Component mounting device and component mounting method

The component mounting device and method simplify configuration and enhance efficiency by using a mounting nozzle with height detection and control to accurately place components on a board, addressing complexity and inefficiencies in existing technologies.

JP7584041B2Active Publication Date: 2024-11-15PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
JP2021006640
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-01-19
Publication Date
2024-11-15
Estimated Expiration
2041-01-19

AI Technical Summary

Technical Problem

Existing component mounting devices and methods are complex and inefficient, requiring improvements in configuration simplicity and work efficiency.

Method used

A component mounting device and method that includes a mounting nozzle, motor, nozzle height detection, and control unit to accurately measure and control the height of mounting points on a board, allowing for precise component placement and simplified operations.

Benefits of technology

The solution enhances work efficiency by simplifying the configuration and improving the accuracy of component mounting, particularly for electronic components, while allowing for high-speed and high-quality mounting processes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007584041000001
    Figure 0007584041000001
  • Figure 0007584041000002
    Figure 0007584041000002
  • Figure 0007584041000003
    Figure 0007584041000003
Patent Text Reader

Abstract

To provide a component mounting device and a component mounting method, capable of improving work efficiency while achieving a simplified configuration.SOLUTION: A component mounting device to mount a component on a mounting point on a substrate that is brought into a work area includes a mounting nozzle, a motor, a mounting nozzle height detector, and a controller. The controller includes; a mounting point height measurement part to measure the height of a mounting point; a mounting point height estimation part to calculate an estimated height of a mounting point where a component is not mounted, based on heights of a plurality of the mounting points measured by the mounting point height measurement part; a target position calculator to calculate a target height when the mounting nozzle holding a component is lowered toward the mounting point, based on the estimated height of the mounting point and the thickness of a component mounted on the mounting point; and a motor controller to control the motor based on the target height.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a component mounting device and a component mounting method. [Background technology]

[0002] For example, there is a component mounting device that mounts components such as electronic components onto a substrate (for example, Patent Document 1). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2019-61989 A Summary of the Invention [Problem to be solved by the invention]

[0004] Recently, there has been a demand for component mounting devices and component mounting methods that have simplified configurations while improving work efficiency.

[0005] SUMMARY OF THE PRESENT EMBODIMENTS Accordingly, an object of the present invention is to provide a component mounting device and a component mounting method that can improve work efficiency while simplifying the configuration in order to solve the above problems. [Means for solving the problem]

[0006] In order to achieve the above-mentioned object, a component mounting device of the present invention is a component mounting device that mounts components onto a mounting point of a board brought into a work area, and includes a mounting nozzle that holds a component and mounts it on the board, a motor that raises and lowers the mounting nozzle, a mounting nozzle height detection unit that detects a height of the mounting nozzle, and a control unit, wherein the control unit includes a mounting point height measurement unit that measures the height of the mounting point based on the height of the mounting nozzle detected by the mounting nozzle detection unit when the mounting nozzle holding a component mounts a component on a mounting point and a thickness of the component, a mounting point height estimation unit that calculates an estimated height of a mounting point on which a component is not mounted based on heights of multiple mounting points measured by the mounting point height measurement unit, a target position calculation unit that calculates a target height for lowering the mounting nozzle holding a component towards the mounting point based on the estimated height of the mounting point and the thickness of the component to be mounted on the mounting point, and a motor control unit that controls the motor based on the target height.

[0007] Moreover, a component mounting method of the present invention is a component mounting method for mounting components onto mounting points of a board brought into a work area, wherein a control unit controls a mounting nozzle holding a component to mount the component onto the mounting point of the board, the control unit uses a mounting nozzle height detection unit that detects the height of the mounting nozzle to measure the height of the mounting point based on the height of the mounting nozzle detected by the mounting nozzle height detection unit when the mounting nozzle mounts the component onto the mounting point and a thickness of the component, the control unit calculates an estimated height of a mounting point on which a component is not mounted based on the measured heights of the multiple mounting points, the control unit calculates a target height for lowering the mounting nozzle holding the component toward the mounting point based on the estimated height of the mounting point and the thickness of the component to be mounted on the mounting point, and the control unit controls a motor that raises and lowers the mounting nozzle based on the target height to lower the mounting nozzle toward the mounting point. Effect of the Invention

[0008] According to the present invention, it is possible to improve the work efficiency while simplifying the configuration. [Brief description of the drawings]

[0009] [Figure 1] Schematic plan view of a component mounting device according to the first embodiment. [Diagram 2] 1 is a bottom perspective view of the take-out head of the first embodiment; [Diagram 3] 1 is a bottom perspective view of a mounting head according to the first embodiment; [Figure 4] Schematic diagram showing the tip of the extraction nozzle of embodiment 1. [Diagram 5] Schematic cross-sectional view showing the tip of the extraction nozzle of embodiment 1. [Figure 6] FIG. 1 is a schematic perspective view showing a tip portion of a mounting nozzle according to a first embodiment; [Figure 7] FIG. 1 is a schematic perspective view showing a tip portion of a mounting nozzle according to a first embodiment; [Figure 8A] FIG. 1 is a vertical cross-sectional view showing the internal structure of the main body of the mounting head according to the first embodiment. [Figure 8B] FIG. 1 is a cross-sectional view showing the internal structure of the main body of the mounting head according to the first embodiment. [Figure 9] FIG. 1 is a vertical cross-sectional view showing the internal structure of the main body of the take-out head of the first embodiment. [Figure 10] FIG. 1 is a schematic perspective view of a relay stage according to a first embodiment; [Figure 11] Schematic vertical cross-sectional view of the relay stage of the first embodiment. [Figure 12] 1 is a schematic plan view of a relay stage according to the first embodiment; [Figure 13] FIG. 1 is a schematic diagram showing a peripheral configuration of a brush driving mechanism according to a first embodiment; [Figure 14] FIG. 1 is a schematic cross-sectional view showing a peripheral configuration of a brush driving mechanism according to a first embodiment. [Figure 15] FIG. 1 is a schematic vertical cross-sectional view of a substrate transport unit according to the first embodiment before the substrate is lifted; [Figure 16] FIG. 1 is a schematic vertical cross-sectional view of the substrate transport unit after the substrate has been lifted in the first embodiment; [Figure 17] Block diagram of a control system of the component mounting device of the first embodiment. [Figure 18] FIG. 1 is a block diagram showing an internal configuration of a head unit control unit according to a first embodiment. [Figure 19] FIG. 1 shows an example of a program installed in the first embodiment. [Figure 20] 1 is a flowchart showing a first reference height setting process according to the first embodiment. [Figure 21] FIG. 13 is a diagram showing a state in which the bottom end surface of the mounting nozzle is in contact with the mounting surface. [Figure 22] FIG. 13 is a diagram showing a state in which the mounting nozzle rises from the mounting surface. [Figure 23] 1 is a flowchart showing a second reference height setting process according to the first embodiment. [Figure 24A] FIG. 24 is a schematic diagram for explaining the flow of processing according to the flowchart of FIG. 23; [Figure 24B] FIG. 24 is a schematic diagram for explaining the flow of processing according to the flowchart of FIG. 23; [Diagram 25] FIG. 1 is a diagram for explaining a method for calculating a target position by a target position calculation unit according to the first embodiment; [Figure 26] FIG. 1 is a diagram showing a flow of a series of component mounting operations by the component mounting device of the first embodiment. [Figure 27] Flowchart of part pick-up processing in the first embodiment [Figure 28A] FIG. 28 is a schematic diagram for explaining the flow of processing according to the flowchart of FIG. 27; [Figure 28B] FIG. 28 is a schematic diagram for explaining the flow of processing according to the flowchart of FIG. 27; [Figure 28C] FIG. 28 is a schematic diagram for explaining the flow of processing according to the flowchart of FIG. 27; [Figure 28D] A graph showing how the output value of the height detector changes when the onboard nozzle is lowered in response to a command from the operation control center. [Figure 29] Flowchart of component mounting process in embodiment 1 [Figure 30A] FIG. 30 is a schematic diagram for explaining the flow of processing according to the flowchart of FIG. 29; [Figure 30B] FIG. 30 is a schematic diagram for explaining the flow of processing according to the flowchart of FIG. 29; [Figure 30C] FIG. 30 is a schematic diagram for explaining the flow of processing according to the flowchart of FIG. 29; [Diagram 31]Flowchart of mounting point height estimation process according to the first embodiment [Diagram 32] FIG. 1 is a schematic plan view showing a state in which nine designated mounting points are designated from among a plurality of mounting points on a board according to the first embodiment; [Diagram 33] FIG. 1 is a schematic plan view showing an example in which the substrate of the first embodiment has a plurality of divided substrates. [Figure 34A] FIG. 1 is a cross-sectional view showing a state in which the component mounting device of the first embodiment performs narrow adjacent mounting. [Figure 34B] FIG. 1 is a cross-sectional view showing a state in which the component mounting device of the first embodiment performs narrow adjacent mounting. [Diagram 35] Flowchart of component mounting process in embodiment 2 [Diagram 36] Flowchart of mounting point height estimation process according to the second embodiment [Figure 37] Schematic plan view of a component mounting device according to a modified example. [Figure 38] FIG. 13 is a schematic plan view of a component mounting device according to another modified example. [Figure 39] FIG. 13 is a schematic plan view of a component mounting device according to yet another modified example. [Diagram 40] FIG. 13 is a bottom perspective view showing a mounting head according to still another modified example. [Diagram 41] FIG. 13 is a schematic vertical sectional view showing a relay stage according to still another modified example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] According to a first aspect of the present invention, there is provided a component mounting device that mounts components onto a mounting point of a board brought into a work area, the component mounting device comprising: a mounting nozzle that holds a component and mounts it on the board; a motor that raises and lowers the mounting nozzle; a mounting nozzle height detection unit that detects a height of the mounting nozzle; and a control unit, wherein the control unit comprises: a mounting point height measurement unit that measures the height of the mounting point based on the height of the mounting nozzle detected by the mounting nozzle detection unit when the mounting nozzle holding the component mounts the component on the mounting point and a thickness of the component; a mounting point height estimation unit that calculates an estimated height of a mounting point on which a component is not mounted based on heights of a plurality of the mounting points measured by the mounting point height measurement unit; a target position calculation unit that calculates a target height for lowering the mounting nozzle holding the component towards the mounting point based on the estimated height of the mounting point and the thickness of the component to be mounted on the mounting point; and a motor control unit that controls the motor based on the target height.

[0011] According to a second aspect of the present invention, there is provided a component mounting device as described in the first aspect, further comprising a stage having a reference surface, wherein the control unit further comprises a reference height setting unit that sets a reference height based on a height detected by the mounting nozzle height detection unit when the lower end surface of the mounting nozzle is brought into contact with the reference surface, and a component thickness measuring unit that measures a thickness of the component based on the reference height and the height detected by the mounting nozzle height detection unit when a component is sandwiched between the reference surface and the lower end surface of the mounting nozzle, and the mounting point height measuring unit measures the height of the mounting point using the thickness of the component measured by the component thickness measuring unit.

[0012] According to a third aspect of the present invention, there is provided a component mounting device as described in the second aspect, wherein the component thickness measuring unit calculates a thickness of the component based on the height detected by the mounting nozzle height detection unit when the component placed on the reference surface is picked up by the mounting nozzle.

[0013] According to a fourth aspect of the present invention, there is provided a component mounting device as described in the third aspect, wherein the component thickness measuring unit measures the thickness of the component based on a value indicating the lowest point among values ​​detected by the mounting nozzle height detection unit during a predetermined period immediately before the mounting nozzle that picked up the component leaves the reference surface.

[0014] According to a fifth aspect of the present invention, there is provided a component mounting device as described in the third or fourth aspect, further comprising a camera that captures an image of a component placed on the reference surface, wherein the control unit further has a component recognition unit that recognizes the component using the image captured by the camera, and the control unit controls the mounting nozzle to align the center of the lower end surface of the mounting nozzle toward the center of the component recognized by the component recognition unit and pick up the component.

[0015] According to a sixth aspect of the present invention, there is provided a component mounting device as described in any one of the first to fifth aspects, wherein some of the mounting points are set as a plurality of designated mounting points for the mounting point height estimator to calculate the estimated heights, and the mounting point height estimator calculates an estimated height of the mounting point on which no component is mounted based on heights obtained from the plurality of designated mounting points.

[0016] According to a seventh aspect of the present invention, there is provided a component mounting device as described in the sixth aspect, wherein the motor control unit has a contact detection unit which detects that a component or the mounting nozzle has come into contact with a mounting point, and the control unit controls the mounting nozzle to descend until the contact detection unit detects contact when a component is to be mounted at a mounting point set as the designated mounting point, and controls the mounting nozzle to descend until it reaches the target height calculated by the target position calculation unit when a component is to be mounted at a mounting point other than the designated mounting point.

[0017] According to an eighth aspect of the present invention, there is provided the component mounting device as defined in the sixth or seventh aspect, wherein the board includes a plurality of divided boards, and a plurality of designated mounting points are set for each of the divided boards.

[0018] According to a ninth aspect of the present invention, there is provided the component mounting device as defined in any one of the sixth to eighth aspects, wherein the designated mounting points are set to nine or more mounting points.

[0019] According to a tenth aspect of the present invention, there is provided a component mounting device as defined in any one of the first to ninth aspects, wherein the mounting point height estimation unit calculates an estimated height of a mounting point on which no component is mounted, using a new mounting point height obtained by the mounting point height measurement unit, and updates the already calculated estimated height of the mounting point.

[0020] According to an eleventh aspect of the present invention, there is provided a component mounting method for mounting a component onto a mounting point of a board brought into a work area, the component mounting method comprising the steps of: controlling a mounting nozzle holding a component by a control unit to mount the component onto the mounting point of the board; using a mounting nozzle height detection unit that detects the height of the mounting nozzle, the control unit measures the height of the mounting point based on the height of the mounting nozzle detected by the mounting nozzle height detection unit when the mounting nozzle mounts the component onto the mounting point and a thickness of the component; calculating an estimated height of a mounting point on which a component is not mounted based on the measured heights of the multiple mounting points; calculating a target height for lowering the mounting nozzle holding the component toward the mounting point based on the estimated height of the mounting point and the thickness of the component to be mounted on the mounting point; and controlling a motor that raises and lowers the mounting nozzle based on the target height to lower the mounting nozzle toward the mounting point.

[0021] According to a twelfth aspect of the present invention, there is provided a component mounting method as set forth in the eleventh aspect, in which a stage having a reference surface is provided, and further, the control unit sets a reference height based on a height detected by the mounting nozzle height detection unit when the lower end surface of the mounting nozzle is brought into contact with the reference surface, the control unit measures a thickness of the component based on the height detected by the mounting nozzle height detection unit when a component is sandwiched between the reference surface and the lower end surface of the mounting nozzle and the reference height, and measures a height of the mounting point based on the measured thickness of the component.

[0022] According to a thirteenth aspect of the present invention, there is provided a component mounting method as described in the twelfth aspect, in which a thickness of the component is calculated based on a height detected by the mounting nozzle height detection unit when the component placed on the reference surface is picked up by the mounting nozzle.

