Air conditioners

The air conditioner integrates a liquid supply unit to the indoor heat exchanger, enabling simultaneous heating and humidification, enhancing efficiency and preventing moisture issues during heating and defrosting operations.

JP7583631B2Active Publication Date: 2024-11-14SHARP KK
View PDF 11 Cites 0 Cited by

Patent Information

Application Number
JP2021016223
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-02-04
Publication Date
2024-11-14
Estimated Expiration
2041-02-04

AI Technical Summary

Technical Problem

Existing air conditioners that utilize a refrigeration cycle do not effectively integrate humidification during heating operations, as methods like circulating hot water within a heat exchanger are not applicable.

Method used

An air conditioner design that includes a liquid supply unit to supply liquid to the surface of an indoor heat exchanger, which can be a condenser or evaporator in the refrigeration cycle, allowing for humidification during heating operations.

Benefits of technology

Enables simultaneous heating and humidification, improves operating efficiency during defrosting, and prevents moisture-related issues by controlling liquid supply to maintain optimal heating performance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007583631000001
    Figure 0007583631000001
  • Figure 0007583631000002
    Figure 0007583631000002
  • Figure 0007583631000003
    Figure 0007583631000003
Patent Text Reader

Abstract

To provide an air conditioner with high convenience.SOLUTION: An air conditioner comprises: an indoor heat exchanger that is a condenser or evaporator in a refrigeration cycle that circulates a refrigerant in the order of a compressor, a condenser, an expansion valve, and an evaporator; an air blower that sends out air heat-exchanged in the indoor heat exchanger by the refrigeration cycle into a room; and a liquid supply unit that supplies liquid to the surface of the indoor heat exchanger.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an air conditioner and the like. [Background technology]

[0002] Conventionally, since the air is dry in winter, there is a demand for humidification in addition to heating. For example, Patent Document 1 discloses an air conditioner having a water supply device that supplies hot water to the surface of a heat exchanger through which hot water for hot water supply is circulated. Humidification is achieved by evaporating high-temperature hot water in the heat exchanger. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Japanese Patent Application Publication No. 9-26152 Summary of the Invention [Problem to be solved by the invention]

[0004] The technique of Patent Document 1 involves dripping hot water onto the surface of a heat exchanger in an indoor unit in a configuration in which hot water is circulated through the heat exchanger. However, in air conditioners that use a refrigeration cycle for heating and cooling, there is no need to circulate hot water through the heat exchanger of the indoor unit, and therefore the technique of Patent Document 1 cannot be applied.

[0005] According to some aspects of the present disclosure, a highly convenient air conditioner or the like can be provided. [Means for solving the problem]

[0006] One aspect of the present disclosure relates to an air conditioner that includes an indoor heat exchanger that is the condenser or the evaporator in a refrigeration cycle that circulates a refrigerant through a compressor, a condenser, an expansion valve, and an evaporator in that order, a blower that sends air that has been heat exchanged in the indoor heat exchanger by the refrigeration cycle into a room, and a liquid supply unit that supplies liquid to a surface of the indoor heat exchanger. [Brief description of the drawings]

[0007] [Figure 1] FIG. [Diagram 2] Cross-sectional view of an indoor unit and a liquid supply unit of an air conditioner [Diagram 3] An example of an air conditioner configuration. [Figure 4] FIG. 4 is an explanatory diagram of a refrigeration cycle during cooling operation. [Diagram 5] FIG. 4 is an explanatory diagram of a refrigeration cycle in a heating operation. [Figure 6] 5 is a flowchart illustrating a process in a heating operation. [Figure 7] 6 is a flowchart illustrating a process in a humidification operation. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0008] Hereinafter, the present embodiment will be described with reference to the drawings. In the drawings, the same or equivalent elements are given the same reference numerals, and duplicated explanations are omitted. Note that the present embodiment described below does not unduly limit the contents described in the claims. In addition, all of the configurations described in the present embodiment are not necessarily essential configurations of the present disclosure.

[0009] 1. Example of air conditioner configuration Fig. 1 is a cross-sectional view showing the configuration of an indoor unit 100 of an air conditioner 10 according to this embodiment. Fig. 1 illustrates a home air conditioner that is fixed to an indoor wall surface. In the following, the horizontal direction perpendicular to the fixing surface is referred to as the front-rear direction, and the direction perpendicular to the front-rear direction is referred to as the left-right direction. Fig. 1 is a cross-sectional view of the indoor unit 100 in a cross section perpendicular to the left-right direction.

[0010] As shown in Fig. 1, the indoor unit 100 includes a blower 110, an indoor heat exchanger 120, and a liquid injection unit 164. However, the configuration of the air conditioner 10 according to this embodiment is not limited to that shown in Fig. 1, and various modifications are possible, such as omitting some components and adding other components. The fact that various modifications are possible regarding the specific configuration also applies to Figs. 2 to 5 described below.

[0011] Specifically, the blower 110 includes an indoor fan 111 and an indoor fan motor 112 (not shown in Fig. 1) that drives the indoor fan. When the indoor fan 111 is rotated by the indoor fan motor 112, outside air is drawn in from an intake port provided on the top of the indoor unit 100. The drawn in outside air is subjected to heat exchange in the indoor heat exchanger 120, and then blown out from an outlet provided on the front side of the indoor unit 100.

[0012] The indoor heat exchanger 120 may include, for example, a first indoor heat exchanger 120a and a second indoor heat exchanger 120b. The first indoor heat exchanger 120a and the second indoor heat exchanger 120b are, for example, fin-tube type heat exchangers each including a tube through which a refrigerant flows and fins. However, the specific configuration of the indoor heat exchanger 120 in this embodiment can be modified in various ways. In addition, the number of indoor heat exchangers 120 is not limited to the example in FIG. 1, and may be one, or three or more. In addition, the position of the indoor heat exchanger 120 in the indoor unit 100 can also be modified in various ways.

