How to build a long span structure
The use of additive manufacturing to install wire rods and discharge hydraulic mixtures for constructing large span structures addresses the inefficiencies of conventional methods, resulting in efficient and robust structures with enhanced rigidity and load-bearing capacity.
Patent Information
- Application Number
- JP2021037398
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-03-09
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2041-03-09
AI Technical Summary
The transportation of materials and labor becomes a bottleneck during the construction of bridge girders, necessitating the use of conventional methods that require ready-mixed concrete placement or precast member installation, which hampers construction efficiency.
A method utilizing additive manufacturing equipment to install wire rods and discharge a hydraulic mixture to construct a face material between the rods, eliminating the need for supporting members in water and incorporating tensioned wire rods to enhance rigidity and strength.
The method enables efficient construction of large span structures with improved workability and rigidity, allowing for safer and more robust structures with reduced deflection and increased load-bearing capacity.
Smart Images

Figure 0007573461000001 
Figure 0007573461000002 
Figure 0007573461000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a method for constructing a large span structure. [Background technology]
[0002] The cantilever construction method has been known as a method for constructing large span structures such as bridges. In this method, bridge piers are erected on the ground, and bridge girders are sequentially installed between the piers from the abutment side (see Patent Document 1 below).
[0003] Meanwhile, in recent years, additive manufacturing devices such as 3D printers have been used to extrude concrete components made of cement-based materials into designated locations to build structures in one go. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2005-171638 A Summary of the Invention [Problem to be solved by the invention]
[0005] However, when constructing bridge girders, in the case of the cast-in-place method, ready-mixed concrete needs to be transported to the designated location and poured, and in the case of the PCa method, precast components need to be transported to the designated location and installed, which poses the problem that the transportation of materials and labor becomes a bottleneck for work.
[0006] Therefore, the present invention has been made in consideration of the above circumstances, and provides a method for constructing a large-span structure that can be constructed with good workability using an additive manufacturing device such as a 3D printer. [Means for solving the problem]
[0007] In order to achieve the above object, the present invention employs the following means. In other words, the method for constructing a large span structure according to the present invention comprises a wire installation process for installing a pair of wires, and a surface material construction process for installing an additive manufacturing device so as to straddle the pair of wires and move it in the extension direction of the wires, ejecting a hydraulic mixture from the additive manufacturing device, covering the pair of wires with the hydraulic mixture, and constructing a surface material between the pair of wires.
[0008] In the method for constructing a large span structure configured in this manner, the hydraulic mixture discharged from the additive manufacturing device covers the pair of wires and constructs the surface material between the pair of wires, so that the structure is constructed in stages. Therefore, there is no need to install components such as piers that support the surface material underwater, and the workability of installing the surface material is good. Note that the "hydraulic mixture" refers to a material that includes various cement-based materials (e.g., cement paste, mortar, concrete, etc.) and geopolymer compositions.
[0009] In addition, in the method for constructing a large span structure according to the present invention, the wire may be a tendon to which tension is applied.
[0010] In the construction method for a large span structure configured in this manner, the wire is a tension material to which tension has been introduced, so that no tensile force acts on the surface material containing the wire, thereby increasing rigidity and strength.
[0011] In addition, the method for constructing a large span structure according to the present invention may include a reticulated wire installation step of installing other wires in a reticulated pattern between the pair of wires, and in the surface material construction step, the hydraulic mixture may be used to cover the other wires installed in a reticulated pattern to construct the surface material.
[0012] In the method for constructing a large span structure configured in this way, other wires are placed in a net-like shape between the pair of wires, and the other wires are also covered with a hydraulic mixture, which further increases the rigidity of the surface material that contains the wires and other wires. Effect of the Invention
[0013] According to the method for constructing a large span structure of the present invention, construction can be performed with good workability using an additive manufacturing device. [Brief description of the drawings]
[0014] [Figure 1] FIG. 2 is a front view showing a method for constructing a large span structure according to the first embodiment of the present invention. [Diagram 2] FIG. 2 is a front view showing a method for constructing a large span structure according to the first embodiment of the present invention, showing a process subsequent to that shown in FIG. [Diagram 3] FIG. 3 is a front view showing the method for constructing a large span structure according to the first embodiment of the present invention, showing a process subsequent to that shown in FIG. [Figure 4] FIG. 2 is an enlarged view showing the panel construction process of the method for constructing a large span structure according to the first embodiment of the present invention. [Diagram 5] FIG. 2 is a cross-sectional view of a constructed panel according to the method for constructing a large span structure according to the first embodiment of the present invention. [Figure 6] FIG. 11 is an enlarged view showing the panel construction process of the method for constructing a large span structure according to the second embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0015] First embodiment A method for constructing a large span structure according to a first embodiment of the present invention will be described with reference to the drawings. In this embodiment, a case where a bridge is constructed will be described. The method for constructing a large span structure includes a wire rod installation process and a face material construction process.