[0023] According to a 14th aspect of the present invention, there is provided a component mounting method as defined in the 13th aspect, in which a thickness of the component is measured based on a value indicating the lowest point among values ​​detected by the mounting nozzle height detection unit during a predetermined period immediately before the mounting nozzle that picked up the component leaves the reference surface.

[0024] According to a 15th aspect of the present invention, there is provided a component mounting method as defined in the 13th or 14th aspect, further comprising: a camera for capturing an image of a component placed on the reference surface; and the control unit recognizes the component using the image captured by the camera, and the control unit controls the mounting nozzle to align the center of the mounting nozzle toward the center of the recognized component and pick up the component.

[0025] According to a 16th aspect of the present invention, there is provided a component mounting method as defined in any one of the 11th to 15th aspects, which comprises setting some of the mounting points as a plurality of designated mounting points for calculating the estimated height, and calculating an estimated height of the mounting point where no component is mounted based on heights obtained from the plurality of designated mounting points.

[0026] According to a 17th aspect of the present invention, there is provided the component mounting method as defined in the 16th aspect, wherein the control unit is a control unit having a contact detection unit which detects when a component comes into contact with a mounting point, and when a component is to be mounted at a mounting point which is set as the designated mounting point, the control unit controls so as to lower the mounting nozzle until the contact detection unit detects contact, and when a component is to be mounted at a mounting point other than the designated mounting point, the control unit controls so as to lower the mounting nozzle until the target height is reached.

[0027] According to an eighteenth aspect of the present invention, there is provided the component mounting method as defined in the sixteenth or seventeenth aspect, in which the board is provided with a plurality of divided boards, and a plurality of designated mounting points are set for each of the divided boards.

[0028] According to a 19th aspect of the present invention, there is provided the component mounting method according to any one of the 16th to 18th aspects, in which the designated mounting points are set to 9 or more mounting points.

[0029] According to a 20th aspect of the present invention, there is provided a component mounting method as defined in any one of the 11th to 19th aspects, further comprising the control unit calculating an estimated height of a mounting point on which no component is mounted based on the newly measured height of the mounting point, and updating the already calculated estimated height of the mounting point.

[0030] Hereinafter, exemplary embodiments of the component mounting device and the component mounting method using the same according to the present invention will be described with reference to the accompanying drawings. The present invention is not limited to the specific configurations of the following embodiments, and configurations based on similar technical ideas are included in the present invention.

[0031] (Embodiment 1) First, the configuration of the component mounting device 1 will be described with reference to Fig. 1. Fig. 1 is a schematic plan view of the component mounting device 1 of the first embodiment.

[0032] The component mounting apparatus 1 of the first embodiment is an apparatus for mounting and mounting components, such as electronic components, on a board 2 positioned in a work area A.

[0033] The component mounting device 1 shown in Figure 1 includes a board transport unit 4, a first component supply unit 6, a second component supply unit 8, a third component supply unit 10, a removal head 12, a mounting head 14, a head camera 16, an XY table 17 (X-axis beams 18, 20 and Y-axis tables 22, 24), a relay stage 26, a relay stage camera 28, a first component disposal box 30, a component camera 32, a second component disposal box 34, and a control unit 35.

[0034] The board transport unit 4 is a unit for holding and transporting the board 2 and positioning it in the work area A. The board transport unit 4 has a transport conveyor 5 that transports the board 2 in the X direction, and in FIG. 1, the transport conveyor 5 is mainly shown. The work area A is an area for performing the work of mounting components on the board 2, and is set on the transport conveyor 5.

[0035] The component supply units 6, 8, and 10 are units for supplying components such as electronic components. Each of the component supply units 6, 8, and 10 in the first embodiment is configured with a tape feeder and has a function of transporting a carrier tape containing components to a predetermined component removal position.

[0036] As shown in FIG. 1, the first component supply unit 6 is disposed on one side (FRONT) of the work area A, and the second component supply unit 8 and the third component supply unit 10 are disposed on the other side (REAR).

[0037] The component supply units 6, 8, and 10 of the first embodiment supply components of different sizes. Specifically, the first component supply unit 6 supplies minute components, the second component supply unit 8 supplies small components, and the third component supply unit 10 supplies medium-sized components. The size of the minute components is, for example, 0.4 mm×0.2 mm or less in length and width in a plan view, and the size of the small components is, for example, 0.6 mm×0.3 mm to 1.0 mm×0.5 mm. The medium-sized components are, for example, 1.6 mm×0.8 mm or more in length and width, and are contained in a carrier tape of 8 mm to 32 mm width and supplied from a tape feeder.

[0038] The take-out head 12 is a component transfer section (first component transfer section) for taking out micro-components supplied by the first component supply unit 6 and transferring them to the relay stage 26. The take-out head 12 is provided corresponding to the first component supply unit 6, and does not correspond to the second component supply unit 8 and the third component supply unit 10. In other words, the take-out head 12 is controlled so as not to take out components supplied by the second component supply unit 8 and the third component supply unit 10.

[0039] The mounting head 14 is a component transfer section (second component transfer section) for picking up components and transferring and mounting them on the board 2. The mounting head 14 is provided corresponding to any of the component supply units 6, 8, and 10, and has a function of picking up minute components placed on the relay stage 26 and mounting them on the board 2, and a function of directly picking up small or medium-sized components from the component supply units 8 and 10 and mounting them on the board 2.

[0040] Head camera 16 is a camera provided on mounting head 14. Head camera 16 is attached to mounting head 14 with the imaging direction facing downward, and moves integrally with mounting head 14 as mounting head 14 moves. Head camera 16 is controlled to capture images of board 2 and the like placed in work area A.

[0041] The XY table 17 is a member that supports the take-out head 12 and the mounting head 14 so that they can move in the X and Y directions. The XY table 17 includes a first X-axis beam 18, a second X-axis beam 20, and Y-axis beams 22 and 24.

[0042] The first X-axis beam 18 is provided between the Y-axis beams 22, 24 and extends along the X direction, and supports the take-out head 12 movably in the X direction. Similarly, the second X-axis beam 20 is provided between the Y-axis beams 22, 24 and extends along the X direction, and supports the mounting head 14 movably in the X direction. The Y-axis beams 22, 24 each support the first X-axis beam 18 and the second X-axis beam 20 movably in the Y direction.

[0043] The relay stage 26 is a stage for temporarily placing the micro-components supplied from the first component supply unit 6. A relay stage camera 28 is provided on the relay stage 26.

[0044] The relay stage camera 28 is a camera for capturing images of minute components placed on the relay stage 26. Based on the images captured by the relay stage camera 28, the position and orientation of the minute component can be recognized, and the nozzle and component can be aligned when the mounting head 14 picks up the component. By performing the alignment, even if the component is minute, it can be picked up and held with high precision, improving the mounting precision on the substrate 2. Furthermore, it is also suitable for "narrow adjacent mounting" in which components are mounted on the substrate 2 with a narrow gap between them (see Figures 34A and 34B).

[0045] The first component disposal box 30 is a box for disposing of components provided adjacent to the relay stage 26. Some of the micro components placed on the relay stage 26 are selectively disposed of in the first component disposal box 30.

[0046] The component camera 32 is a camera for capturing an image of a component held by the mounting head 14. The component camera 32 is fixed with the imaging direction facing upward.

[0047] The second component disposal box 34 is a box for disposing of components similar to the first component disposal box 30. Some of the small or medium-sized components held by the mounting head 14 are selectively disposed of in the second component disposal box 34.

[0048] 2 to 8, the configurations and functions of the take-out head 12 and the mounting head 14 will be described. Fig. 2 is a bottom perspective view of the take-out head 12, and Fig. 3 is a bottom perspective view of the mounting head 14.

[0049] As shown in FIG. 2, the take-out head 12 includes a plurality of take-out nozzles 36 and a body portion 38 .

[0050] The take-out nozzles 36 are holding nozzles for transferring the micro-components described above. The take-out nozzles 36 are arranged at regular intervals in the X and Y directions. The take-out nozzles 36 are arranged at equal intervals, with a pitch of X1 in the X direction and a pitch of Y1 in the Y direction. In the first embodiment, a total of 16 take-out nozzles 36 are provided, four in the X direction and four in the Y direction.

[0051] The main body 38 is a member that supports the multiple take-out nozzles 36. The main body 38 supports the multiple take-out nozzles 36 and has an internal drive mechanism for driving the multiple take-out nozzles 36. The drive mechanism performs the lifting and lowering operation of the take-out nozzles 36 and the suction operation of the take-out nozzles 36 to pick up components. Details will be described later.

[0052] As shown in FIG. 3, the mounting head 14 includes a head camera 16, a plurality of mounting nozzles 40, a plurality of shafts 42, and a main body portion 44.

[0053] The mounting nozzles 40 are holding nozzles for transferring the micro, small or medium-sized components described above. The mounting nozzles 40 are arranged at regular intervals in the X and Y directions. The mounting nozzles 40 are equally spaced at a pitch of X2 in the X direction and a pitch of Y2 in the Y direction. In the first embodiment, a total of eight mounting nozzles 40 are provided, four in each of the X directions and two in each of the Y directions. In other words, the number of take-out nozzles 36 is doubled compared to the number of mounting nozzles 40.

[0054] In the first embodiment, the pitch X1 of the take-out nozzles 36 in the X direction and the pitch X2 of the mounting nozzles 40 in the X direction are set to be the same, and the pitch Y1 of the take-out nozzles 36 in the Y direction is set to 1 / 2 of the pitch Y2 of the mounting nozzles 40 in the Y direction. The relationship between the Y direction pitches Y1, Y2 is not limited to being set to 1 / 2, and may be set to 1 / n (n is an integer equal to or greater than 1).

[0055] The shaft 42 is a member for replaceably mounting the mounted nozzle 40. As shown in FIG.

[0056] The main body 44 is a member that supports the head camera 16 and the multiple shafts 42. A drive mechanism for driving the multiple shafts 42 is provided inside the main body 44. The drive mechanism performs the integral lifting and lowering of the shafts 42 and the mounting nozzles 40 attached to the shafts 42, and the suction operation of the mounting nozzles 40 to pick up components. Details will be described later.

[0057] 4 and 5 are schematic diagrams showing the tip of the extraction nozzle 36. FIG.

[0058] 4A shows an enlarged cross-sectional view of the tip of the take-out nozzle 36, and FIG. 4B shows a bottom view of the tip of the take-out nozzle 36. In FIG.

[0059] As shown in FIG. 4, a porous member 46 having air permeability is disposed at the tip of the take-out nozzle 36. The porous member 46 is fitted into a recess provided at the tip of the take-out nozzle 36 and disposed so as to face an internal suction hole 48. The suction hole 48 is connected to a suction source (not shown) and generates a negative pressure for adsorbing the component. The porous member 46 adsorbs the component to its bottom surface 46A by the negative pressure generated by the suction hole 48. The bottom surface 46A of the porous member 46 corresponds to the lower end surface of the take-out nozzle 36. The material of the porous member 46 may be any material as long as it transmits the negative pressure generated by the suction hole 48 to the bottom surface 46A.

[0060] 5A shows a state immediately before the component P is picked up by the take-out nozzle 36, and FIG. 5B shows a state immediately after the component P is picked up.

[0061] As shown in Fig. 5(a), a component P as a microcomponent is stored in a pocket 52 of a carrier tape 50 of the first component supply unit 6. With negative pressure being generated via the porous member 46 of the take-out nozzle 36, the tip of the take-out nozzle 36 is brought close to the component P to adsorb the component P. As shown in Fig. 5(b), the take-out nozzle 36 is raised to take out the component P from the pocket 52 of the carrier tape 50.

[0062] 6 and 7 are bottom perspective views showing the tip portion of the mounting nozzle 40. FIG.

[0063] As shown in Fig. 6, the mounting nozzle 40 has a suction hole 54 formed in its lower end surface. The suction hole 54 is connected to a suction source (not shown) and generates a negative pressure for suctioning the component P. The shape of the suction hole 54 is not limited to the shape shown in Fig. 6 and may be any shape. As shown in Fig. 7, the lower end surface of the mounting nozzle 40 is brought close to the component P (a micro component, a small component, or a medium-sized component) to suction the component P.

[0064] Next, the drive mechanisms for the mounting nozzle 40 and the extraction nozzle 36 will be described with reference to FIGS. 8A, 8B, and 9. FIG.

[0065] 8A and 8B are a vertical cross-sectional view and a horizontal cross-sectional view, respectively, showing the internal structure of the main body 44 of the mounting head 14.

[0066] As shown in FIGS. 8A and 8B, the drive mechanism of the mounting nozzle 40 includes a plurality of servo motors 56, a plurality of pulleys 57, a toothed belt 58, a θ-axis motor 59, and a pulley 60.

[0067] The servo motor 56 is a motor that moves the shaft 42 and the mounting nozzle 40 up and down in the Z direction. One servo motor 56 is provided for each combination of the shaft 42 and the mounting nozzle 40, and a total of eight servo motors 56 are provided in the example shown in FIGS. 8A and 8B. Each servo motor 56 includes a linear motor 61 and an encoder 62.

[0068] The linear motor 61 is a motor unit that raises and lowers the shaft 42 that is inserted in the vertical direction. The encoder 62 is a member that outputs encoder pulses (position signals) that indicate the movement distance and direction of the shaft 42 in accordance with the movement of the shaft 42. The encoder pulses output by the encoder 62 are used as height information of the mounted nozzle 40.

[0069] The pulley 57 is disposed so as to surround the shaft 42. The pulley 57 and the shaft 42 are connected to each other so as to transmit a rotational force in the rotation direction R1, but not to transmit the up and down movement of the shaft 42 to the pulley 57. In the first embodiment, a total of eight pulleys 57 are provided, similar to the servo motor 56, and each of the pulleys 57 is engaged with a toothed belt 58.

[0070] The toothed belt 58 is a belt for synchronously rotating the plurality of pulleys 57. The toothed belt 58 is connected to a θ-axis motor 59 via a pulley 60.

[0071] The θ-axis motor 59 is a motor for rotating the toothed belt 58. The θ-axis motor 59 has an output shaft 59A, and the output shaft 59A is engaged with a pulley 60. The rotational force of the θ-axis motor 59 is transmitted to the pulley 60 and the toothed belt 58 via the output shaft 59A.

[0072] According to the above-mentioned driving mechanism for the mounting nozzles 40, the multiple mounting nozzles 40 can be rotated integrally in the rotational direction R1 by driving the θ-axis motor 59, and the mounting nozzles 40 can be individually raised and lowered in the vertical direction D1 by driving each of the servo motors 56.

[0073] The above-mentioned operation of the mounting nozzle 40 is also the same for the take-out nozzle 36 of the take-out head 12. The drive mechanism of the take-out nozzle 36 will be described with reference to Figure 9. Figure 9 is a plan view showing the internal structure of the main body 38 of the take-out head 12.

[0074] As shown in Fig. 9, the drive mechanism of the take-out nozzle 36 includes a plurality of servo motors 63, a plurality of pulleys 64, a toothed belt 65, a θ-axis motor 66 having an output shaft 66A, and a pulley 67. Each servo motor 63 includes a linear motor 68 and an encoder 69. The functions and connections of these components are similar to those of the drive mechanism of the mounting nozzle 40 described in Figs. 8A and 8B, and therefore will not be described here.