[0013] As described later with reference to Figures 4 and 5, the indoor heat exchanger 120 in this embodiment is a heat exchanger in a refrigeration cycle. For example, the indoor heat exchanger 120 may be an evaporator in a refrigeration cycle in which a refrigerant circulates through a compressor 250, a condenser, an expansion valve 260, and an evaporator in this order, as shown in Figure 4. The indoor heat exchanger 120 may also be a condenser in a refrigeration cycle, as shown in Figure 5.

[0014] The liquid injection unit 164 supplies liquid to the surface of the indoor heat exchanger 120. The liquid injection unit 164 is a porous body, and is an object through which liquid can permeate by, for example, capillary action. More specifically, the liquid injection unit 164 may be a sponge. The liquid injection unit 164 is provided vertically above the indoor heat exchanger 120. For example, the liquid injection unit 164 is provided at a position in contact with the upper ends of the fins of the indoor heat exchanger 120, and supplies liquid to the surfaces of the fins. The liquid here is, for example, water, but other liquids may be used.

[0015] 2 is a cross-sectional view of indoor unit 100 in a cross section perpendicular to the front-rear direction, and shows the relationship with liquid supply unit 160. Liquid supply unit 160 includes a storage tank 161, a pump 162, piping 163, and a liquid injection unit 164. Of liquid supply unit 160, storage tank 161 and pump 162 may be disposed in a housing 165 provided outside indoor unit 100. However, the configuration of liquid supply unit 160 is not limited to this, and storage tank 161, pump 162, and piping 163 may be provided inside indoor unit 100.

[0016] The storage tank 161 stores the liquid to be supplied to the indoor heat exchanger 120 by the liquid injection unit 164. For example, the storage tank 161 is a tank that can be removed from the housing 165, and the user of the air conditioner 10 sets the tank, which has been refilled with tap water or the like, in a predetermined position in the housing 165. This brings the storage tank 161 into a state where it is filled with liquid.

[0017] The pump 162 operates under the control of the indoor control unit 130, which will be described later. Since a wide range of known configurations can be applied to the pump 162 here, a description of the specific configuration will be omitted.

[0018] The piping 163 is provided between the pump 162 and the liquid injection unit 164. The pump 162 supplies the liquid stored in the storage tank 161 to the piping 163, thereby supplying the liquid to the liquid injection unit 164. In the example of FIG. 2, one end of the piping 163 is connected to the pump 162 in the housing 165. The piping 163 is inserted into the indoor unit 100 from an opening (not shown) provided on the side surface of the indoor unit 100, and the other end of the piping 163 is located near the liquid injection unit 164.

[0019] The liquid injection unit 164 is a plate-like member having a length corresponding to the indoor heat exchanger 120 in the left-right direction, for example, as shown in FIG. 2. The end of the pipe 163 on the liquid injection unit 164 side is provided, for example, near one end of the liquid injection unit 164 in the left-right direction. The liquid from the pump 162 is supplied to one end of the liquid injection unit 164 and permeates to the other end side by capillary action. By supplying a certain amount of liquid by the pump 162, the liquid can permeate a wide area of ​​the liquid injection unit 164. However, the configuration for supplying liquid to the liquid injection unit 164 is not limited to this, and various modifications can be made to the position of the pipe 163, etc.

[0020] The lower side of the liquid injection unit 164 is in contact with, for example, the fins. By making the fins more hydrophilic than the liquid injection unit 164, the liquid that has permeated into the liquid injection unit 164 is supplied to the fins, thereby achieving a wet state for the fins.

[0021] As shown in Figs. 1 and 2, the indoor unit 100 may include a drain pan 170 provided below the indoor heat exchanger 120. Of the liquid supplied by the liquid injection unit 164, the liquid that falls without being vaporized on the surface of the indoor heat exchanger 120 is collected by the drain pan 170. The drain pan 170 is connected to the water tank 161, for example, by a pipe not shown, and the liquid collected in the drain pan 170 is returned to the tank 161. The drain pan 170 is disposed, for example, at a position where it contacts a part of the fin included in the indoor heat exchanger 120. However, the drain pan 170 may be provided at a position where it can collect the liquid that falls from the indoor heat exchanger 120, and various modifications of the specific arrangement are possible.

[0022] 3 is a block diagram showing the configuration of an air conditioner 10 according to this embodiment. The air conditioner 10 includes an indoor unit 100 and an outdoor unit 200.

[0023] The indoor unit 100 includes an indoor control unit 130, an environment detection unit 140, a remote control transmission / reception unit 150, an indoor fan motor 112, and a pump 162. As described above, the pump 162 may be provided outside the indoor unit 100.

[0024] The indoor control unit 130 includes an operation control unit 131 and a command transmission unit 132. The operation control unit 131 performs various operation controls such as heating operation, humidification operation, cooling operation, and defrosting operation. Specifically, the operation control unit 131 performs a process of driving / stopping the indoor fan motor 112, a process of determining the air volume, a process of driving the pump 162, and the like. The operation control unit 131 also executes processes described below with reference to Figs. 6 and 7.

[0025] The command transmission unit 132 generates control signals for operating each part of the indoor unit 100 in accordance with the processing in the operation control unit 131, and outputs the control signals. For example, the command transmission unit 132 outputs control signals to the indoor fan motor 112 and the pump 162.

[0026] Moreover, the indoor control unit 130 transmits and receives information to and from the outdoor control unit 230, causing the outdoor control unit 230 to execute predetermined control. For example, in the above-mentioned operation control, the indoor control unit 130 causes the outdoor control unit 230 to execute control to switch the four-way valve 270, which will be described later. In this manner, in the air conditioner 10, when realizing operation in a given operation mode, the indoor control unit 130 and the outdoor control unit 230 may operate in conjunction with each other. Therefore, in the following specification, the indoor control unit 130 and the outdoor control unit 230 are collectively referred to simply as the control unit.

[0027] The environment detection unit 140 includes a room temperature sensor 141 and an indoor heat exchanger temperature sensor 142. The room temperature sensor 141 is provided, for example, near the air intake, and is a sensor that detects the temperature in the room where the indoor unit 100 is installed. The indoor heat exchanger temperature sensor 142 is provided near the indoor heat exchanger 120, and is a sensor that detects the temperature of the indoor heat exchanger 120. Temperature information detected by the room temperature sensor 141 and the indoor heat exchanger temperature sensor 142 is output to the indoor control unit 130.

