Curing lids and installation methods for curing lids

The curing lid with a soft material and drainage pipe connection simplifies installation and removal, addressing time-consuming sealing and safety hazards in construction sites.

JP7572665B2Active Publication Date: 2024-10-24MARUI SANGYO
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2022092411
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-06-07
Publication Date
2024-10-24
Estimated Expiration
2042-06-07

AI Technical Summary

Technical Problem

Existing curing lids for construction sites with embedded drainage pipes require time-consuming post-processing to seal gaps and risk misalignment, leading to potential water leaks and safety hazards during installation and removal.

Method used

A curing lid with a soft material covering the top surface and a drainage pipe connection, allowing easy peeling and fixing to the concrete edge, eliminating the need for sealing and reducing installation and removal burdens.

Benefits of technology

The solution enhances workability and safety by simplifying the installation and removal process, preventing water leaks, and reducing the need for additional sealing treatments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007572665000001
    Figure 0007572665000001
  • Figure 0007572665000002
    Figure 0007572665000002
  • Figure 0007572665000003
    Figure 0007572665000003
Patent Text Reader

Abstract

To provide a curing lid with a drainage function and excellent workability and safety in installation and removal.SOLUTION: There is provided a curing lid 1 for closing an opening 3a in a floor slab 4 of a concrete structure, comprising: a lid 10 covering the opening 3a and having an insertion hole 11 provided in an opening direction of the opening 3a; a drainage pipe 30 connected to a lower part of the lid 10 and communicated with the insertion hole 11; and a soft material 40 covering an upper surface of the lid 10 by exposing an outer peripheral edge 10a of the lid 10.SELECTED DRAWING: Figure 4
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a protective cover and a method for installing the protective cover. [Background technology]

[0002] At construction sites using reinforced concrete for condominiums and other buildings, openings are provided in the floor slab to allow the passage of piping for various facilities. Conventionally, the floor slab is exposed to rain until the upper floors and roof are constructed, which causes the problem of water collecting on the floor slab and leaking through the openings to the floors below.

[0003] To solve this problem, drainage pipes are embedded in the floor slab to drain water from the lower floor. However, this method leaves holes where the pipes were embedded, and ultimately requires post-processing by filling the holes with mortar, which is time-consuming. In addition, boards are laid over the openings through which the equipment pipes pass, but there is a risk that the boards will fall out of the openings if they are misaligned.

[0004] Therefore, the opening is closed with a curing lid as described in Patent Document 1. The curing lid described in Patent Document 1 has a water collection part on the upper surface. When pouring concrete, the water collection part is closed with a water collection part cap to prevent concrete from entering the water collection part. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2018-188867 A Summary of the Invention [Problem to be solved by the invention]

[0006] The curing lid described in Patent Document 1 is removed from the opening once after the concrete has hardened by chipping off the concrete on top of the curing lid. The curing lid is then reattached to the opening with a drainage hose connected. Next, the gap between the curing lid and the floor slab is sealed with waterproof putty, allowing water to drain from the water collection section through the opening.

[0007] The curing lid of Patent Document 1 has a problem that the work of chipping the concrete and removing it from the opening after casting is a burden for the worker. After the curing lid is reattached to the opening, it is necessary to fix it to ensure safety. In addition, in order to fully utilize the drainage function, it is necessary to seal the gap with the floor slab with waterproof putty, which is time-consuming. With a curing lid of this configuration, it is possible to expose only the water collection part by chipping the concrete above the water collection part cap, but there are problems in that chipping work is required and that if the concrete is not chipped well, cracks will occur, causing water leakage between the concrete and the curing lid.

[0008] The present invention has been made in consideration of the above points, and provides a protective cover and a method for installing a protective cover that have a drainage function and are easy to install and remove, as well as being safe. [Means for solving the problem]

[0009] In order to achieve the above object, in a first aspect of the present invention, A curing cover for closing an opening in a floor slab of a concrete structure, a cover body covering the opening and having an insertion hole provided in the opening direction; A drain pipe connected to a lower portion of the lid and communicating with the insertion hole; and a soft material covering the upper surface of the lid body while exposing the outer peripheral edge of the lid body.