[0075] According to the drive mechanism for the extraction nozzle 36 shown in Figure 9, the multiple extraction nozzles 36 can be driven to rotate integrally in the rotational direction R2 by driving the θ-axis motor 66, and the extraction nozzles 36 can be individually driven to move up and down in the vertical direction D2 by driving each of the servo motors 63.

[0076] Next, the configuration of the relay stage 26 will be described with reference to FIGS.

[0077] 10 is a schematic perspective view of the relay stage 26, FIG. 11 is a schematic vertical cross-sectional view of the relay stage 26, and FIG. 12 is a schematic plan view of the relay stage 26. As shown in FIG.

[0078] As shown in FIGS. 10 to 12, the relay stage 26 includes a relay stage camera 28, a first component disposal box 30, a temporary placement section 70, a housing 74, a component removal brush 76, and a brush drive mechanism 78.

[0079] The temporary placement section 70 is a member for temporarily placing a component P as a minute component. The upper surface of the temporary placement section 70 is a placement surface 71 for placing the component P. The placement surface 71 has a size large enough to place a plurality of components P thereon, and in the first embodiment, has a size large enough to accommodate all of the components P when the above-mentioned take-out head 12 or mounting head 14 transfers the plurality of components P collectively. FIGS. 10 and 11 show an example in which a total of 16 components P are placed on the placement surface 71.

[0080] 11, the height position of the placement surface 71 is set to a reference height (first reference height H1) related to the relay stage 26. The temporary placement section 70 is used as a reference member (first reference member) for setting the first reference height H1.

[0081] The temporary placement portion 70 of the first embodiment is made of a transparent plate-like member. The temporary placement portion 70 can be seen through in the thickness direction by the relay stage camera 28 provided below the temporary placement portion 70.

[0082] The relay stage camera 28 captures images of the multiple components P placed on the temporary placement section 70. The relay stage camera 28 is disposed in a space surrounded by a housing 74 below the temporary placement section 70 with the imaging direction facing upward. In the first embodiment, two relay stage cameras 28 are provided.

[0083] 11 and 12, the relay stage camera 28 has a predetermined imaging range B. The imaging range B is set to a range capable of imaging a plurality of parts P (16 parts in total) placed on the placement surface 71.

[0084] The housing 74 is the housing portion of the relay stage 26, and supports components such as the temporary placement unit 70 and the relay stage camera 28. A plurality of lights 80 and a plurality of diffusion plates 82 are provided inside the housing 74. The lights 80 are components that irradiate light toward the imaging range B of the relay stage camera 28, and the diffusion plates 82 are components that diffuse the light irradiated by the lights 80.

[0085] The part removal brush 76 is a brush for removing parts P remaining on the placement surface 71. As shown in Fig. 10 and other figures, the part removal brush 76 is composed of a number of brushes that protrude downward. The part removal brush 76 is configured to be able to move linearly in the X direction, and pushes out parts P left behind on the placement surface 71 towards the first part removal box 30, thereby discarding the parts P. The parts P discarded in the first part removal box 30 become discarded parts Pz (Figs. 11 and 12).

[0086] The brush driving mechanism 78 is a mechanism for driving the part removal brush 76. The brush driving mechanism 78 includes a motor 84 and a belt cover 86.

[0087] The detailed configuration of the brush driving mechanism 78 will be described with reference to Figures 13 and 14. Figures 13 and 14 are schematic cross-sectional views showing the peripheral configuration of the brush driving mechanism 78.

[0088] As shown in FIGS. 13 and 14, the brush driving mechanism 78 includes a motor 84 and a belt cover 86, as well as a belt 88, a connecting portion 90, a slider 92, and a guide 94.

[0089] The motor 84 rotates and drives the belt 88. The motor 84 and the belt 88 are housed inside a belt cover 86. A connecting portion 90 is attached to the belt 88, and the belt 88 is connected to a slider 92 by the connecting portion 90. The slider 92 is a member that moves linearly in the X direction along a guide 94, and is integrally attached with the component removal brush 76 described above. The guide 94 is attached in a horizontal position to the side surface of the housing 74, and extends along the X direction.

[0090] According to the brush driving mechanism 78 described above, the belt 88 is rotated by driving the motor 84 to move the component removal brush 76 in the X direction, thereby pushing the component P placed on the placement surface 71 into the first component disposal box 30 and removing it from the temporary placement section 70.

[0091] Next, the configuration and function of substrate transport unit 4 will be described with reference to Figures 15 and 16. Figure 15 is a schematic vertical cross-sectional view of substrate transport unit 4 in a state before substrate 2 is lifted, and Figure 16 is a schematic vertical cross-sectional view of substrate transport unit 4 in a state after substrate 2 has been lifted.

[0092] 15, the board transport unit 4 includes a pair of transport conveyors 5 and a backup pin 98. Furthermore, each transport conveyor 5 includes a board pressing member 95, a board guide 96, and a transport belt 97.

[0093] The substrate holding members 95 are plate-like members for holding down the substrate 2 from above, and are provided in pair above the conveyor belt 97. The substrate guide 96 is a member that supports the conveyor belt 97 and the substrate holding members 95. The backup pins 98 are rod-like members configured to be vertically movable below the working area A, and a plurality of backup pins 98 are provided so as to be able to come into contact with the underside of the substrate 2.

[0094] When the multiple backup pins 98 are raised together from the state shown in Fig. 15, the substrate 2 supported by the transport belt 97 is lifted by the backup pins 98 as shown in Fig. 16. The lifted substrate 2 comes into contact with the lower surface 95B of the substrate holding member 95 and is held down from above by the substrate holding member 95. This positions the substrate 2 in the working area A. The backup pins 98 and the transport conveyor 5 form a substrate holding section 99 that holds the substrate 2.

[0095] At least one first measurement point 95M (see FIG. 1) is set on the upper surface 95A of each substrate holding member 95 for setting a reference height (second reference height H2) for the working area A. In the first embodiment, two first measurement points 95M are provided on each substrate holding member 95, for a total of four first measurement points 95M. The substrate holding member 95 is used as a reference member (second reference member) for setting the second reference height H2.

[0096] The upper surface of the substrate 2 is pressed against the lower surface of the substrate holding member 95 and is supported from below by backup pins 98, so that the substrate 2 is held horizontally in the working area A. Therefore, the reference height (second reference height H2) for the working area A is set to coincide with the height position of the lower surface 95B (FIG. 15) of the substrate holding member 95. Therefore, the reference height (second reference height H2) can be set from the height position of the first measurement point 95M and the known dimension (thickness) of the substrate holding member 95.

[0097] 1, the control unit 35 is a member that controls the entire component mounting device 1. The control unit 35 includes, for example, a microcomputer. The detailed configuration of the control unit 35 will be described with reference to FIG.

[0098] 17 is a block diagram relating to a control system of the component mounting device 1. As shown in FIG.

[0099] The head unit control unit 100 has a function of controlling the lifting and suctioning operations of the take-out nozzle 36 of the take-out head 12, and the lifting and suctioning operations of the mounting nozzle 40 of the mounting head 14. On the other hand, the main body control unit 102 has a function of controlling the transportation of the substrate 2 in the component mounting device 1, the imaging operation by the camera, and the like, as well as transmitting control commands to the head unit control unit 100. The head unit control unit 100 and the main body control unit 102 are electrically connected via a wiring connector (not shown) or the like.

[0100] The head unit control unit 100 has a take-out head control unit 104 for controlling the take-out head 12 and a mounting head control unit 106 for controlling the mounting head 14 .

[0101] FIG. 18 shows the internal configuration of the head unit control unit 100 including the take-out head control unit 104 and the mounting head control unit 106.

[0102] 18, the mounting head control unit 106 is provided with motor control units 112 (#1 to #8) for controlling the servo motors 56 (#1 to #8) of the mounting nozzles 40 arranged on the mounting head 14, for each of the multiple (eight in this example) mounting nozzles 40. The mounting head control unit 106 is further provided with a θ-axis motor control unit 114 for controlling the θ-axis motor 59 arranged on the mounting head 14.

[0103] Each of the motor control units 112 includes a motor driver 116, a contact detection unit 118, a height detection unit 120 (mounting nozzle height detection unit), a lowest point memory unit 122, and an operation command unit 124.

[0104] The motor driver 116 supplies power to the servo motor 56 to drive it in accordance with an operation command from the operation command unit 124. Specifically, the motor driver 116 drives the servo motor 56 by servo control that feeds back the deviation between target values ​​of position, speed, etc. based on position commands and speed commands from the operation command unit 124 and current values ​​of position, speed, etc. detected by pulse signals sent from the encoder 62.

[0105] The contact detection unit 118 detects that the mounting nozzle 40 has come into contact with an object such as the relay stage 26 or a component, or that the component P held by the mounting nozzle 40 has landed (comes into contact) with a mounting point on the board 26. This detection is performed based on the torque (current) output by the motor driver 116 or the encoder pulse from the encoder 62. When torque is used, if the mounting nozzle 40 comes into contact with an object and cannot descend, causing an increase in deviation from the target value, the torque (current) supplied from the motor driver 116 to the servo motor 56 increases. When torque is used, contact is detected by detecting an increase in this torque (current). When detecting contact based on the encoder pulse, contact is detected by detecting that the period of the encoder pulse becomes longer or is no longer detected, or by receiving an encoder pulse indicating a change from a descent to an ascent.

[0106] The height detection unit 120 counts the encoder pulses from the encoder 62 of the servo motor 56. This count value becomes height information indicating the height direction position of the mounting nozzle 40. In other words, the height detection unit 120 has a height detection function that detects the height of the mounting nozzle 40 based on the position signal from the servo motor 56 (take-out nozzle height detection unit). Mounting point height measurement, which will be described later, is performed using the height detection function of the height detection unit 120.

[0107] The lowest point storage unit 122 temporarily stores the minimum value of the value output by the height detection unit 120 during a predetermined period when the contact of the mounted nozzle 40 is detected by the contact detection unit 118, that is, the value indicating the height (lowest point) to which the mounted nozzle 40 has descended the most during the predetermined period. In this embodiment, the value output by the height detection unit 120 decreases as the position of the mounted nozzle 40 becomes lower, so the "minimum value" is stored in the lowest point storage unit 122 as the value indicating the lowest point. However, if the value output by the height detection unit 120 increases as the position of the mounted nozzle 40 becomes lower, the "maximum value" may be stored in the lowest point storage unit 122. The value stored in the lowest point storage unit 122 is used as height information of the mounted nozzle 40.

[0108] The operation command unit 124 issues an operation command for lifting and lowering the mounted nozzle 40. Specifically, the operation command unit 124 transmits signals as position commands and speed commands based on a preset operation pattern to the motor driver 116.

[0109] Each of the motor control units 112 and the θ-axis motor control unit 114 is realized, for example, by a processing circuit executing a computer program, or by a processing circuit alone, or by a memory alone. The same applies to the other control units.

[0110] Similarly, the take-out head control unit 104 is provided with a motor control unit 108 (#1-#16) for controlling the servo motors 63 (#1-#16) of the take-out nozzles 36 arranged on the take-out head 12, for each of the multiple (16 in this example) take-out nozzles 36. The take-out head control unit 104 is further provided with a θ-axis motor control unit 110 for controlling the θ-axis motor 66 arranged on the take-out head 12.

[0111] Each of the motor control units 108 includes a motor driver 160 and a motion command unit 168. The motor driver 160 and the motion command unit 168 have the same functions as the motor driver 116 and the motion command unit 124 described above, respectively, and therefore a description thereof will be omitted.

[0112] 17, the main body control unit 102 is connected to each component of the component mounting device 1. Specifically, the main body control unit 102 is connected to, for example, the head camera 16, the XY table 17, the board transport unit 4, the component camera 32, the two relay stage cameras 28, the motor 84, the first component supply unit 6, the second component supply unit 8, and the third component supply unit 10.

[0113] The main body control unit 102 has, as its internal processing unit 101, a mounting work execution unit 126, a component thickness measurement unit 128, a reference height setting unit 130, a mounting point height measurement unit 132, a mounting point height measurement unit 134, and a target position calculation unit 136.

[0114] The mounting operation execution unit 126 controls the XY table 17, the board transport unit 4, the component supply units 6, 8, 10, the take-out head 12, the mounting head 14, the head camera 16, the component camera 32, the relay stage camera 28, and the like, based on a mounting program 138, which will be described later. In this way, a series of operations for mounting the components P on the board 2 is executed. The mounting operation execution unit 126 executes an operation of mounting the components P on the board 2 by repeating an operation of moving the mounting head 14 from the component supply units 6, 8, 10 or the relay stage 26 to the operation area A multiple times (hereinafter, this operation is referred to as a "turn"). In addition, the mounting operation execution unit 126 executes an operation of taking out the minute components supplied from the component supply unit 6 by the take-out head 12 before the above-mentioned turn is started or between turns, and transferring them to the relay stage 26.

[0115] The component thickness measuring unit 128 controls the mounting head 14 to measure the thickness of the component P based on the height information of the mounting nozzle 40 output by the height detection unit 120 when picking up the component P placed on the relay stage 26. In order to measure the thickness of the component P, a first reference height H1 related to the reference surface of the relay stage 26 is used.

[0116] The reference height setting unit 130 controls the mounting head 14 to set a first reference height H1 for the relay stage 26 based on the height information of the mounting nozzle 40 output by the height detection unit 120 when the lower end surface of the mounting nozzle 40 is brought into contact with the placement surface 71, which is the reference surface of the relay stage 26. The reference height setting unit 130 further controls the mounting head 14 to set a second reference height H2 for the working area A based on the height information of the mounting nozzle 40 output by the height detection unit 120 when the lower end surface of the mounting nozzle 40 is brought into contact with the upper surface 95A of the substrate holding member 95 in the working area A.

[0117] The mounting point height measurement unit 132 controls the mounting head 14 to measure the height of the mounting point based on the height information of the mounting nozzle 40 output by the height detection unit 120 when the component P is mounted on the mounting point of the board 2. In order to measure the height of the mounting point, the second reference height H2 of the work area A and the thickness information of the component are used.

[0118] The mounting point height estimation unit 134 calculates the estimated heights of other mounting points whose heights have not been measured, based on the height data of the multiple mounting points obtained by the mounting point height measurement unit 132. The other mounting point estimation unit 134 of the first embodiment uses "face correction" for the mounting point height estimation process.

[0119] The target position calculation unit 136 calculates a target position to which the mounting nozzle 40 holding the component P is moved when mounting the component P on the board 2. A specific calculation method will be described later with reference to FIG. 20 etc.

[0120] The main body control unit 102 further has, as an internal memory unit, a mounting program 138, a target position 140, component data 142, board data 144, reference height data 146, mounting point data 148, component thickness (measured value) 150, and mounting point height (measured value) 152.

[0121] The mounting program 138 is a program that determines the mounting order and mounting positions of the components P. An example of the mounting program 138 is shown in FIG.