[0016] First, a wire installation step is performed. As shown in Fig. 1, a pair of piers 11 and abutments 12 are installed on both banks. The piers 11 only need to be installed in the water on both banks or near both banks, and there is no need to install other piers in the water between the pair of piers 11. A brace (tensile member) 13 is installed between the pier 11 and the abutment 12.
[0017] A PC cable (PC steel, wire, and tension member) 14 is installed between the upper parts of the piers 11. The extension direction of the PC cable 14 is the X direction. The extension direction of the bridge 1 is the X direction.
[0018] The PC cables 14 are installed as a pair, spaced apart in the width direction (Y direction) of the bridge 1 (see FIG. 4). The pair of PC cables 14 are arranged substantially parallel to each other or partially parallel to each other. In this case, the PC cables 14 may be transported and erected by an aircraft such as a drone (UAV: Unmanned Aerial Vehicle) or a ship.
[0019] A tension force is introduced into the PC cable 14. When the PC cable 14 is fixed to the top 11u of the pier 11, the PC cable 14 forms a catenary curve. Since the PC cable 14 bends as the load increases, the PC cable 14 is tensioned to control the bending.
[0020] As shown in Fig. 4, the outer periphery of the PC cable 14 is covered with a sheath pipe 15. The sheath pipe 15 may be installed together with the PC cable 14, or may be successively fed out from the top 11u of the pier 11 after the PC cable 14 is installed. The PC cable 14 covered with the sheath pipe 15 is referred to as a cable body 16.
[0021] Next, the surface material construction process is carried out. 2, a lower chord member 20 is constructed so as to enclose the PC cable 14. The face member construction process will be described in detail later.
[0022] Next, a bundle 31 extending in the vertical direction is placed on the lower chord 20. A plurality of bundles 31 are placed at a distance from one another between the piers 11. The bundles 31 may be made of concrete produced by a 3D printer on the lower chord 20. The bundles 31 may be made of steel and transported and placed on the lower chord 20 by a transport vehicle, or the steel bundles 31 may be coated with mortar. The upper part of one adjacent bundle 31 and the lower part of the other bundle 31 are connected by a brace 32.
[0023] The upper parts of adjacent beams 31 are connected by an upper chord 33. The upper chord 33 may be a single member such as an H-beam, or a truss member. Both ends of the upper chord 33 may extend to the abutments 12, and the abutments 12 may be supported by roller bearings (movable).
[0024] As shown in Fig. 3, a deck 36 is installed on the upper chord 33. The deck 36 is installed up to both banks. The deck 36 is supported by the upper parts of the piers 11 and the upper parts of the beams 31. The deck 36 is made of concrete, and may be precast concrete and installed sequentially, or may be poured on site.
[0025] The surface material construction process will now be described in detail. In this embodiment, the lower chord surface material (surface material) 22 is constructed from one side (X2 side) to the other side (X1 side) in the X direction shown in Fig. 4. The X1 direction is the progression direction.
[0026] The support plates 5 are sequentially installed from the X2 side toward the X1 side between the pair of cable bodies 16. A plurality of support plates 5 are installed consecutively in the X direction.
[0027] As shown in FIG. 5, the support plate 5 is placed on a pair of cable bodies 16. It has a flat plate portion 51. The flat plate portion 51 is formed in a flat plate shape. The plate surface of the flat plate portion 51 faces the vertical direction. Protruding portions 52 that bulge upward are formed near both ends of the flat plate portion 51 in the Y direction. An insertion hole 53 having a shape corresponding to the cable body 16 is formed inside the protruding portion 52. The cable body 16 is inserted into the insertion hole 53.
[0028] Next, the additive manufacturing device 4 is used to construct the lower chord surface material 22. The additive manufacturing device 4 is installed so as to straddle the pair of cable bodies 16, and while traveling on the cable bodies 16, it ejects concrete fluid (hydraulic mixture) 21 to form the lower chord surface material 22.
[0029] The additive manufacturing apparatus 4 has a main body support portion 41, a self-propelled portion 42, a nozzle support portion 43, a nozzle 44, and a hose 45.
[0030] The main body support part 41 is disposed between the pair of cable bodies 16. The self-propelled part 42 is provided on both sides of the main body support part 41 in the Y direction. The wheels 42a of the self-propelled part 42 are capable of traveling on the convex part 52 of the support plate 5 arranged on the upper side of the cable body 16 in the extension direction (X direction) of the cable body 16. The nozzle support part 43 is provided on the upper surface of the main body support part 41. The nozzle 44 is provided at the tip part of the nozzle support part 43. The nozzle support part 43 can move the nozzle 44 to a desired position. The nozzle 44 is connected to a hose 45 through which the unhardened concrete fluid 21 flows. The hose 45 is connected to a tank (not shown) in which the unhardened concrete fluid 21 is stored. The nozzle 44 discharges the concrete fluid 21 and layers the concrete fluid 21 in a flat plate shape on the support plate 5. The configuration of the additive manufacturing device 4 is not particularly limited. The additive manufacturing device 4 may be remotely operable.