[0028] The remote control transmitting / receiving unit 150 is an interface that transmits and receives signals to and from a remote control used by a user. The remote control transmitting / receiving unit 150 may communicate with the remote control using infrared rays, or may communicate according to other standards such as IEEE (Institute of Electrical and Electronics Engineering) 802.11. The remote control transmitting / receiving unit 150 receives signals such as instructions to start / end a heating operation and instructions to start / end a humidifying operation from the remote control.

[0029] The outdoor unit 200 includes an outdoor control unit 230, an outdoor fan motor 212, an environment detection unit 240, a compressor 250, an expansion valve 260, a four-way valve 270, and the like.

[0030] The outdoor control unit 230 includes an operation control unit 231 and a command transmission unit 232. The operation control unit 231 performs various operation controls such as heating operation, humidification operation, cooling operation, and defrosting operation. Specifically, the operation control unit 231 performs a process of driving / stopping the outdoor fan motor 212, a process of determining the air volume, etc. The operation control unit 231 also performs a process of determining the compression degree in the compressor 250, a process of switching the four-way valve 270, etc.

[0031] The command transmitting unit 232 generates control signals for operating each part of the outdoor unit 200 in accordance with the processing in the operation control unit 231, and outputs the control signals. For example, the command transmitting unit 232 outputs control signals to the outdoor fan motor 212, the compressor 250, the expansion valve 260, and the four-way valve 270. The control of the compressor 250 includes control of the compression degree in the compressor 250. The command transmitting unit 232 also controls the four-way valve 270 to perform control for switching the circulation direction of the refrigerant in the refrigeration cycle.

[0032] The environment detection unit 240 includes an outdoor air temperature sensor 241 and an outdoor heat exchanger temperature sensor 242. The outdoor air temperature sensor 241 is a sensor that detects the outdoor air temperature around the outdoor unit 200. The outdoor heat exchanger temperature sensor 242 is a sensor that is provided in the vicinity of the outdoor heat exchanger 220 and detects the temperature of the outdoor heat exchanger 220. Temperature information detected by the outdoor air temperature sensor 241 and the outdoor heat exchanger temperature sensor 242 is output to the outdoor control unit 230.

[0033] The compressor 250 is a compressor in a refrigeration cycle. The compressor 250 compresses a refrigerant, thereby outputting the high-temperature, high-pressure refrigerant to a refrigerant pipe connected to a condenser. For example, a rotary compressor, a scroll compressor, or the like can be used as the compressor 250. The compressor 250 can control the degree of compression of the refrigerant according to, for example, the driving amount of a motor, or the like.

[0034] The four-way valve 270 is for switching the circulation direction of the refrigerant in the refrigeration cycle between cooling operation and heating operation. A specific switching will be described with reference to Figs.

[0035] FIG. 4 is an explanatory diagram of the refrigeration cycle during cooling operation, and FIG. 5 is an explanatory diagram of the refrigeration cycle during heating operation. As described above, the indoor unit 100 includes a blower 110, an indoor heat exchanger 120, a room temperature sensor 141, and an indoor heat exchanger temperature sensor 142. The blower 110 includes, for example, an indoor fan 111 and an indoor fan motor 112, and FIG. 4 illustrates the indoor fan 111. The outdoor unit 200 includes a blower 210, an outdoor heat exchanger 220, an outdoor air temperature sensor 241, an outdoor heat exchanger temperature sensor 242, a compressor 250, an expansion valve 260, and a four-way valve 270. The blower 210 includes, for example, an outdoor fan 211 and an outdoor fan motor 212, and FIG. 4 illustrates the outdoor fan 211. The outdoor unit 200 also includes a three-way valve 280 and a two-way valve 290, which are valves provided in the refrigerant circuit in the refrigeration cycle.

[0036] As shown in Fig. 4 and Fig. 5, the cooling operation and the heating operation are switched by switching the four-way valve 270. As shown in Fig. 4, during the cooling operation, the four-way valve 270 is switched so as to circulate the refrigerant through the compressor 250, the outdoor heat exchanger 220, the expansion valve 260, and the indoor heat exchanger 120 in this order. During the cooling operation, the indoor heat exchanger 120 is an evaporator, and the outdoor heat exchanger 220 is a condenser. In addition, the compressor 250, the four-way valve 270, the outdoor heat exchanger 220 as a condenser, the expansion valve 260, the two-way valve 290, the indoor heat exchanger 120 as an evaporator, and the three-way valve 280 are connected by refrigerant piping, forming a closed cycle refrigerant circuit in which the refrigerant as the working fluid is sealed inside. As the refrigerant in this embodiment, various refrigerants such as R32, R410, R22, and CO2 can be used.

[0037] As shown in Fig. 5, during heating operation, the four-way valve 270 is switched so as to circulate the refrigerant through the compressor 250, the indoor heat exchanger 120, the expansion valve 260, and the outdoor heat exchanger 220 in that order. During heating operation, the indoor heat exchanger 120 serves as a condenser, and the outdoor heat exchanger 220 serves as an evaporator. Each component is connected by refrigerant piping to form a closed-cycle refrigerant circuit in which a refrigerant is sealed inside as a working fluid, as in Fig. 4.

[0038] As described above, in the air conditioner 10 of this embodiment, liquid is supplied to the surface of the indoor heat exchanger 120, which is a condenser or evaporator in the refrigeration cycle. According to the technique of this embodiment, it is possible to realize an air conditioner 10 suitable for operation using a refrigeration cycle. Specifically, as described below, it becomes possible to perform humidification during heating operation, improve operation efficiency during defrosting operation, and so on.

[0039] 2. Air conditioner operation The supply of liquid to the surface of the indoor heat exchanger 120 is performed during heating operation or defrosting operation. Specific operations of the air conditioner 10 in each case will be described below.

[0040] 2.1 Water supply control during heating operation Fig. 6 is a flowchart explaining the heating operation. The process shown in Fig. 6 is executed, for example, when the user presses the heating button on the remote control and the indoor control unit 130 receives a control signal corresponding to the pressing operation via the remote control transmitting / receiving unit 150.