[0122] The mounting program 138 shown in FIG. 19 stores multiple types of information, including "mounting number," "turn number," "component type," "mounting point," "X," "Y," "θ," "Z," "removal nozzle," "mounting nozzle," "relay," and "designated mounting point."

[0123] "Mounting No." is identification information indicating the mounting order of the component P. "Turn No." is identification information indicating which turn the component P is to be mounted on the board 2. "Component" is identification information indicating the component P to be mounted. "Mounting point" is identification information indicating the mounting point where the component P to be mounted should be mounted. "X" and "Y" are numerical information indicating the X and Y coordinates of the mounting point where the target component P is to be mounted, respectively. "θ" is numerical information indicating the orientation of the component P to be mounted on the board 2. "Z" is numerical information indicating the height of the mounting point of the board 2 held by the board holding unit 99 in an ideal state, as a height difference from the second reference height H2. "Extraction nozzle" is identification information indicating which extraction nozzle 36 will hold the component P to be mounted. "Mounting nozzle" is identification information indicating which mounting nozzle 40 will hold the component P to be mounted. "Relay" is identification information indicating whether the component P to be mounted passes through the relay stage 26. In the example of Fig. 19, when the identification information of "relay" is "1", it indicates that the relay stage 26 will be passed through, and when it is "0", it indicates that the relay stage 26 will not be passed through. "Designated mounting point" is identification information that indicates which of multiple mounting points is designated as a "designated mounting point" for performing the height estimation process of other mounting points. In the example of Fig. 19, when the identification information of "designated mounting point" is "1", it indicates that the mounting point is designated as a designated mounting point, and when it is "0", it indicates that the mounting point is not designated as a designated mounting point.

[0124] 17, the target position 140 is information indicating a target position to which the mounting nozzle 40 holding the component P is moved when mounting the component P on the board 2. The target position 140 is calculated by the target position calculation unit 136.

[0125] The part data 142 is data related to the part P. The part data 142 includes, for example, information related to the part P such as dimensions, shape, and type (for example, catalog data).

[0126] The board data 144 is data relating to the board 2. The board data 144 includes, for example, information such as the relative positional relationship between a reference mark (see reference mark 174 in FIG. 32) for identifying the position of the board 2 and each mounting point.

[0127] The reference height data 146 is data including a first reference height H1 and a second reference height H2 set by the reference height setting unit .

[0128] The mounting point data 148 is data related to the mounting point of the carried-in board 2. The mounting point data 148 includes, for example, the X coordinate, the Y coordinate, and the Z coordinate of the mounting point, and the orientation θ of the component P to be mounted on the mounting point. The mounting point data 148 is a mounting point height storage unit that stores the height of the mounting point.

[0129] The component thickness (measured value) 150 stores the thickness of the component P measured by the component thickness measuring unit 128.

[0130] Mounting point height (measured value) 152 stores the height of the mounting point measured by mounting point height measurement unit 132.

[0131] The main body control unit 102 further includes a first recognition unit 154, a second recognition unit 156, and a third recognition unit 158.

[0132] The first recognition unit 154 is a board recognition unit that recognizes the board 2 using the image captured by the head camera 16. The second recognition unit 156 is a component recognition unit that recognizes the component P placed on the relay stage 26 using the image captured by the relay stage camera 28. The third component recognition unit 158 ​​is a component recognition unit that recognizes the component P held by the mounting head 14 using the image captured by the component camera 32.

[0133] The operation of the component mounting device 1 of the embodiment 1 having the above-mentioned configuration will be described with reference to Fig. 20 to Fig. 34B. Prior to the component mounting operation on the substrate 2, the component mounting device 1 of the embodiment 1 executes a reference height setting process (a reference heights H1, H2 setting process) for measuring and storing the reference heights of the relay stage 26 and the substrate holding unit 99.

[0134] First, the process of setting the reference heights H1 and H2 will be described with reference to FIGS. 20 to 24B.

[0135] 20 is a flowchart showing the process of setting the first reference height H1. Each process in the flow shown in FIG.

[0136] First, the control unit 35 moves the mounting nozzle 40 to the relay stage 26 (S1). Specifically, the reference height setting unit 130 of the main body control unit 102 controls the XY table 7 supporting the mounting head 14 to move the mounting head 14 having the multiple mounting nozzles 40 without holding any components P, above the relay stage 26. Note that this flow is executed in a state where no components P are placed on the placement surface 71 of the relay stage 26.

[0137] The control unit 35 starts lowering the mounting nozzle 40 (S2). Specifically, in response to a command from the operation command unit 124 of the mounting head control unit 106, the motor driver 116 controls the servo motor 56 corresponding to one of the multiple mounting nozzles 40 to lower the mounting nozzle 40 toward the placement surface 71.

[0138] The control unit 35 waits until the contact detection unit 118 detects that the mounting nozzle 40 has come into contact with the placement surface 71 (S3).

[0139] Fig. 21 shows a state in which the lower end surface of the mounting nozzle 40 is in contact with the mounting surface 71. As shown in Fig. 21, when it is detected that the lower end surface of the mounting nozzle 40 is in contact with the mounting surface 71 (YES in S3), the process proceeds to step S4.

[0140] The control unit 35 controls the servo motor 56 to stop the descent of the mounting nozzle 40 (S4), and the reference height setting unit 130 sets the first reference height H1 (S5). The reference height setting unit 130 acquires height information of the mounting nozzle 40 that has come into contact with the mounting surface 71 from the height detection unit 120 or the lowest point storage unit 122. The reference height setting unit 130 then stores the acquired height information in the storage unit 103 as the reference height H1, i.e., the reference height data 146. This completes the setting of the reference height H1 for this mounting nozzle 40. Note that, when the lower end surface of the same mounting nozzle 40 is brought into contact with the same location on the mounting surface 71 multiple times, the reference height setting unit 130 sets the average value of the acquired multiple pieces of height information as the reference height H1. Also, when the lower end surface of the same mounting nozzle 40 is brought into contact with multiple locations on the mounting surface 71, the reference height setting unit 130 sets the function of the surface obtained from the acquired multiple pieces of height information as the reference height H1.

[0141] The control unit 35 controls the servo motor 56 to raise the mounting nozzle 40 as shown in Fig. 22 (S6). The raised mounting nozzle 40 is returned to the same height position as the other mounting nozzles 40.

[0142] The control unit 35 judges whether or not the process has been completed for all the mounted nozzles 40 (S7). In step S7, the control unit 35 judges whether or not the process of steps S1 to S6 has been performed for all of the multiple mounted nozzles 40 (#1 to #8) provided on the mounting head 14. If there are any mounted nozzles 40 for which the process of steps S1 to S6 has not been performed, it is judged that the process has not been completed for all mounted nozzles 40 (NO in S7), and the process of steps S1 to S6 is performed for the other mounted nozzles 40 as well. That is, the process of steps S1 to S6 is performed for each of the multiple mounted nozzles 40, and the first reference height H1 is set for each mounted nozzle 40. This makes it possible to set the first reference height H1 without being affected by individual differences between the multiple mounted nozzles 40.

[0143] In the first embodiment, each of the mounted nozzles 40 is replaceably attached to the shaft 42, and the first reference height H1 can be set for each combination of the mounted nozzle 40 and the shaft 42. This allows the first reference height H1 to be set with greater accuracy.

[0144] When the processing of steps S1 to S6 is completed for all mounting nozzles 40, it is determined that the processing is completed for all mounting nozzles 40 (YES in step S7), and the setting processing of the first reference height H1 is terminated.

[0145] Fig. 23 is a flowchart showing the setting process of the second reference height H2, and Fig. 24A and Fig. 24B are schematic diagrams for explaining the flow of the process according to the flowchart of Fig. 23. Each process according to the flowchart of Fig. 23 is executed by the control unit 35 including the reference height setting unit 130. Descriptions of contents that overlap with the above-mentioned first reference height setting process will be omitted as appropriate.

[0146] First, the control unit 35 moves the mounting nozzle 40 to the working area A (S8). Specifically, the reference height setting unit 130 of the main body control unit 102 controls the XY table 7 supporting the mounting head 14 to move the mounting head 14, which has multiple mounting nozzles 40 and is not holding components P, above the board transport unit 4 in the working area A. This flow is executed in a state where no board 2 is placed in the working area A.

[0147] The control unit 35 starts lowering the mounting nozzle 40 (S9). Specifically, in response to a command from the operation command unit 124 of the mounting head control unit 106, the motor driver 116 controls the servo motor 56 corresponding to one of the multiple mounting nozzles 40, and lowers the mounting nozzle 40 toward the substrate holding member 95 of the substrate transport unit 4, as shown in Fig. 24A. In the first embodiment, a pair of substrate holding members 95 are provided, and the mounting nozzle 40 is lowered toward one of the substrate holding members 95 (the one on the left side of the drawing).

[0148] The control unit 35 waits until the contact detection unit 118 detects that the mounting nozzle 40 has come into contact with the upper surface 95A (first measurement point 95M) of the board holding member 95 (S10).

[0149] 24A, when it is detected that the mounting nozzle 40 has come into contact with the substrate holding member 95 (YES in S10), the descent of the mounting nozzle 40 is stopped (S11), and height information of the mounting nozzle 40 obtained by the height detection unit 120 or height information stored in the lowest point storage unit 122 is obtained and stored (S12). As a result, the height of the upper surface 95A (first measurement point 95M) is measured.

[0150] The control unit 35 raises the mounting nozzle 40 (S13) and determines whether height measurement has been completed at all measurement points (S14). In the first embodiment, since there are four first measurement points 95M, if height measurement has not been completed at all measurement points (NO in S14), steps S8 to S14 are executed again.

[0151] As shown in FIG. 24A, once height measurement of the first measurement point 95M of one of the substrate holding members 95 has been completed, the mounting nozzle 40 is lowered toward the upper surface of the other substrate holding member 95 (S8-S9), and measurements are performed on the remaining first measurement points 95M (S10-S13), as shown in FIG. 24B.

[0152] Then, when the height measurements of all the first measurement points 95M are completed (YES in S14), the second reference height H2 is set (S15). In the first embodiment, the average value of the heights of the four first measurement points 95M is set as the second reference height H2.

[0153] The number of measurement points is not limited to four, and one, three, five or more measurement points may be set. When the inclination of the substrate transport unit 4 in the vertical direction is taken into consideration as the second reference height H2, the second reference height H2 may be a function that defines the inclination.

[0154] After completing the preparatory work including the process of setting the reference heights H1 and H2, the component mounting device 1 starts the work of mounting components on the board 2. Next, the work of mounting components on the board 2 will be described with reference to Figs. 25 to 34B. Fig. 25 is a block diagram for explaining a method of calculating a target position by the target position calculation unit 136. Fig. 26 is a diagram showing the flow of a series of component mounting operations by the component mounting device 1.

[0155] (Board delivery) 26, first, the board 2 is carried into the work area A. Specifically, the board 2 is transported by the transport conveyor 5 of the board transport unit 4 and positioned in the work area A.

[0156] (Board Recognition) The board 2 positioned in the work area A is recognized. Specifically, the mounting head 14 having the head camera 16 is moved in the XY directions, and the head camera 16 is positioned above the board 2 to capture an image of the board 2. Based on the image captured by the head camera 16, the first recognition unit 154 recognizes the position of the board 2. The recognition result of the board 2 by the first recognition unit 154 is transmitted to the target position calculation unit 136.

[0157] (Setting implementation data) 25(2), the target position calculation unit 136 reads information on all mounting points scheduled for the component mounting device 1 from the mounting program 138. The information to be read is the information on X, Y, θ, and Z in the mounting program 138 shown in FIG.

[0158] 25(3), the target position calculation unit 136 calculates and stores corrected mounting point data 148 (X1, Y1, θ1) in the storage unit 103 by correcting the read X, Y, and θ based on the board recognition result by the first recognition unit 154. If there is an estimated value by the mounting point height estimation unit 134 for the mounting point, the target position calculation unit 136 stores the value as Z1, but if there is no estimated value, stores Z of the mounting program 138 as Z1. At the start of the first turn, there is no estimated value by the mounting point height estimation unit 134 for the mounting point, so Z of the mounting program 138 is set as Z1. Of the mounting point data 148, (X1, Y1, θ1) becomes the tentative target position of each mounting nozzle 40 in the component mounting process.

[0159] (Removing parts) In parallel with the board loading and board recognition described above, as shown in Fig. 26, the take-out head 12 takes out the components P and places them on the relay stage 26. To take out the components P by the take-out head 12, the take-out head 12 moves above the first component supply unit 6 shown in Fig. 1, and the take-out nozzles 36 of the take-out head 12 pick up and take out the components P accommodated in the carrier tape of the first component supply unit 6. The take-out nozzles 36 are raised and lowered individually, and each take-out nozzle 36 sequentially picks up the components P. In the first embodiment, a total of 16 take-out nozzles 36 are provided, and the components P are taken out until a maximum of 16 take-out nozzles 36 pick up the components P.

[0160] (Parts placement) The take-out head 12 is moved to the relay stage 26 with the multiple take-out nozzles 36 holding the components P. This allows the multiple components P to be transported from the first component supply unit 6 to the relay stage 26 in a lump. Thereafter, the components P held by the take-out nozzles 36 are placed on the temporary placement section 70 of the relay stage 26. Specifically, the multiple take-out nozzles 36 are simultaneously lowered to release the suction of the components P close to the placement surface 71 of the temporary placement section 70, and the components P are placed on the placement surface 71. This results in a state in which multiple (e.g., 16) components P are placed on the placement surface 71 as shown in FIG. 10. In the first embodiment, the take-out nozzle 36 transports 16 components P to be mounted on the board 2 in the first and second turns, in other words, multiple components P for multiple turns, to the relay stage 26 in a lump.

[0161] When the placement of the component P is completed, the take-out head 12 returns to the component supply unit 6.

[0162] (Parts Recognition) Thereafter, component recognition is performed on the components P arranged on the relay stage 26. Specifically, the components P arranged on the temporary placement section 70 are imaged from below using the relay stage camera 28 shown in FIG. 10 and the like. In the first embodiment, two relay stage cameras 28 are provided, and the 16 components P arranged on the temporary placement section 70 can be imaged simultaneously. Based on the captured image (first image), the second recognition section 156 of the control section 35 recognizes each of the components P. The recognition of the components P at this timing is "pre-pickup component recognition" (first component recognition) performed before the mounting head 14 picks up the components P. In the first embodiment, pre-pickup component recognition is performed on all of the components P arranged on the temporary placement section 70.

[0163] Using this pre-pickup component recognition, the mounting head 14 performs a pick-up process of the component P. During the pre-pickup component recognition, the mounting head 14 moves from the working area A to the relay stage 26 (FIG. 26). Furthermore, when the pre-pickup component recognition is completed while the mounting head 14 is moving, the main body control unit 102 starts the component pick-up process.

[0164] The flow of the component pick-up process is shown in Fig. 27. Each process in the flowchart shown in Fig. 27 is executed by the mounting work execution unit 126 of the control unit 35.