[0031] The self-propelled part 42 is moved from one bank towards the X1 side over the cable body 16. The nozzle 44 faces the X2 side. The nozzle 44 ejects and layers the concrete fluid 21, thereby covering the top of the pair of cable bodies 16 and constructing the lower chord surface material 22 between the pair of cable bodies 16. As the self-propelled part 42 moves towards the X1 side, the lower chord surface material 22 is constructed in the X1 direction between both banks.
[0032] The lower chord surface material 22 is formed in a plate shape. The lower chord surface material 22 has a width sufficient to cover a pair of sheath pipes 15.
[0033] As shown in Figure 5, the PC cable 14 is covered by a sheath pipe 15, which is inserted into an insertion hole 53 in the support plate 5. A small gap s1 is formed between the PC cable 14 and the sheath pipe 15. In this manner, the PC cable 14 and the lower chord surface member 22 are in an unbonded state. As the lower chord member 20 is constructed, it bends due to its own weight, so the PC cable 14 can be gradually tensioned at the top 11u of the pier 11 to control the bending.
[0034] Concrete fluid 21, an example of a hydraulic mixture, is a material that includes various cement-based materials (eg, cement paste, mortar, concrete, etc.), geopolymer compositions, and the like.
[0035] In the method for constructing a long span structure configured in this manner, the concrete fluid 21 discharged from the additive manufacturing device 4 covers the pair of PC cables 14 and constructs the lower chord surface member 22 between the pair of PC cables 14, thereby constructing the structure in stages. Therefore, there is no need to install components such as piers that support the lower chord surface member 22 underwater, and the workability of installing the lower chord surface member 22 is good.
[0036] In addition, since the PC cable 14 is a tension material to which tension has been introduced, no tensile force acts on the lower chord panel 22 which contains the PC cable 14, thereby increasing rigidity and strength.
[0037] In addition, work robots, vehicles, etc. can run on the lower chord member 20 installed during construction.
[0038] In addition, by adding the lower chord panel 22 that covers the PC cable 14 to the lower chord 20, the cross-sectional performance is improved, and the strength and rigidity are high in both the vertical and horizontal directions. Therefore, the deflection of the lower chord 20 due to the load applied from above can be reduced.
[0039] Furthermore, if concrete were used for the lower chord 20, there is a risk that it would crack when pulled, and the strength and rigidity of the concrete portion would not be expected, but by tensioning the PC cables 14, the concrete goes into compression, making the entire cross section effective. This gives the lower chord 20 the strength and rigidity of the concrete portion. Furthermore, by integrating it with the upper chord 33 via the beams 31 and braces 32, the strength and rigidity of the bridge structure increase dramatically, and after the process shown in Figure 3, the bridge will be able to withstand a larger load and have less deflection.
[0040] In addition, by introducing tension with the PC cables 14, the deflection of the lower chord 20 can be controlled during construction, so construction can be carried out safely without causing large displacements. Even if deflection occurs due to creep after completion, it can be dealt with by re-tensioning.
[0041] Second Embodiment Next, a method for constructing a large span structure according to a second embodiment of the present invention will be described mainly with reference to Fig. 6. In the following embodiment, parts having substantially the same configuration as those in the first embodiment will be given the same reference numerals and detailed description will be omitted.
[0042] As shown in FIG. 6, in this embodiment, the method for constructing a large span structure includes a reticulated wire installation step between the wire installation step and the face material construction step.
[0043] In the reticulated wire installation process, reinforcing wires (other wires) 18 are installed in a reticulated state between a pair of cable bodies 16. Locking members 6 are provided integrally with the lower portions of the reinforcing wires 18 installed in a reticulated state. A plurality of locking members 6 are provided at intervals in the Y direction.
[0044] The locking member 6 has a rod-shaped portion 61 and a locking portion 62. The rod-shaped portion 61 is a rod-shaped member extending in the Y direction. The locking portions 62 are provided at both ends of the rod-shaped portion 61. The locking portions 62 extend upward from the ends of the rod-shaped portion 61, and the tips thereof can be locked to the upper side of the cable body 16.
[0045] The reinforcing wire 18 and the locking member 6 are attached to and laid on the cable body 16 while pulling the reinforcing wire 18 in the direction of travel (X1 side) using a reticulated wire laying device (not shown) provided at the bottom of the additive manufacturing device 4 running on the cable body 16.