[0041] First, in step S101, the control unit starts the heating operation. Specifically, the outdoor control unit 230 controls the four-way valve 270 to circulate the refrigerant through the compressor 250, the indoor heat exchanger 120, the expansion valve 260, and the outdoor heat exchanger 220 in this order, as shown in FIG. 5. As a result, a high-temperature, high-pressure refrigerant is supplied to the indoor heat exchanger 120. The indoor control unit 130 also controls the indoor fan motor 112 to send out high-temperature air that has been heat-exchanged in the indoor heat exchanger 120 into the room. After this, the heating operation continues until the processing of step S110 is performed, although this is not specifically shown except for step S109 described later.

[0042] After the heating operation starts, in step S102, the indoor control unit 130 determines whether a humidification start instruction has been given. The indoor control unit 130 determines that a humidification start instruction has been given when, for example, a user presses a humidification start button on a remote control and receives a control signal corresponding to the pressing operation via the remote control transmitting / receiving unit 150. If a humidification start instruction has been given, in step S103, the indoor control unit 130 starts a humidification operation.

[0043] Fig. 7 is a flow chart for explaining the humidification operation in step S103. As described above, the process shown in Fig. 7 is started when a humidification start instruction is given. Also, as described later, the process shown in Fig. 7 is ended when a humidification stop instruction is given.

[0044] When the humidification operation is started, first, in step S201, the indoor control unit 130 determines whether the temperature of the indoor heat exchanger 120 is equal to or higher than a predetermined value. For example, during normal heating operation without humidification operation, the temperature of the indoor heat exchanger 120 is about 40 to 60 degrees Celsius. The predetermined value here is a value set based on the temperature of the indoor heat exchanger 120 during normal heating operation, for example, 40 degrees. In this way, it is possible to determine whether the temperature of the indoor heat exchanger 120 has dropped to a level outside the normal range. Note that the predetermined value here is not limited to 40 degrees, and may be a lower temperature or a higher temperature. In addition, the predetermined value used in the processing of step S201 may be changed according to the set temperature set by the user using the remote control.

[0045] If the temperature of the indoor heat exchanger 120 is below the predetermined value, in step S202, the indoor control unit 130 waits for a predetermined time. After waiting for the predetermined time, the process returns to step S201, and the indoor control unit 130 determines the temperature of the indoor heat exchanger 120. That is, the standby state continues until the temperature of the indoor heat exchanger 120 becomes equal to or higher than the predetermined value. In step 202, the rotation speed of the indoor fan 111 may be reduced to promote heating of the indoor heat exchanger 120.

[0046] If the temperature of the indoor heat exchanger 120 is equal to or higher than a predetermined value, in step S203, the indoor control unit 130 starts water injection control. Specifically, under the control of the indoor control unit 130, the pump 162 of the liquid supply unit 160 supplies the liquid stored in the storage tank 161 to the liquid injection unit 164 via the piping 163. As a result, the liquid injection unit 164 starts supplying the liquid to the surface of the indoor heat exchanger 120.

[0047] 6 and step S203 in Fig. 7, in a heating operation in which the indoor heat exchanger 120 serves as a condenser and the outdoor heat exchanger 220 serves as an evaporator, the liquid supply unit 160 performs a humidification operation of supplying liquid to the surface of the indoor heat exchanger 120 and evaporating the liquid. Specifically, the liquid supplied to the surface of the indoor heat exchanger 120 evaporates due to the indoor heat exchanger 120 being at a high temperature and the indoor fan 111 blowing air.

[0048] During heating operation, the room tends to become dry, but the method of this embodiment makes it possible to perform heating and humidification at the same time. During heating operation, the indoor heat exchanger 120 is at a high temperature and air is blown by the indoor fan 111, so liquid is easily vaporized and efficient humidification is possible. For example, the humidification operation of this embodiment may be performed only during heating operation.

[0049] In the water injection control in step S203, the pump 162 of the liquid supply section 160 may intermittently supply liquid to the liquid injection unit. For example, the indoor control section 130 repeatedly controls the pump 162 to be driven for a period of length t1 and then stopped for a period of length t2. Here, t1 is, for example, about 1 minute, and t2 is about 3 minutes. However, the specific values ​​of t1 and t2 can be modified in various ways.

[0050] In this way, it is possible to supply an appropriate amount of liquid to the surface of the indoor heat exchanger 120. If the amount of liquid supplied is excessively small, the amount of liquid that vaporizes will also be small, and the humidification effect may be reduced. If the amount of liquid supplied is excessively large, there is a possibility that the amount of liquid that drips downward from the indoor heat exchanger 120 without vaporizing will increase. In this case, the pump 162 will supply liquid that does not contribute to humidification, and is therefore inefficient. If there is an excessive amount of liquid on the surface of the indoor heat exchanger 120, liquid droplets will be generated, and the liquid droplets may fly into the room due to the air blown by the indoor fan 111. In this regard, by performing intermittent control, the amount of liquid supplied can be easily controlled.

[0051] While the water injection control is being performed, in step S204, the indoor control unit 130 periodically determines whether the temperature of the indoor heat exchanger 120 is equal to or higher than a predetermined value. The process of step S204 is similar to step S201, and is a process of determining whether the temperature detected by the indoor heat exchanger temperature sensor 142 is equal to or higher than a predetermined value such as 40 degrees. If the temperature of the indoor heat exchanger 120 is equal to or higher than the predetermined value, the water injection control of step S203 is continued.

[0052] If the temperature of the indoor heat exchanger 120 is below a predetermined value, in step S205, the indoor control unit 130 stops the water injection control. Specifically, the indoor control unit 130 performs control to stop the pump 162 of the liquid supply unit 160. Since liquid may remain on the liquid injection unit 164 or the surface of the indoor heat exchanger 120, evaporation of the liquid on the surface of the indoor heat exchanger 120 may continue, but here, no particular consideration is given to the time lag between the stopping of the pump 162 and the end of evaporation of the liquid.