[0165] The mounting operation execution unit 126 acquires the result of the pre-pickup component recognition (S16). Specifically, the mounting operation execution unit 126 of the main body control unit 102 reads out data temporarily stored in the second recognition unit 156 as a result of the pre-pickup component recognition. The result of the pre-pickup component recognition includes position information of each of the components P placed on the relay stage 26. In the first embodiment, the mounting operation execution unit 126 acquires, from the second recognition unit 156, position information of one or more (maximum eight) components P scheduled to be mounted on the board 2 in the started turn.

[0166] The mounting operation execution unit 126 aligns the mounting nozzle 40 with respect to the component P (S17). Specifically, the mounting operation execution unit 126 aligns, in the XY directions, the mounting nozzle 40 assigned by the mounting program 138 with respect to one of the multiple components P recognized in the pre-pickup component recognition. In the first embodiment, as shown in Fig. 28A, alignment is performed so that the center in the XY directions of the lower end surface of the mounting nozzle 40 coincides with the center in the XY directions of the component P.

[0167] The mounting operation execution unit 126 starts lowering the mounting nozzle 40 in parallel with the alignment of the mounting nozzle 40 (S18). Specifically, the mounting operation execution unit 126 sends a command to the motor control unit 112, which controls the servo motor 56 to lower the mounting nozzle 40. This makes it possible to move the component P diagonally downward as shown in Fig. 28A, thereby shortening the operation time and increasing productivity.

[0168] The mounting operation execution unit 126 starts suction by the mounting nozzle 40 at a predetermined timing after starting the descent of the mounting nozzle 40 (S19). Specifically, a valve (not shown) connected through a pipe to the suction hole 54 (see FIG. 6) of the mounting nozzle 40 is driven to connect the suction hole 54 to a negative pressure source, thereby generating negative pressure in the suction hole 54. If the mounting nozzle 40 continues to descend in this state, it will come into contact with the component P placed on the relay stage 26 (FIG. 28B).

[0169] The mounting operation executing unit 126 judges whether or not the mounting nozzle 40 has come into contact (S20). A specific method will be described with reference to FIG. 28D.

[0170] FIG. 28D is a graph showing how the output value of the height detection unit 120 changes when the mounting nozzle 40 is lowered in response to a command from the operation command unit 124.

[0171] 28D, when the bottom end surface of the mounting nozzle 40 comes into contact with the mounting surface 71, a fluctuation occurs in the output value of the height detection unit 120. When such a fluctuation that is not proportional to the command of the operation command unit 124 is detected in the output value of the height detection unit 120, the contact detection unit 118 determines that the bottom end surface of the mounting nozzle 40 has come into contact with the mounting surface 71.

[0172] When the mounting operation execution unit 126 detects that the bottom end surface of the mounting nozzle 40 has come into contact with the component P (YES in S20), it stores the minimum value of the height of the mounting nozzle 40 (S21). Specifically, it stores in the lowest point storage unit 122 the minimum value of the output value of the height detection unit 120 during a predetermined period after the bottom end surface of the mounting nozzle 40 has come into contact with the component P.

[0173] 28D, a "buffer period" is defined from when contact of the mounting nozzle 40 is detected until the mounting nozzle 40 starts to rise, and a predetermined range in the latter half of the buffer period is defined as a "minimum value acquisition period." This makes it possible to acquire the minimum value during the period when the output value is stable, without using the output value of the height detection unit 120 during the unstable period immediately after contact is detected.

[0174] The mounting operation execution unit 126 raises the mounting nozzle 40 (S22). Specifically, the mounting operation execution unit 126 sends a command to the motor control unit 112, and the motor control unit 112 controls the servo motor 56 to raise the mounting nozzle 40. In the first embodiment, as shown in FIG. 28C, the mounting nozzle 40 is moved obliquely upward.

[0175] The mounting operation execution unit 126 issues a command to recognize the component after picking up (S23). Specifically, the mounting operation execution unit 126 sends a command to the relay stage camera 28 to capture an image of the component P held by the mounting nozzle 40 and output the image to the second recognition unit 156. As shown in FIG. 28C, the relay stage camera 28 arranged below captures an image of the component P that has been lifted from the temporary placement unit 70 by moving diagonally upward. Based on the captured image (second image), the second recognition unit 156 of the control unit 35 recognizes the component P by the second recognition unit 156. The recognition of the component P at this timing is "post-pickup component recognition (second component recognition)" performed after the mounting head 14 picks up the component P. The second recognition unit 156 recognizes the positional deviation between the component P held by the mounting nozzle 40 and the mounting nozzle 40. Specifically, a well-known image recognition technique is used to calculate the deviation (ΔX, ΔY) between the center of the mounting nozzle 40 and the center of the component P, as well as the angle difference (Δθ) between the orientation of the mounting nozzle 40 and the orientation of the component P. These deviations and angle differences are output to target position calculation section 136 as the post-pickup component recognition results (arrow (B) in FIG. 25).

[0176] The component thickness measuring unit 128 acquires the minimum value of the height of the mounting nozzle 40 (S24). Specifically, the component thickness measuring unit 128 of the main body control unit 102 reads and acquires the minimum value of the height of the mounting nozzle 40 stored in the lowest point memory unit 122 of the motor control unit 112 in step S21.

[0177] The component thickness measuring unit 128 calculates the thickness of the component P (S25). Specifically, the component thickness measuring unit 128 calculates the thickness of the component P based on the minimum value of the height of the mounting nozzle 40 acquired in step S24 and the first reference height H1 of the relay stage 26 stored in the reference height storage unit 146. Since the minimum value of the height of the mounting nozzle 40 corresponds to the height of the lower end surface of the mounting nozzle 40 when the mounting nozzle 40 contacts the component P as shown in FIG. 28B, the thickness of the component P can be calculated by finding the difference from the first reference height H1 of the relay stage 26. The calculated thickness of the component P is stored in the storage unit of the main body control unit 102 as the component thickness (measured value) 150.

[0178] The mounting operation execution unit 126 determines whether or not there is an incomplete mounting nozzle 40 that has not yet finished picking up the component P (S26).

[0179] If any of the mounting nozzles 40 for one turn have not executed steps S17 to S25, it is determined that there is an incomplete mounting nozzle 40 (YES in S26), and steps S17 to S26 are executed again. That is, the pickup process of the component P and the calculation of the thickness of the component P are executed for each of the multiple mounting nozzles 40 (#1 to #8) provided on the mounting head 14.

[0180] When steps S17 to S25 are executed for all of the multiple mounted nozzles 40 for one turn, it is determined that there are no incomplete mounted nozzles 40 (NO in S26), and the processing of the flowchart shown in FIG. 27 ends.

[0181] The component mounting device 1 of the first embodiment repeatedly executes the process of the flowchart shown in Fig. 27 for each turn. As a result, in accordance with the mounting order of the mounting program 138, the mounting nozzle 40 sequentially performs the pickup process of the component P and the thickness calculation for each turn.

[0182] 26, the mounting head 14 moves to the working area A with the multiple mounting nozzles 40 picking up components P. This transports the multiple components P en masse. During this transport, the target position calculation unit 136 determines the target position (X2, Y2, θ2, Z2) of each mounting nozzle 40 when mounting the components P on the board 2.

[0183] A method for calculating the target position (X2, Y2, θ2, Z2) by the target position calculation unit 136 will be described with reference to FIG.

[0184] 25, the first calculation unit 136A of the target position calculation unit 136 calculates the target position (X2, Y2, θ2) based on (A) the mounting point data 148 (X1, Y1, θ1) and (B) the post-pickup component recognition result. Specifically, the tentative target position indicated by the mounting point data 148 (X1, Y1, θ1) is corrected using the post-pickup component recognition result (ΔX, ΔY, Δθ) to calculate the target position (X2, Y2, θ2).

[0185] In addition, when the mounting head 14 picks up a component directly from the component supply units 8 and 10 (when the component P is other than a micro component) as in the seventh and eighth turns of the first embodiment, the recognition of the component P is performed by the component recognition in which the image captured by the component camera 32 (FIG. 1) is processed by the third recognition unit 158. In this case, instead of the (B) post-pickup component recognition result, (C) the component recognition result by the third recognition unit 158 ​​is used to correct the mounting point data 148 (X1, Y1, θ1) and calculate the target position (X2, Y2, θ2). The component recognition result by the third recognition unit 158 ​​is obtained by capturing an image of the component P (other than a micro component) adsorbed to the mounting head 14 by the component camera 32, and the third component recognition unit 158 ​​recognizes the component P based on the captured image.

[0186] The second calculation unit 136B of the target position calculation unit 136 calculates the target height (Z2) based on (D) mounting point data 148 (Z1), (E) component thickness (measurement value) 150, and (H) second reference height H2. Specifically, the target height (Z2) to which the mounting nozzle 40 holding the component P is moved can be calculated by adding the component thickness (measurement value) 150 obtained by the measurement in step S25 to the reference height (Z1) included in the mounting point data 148.

[0187] (4) The target position (X2, Y2, θ2) calculated by the first calculation unit 136A and (5) the target height (Z2) calculated by the second calculation unit 136B are stored as the target position 140 in the memory unit 103 of the main body control unit 102.

[0188] Next, the component mounting process will be described with reference to Fig. 29. A flow of the mounting process of the components P by the mounting head 14 is shown in Fig. 29. Each process of the flowchart shown in Fig. 29 is executed by the mounting operation execution unit 126.

[0189] The mounting operation execution unit 126 acquires the target position (X2, Y2, θ2, Z2) (S27). Specifically, the mounting operation execution unit 126 acquires the target position (X2, Y2, θ2, Z2) calculated by the target position calculation unit 136.

[0190] The mounting operation execution unit 126 positions the mounting nozzle 40 at the mounting point (S28). Specifically, under the control of the mounting operation execution unit 126, the mounting nozzle 40 holding the component P to be mounted on the board 2 is positioned in the XY and θ directions according to the mounting order of the mounting program 138. When positioning, the mounting nozzle 40 is moved toward the target position (X2, Y2, θ2) acquired in step S27. In the first embodiment, as shown in FIG. 30A, the mounting nozzle 40 is positioned by moving the mounting nozzle 40 diagonally downward while descending in the Z direction.

[0191] The mounting operation execution unit 126 judges whether the mounting point is a designated mounting point (S29). Specifically, the mounting operation execution unit 126 judges whether the mounting point of the board 2 on which the component P is to be mounted is designated as a designated mounting point in the mounting program 138. In the example of the mounting program 138 shown in Fig. 19, the mounting points corresponding to the first to ninth components P in the mounting order are designated as designated mounting points, and the tenth and subsequent mounting points are not designated as designated mounting points. Therefore, all mounting points on which components are mounted in the first turn are designated as designated mounting points.

[0192] When it is determined that the mounting point is the designated mounting point (YES in S29), the control unit 35 starts lowering the mounting nozzle 40 (S30) and determines whether contact is detected (S31). In step S31, it is determined whether the mounting nozzle 40 holding the component P has come into contact with the mounting point on the board 2 by using the same contact detection method as in step S20 described above.

[0193] If contact of the mounting nozzle 40 is not detected (NO in S31), the mounting nozzle 40 continues to descend. On the other hand, as shown in Fig. 30B, when the component P held by the mounting nozzle 40 comes into contact with the upper surface of the board 2, contact of the mounting nozzle 40 is detected (YES in S31).

[0194] When the mounting operation execution unit 126 detects contact of the mounting nozzle 40, it releases the suction by the mounting nozzle 40 (breaks the vacuum) and raises the mounting nozzle 40 (S34). In the first embodiment, as shown in Fig. 30C, the mounting nozzle 40 is raised in an oblique direction while moving upward.

[0195] The mounting operation execution unit 126 acquires the minimum value (S35). Specifically, in a manner similar to that of step S21 described above, the mounting operation execution unit 126 reads and acquires the minimum value of the height of the mounting nozzle 40 stored in the lowest point storage unit 122 with respect to the output value for a predetermined period of time immediately before the mounting nozzle 40 is raised after the contact is detected (YES in S31). This minimum value is the height position of the mounting nozzle 40 when the component P is mounted on the board 2.

[0196] The mounting operation execution unit 126 instructs the mounting point height measurement unit 132 to calculate the mounting point height (S36). The mounting point height measurement unit 132, which has received this instruction, calculates the mounting point height. Specifically, since the minimum value of the mounting nozzle 40 acquired in step S35 corresponds to the height Z3 of the mounting nozzle 40 holding the component P in contact with the mounting point on the board 2 as shown in FIG. 30B, the mounting point height Z4, which is the height of the mounting point on the board 2, can be calculated by subtracting the component thickness (measurement value) 150. The calculated mounting point height Z4 is stored in the storage unit 103 of the main body control unit 102 as the mounting point height (measurement value) 152. In this way, in the first embodiment, the component thickness used in calculating the mounting point height is not a catalog value, but an accurate value measured for the component P actually mounted on the mounting point, so that an accurate mounting point height can be obtained.

[0197] The mounting operation execution unit 126 determines whether or not there is an incomplete mounting nozzle 40 (S37). Specifically, the determination is made based on whether or not there is a mounting nozzle 40 that has not executed steps S28 to S36 among the multiple mounting nozzles 40 for one turn in accordance with the mounting order of the mounting program 138.

[0198] If there is a mounted nozzle 40 for which steps S28 to S36 have not been executed among the multiple mounted nozzles 40 for one turn, it is determined that there is an incomplete mounted nozzle 40 (YES in S37), and steps S28 to S37 are executed again.

[0199] When steps S28 to S36 have been executed for all of the multiple mounting nozzles 40 for one turn, it is determined that there are no incomplete mounting nozzles 40 (NO in S37), and the component mounting process ends. This completes the component mounting process for the first turn. The component mounting device 1 repeatedly executes a series of processes from setting the mounting data 148 by the target position calculation unit 136 to the component mounting process (FIG. 29) for each turn, thereby sequentially mounting components P by the mounting nozzles 40 from the second turn onwards, and calculating the mounting point height Z4 of the board 2 on which the components P are mounted, according to the mounting order of the mounting program 138.

[0200] In the example of mounting program 138 shown in Fig. 19, the mounting points corresponding to the first to ninth components P in the mounting order are designated as designated mounting points. Of these, the first to sixth components P in the mounting order are programmed to be mounted in the first turn, and the seventh to ninth components P in the mounting order are programmed to be mounted in the second turn. Therefore, when the flow shown in Fig. 29 is executed for the first and second turn components P, it is determined that all mounting points (first to ninth in the mounting order) are designated mounting points (YES in S29), and the processes of steps S30, S31, and S34 to S36 are executed for each mounting point. As a result, mounting point heights H4 are calculated for all nine designated mounting points.

[0201] When the mounting point height H4 has been calculated for all the designated mounting points, the mounting point height estimation unit 134 performs a process of estimating the heights of the mounting points other than the designated mounting points.

[0202] A flow of the mounting point height estimation process is shown in Fig. 31. Each process in the flowchart shown in Fig. 31 is executed by the mounting point height estimation unit 134.

[0203] The mounting point height estimation unit 134 determines whether the turn has been completed (S38). Specifically, it determines whether the component mounting process (FIG. 29) has been completed.