[0046] The retaining portion 62 of the retaining member 6 is retained on the cable body 16, whereby the mesh-like reinforcing wire material 18 provided integrally with the retaining member 6 is installed.
[0047] In the surface material construction process, the wheels 42a of the self-propelled part 42 of the additive manufacturing device 4A travel on the cable body 16, and the concrete fluid 21 is ejected from the nozzle 44A in a spraying manner. The lower chord surface material 22 is constructed so as to cover the pair of cable bodies 16, the reinforcing wires 18, and the locking members 6.
[0048] When the mesh-like reinforcing wire 18 is pulled at the lower end of the additive manufacturing device 4A, the part of the concrete fluid 21 that has been poured and integrated with the reinforcing wire 18 acts as a reaction force, causing the reinforcing wire 18 to be placed in a state of tensile stress, thereby preventing it from bending due to its own weight when poured.
[0049] In the method for constructing a long span structure configured in this manner, the concrete fluid 21 discharged from the additive manufacturing device 4A covers the pair of PC cables 14 and constructs the lower chord surface member 22 between the pair of PC cables 14. Therefore, there is no need to install components such as piers that support the lower chord surface member 22 underwater, and the ease of installation of the lower chord surface member 22 is good.
[0050] In addition, reinforcing wires 18 are installed in a net-like manner between the pair of PC cables 14, and the reinforcing wires 18 are also covered with the concrete fluid 21. Therefore, the rigidity of the lower chord surface member 22 containing the PC cables 14 and the reinforcing wires 18 can be further increased.
[0051] The assembly procedures, shapes and combinations of the components, etc. shown in the above-described embodiment are merely examples, and various modifications can be made based on design requirements, etc., without departing from the spirit of the present invention.
[0052] For example, in the above embodiment, the bridge 1 has been taken as an example for explanation, but a roof may also be constructed by the method for constructing a large span structure.
[0053] Furthermore, a robot capable of traveling on the PC cable 14 may be used to cross-link multiple wires other than the PC cable 14, or 3D printing using metal or resin may be performed to increase the diameter of the PC cable 14 (for example, widening it to an H-beam shape). Although the discharge port of the concrete fluid 21 is configured to be located on the upper side of the PC cable 14, it may also be configured to be located on the lower side of the PC cable 14.
[0054] Also, a robot capable of moving on the lower chord 20 may be used to perform 3D printing using concrete material to thicken the lower chord 20 and add rigidity. Alternatively, a robot capable of transporting and welding rods may be used to weld rod members (e.g., beam members 31) in a direction rising from the lower chord 20 to construct a three-dimensional structure such as an arch or truss structure. Increasing the cross section of the member can improve the strength and rigidity of the member. In this way, by growing the structure, it becomes possible to use heavy robots, so that the structure can be grown by using machines such as drones, small robots, medium robots, and large robots in sequence or simultaneously while chasing each other.
[0055] Furthermore, if the top 11u of the pier 11 is positioned higher than the bridge girder (deck 36), the lower end height of the lower chord 20 can be set at a higher position. Since the rise (height in the vertical direction) of the catenary curve can be secured, a bridge 1 with a larger span can be constructed.
[0056] In addition, if the height of the core of the PC cable 14 is made higher than the height of the center of gravity of the lower chord 20, the lower chord 20 of the bridge 1 can be prevented from collapsing. [Explanation of symbols]
[0057] 4,4A Additive Manufacturing Equipment 14 PC cable (PC steel, wire, tension material) 18 Reinforcing wire (other wire) 21 Concrete fluid (hydraulic mixture) 22 Lower Chord Surface Material (Surface Material)
Claims
1. a wire installation step of installing a pair of wires; and a surface material construction process for installing an additive manufacturing device so as to straddle the pair of wires and move it in the extension direction of the wires, and discharging a hydraulic mixture from the additive manufacturing device to cover the pair of wires with the hydraulic mixture and construct a surface material between the pair of wires.
2. The method for constructing a large span structure according to claim 1, wherein the wire is a tendon to which tension is applied.
3. A reticulated wire installation step is provided for installing another wire in a reticulated state between the pair of wires, 3. The method for constructing a large span structure according to claim 1 or 2, wherein in the surface material construction step, the surface material is constructed by covering the other wire members arranged in a net shape with the hydraulic mixture.
Citation Information
Patent Citations
Suspension bridge in concrete and its constructing method
JP1979160027A
Method for constructing suspended floor board bridge
JP1994299516A
Composite suspension floor slab and method for construction thereof
JP2003336216A
Planar structure reinforcing method
JP2005133500A
Displacement adjusting method in overhanging installing construction method for concrete girder
JP2005171638A