[0010] According to the above configuration, when concrete is poured, the lid body is protected by the soft material except for the outer peripheral edge portion and does not directly contact the concrete. After concrete is poured, the soft material that is easy to peel off is present under the thin slag. Since the curing lid is provided with the soft material, the unevenness can be made gentle and the upper surface can be made approximately flat, so that when concrete is poured, it is not necessary to flatten the upper part of the lid body by covering it with thick concrete, and it is possible to spread the slag thinly in this way. Concrete contains a lot of solids such as gravel and sand, but slag contains a lot of water and cement. Since concrete is hard after hardening, it is necessary to chip it, but since slag is not as strong as concrete, it does not require chipping and can be easily peeled off. Since the slag can be peeled off together with the soft material, it is easier than chipping concrete and it is possible to remove only the slag within a predetermined range. Furthermore, when the soft material is peeled off, a concrete edge portion made of hardened slag remains on the outer peripheral edge portion of the lid body. Since the slag can be removed within a specified range and the slag outside the specified range can be left, the drainage path on the lid is less likely to become clogged. The concrete edge remaining on the outer periphery seals the gap between the curing lid and the floor slab, so there is no need to apply a water-stopping treatment. In addition, since the drainage pipe is connected to the lid, there is no need to remove the curing lid once, and the curing lid is fixed to the concrete edge simply by peeling off the soft material. This prevents the curing lid from floating up or shifting, and improves workability while maintaining safety. The series of operations required for installing the curing lid can be made more efficient, reducing the burden on the worker.

[0011] In the second invention, in the first invention, a drainage member is provided on the periphery of the insertion hole, the drainage member having a groove having a bottom surface on the top surface of the lid body and a protrusion protruding from the top surface of the lid body with a gap therebetween, The drain pipe is connected to a lower portion of the drain member.

[0012] According to the above configuration, water accumulated on the top surface of the lid can be smoothly drained from the groove to the insertion hole, and the protruding part protruding from the top surface of the lid creates a gap between the soft material and the top surface of the lid, making it difficult for the soft material to stick to the top surface of the lid, making it easier to peel off the soft material after the concrete has hardened. In addition, the protruding part has a slightly raised appearance after the concrete has hardened, making it easy to grasp the position of the soft material.

[0013] In a third aspect of the present invention, in the second aspect of the present invention, The soft material is characterized in that a plurality of slits are provided around the outer periphery of the drainage member, and the inside of the slits is configured to be detachable.

[0014] According to the above configuration, when removing the soft material after pouring the concrete, it is possible to separate and remove only the inner part of the slit. The inner part of the slit has a small area and is located on the upper part of the drainage member protruding from the upper surface of the cover, so it can be removed more easily than the entire soft material. In addition, for example, when the opening is located at the bottom of a step slab where water is likely to accumulate and water needs to be drained immediately, it is possible to quickly remove only the inner part of the slit. The method of removal can be selected based on the situation at the time, which improves workability.

[0015] The fourth invention is a method for installing a curing cover, a step of assembling a curing lid by connecting a drainage pipe communicating with the insertion hole to a lower portion of a lid body having the insertion hole; a step of placing a sleeve pipe in a formwork material, inserting the drainage pipe into the sleeve pipe, and placing the lid body so as to cover the opening of the sleeve pipe and attaching the curing lid; a step of disposing a soft material on an upper surface of the lid body so as to cover the upper surface of the lid body while exposing an outer peripheral edge portion of the lid body; Pouring concrete up to the top of the soft material; and after the concrete has hardened, peeling off the soft material leaving a concrete edge portion formed on the outer periphery of the lid body.