[0204] When it is determined that the turn has ended (Yes in S38), the mounting point height estimation unit 134 determines whether or not the heights of all the specified mounting points have been acquired (S39). In the example shown in Fig. 19, when the mounting point heights (measured values) 152 for the first to ninth mounting points in the mounting order have been acquired, it is determined that the heights of all the mounting points have been acquired (Yes in S39), and the process proceeds to step S40.

[0205] In this embodiment, the first to sixth mounting point heights (measured values) 152 have been acquired when the first turn is completed, so even if it is determined that the first turn is completed in the flow of Fig. 31, it is determined that the heights of all the specified mounting points have not been acquired (NO in S39), so the processing from S40 onwards is not executed. After that, when the second turn is completed and the first to ninth mounting point heights (measured values) 152 have been acquired (YES in S39), the processing from S40 onwards is executed.

[0206] The mounting point height estimation unit 134 calculates the board shape (S40). Specifically, the mounting point heights (measured values) 152 for a plurality of specified mounting points are acquired (arrow (G) in FIG. 25), and the overall shape of the board 2 is calculated based on the acquired mounting point heights (measured values) 152. In the first embodiment, "surface correction" is used when calculating the board shape. For example, a method such as that disclosed in Japanese Patent Application Laid-Open No. 2019-61989 may be used as the method of surface correction. Not limited to surface correction, any calculation method capable of calculating the overall shape of the board 2 may be used. By calculating the overall shape of the board 2, the height at any position on the board 2 can be calculated.

[0207] Fig. 32 is a schematic front view showing a state in which nine designated mounting points 172 are designated from among a plurality of mounting points 170 on the board 2. As shown in Fig. 32, a plurality of reference marks 174 are provided at the corners of the board 2, and are used by the first recognition unit 154 to recognize the position of the board 2 based on the image captured by the head camera 16 described above.

[0208] 32, multiple designated mounting points 172 are evenly distributed and arranged. This can improve the calculation accuracy when calculating the board shape by surface correction. The more the number of designated mounting points 172 increases, the more accurate the calculation of the board shape becomes, so by providing a total of nine designated mounting points 172, the calculation accuracy can be further improved.

[0209] Fig. 33 is a schematic front view showing an example in which a board 176 has a plurality of divided boards 178. In the example shown in Fig. 33, the board 176 has four divided boards 178, and nine designated mounting points 180 are specified for each of the divided boards 178. In such a case, by calculating the board shape for each of the divided boards 178, the overall shape of the board 176 can be calculated with higher accuracy.

[0210] The mounting point height estimation unit 134 calculates the heights of the other mounting points (S41). Specifically, the mounting point height estimation unit 134 calculates the estimated heights of the other mounting points that are not designated as the designated mounting points, based on the shape of the board 2 calculated in step S40. In other words, the heights of the mounting points on which the component P is not mounted are estimated.

[0211] The mounting point height estimator 134 updates the mounting point data (Z1) (S42). Specifically, the mounting point height estimator 134 updates the value of Z1 in the mounting point data 148 based on the estimated height of the mounting point calculated in step S41 (arrow (6) in FIG. 25). Then, the flow shown in FIG. 31 ends. In the first embodiment, after the second turn ends, the mounting point height estimator 134 executes height estimation processing for mounting points other than the designated mounting point, and the mounting point data (Z1) is updated. That is, it is updated to a value that reflects the actual deformation of the board 2. Therefore, for the third turn and onwards, the target height (Z2) is calculated using the updated mounting point data (Z1), so that the height of the mounting nozzle 40 during component mounting can be appropriately controlled to realize high-quality component mounting with fewer mounting errors of the components P and fewer positional deviations after mounting.

[0212] Next, the component mounting process after components P have been mounted on all the designated mounting points will be described with reference to Fig. 29. In the first embodiment, component mounting on mounting points other than the designated mounting points starts from the third turn (the tenth mounting point or later). In the flow shown in Fig. 29, it is determined that the mounting point is not the designated mounting point (NO in S29), and the process proceeds to step S32. The mounting operation execution unit 126 lowers the mounting nozzle 40 (S32), and determines whether the mounting nozzle 40 has reached the target height (Z2) (S33).

[0213] When steps S32 and S33 are taken, contact detection (S31) of the component P is not performed as when the designated mounting point is determined, and therefore the mounting nozzle 40 can be lowered at high speed toward the target height (Z2). In other words, after the mounting point height estimation process is performed, the mounting nozzle 40 can be lowered at high speed to mount the component P, improving productivity.

[0214] If the mounting point is a designated mounting point (YES in S29), the mounting nozzle 40 is lowered at a low speed (S30) to detect contact between the component P and the board 2 (S31). On the other hand, if the mounting point is not a designated mounting point (NO in S29), the target height (Z2) of the mounting point has been calculated by the mounting point height estimation process, so the mounting nozzle 40 can be lowered at high speed toward the target height (Z2) (S32, S33). In either case, the mounting nozzle 40 can be lowered to a position where the component P contacts the board 2, as shown in FIG. 30B, and the component P can be mounted on the mounting point on the board 2.

[0215] 26, in the working area A, the mounting head 14 mounts components P on the board 2 in each turn. As described above, in the first and second turns, the mounting nozzle 40 is lowered at a slow speed in order to mount components P accompanied by contact detection, whereas in the third turn and thereafter, the mounting nozzle 40 is lowered at a high speed in order to lower the component P to a target height based on an estimated mounting point height, thereby improving the processing speed.

[0216] The calculation of the target position (X2, Y2, Z2, θ2) by the target position calculation unit 136 described above can be performed while the mounting head 14 picks up the component P on the relay stage 26 and moves to the work area A. This can improve the work efficiency.

[0217] As shown in Figure 26, the take-out head 12 repeatedly performs a take-out operation to take out micro-components from the first component supply unit 6, a transport operation to transport the taken-out micro-components all at once to the relay stage 26, a placement operation to place the micro-components on the relay stage 26, and a return operation to the first component supply unit 6.

[0218] Similarly, the mounting head 14 repeatedly performs, for each turn, a moving operation of moving from the work area A to the relay stage 26, a picking up operation of picking up micro-components placed on the relay stage 26, a transport operation of transporting the picked-up micro-components all at once to the work area A, and a mounting operation of mounting the micro-components on the substrate 2 in the work area A.

[0219] In the first embodiment, the number of take-out nozzles 36 in the take-out head 12 is greater than the number of mounting nozzles 40 in the mounting head 14, and the number of micro components that can be transported to the relay stage 26 at once can also be increased. In particular, in the first embodiment, the number of take-out nozzles 36 (16) is twice the number of mounting nozzles 40 (8), and as shown in Fig. 26, for example, the take-out head 12 can be controlled to perform two turns of work while the mounting head 14 performs one turn of work. This can improve work efficiency.

[0220] In the example shown in FIG. 26, the sixth turn of the mounting head 14 includes a turn in which the mounting head 14 picks up a component P (small or medium-sized component) from the second component supply unit 8 or the third component supply unit 10 on the REAR side instead of the first component supply unit 6 on the FRONT side and mounts it on the board 2. The mounting head 14 picks up the component P from the component supply units 8 and 10, moves above the component camera 32, captures an image of the component P with the component camera 32, and recognizes the component, and then moves to the working area A. In the working area A, a mounting operation for mounting the component P on the mounting point of the board 2 is sequentially performed for each mounting nozzle 40, as in the case of a minute component. The target position of the mounting nozzle 40 in the mounting operation is determined using the value of mounting point data 148 based on the initial value of the mounting program 138, and the mounting nozzle 40 is lowered at high speed to mount the component P on the board 2.

[0221] As described above, component mounting can be performed while switching between the component supply units 6, 8, and 10 that supply the components P on a turn-by-turn basis.

[0222] (Action / Effect 1) As described above, the component mounting device 1 of embodiment 1 is a component mounting device that picks up components P from the first component supply unit 6 and mounts them on the board 2, and is equipped with an intermediate stage 26 on which multiple components P can be placed, a removal head 12 (first component transfer section) that picks up components P from the first component supply unit 6 and transfers them to the intermediate stage 26, an intermediate stage camera 28 that images the multiple components P on the intermediate stage 26 to obtain a first image, a mounting head 14 (second component transfer section) that has multiple mounting nozzles 40 that hold the components P and picks up the components P on the intermediate stage 26 with the mounting nozzles 40 and mounts them on the board 2, and a control unit 35. The control unit 35 performs pre-pickup component recognition (first component recognition) to recognize multiple components P on the relay stage 26 using the first image, controls the mounting head 14 to use the results of the pre-pickup component recognition to sequentially perform a pick-up operation for each mounting nozzle 40, aligning the mounting nozzle 40 with the component P on the relay stage 26 and picking up the component P, performs a transport operation to move the mounting nozzle 40 that has picked up the component P above the board 2, and sequentially performs a mounting operation for each mounting nozzle 40, mounting the component P held by the mounting nozzle 40 to a mounting point on the board 2.

[0223] Moreover, the component mounting method of embodiment 1 is a component mounting method for taking a component P from the first component supply unit 6 and mounting it on the board 2, in which the control unit 35 controls the take-out head 12 to take a component P from the first component supply unit 6 and transfer it to the relay stage 26, the control unit 35 controls the relay stage camera 28 to capture an image of the multiple components P on the relay stage 26 to obtain a first image, the control unit 35 performs pre-pickup component recognition for recognizing the multiple components P on the relay stage 26 using the first image, the control unit 35 controls the mounting head 14 having multiple mounting nozzles 40 to sequentially perform a pick-up operation for aligning the mounting nozzle 40 with the component P on the relay stage 26 using the result of the pre-pick-up component recognition and picking up the component P for each mounting nozzle 40, a transport operation is performed to move the mounting nozzle 40 that has picked up the component P above the board 2, and a mounting operation is sequentially performed for each mounting nozzle 40 to mount the component P held by the mounting nozzle 40 on a mounting point of the board 2.

[0224] According to such an apparatus / method, by aligning the mounting nozzle 40 with the component P on the relay stage 26 and then holding the component P, the component P can be mounted on the board 2 with its posture stabilized, realizing higher quality component mounting. In addition, even when holding a very small component as the component P, the area of ​​the component P that protrudes from the holding surface of the mounting nozzle 40 can be reduced, making it suitable for "close adjacent mounting" in which the components P are mounted on the board 2 with close spacing between them as shown in Figs. 34A and 34B. Furthermore, since multiple components P on the relay stage 26 are imaged and recognized at the same time, the operation of picking up the components P by the multiple mounting nozzles 40 can be efficiently performed.

[0225] Moreover, according to the component mounting device / component mounting method of the first embodiment, the control unit 35 further includes a second recognition unit 156 (component recognition unit) that recognizes the component P based on an image captured by the relay stage camera 28, and the control unit 35 controls the mounting nozzle 40 to align the center of the lower end face of the mounting nozzle 40 with the center of the component P recognized by the second recognition unit 156 and pick up the component P. As a result, the component P is picked up by aligning the center of the lower end face of the mounting nozzle 40 with the center of the component P, so that the component P can be held in a stable attitude by the mounting nozzle 40, and the movement of the mounting nozzle 40 is prevented from disturbing the attitude of the component P, and the component P can be mounted in an appropriate attitude on the mounting point. This is particularly effective when mounting small components.

[0226] Furthermore, according to the component mounting device / component mounting method of embodiment 1, the relay stage 26 has a temporary placement section 70 on which the component P is placed, the temporary placement section 70 allows the component P to be seen from below, and the relay stage camera 28 is disposed below the temporary placement section 70. This allows the relay stage camera 28 to be disposed below the temporary placement section 70 and capture an image of the component P without interfering with the movement of the take-out head 12. Furthermore, the take-out head 12 does not interfere with the capture of the component P.

[0227] Moreover, according to the component mounting device / component mounting method of the first embodiment, a plurality of relay stage cameras 28 are provided, and the first image is acquired by the plurality of relay stage cameras 28. This allows the area of ​​the temporary placement section 70 to be large, and the mounting work of many components P can be efficiently performed.

[0228] Moreover, according to the component mounting device / component mounting method of the first embodiment, the control unit 35 further controls the relay stage camera 28 to capture an image of the component P held by the mounting nozzle 40 to obtain a second image. As a result, by using the same relay stage camera 28 to capture an image of the component P after picking up, it is not necessary to capture an image of the component P after picking up with a component recognition camera separate from the relay stage camera 28, and it is not necessary for the mounting nozzle 40 to move above the component camera 32. This makes it possible to eliminate unnecessary operations and achieve highly productive component mounting.

[0229] Moreover, according to the component mounting device / component mounting method of embodiment 1, the control unit 35 further uses the second image to execute post-pickup component recognition for recognizing the component P held by the mounting nozzle 40, and calculates a target position for mounting the component P on the mounting point in the mounting operation using the result of the post-pickup component recognition. This makes it possible to improve the mounting accuracy of the component P, and to achieve component mounting with fewer mounting errors and close-adjacent mounting.

[0230] Furthermore, according to the component mounting device / component mounting method of embodiment 1, in the transport operation, the control unit 35 moves the multiple mounting nozzles 40, each holding a component P, above the board 2 to transport the multiple components P collectively. This allows the multiple components P to be transported collectively from the relay stage 26 to above the board 2, thereby improving the efficiency of the component mounting operation.

[0231] According to the component mounting device / component mounting method of the first embodiment, the take-out head 12 includes a plurality of take-out nozzles 36, and the control unit 35 controls the take-out head 12 to sequentially perform a take-out operation for taking out the components P from the first component supply unit 6 with the take-out nozzles 36 for each take-out nozzle 36, perform a transport operation for transporting the plurality of take-out nozzles 36 above the relay stage 26 while the plurality of components P are held by the plurality of take-out nozzles 36, and perform a placing operation for placing the components P held by the take-out nozzles 36 on the relay stage 26 for each take-out nozzle 36, in sequence. In this way, the plurality of components P can be transported collectively from the first component supply unit 6 to the relay stage 26, thereby improving the efficiency of the component mounting operation.

[0232] Furthermore, according to the component mounting device / component mounting method of embodiment 1, the number of take-out nozzles 36 in the take-out head 12 is greater than the number of mounting nozzles 40 in the mounting head 14. As a result, a greater number of components P can be transferred to the relay stage 26 in one batch transport by the take-out head 12 than in one batch transport by the mounting head 14, improving the efficiency of component mounting work.

[0233] Furthermore, according to the component mounting device / component mounting method of the first embodiment, the arrangement pitch of the take-out nozzles 36 in the take-out head 12 is the same as or 1 / n (n is an integer equal to or greater than 1) the arrangement pitch of the mounting nozzles 40 in the mounting head 14. This can improve the efficiency of component mounting operations.

[0234] Furthermore, according to the component mounting device / component mounting method of the first embodiment, the number of take-out nozzles 36 in the take-out head 12 (16 nozzles) is twice the number of mounting nozzles 40 in the mounting head 14 (8 nozzles). As a result, for example, in one batch transport of the take-out head 12, the components P from two or more batch transports of the mounting head can be transferred to the relay stage 26, thereby improving the efficiency of component mounting work. Note that the number of take-out nozzles 36 is not limited to twice the number of the mounting nozzles 40, and may be more than twice as many.

