stone 5 Feeding aid 6. Hammer 7 Basics
Claims
1. A pile construction method including the following [Step 1] to [Step 6]. [Step 1] By forming multiple slits in the peripheral wall of a hollow straight pipe, extending in the longitudinal direction of the straight pipe and penetrating the peripheral wall in an inward and outward direction, the peripheral wall in that portion is made into an easily expandable section, and a pipe pile is prepared with the tip of the straight pipe blocked. [Step 2] The pipe pile is buried in the ground to a predetermined depth by pressing or driving it in. [Step 3] Attach a subsidence prevention device to the head of the pipe pile and abut the subsidence prevention device against the ground surface. [Step 4] Pour crushed stone into the inside of the pipe pile, filling it at least up to the height of the easy-to-expand portion. [Step 5] Pressurization is applied to the crushed stone from above the pipe pile using a pressure device, thereby causing the easily expandable portion to bulge and deform in the radially outward direction. [Step 6] Stop applying pressure to the crushed stone, remove the pressure device, and detach the anti-settling device.
2. In the step 2 of the pile construction method according to claim 1, The pipe pile is buried while being rotated and pressed in a certain direction. A pile construction method characterized by the above.
3. The pile construction method according to claim 2, The pipe pile prepared in [Step 1] is formed so that the penetration direction of the slit appearing in the cross section perpendicular to the material axis of the easy-to-expand portion is inclined at a predetermined angle with respect to the radial direction of the pipe pile, In step 2, the pipe pile is rotated so that the inner side in the penetration direction of the slit leads in the rotation direction of the pipe pile. A pile construction method characterized by the above.
4. A pipe pile consisting of a hollow straight pipe, A peripheral wall of the straight pipe, the tip of which is closed, is provided with an easily expandable diameter portion formed by forming a plurality of slits extending in the material length direction of the straight pipe and penetrating the peripheral wall in an inward and outward direction, The easily expandable portion is formed such that the penetration direction of the slits, which appears in a cross section perpendicular to the material axis, is inclined at a predetermined angle with respect to the radial direction of the straight pipe. A pipe pile characterized by:
5. The pipe pile according to claim 4, The easily expandable diameter portion is provided at a plurality of locations at predetermined intervals in the material axial direction. A pipe pile characterized by:
6. A peripheral wall of a pipe pile made of a hollow straight pipe with a closed tip is provided with an easily expandable diameter portion having a plurality of slits extending in the material length direction of the pipe pile and penetrating the peripheral wall in an inward and outward direction; The pipe pile is buried in the ground, The inside of the pipe pile is filled with crushed stone, When the crushed stone is pressurized, the easily expandable portion is deformed by expanding in the radially outward direction within the ground. A pile structure characterized by:
7. The pile structure according to claim 6, The easily expandable portion is formed such that the penetration direction of the slits, which appears in a cross section perpendicular to the material axis, is inclined at a predetermined angle with respect to the radial direction of the straight pipe. A pile structure characterized by:
Citation Information
Patent Citations
JP1974040964A
Method and apparatus for installing steel pipe pile
JP1980009953A
Pile fixing work
JP1982108314A
Tip-expanded steel tubular pile and construction work thereof
JP1988233117A
Friction pile
JP1988251519A