[0016] According to the above configuration, after concrete is poured, there is a soft material that is easy to peel off under the thin slag. Since the curing cover is provided with a soft material, the unevenness can be made gentle and the upper surface can be made approximately flat, so that when pouring concrete, it is not necessary to flatten the upper part of the cover body by covering it with thick concrete, and it is possible to spread the slag thinly in this way. Concrete contains a lot of solids such as gravel and sand, but slag contains a lot of water and cement. Since concrete is hard after hardening and requires chipping work, slag is not as strong as concrete, so chipping work is not required and it can be easily peeled off. Since the slag can be peeled off together with the soft material, it is easier than chipping concrete and it is possible to remove only the slag within a predetermined range. Furthermore, when the soft material is peeled off, a concrete edge portion consisting of hardened slag remains on the outer peripheral edge of the cover body. Since the slag within a predetermined range can be removed and the slag outside the predetermined range can be left, the drainage path on the cover body is less likely to be blocked. The concrete edge remaining on the outer periphery acts as a watertight seal between the cover and the floor slab, eliminating the need for watertight treatment. In addition, since the cover is connected to a drainage pipe, there is no need to remove the cover once. The cover is fixed to the concrete edge simply by peeling off the soft material, which greatly improves workability. The process of installing the cover can be made more efficient, reducing the burden on workers. Effect of the Invention

[0017] As described above, the present invention can provide a protective cover and a method for installing a protective cover that have a drainage function and are easy to install and remove and have excellent safety. [Brief description of the drawings]

[0018] [Figure 1] FIG. 2 is a perspective view of the protective cover according to the embodiment after installation. [Diagram 2] This is an oblique view of the protective cover. [Diagram 3] FIG. [Figure 4] This is an oblique view of the protective cover. [Diagram 5]This is an oblique view of the protective cover. [Figure 6] FIG. 2 is a perspective view showing a method of installing the protective cover. [Figure 7] A cross-sectional view showing a method of installing a protective cover. [Figure 8] FIG. 2 is a perspective view showing a method of installing the protective cover. [Figure 9] FIG. 2 is a perspective view showing a method of installing the protective cover. [Figure 10] A cross-sectional view showing a method of installing a protective cover. [Figure 11] FIG. 2 is a perspective view showing a method of installing the protective cover. [Figure 12] FIG. 11 is a perspective view showing a method for removing the protective cover. [Figure 13] FIG. 11 is a perspective view showing a method for removing the protective cover. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0019] (Embodiment) Hereinafter, the protective cover according to the embodiment will be described with reference to the drawings.

[0020] Fig. 1 is a perspective view of a curing cover according to an embodiment after installation, with a portion shown in cross section for ease of explanation. As shown in Fig. 1, a curing cover 1 according to an embodiment of the present invention is used for a concrete structure, and is installed so as to close an opening 3a of a sleeve pipe 3 arranged on the upper surface of a formwork material 2. The curing cover 1 can drain rainwater and the like from a floor slab 4 formed by pouring concrete through an insertion hole 11.

[0021] Fig. 2 is a perspective view of the curing cover seen from below. Fig. 3 is a cross-sectional view of the cover. As shown in Fig. 2 and Fig. 3, the curing cover 1 is provided with a cover 10 that covers the opening 3a of the cylindrical sleeve pipe 3, that is, the opening 3a provided in the floor slab 4 after concrete is poured.

[0022] The lid 10 is a circular plate-shaped iron member having a diameter slightly larger than that of the sleeve tube 3. A circular insertion hole 11 is formed in the center of the lid 10. The insertion hole 11 penetrates the front and back of the lid 10 and is provided in the opening direction of the opening 3a. The underside of the lid 10 is provided with a plurality of legs 12 spaced apart in the circumferential direction. The legs 12 are angle adjustable with respect to the lid 10 and are configured to be able to abut against the inner wall surface of the sleeve tube 3. The lid 10 is provided with a drainage member 20 in the insertion hole 11.