[0235] (Action / Effect 2) As described above, the component mounting device 1 of embodiment 1 is a component mounting device that mounts a component P at a mounting point of the substrate 2, and includes a mounting nozzle 40 that holds the component P and mounts it on the substrate 2, a servo motor 56 (motor) that raises and lowers the mounting nozzle 40, a height detection unit 120 (mounting nozzle height detection unit) that detects the height of the mounting nozzle 40, an intermediate stage 26 having a mounting surface 71 (first reference surface), a backup pin 98 (substrate holding unit 99) that holds the substrate 2 brought into the work area A, a substrate pressing member 95 provided in the work area A and having an upper surface 95A (second reference surface), and a control unit 35. The control unit 35 includes a reference height setting unit 130 which sets a first reference height H1 based on the height detected by the height detection unit 120 when the lower end surface of the mounting nozzle 40 is brought into contact with the placement surface 71 of the intermediate stage 26, and which sets a second reference height H2 based on the height detected by the height detection unit 120 when the lower end surface of the mounting nozzle 40 is brought into contact with the upper surface 95A of the board pressing member 95; and a reference height setting unit 130 which sets a second reference height H2 based on the height detected by the height detection unit 120 when the component P is sandwiched between the placement surface 71 and the lower end surface of the mounting nozzle 40 and the first reference height H1. the mounting point height storage unit 148 storing the height of the mounting point of the board 2 held in the work area A; a target position calculation unit 136 calculating a target height (Z2) for lowering the mounting nozzle 40 holding the component P toward the mounting point based on the height of the mounting point stored in the mounting point data 148, the thickness of the component P measured by the component thickness measurement unit 128, and a second reference height H2; and a motor control unit 112 controlling the servo motor 56 based on the target height (Z2).

[0236] The component mounting method of the first embodiment is a component mounting method for mounting a component P on a mounting point of a board 2, in which the controller 35 controls the mounting nozzle 40 that holds the component P to bring the lower end surface of the mounting nozzle 40 into contact with the placement surface 71 of the intermediate stage 26, and sets a first reference height H1 from the height detected by a height detection unit 120 that can detect the height of the mounting nozzle 40, controls the mounting nozzle 40 to bring the lower end surface of the mounting nozzle 40 into contact with an upper surface 95A of a board pressing member 95 provided in a working area A of the board 2, and sets a second reference height H2 from the height detected by the height detection unit 120, and Then, the mounting nozzle 40 is controlled to sandwich the component P between the placement surface 71 and the lower end surface of the mounting nozzle 40, and the thickness of the component P is calculated based on the height detected by the height detection unit 120 and the first reference height H1. The control unit 35 calculates a target height (Z2) for lowering the mounting nozzle 40 holding the component P toward the mounting point based on the calculated thickness of the component P, the height of the mounting point stored in the mounting point data 138, and the second reference height H2. The control unit 35 controls the servo motor 56 that raises and lowers the mounting nozzle 40 based on the target height (Z2), thereby lowering the mounting nozzle 40 toward the mounting point.

[0237] According to such an apparatus / method, the thickness of the component P can be measured by utilizing the height detection function of the mounting nozzle 40, eliminating the need for a dedicated measuring device for measuring the thickness of the component, making it possible to reduce the size and weight of the mounting head 40, thereby realizing a highly productive component mounting apparatus 1.

[0238] Furthermore, according to the component mounting device / component mounting method of embodiment 1, the mounting nozzles 40 are replaceably attached to the shaft 42 which is driven to move up and down by the servo motor 56, and the reference height setting unit 130 sets a first reference height H1 and a second reference height H2 for each mounting nozzle 40. In this way, by setting the first reference height H1 and the second reference height H2 for each mounting nozzle 40, it is possible to perform component thickness measurement and component mounting without being affected by individual differences in the mounting nozzles 40.

[0239] Moreover, according to the component mounting device / component mounting method of embodiment 1, a plurality of mounting nozzles 40 are provided and are replaceably attached to each of a plurality of shafts 42 that are driven to move up and down by a servo motor 56, and the reference height setting unit 130 sets a first reference height H1 and a second reference height H2 for each combination of the mounting nozzle 40 and the shaft 42. By setting the first reference height H1 and the second reference height H2 for each combination of the mounting nozzle 40 and the shaft 42, it is possible to perform component thickness measurement and component mounting without being affected by individual differences in the mounting nozzle 40 or the shaft 42.

[0240] Furthermore, according to the component mounting device / component mounting method of embodiment 1, component thickness measurement unit 128 measures the thickness of component P based on the height detected by height detection unit 120 when mounting nozzle 40 picks up component P placed on mounting surface 71, and target position calculation unit 136 calculates target height (Z2) while mounting nozzle 40 moves from picking up component P to working area A. This makes it possible to measure the component thickness and calculate target height (Z2) during a series of operations from picking up component P to mounting.

[0241] Furthermore, according to the component mounting device / component mounting method of the first embodiment, the component thickness measuring unit 128 measures the thickness of the component P based on the value indicating the lowest point (minimum value) among the values ​​detected by the height detecting unit 120 during a predetermined period immediately before the mounting nozzle 40 that picked up the component P leaves the mounting surface 71. This allows the thickness of the component P to be measured more accurately by using the minimum value during the period that is less susceptible to the impact at the time of picking up the component P.

[0242] Moreover, according to the component mounting device / component mounting method of embodiment 1, the device further includes a relay stage camera 28 that captures an image of the component P placed on the placement surface 71, and the control unit 35 further includes a second recognition unit 156 (component recognition unit) that recognizes the component P based on the image captured by the relay stage camera 28, and the control unit 35 controls the mounting nozzle 40 to align the center of the lower end face of the mounting nozzle 40 with the center of the component P recognized by the second recognition unit 156 and pick up the component P. As a result, the thickness of the component P can be measured more accurately because the center of the lower end face of the mounting nozzle 40 is aligned with the center of the component P and the component P is picked up.

[0243] Moreover, according to the component mounting device / component mounting method of the first embodiment, the first reference member having the first reference surface is the relay stage 26 on which the component P supplied from the first component supply unit 6 is temporarily placed. Thus, by providing the relay stage 26, the component P can be temporarily placed before being mounted on the board 2.

[0244] According to the component mounting device / component mounting method of the first embodiment, the second reference member having the second reference surface is substrate holding member 95 which holds down from above substrate 2 supported from below by backup pins 98 to position it. This makes it possible to use substrate holding member 95 as a reference member for setting second reference height H2.

[0245] (Action / Effect 3) As described above, the component mounting device 1 of embodiment 1 is a component mounting device that mounts a component P at a mounting point of a board 2 brought into the work area A, and is equipped with a mounting nozzle 40 that holds the component P and mounts it on the board 2, a servo motor 56 that raises and lowers the mounting nozzle 40, a height detection unit 120 (mounting nozzle height detection unit) that detects the height of the mounting nozzle 40, and a control unit 35. The control unit 35 includes a mounting point height measurement unit 132 that measures the height of the mounting point based on the height of the mounting nozzle 40 detected by the height detection unit 120 when the mounting nozzle 40 holding the component P mounts the component P at the mounting point and the thickness of the component P, a mounting point height estimation unit 134 that calculates an estimated height of a mounting point on which the component P is not mounted based on the heights of the multiple mounting points measured by the mounting point height measurement unit 132, a target position calculation unit that calculates a target height (Z2) for lowering the mounting nozzle 40 holding the component P toward the mounting point based on the estimated height of the mounting point and the thickness of the component P to be mounted at the mounting point, and a motor control unit 112 that controls the servo motor 56 based on the target height (Z2).

[0246] Moreover, the component mounting method of embodiment 1 is a component mounting method for mounting a component P on a mounting point of a board 2 brought into working area A, in which the control unit 35 controls the mounting nozzle 40 holding the component P to mount the component P on the mounting point of the board 2, the control unit 35 uses a height detection unit 120 that detects the height of the mounting nozzle 40 to measure the height of the mounting point based on the height of the mounting nozzle 40 detected by the height detection unit 120 when the mounting nozzle 40 mounts the component P on the mounting point and the thickness of the component P, the control unit 35 calculates an estimated height of a mounting point on which no component P is mounted based on the measured heights of the multiple mounting points, the control unit 35 calculates a target height (Z2) for lowering the mounting nozzle 40 holding the component P toward the mounting point based on the estimated height of the mounting point and the thickness of the component P to be mounted on the mounting point, and the control unit 35 controls a servo motor 56 that raises and lowers the mounting nozzle 40 based on the target height (Z2) to lower the mounting nozzle 40 toward the mounting point.

[0247] According to such an apparatus / method, the height information of the mounting point measured when the mounting nozzle 40 mounts the component P on the mounting point is used to estimate the height of other mounting points where the component P is not mounted, so that the component mounting can be performed using the estimated height and a dedicated measuring device for measuring the height of the mounting point is not required. This makes it possible to simplify the component mounting apparatus 1 while improving work efficiency.

[0248] According to the component mounting device / component mounting method of the first embodiment, the relay stage 26 having the mounting surface 71 as a reference surface is further provided. The control unit 35 further includes a reference height setting unit 130 for setting a first reference height H1 based on a height detected by the height detection unit 120 when the lower end surface of the mounting nozzle 40 is brought into contact with the mounting surface 71, and a component thickness measurement unit 128 for measuring the thickness of the component P based on the height detected by the height detection unit 120 when the component P is sandwiched between the mounting surface 71 and the lower end surface of the mounting nozzle 40 and the reference height, and the mounting point height measurement unit 132 measures the height of the mounting point using the thickness of the component P measured by the component thickness measurement unit 128. Thus, by measuring the thickness of the component P using the relay stage 26 in which the first reference height H1 is set, the height of the mounting point can be measured with high accuracy even when there is variation in the thickness of the component P. This improves the reliability of the estimated height of the mounting point calculated by the mounting point height estimation unit 134, and enables highly reliable component mounting.

[0249] Furthermore, according to the component mounting device / component mounting method of embodiment 1, the component thickness measurement unit 128 calculates the thickness of the component P based on the height detected by the height detection unit 120 when the component P placed on the mounting surface 71 is picked up by the mounting nozzle 40. This makes it possible to execute component thickness measurement and target height calculation during a series of operations from picking up the component P to mounting it.

[0250] Furthermore, according to the component mounting device / component mounting method of embodiment 1, some of the mounting points 170 are set as a plurality of designated mounting points 172 for the mounting point height estimating unit 134 to calculate an estimated height, and the mounting point height estimating unit 134 calculates an estimated height of the mounting point 170 at which the component P is not mounted, based on the height obtained from the plurality of designated mounting points 172. As a result, by setting the designated mounting point 172 in advance, the optimal mounting point 170 can be set as the designated mounting point 172, and the reliability of the estimated height of the mounting point 170 calculated by the mounting point height estimating unit 134 is improved.

[0251] Moreover, according to the component mounting device / component mounting method of the first embodiment, the motor control unit 112 has a contact detection unit 118 that detects that the component P or the mounting nozzle 40 has come into contact with the mounting point 170, and the control unit 35 controls the mounting nozzle 40 to descend until the contact detection unit 118 detects contact when mounting the component P at the mounting point 170 set as the designated mounting point 172, and controls the mounting nozzle 40 to descend until it reaches the target height (Z2) calculated by the target position calculation unit 136 when mounting the component P at a mounting point 170 other than the designated mounting point 172. As a result, the mounting time of the component P is shortened at the mounting points 170 other than the designated mounting point 172, thereby improving productivity.

[0252] Moreover, according to the component mounting device / component mounting method of the first embodiment, the board 176 includes a plurality of divided boards 178, and a plurality of designated mounting points 180 are set for each divided board 178. As a result, even if the board 176 includes a plurality of divided boards 178, by setting a plurality of designated mounting points 180 for each divided board 178, it is possible to accurately calculate the estimated height of the mounting points over the entire board 176.

[0253] Furthermore, according to the component mounting device / component mounting method of the first embodiment, the designated mounting points 172, 204 are set to nine or more mounting points. This makes it possible to calculate the estimated height of the mounting points with high accuracy.

[0254] (Embodiment 2) A component mounting device and a component mounting method using the same according to a second embodiment of the present invention will be described. Note that in the second embodiment, differences from the first embodiment will be mainly described, and descriptions overlapping with the first embodiment will be omitted.

[0255] The second embodiment differs from the first embodiment in that height measurements are also performed on mounting points other than the designated mounting points, and the estimated height of the board 2 is updated using the newly obtained height information on the mounting points.

[0256] FIG. 35 is a flowchart relating to the component mounting process of the second embodiment.

[0257] 35, after steps S27 and S28 are executed as in the first embodiment, component mounting with contact detection is performed (S130, S131) ​​without judging whether the mounting point is a designated mounting point (S29). The control unit 35 starts lowering the mounting nozzle 40 (S130) regardless of whether the mounting point is a designated mounting point, and judges whether contact of the mounting nozzle 40 is detected (S131). Steps S130 and S131 are the same processes as steps S30 and S31 in the first embodiment, respectively.

[0258] According to the above method, it is possible to calculate the mounting point height by contact detection even for mounting points that are not designated as specified mounting points (S36), and it is possible to update the estimated mounting point height results.

[0259] FIG. 36 is a flowchart relating to the mounting point height estimation process of the second embodiment.

[0260] 36, steps S38 to S42 similar to those in the first embodiment are executed, and then step S143 is executed. Specifically, the control unit 35 determines whether or not to update the next turn as well (S143). If it is determined that the next turn will also be updated (YES in S143), steps S38 to S42 are executed again, and the mounting point data 148 (Z1) is updated for the next turn as well (S42).

[0261] The determination of whether to update in step S143 may be, for example, by setting a threshold for the number of updates, and determining that the next turn will also be updated if the number of updates is equal to or less than the threshold (YES in S143), and determining that the next turn will not be updated if the number of updates is greater than the threshold (NO in S143). Alternatively, if components P have not been mounted on all mounting points handled by component mounting device 1, it may be determined that the next turn will also be updated (YES in S143), and if components P have been mounted on all mounting points handled by component mounting device 1, it may be determined that the next turn will also not be updated (NO in S143).

[0262] According to the above flow, as long as it is determined in step S143 that the next turn should also be updated, the mounting point heights newly obtained in step S36 of Fig. 35 are used to calculate the estimated heights of other mounting points for each turn (S41), and the mounting point data (Z1) can be continually updated (S42). As the number of mounted components P increases, the amount of source data for estimating the mounting point heights increases, and so by recalculating the estimated mounting point heights, the accuracy of the estimated mounting point heights can be improved.

[0263] On the other hand, if it is determined that the value will not be updated in the next turn either (NO in S143), the flow shown in Fig. 36 is terminated. When the flow shown in Fig. 36 is terminated, in the flow shown in Fig. 35, instead of the processes in steps S130 and S131, processes similar to steps S32 and S33 in the flow shown in Fig. 29 may be performed. This makes it possible to calculate the target height (Z2) based on a more accurate estimated height of the mounting point, while lowering the mounting nozzle 40 at high speed toward the target height (Z2), thereby enabling component mounting processing to be performed accurately and quickly.