[0053] After the pump 162 is stopped, in step S206, the indoor control unit 130 waits for a predetermined time, and then returns to step S201 to continue the process. That is, when the temperature of the indoor heat exchanger 120 increases due to a decrease in the amount of vaporized liquid and becomes equal to or higher than a predetermined value (Yes in step S201), the water injection control is resumed in step S203.

[0054] It is believed that while the liquid is being supplied, the liquid evaporates on the surface of the indoor heat exchanger 120, and the heat of vaporization is removed, causing the temperature of the indoor heat exchanger 120 to drop. If the temperature of the indoor heat exchanger 120 drops excessively, the temperature of the air that has undergone heat exchange in the indoor heat exchanger 120 also drops, resulting in a decrease in heating efficiency.

[0055] In contrast, in this embodiment, as shown in steps S201 and S204 in FIG. 7, the liquid supply unit 160 may supply liquid to the surface of the indoor heat exchanger 120 when the temperature of the indoor heat exchanger 120 is equal to or higher than a given threshold. In other words, the liquid supply unit 160 does not execute control to supply liquid to the surface of the indoor heat exchanger 120 when the temperature of the indoor heat exchanger 120 is lower than the given threshold. This makes it possible to suppress a decrease in the heating function associated with humidification. Note that in the method of Patent Document 1, since hot water is supplied to the indoor heat exchanger 120, the temperature of the indoor heat exchanger 120 is unlikely to decrease, and the decrease in the heating function associated with humidification is not taken into consideration at all.

[0056] Returning to Fig. 6, the heating operation will be continued. After the humidification operation starts in step S103, in step S104, the indoor control unit 130 determines whether an instruction to stop humidification has been given. The indoor control unit 130 determines that an instruction to stop humidification has been given when, for example, the user presses the humidification stop button on the remote control and receives a control signal corresponding to the pressing operation via the remote control transmitting / receiving unit 150. Note that the humidification start button and the humidification stop button may be two different buttons, or may be the same button.

[0057] If a command to stop humidification has not been issued, the indoor control unit 130 returns to step S103 and continues the humidification operation. If a command to stop humidification has been issued, in step S105, the indoor control unit 130 stops the humidification operation. For example, the indoor control unit 130 ends the process shown in FIG. 7 regardless of which step in FIG. 7 it was executing. Note that if water injection control is being executed, the indoor control unit 130 ends the water injection control and then ends the process shown in FIG. 7.

[0058] If a command to start humidification has not been issued in step S102, or after the processing of step S105, the indoor control unit 130 determines in step S106 whether a command to stop heating has been issued. The indoor control unit 130 determines that a command to stop heating has been issued when, for example, a user presses the stop button on the remote control and receives a control signal corresponding to the pressing operation via the remote control transmitting / receiving unit 150.

[0059] In this embodiment, the humidification operation is performed during the heating operation, and the heating stop instruction includes a humidification stop instruction. That is, if a heating stop instruction is given during the humidification operation in step S103, the indoor control unit 130 determines that a humidification stop instruction has been given (Yes in step S104), stops the humidification operation in step S105, and then proceeds to step S106, where it determines that a heating stop instruction has been given.

[0060] In the method of this embodiment, an internal drying operation may be performed after the heating operation is stopped. The internal drying operation is an operation mode for drying the liquid injection unit 164 and the indoor heat exchanger 120 by increasing the temperature of the indoor heat exchanger 120 in the heating cycle to remove moisture adhering to the liquid injection unit 164 and the indoor heat exchanger 120. Therefore, the internal drying operation is basically the same as the heating operation, and it is preferable to rotate the indoor fan 111.

[0061] For example, the air conditioner 10 may include a control unit that controls the refrigeration cycle, the blower 110, and the liquid supply unit 160. The control unit here includes, for example, the indoor control unit 130 and the outdoor control unit 230, as described above. After receiving an operation to stop the heating operation, the control unit is capable of executing an internal drying operation that continues the heating operation.

[0062] In the case of a conventional heating operation, since it is expected that the inside of the indoor unit 100 will dry out, there is little need to perform a separate internal drying operation after issuing a heating stop command. However, in this embodiment, a humidification operation may be performed, and in this humidification operation, liquid is supplied to the liquid injection unit 164 and the surface of the indoor heat exchanger 120. If this liquid is left, it can cause mold, so in this embodiment, it is effective to perform an internal drying operation after the heating operation.

[0063] However, as shown in Fig. 6, if a command to start humidification is not issued (No in step S102), a normal heating operation without humidification is performed. For example, if a humidification operation has not been performed even once in a series of heating operations, there is little need to perform an internal drying operation. Even if a humidification operation has been performed, if the humidification operation is stopped and the heating operation is continued thereafter (Yes in step S104 and No in step S106), the inside of the indoor unit 100 may be sufficiently dried by the heating operation.

[0064] Therefore, in this embodiment, if the heating operation without humidification continues for a given time or more after the humidification operation is stopped during the heating operation, the control unit may perform control to skip the internal drying operation. In this way, the internal drying operation that is less necessary can be omitted, enabling efficient operation.

[0065] Specifically, when a heating stop command is received (Yes in step S106), the control unit determines whether a humidification operation is performed during the heating operation in step S107. If a humidification operation is not performed, the control unit skips the processes in steps S108 and S109 and stops the heating operation in step S110.

[0066] If a humidification operation is performed during a heating operation, in step S108, it is determined whether the heating duration after humidification is stopped is equal to or longer than a predetermined time. For example, the control unit obtains the time difference between the first timing at which the humidification operation is stopped in step S105 and the second timing at which an instruction to stop heating is issued and the determination is made as Yes in step S106 as the heating duration after humidification is stopped. Note that if the humidification operation is restarted without stopping the heating operation after the humidification operation is stopped, the first timing up to that point is discarded, and the timing at which the humidification operation was stopped after it was restarted is set as the new first timing.

[0067] If the duration of heating after humidification is stopped is less than the predetermined time (No in step S108), the indoor control unit 130 executes the internal drying operation in step S109. As described above, since the internal drying operation is a heating operation, the control unit continues the heating operation in the same manner as before the heating stop instruction was given. However, the compression degree of the compressor 250, the blowing strength of the fan 110, etc. may be changed between the heating operation before the heating stop instruction and the internal drying operation.