[0023] The drainage member 20 is a substantially cylindrical plastic member, and is composed of a substantially cylindrical inner tube portion 21 and an outer tube portion 22. The inner tube portion 21 is inserted into the insertion hole 11 of the lid body 10 from above, and the outer tube portion 22 is screwed onto the outer periphery of the inner tube portion 21 below the lid body 10, thereby attaching the drainage member 20 to the insertion hole 11 of the lid body 10.

[0024] The inner cylinder portion 21 has an upper end exposed above the insertion hole 11, and is formed with a groove portion 21a having a bottom surface on the upper surface of the lid body at the periphery of the insertion hole 11, and a protrusion portion 21b protruding from the upper surface of the lid body 10 with a gap serving as the groove portion 21a. The protrusion portion 21b extends radially outward from the insertion hole 11 and is formed in a flange shape, and the lower surface of the radially outer end portion of the protrusion portion 21b abuts against the upper surface of the lid body 10.

[0025] An annular sealant 23 is disposed inside the insertion hole 11. The sealant 23 is positioned between the inner cylinder portion 21, the outer cylinder portion 22, and the lid body 10, and seals off the gap between the lid body 10 and the drainage member 20. An upper portion of the sealant 23 is covered by the protrusion 21b and exposed in the groove portion 21a.

[0026] The inner cylinder 21 has thread grooves formed on its inner and outer periphery below the lid 10. A connecting member 31 connected to an end of a drainage pipe 30 is screwed into the thread groove formed on the inner periphery of the inner cylinder 21. The outer cylinder 22 is screwed into the thread groove formed on the outer periphery of the inner cylinder 21. The upper end of the outer cylinder 22 abuts against the lower surface of the lid 10.

[0027] The number and shapes of the grooves 21a and the protrusions 21b are not limited, but in this embodiment, two protrusions 21b having an arc shape in a plan view are formed at an interval in the circumferential direction of the insertion hole 11, and the groove 21a is between the two protrusions 21b. The two protrusions 21b and the two grooves 21a are alternately formed to form a ring and surround the periphery of the insertion hole 11. The two grooves 21a are provided to face each other with an interval of 180°.

[0028] The drainage pipe 30 is connected to the lower part of the cover 10 and communicates with the insertion hole 11. Specifically, a connecting member 31 is connected to the end of the drainage pipe 30, and the connecting member 31 is connected to the lower part of the drainage member 20. The material of the drainage pipe 30 is not limited, but for example, an electric conduit called a CD pipe or a PF pipe, or a general hose can be used.

[0029] Rainwater or the like that accumulates on the upper surface of the lid 10 passes through the groove 21a and is drained from the insertion hole 11 to the drainage pipe 30.

[0030] 4 and 5 are perspective views of the curing cover seen from above. The curing cover 1 of this embodiment is provided with a soft material 40 for easily exposing the insertion hole 11 after the curing cover 1 is installed to cover the sleeve pipe 3 and concrete is poured.

[0031] The soft material 40 is a circular flat member having a diameter slightly smaller than that of the lid body 10. The shape of the soft material 40 is not limited to a circle, and may be other shapes. For example, it may be a polygon or a circle with a wavy periphery. The soft material 40 is not particularly limited as long as it is soft enough to be easily deformed by hand, but for example, in this embodiment, a sheet-like sponge material with a thickness of about 5 mm is used. The soft material 40 covers the upper surface of the lid body 10 while exposing the outer peripheral edge portion 10a of the lid body 10. The outer peripheral edge portion 10a of the lid body 10 is a ring-shaped region having a width of, for example, about 10 mm inward from the outer peripheral end portion of the lid body 10, and is a region that protrudes from the soft material 40 at the outer peripheral end portion of the lid body 10 when the center of the soft material 40 is aligned so as to almost overlap with the center of the lid body.

[0032] The soft material 40 has a plurality of slits 41. The slits 41 are provided so as to surround the outer periphery of the drainage member 20 when the soft material 40 is placed on the upper surface of the lid 10 so that the center of the soft material 40 substantially overlaps with the center of the lid. The slits 41 are provided penetrating the front and back of the soft material 40, and the soft material 40 is configured so that an inner peripheral portion 40a on the inside of the slits 41 can be separated from an outer peripheral portion 40b on the outside of the slits 41.