[0264] 17, mounting point height measurement unit 132 also measures the heights of mounting points other than the designated mounting point, and mounting point height estimation unit 134 calculates estimated heights of the other mounting points using the height of the designated mounting point and the height of the newly measured mounting point. Mounting point height (measured value) 152 includes the measured value of the height of the designated mounting point as well as the measured value of the height of the mounting point other than the designated mounting point.

[0265] Furthermore, in the flow of data processing by the target position calculation unit 136 shown in FIG. 25, once the mounting point height estimation unit 134 has acquired the height of the specified mounting point, it can (6) perform mounting point height estimation processing for each turn and (5) update the mounting point data 148 (Z1).

[0266] As described above, according to the component mounting apparatus / component mounting method of the second embodiment, the mounting point height estimation unit 134 calculates the estimated height of a mounting point on which no component P is mounted, using the height of the new mounting point obtained by the mounting point height measurement unit 132, and updates the estimated height of the mounting point that has already been calculated. This makes it possible to improve the accuracy of the estimated height.

[0267] Next, various modified examples will be described with reference to FIGS.

[0268] Fig. 37 is a schematic plan view of a component mounting device 200 according to a modified example. The component mounting device 200 shown in Fig. 37 is mainly different from the first and second embodiments in that it includes two relay stages 228A and 228B, two take-out heads 212A and 212B, and two mounting heads 214A and 214B. As shown in Fig. 37, the XY table 217 includes a first X-axis beam 218A, a second X-axis beam 218B, a third X-axis beam 220A, and a fourth X-axis beam 220B. The first X-axis beam 218A supports the first take-out head 212A, the second X-axis beam 218B supports the second take-out head 212B, the third X-axis beam 220A supports the first mounting head 214A, and the fourth X-axis beam 220B supports the second mounting head 214B.

[0269] The first take-out head 212A, the first relay stage 228A, and the first placing head 214A are provided corresponding to the first component supplying unit 6. Similarly, the second take-out head 212B, the second relay stage 228B, and the second placing head 214B are provided corresponding to the second component supplying unit 8. With this configuration, it is also possible to cope with the case where the second component supplying unit 8 supplies micro-components in the same manner as the first component supplying unit 6.

[0270] Fig. 38 is a schematic plan view of a component mounting apparatus 300 according to another modified example. The component mounting apparatus 300 shown in Fig. 38 differs from the modified example shown in Fig. 37 mainly in that it has only one mounting head 314. As shown in Fig. 38, the XY table 317 has a first X-axis beam 218A, a second X-axis beam 218B, and a third X-axis beam 320 that supports the mounting head 314.

[0271] The first take-out head 212A, the first relay stage 228A and the mounting head 314 are provided corresponding to the first component supply unit 6, and the second take-out head 212B, the second relay stage 228B and the mounting head 314 are provided corresponding to the second component supply unit 8. The mounting head 314 can be used for both the component supply units 6 and 8.

[0272] Fig. 39 is a schematic plan view of a component mounting apparatus 400 according to yet another modified example. The component mounting apparatus 400 shown in Fig. 39 differs from the modified example shown in Fig. 38 mainly in that the component mounting apparatus 400 does not include a take-out head, but only includes one mounting head 314. As shown in Fig. 39, an XY table 417 includes a third X-axis beam 320 that supports the mounting head 314.

[0273] 39, a single mounting head 314 performs all of the following operations: taking out components P from component supply units 6 and 8, placing components P on relay stages 228A and 228B, picking up components P from relay stages 228A and 228B, and mounting components P on substrate 2. This allows the structure of component mounting device 400 to be simplified.

[0274] 40 is a perspective view showing a mounting head 514 according to yet another modified example. The mounting head 514 shown in FIG.

[0275] 40, the multiple mounting nozzles 540 and the multiple shafts 542 are arranged in an annular shape and are rotatable about a rotation axis G extending in the Z direction. In this manner, a rotary type mounting head 514 in which multiple mounting nozzles 540 are arranged in an annular shape may be used in place of the mounting head 14. The take-out head 12 may also be of a rotary type.

[0276] Fig. 41 is a schematic vertical cross-sectional view showing a relay stage 626 according to yet another modified example. The relay stage 626 shown in Fig. 41 includes a relay stage camera 628, a temporary placement section 670, a housing 674, lighting 680, and a diffusion plate 682.

[0277] In the modified example shown in Fig. 41, the relay stage camera 628 is provided above the temporary placement unit 670, not below it. The relay stage camera 628 is fixed with its imaging direction facing downward. The temporary placement unit 670 is made of a transparent plate, and light emitted by a light source 680 is diffused by a diffusion plate 682 and passes through the temporary placement unit 670, thereby illuminating the component P. The relay stage camera 628 images the component P in the temporary placement unit 670 located below at a timing when the take-out head 12 or the mounting head 14 is not above the temporary placement unit 670.

[0278] Although the present invention has been described above with reference to the above-mentioned first and second embodiments, the present invention is not limited to the above-mentioned first and second embodiments.

[0279] Although the present disclosure has been fully described in connection with the preferred embodiments with reference to the accompanying drawings, various modifications and alterations will be apparent to those skilled in the art. Such modifications and alterations should be understood to be included within the scope of the present disclosure as defined by the appended claims, unless they deviate from the scope of the present disclosure. In addition, changes in the combination and order of elements in each embodiment may be made without departing from the scope and spirit of the present disclosure.

[0280] Incidentally, by appropriately combining any of the various modified examples of the above embodiment, it is possible to obtain the effects of each of the modified examples. [Industrial Applicability]

[0281] The present invention is applicable to any component mounting device and component mounting method. [Explanation of symbols]

[0282] 1. Parts mounting equipment 2. Board 4. Board transport unit 5. Transport Conveyor 6 First parts supply unit 8 Second Parts Supply Unit 10 Third Parts Supply Unit 12 Extraction head 14 Mounting head 16 Head Camera 17 XY Table 18, 20 X-axis beam 22, 24 Y-axis table 26 Relay Stage 28 Broadcast Stage Camera 30 1st Parts Disposal Box 32 Parts Camera 34 2nd Parts Disposal Box 35 Control section 36 Extraction nozzle 38 Main body 40 Onboard nozzle 42 Shaft 44 Main body 46 Porous Materials 46A Bottom 48 Suction hole 50 Carrier Tape 52 Pocket 54 Suction hole 56 Servo Motor 57 Pulley 58 Toothed belt 59 θ-axis motor 60 Pulley 61 Linear motor 62 Encoder 63 Servo motor 64 Pulley 65 Toothed Belt 66 θ-axis motor 66A Output shaft 67 Pulley 68 Linear Motor 69 Encoder 70 Temporary Storage Section 71 Placement surface 74 Case 76 Parts Removal Brush 78 Brush drive mechanism 80 Lighting 82 Diffuser 84 Motor 86 Belt cover 88 Belt 90 Connection part 92 Slider 94 Guide 95 Board holding member 95A Top 95B Bottom 95M First measurement point 96 PCB Guide 97 Conveyor Belt 98 Backup pin 99 Board holding part 100 Head unit control section 101 Processing section 102 Main unit control section 103 Storage section 104 Extraction head control section 106 Mounting head control unit 108 Motor control unit 110 θ-axis motor control unit 112 Motor control unit 114 θ-axis motor control unit 116 Motor Driver 118 Contact detection unit 120 Height detection unit (mounted nozzle height detection unit) 122 Lowest point memory unit 124 Operational Command 126 Implementation Work Execution Department 128 Parts Thickness Measurement Unit 130 Reference height setting section 132 Mounting point height measurement unit 134 Mounting point height measurement unit 136 Target position calculation section 136A 1st calculation section 136B 2nd calculation section 138 On-board programs 140 Target position 142 Parts Data 144 Board Data 146 Reference Height Data 148 Mounting point data 150 Part thickness (measured value) 152 Mounting point height (measured value) 154 First Recognition Section 156 Second Recognition Section 158 Third Recognition Section 160 Motor Driver 168 Operation Command 170 mounting points 172 Designated mounting point 174 Reference Mark 176 PCB 178 Split Board 180 Designated mounting point 200 Parts mounting device 212A First Extraction Head 212B 2nd extraction head 214A 1st mounting head 214B 2nd Mounting Head 217 XY Table 218A 1st X-axis beam 218B 2nd X-axis beam 220A 3rd X-axis beam 220B 4th X-axis beam 228A 1st relay stage 228B 2nd Relay Stage 300 Parts Mounting Equipment 314 Mounting Head 317 XY Table 320 3rd X-axis beam 400 Parts Mounting Equipment 417 XY table 514 Mounting Head 516 Head Camera 540 Onboard Nozzle 542 Shaft 544 Main body 626 Relay Stage 628 Broadcast Stage Camera 670 Temporary Storage Section 674 Case 680 Lighting 682 Diffuser

Claims

1. A component mounting device that mounts components on mounting points of a board brought into a work area, a mounting nozzle that holds the component and mounts it on the board; A motor for raising and lowering the mounting nozzle; a mounting nozzle height detection unit for detecting the height of the mounting nozzle; A control unit; a stage having a reference surface; The control unit is a mounting point height measuring unit that measures a height of the mounting point based on a height of the mounting nozzle detected by the mounting nozzle height detecting unit when the mounting nozzle holding a component mounts the component on the mounting point and a thickness of the component; a mounting point height estimating unit that calculates an estimated height of a mounting point on which no component is mounted based on the heights of the plurality of mounting points measured by the mounting point height measuring unit; a target position calculation unit that calculates a target height for lowering the mounting nozzle holding a component toward the mounting point based on the estimated height of the mounting point and a thickness of the component to be mounted on the mounting point; a motor control unit that controls the motor based on the target height, The control unit further includes: a reference height setting unit that sets a reference height based on a height detected by the mounting nozzle height detection unit when a lower end surface of the mounting nozzle is brought into contact with the reference surface; a component thickness measuring unit that measures a thickness of the component based on a height detected by the mounting nozzle height detecting unit and the reference height when the component placed on the reference surface is sandwiched between the reference surface and the lower end surface of the mounting nozzle and picked up, the mounting point height measurement unit measures the height of the mounting point using the thickness of the component measured by the component thickness measurement unit; Parts mounting device.

2. the component thickness measuring unit measures the thickness of the component based on a value indicating the lowest point among values ​​detected by the mounting nozzle height detecting unit during a predetermined period immediately before the mounting nozzle that picked up the component leaves the reference surface; The component mounting device according to claim 1.

3. Further, a camera is provided for capturing an image of a component placed on the reference surface, The control unit further includes a component recognition unit that recognizes components using an image captured by the camera, the control unit controls the mounting nozzle to align a center of the lower end surface of the mounting nozzle toward a center of the component recognized by the component recognition unit and pick up the component.

3. The component mounting device according to claim 1 or 2.

4. some of the mounting points are set as a plurality of designated mounting points for the mounting point height estimator to calculate the estimated height; the mounting point height estimating unit calculates an estimated height of the mounting point on which no component is mounted, based on heights obtained from a plurality of the designated mounting points; 4. The component mounting device according to claim 1.

5. the motor control unit has a contact detection unit that detects when a component or the mounting nozzle comes into contact with a mounting point, the control unit controls the mounting nozzle to descend until the contact detection unit detects contact when a component is to be mounted at a mounting point set as the designated mounting point, and controls the mounting nozzle to descend until the mounting nozzle reaches the target height calculated by the target position calculation unit when a component is to be mounted at a mounting point other than the designated mounting point.

5. The component mounting device according to claim 4.

6. The substrate includes a plurality of divided substrates, and a plurality of designated mounting points are set for each of the divided substrates.

6. The component mounting device according to claim 4 or 5.

7. The designated mounting points are set to 9 or more mounting points.

7. The component mounting device according to claim 4, wherein the component mounting device is a component mounting device for mounting a component on a substrate.

8. the mounting point height estimating unit calculates an estimated height of a mounting point on which no component is mounted, using the new mounting point height obtained by the mounting point height measuring unit, and updates the already calculated estimated height of the mounting point.

8. The component mounting device according to claim 1.

9. A component mounting method for mounting components on mounting points of a board brought into a work area, comprising the steps of: the control unit sets a reference height based on the height detected by the mounting nozzle height detection unit when the lower end surface of the mounting nozzle is brought into contact with the reference surface of the stage; the control unit measures a thickness of the component based on a height detected by the mounting nozzle height detection unit and the reference height when the component placed on the reference surface is sandwiched between the reference surface and the lower end surface of the mounting nozzle and picked up; The control unit controls the mounting nozzle holding the component to mount the component on the mounting point of the board; using the mounting nozzle height detection unit, the control unit measures a height of the mounting point based on a height of the mounting nozzle detected by the mounting nozzle height detection unit when the mounting nozzle mounts a component on the mounting point and a measured thickness of the component; calculating an estimated height of a mounting point on which no component is mounted based on the measured heights of the mounting points by the control unit; calculating a target height for lowering the mounting nozzle holding a component toward the mounting point based on an estimated height of the mounting point and a thickness of the component to be mounted on the mounting point by the control unit; the control unit controls a motor that raises and lowers the mounting nozzle based on the target height, thereby lowering the mounting nozzle toward the mounting point. Parts mounting method.

10. measuring a thickness of the component based on a value indicating a lowest point among values ​​detected by the mounting nozzle height detection unit during a predetermined period immediately before the mounting nozzle that picked up the component leaves the reference surface; The component mounting method according to claim 9.

11. A camera is further provided for capturing an image of the component placed on the reference surface, moreover, The control unit recognizes parts using images captured by the camera, controlling the mounting nozzle by the control unit to align the center of the mounting nozzle toward the center of the recognized component and pick up the component; The component mounting method according to claim 9 or 10.

12. A part of the mounting points is set as a plurality of designated mounting points for calculating the estimated height; calculating an estimated height of the mounting point on which no component is mounted based on the heights obtained from the plurality of designated mounting points; 12. The component mounting method according to claim 9, wherein the component mounting method comprises the steps of:

13. The control unit includes a contact detection unit that detects when a component contacts a mounting point, When a component is to be mounted on a mounting point that is set as the designated mounting point, the mounting nozzle is controlled to be lowered until the contact detection unit detects contact, and when a component is to be mounted on a mounting point other than the designated mounting point, the mounting nozzle is controlled to be lowered until the target height is reached. The component mounting method according to claim 12.

14. The substrate is provided with a plurality of divided substrates, and a plurality of designated mounting points are set for each of the divided substrates. The component mounting method according to claim 12 or 13.

15. The specified mounting points are set to 9 or more mounting points.

15. The component mounting method according to claim 12,

16. moreover, the control unit calculates an estimated height of a mounting point on which no component is mounted based on the newly measured height of the mounting point, and updates the already calculated estimated height of the mounting point.

16. The component mounting method according to claim 9,

Citation Information

Patent Citations

  • Method for detecting warpage of substrate, and part- fitting method and device using the same

    JP2000269692A

  • Method for mounting electronic component

    JP2007109778A

  • Component mounting device

    JP2009135366A

  • Electronic component mounting device and electronic component mounting operation performing method

    JP2012094673A

  • Component thickness measurement method and component mounting device

    JP2017027989A