[0068] Then, when the heating duration after the humidification is stopped is equal to or longer than the predetermined time (Yes in step S108), the control unit stops the heating operation in step S110. In this way, it is possible to appropriately dry the liquid injection unit 164 and the indoor heat exchanger 120 that become wet due to the humidification operation.

[0069] 2.2 Variations in heating operation <Control according to whether humidification is on or off> As described above using steps S101 to S106 in FIG. 6, in this embodiment, after the heating operation is started in response to a heating start instruction, any one of the following operations is executed. (A) Heating operation without humidification (B) Heating with humidification

[0070] (A) is an operation corresponding to the loop processing when a humidification start instruction has not been issued (No in step S102) and a heating stop instruction has not been issued (No in step S106). (B) is an operation corresponding to the loop processing when a humidification start instruction has been issued (Yes in step S102) and thereafter a humidification stop instruction has not been issued (No in step S104).

[0071] In this embodiment, different controls may be performed depending on the above (A) and (B). For example, the air conditioner 10 of this embodiment may include an outdoor unit 200 having a compressor 250, an expansion valve 260, and an outdoor heat exchanger 220, as shown in Fig. 3 to Fig. 5. The compressor 250 may increase the degree of compression of the refrigerant in a heating operation accompanied by a humidifying operation compared to when a heating operation without a humidifying operation is performed.

[0072] For example, when a user sets the temperature to T1 degrees using the remote control, the outdoor control unit 230 operates the compressor 250 to a given compression degree. When a heating operation without a humidifying operation is performed using that compression degree, the indoor heat exchanger 120 becomes about T2 degrees, and hot air of a predetermined temperature is sent out, resulting in the indoor temperature being close to T1.

[0073] However, in a heating operation accompanied by a humidifying operation, the temperature of the indoor heat exchanger 120 drops due to the heat of vaporization of the liquid. Therefore, even if the temperature setting is T1 degrees and the outdoor control unit 230 operates the compressor 250 at the same compression degree, the temperature of the indoor heat exchanger 120 may not rise to T2 degrees. As a result, even if the heat-exchanged hot air is blown out, the room temperature does not rise to T1 degrees, and the heating performance drops.

[0074] In contrast, the heat of compression increases by increasing the compression degree of the compressor 250 during heating operation accompanied by humidification. As a result, even taking into account the heat of vaporization, it is possible to raise the temperature of the indoor heat exchanger 120 to about T2 degrees, and the deterioration of heating performance can be suppressed.

[0075] In addition, the blower 110 may have a lower air volume in a heating operation accompanied by a humidification operation compared to a heating operation without a humidification operation. As described above, in a humidification operation, liquid may be supplied to the surface of the indoor heat exchanger 120, and if the air blowing to the indoor heat exchanger 120 is too strong, the liquid may be discharged into the room. On the other hand, in a heating operation without a humidification operation, the surface of the indoor heat exchanger 120 is less likely to be wet, and liquid droplets are less likely to be discharged even if the air volume is increased. In this way, it is possible to suppress the discharge of liquid by controlling the air volume of the blower 110 according to the situation.

[0076] Also, as described above with reference to Fig. 7, even when the humidification operation of step S103 in Fig. 6 is being performed, depending on the temperature of the indoor heat exchanger 120, water injection control may be performed (Yes in steps S201 and S204) or not (No in step S201 or S204). Therefore, of the above-mentioned operations (A) and (B), (B) can be divided into the following (B1) and (B2). (B1) Heating operation without water injection control (B2) Heating operation with water injection control

[0077] In the above example, in the intermittent water injection, the pump 162 operates during a period t1, and then stops during the following period t2. The pump 162 is stopped during the period t2 as a control for supplying an appropriate amount of liquid to the indoor heat exchanger 120, and the liquid injection unit 164 continues to inject water into the indoor heat exchanger 120 during this period. Therefore, when the process of step S203 is being performed, the water injection control continues even during the period t2, and this is considered to be included in the above (B2).

[0078] The control of the compression degree in the compressor 250 and the control of the air volume of the blower 110 described above are controls that are performed in consideration of the presence of liquid on the surface of the indoor heat exchanger 120. Therefore, in the above-mentioned (B1), there may be cases where the control to increase the compression degree or the control to decrease the air volume is unnecessary. Therefore, in the method of this embodiment, the above-mentioned (B2) may be considered as a "heating operation with humidification operation" in the narrow sense. Specifically, in the heating operation shown in (B2), the control unit may perform control to increase the compression degree or control to decrease the air volume, or both, compared to the case of performing the heating operation shown in (A). Also, in the heating operation shown in (B1), the control may be performed similarly to (A) or similarly to (B2). Also, in the case of (B1), it is possible to perform intermediate control between (A) and (B2).

[0079] <Modifications for internal drying> In the above example, the internal drying operation is the same as the normal heating operation. However, in consideration of drying efficiency, the temperature of the indoor heat exchanger 120 may be set higher in the internal drying operation than in the normal heating operation. For example, the compression degree of the compressor 250 is set to the same as in the heating operation accompanied by humidification. The heating operation accompanied by humidification corresponds to the above (B), and in a narrow sense corresponds to (B2).

[0080] In addition, in determining whether to end the internal drying operation, the predetermined time used in the process of comparing with the heating duration time after the humidification operation is stopped may be a fixed value or may be dynamically changed. For example, the predetermined time may be corrected based on the amount of moisture estimated to be contained in the liquid injection unit 164. For example, the control unit may correct the predetermined time based on information such as the size and hydrophilicity of the liquid injection unit 164 and the temperature during the internal drying operation. The temperature here may be room temperature, the temperature of the indoor heat exchanger 120, or a temperature detected by a temperature sensor arranged at another position of the indoor unit 100.

[0081] In the above, an example has been described in which it is determined whether to stop the internal drying operation based on the duration of heating after the humidification operation has stopped. However, the determination process is not limited to this, and it may be determined whether to end the internal drying operation based on the humidity inside the indoor unit 100. In this way, it is possible to control the internal drying operation according to the humidity, thereby suppressing unnecessary internal drying operations.