[0033] The number and shape of the slits 41 are not limited, but in this embodiment, a total of six linear slits 41 are arranged at intervals in a substantially hexagonal shape. The soft material 40 has an adhesive portion 42 formed on the surface facing the upper surface of the lid 10, so that the soft material 40 can be temporarily fixed to the lid 10. The adhesive portion 42 is, for example, a double-sided tape.

[0034] Next, a method for installing the protective cover of this embodiment will be described with reference to Figs.

[0035] First, the drainage pipe 30 communicating with the insertion hole 11 is connected to the lower part of the lid body 10 having the insertion hole 11, and the protective lid 1 is assembled.

[0036] Fig. 6 is a perspective view showing the state before concrete is poured. As shown in Fig. 6, reinforcing bars 5 are placed in the foundation of the structure, and a sleeve pipe 3 is placed on the formwork material 2 at a position where an opening is to be formed. A drainage pipe 30 is inserted into the sleeve pipe 3 thus placed, and a cover 10 is placed so as to cover the opening 3a of the sleeve pipe 3, and a curing cover 1 is attached.

[0037] A soft material 40 is placed on the upper surface of the lid 10, covering the upper surface of the lid 10 while exposing the outer peripheral edge portion 10a of the lid 10. The process of placing the soft material 40 on the upper surface of the lid may be performed at any time before pouring the concrete.

[0038] Fig. 7 is a cross-sectional view showing the state after concrete has been poured. As shown in Fig. 7, a sleeve pipe 3 is placed in a formwork material 2, a curing lid 1 is attached, and then concrete is poured up to the top of the soft material 40. The top of the curing lid 1 has slag several mm thick sandwiched between the soft material 40, which is easy to peel off. The curing lid 1 constructed as above is protected by the soft material 40 except for the outer peripheral edge 10a of the lid body 10, and does not come into direct contact with the slag.

[0039] Fig. 8 is a perspective view seen from below of the formwork material 2. As shown in Fig. 8, the drainage pipe 30 is inserted through the formwork material 2, and a drainage hose or the like is connected to extend to a drainage location.

[0040] FIG. 9 is a perspective view showing the state of the concrete after hardening, and FIG. 10 is a cross-sectional view showing the state of the concrete after hardening. After the concrete hardens, a thin layer of slag spreads on the top of the curing lid 1. The curing lid 1 has a substantially flat top surface due to the soft material 40, so that when pouring concrete, it is not necessary to cover the top of the lid body 10 with a thick concrete to flatten it, and it is possible to spread the slag thinly in this way. As shown in FIG. 9, when the soft material 40 is peeled off together with the slag, leaving the concrete edge portion 4a formed on the outer peripheral edge portion 10a of the lid body 10, as shown in FIG. 10, only the slag on the top of the soft material 40 can be removed cleanly, and the drainage member 20 and the insertion hole 11 can be exposed. Concrete contains a lot of solids such as gravel and sand, whereas slag contains a lot of water and cement. Since concrete is hard after hardening, chipping is required, but since slag is not as strong as concrete, chipping is not required and it can be easily peeled off. In addition, since not only the slag but also the soft material 40 itself is easy to peel off, the work of exposing the insertion hole 11 is easy.

[0041] Furthermore, by forming the protrusion 21b on the lid 10, a gap is generated around the protrusion 21b between the lid 10 and the soft material 40 that is placed on the top surface of the lid 10 when pouring concrete. This makes it difficult for the soft material 40 to stick to the top surface of the lid 10, making it easier to peel off the soft material 40 after the concrete has hardened. Furthermore, since the protrusion 21b has a slightly raised appearance after the concrete has hardened, it is easy to grasp the position of the soft material 40, in particular the position of the inner periphery 40a inside the slit 41.