[0082] For example, a humidity sensor may be provided between the indoor heat exchanger 120 and the air outlet, and the humidity sensor may detect the humidity inside the indoor unit 100. However, when a humidity sensor is provided at the air outlet, there is a risk of an increase in airflow resistance.

[0083] Therefore, the humidity sensor may be provided near the air inlet. However, when the indoor fan 111 rotates in the forward direction, it is difficult for the humidity sensor provided at the air inlet to measure the humidity of the air inside the air conditioner 10. This is because, when rotating in the forward direction, the air flows from the air inlet through the interior of the indoor unit 100 and is then blown out from the air outlet. Therefore, when measuring humidity, the indoor control unit 130 may control the indoor fan 111 to rotate in the reverse direction, so that air is taken in from the air outlet and blown out from the air inlet. In this way, the humidity inside the indoor unit 100 can be measured using the humidity sensor near the air inlet without increasing the blowing resistance.

[0084] 2.3 Water supply control during defrosting operation During heating operation, the temperature of the outdoor heat exchanger 220 drops, and frost may form on the outdoor heat exchanger 220, causing a drop in heat exchange capacity. Therefore, the outdoor control unit 230 may determine whether or not frost has formed on the outdoor heat exchanger 220, based on the temperature from the outdoor heat exchanger temperature sensor 242. The outdoor control unit 230 determines that frost has formed on the outdoor heat exchanger 220 when the temperature of the outdoor heat exchanger 220 is equal to or lower than a predetermined threshold value. When it is determined that frost has formed, the outdoor control unit 230 defrosts the outdoor heat exchanger 220 by switching the four-way valve 270 to perform the cooling operation shown in FIG. 4. Hereinafter, the cooling operation for defrosting will be referred to as a defrosting operation.

[0085] 4, in the defrosting operation, a high-temperature, high-pressure refrigerant is supplied to the outdoor heat exchanger 220, and defrosting is performed by the heat. The liquid supply unit 160 may supply liquid to the surface of the indoor heat exchanger 120 in the defrosting operation in which the indoor heat exchanger 120 serves as an evaporator and the outdoor heat exchanger 220 serves as a condenser.

[0086] In the defrosting operation, a low-temperature, low-pressure refrigerant is supplied to the indoor heat exchanger 120, and the temperature of the indoor heat exchanger 120 drops. The temperature of the indoor heat exchanger 120 here is, for example, about -10 degrees to -20 degrees, but the specific temperature changes depending on the situation. In any case, it is assumed that the temperature of the indoor heat exchanger 120 in the defrosting operation is lower than the temperature of the liquid stored in the storage tank 161. Therefore, when the liquid in the storage tank 161 is supplied to the indoor heat exchanger 120 via the liquid injection unit 164, the temperature of the indoor heat exchanger 120 rises.

[0087] In this way, by using the liquid supply unit 160 to supply liquid to the indoor heat exchanger 120 during defrosting operation, the liquid can be used as a heat source in addition to the compression heat of the compressor 250, which has the advantage that the defrosting operation can be completed in a short time.

[0088] When performing a humidification operation, humidification is possible if liquid evaporates on the surface of the indoor heat exchanger 120, so it is sufficient that liquid is attached to the surface of the indoor heat exchanger 120. However, when using liquid as a heat source, it is possible to increase the temperature rise effect of the indoor heat exchanger 120 by constantly supplying liquid with a relatively high temperature (that has not lost heat to the indoor heat exchanger 120). Therefore, the liquid supply unit 160 may continuously supply new liquid to the surface of the indoor heat exchanger 120. For example, the indoor control unit 130 increases the amount of liquid supplied during the defrosting operation compared to the humidification operation in the heating operation. Specifically, the indoor control unit 130 may supply liquid to the surface of the indoor heat exchanger 120 by continuously operating the pump 162.

[0089] In addition, since the defrosting operation is a cooling cycle, the temperature of the air that has been heat exchanged in the indoor heat exchanger 120 is low. Therefore, the blower 110 may reduce the air volume during the defrosting operation compared to before the defrosting operation starts. Before the defrosting operation starts is, for example, when the heating operation is performed. The heating operation here does not involve a humidifying operation in the narrow sense, but may include a heating operation involving a humidifying operation. Specifically, the indoor control unit 130 may stop the indoor fan 111 during the defrosting operation. In this way, it is possible to suppress the blowing of cold air into the room, and therefore to suppress the deterioration of the comfort of the room. Note that when the blowing by the indoor fan 111 is stopped, the air does not move as compared to when blowing is performed, and therefore the heat exchange between the air and the refrigerant in the indoor heat exchanger 120 is hindered. Therefore, in a conventional air conditioner, if the air volume of the blower 110 is reduced during the defrosting operation, the efficiency of the refrigeration cycle may deteriorate, and the burden on the compressor 250 may increase. In this respect, the method of this embodiment makes it possible to supply liquid as a heat source, and therefore it is possible to suppress deterioration in the efficiency of the refrigeration cycle even when air blowing is suppressed. That is, the method of this embodiment makes it possible to achieve both refrigeration cycle efficiency and indoor comfort. Note that, although an example of stopping the indoor fan 111 has been shown above, the indoor control unit 130 may reverse the rotation of the indoor fan 111 during the defrosting operation. In this case as well, the same effect as when the indoor fan 111 is stopped can be expected.

[0090] Furthermore, if it is determined that defrosting has been performed by the defrosting operation, the control unit performs the heating operation by controlling the four-way valve 270. Whether or not defrosting has been performed is determined based on temperature information from the outdoor heat exchanger temperature sensor 242. The liquid supplied to the surface of the indoor heat exchanger 120 during the defrosting operation and the liquid that has permeated into the liquid injection unit 164 are appropriately dried by the heating operation. Furthermore, if a humidification operation is performed after transition to the heating operation, the internal drying operation is performed as necessary as described above.

[0091] However, attention should be paid to the case where a heating stop command is given immediately after the defrosting operation is completed and the operation shifts to the heating operation. This is because it may be determined that the humidification operation is not being performed (No in step S107) even though the liquid injection unit 164 or the indoor heat exchanger 120 has become wet due to the defrosting operation, or that the heating operation has continued for a predetermined time or longer since the last humidification operation was stopped (Yes in step S108), and the internal drying operation may not be performed sufficiently.

[0092] Therefore, the control unit may use not only the heating duration after the humidification operation is stopped but also the heating duration after the defrosting operation is stopped for the judgment. When a heating stop instruction is given, the control unit judges whether both the humidification operation and the defrosting operation are not being performed instead of the process of step S107. When at least one of the humidification operation and the defrosting operation is being performed, the control unit stops the heating operation if the heating duration after the humidification operation is stopped is equal to or longer than a predetermined time and the heating duration after the defrosting operation is stopped is equal to or longer than a predetermined time. In this way, even when the defrosting operation is performed, the inside of the indoor unit 100 can be appropriately dried. Furthermore, when the liquid supply amount in the defrosting operation is greater than that of the humidification operation, the control unit may set the above-mentioned predetermined time to be shorter for the humidification operation and longer for the defrosting operation. Furthermore, the control unit may perform an internal drying operation based on the presence or absence of water injection control and the amount of water injection, regardless of whether the purpose is humidification or defrosting.

[0093] Although the present embodiment has been described in detail as above, it will be easily understood by those skilled in the art that many modifications are possible that do not substantially deviate from the novel matters and effects of the present embodiment. Therefore, all such modifications are intended to be included in the scope of the present disclosure. For example, a term described at least once in the specification or drawings together with a different term having a broader meaning or synonymy can be replaced with that different term anywhere in the specification or drawings. All combinations of the present embodiment and modifications are also included in the scope of the present disclosure. Furthermore, the configurations and operations of the air conditioner, indoor unit, outdoor unit, etc. are not limited to those described in the present embodiment, and various modifications are possible. [Explanation of symbols]

[0094] 10...air conditioner, 100...indoor unit, 110...blower, 111...indoor fan, 112...indoor fan motor, 120...indoor heat exchanger, 120a...first indoor heat exchanger, 120b...second indoor heat exchanger, 130...indoor control unit, 131...operation control unit, 132...command transmission unit, 140...environment detection unit, 141...room temperature sensor, 142...indoor heat exchanger temperature sensor, 150...remote control transmission / reception unit, 160...liquid supply unit, 161...storage tank, 162...pump , 163...piping, 164...liquid injection unit, 165...casing, 170...drain pan, 200...outdoor unit, 210...blower, 211...outdoor fan, 212...outdoor fan motor, 220...outdoor heat exchanger, 230...outdoor control unit, 231...operation control unit, 232...command transmission unit, 240...environment detection unit, 241...outdoor air temperature sensor, 242...outdoor heat exchanger temperature sensor, 250...compressor, 260...expansion valve, 270...four-way valve, 280...three-way valve, 290...two-way valve

Claims

1. An indoor heat exchanger that is the condenser or the evaporator in a refrigeration cycle in which a refrigerant is circulated through a compressor, a condenser, an expansion valve, and an evaporator in this order; a blower that blows the air that has been heat exchanged in the indoor heat exchanger by the refrigeration cycle into the room; A liquid supply unit that supplies liquid to a surface of the indoor heat exchanger; an outdoor unit including the compressor, the expansion valve, and an outdoor heat exchanger; Including, The liquid supply unit includes: In a heating operation in which the indoor heat exchanger serves as the condenser and the outdoor heat exchanger serves as the evaporator, a humidification operation is performed in which the liquid is supplied to a surface of the indoor heat exchanger and evaporated; The compressor includes: The air conditioner, in the heating operation accompanied by the humidification operation, the degree of compression of the refrigerant is made higher than in the case where the heating operation is performed without the humidification operation.

2. In claim 1, The liquid supply unit includes: An air conditioner that supplies the liquid to a surface of the indoor heat exchanger when the temperature of the indoor heat exchanger is equal to or higher than a given threshold value.

3. In claim 1 or 2, The blower is The air conditioner reduces an air volume in the heating operation accompanied by the humidification operation, compared to when the heating operation is performed without the humidification operation.

4. In any one of claims 1 to 3, The liquid supply unit includes: a liquid injection unit that injects the liquid into the indoor heat exchanger; A storage tank for storing the liquid; a pump that supplies the liquid stored in the storage tank to the liquid injection unit; A pipe provided between the pump and the liquid injection unit; Including, The pump comprises: An air conditioner that intermittently supplies the liquid to the liquid injection unit.

5. A refrigeration cycle in which a refrigerant is circulated through a compressor, a condenser, an expansion valve, and an evaporator in that order, comprising: an indoor heat exchanger which is the condenser or the evaporator; a blower that blows the air that has been heat exchanged in the indoor heat exchanger by the refrigeration cycle into the room; A liquid supply unit that supplies liquid to a surface of the indoor heat exchanger; A control unit that controls the refrigeration cycle, the blower, and the liquid supply unit; Including, The liquid supply unit includes: In a heating operation in which the indoor heat exchanger serves as the condenser and the outdoor heat exchanger serves as the evaporator, a humidification operation is performed in which the liquid is supplied to a surface of the indoor heat exchanger and evaporated; The control unit is After receiving a stop operation of the heating operation, an internal drying operation can be executed to continue the heating operation, The air conditioner performs control to skip the internal drying operation if the heating operation without the humidifying operation has continued for a given time or more after the humidifying operation has been stopped during the heating operation and before the heating operation is stopped.

6. In any one of claims 1 to 5, The liquid supply unit includes: The air conditioner supplies the liquid to a surface of the indoor heat exchanger during a defrosting operation in which the indoor heat exchanger serves as the evaporator and the outdoor heat exchanger serves as the condenser.

7. In claim 6, The blower is The air conditioner reduces an air volume during the defrosting operation compared to before the start of the defrosting operation.

Citation Information

Patent Citations

  • Air-conditioning system and control method

    CN109506333A

  • System for treating dew

    JP1978084343A

  • Humidification control device for air conditioner

    JP1988297955A

  • Radiation panel type air conditioner

    JP1990093235A

  • Air conditioner

    JP1997026152A