[0042] When the soft material 40 is peeled off, hardened slag remains on the upper surface of the outer peripheral edge 10a of the lid 10. Since a specified range of slag can be removed and left behind, the drainage path on the lid 10 is less likely to become blocked. In addition, the concrete edge 4a consisting of the slag remaining on the outer peripheral edge 10a seals the water between the curing lid 1 and the floor slab 4, so there is no need to apply a caulking agent or perform other water-stopping treatment. The curing lid 1 is fixed to the concrete edge 4a of the floor slab 4, ensuring safety. There is no need to remove or fix the curing lid 1, so work efficiency is also good.

[0043] Depending on the situation at the site, as shown in Fig. 11, it is also possible to expose the insertion hole 11 by peeling off only the inner periphery 40a inside the slit 41 of the soft material 40. The inner periphery 40a located at the top of the protruding portion 21b is easier to peel off than the entire soft material 40, making it easier to remove the slag. For example, when the opening 3a is provided at the bottom of a stepped slab where water is likely to accumulate and water needs to be drained immediately, it is possible to peel off only the inner periphery 40a of the slit 41 for a short time, and the peeling method can be selected depending on the situation at the time, which improves workability.

[0044] When removing the curing cover 1, as shown in Figure 12, the concrete edge 4a remaining on the upper surface of the outer peripheral edge 10a of the cover body 10 is removed with a hammer X, and as shown in Figure 13, a tool Y such as a chisel or flathead screwdriver can be inserted into the gap between the cover body 10 and the floor slab 4 to easily remove the curing cover 1.

[0045] As described above, the protective cover 1 of this embodiment can streamline a series of installation and removal tasks while ensuring safety, thereby reducing the burden on workers. [Explanation of symbols]

[0046] 1 Curing lid 2 Formwork material 3 Sleeve pipe 3a opening 4. Floor slab 10 Lid 10a Outer periphery 11 Insertion hole 12 Legs 20 Drainage material 21 Inner cylinder 21a Groove 21b Projection 22 External cylinder 30 Drainage piping 31 Connecting material 40 Soft material 41 Slit 42 Adhesive part

Claims

1. A curing cover for closing an opening in a floor slab of a concrete structure, a cover body covering the opening and having an insertion hole provided in the opening direction; A drain pipe connected to a lower portion of the lid and communicating with the insertion hole; A protective lid comprising: a soft material that covers an upper surface of the lid body and exposes an outer peripheral edge portion of the lid body.

2. a drainage member is provided on the periphery of the insertion hole, the drainage member having a groove having a bottom surface on the top surface of the lid body and a protrusion protruding from the top surface of the lid body with a gap therebetween, The protective cover according to claim 1, characterized in that the drainage pipe is connected to a lower part of the drainage member.

3. The protective cover according to claim 2, characterized in that the soft material has a plurality of slits formed around the outer periphery of the drainage member, and the inside of the slits is configured to be detachable.

4. a step of assembling a curing lid by connecting a drainage pipe communicating with the insertion hole to a lower portion of a lid body having the insertion hole; a step of placing a sleeve pipe in a formwork material, inserting the drainage pipe into the sleeve pipe, and placing the lid body so as to cover the opening of the sleeve pipe and attaching the curing lid; a step of disposing a soft material on an upper surface of the lid body so as to cover the upper surface of the lid body while exposing an outer peripheral edge portion of the lid body; Pouring concrete up to the top of the soft material; and after the concrete has hardened, peeling off the soft material leaving behind a concrete edge portion formed on the outer peripheral edge of the cover body.

Citation Information

Patent Citations

  • Temporary lid device for pipe clogging prevention in roof drain

    JP1993034255U

  • Cover for drainage component and molding method therefor

    JP1994193124A

  • Sleeve for slab and sleeve with base

    JP1998110528A

  • Cut off and water dripping device for sleeve placed in slab

    JP2004270396A

  • Curing device of drain body

    JP2006299619A